APO_SNP

download APO_SNP

of 23

Transcript of APO_SNP

  • 8/2/2019 APO_SNP

    1/23

    Supp ly Netw ork Plann ingc on SAP APO

    Josep Ramon Bonamusa,SAP Iberia

  • 8/2/2019 APO_SNP

    2/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 2

    APO Supply Ne t w ork Planning (SNP)

    Beneficios ClaveFunciones

    Mayor visibilidad sobre toda lacadena de suministro

    Optimizacin del aprovisionamientoy utilizacin de capacidades

    Tiempos menores para elcumplimiento de ordenes

    Reduccin de los niveles deinventario

    Nivel de servicio al cliente mejorado

    Integra compras, manufacturing,distribucin y transporte

    Considera restricciones ypenalizaciones para planificar el flujode productos a traves de la cadena desuministro

    Permite la planificacin con diversosniveles de detalle (planificacinagregada)

    Algoritmos heuristicos, basados enreglas o optimizacin

    Algoritmos para la planificacinavanzada de stocks de seguridad

    Calcula las cantidades a producir y entregar a los centros para cubrirlas demandas de los clientes y mantener los niveles de servicio.service levels.

  • 8/2/2019 APO_SNP

    3/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 3

    APO DP: Improves the forecast quality and

    planning accuracy

    APO SNP: Improves visibility across your global

    supply chain and lowers inventory

    APO PP/DS: Supports you in creating optimizedproduction plans

    APO gATP: Allows state-of-the-art sales order

    confirmation planning processes

    APO TP/VS: Optimizes transportation loads and

    minimizes transportation costs

    APO Alert Monitor: Powerful exception message

    system integrated in all APO planning modules

    Global Available-to-Promise

    Demand Planning

    Supply Network Planning

    Production Planning &Detailed Scheduling

    Advanced Planning & Optimization

    AlertMonitor

    Transportation Planning &Vehicle Scheduling

    Com o esta est ruc t urado APO?

  • 8/2/2019 APO_SNP

    4/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 4

    Supply Chain Ex ec ut ion & Supply ChainPlanning

    DatosMaestros

    Global Available-to-Promise

    Demand Planning

    Supply Network Planning

    Production Planning &Detailed Scheduling

    SAP APO

    AlertMonitor

    Supply Chain Planning

    Material Management (MM)

    Sales & Distribution Planning(SD)

    ERP

    CIF

    Supply Chain Execution

    Production Planning (PP)

    DatosTransactionales

    (real-time)

    Locations

    Products

    Resources

    BoM & Routings

    Master Data

    Transactional Data(real-time)

    Stock

    Production Orders

    Confirmation

    Goods Receipt

    Purchase Orders

    Sales Order

    (ERP to APO)

    Transactional Data(real-time)

    Planned Orders

    Stock Transfer Orders

    Order Conversion

    Sales Order confirmation

    (APO to ERP)

  • 8/2/2019 APO_SNP

    5/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 5

    El c i c lo de p lan i f icac in en SNP

    Sense&

    Respond

    Release SNP plan to PP/DSor execution system to

    perform detailed planning

    Release Forecasts from DPto SNP (incl. forecast

    consumption)Perform SNP planning run(Heuristic, Optimization,

    Capable-To-Match)

    Perform Deployment/TLB runto create the short-term

    distribution plan

    Check of planning results inInteractive Planning Table

    and Alert Monitor to resolveremaining issues

    Transfer results to executionsystem

    .. . Para t oda la supp ly c hain... Planes basados en c ostes o reg las

    ... Plani f ic ac in a m edio plazo

    .. . Basado en rest r ic c iones.. . Basado en ex c epc iones

    1

    3

    4

    56

    7

    Safety Stock

    Planning

    2

  • 8/2/2019 APO_SNP

    6/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 6

    Creacin de planes viables de compra, produccin y distribucinpara toda la supply chain

    Visibilidad sobre toda la supply chain

    Niveles de inventario optimizados mientras se cumplen losniveles de servicio requeridos

    Planificacin de requerimientos de materiales y capacidades enun solo proceso

    Algoritmos en base a heuristicas-, reglas- o costes para crearplanes viables o optimizados de acuerdo a las reglas y logicas delnegocio

    Planificacin basada en excepciones mediante alertas paraidentificar y resolver situaciones de sobrecarga de recursos,caducidades o pedidos retrasados

    .

