Nomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor Loan : IBRD Loan 8213-ID & LN 0004 Nama Konsultan : PT. Phibeta Kalamwijaya, Joint venture with PT. Kogas Driyap Konsultan Paket Pekerjaan : Non Konsultan Service for Oversight Provider (OSP) Package-6 (East Java, Central Kalimantan, East Kalimantan, South Kalimantan Province) Nomor & Tanggal Kontrak : HK.02.03/OSP-6/IBRD/SATKER-PKP/004/2012, Tanggal 08 Mei 2016 Periode Kontrak : 08 Mei 2012 s/d 30 Juni 2018 I. REMUNERASI 53.848.525.880 52.540.738.128 581.044.000 53.121.782.128 726.743.752 1.1. Profesional Staff 38.028.733.000 37.105.616.764 411.900.000 37.517.516.764 511.216.236 1.2. Supporting Staff 8.392.410.000 8.188.123.001 89.000.000 8.277.123.001 115.286.999 1,3 Fee […….% x (1.1+1.2)] II. DIRECT REIMBURSABLE COST 31.262.911.048 29.900.749.077 355.994.419 30.256.743.496 1.006.167.552 2.1. Duty Travel Expenses East Java 2.141.240.000 1.795.511.995 32.534.300 1.828.046.295 313.193.705 a. Transport 1.939.740.000 1.645.192.850 26.634.300 1.671.827.150 267.912.850 b. Accomodation 78.850.000 58.619.145 1.200.000 59.819.145 19.030.855 c. OSA (fixed) 122.650.000 91.700.000 4.700.000 96.400.000 26.250.000 2,2 Duty Travel Expenses South Kalimantan 692.413.000 563.909.197 27.479.200 591.388.397 101.024.603 a. Transport 543.093.000 452.007.697 24.279.200 476.286.897 66.806.103 b. Accomodation 65.620.000 47.351.500 0 47.351.500 18.268.500 c. OSA (fixed) 83.700.000 64.550.000 3.200.000 67.750.000 15.950.000 2,3 Duty Travel Expenses Center Kalimantan 290.340.000 267.795.510 0 267.795.510 22.544.490 a. Transport 231.740.000 215.895.510 0 215.895.510 15.844.490 b. Accomodation 14.500.000 13.500.000 0 13.500.000 1.000.000 c. OSA (fixed) 44.100.000 38.400.000 0 38.400.000 5.700.000 2,4 Duty Travel Expenses East Kalimantan 1.070.801.000 900.919.590 35.846.100 936.765.690 134.035.310 a. Transport 907.851.000 775.502.590 32.246.100 807.748.690 100.102.310 b. Accomodation 90.450.000 69.067.000 0 69.067.000 21.383.000 c. OSA (fixed) 72.500.000 56.350.000 3.600.000 59.950.000 12.550.000 2,5 Office Operational Expenses 5.014.616.000 4.886.927.101 55.005.613 4.941.932.714 72.683.286 a. Office Running Cost 2.691.762.000 2.624.021.982 32.153.463 2.656.175.445 35.586.555 b. Office Supply and Consumable 1.057.089.000 1.023.743.480 11.657.150 1.035.400.630 21.688.370 c. Communication Cost 1.115.955.000 1.098.130.181 8.250.000 1.106.380.181 9.574.819 d. Internet 149.810.000 141.031.458 2.945.000 143.976.458 5.833.542 PROGRAM KOTA TANPA KUMUH SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2018 PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT SISA KONTRAK INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI NO KOMPOSISI BIAYA CONTRACT AMOUNT + AMANDEMEN 24

Transcript of 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor &...

Page 1: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

Nomor & Periode Invoice : No. 54 Periode (Mei 2018)

Realisasi Invoice : 11 Juli 2018

Nomor Loan : IBRD Loan 8213-ID & LN 0004

Nama Konsultan : PT. Phibeta Kalamwijaya, Joint venture with PT. Kogas Driyap Konsultan

Paket Pekerjaan : Non Konsultan Service for Oversight Provider (OSP) Package-6

(East Java, Central Kalimantan, East Kalimantan, South Kalimantan Province)

Nomor & Tanggal Kontrak : HK.02.03/OSP-6/IBRD/SATKER-PKP/004/2012, Tanggal 08 Mei 2016

Periode Kontrak : 08 Mei 2012 s/d 30 Juni 2018

I. REMUNERASI 53.848.525.880 52.540.738.128 581.044.000 53.121.782.128 726.743.752

1.1. Profesional Staff 38.028.733.000 37.105.616.764 411.900.000 37.517.516.764 511.216.236

1.2. Supporting Staff 8.392.410.000 8.188.123.001 89.000.000 8.277.123.001 115.286.999

1,3 Fee […….% x (1.1+1.2)]

II. DIRECT REIMBURSABLE COST 31.262.911.048 29.900.749.077 355.994.419 30.256.743.496 1.006.167.552

2.1. Duty Travel Expenses East Java 2.141.240.000 1.795.511.995 32.534.300 1.828.046.295 313.193.705

a. Transport 1.939.740.000 1.645.192.850 26.634.300 1.671.827.150 267.912.850

b. Accomodation 78.850.000 58.619.145 1.200.000 59.819.145 19.030.855

c. OSA (fixed) 122.650.000 91.700.000 4.700.000 96.400.000 26.250.000

2,2 Duty Travel Expenses South Kalimantan 692.413.000 563.909.197 27.479.200 591.388.397 101.024.603

a. Transport 543.093.000 452.007.697 24.279.200 476.286.897 66.806.103

b. Accomodation 65.620.000 47.351.500 0 47.351.500 18.268.500

c. OSA (fixed) 83.700.000 64.550.000 3.200.000 67.750.000 15.950.000

2,3 Duty Travel Expenses Center Kalimantan 290.340.000 267.795.510 0 267.795.510 22.544.490

a. Transport 231.740.000 215.895.510 0 215.895.510 15.844.490

b. Accomodation 14.500.000 13.500.000 0 13.500.000 1.000.000

c. OSA (fixed) 44.100.000 38.400.000 0 38.400.000 5.700.000

2,4 Duty Travel Expenses East Kalimantan 1.070.801.000 900.919.590 35.846.100 936.765.690 134.035.310

a. Transport 907.851.000 775.502.590 32.246.100 807.748.690 100.102.310

b. Accomodation 90.450.000 69.067.000 0 69.067.000 21.383.000

c. OSA (fixed) 72.500.000 56.350.000 3.600.000 59.950.000 12.550.000

2,5 Office Operational Expenses 5.014.616.000 4.886.927.101 55.005.613 4.941.932.714 72.683.286

a. Office Running Cost 2.691.762.000 2.624.021.982 32.153.463 2.656.175.445 35.586.555

b. Office Supply and Consumable 1.057.089.000 1.023.743.480 11.657.150 1.035.400.630 21.688.370

c. Communication Cost 1.115.955.000 1.098.130.181 8.250.000 1.106.380.181 9.574.819

d. Internet 149.810.000 141.031.458 2.945.000 143.976.458 5.833.542

PROGRAM KOTA TANPA KUMUH

SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2018

PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN

DIREKTORAT JENDERAL CIPTA KARYA

KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT

SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO KOMPOSISI BIAYACONTRACT AMOUNT

+ AMANDEMEN 24

Page 2: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO KOMPOSISI BIAYACONTRACT AMOUNT

+ AMANDEMEN 24

2,6 Office Equipment Expenses 1.426.978.573 1.411.282.410 0 1.411.282.410 15.696.163

a. Desktop Computer 540.000.000 540.000.000 0 540.000.000 0

b. Laptop 640.000.000 640.000.000 0 640.000.000 0

c. Printer Laser Jet 117.250.000 117.250.000 0 117.250.000 0

d. Printer Color A3 12.000.000 12.000.000 0 12.000.000 0

e. Digital Camera 5.000.000 5.000.000 0 5.000.000 0

f. GPS Tool;s 6.000.000 6.000.000 0 6.000.000 0

g. LCD Projector 30.000.000 30.000.000 0 30.000.000 0

h. Scanner 38.000.000 38.000.000 0 38.000.000 0

i. Equipment Maintenance (Including Existing Equipment) 38.728.573 23.032.410 0 23.032.410 15.696.163

j. Peta Citra Satelit (1:5000) 0 0 0 0 0

2,7 Rental Expenses 19.307.946.500 18.903.490.833 181.450.000 19.084.940.833 223.005.667

a. Office Space 893.821.500 882.167.500 0 882.167.500 11.654.000

b. Vehicle 16.809.375.000 16.477.708.333 156.250.000 16.633.958.333 175.416.667

c. Motorcycle 1.386.000.000 1.325.800.000 25.200.000 1.351.000.000 35.000.000

d. Rent for PERCEPATAN 218.750.000 217.815.000 0 217.815.000 935.000

2,8 Reporting Expenses 145.025.000 120.300.000 3.000.000 123.300.000 21.725.000

a. Reguler Report 74.900.000 65.925.000 1.500.000 67.425.000 7.475.000

b. Special Report 70.125.000 54.375.000 1.500.000 55.875.000 14.250.000

2,9 Fee [[…….% x [ 2.1 + 2.2 + 2.3 + 2.4 + 2.5a + 2.5b ]]

III. TRAINING ACTIVITY EXPENSES 16.410.524.720 13.060.900.766 0 13.060.900.766 3.349.623.954

3,1 Training Activity 2011 0 0 0 0 0

3,2 Training Activity 2012 850.525.000 847.251.000 0 847.251.000 3.274.000

a. In Regional Levels (Surabaya) 8.000.000 8.000.000 0 8.000.000 0

b. In Provincial Levels 801.775.000 799.751.000 0 799.751.000 2.024.000

c. In City/Regency Levels 40.750.000 39.500.000 0 39.500.000 1.250.000

3,3 Training Activity 2013 2.111.491.000 2.109.550.303 0 2.109.550.303 1.940.697

Training Activity 2014 39.900.000 39.900.000 0 39.900.000 0

Training Activity 2015 2.018.641.000 2.016.783.303 0 2.016.783.303 1.857.697

Training Activity 2016 52.950.000 52.867.000 0 52.867.000 83.000

Training Activity 2016 11.370.320.000 8.450.685.843 0 8.450.685.843 2.919.634.157

Fee [[…….. % x [ 3.1 + 3.2 + 3.3+3.4]]

IV. SOCIALIZATION ACTIVITY EXPENSES 4.671.820.323 4.529.653.326 0 4.529.653.326 142.166.997

4,1 Socilization Activity in Provincial Levels [ Fixed ] 525.350.000 402.877.534 0 402.877.534 122.472.466

4,2 Socilization Activity in City/Regency Levels [ Fixed ] 1.897.200.500 1.895.509.650 0 1.895.509.650 1.690.850

