ENTIDAD: MTC-PROVIAS NACIONAL.
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA-SAN FRANCISCO
TRAMO 2: KM. 78+500-KM.172+420 ( SAN FRANCISCO ).
CONTRATISTA: CONSORCIO VIAL QUINUA.
SUPERVISOR: CONSORCIO SUPERVISOR LA QUINUA
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJE
REPLANTEO DE MUROS DE C.C. ZONA RURAL
PROYECTO REPLANTEO
PROG. FINAL km
1 79+340.000 79+365.000 25.00
79+340.000
79+345.000
79+350.000
79+355.000
79+360.000
2 80+347.000 80+366.000 19.00
80+345.000
80+350.000
80+355.000
80+360.000
3 80+645.000 80+671.000 26.00
80+645.000
80+650.000
80+655.000
80+660.000
80+665.000
80+668.000
4 82+174.000 82+186.000 12.00
82+174.000
82+179.000
82+182.500
5 83+231.000 83+259.000 28.00
83+231.000
83+236.000
83+241.000
83+246.000
83+251.000
83+256.000
6 84+986.500 85+003.000 16.50
84+982.000
84+985.000
84+988.500
84+993.500
7 85+116.000 85+120.000 4.00 85+116.000
85+118.000
8 95+241.000 95+264.000 23.00
95+241.000
95+246.000
No
LOG. PROYECTO (m)
ALTURA DE MURO (m) PROYECTO PROG. INICIAL
kmPROG.
INICIAL
8 95+241.000 95+264.000 23.00 95+251.000
95+256.000
95+261.000
9 95+430.000 95+446.000 16.00
95+430.000
95+435.000
95+439.500
95+442.500
10 95+461.000 95+477.000 16.00
95+461.000
95+465.000
95+469.000
95+473.000
11 95+552.000 95+562.000 10.00 95+552.000
95+557.000
12 95+775.000 95+802.000 27.00
95+775.000
95+780.000
95+785.000
95+790.000
95+795.000
95+800.000
13 95+808.000 95+827.000 19.00
95+812.000
95+817.000
95+822.000
95+827.000
14 95+894.000 95+918.000 24.00
95+894.000
95+899.000
95+904.000
95+909.000
95+914.000
15 95+992.000 96+001.000 9.00 95+992.000
95+997.000
16 97+005.000 97+011.000 6.00 97+005.000
17 99+250.000 99+263.000 13.00
99+250.000
99+255.000
99+260.000
18 101+300.000 101+315.000 15.00
101+299.540
101+302.540
101+307.540
101+309.540
101+312.540
19 102+088.000 102+095.000 7.00
20 102+525.000 102+534.000 9.00 102+530.000
102+533.000
21 103+422.000 103+431.000 9.00 103+420.000
21 103+422.000 103+431.000 9.00 103+424.000
22 103+800.000 103+812.000 12.00 103+797.000
103+802.000
23 104+949.000 104+951.000 2.00 104+949.000
104+951.000
24 105+205.000 105+231.000 26.00
105+200.000
105+205.000
105+210.000
105+215.000
105+220.000
25 105+570.000 105+576.000 6.00 105+570.000
105+573.000
26 106+384.000 106+391.000 7.00
106+385.000
106+387.000
106+390.000
27 106+444.000 106+459.000 15.00
106+444.000
106+447.000
106+450.000
106+453.000
106+456.000
28 109+647.000 109+657.000 10.00 109+655.000
109+660.000
29 109+793.000 109+804.000 11.00
109+793.000
109+797.000
109+801.000
109+805.000
30 109+838.000 109+843.000 5.00 109+835.000
31 112+912.000 112+924.000 12.00
112+915.000
112+918.000
112+924.000
32 117+007.000 117+026.000 19.00
117+007
117+012
117+017
117+022
33 118+992.000 119+007.000 15.00
118+994
118+999
119+004
34 121+020.000 121+030.000 10.00 121+024