    Benef ic ios de SAP APO SNP

  • 8/2/2019 APO_SNP

    7/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 7

    In terac t ive SNP Planning Book: SNP Plan (I )

    Navigation onproducts and

    locations

    Selection of planning bookand data view

    Interactive Planning Grid- Overall planning situation- Drill-Down options- SNP Heuristic and Optimizer- Deployment Heuristic and Optimizer

    Pre-defined Selections

    for an SNP planner

  • 8/2/2019 APO_SNP

    8/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 8

    In terac t ive SNP Planning Book: SNP Plan (I I ) Ex c ept ion based Planning

    SNP planner can alternatively also drill-down from the alert

    monitor to the application to solve the issue.

    Alerts for SupplyShortages

  • 8/2/2019 APO_SNP

    9/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 9

    Vist a de Capac idades

    Navigation onresources

    Alerts for resource load

    Visualization ofresource overload

    Planned productionorders on resource

  • 8/2/2019 APO_SNP

    10/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 10

    Algor i t m o: SNP Heur is t ic a

    Local DC

    30%

    70%

    40%

    60%

    SNP Heuristic is a heuristic without considering constraints inthe supply network.

    SNP Heuristic does the sourcing based on quota arrangementsand priorities.

    As additional planning step, Capacity Levelling can be

    performed in order to resolve capacity overloads.

    Planned StockTransfers

    Planned Production

    Orders

    Planned Purchase

    Requisitions

    Demands

    Demands

    100%100%

    Plant

    DC

    Supplier

  • 8/2/2019 APO_SNP

    11/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 11

    Algor i t m o: Capable-To-Mat c h (CTM)

    Local DC CTM planning uses a constraint-based heuristic planningapproach for the cross-supply-chain checks of capacities aswell as material availability.

    CTM considers predefined supply categories and demandpriorities.

    Planned Stock Transfers-> Transportation and Handling Capacities

    -> Quota Arrangements and Procurement Priority

    Planned Production Orders

    -> Production Capacities

    -> Priority of PPM/PDS

    Planned Purchase Requisitions

    -> Procurement Priorities

    Demands

    -> Priority Classes

    Demands

    -> Priority Classes

    Prio 2

    Prio 1Prio 1

    Prio 1

    Prio 2Prio 1

    Plant

    DC

    Supplier

  • 8/2/2019 APO_SNP

    12/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 12

    Algor i t m o: SNP Opt im izador

    Local DC

    $

    SNP Optimization is a cost-based optimization considering allcapacity constraints and material availability in the supplynetwork.

    SNP Optimization determines the optimal solution based onpredefined costs for supply alternatives and demands.

    Planned Stock Transfers-> Transportation and Handling Capacities

    -> Transportation Cost

    Planned Production Orders

    -> Production Capacities

    -> Production Costs

    Planned Purchase Requisitions

    -> Procurement Costs

    Demands

    -> Cost for

    - non deliveries

    - late deliveries$

    $

    $

    $$

    Plant

    DC

    Supplier

  • 8/2/2019 APO_SNP

    13/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 13

    Algor i t m o: SNP Opt im izer - Per f i les

    CostProfile

    Status ofOptimizer Run

    Solution Processand Costs

    ImportantMessages

    OptimizerProfile

    Activation of

    Constraints

    Usage ofLot Sizes

    Consideration ofSafety Stock

  • 8/2/2019 APO_SNP

    14/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 14

    Dist r ibut ion Planning: Deployment and TransportLoad Bui lder

    Deployment determines the best short-termsolution to allocate available supply to meetdemand and to replenish stocking locations.

    Deployment confirms or changes the supplynetwork plan depending and creates aoptimized plan for stock transfers

    The rules-based Deployment Heuristicdistributes the products according toquotations and priorities.

    The Deployment Optimizer distributes theproducts according to cost while also

    considering specific rules.

    Supply

    Supply

    Stock

    Stock

    Stock

    Demand

    The Transport Load Builder (TLB)groups deployment results for singleproducts (i.e. confirmed stocktransport purchase requisitions) tomulti product stock transport orders.

    The TLB considers factors likevolume, weight or number of pallets tofill transport vehicles optimal.