4,3 Fee [[………. % x [ 4.1 + 4.2]]

4,4 Biaya Penyusunan RPLP/RTPLP (Fix cost) 1.898.000.000 1.898.000.000 0 1.898.000.000 0

Page 3: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO KOMPOSISI BIAYACONTRACT AMOUNT

+ AMANDEMEN 24

V. TOTAL (I + II + III + IV) 106.193.781.970 100.032.041.297 937.038.419 100.969.079.715 5.224.702.255

VI. CONTIGENCIES (Fixed)

VII. TOTAL (V + VI) 106.193.781.970 100.032.041.297 937.038.419 100.969.079.715 5.224.702.255

Temuan BPKP I * 237.875.000 0 237.875.000

Temuan BPKP II ** 18.000.000 0 18.000.000

Temuan BPKP III *** 56.750.000 0 56.750.000

Temuan BPKP IV **** 9.790.500 0 9.790.500

VIII. TOTAL (SETELAH DIKURANGI TEMUAN) 106.193.781.970 99.709.625.797 937.038.419 100.646.664.215 5.547.117.755

VIII. PPN 10% 10.619.378.197 9.970.962.580 93.703.842 10.064.666.422 554.711.775

IX. TOTAL SETELAH PAJAK 116.813.160.167 109.680.588.376 1.030.742.261 110.711.330.637 6.101.829.530

Temuan BPKP I * 237.875.000 0

Temuan BPKP II ** 18.000.000 0

VIII. TOTAL (SETELAH DIKURANGI TEMUAN) 1.446.215.715 0

IX. LOCAL TAX/VAT(10% x VII) 10.619.378.197 9.970.962.580 93.703.842 10.064.666.422 554.711.775

X. TOTAL INVOICE 116.813.160.167 109.680.588.376 1.030.742.261 110.711.330.637 6.101.829.530

Page 4: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

I. REMUNERASI

1.1.Profesional Staff Mei 2018

NO NAMA POSISI

MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

A. OSP LEVEL 1.395.984.000 1.395.962.856 0 1.395.962.856 21.144

19,77 14.000.000 276.780.000 19,77 276.780.000 0,00 14.000.000 0 19,77 276.780.000 0,00 0

17,00 15.500.000 263.500.000 17,00 263.500.000 0,00 15.500.000 0 17,00 263.500.000 0,00 0

19,00 16.700.000 317.300.000 19,00 317.300.000 0,00 16.700.000 0 19,00 317.300.000 0,00 0

14,50 4.900.000 71.050.000 14,50 71.050.000 0,00 4.900.000 0 14,50 71.050.000 0,00 0

2,50 5.300.000 13.250.000 2,50 13.250.000 0,00 5.300.000 0 2,50 13.250.000 0,00 0

2,63 4.900.000 12.887.000 2,63 12.887.000 0,00 4.900.000 0 2,63 12.887.000 0,00 0

1,00 4.900.000 4.900.000 1,00 4.900.000 0,00 4.900.000 0 1,00 4.900.000 0,00 0

Nur Rochim 11,00 4.900.000 53.900.000 11,00 53.900.000 0,00 4.900.000 0 11,00 53.900.000 0,00 0

19,77 6.500.000 128.505.000 19,77 128.483.856 0,00 6.500.000 0 19,77 128.483.856 0,00 21.144

1,00 7.200.000 7.200.000 1,00 7.200.000 0,00 7.200.000 0 1,00 7.200.000 0,00 0

14,21 7.200.000 102.312.000 14,21 102.312.000 0,00 7.200.000 0 14,21 102.312.000 0,00 0

19,00 7.600.000 144.400.000 19,00 144.400.000 0,00 7.600.000 0 19,00 144.400.000 0,00 0

B. EAST JAVA PROVINCE 17.567.525.000 17.310.010.739 123.200.000 17.433.210.739 134.314.261

19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333

17,00 12.700.000 215.900.000 17,00 215.900.000 0,00 12.700.000 0 17,00 215.900.000 0,00 0

19,00 13.700.000 260.300.000 19,00 260.300.000 0,00 13.700.000 0 19,00 260.300.000 0,00 0

Agus Shonhaji Mu'thi 13,50 13.700.000 184.950.000 13,50 184.950.000 0,00 13.700.000 0 13,50 184.950.000 0,00 0

3,50 14.100.000 49.350.000 1,50 21.150.000 1,00 14.100.000 14.100.000 2,50 35.250.000 1,00 14.100.000

19,77 8.500.000 168.045.000 19,77 168.016.667 0,00 8.500.000 0 19,77 168.016.667 0,00 28.333

17,00 9.400.000 159.800.000 17,00 159.800.000 0,00 9.400.000 0 17,00 159.800.000 0,00 0

33,50 10.100.000 338.350.000 33,50 338.350.000 0,00 10.100.000 0 33,50 338.350.000 0,00 0

3,50 10.900.000 38.150.000 1,50 16.350.000 1,00 10.900.000 10.900.000 2,50 27.250.000 1,00 10.900.000

19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

5,00 7.700.000 38.500.000 5,00 38.500.000 0,00 7.700.000 0 5,00 38.500.000 0,00 0

TBN 0,00 7.700.000 0 0,00 0 0,00 7.700.000 0 0,00 0 0,00 0

19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0

Wahyu Hidayat 5,27 6.500.000 34.255.000 5,27 34.233.333 0,00 6.500.000 0 5,27 34.233.333 0,00 21.667

14,50 6.500.000 94.250.000 14,50 94.250.000 0,00 6.500.000 0 14,50 94.250.000 0,00 0

17,00 7.000.000 119.000.000 17,00 119.000.000 0,00 7.000.000 0 17,00 119.000.000 0,00 0

12,00 7.500.000 90.000.000 12,00 90.000.000 0,00 7.500.000 0 12,00 90.000.000 0,00 0

Brida Mardi Utomo 5,00 7.500.000 37.500.000 5,00 37.500.000 0,00 7.500.000 0 5,00 37.500.000 0,00 0

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

16,00 8.800.000 140.800.000 16,00 140.800.000 0,00 8.800.000 0 16,00 140.800.000 0,00 0

19,00 9.500.000 180.500.000 19,00 180.500.000 0,00 9.500.000 0 19,00 180.500.000 0,00 0

5,50 9.500.000 52.250.000 3,50 33.250.000 1,00 9.500.000 9.500.000 4,50 42.750.000 1,00 9.500.000

Soetomo 5,27 6.500.000 34.255.000 5,27 34.233.333 0,00 6.500.000 0 5,27 34.233.333 0,00 21.667

14,50 6.500.000 94.250.000 14,50 94.250.000 0,00 6.500.000 0 14,50 94.250.000 0,00 0

17,00 7.000.000 119.000.000 17,00 119.000.000 0,00 7.000.000 0 17,00 119.000.000 0,00 0

19,00 7.500.000 142.500.000 19,00 142.500.000 0,00 7.500.000 0 19,00 142.500.000 0,00 0

Qurrota A'yun 18,77 8.000.000 150.160.000 18,77 150.133.333 0,00 8.000.000 0 18,77 150.133.333 0,00 26.667

14,37 8.000.000 114.960.000 14,35 114.838.710 0,00 8.000.000 0 14,35 114.838.710 0,02 121.290

0,00 8.500.000 0 0,00 0 0,00 8.500.000 0 0,00 0 0,00 0

Hamzah R. Dani 14,00 8.500.000 119.000.000 14,00 119.000.000 0,00 8.500.000 0 14,00 119.000.000 0,00 0

Bambang Kristiawan 3,50 8.000.000 28.000.000 1,00 8.000.000 1,00 8.000.000 8.000.000 2,00 16.000.000 1,50 12.000.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

7,00 9.500.000 66.500.000 7,00 66.500.000 0,00 9.500.000 0 7,00 66.500.000 0,00 0

Rahmad Hidayat 21,45 9.500.000 203.775.000 21,45 203.758.621 0,00 9.500.000 0 21,45 203.758.621 0,00 16.379

M. Tabroni 5,50 8.000.000 44.000.000 3,36 26.909.600 1,00 8.000.000 8.000.000 4,36 34.909.600 1,14 9.090.400

19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0

19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0

2

Markus Apriono

Anis Mufadillah

Nani Saodah

Assisten OC

3 a. Sub Spec. Monev PNPMHamzah R. Dani

Pranata Putra

3 Sub Spec. Legal & CHU

SISA KONTRAKCONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI

Moh. Zamroni S 5 Sub Spec. Monev Advance

a. Sub Spec.Training/CB for PNPM10

Sub Spec. MIS for PNPMSiswo Prasetyo

MIS Specialist 6 Aris Suprihanto

7

M. Yani Zamroni, SE b. Sub Spec.SME’s11

Training Specialist9

Socialization Specialist8

2

4 b. Sub Spec. Monev PNPM

Program Director OCAgus Shonhaji Mu'thi1

Hasan Ubaidillah

Ja'far Sodiq

Provincial Team Leader

Monev SpecialistAbdusallam

1

M. Jakfar Shodiq

Muh. Frid Hamzah

Hasan Ubaidillah

Page 5: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

33,50 9.500.000 318.250.000 33,50 318.250.000 0,00 9.500.000 0 33,50 318.250.000 0,00 0

3,50 9.800.000 34.300.000 1,50 14.700.000 1,00 9.800.000 9.800.000 2,50 24.500.000 1,00 9.800.000

19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

10,00 9.500.000 95.000.000 10,00 95.000.000 0,00 9.500.000 0 10,00 95.000.000 0,00 0

Bambang Kristiawan 18,00 9.500.000 171.000.000 18,00 171.000.000 0,00 9.500.000 0 18,00 171.000.000 0,00 0

Ahmad Fauzi 3,50 8.000.000 28.000.000 1,00 8.000.000 1,00 8.000.000 8.000.000 2,00 16.000.000 1,50 12.000.000

19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0

19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

12,00 7.700.000 92.400.000 12,00 92.400.000 0,00 7.700.000 0 12,00 92.400.000 0,00 0

Endra Sulistiyono 4,00 7.700.000 30.800.000 4,00 30.800.000 0,00 7.700.000 0 4,00 30.800.000 0,00 0

19,00 8.000.000 152.000.000 19,00 152.000.000 0,00 8.000.000 0 19,00 152.000.000 0,00 0

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

8,00 9.500.000 76.000.000 8,00 76.000.000 0,00 9.500.000 0 8,00 76.000.000 0,00 0

Muh. Zamroni 7,00 9.500.000 66.500.000 7,00 66.500.000 0,00 9.500.000 0 7,00 66.500.000 0,00 0

M. Zainul Arifin 12,00 9.500.000 114.000.000 9,94 94.430.000 1,00 9.500.000 9.500.000 10,94 103.930.000 1,06 10.070.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