121+029
35 121+105.000 121+110.000 5.00 121+101.5
36 121+502.000 121+510.000 8.00 121+502
121+506
37 122+633.000 122+658.000 25.00
122+630.000
37 122+633.000 122+658.000 25.00
122+635.000
122+640.000
122+645.000
122+650.000
38 125+285.000 125+296.000 11.00
125+285.000
125+290.000
125+294.000
39 125+338.000 125+348.000 10.00
125+338.000
125+343.000
125+346.000
40 125+863.000 125+875.000 12.00
125+870.000
125+874.000
125+878.000
41 126+739.000 126+752.000 13.00
126+739
126+744
126+748
42 130+659.000 130+662.000 3.00 130+659.000
43 132+014.000 132+059.000 45.00
132+014.000
132+018.000
132+022.000
132+027.000
132+032.000
132+037.000
132+042.000
132+047.000
44 142+489.000 142+529.000 40.00
142+479.000
142+484.000
142+489.000
142+494.000
142+499.000
142+504.000
142+509.000
142+514.000
45 142+625.000 142+655.000 30.00
MC.C 142+632.000
MC.A 142+635.000
MC.A 142+639.000
MC.A 142+647.000
MC.C 142+652.000
46 144+508.000 144+524.000 16.00
144+505.000
144+510.000
144+515.000
47 144+614.000 144+657.000 43.00
48 148+146.000 148+152.000 6.00 148+146.000
48 148+146.000 148+152.000 6.00 148+150.000
49 155+336.000 155+341.000 5.00 155+355.000
50 155+399.000 155+405.000 6.00 155+394.000
155+398.000
51 157+230.000 157+244.000 14.00
157+230.000
157+235.000
157+240.000
52 162+017.000 162+032.000 15.00
162+020.000
162+026.000
162+031.000
53
168+192.000 168+243.000 51.00
168+175.000
168+180.000
168+185.000
168+190.000
168+195.000
168+212.000 168+217.000 5.00
168+200.000
168+205.000
168+210.000
168+215.000
168+220.000
replanteado Y revisado pero desaprovado para nueva presentacionprogresivas de replanteo que varian del proyectoprogresivas de replanteo que varian del proyecto en presentacion_separados
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJE
REPLANTEO DE MUROS DE C.C. ZONA RURAL
REPLANTEO
OBSERVACIONAUTORIZACIONES DE TRABAJO
PROG. FINAL FECHA AUT. N° DE AUT.
79+345.000 5.00 1.50
Aprobado 5/27/2013 AUT. N° 56779+350.000 5.00 1.50
79+355.000 5.00 1.50
79+360.000 5.00 1.50
79+365.000 5.00 1.50
80+350.000 5.00 1.50
Aprobado80+355.000 5.00 1.50
80+360.000 5.00 1.50
80+364.000 4.00 1.50
80+650.000 5.00 1.50
Aprobado
80+655.000 5.00 1.50
80+660.000 5.00 1.50
80+665.000 5.00 1.50
80+668.000 3.00 1.50
80+671.000 3.00 1.50
82+179.000 5.00 1.50
Aprobado82+182.500 3.50 1.50
82+186.000 3.50 1.50
83+236.000 5.00 1.50
Aprobado
83+241.000 5.00 1.50
83+246.000 5.00 1.50
83+251.000 5.00 1.50
83+256.000 5.00 1.50
83+259.000 3.00 1.50
84+985.000 3.00 1.50
Aprobado 84+988.500 3.50 2.00
84+993.500 5.00 1.50
84+998.500 5.00 1.50
85+118.000 2.00 1.50 Aprobado
85+120.000 2.00 1.50
95+246.000 5.00 2.00
Aprobado 11/20/2012 AUT. N° 33795+251.000 5.00 2.00
LOG. REPLANTEO (m)
ALTURA DE MURO (m) REPLANTEO
95+256.000 5.00 2.00 Aprobado 11/20/2012 AUT. N° 33795+261.000 5.00 2.00
95+264.000 3.00 2.00
95+435.000 5.00 2.00