    Plant

    DC

  • 8/2/2019 APO_SNP

    15/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 15

    Feat ure: Safet y St oc k Planning

    Uncertainty of supply Uncertainty of demand

    DC

    Plant

    Use safety stock to safeguard the supply chain against negative effects ofuncertain influencing factors like:

    Errors in predicting customer demand

    Disruptions in production

    Fluctuations in transportation times Satisfy unexpected demands caused by these factors using an extra amount

    of material, intermediate products or end products.

    Usage of Advanced Safety Stock Planning methods in APO SNP todetermine optimal amount of safety stock for all location-products in thesupply chain based on service levels while considering demand and supplyuncertainties.

  • 8/2/2019 APO_SNP

    16/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 16

    Feat ure: Aggregat ed Planning

    Aggregated Planning allows users to perform a SNP run on an aggregated level, bydefining hierarchies for products, locations and production resources to be taken intoaccount by the SNP heuristic, SNP optimizer, and CTM (Capable to Match)

    A disaggregating logic is available to ensure that plans are consistent at all levels ofaggregation

    The User Interface offers extended drilldown options for displaying the planningresults

    Benefits

    Larger supply chain models can be planned

    Performance improvements by calculation on aggregation levels

    Simplified planning process

    Master data for aggregatedplanning can be transferredvia CIF from an SAP AFS(Apparel and FootwearSolution) to SAP APO

    SAP AFS CIF SAP APO

  • 8/2/2019 APO_SNP

    17/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 17

    Feat ure: Shelf L i fe in SNP

    Enable manufacturers to consider shelf life in the distribution of perishable goodssuch as food or pharmaceutical products

    Offer companies the possibility to consider shelf life issues with regard to specificproducts or demands in the supply chain

    Enable planners to ensure that products have a certain shelf life at their demanddate

    Enable planners to visualize and alert on shelf life data across the supply chain

    Demand A

    Demand B

    Demand C

    Demand D

    Stock

    Pegging

    Shelf life periodMaturat ion

    period

    Propagate shelf life data of demands (e.g.sales orders) across the supply chain

    Generate alerts for goods that will expire or forshelf life mismatches between demands andstocks

    Integrate shelf life data of purchase requisitionto SAP ERP and use shelf life data for furtherprocesses in ERP (purchase order, batchdetermination for delivery creation)

  • 8/2/2019 APO_SNP

    18/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 18

    Feature: Subcont ract ing in SNP

    Subcontractor Plant

    Components

    Finished Good

    In a subcontracting scenario the plant provides the subcontracting components to athird party, called the subcontractor. The subcontractor assembles the componentsand returns the finished product. Enable outsourcing of manufacturing facilities to a third party Consider subcontracting scheduling agreements as external procurementrelationships Plan the following for the subcontractors (vendor) location:

    Ordered finished products Subcontracting components

    Give access to information about subcontracting stock at subcontractor locations

  • 8/2/2019 APO_SNP

    19/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 19

    Algunos da t os sobre SAP APO

    Primera version SAP APO 1.1 (1998)

    Version actual: SAP APO 5.1 (8 version APO) parte de SCM 2007 - en

    ramp-up desde Agosto 2007 - mass shipment planificado para Q1/2008

    Siguiente versin planificada: SAP APO 7.0 (Inicio del ramp-up: Q4/2008)

    Numero de clientes APO : 1800

    Service marketplace for SCM: http://service.sap.com/scm

    http://help.sap.com/

    Informacion

    Datos sobre SAP APO

    http://service.sap.com/scmhttp://help.sap.com/http://help.sap.com/http://service.sap.com/scm
  • 8/2/2019 APO_SNP

    20/23

    SAP SCM Refer enc ias

  • 8/2/2019 APO_SNP

    21/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 21

    Analyst Quot es

    SAP Extends Its Vision for Supply Chain Management" 1

    As implementations of SAP Advanced Planner and Optimizer

    (APO) have increased, APOs strengths (and challenges) have

    become apparent.

    APO 5.0 is the most mature product in the mySAP SCMportfolio With APO 5.0, SAP has moved the investment towards

    innovation and new functionality

    Functionally, SAP is a good contender when companies are

    considering using SAP APO to power their ATP processes.