35,50 9.500.000 337.250.000 33,50 318.250.000 1,00 9.500.000 9.500.000 34,50 327.750.000 1,00 9.500.000

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

25

27

28 Budi Suryawan

24

20

19

22

Eri Sunahar Anwar

Ibnu Arfan Ismanto

Abdillah

Moh. Firman Wahyudi

Sub Proff. Financial 523

26

Sub Proff. Financial 6

Sub Proff. Financial 7

Sub Proff. Financial 8

Sub Proff. Financial 9

Sub Proff. Financial 4

Boedy Soewartono

Yudi Tri Cahyono Kasmilan

Sugeng Widodo

Sub Proff. Financial 10

Infrastructure SpecialistAinul Hidayat / Agus Setijabudi12

a. Sub Spec. Infras. PNPM & DRMAgus Setijabudi13

14 Micro Fin & Fin.Mgmt Spec.

Urban Planner Specialist**)

Sub Proff. Financial 2

Collaboration & Local Government Spec

b. Sub Spec. RLF

Sub Proff. Financial 1

Elly Zuroida

17

21

15

16

18 Edi Sutanto

Indra Agung Kurniawan

Sub Proff. Financial 3

a. Sub Spec. Fin.Mgmt for PNPM

Nurul

Adi Suprayitno

Mochammad Wahyudi Ernawi

Bambang Kristiawan

Page 6: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

17,00 5.000.000 85.000.000 17,00 85.000.000 0,00 5.000.000 0 17,00 85.000.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

8,50 5.500.000 46.750.000 8,50 46.750.000 0,00 5.500.000 0 8,50 46.750.000 0,00 0

8,00 5.500.000 44.000.000 8,00 44.000.000 0,00 5.500.000 0 8,00 44.000.000 0,00 0

3,00 5.500.000 16.500.000 3,00 16.500.000 0,00 5.500.000 0 3,00 16.500.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 0,00 5.500.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 2,00 5.900.000 11.800.000 2,00 11.800.000 0,00 5.900.000 0 2,00 11.800.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 2,00 5.900.000 11.800.000 2,00 11.800.000 0,00 5.900.000 0 2,00 11.800.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

33,50 5.900.000 197.650.000 33,50 197.650.000 0,00 5.900.000 0 33,50 197.650.000 0,00 0

3,50 6.400.000 22.400.000 1,50 9.600.000 1,00 6.400.000 6.400.000 2,50 16.000.000 1,00 6.400.000

40

34

Sub Proff. Financial 11

Sub Proff. Financial 24

31

29 Indra Adiyanto

Didik Purwo Santoso

Suswayanti 44

Sub Proff. Financial 22

37

41

38

Sub Proff. Financial 19

Sub Proff. Financial 21

Imam Syafi'i

Heru Sulistiono

Elly Sulistiawati

43 Susanah

39

42

33

Gangsar Yudono

Bekti Hariyanto

30

Sub Proff. Financial 15

32

Sub Proff. Financial 18

Sub Proff. Financial 13Ari Wijianto

Sub Prof, Administration 1

Sub Proff. Financial 16

Sub Proff. Financial 14

Sub Proff. Financial 20

Sub Proff. Financial 17

Dwijayanti Edi Jayani

Sub Proff. Financial 23

Sub Proff. Financial 12

36

35

Muhammad Sulaiman

Heri Suyatno

Luqman Hakim

Indah Zulfana

Theresia Dian Purnama Dewi

Sub Proff. Financial 25

Page 7: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,80 5.000.000 99.000.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,03 166.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

31,50 5.900.000 185.850.000 31,50 185.850.000 0,00 5.900.000 0 31,50 185.850.000 0,00 0

3,50 5.900.000 20.650.000 1,50 8.850.000 1,00 5.900.000 5.900.000 2,50 14.750.000 1,00 5.900.000

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

31,50 5.900.000 185.850.000 31,50 185.850.000 0,00 5.900.000 0 31,50 185.850.000 0,00 0

3,50 5.900.000 20.650.000 1,50 8.850.000 1,00 5.900.000 5.900.000 2,50 14.750.000 1,00 5.900.000

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

31,50 5.900.000 185.850.000 31,50 185.850.000 0,00 5.900.000 0 31,50 185.850.000 0,00 0

3,50 5.900.000 20.650.000 1,50 8.850.000 1,00 5.900.000 5.900.000 2,50 14.750.000 1,00 5.900.000

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

30,00 5.900.000 177.000.000 30,00 177.000.000 0,00 5.900.000 0 30,00 177.000.000 0,00 0

49 Luqman Hakim Sub Prof Financial 9,00 5.900.000 53.100.000 9,00 53.100.000 0,00 5.900.000 0 9,00 53.100.000 0,00 0

50 Sri Umi Sub Prof Financial 6,00 5.900.000 35.400.000 6,00 35.400.000 0,00 5.900.000 0 6,00 35.400.000 0,00 0

Bambang Kristiawan/Mochammad Wahyudi 2,00 5.900.000 11.800.000 2,00 11.800.000 0,00 5.900.000 0 2,00 11.800.000 0,00 0

3,50 5.900.000 20.650.000 1,50 8.850.000 1,00 5.900.000 5.900.000 2,50 14.750.000 1,00 5.900.000

Ika Oktavianti Sub Prof Financial 2,00 5.900.000 11.800.000 2,00 11.800.000 0,00 5.900.000 0 2,00 11.800.000 0,00 0

3,50 5.900.000 20.650.000 1,50 8.850.000 1,00 5.900.000 5.900.000 2,50 14.750.000 1,00 5.900.000

PERCEPATAN PENYIAPAN DOKUMEN SIAP

Dana Wahyu Prismawan Sub TA GIS - 1 2,48 6.500.000 16.120.000 2,48 16.120.000 0,00 6.500.000 0 2,48 16.120.000 0,00 0

Meyuston Lenggu Sub TA GIS - 2 2,48 6.500.000 16.120.000 2,48 16.088.800 0,00 6.500.000 0 2,48 16.088.800 0,00 31.200

Bagus Subakti Sub TA GIS - 3 2,48 6.500.000 16.120.000 2,47 16.076.914 0,00 6.500.000 0 2,47 16.076.914 0,01 43.086

Nyimas Martha O Sub TA Urban Planner - 1 1,85 6.500.000 12.000.000 1,84 11.950.000 0,00 6.500.000 0 1,84 11.950.000 0,01 50.000

Saifudin Sub TA Urban Planner - 2 1,85 6.500.000 12.000.000 1,84 11.950.000 0,00 6.500.000 0 1,84 11.950.000 0,01 50.000

Cristina Lukita Sari Sub TA Urban Planner - 3 1,80 6.500.000 11.700.000 1,80 11.695.238 0,00 6.500.000 0 1,80 11.695.238 0,00 4.762

Danny Mahardika Sub TA Teknik & Arsitek - 1 1,96 6.500.000 12.771.500 1,96 12.771.428 0,00 6.500.000 0 1,96 12.771.428 0,00 72

Aries Munanto Sub TA Teknik & Arsitek - 2 1,96 6.500.000 12.677.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 27.000

Saiful Anam Sub TA Teknik & Arsitek - 3 1,96 6.500.000 12.740.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 90.000

Lia Agustina M Sub TA Teknik Environmental - 1 1,96 6.500.000 12.771.500 1,96 12.771.428 0,00 6.500.000 0 1,96 12.771.428 0,00 72

Tutut Indra I Sub TA Teknik Environmental - 2 1,96 6.500.000 12.740.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 90.000

Allen Ardianto W Sub TA Teknik Environmental - 3 1,96 6.500.000 12.740.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 90.000

TBN Cost Estimator - 1 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0

TBN Cost Estimator - 2 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0

TBN Cost Estimator - 3 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0

Arif Fadilah Drafter/Operator 1 2,00 5.000.000 10.000.000 2,00 10.000.000 0,00 5.000.000 0 2,00 10.000.000 0,00 0

Alfan Prasetyo Drafter/Operator 2 2,00 5.000.000 10.000.000 2,00 10.000.000 0,00 5.000.000 0 2,00 10.000.000 0,00 0

Mat Arif Drafter/Operator 3 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0

Ahmad Subandrio Sidik Drafter/Operator 4 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0

Mohammad Firdaus Fuadi Drafter/Operator 5 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0

Zainul Arifin Drafter/Operator 6 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0

TBN Surveyor 5 Orang 15,00 5.000.000 75.000.000 15,00 75.000.000 0,00 5.000.000 0 15,00 75.000.000 0,00 0

TBN Tenaga Lokal 1 Surveyor 2 Orang 29,00 3.000.000 87.000.000 29,00 87.000.000 0,00 3.000.000 0 29,00 87.000.000 0,00 0

C. EAST KALIMANTAN PROVINCE 7.200.985.000 6.986.964.672 101.600.000 7.088.564.672 112.420.328

19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333

17,00 12.700.000 215.900.000 17,00 215.900.000 0,00 12.700.000 0 17,00 215.900.000 0,00 0

33,50 13.700.000 458.950.000 33,50 458.950.000 0,00 13.700.000 0 33,50 458.950.000 0,00 0

3,50 14.800.000 51.800.000 1,50 22.200.000 1,00 14.800.000 14.800.000 2,50 37.000.000 1,00 14.800.000

19,77 8.500.000 168.045.000 19,77 168.016.667 0,00 8.500.000 0 19,77 168.016.667 0,00 28.333

17,00 9.400.000 159.800.000 17,00 159.800.000 0,00 9.400.000 0 17,00 159.800.000 0,00 0

33,50 10.100.000 338.350.000 33,50 338.350.000 0,00 10.100.000 0 33,50 338.350.000 0,00 0

3,50 10.900.000 38.150.000 1,50 16.350.000 1,00 10.900.000 10.900.000 2,50 27.250.000 1,00 10.900.000

Sub Prof, Administration 2Danny Chandra Sagita/ Luqman Hakim45

Sub Prof, Administration 3Leny Dayan Patiung

Sub Prof, Administration 548

47 Sub Prof, Administration 4

Sub Prof Financial

Provincial Team Leader 1

Nurmala Sari / Luqman Hakim/ Adi Suhendro

46

FX. Isgiarto

Adi Suhendro

Monev Specialist2 Husnul Yakin Huda

Page 8: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

Siswo Prasetyo 5,27 8.000.000 42.160.000 5,27 42.133.333 0,00 8.000.000 0 5,27 42.133.333 0,00 26.667

14,50 8.000.000 116.000.000 14,50 116.000.000 0,00 8.000.000 0 14,50 116.000.000 0,00 0

17,00 8.600.000 146.200.000 17,00 146.200.000 0,00 8.600.000 0 17,00 146.200.000 0,00 0