Aprobado 12/11/2012 AUT. N° 36795+439.500 4.50 2.00
95+442.500 3.00 3.50
95+446.000 3.50 2.00
95+465.000 4.00 2.00
Aprobado 12/11/2012 AUT. N° 36895+469.000 4.00 2.00
95+473.000 4.00 2.00
95+477.000 4.00 2.00
95+557.000 5.00 2.00 Aprobado
95+562.000 5.00 2.00
95+780.000 5.00 2.00
Aprobado 12/11/2012 AUT. N° 369
95+785.000 5.00 2.00
95+790.000 5.00 2.00
95+795.000 5.00 2.50
95+800.000 5.00 2.50
95+802.000 2.00 2.00
95+817.000 5.00 2.00
Aprobado 12/11/2012 AUT. N° 37095+822.000 5.00 2.00
95+827.000 5.00 2.00
95+831.000 4.00 2.00
95+899.000 5.00 2.50
Aprobado 1/22/2013 AUT. N° 38695+904.000 5.00 2.50
95+909.000 5.00 2.50
95+914.000 5.00 2.00
95+918.000 4.00 2.00
95+997.000 5.00 2.00 Aprobado 1/23/2013 AUT. N° 385
96+001.000 4.00 2.00
97+011.330 6.00 1.50 Aprobado 6/2/2013 AUT. N° 57399+255.000 5.00 1.50
Aprobado 6/2/2013 AUT. N° 57499+260.000 5.00 1.50
99+262.280 3.00 1.50
101+302.540 3.00 2.50
Aprobado 6/13/2013 AUT. N° 588101+307.540 5.00 3.00
101+309.540 2.00 3.00
101+312.540 3.00 3.00
101+315.000 2.00 2.50
102+533.000 3.00 1.50 Aprobado 6/13/2013 AUT. N° 589
102+539.000 6.00 2.00
103+424.000 4.00 1.50 Aprobado 6/13/2013 AUT. N° 590
103+429.180 5.00 1.50 Aprobado 6/13/2013 AUT. N° 590
103+802.000 5.00 2.00 Aprobado
103+807.000 5.00 2.00
104+951.000 2.00 2.50 Aprobado 6/13/2013 AUT. N° 591
104+955.060 4.06 3.00
105+205.000 5.00 2.00
Aprobado105+210.000 5.00 2.00
105+215.000 5.00 1.50
105+220.000 5.00 2.00
105+229.600 9.00 2.00
105+573.000 3.00 2.00 Aprobado
105+576.000 3.00 2.00
106+387.000 2.00 2.00
Aprobado106+390.000 3.00 1.50
106+392.000 2.00 2.00
106+447.000 3.00 1.50
Aprobado106+450.000 3.00 1.50
106+453.000 3.00 1.50
106+456.000 3.00 1.50
106+458.060 3.00 1.50
109+660.000 5.00 2.00 Aprobado
109+665.000 5.00 2.00
109+797.000 4.00 1.50
Aprobado 109+801.000 4.00 1.50
109+805.000 4.00 1.50
109+809.00 4.00 1.50
109.840.28 5.00 1.50 Aprobado 7/8/2013 AUT. N° 644 112+918.000 3.00 2.50
Aprobado 112+924.000 6.00 2.50
112+930.000 6.00 1.50
117+012 5.00 1.50
Aprobado117+017 5.00 1.50
117+022 5.00 1.50
117+026 4.00 1.50
118+999 5.00 1.50
Aprobado 3/13/2015 AUT. N°927 119+004 5.00 2.00
119+009 5.00 2.00
121+029 5.00 3.00 Aprobado 6/11/2015 AUT. N°1078
121+034 5.00 3.00
121+106.5
121+506 4.00 1.50 Aprobado 6/16/2015 AUT. N°1096
121+510 4.00 1.50
122+635.000 5.00 1.50
Aprobado
122+640.000 5.00 2.00
Aprobado122+645.000 5.00 2.00
122+650.000 5.00 2.00
122+655.000 5.00 2.00
125+290.000 5.00 1.50
Aprobado125+294.000 4.00 1.50
125+298.000 4.00 1.50
125+343.000 5.00 2.00
Aprobado 5/29/2015 AUT. N°1053 125+346.000 3.00 2.00
125+348.000 2.00 1.50
125+874.000 4.00 2.00
Aprobado 5/29/2015 AUT. N°1057 125+878.000 4.00 2.00
125+882.000 4.00 2.00
126+744 5.00 2.00
Aprobado126+748 4.00 2.00
126+752 4.00 2.00
130+662.000 3.00 1.50 Aprobado132+018.000 4.00 2.50
Aprobado 7/14/2015 AUT. N° 1160