    1 White, et al., March 20, 2006 (Gartner)

  • 8/2/2019 APO_SNP

    22/23

    Para ms in formac in:

    Josep Ramon Bonam usa

    SAP Iberia

    Torre Diagonal MarC/ Josep pla,2 Planta 1308019 Barcelona

    T +34 93 483 35 00F +34 93 483 35 01

    [email protected]

    Experto en SolucionesGestin de la Cadena de Suministro (SCM)

    mailto:[email protected]:[email protected]
  • 8/2/2019 APO_SNP

    23/23

    SAP 2007 / SNP Overview, Dr. Gerald Heisig, 23

    Copyr ight 2007 SAP AGAl l r ights reserved

    No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changedwithout prior notice.

    Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

    SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, Duet, Business ByDesign, ByDesign, PartnerEdge and other SAP products and services mentioned herein as well as theirrespective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned andassociated logos displayed are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

    The information in this document is proprietary to SAP. This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This documentcontains only intended strategies, developments, and functionalities of the SAP product and is not intended to be binding upon SAP to any particular course of business, product strategy,and/or development. SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, orother items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties ofmerchantability, fitness for a particular purpose, or non-infringement.

    SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitationshall not apply in cases of intent or gross negligence.

    The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in thesematerials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relat ing to third-party Web pages

    Weitergabe und Vervielfltigung dieser Publikation oder von Teilen daraus sind, zu welchem Zweck und in welcher Form auch immer, ohne die ausdrckliche schriftliche Genehmigung durchSAP AG nicht gestattet. In dieser Publikation enthaltene Informationen knnen ohne vorherige Ankndigung gendert werden.

    Einige von der SAP AG und deren Vertriebspartnern vertriebene Softwareprodukte knnen Softwarekomponenten umfassen, die Eigentum anderer Softwarehersteller sind.

    SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, Duet, Business ByDesign, ByDesign, PartnerEdge und andere in diesem Dokument erwhnte SAP-Produkte und Servicessowie die dazugehrigen Logos sind Marken oder eingetragene Marken der SAP AG in Deutschland und in mehreren anderen Lndern weltweit. Alle anderen in diesem Dokument erwhntenNamen von Produkten und Services sowie die damit verbundenen Firmenlogos sind Marken der jeweiligen Unternehmen. Die Angaben im Text sind unverbindlich und dienen lediglich zuInformationszwecken. Produkte knnen lnderspezifische Unterschiede aufweisen.

    Die in diesem Dokument enthaltenen Informationen sind Eigentum von SAP. Dieses Dokument ist eine Vorabversion und unterliegt nicht Ihrer Lizenzvereinbarung oder einer anderenVereinbarung mit SAP. Dieses Dokument enthlt nur vorgesehene Strategien, Entwicklungen und Funktionen des SAP-Produkts und ist fr SAP nicht bindend, einen bestimmtenGeschftsweg, eine Produktstrategie bzw. -entwicklung einzuschlagen. SAP bernimmt keine Verantwortung fr Fehler oder Auslassungen in diesen Materialien. SAP garantiert nicht dieRichtigkeit oder Vollstndigkeit der Informationen, Texte, Grafiken, Links oder anderer in diesen Materialien enthaltenen Elemente. Diese Publikation wird ohne jegliche Gewhr, wederausdrcklich noch stillschweigend, bereitgestellt. Dies gilt u. a., aber nicht ausschlielich, hinsichtlich der Gewhrleistung der Marktgngigkeit und der Eignung fr einen bestimmten Zwecksowie fr die Gewhrleistung der Nichtverletzung geltenden Rechts.

    SAP bernimmt keine Haftung fr Schden jeglicher Art, einschlielich und ohne Einschrnkung fr direkte, spezielle, indirekte oder Folgeschden im Zusammenhang mit der Verwendungdieser Unterlagen. Diese Einschrnkung gilt nicht bei Vorsatz oder grober Fahrlssigkeit.

    Die gesetzliche Haftung bei Personenschden oder die Produkthaftung bleibt unberhrt. Die Informationen, auf die Sie mglicherweise ber die in diesem Material enthaltenen Hotlinkszugreifen, unterliegen nicht dem Einfluss von SAP, und SAP untersttzt nicht die Nutzung von Internetseiten Dritter durch Sie und gibt keinerlei Gewhrleistungen oder Zusagen berInternetseiten Dritter ab.

    Alle Rechte vorbehalten.