19,00 9.300.000 176.700.000 19,00 176.700.000 0,00 9.300.000 0 19,00 176.700.000 0,00 0

5,50 9.300.000 51.150.000 3,50 32.550.000 1,00 9.300.000 9.300.000 4,50 41.850.000 1,00 9.300.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

19,00 9.500.000 180.500.000 19,00 180.500.000 0,00 9.500.000 0 19,00 180.500.000 0,00 0

Susanto Eko 3,50 8.000.000 28.000.000 1,00 8.000.000 1,00 8.000.000 8.000.000 2,00 16.000.000 1,50 12.000.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

19,00 9.500.000 180.500.000 18,98 180.310.000 0,00 9.500.000 0 18,98 180.310.000 0,02 190.000

Hendery Casanova 16,00 9.500.000 152.000.000 14,00 133.000.000 1,00 9.500.000 9.500.000 15,00 142.500.000 1,00 9.500.000

19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

1,00 7.700.000 7.700.000 1,00 7.700.000 0,00 7.700.000 0 1,00 7.700.000 0,00 0

Deny Saputra 2,55 7.700.000 19.635.000 2,55 19.635.000 0,00 7.700.000 0 2,55 19.635.000 0,00 0

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

33,50 9.500.000 318.250.000 33,50 318.250.000 0,00 9.500.000 0 33,50 318.250.000 0,00 0

3,50 10.300.000 36.050.000 1,50 15.450.000 1,00 10.300.000 10.300.000 2,50 25.750.000 1,00 10.300.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

33,50 9.500.000 318.250.000 31,00 294.500.000 1,00 9.500.000 9.500.000 32,00 304.000.000 1,50 14.250.000

19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0

17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0

19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0

Suwarno Hardjo 12,07 8.000.000 96.560.000 12,07 96.533.333 0,00 8.000.000 0 12,07 96.533.333 0,00 26.667

Umar Sodik 16,00 8.000.000 128.000.000 16,00 128.000.000 0,00 8.000.000 0 16,00 128.000.000 0,00 0

Harly Suhartono 4,00 8.500.000 34.000.000 4,00 34.000.000 0,00 8.500.000 0 4,00 34.000.000 0,00 0

Suyono 14,50 8.500.000 123.250.000 12,44 105.731.500 1,00 8.500.000 8.500.000 13,44 114.231.500 1,06 9.018.500

14,30 8.000.000 114.400.000 14,30 114.400.000 0,00 8.000.000 0 14,30 114.400.000 0,00 0

1,00 8.500.000 8.500.000 1,00 8.500.000 0,00 8.500.000 0 1,00 8.500.000 0,00 0

Muhammad Tauhid 23,50 8.500.000 199.750.000 21,50 182.750.000 1,00 8.500.000 8.500.000 22,50 191.250.000 1,00 8.500.000

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

33,50 5.900.000 197.650.000 33,50 197.650.000 0,00 5.900.000 0 33,50 197.650.000 0,00 0

3,50 6.400.000 22.400.000 1,50 9.600.000 1,00 6.400.000 6.400.000 2,50 16.000.000 1,00 6.400.000

15 Marlyana Sub Prof Financial 9,00 5.900.000 53.100.000 9,00 53.100.000 0,00 5.900.000 0 9,00 53.100.000 0,00 0

8,60 5.900.000 50.740.000 8,54 50.409.600 0,00 5.900.000 0 8,54 50.409.600 0,06 330.400

3,50 5.900.000 20.650.000 1,50 8.850.000 1,00 5.900.000 5.900.000 2,50 14.750.000 1,00 5.900.000

PERCEPATAN PENYIAPAN DOKUMEN SIAP

Dana Adisukma Sub TA GIS - 1 2,30 6.500.000 14.950.000 2,30 14.925.000 0,00 6.500.000 0 2,30 14.925.000 0,00 25.000

Tommy Sembiring Sub TA GIS - 2 2,30 6.500.000 14.950.000 2,30 14.789.286 0,00 6.500.000 0 2,30 14.789.286 0,00 160.714

Monthana Kharisma Kadri Sub TA Urban Planner - 1 2,30 6.500.000 14.950.000 2,30 14.925.000 0,00 6.500.000 0 2,30 14.925.000 0,00 25.000

Jelita Citrawati Jihan Sub TA Urban Planner - 2 2,30 6.500.000 14.950.000 2,30 14.789.286 0,00 6.500.000 0 2,30 14.789.286 0,00 160.714

Reni Handayani Sub TA Tehnik & Arsitek - 1 2,40 6.500.000 15.600.000 2,40 15.476.190 0,00 6.500.000 0 2,40 15.476.190 0,00 123.810

Untung Sub TA Tehnik & Arsitek - 2 2,40 6.500.000 15.600.000 2,40 15.476.191 0,00 6.500.000 0 2,40 15.476.191 0,00 123.809

Febrina Zulya Sub TA Teknik Environmental - 1 2,30 6.500.000 14.950.000 2,30 14.925.000 0,00 6.500.000 0 2,30 14.925.000 0,00 25.000

Muhammad Rizky Sa'bani Sub TA Teknik Environmental - 2 2,30 6.500.000 14.950.000 2,30 14.789.286 0,00 6.500.000 0 2,30 14.789.286 0,00 160.714

TBN Cost Estimator - 1 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0

TBN Cost Estimator - 2 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0

Yaskinul Anwar Drafter/Operator - 1 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0

6

10

13

16

Yoga Oetama

5

Mohamad Ma'sum Damiri

Training Specialist

Yoga Oetama

14

3

a. Sub Spec. RLF

Collaboration & Local Government Spec

Masitah Harahap

Marlina Indah Susanti

Sub Prof Financial

Sub Prof, Administration

a. Sub Spec.SME’s

MIS Specialist

8

Infrastructure Specialist7

4

Dadang Abdullah

Susman Haryono

Abdul Rozak

Nur Varida Agustin

12

Sub Proff. Financial 2

Socialization Specialist

Urban Planner Specialist**)11

Marlyana Sub Proff. Financial 1

Soetomo

Hendery Casanova

9

Micro Fin & Fin.Mgmt Spec.

Page 9: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

Cahyaning Permata dewi Drafter/Operator - 2 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0

Hendri Fauzi Drafter/Operator - 3 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0

Zeth Birawin Songgo Drafter/Operator - 4 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0

Nur Ichsan, Nandik Purwanto, Erli Anastasia Wardhani Surveyor 5 Orang 3,00 5.000.000 15.000.000 3,00 15.000.000 0,00 5.000.000 0 3,00 15.000.000 0,00 0

Dian Ika Sari, Erni Loboran, Mohan Wibowo, Ermia Tammu Tenaga Lokal 1 Surveyor 2 Orang 4,00 3.000.000 12.000.000 4,00 12.000.000 0,00 3.000.000 0 4,00 12.000.000 0,00 0

D. CENTRAL KALIMANTAN PROVINCE 4.417.399.000 4.187.938.333 96.500.000 4.284.438.333 132.960.667

19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333

17,00 12.700.000 215.900.000 17,00 215.900.000 0,00 12.700.000 0 17,00 215.900.000 0,00 0

4,42 13.700.000 60.554.000 4,42 60.554.000 0,00 13.700.000 0 4,42 60.554.000 0,00 0

Anto S. Andai 26,50 13.700.000 363.050.000 26,50 363.050.000 0,00 13.700.000 0 26,50 363.050.000 0,00 0

3,50 14.800.000 51.800.000 1,50 22.200.000 1,00 14.800.000 14.800.000 2,50 37.000.000 1,00 14.800.000

2 Alexsen L. Panjaitan Monev Specialist 3,50 8.000.000 28.000.000 0,00 0 2,00 8.000.000 16.000.000 2,00 16.000.000 1,50 12.000.000

M. Saiful Arif 12,77 8.000.000 102.160.000 12,77 102.133.333 0,00 8.000.000 0 12,77 102.133.333 0,00 26.667

H. Zainul Mushoffie 22,00 8.000.000 176.000.000 22,00 176.000.000 0,00 8.000.000 0 22,00 176.000.000 0,00 0

18,00 9.000.000 162.000.000 18,00 162.000.000 0,00 9.000.000 0 18,00 162.000.000 0,00 0

Sukwan Itta 5,50 9.000.000 49.500.000 3,50 31.500.000 1,00 9.000.000 9.000.000 4,50 40.500.000 1,00 9.000.000

4 Ma'mun Suryana Socialization Specialist 3,50 8.000.000 28.000.000 1,00 8.000.000 1,00 8.000.000 8.000.000 2,00 16.000.000 1,50 12.000.000

Aris Hariyanto 4,77 8.000.000 38.160.000 4,77 38.133.333 0,00 8.000.000 0 4,77 38.133.333 0,00 26.667

14,00 8.000.000 112.000.000 14,00 112.000.000 0,00 8.000.000 0 14,00 112.000.000 0,00 0

17,00 8.600.000 146.200.000 17,00 146.200.000 0,00 8.600.000 0 17,00 146.200.000 0,00 0

10,00 9.300.000 93.000.000 10,00 93.000.000 0,00 9.300.000 0 10,00 93.000.000 0,00 0

Suwisnu 16,00 9.300.000 148.800.000 16,00 148.800.000 0,00 9.300.000 0 16,00 148.800.000 0,00 0

Metty Rud Sakalessy 3,50 8.000.000 28.000.000 1,00 8.000.000 1,00 8.000.000 8.000.000 2,00 16.000.000 1,50 12.000.000

Moh. Zamroni S. 5,27 8.000.000 42.160.000 5,27 42.133.333 0,00 8.000.000 0 5,27 42.133.333 0,00 26.667

Wahyu Hidayat 6,50 8.000.000 52.000.000 6,50 52.000.000 0,00 8.000.000 0 6,50 52.000.000 0,00 0

21,00 8.000.000 168.000.000 21,00 168.000.000 0,00 8.000.000 0 21,00 168.000.000 0,00 0

2,00 8.000.000 16.000.000 2,00 16.000.000 0,00 8.000.000 0 2,00 16.000.000 0,00 0

Alexsen L. Panjaitan 24,50 8.000.000 196.000.000 24,50 196.000.000 0,00 8.000.000 0 24,50 196.000.000 0,00 0

Alexsen L. Panjaitan/ Purna Icae 3,50 8.000.000 28.000.000 1,50 12.000.000 1,00 8.000.000 8.000.000 2,50 20.000.000 1,00 8.000.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

16,00 8.800.000 140.800.000 16,00 140.800.000 0,00 8.800.000 0 16,00 140.800.000 0,00 0

2,00 8.800.000 17.600.000 2,00 17.600.000 0,00 8.800.000 0 2,00 17.600.000 0,00 0