132+022.000 4.00 3.00
132+027.000 5.00 5.00
132+032.000 5.00 5.00
132+037.000 5.00 6.00
132+042.000 5.00 4.50
132+047.000 5.00 4.50
132+059.000 3.00 3.00
142+484.000 5.00 2.50
Aprobado 9/18/2014 AUT. N° 695
142+489.000 5.00 2.50
142+494.000 5.00 2.50
142+499.000 5.00 2.50
142+504.000 5.00 2.50
142+509.000 5.00 2.50
142+514.000 5.00 2.50
142+519.000 5.00 2.50
142+635.000 3.00 1.50
Aprobado 9/18/2014 AUT. N° 696
142+639.000 4.00 3.50
142+647.000 8.00 6.00
142+652.000 5.00 4.50
142+655.000 3.00 2.00
144+510.000 5.00 1.50
Aprobado144+515.000 5.00 3.50
144+518.000 3.00 2.00
148+150.000 4.00 3.00 Aprobado 9/20/2014 AUT. N°706
148+152.000 2.00 2.00 Aprobado 9/20/2014 AUT. N°706
155+360.000 5.00 1.50 Aprobado 4/22/2013 AUT. N° 480
155+398.000 4.00 2.00 Aprobado 4/18/2013 AUT. N° 466
155+401.000 3.00 1.50
157+235.000 5.00 2.00
Aprobado 4/2/2013 AUT. N° 459157+240.000 5.00 1.50
157+244.000 4.00 1.50
162+026.000 6.00 3.00
Aprobado162+031.000 5.00 3.00
162+035.000 4.00 3.00
168+180.000 5.00 1.50
Aprobado 4/2/2013 AUT. N° 460168+185.000 5.00 1.50
168+190.000 5.00 2.00
168+195.000 5.00 2.50
168+200.000 5.00 2.00
168+205.000 5.00 1.50
Aprobado 4/18/2013 AUT. N° 465168+210.000 5.00 1.50
168+215.000 5.00 1.50
168+220.000 5.00 1.50
168+226.000 6.00 1.50
replanteado Y revisado pero desaprovado para nueva presentacion
progresivas de replanteo que varian del proyecto en presentacion_separados
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJE
REPLANTEO DE MUROS DE C.C. ZONA RURAL
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0243: F=08-09-12 CSQ-0061: F=12-09-12
CVQ-0233: F=06-09-12 CSQ-0059: F=07-09-12
CVQ-0233: F=06-09-12 CSQ-0059: F=07-09-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0203: F=22-04-15 CSQ-0046: F=23-04-15
CVQ-0233: F=06-09-12 CSQ-0059: F=07-09-12
CVQ-0363: F=09-11-12 CSQ-0091: F=12-11-12
CARTA PRESENTADA POR EL CONTRATISTA
INORME - SUPERVISOR (ESPECIALISTA EOAD)
CVQ-0363: F=09-11-12 CSQ-0091: F=12-11-12
CVQ-0363: F=09-11-12 CSQ-0091: F=12-11-12
CVQ-0363: F=09-11-12 CSQ-0091: F=12-11-12
CVQ-0363: F=09-11-12 CSQ-0091: F=12-11-12
CVQ-0369: F=13-11-12 CSQ-0096: F=26-11-12
CVQ-0369: F=13-11-12 CSQ-0096: F=26-11-12
CVQ-0369: F=13-11-12 CSQ-0096: F=26-11-12
CVQ-0369: F=13-11-12 CSQ-0096: F=26-11-12
CVQ-0210: F=13-05-13 CSQ-0061: F=14-05-13
CVQ-0228: F=24-05-13 CSQ-0074: F=24-05-13
CVQ-0251: F=01-06-13 CSQ-0082: F=04-06-13
CVQ-0251: F=01-06-13 CSQ-0082: F=04-06-13
CVQ-0259: F=04-06-13 CSQ-0086: F=05-06-13
CVQ-0259: F=04-06-13 CSQ-0086: F=05-06-13
CVQ-300: F=26-06-13 CSQ-0102: F=27-06-13
CVQ-0259: F=04-06-13 CSQ-0086: F=05-06-13
CVQ-0269: F=10-06-13 CSQ-0089: F=11-06-13
CVQ-0269: F=10-06-13 CSQ-0089: F=11-06-13
CVQ-0269: F=10-06-13 CSQ-0089: F=11-06-13
CVQ-0269: F=10-06-13 CSQ-0089: F=11-06-13
CVQ-0283: F=17-06-13 CSQ-0096: F=19-06-13