Yusnita 24,50 8.800.000 215.600.000 22,00 193.600.000 1,00 8.800.000 8.800.000 23,00 202.400.000 1,50 13.200.000

19,00 8.000.000 152.000.000 19,00 152.000.000 0,00 8.000.000 0 19,00 152.000.000 0,00 0

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

28,00 9.500.000 266.000.000 25,87 245.765.000 1,00 9.500.000 9.500.000 26,87 255.265.000 1,13 10.735.000

14,30 8.000.000 114.400.000 14,30 114.400.000 0,00 8.000.000 0 14,30 114.400.000 0,00 0

28,00 8.500.000 238.000.000 28,00 238.000.000 0,00 8.500.000 0 28,00 238.000.000 0,00 0

Gus Mulyadi 4,00 8.000.000 32.000.000 0,14 1.136.000 1,00 8.000.000 8.000.000 1,14 9.136.000 2,86 22.864.000

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

23,50 5.900.000 138.650.000 22,50 126.850.000 0,00 5.900.000 0 22,50 126.850.000 1,00 11.800.000

3,50 6.400.000 22.400.000 1,50 9.600.000 1,00 6.400.000 6.400.000 2,50 16.000.000 1,00 6.400.000

11 TBN Sub Proff. Financial 1,00 5.900.000 5.900.000 1,00 5.900.000 0,00 5.900.000 0 1,00 5.900.000 0,00 0

E. SOUTH KALIMANTAN PROVINCE 7.446.840.000 7.224.740.164 90.600.000 7.315.340.164 131.499.836

19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333

7,35 12.700.000 93.345.000 7,35 93.345.000 0,00 12.700.000 0 7,35 93.345.000 0,00 0

42,50 12.700.000 539.750.000 42,50 538.000.000 0,00 12.700.000 0 42,50 538.000.000 0,00 1.750.000

3,50 14.500.000 50.750.000 1,50 19.050.000 1,00 12.700.000 12.700.000 2,50 31.750.000 1,00 19.000.000

Hasan Ubaidillah 5,27 8.500.000 44.795.000 5,27 44.766.667 0,00 8.500.000 0 5,27 44.766.667 0,00 28.333

14,50 8.500.000 123.250.000 14,50 123.250.000 0,00 8.500.000 0 14,50 123.250.000 0,00 0

8,00 9.200.000 73.600.000 8,00 73.600.000 0,00 9.200.000 0 8,00 73.600.000 0,00 0

0,00 9.200.000 0 0,00 0 0,00 9.200.000 0 0,00 0 0,00 0

Arif Rachman / Ahmad Zaini 27,10 9.200.000 249.320.000 27,02 248.548.387 0,00 9.200.000 0 27,02 248.548.387 0,08 771.613

Ahmad Zaini 3,50 9.800.000 34.300.000 1,50 14.700.000 1,00 9.800.000 9.800.000 2,50 24.500.000 1,00 9.800.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

1,00 9.500.000 9.500.000 1,00 9.500.000 0,00 9.500.000 0 1,00 9.500.000 0,00 0

3,00 9.500.000 28.500.000 3,00 28.500.000 0,00 9.500.000 0 3,00 28.500.000 0,00 0

11,00 9.500.000 104.500.000 11,00 104.500.000 0,00 9.500.000 0 11,00 104.500.000 0,00 0

Dwi Joko Riswoto 5,50 8.000.000 44.000.000 3,50 28.000.000 1,00 8.000.000 8.000.000 4,50 36.000.000 1,00 8.000.000

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

22,50 9.500.000 213.750.000 20,00 190.000.000 1,00 9.500.000 9.500.000 21,00 199.500.000 1,50 14.250.000

5 Training Specialist

Infrastructure Specialist6

Provincial Team Leader

MIS Specialist

1

Sub Proff Admin for Kota/Kabupaten

Urban Planner Specialist**)

10

7

9

8

Sub Proff. Financial

Iwan Setiawan

3

1

Mohammad Aziz

Provincial Team Leader

3

4

Collaboration & Local Government Spec

2

Socialization Specialist

MIS Specialist

Micro Fin & Fin.Mgmt Spec.

Monev Specialist

Emmy Uthanya Antang

Heru Agus Sulistyo

Asmaul Aziz

Anto S. Andai / Frind Emanuel

Irfan / Firman S

Yusepta

Deni Jauhari

Iwan Setiawan

Bagus Priono

Sukwan Itta

Sarkowi

Page 10: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

35,50 9.500.000 337.250.000 33,50 318.250.000 1,00 9.500.000 9.500.000 34,50 327.750.000 1,00 9.500.000

Arif Rachman 5,27 6.500.000 34.255.000 5,27 34.233.333 0,00 6.500.000 0 5,27 34.233.333 0,00 21.667

Sari Melawati 4,00 6.500.000 26.000.000 4,00 26.000.000 0,00 6.500.000 0 4,00 26.000.000 0,00 0

M. Yatin 10,76 6.500.000 69.940.000 10,76 69.940.000 0,00 6.500.000 0 10,76 69.940.000 0,00 0

13,00 6.500.000 84.500.000 13,00 84.500.000 0,00 6.500.000 0 13,00 84.500.000 0,00 0

5,00 6.900.000 34.500.000 5,00 34.500.000 0,00 6.900.000 0 5,00 34.500.000 0,00 0

Muhammad Ripay 9,00 6.900.000 62.100.000 9,00 62.100.000 0,00 6.900.000 0 9,00 62.100.000 0,00 0

19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667

17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0

33,50 9.500.000 318.250.000 33,50 318.250.000 0,00 9.500.000 0 33,50 318.250.000 0,00 0

3,50 10.300.000 36.050.000 1,50 15.450.000 1,00 10.300.000 10.300.000 2,50 25.750.000 1,00 10.300.000

8,77 10.000.000 87.700.000 8,77 87.666.667 0,00 10.000.000 0 8,77 87.666.667 0,00 33.333

19,00 10.000.000 190.000.000 19,00 190.000.000 0,00 10.000.000 0 19,00 190.000.000 0,00 0

Rusdian 36,50 10.000.000 365.000.000 34,00 340.000.000 1,00 10.000.000 10.000.000 35,00 350.000.000 1,50 15.000.000

19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0

14,00 7.200.000 100.800.000 14,00 100.800.000 0,00 7.200.000 0 14,00 100.800.000 0,00 0

0,00 7.200.000 0 0,00 0 0,00 7.200.000 0 0,00 0 0,00 0

Akhmad Ridhany Fidzi 5,00 7.200.000 36.000.000 5,00 36.000.000 0,00 7.200.000 0 5,00 36.000.000 0,00 0

Iwan Setiawan 5,27 8.000.000 42.160.000 5,27 42.133.333 0,00 8.000.000 0 5,27 42.133.333 0,00 26.667

14,50 8.000.000 116.000.000 14,50 116.000.000 0,00 8.000.000 0 14,50 116.000.000 0,00 0

17,00 8.600.000 146.200.000 17,00 146.200.000 0,00 8.600.000 0 17,00 146.200.000 0,00 0

4,00 9.300.000 37.200.000 4,00 37.200.000 0,00 9.300.000 0 4,00 37.200.000 0,00 0

Edi Sudiono 27,00 9.300.000 251.100.000 24,90 231.551.400 0,00 9.300.000 0 24,90 231.551.400 2,10 19.548.600

10,00 8.000.000 80.000.000 9,97 79.733.333 0,00 8.000.000 0 9,97 79.733.333 0,03 266.667

14,36 8.000.000 114.880.000 14,35 114.838.710 0,00 8.000.000 0 14,35 114.838.710 0,01 41.290

35,50 8.500.000 301.750.000 33,50 284.750.000 1,00 8.500.000 8.500.000 34,50 293.250.000 1,00 8.500.000

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0

Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0

19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667

17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0

33,50 5.900.000 197.650.000 33,50 197.650.000 0,00 5.900.000 0 33,50 197.650.000 0,00 0

3,50 6.400.000 22.400.000 1,50 9.600.000 1,00 6.400.000 6.400.000 2,50 16.000.000 1,00 6.400.000

16 Nor Afidah Sub Prof Financial 9,00 5.900.000 53.100.000 9,00 53.100.000 0,00 5.900.000 0 9,00 53.100.000 0,00 0

8,00 5.900.000 47.200.000 8,00 47.200.000 0,00 5.900.000 0 8,00 47.200.000 0,00 0

3,50 6.400.000 22.400.000 1,50 9.100.000 1,00 6.400.000 5.900.000 2,50 15.000.000 1,00 7.400.000

PERCEPATAN PENYIAPAN DOKUMEN SIAP

Mulyadi Sub TA GIS 2,30 6.500.000 14.950.000 2,30 14.950.000 0,00 6.500.000 0 2,30 14.950.000 0,00 0

Bubun Primbun Sub TA Urban Planner 2,30 6.500.000 14.950.000 2,25 14.625.000 0,00 6.500.000 0 2,25 14.625.000 0,05 325.000

Dini Danianti Sub TA Tehnik & Arsitek 2,30 6.500.000 14.950.000 2,30 14.950.000 0,00 6.500.000 0 2,30 14.950.000 0,00 0

Ainal Muttaqin, ST Sub TA Teknik Environmental 2,30 6.500.000 14.950.000 2,25 14.625.000 0,00 6.500.000 0 2,25 14.625.000 0,05 325.000

TBN Cost Estimator 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0

Fitri Eka Sumitra Drafter/Operator - 1 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0

Eka Saktianto Drafter/Operator - 2 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0

Wahyu Kurniawan, Alpianor, Isa Ansari, M. Zakaria, Abdurrahman Surveyor 5 Orang 5,00 5.000.000 25.000.000 5,00 25.000.000 0,00 5.000.000 0 5,00 25.000.000 0,00 0

TBN Tenaga Lokal 1 Surveyor 2 Orang 0,00 3.000.000 0 0,00 0 0,00 3.000.000 0 0,00 0 0,00 0

Sub Total 1.1 38.028.733.000 37.105.616.764 411.900.000 37.517.516.764 511.216.236

15

Sub Prof Financial

Sub Proff. Financial 1

10

Sub Prof, Administration

14

13

Urban Planner Specialist**)

12

Infrastructure Specialist

a. Sub Spec.SME’s

Local Gov & Public Policy Spec

Training Specialist

17

9

Akhmad Ridhany Fidzi

Micro Fin & Fin.Mgmt Spec.

11

Sub Proff. Financial 3

Sub Proff. Financial 2

8

5

6

7

a. Sub Spec. RLF

Fathur Rahmi Gultom

Edi Sudiono

Ardan Noor

Kusdarminto

Rini S. Friyanti

Rusdian

Arif Rachman

Dwi Kurniasih

Abdolli

Nor Afidah

Risna Hastuti

Nor Afidah

Page 11: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

1.2.Supporting Staff Mei 2018

0 NAMA POSISI

MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

A. EAST JAVA PROVINCE 984.877.500 952.440.000 13.900.000 966.340.000 18.537.50018,77 3.500.000 65.695.000 18,77 65.683.333 0,00 3.500.000 0 18,77 65.683.333 0,00 11.66717,00 3.800.000 64.600.000 17,00 64.600.000 0,00 3.800.000 0 17,00 64.600.000 0,00 033,50 4.100.000 137.350.000 33,50 137.350.000 0,00 4.100.000 0 33,50 137.350.000 0,00 0

Muhson 3,50 4.500.000 15.750.000 1,50 6.750.000 1,00 4.500.000 4.500.000 2,50 11.250.000 1,00 4.500.0004,00 2.000.000 8.000.000 4,00 8.000.000 0,00 2.000.000 0 4,00 8.000.000 0,00 0

16,00 2.200.000 35.200.000 16,00 35.200.000 0,00 2.200.000 0 16,00 35.200.000 0,00 033,50 2.400.000 80.400.000 33,50 80.400.000 0,00 2.400.000 0 33,50 80.400.000 0,00 03,50 2.600.000 9.100.000 1,50 3.900.000 1,00 2.600.000 2.600.000 2,50 6.500.000 1,00 2.600.000

19,77 2.000.000 39.540.000 19,77 39.533.333 0,00 2.000.000 0 19,77 39.533.333 0,00 6.66717,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 032,50 2.400.000 78.000.000 32,50 78.000.000 0,00 2.400.000 0 32,50 78.000.000 0,00 0

Romdhoni 3,50 2.600.000 9.100.000 1,50 3.900.000 1,00 2.600.000 2.600.000 2,50 6.500.000 1,00 2.600.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 31,50 45.675.000 0,00 1.450.000 0 31,50 45.675.000 2,00 2.900.000

Rina Wahyu Seftya Wheny 3,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 21.250.000 0,00 1.250.000 0 17,00 21.250.000 0,00 1.700.00019,00 1.450.000 27.550.000 19,00 27.550.000 0,00 1.450.000 0 19,00 27.550.000 0,00 0

Ramadhani Fitriza 15,77 1.250.000 19.712.500 15,77 19.708.333 0,00 1.250.000 0 15,77 19.708.333 0,00 4.1670,00 1.350.000 0 0,00 0 0,00 1.350.000 0 0,00 0 0,00 00,00 1.450.000 0 0,00 0 1.450.000 0 0,00 0 0,00 0

TBN 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33315,00 1.100.000 16.500.000 15,00 16.500.000 0,00 1.100.000 0 15,00 16.500.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 07,00 1.100.000 7.700.000 7,00 7.700.000 0,00 1.100.000 0 7,00 7.700.000 0,00 00,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0

PERCEPATAN PENYIAPAN DOKUMEN SIAP 0,00 0

Wasiatul Rosidah Ass. OM-1 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0

Cahya Erni Dwi Astuti Ass. OM-2 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0

Hasti Widyani Ass. OM-3 1,00 2.400.000 2.400.000 1,00 2.400.000 0,00 2.400.000 0 1,00 2.400.000 0,00 0

TBN Sekretaris/ Comp Oprtr-1 0,00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0

TBN Sekretaris/ Comp Oprtr-2 0,00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0

TBN Sekretaris/ Comp Oprtr-3 0,00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0

Sri Utami OB-1 2,00 1.200.000 2.400.000 2,00 2.400.000 0,00 1.200.000 0 2,00 2.400.000 0,00 0

Mukhammad Zainuri OB-2 1,20 1.200.000 1.440.000 1,20 1.440.000 0,00 1.200.000 0 1,20 1.440.000 0,00 0

Daud Supriyadi OB-3 1,00 1.200.000 1.200.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 0,00 0

KORKOT 3.951.617.500 3.894.651.333 24.500.000 3.919.151.333 32.466.167 19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 1 (Kab. Pacitan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 2 (Kab. Ponorogo) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 4 (Kab. Blitar) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 5 (Kab. Kediri) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 0

8

4Romdhoni

Ass. Office Manager

Office Boy7 Sri Windari

Computer Operator 2

Ramadhani Fitriza2

Secretary3Ika Oktavianti/ Romdhoni

Office Manager1Bangkit Priyohusodho / Muhson

Computer Operator 4

Computer Operator 5

Computer Operator 1

Security 1

Hana Hariani

M. Muchlis Chumaida

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE SAAT INI INVOICE S/D SAAT INI

3

2

Computer Operator 3

INVOICE LALU

Eka Novita Sari

9

6

Security 2

4

Computer Operator 3 (Kab. Tulung

Agung)

Budi Santoso

Nofa Eka Aprillia

5

Computer Operator 1

Danar Hadi Prasetyo

Computer Operator 2

1

Computer Operator 3

5

TBN

Eko Heppy Nugroho

Andrias C Eko

Page 12: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 6 (Kota. Kediri) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,37 1.250.000 24.212.500 17,77 24.205.000 0,00 1.250.000 0 17,77 24.205.000 1,60 7.50017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 8 (Kab. Nganjuk) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 020,17 1.250.000 25.212.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,40 504.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 10 (kab. Magetan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 11 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 12 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 030,50 1.450.000 44.225.000 30,50 44.225.000 0,00 1.450.000 0 30,50 44.225.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 027,50 1.450.000 39.875.000 27,50 38.193.000 0,00 1.450.000 0 27,50 38.193.000 0,00 1.682.0003,50 1.600.000 5.600.000 0,00 0 0,00 1.600.000 0 0,00 0 3,50 5.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 16 (Kab. Mojokerto) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 18 (Kab. Malang) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 19 (Kab. Pasuruan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 20 (Kota. Pasuruan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 23 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0

Computer Operator 24 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16713,00 1.350.000 17.550.000 13,00 17.550.000 0,00 1.350.000 0 13,00 17.550.000 0,00 0

Computer Operator 25 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 0

TBN Computer Operator Kab. Bondowoso 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 0

Stifani Fauziyah, Amd /Afan Januar H, ST22

Yudit Suryo Prayugo23

24

Computer Operator 22 (Kab. Jember)

Lisa Eka Nur Apri Septiana25

Dewi Martiyana9

Computer Operator 13 (Kab. Gresik)

Nurul Hidayah13

Computer Operator 9

Moh. Ali

Computer Operator 6

Computer Operator 10

Computer Operator 9 (Kota Madiun)

Computer Operator 7 (Kab. Jombang)

Computer Operator 14

Computer Operator 11

Computer Operator 12

Computer Operator 13

Wasiatul Rosidah

11

Yuli Purwaningtyas

Computer Operator 16

12

Nurul Safitri10

8

Nella Wati6

14

15

Riza Zuhrroti Mawaddah

Computer Operator 8

Andri Suhariyanto

Siti Sholikhah

Computer Operator 17

Heny Lutfiana

Computer Operator 7

Computer Operator 15

Computer Operator 14 (Kota Surabaya)

Yesi Fatmasari

Computer Operator 15 (Kab. Sidoarjo)

Computer Operator 17 (Kota Malang)

17

Computer Operator 21 (Kab.

Probolinggo)

21

Intan Budi Arifah19

Computer Operator 18

Computer Operator 20

Delia Ratna Susita/ Siti Fatimah

Maslukha

16

Computer Operator 21

Computer Operator 22

Computer Operator 25

18

Computer Operator 23

Computer Operator 19

20

Computer Operator 24

Rizqiyyah Muyassaroh

7

Rizqiyyah Muyassaroh

Page 13: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

TBN Computer Operator Kota Pasuruan 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 0

TBN Computer Operator Kab. Trenggalek 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 0

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 1 (Kab. Pacitan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 2 (Kab. Ponorogo) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 4 (Kab. Blitar) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 5 (Kab. Kediri) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 6 (Kota Kediri) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

17,77 1.000.000 17.770.000 17,77 17.770.000 0,00 1.000.000 0 17,77 17.770.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 8 (Kab. Nganjuk) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 10 (Kab. Magetan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 11 (Kab. Bojonegoro) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 12 (Kab. Lamongan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 0

19,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 0

17,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

31,50 1.200.000 37.800.000 31,50 37.800.000 0,00 1.200.000 0 31,50 37.800.000 0,00 0

3,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 16 (Kab. Mojokerto) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 18 (Kab. Malang) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 19 (Kab. Pasuruan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 20 (Kota Pasuruan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 0

Nurhadi

41

Office Boy 15

Office Boy 16

Djumadi42

Office Boy 15 (Kab. Sidoarjo)

M. Kholili 40

Dian Wahyuni

Office Boy 3 (Kab. Tulung Agung)

Mukarom28

Puji Lestari27

Achmad Fatoni32

Office Boy 6

Nur Dewi Asiyah

Office Boy 3

Office Boy 4

Office Boy 7 (Kab. Jombang)

26

31

30

Ulin Nayyiron

Heri Waluyo29

39

Wiwid Basuki

Office Boy 7

Office Boy 5

Office Boy 8

Office Boy 9 (Kota Madiun)

Lintang Atyophya34

33

Abelia Sanjaya

43

35

Office Boy 13

Office Boy 18

Office Boy 19

Office Boy 13 (Kab. Gresik)

Office Boy 14 (Kota Surabaya)

Office Boy 17 (Kota Malang)

M. Sholihah

Dewi Masita

Office Boy 11

Office Boy 12

Office Boy 9

Office Boy 10

44

Priyo Aji Saputro

Office Boy 2

Office Boy 1

36

Misbachul Munir 45

Aminun38

Ahmadi

Office Boy 20

Office Boy 14

Office Boy 17

Suryanto37

Page 14: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 032,50 1.200.000 39.000.000 32,50 39.000.000 0,00 1.200.000 0 32,50 39.000.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 23 (Kab. Situbondo) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 24 (Kab. Banyuwangi) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0

Office Boy 25 (Kab. Pamekasan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 0

TBN Office Boy Kab. Bondowoso 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0

TBN Office Boy Kota Pasuruan 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0

TBN Office Boy Kab. Trenggalek 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0

B. SOUTH KALIMANTAN PROVINCE 718.132.500 697.908.333 9.200.000 707.108.333 11.024.16719,77 2.000.000 39.540.000 19,77 39.533.333 0,00 2.000.000 0 19,77 39.533.333 0,00 6.66717,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 033,50 2.400.000 80.400.000 33,50 80.400.000 0,00 2.400.000 0 33,50 80.400.000 0,00 03,50 2.600.000 9.100.000 1,50 3.900.000 1,00 2.600.000 2.600.000 2,50 6.500.000 1,00 2.600.000