CVQ-0283: F=17-06-13 CSQ-0096: F=19-06-13
CVQ-0283: F=17-06-13 CSQ-0096: F=19-06-13
CVQ-0042: F=29-01-15 CSQ-0015: F=03-02-15
CVQ-0242: F=31-05-13 CSQ-0080: F=31-05-13
CVQ-0242: F=31-05-13 CSQ-0080: F=31-05-13
CVQ-0242: F=31-05-13 CSQ-0080: F=31-05-13
CVQ-515
CVQ-0242: F=31-05-13 CSQ-0080: F=31-05-13
CVQ-0226: F=22-05-13 CSQ-0073: F=24-05-13
CVQ-0226: F=22-05-13 CSQ-0073: F=24-05-13
CVQ-0322: F=11-07-13 CSQ-0112: F=18-07-13
CVQ-0243: F=08-09-12 CSQ-0061: F=12-09-12
CVQ-0322: F=11-07-13 CSQ-0112: F=18-07-13
CVQ-0242: F=31-05-13 CSQ-0080: F=31-05-12
CVQ-0223: F=03-09-12 CSQ-0056: F=04-09-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0104: F=27-09-14 CSQ-0024: F=27-09-14
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0353: F=06-11-12 CSQ-0088: F=09-11-12
CVQ-0251: F=01-06-13 CSQ-0082: F=04-06-13
CVQ-0157: F=10-04-13 CSQ-0143: F=11-04-13
CVQ-0181: F=26-04-13 CSQ-0050: F=29-04-13
OBSERVACION - INFORMES
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
cambio por informe 0056 CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
Cambio x CSQ-0056: F=04-09-12
CVQ-0183: F=13-11-14
METRADO PRESENTADOS CON
CARTA:
carta 0156-13 , informe 044_adicionales adicional_intercalado
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
adicional_intercalado
MC Adic-Proy Km 105+562 - 105+581(L=19metros)
Adic. 1 metro(109+657-109+658)_intercalado MC Km 109+647 - 109+658
Adic. 1 metro(109+804-109+805)_intercalado MC Km 109+793 - 109+805
cambio x informe 0115; 18-07-13 RCDO v2 incremento de longitud y altura
adicional_intercalado
CVQ-0183: F=13-11-14
cambio x informe 61;12-09-12_RCDOCVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
cambio por informe 0065
cambio por informe 0065
cambio por informe 0065
cambio x informe 59; 07-09-12
cambio por informe 0065; Version III cambio por informe 0088-CVQ N°0353 06.11.12 MC.C - MC.A - MC.C
cambio por informe 0065 adicional_intercalado
CVQ-0183: F=13-11-14
CVQ-0183: F=13-11-14
cambio por informe 0066 CVQ-0183: F=13-11-14
cambio x informe 88;09-11-12 CVQ-0183: F=13-11-14
cambio por informe 0088 CVQ-0183: F=13-11-14
cambio por informe 0088 CVQ-0183: F=13-11-14
cambio por informe 0065 adicional_intercalado
cambio por informe 0065 adicional_intercalado
cambio por informe 0065 adicional_intercalado
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
METRADO APROBADOS CON
INFORME:
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12 ACTUALIZAR PLANO DE REPL.
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12 ACTUALIZAR PLANO DE REPL.
CSQ-0044: F=17-11-12 ACTUALIZAR PLANO DE REPL.
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
CSQ-0044: F=17-11-12
ENTIDAD: MTC-PROVIAS NACIONAL.
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA-SAN FRANCISCO
TRAMO 2: KM. 78+500-KM.172+420 ( SAN FRANCISCO ).
CONTRATISTA: CONSORCIO VIAL QUINUA.