19,77 1.750.000 34.597.500 19,77 34.591.667 0,00 1.750.000 0 19,77 34.591.667 0,00 5.83317,00 1.850.000 31.450.000 17,00 31.450.000 0,00 1.850.000 0 17,00 31.450.000 0,00 033,50 2.000.000 67.000.000 33,50 67.000.000 0,00 2.000.000 0 33,50 67.000.000 0,00 03,50 2.200.000 7.700.000 1,50 3.300.000 1,00 2.200.000 2.200.000 2,50 5.500.000 1,00 2.200.000

19,77 1.500.000 29.655.000 19,77 29.650.000 0,00 1.500.000 0 19,77 29.650.000 0,00 5.00017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 026,50 1.700.000 45.050.000 26,50 45.050.000 0,00 1.700.000 0 26,50 45.050.000 0,00 03,50 1.800.000 6.300.000 1,50 2.700.000 1,00 1.800.000 1.800.000 2,50 4.500.000 1,00 1.800.000

18,00 1.500.000 27.000.000 18,00 27.000.000 0,00 1.500.000 0 18,00 27.000.000 0,00 017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 019,00 1.700.000 32.300.000 19,00 32.300.000 0,00 1.700.000 0 19,00 32.300.000 0,00 0

J Office Boy 19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33316,00 1.100.000 17.600.000 16,00 17.600.000 0,00 1.100.000 0 16,00 17.600.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

J Security 1 19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

18,00 1.000.000 18.000.000 18,00 18.000.000 0,00 1.000.000 0 18,00 18.000.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 02,50 1.200.000 3.000.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 1,50 1.800.000

PERCEPATAN PENYIAPAN DOKUMEN SIAP 0,00 0

Fahrin Rosyadi Ass. OM 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0

Doni Pranata Sekretaris/ Comp Oprtr 2,00 2.000.000 4.000.000 2,00 4.000.000 0,00 2.000.000 0 2,00 4.000.000 0,00 0

Jiyani OB 2,00 1.200.000 2.400.000 2,00 2.400.000 0,00 1.200.000 0 2,00 2.400.000 0,00 0

KORKOT 780.805.000 749.500.000 12.900.000 762.400.000 18.405.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,50 1.350.000 23.625.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,50 675.00033,00 1.450.000 47.850.000 33,00 47.850.000 0,00 1.450.000 0 33,00 47.850.000 0,00 03,50 1.600.000 5.600.000 0,50 800.000 0,00 1.600.000 0 0,50 800.000 3,00 4.800.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

Office Boy 21 (Kab. Probolinggo)

4 M. Nur Ilman

6

4

Nor Asikin1

2

Senol Afidin

5

Hasiyah

Joko Sulistyono46

50

Khairunnisa

Adin Junia

49 Heny Nur Cahyani

Fitria Widianti48

47

Computer Operator 2

7

Computer Operator 3

Security 2

Computer Operator 1

Computer Operator 2

Office Boy 25

Ass Office Manager

Office Boy 22

Office Boy 22 (Kab. Jember)

Office Boy 23

Mulyani/Yetty Fatimah1

2 Secretary

Computer Operator 1Sefriady3

Rita EW3

Office Boy 24

Office Boy 21

Computer Operator 4

Kurdi/Iwan Sunata/Angga Saputra

Mutia Hikmah

Page 15: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

11,50 1.450.000 16.675.000 11,50 16.675.000 0,00 1.450.000 0 11,50 16.675.000 0,00 0

3,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

11,50 1.200.000 13.800.000 11,50 13.800.000 0,00 1.200.000 0 11,50 13.800.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

C. CENTRAL KALIMANTAN PROVINCE 737.842.500 719.425.000 9.200.000 728.625.000 9.217.50019,77 2.000.000 39.540.000 19,77 39.533.333 0,00 2.000.000 0 19,77 39.533.333 0,00 6.66717,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 033,50 2.400.000 80.400.000 33,50 80.400.000 0,00 2.400.000 0 33,50 80.400.000 0,00 03,50 2.600.000 9.100.000 1,50 3.900.000 1,00 2.600.000 2.600.000 2,50 6.500.000 1,00 2.600.000

19,77 1.750.000 34.597.500 19,77 34.591.667 0,00 1.750.000 0 19,77 34.591.667 0,00 5.83316,00 1.850.000 29.600.000 16,00 29.600.000 0,00 1.850.000 0 16,00 29.600.000 0,00 033,50 2.000.000 67.000.000 33,50 67.000.000 0,00 2.000.000 0 33,50 67.000.000 0,00 03,50 2.200.000 7.700.000 1,50 3.300.000 1,00 2.200.000 2.200.000 2,50 5.500.000 1,00 2.200.000

19,77 1.500.000 29.655.000 19,77 29.650.000 0,00 1.500.000 0 19,77 29.650.000 0,00 5.00017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 033,50 1.700.000 56.950.000 33,50 56.950.000 0,00 1.700.000 0 33,50 56.950.000 0,00 03,50 1.800.000 6.300.000 1,50 2.700.000 1,00 1.800.000 1.800.000 2,50 4.500.000 1,00 1.800.000

19,00 1.500.000 28.500.000 19,00 28.500.000 0,00 1.500.000 0 19,00 28.500.000 0,00 017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 019,00 1.700.000 32.300.000 19,00 32.300.000 0,00 1.700.000 0 19,00 32.300.000 0,00 019,77 1.000.000 19.770.000 19,77 19.770.000 0,00 1.000.000 0 19,77 19.770.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

17,23 1.000.000 17.230.000 17,23 17.230.000 0,00 1.000.000 0 17,23 17.230.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 029,50 1.200.000 35.400.000 29,50 35.400.000 0,00 1.200.000 0 29,50 35.400.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

19,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 023,00 1.200.000 27.600.000 23,00 27.600.000 0,00 1.200.000 0 23,00 27.600.000 0,00 0

KORKOT 184.095.000 178.291.668 2.900.000 181.191.668 2.903.33219,00 1.250.000 23.750.000 19,00 23.750.000 0,00 1.250.000 0 19,00 23.750.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,77 1.000.000 19.770.000 19,77 19.766.668 0,00 1.000.000 0 19,77 19.766.668 0,00 3.33217,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

D. EAST KALIMANTAN PROVINCE 553.060.000 531.356.667 7.700.000 539.056.667 14.003.33319,00 2.000.000 38.000.000 19,00 38.000.000 0,00 2.000.000 0 19,00 38.000.000 0,00 017,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 033,50 2.400.000 80.400.000 33,50 80.400.000 0,00 2.400.000 0 33,50 80.400.000 0,00 03,50 2.600.000 9.100.000 1,50 3.900.000 1,00 2.600.000 2.600.000 2,50 6.500.000 1,00 2.600.000

19,00 1.750.000 33.250.000 19,00 33.250.000 0,00 1.750.000 0 19,00 33.250.000 0,00 017,00 1.850.000 31.450.000 17,00 31.450.000 0,00 1.850.000 0 17,00 31.450.000 0,00 033,50 2.000.000 67.000.000 33,50 67.000.000 0,00 2.000.000 0 33,50 67.000.000 0,00 03,50 2.200.000 7.700.000 1,50 3.300.000 1,00 2.200.000 2.200.000 2,50 5.500.000 1,00 2.200.000

Security 1Hermiko Purnama Jaya7

Office Boy 1

Office Boy 4Suryati9

Office Boy 510 Gading Melati

6

Office Boy 2Muhammad Nurdiansyah7

Office Boy 3Noviyanti8

5 Computer Operator 5Ana Dewi Lestari

Security 2Andreas Andrianto/ Rizki

Ass Office Manager1 Erna Fatmawaty

Office Boy 1Suci Arliati

6

Yoga Setiawan/ Wahyu Yulianto

4

5 Office Boy

2

Wahyu Yulianto

Azis Santoso

Computer Operator 2

Computer Operator 1

Computer Operator 1Grid Degra Prasdiman3

SecretaryPina Yanti2

Ass Office Manager

Secretary

Lodewik

Heldy Yuliaty1

Achmadi1

2

Page 16: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

19,00 1.500.000 28.500.000 19,00 28.500.000 0,00 1.500.000 0 19,00 28.500.000 0,00 016,00 1.600.000 25.600.000 16,00 25.600.000 0,00 1.600.000 0 16,00 25.600.000 0,00 00,00 1.700.000 0 0,00 0 0,00 1.700.000 0 0,00 0 0,00 03,50 1.800.000 6.300.000 0,00 0 0,00 1.800.000 0 0,00 0 3,50 6.300.0000,00 1.500.000 0 0,00 0 0,00 1.500.000 0 0,00 0 0,00 04,00 1.600.000 6.400.000 4,00 6.400.000 0,00 1.600.000 0 4,00 6.400.000 0,00 00,00 1.700.000 0 0,00 0 0,00 1.700.000 0 0,00 0 0,00 0

19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 33,50 40.200.000 0,00 1.200.000 0 33,50 40.200.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.0000,00 1.000.000 0 0,00 0 0,00 1.000.000 0 0,00 0 0,00 00,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 00,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0

PERCEPATAN PENYIAPAN DOKUMEN SIAP 0,00 0

Shinta Ayu Lestari Ass. OM-1 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0

Yenni Kombong Ass. OM-2 1,30 2.400.000 3.120.000 1,30 3.120.000 0,00 2.400.000 0 1,30 3.120.000 0,00 0

Nanda Kusuma Wardani Sekretaris/ Comp Oprtr-1 2,00 2.000.000 4.000.000 2,00 4.000.000 0,00 2.000.000 0 2,00 4.000.000 0,00 0

Sarce Padondan Sekretaris/ Comp Oprtr-2 1,50 2.000.000 3.000.000 1,50 3.000.000 0,00 2.000.000 0 1,50 3.000.000 0,00 0

Natal Kristian OB-1 2,00 1.200.000 2.400.000 2,00 2.400.000 0,00 1.200.000 0 2,00 2.400.000 0,00 0

Maria Jenny OB-2 1,60 1.200.000 1.920.000 1,60 1.920.000 0,00 1.200.000 0 1,60 1.920.000 0,00 0

KORKOT 481.980.000 464.550.000 8.700.000 473.250.000 8.730.00019,00 1.250.000 23.750.000 19,00 23.750.000 0,00 1.250.000 0 19,00 23.750.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 029,20 1.450.000 41.340.000 28,50 41.325.000 0,00 1.450.000 0 28,50 41.325.000 0,70 15.0003,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

18,00 1.250.000 22.500.000 18,00 22.500.000 0,00 1.250.000 0 18,00 22.500.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,20 1.450.000 47.140.000 32,50 47.125.000 0,00 1.450.000 0 32,50 47.125.000 0,70 15.0003,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