SUPERVISOR: CONSORCIO SUPERVISOR LA QUINUA
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJE
REPLANTEO DE MUROS DE C.C. ZONA URBANA
PROYECTO
PROG. INICIAL km PROG. FINAL km
TE-60 85+298.000 85+308.000 10.00
TE-61 85+339.000 85+369.000 30.00
TE-62 85+445.000 85+465.000 20.00
TE-63 85+541.000 85+576.000 35.00
TE-64 85+602.000 85+616.000 14.00
TE-65 93+060.000 93+100.000 40.00
No LOG. PROYECTO (m)
ALTURA DE MURO (m) PROYECTO
TE-65 93+060.000 93+100.000 40.00
TE-66 96+220.000 96+238.000 18.00
TE-67 96+389.000 96+404.000 15.00 TE-68 96+422.000 96+442.000 20.00
TE-69 96+454.000 96+461.000 7.00 TE-70 96+468.000 96+476.000 8.00
TE-71 112+385.000 112+400.000 15.00
TE-72 112+476.000 112+535.000 59.00
TE-73 112+628.000 112+643.000 15.00
TE-74 112+663.000 112+720.000 57.00
TE-74 112+663.000 112+720.000 57.00
TE-75 148+667.000 148+678.000 11.00
TE-76 149+753.000 149+780.000 27.00
TE-77 149+989.000 150+009.000 20.00 TE-77A 158+937.000 158+956.000 19.00 TE-77B 159+592.000 159+603.000 11.00
TE-78 159+699.000 159+712.000 13.00
TE-79 164+856.000 164+887.000 31.00
TE-80 164+971.000 164+999.000 28.00
REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA-SAN FRANCISCO
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJE
REPLANTEO DE MUROS DE C.C. ZONA URBANA
REPLANTEO
OBSERVACION
PROG. INICIAL PROG. FINAL
85+298.00 85+303.00 5.00 1.00Aprobado
85+303.00 85+308.00 5.00 1.0085+339.00 85+344.00 5.00 1.50
Aprobado
85+344.00 85+349.00 5.00 1.5085+349.00 85+354.00 5.00 2.0085+354.00 85+359.00 5.00 2.0085+359.00 85+364.00 5.00 2.0085+364.00 85+369.00 5.00 2.0085+369.00 85+374.00 5.00 1.5085+445.00 85+450.00 5.00 1.50
Aprobado85+450.00 85+455.00 5.00 2.0085+455.00 85+460.00 5.00 2.0085+460.00 85+465.00 5.00 1.0085+541.00 85+543.00 2.00 2.00
Aprobado
85+543.00 85+548.00 5.00 2.5085+548.00 85+552.00 4.00 3.0085+552.00 85+557.00 5.00 3.5085+557.00 85+562.00 5.00 3.0085+562.00 85+567.00 5.00 2.5085+567.00 85+572.00 5.00 2.0085+572.00 85+576.00 4.00 1.5085+602.00 85+604.00 2.00 1.50
Aprobado85+604.00 85+608.00 4.00 1.5085+608.00 85+612.00 4.00 1.5085+612.00 85+616.00 4.00 1.5093+060.00 93+065.00 5.00 2.00
Aprobado
93+065.00 93+070.00 5.00 2.5093+070.00 93+075.00 5.00 3.0093+075.00 93+080.00 5.00 3.0093+080.00 93+085.00 5.00 3.0093+085.00 93+090.00 5.00 3.0093+090.00 93+095.00 5.00 2.50
LOG. REPLANTEO (m)
ALTURA DE MURO (m) REPLANTEO
93+095.00 93+100.00 5.00 2.00
Aprobado
96+220.00 96+225.00 5.00 2.50
Aprobado96+225.00 96+230.00 5.00 2.5096+230.00 96+234.00 4.00 2.0096+234.00 96+238.00 4.00 2.00
96+382 96+387.00 5.00 1.50
Aprobado
96+387 96+391.00 4.00 1.5096+391 96+396.00 5.00 1.5096+396 96+401.00 5.00 1.5096+401 96+406.00 5.00 1.5096+406 96+410.00 4.00 1.5096+410 96+415.00 5.00 1.5096+415 96+420.00 5.00 2.0096+420 96+427.00 7.00 2.5096+427 96+432.00 5.00 2.5096+432 96+437.00 5.00 2.5096+437 96+443.00 6.00 2.0096+443 96+447.00 4.00 1.5096+452 96+457.00 5.00 2.00
Aprobado96+457 96+462.00 5.00 2.0096+462 96+467.00 5.00 2.0096+467 96+471.00 4.00 2.0096+471 96+475.00 4.00 2.00
112+382.70 112+387.70 5.00 2.00Aprobado112+387.70 112+392.70 5.00 2.00
112+392.70 112+397.70 5.00 2.00112+478.00 112+483.00 5.00 1.00
Aprobado
112+483.00 112+488.00 5.00 1.00112+488.00 112+493.00 5.00 1.50112+493.00 112+498.00 5.00 2.50112+498.00 112+503.00 5.00 2.50112+503.00 112+508.00 5.00 2.00112+508.00 112+513.00 5.00 2.00112+513.00 112+518.00 5.00 2.50112+518.00 112+523.00 5.00 2.50112+523.00 112+528.00 5.00 2.50112+528.00 112+533.00 5.00 2.50112+533.00 112+537.00 4.00 2.50112+628.00 112+633.00 5.00 2.00
Aprobado112+633.00 112+638.00 5.00 2.00112+638.00 112+643.00 5.00 2.00112+664.00 112+669.00 5.00 2.00
Aprobado
112+669.00 112+674.00 5.00 2.50112+674.00 112+679.00 5.00 3.00112+679.00 112+684.00 5.00 3.00
112+684.00 112+689.00 5.00 3.00Aprobado
112+689.00 112+694.00 5.00 3.00112+694.00 112+699.00 5.00 2.50112+699.00 112+704.00 5.00 2.50112+704.00 112+709.00 5.00 2.50112+709.00 112+715.00 6.00 2.50148+669.00 148+673.00 4.00 2.50
Aprobado148+673.00 148+677.00 4.00 3.50148+677.00 148+681.00 4.00 3.50149+753.00 149+757.00 4.00 4.00
Aprobado149+757.00 149+762.00 5.00 5.50149+762.00 149+767.00 5.00 5.50149+767.00 149+771.00 4.00 5.00149+771.00 149+774.00 3.00 4.00
158+937.00 158+956.00 19.00 Aprobado
159+699.00 159+703.00 4.00 2.00 Aprobado 159+703.00 159+708.00 5.00 2.50
159+708.00 159+712.00 4.00 2.00164+857.00 164+862.00 5.00 1.50
Aprobado
164+862.00 164+867.00 5.00 2.00164+867.00 164+872.00 5.00 2.00164+872.00 164+877.00 5.00 2.00164+877.00 164+882.00 5.00 2.50164+882.00 164+886.00 4.00 3.00164+973.50 164+978.50 5.00 3.50
Aprobado
164+978.50 164+983.50 5.00 2.50164+983.50 164+988.50 5.00 2.00164+988.50 164+993.50 5.00 2.00164+993.50 164+997.50 4.00 1.50164+997.50 165+001.50 4.00 1.50
AUTORIZACIONES DE TRABAJO PRESENTA CONTRATISTA APROBACION SUPERVISOR
FECHA AUT. N° DE AUT. FECHA FECHA
CVQ-0200: F=09-05-13 CSQ-0057: F=10-05-13
CVQ-0200: F=09-05-13 CSQ-0057: F=10-05-13
CVQ-0200: F=09-05-13 CSQ-0057: F=10-05-13
CVQ-0200: F=09-05-13 CSQ-0057: F=10-05-13
10/2/2015 AUT. N° 1486 CVQ-0214: F=15-05-13 CSQ-0063: F=17-05-13
3/13/2015 AUT. N° 926 CVQ-0226: F=22-05-13 CSQ-0073: F=24-05-13
3/13/2015 AUT. N° 926 CVQ-0226: F=22-05-13 CSQ-0073: F=24-05-13
6/16/2015 AUT. N° 1101 CVQ-0278: F=26-05-15 CSQ-0061: F=28-05-15
6/10/2015 AUT. N° 1074 CVQ-0285: F=29-05-15 CSQ-0066: F=01-06-15
CVQ-0293: F=01-06-15 CSQ-0069: F=02-06-15
10/2/2015 AUT. N°1487 CVQ-0203: F=22-04-15 CSQ-0046: F=23-04-15
10/2/2015 AUT. N° 1492 CVQ-0203: F=22-04-15 CSQ-0046: F=23-04-15
10/2/2015 AUT. N° 1489 CVQ-0280: F=26-05-15 CSQ-0065: F=01-06-15
10/2/2015 AUT. N° 1490 CVQ-0280: F=26-05-15 CSQ-0065: F=01-06-15
10/2/2015 AUT. N° 1490 CVQ-0280: F=26-05-15 CSQ-0065: F=01-06-15
9/20/2014 AUT. N° 707 CVQ-0294: F=24-06-13 CSQ-0099: F=26-06-13
9/28/2014 AUT. N° 717 CVQ-0316: F=05-07-13 CSQ-0107: F=05-07-13
CVQ-0214: F=15-05-13 CSQ-0063: F=17-05-13
CVQ-0086: F=18-02-15 CSQ-0021: F=20-02-15
11/25/2014 AUT. N° 807 CVQ-0294: F=24-06-13 CSQ-0099: F=26-06-13
CVQ-0294: F=24-06-13 CSQ-0099: F=26-06-13
OBSERVACION - INFORMES
MURO ADIC. - PROY
METRADO PRESENTADOS CON
CARTA:
SE VA ANULAR PARA CONSTRUCCIONDE MURO SECO
SE VA ANULAR PARA CONSTRUCCIONDE MURO SECO
MURO ADIC.2 y CONTRACTUAL L/DER KM.96+382-KM.96+389 =
ADIC.2 KM.96+389-KM.96+404 = PROY. KM.96+404-KM.96+422 = ADIC.2 KM.96+422-KM.96+442 = PROY.
KM.96+442-KM.96+447 = ADIC.2
MURO ADIC.2 y CONTRACTUAL L/DER KM.96+452-KM.96+454 =
ADIC.2 KM.96+454-KM.96+461 = PROY. KM.96+462-KM.96+468 = ADIC.2 KM.96+468-KM.96+476 = PROY.
CVQ-0183: F=13-11-14
adic._Proy Km 158+956-158+964 MC-URB(ruCVQ-0183: F=13-11-14
Cambio x informe 99;26-06-13 modificado_(Muro C.A.)
ENTIDAD: MTC-PROVIAS NACIONAL.
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA-SAN FRANCISCO
TRAMO 2: KM. 78+500-KM.172+420 ( SAN FRANCISCO ).
CONTRATISTA: CONSORCIO VIAL QUINUA.
SUPERVISOR: CONSORCIO SUPERVISOR LA QUINUA
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJEREPLANTEO DE MUROS DE C.A.
PROYECTO REPLANTEO
PROG. INICIAL km PROG. INICIAL
1.0 85+003.000 85+008.000 5.00 84+998.500
2.0 95+439.000 95+441.000 2.00
3.0 118+998.000 119+002.000 4.00
4.0 132+023.000 132+056.000 33.00
5.0 142+627.000 142+650.000 23.00
6.0 144+501.000 144+508.000 7.00
7.0 144+657.000 144+660.000 3.00
8.0 168+212.000 168+217.000 5.00 168+200.000
No LOG. PROYECTO (m)
ALTURA DE MURO (m) PROYECTO PROG. INICIAL
km
CONSORCIO SUPERVISION LA QUINUA OBRAS DE ARTE Y DRENAJEREPLANTEO DE MUROS DE C.A.
REPLANTEO
OBSERVACIONAUTORIZACIONES DE TRABAJO
PROG. FINAL FECHA AUT. N° DE AUT.
85+003.500 5.00 3.50 Aprobado -
-
-
-
-
168+226.000 26.00 Aprobado
LOG. REPLANTEO (m)
ALTURA DE MURO (m) REPLANTEO
PRESENTA CONTRATISTA APROBACION SUPERVISOR
FECHA FECHA
CVQ-0203: F=22-04-15 Q-0046: F=23-04-15
CVQ-0353: F=08-11-12 CSQ-0088: F=09-11-12