17,50 1.250.000 21.875.000 17,50 21.875.000 0,00 1.250.000 0 17,50 21.875.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 33,50 48.575.000 0,00 1.450.000 0 33,50 48.575.000 0,00 03,50 1.600.000 5.600.000 1,50 2.400.000 1,00 1.600.000 1.600.000 2,50 4.000.000 1,00 1.600.000

19,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 015,00 1.100.000 18.500.000 15,00 18.500.000 0,00 1.100.000 0 15,00 18.500.000 0,00 029,50 1.200.000 35.400.000 29,50 35.400.000 0,00 1.200.000 0 29,50 35.400.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

16,00 1.000.000 16.000.000 16,00 16.000.000 0,00 1.000.000 0 16,00 16.000.000 0,00 014,00 1.100.000 15.400.000 14,00 15.400.000 0,00 1.100.000 0 14,00 15.400.000 0,00 022,50 1.200.000 27.000.000 22,50 27.000.000 0,00 1.200.000 0 22,50 27.000.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

18,00 1.000.000 18.000.000 18,00 18.000.000 0,00 1.000.000 0 18,00 18.000.000 0,00 012,00 1.100.000 13.200.000 12,00 13.200.000 0,00 1.100.000 0 12,00 13.200.000 0,00 012,50 1.200.000 15.000.000 12,50 15.000.000 0,00 1.200.000 0 12,50 15.000.000 0,00 03,50 1.300.000 4.550.000 1,50 1.950.000 1,00 1.300.000 1.300.000 2,50 3.250.000 1,00 1.300.000

Sub Total 1.2 8.392.410.000 8.188.123.001 89.000.000 8.277.123.001 115.286.999

Computer Operator 3Sukmawati1

7

6 Security 1

4

Computer Operator 1Iis Tri Rahayu3

Dewi Tarwiyati2 Computer Operator 2

Ahmad Yupiansyah

4

Security 2To be name

Computer Operator 1

Computer Operator 2

Office Boy

Sudirman

Office Boy 1Eka Saraswati6

Nur Laila5 Office Boy 2

Office Boy 3

To be name

Sani 5

Rahmanto

3

Page 17: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

II. DIRECT REIMBURSABLE COST

2.1. Duty Travel Expenses Province Jawa Timur Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.1.1 IN PROVINCE

2.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3% x Number of Kelurahan) 86.400.000 43.470.000 4.700.000 48.170.000 38.230.000

a. To Tulungagung, Trenggalek & Pacitan (119 kel x 3% = 4 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.470.000 0,00 150.000 0 10,00 1.470.000 0,00 30.000OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

b. To Madiun, Kota Madiun, Nganjuk (91 kel x 3% = 3 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

c. To Ponorogo & Magetan (79 kel x 3% = 3 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 3 days 14 150.000 2.100.000 14,00 2.100.000 0,00 150.000 0 14,00 2.100.000 0,00 0OSA 6 time x 1 person x 4 days 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0

d. To Kota Mojokerto, Mojokerto & Jombang (231 kel x 3% = 7 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 14 150.000 2.100.000 14,00 2.100.000 0,00 150.000 0 14,00 2.100.000 0,00 0OSA 6 time x 1 person x 3 days 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0

e. To Kota Malang, Malang & Kota Batu (179 kel x 3% = 6 kel)Tranport 6 time x 1 person 8 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 2 days 13 150.000 1.950.000 13,00 1.950.000 0,00 150.000 0 13,00 1.950.000 0,00 0OSA 6 time x 1 person x 3 days 21 50.000 1.050.000 21,00 1.050.000 0,00 50.000 0 21,00 1.050.000 0,00 0

f. To Kota Blitar, Blitar, Kediri & Kota Kediri (150 kel x 3% = 5 kel)Tranport 6 time x 1 person 4 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0Acomodation 6 time x 1 person x 2 days 8 150.000 1.200.000 8,00 1.200.000 0,00 150.000 0 8,00 1.200.000 0,00 0OSA 6 time x 1 person x 3 days 13 50.000 650.000 13,00 650.000 0,00 50.000 0 13,00 650.000 0,00 0

g. To Kota Pasuruan & Pasuruan (125 kel x 3% = 4 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

h. To Kota Probolinggo & Probolinggo (76 kel x 3% = 3 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

i. Transport Surabaya, Sidoarjo (454 kel x 3% = 14 kel)OSA 6 time x 1 person x 3 days 24 50.000 1.200.000 24,00 1.200.000 0,00 50.000 0 24,00 1.200.000 0,00 0

j. To Banyuwangi, Bondowoso, & Situbondo (86 kel x 3% = 3 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

k. To Gresik, Lamongan, Tuban, & Bojonegoro (175 kel x 3% = 6 kel)Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 11 150.000 1.650.000 11,00 1.575.000 0,00 150.000 0 11,00 1.575.000 0,00 75.000OSA 6 time x 1 person x 3 days 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0

l. To Bangkalan, Sumenep, & Pamekasan (54 kel x 3% = 2 kel)Tranport 6 time x 1 person 4 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0Acomodation 6 time x 1 person x 2 days 9 150.000 1.350.000 9,00 1.275.000 0,00 150.000 0 9,00 1.275.000 0,00 75.000OSA 6 time x 1 person x 3 days 13 50.000 650.000 13,00 650.000 0,00 50.000 0 13,00 650.000 0,00 0

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 18: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

m. To Lumajang & Jember (49 kel x 3% = 2 kel)Tranport 6 time x 1 person 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0Acomodation 6 time x 1 person x 2 days 2 150.000 300.000 2,00 300.000 0,00 150.000 0 2,00 300.000 0,00 0OSA 6 time x 1 person x 3 days 6 50.000 300.000 6,00 300.000 0,00 50.000 0 6,00 300.000 0,00 0

MONITORING OSP-6 JAWA PROVINSI JAWA TIMURKOTA KUMUH INFRA SKALA KOTA

Dari Surabaya ke SIDOARJOTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Surabaya ke SURABAYATransport 2 0 0 0,00 0 0,00 0 0 0,00 0 2,00 0Acomodation 6 0 0 0,00 0 0,00 0 0 0,00 0 6,00 0OSA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Dari Surabaya ke MOJOKERTOTransport 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Dari Surabaya ke GRESIKTransport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 2,00 100.000 0,00 50.000 0 2,00 100.000 2,00 100.000

Dari Surabaya ke TULUNG AGUNGTransport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 1,00 50.000 0,00 50.000 0 1,00 50.000 3,00 150.000

Dari Surabaya ke KOTA MALANGTransport 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0Acomodation 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 50.000 100.000 2,00 100.000 0,00 50.000 0 2,00 100.000 0,00 0

Dari Surabaya ke KOTA PROBOLINGGOTransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 6 150.000 900.000 0,00 0 0,00 150.000 0 0,00 0 6,00 900.000OSA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Dari Surabaya ke KOTA PASURUANTransport 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Dari Surabaya ke KOTA MADIUNTransport 1 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Acomodation 3 150.000 450.000 1,00 150.000 0,00 150.000 0 1,00 150.000 2,00 300.000OSA 4 50.000 200.000 2,00 100.000 0,00 50.000 0 2,00 100.000 2,00 100.000

Dari Surabaya ke Kab. JEMBERTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

KOTA KUMUH NON INFRA SKALA KOTA

Dari Surabaya ke JOMBANGTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000

Page 19: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Dari Surabaya ke PACITANTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000

Dari Surabaya ke MAGETANTransport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000Acomodation 4 150.000 600.000 1,00 150.000 0,00 150.000 0 1,00 150.000 3,00 450.000OSA 6 50.000 300.000 2,00 100.000 0,00 50.000 0 2,00 100.000 4,00 200.000

Dari Surabaya ke TUBANTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000

Dari Surabaya ke KOTA BLITARTransport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 1,00 50.000 0,00 50.000 0 1,00 50.000 3,00 150.000

Dari Surabaya ke TRENGGALEKTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000

Dari Surabaya ke KOTA KEDIRITransport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 2,00 100.000 0,00 50.000 0 2,00 100.000 2,00 100.000

Dari Surabaya ke BANYUWANGITransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Surabaya ke SITUBONDOTransport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000OSA 4 50.000 200.000 1,00 50.000 0,00 50.000 0 1,00 50.000 3,00 150.000

Dari Surabaya ke PASURUANTransport 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0Acomodation 3 150.000 450.000 1,00 150.000 0,00 150.000 0 1,00 150.000 2,00 300.000OSA 4 50.000 200.000 3,00 150.000 0,00 50.000 0 3,00 150.000 1,00 50.000

UJI PETIK TIM OSP KE KOTA (BDI)

Dari Surabaya ke PONOROGOTransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 4 150.000 600.000 0,00 0 0,00 150.000 0 0,00 0 4,00 600.000OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Dari Surabaya ke PASURUANTransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 4 150.000 600.000 0,00 0 0,00 150.000 0 0,00 0 4,00 600.000OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Dari Surabaya ke LAMONGANTransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 4 150.000 600.000 0,00 0 0,00 150.000 0 0,00 0 4,00 600.000OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Dari Surabaya ke SUMENEPTransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 4 150.000 600.000 0,00 0 0,00 150.000 0 0,00 0 4,00 600.000OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Page 20: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Dari Surabaya ke MALANGTransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 4 150.000 600.000 0,00 0 0,00 150.000 0 0,00 0 4,00 600.000OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Dari Surabaya ke SURABAYAOSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

UJI PETIK TEMATIKTransport 9 200.000 1.800.000 0,00 0 4,00 200.000 800.000 4,00 800.000 5,00 1.000.000Acomodation 9 150.000 1.350.000 0,00 0 2,00 150.000 300.000 2,00 300.000 7,00 1.050.000OSA 18 50.000 900.000 0,00 0 4,00 50.000 200.000 4,00 200.000 14,00 700.000

MONITORING KE KAB/KOTA (COACHING CLINIC)Transport 42 200.000 8.400.000 0,00 0 8,00 200.000 1.600.000 8,00 1.600.000 34,00 6.800.000Acomodation 43 150.000 6.450.000 0,00 0 6,00 150.000 900.000 6,00 900.000 37,00 5.550.000OSA 86 50.000 4.300.000 0,00 0 18,00 50.000 900.000 18,00 900.000 68,00 3.400.000

2.1.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 147.950.000 131.900.000 0 131.900.000 16.050.000

A. For City Coordinator and Assistance City Coordinator (1884 Kel x 50%) x 6 6 time x 471 kelurahan 1602 50.000 80.075.000 1601,50 80.075.000 0,00 50.000 0 1601,50 80.075.000 0,50 0Cost / Day Rp. 50.000.- 1 Day cover 2 kel

B. For Ass. City Coordinator Infrastructure and FM in the city(1884 Kel - 195 Kel luar kota) x 50%) x 18 18 time x 422 kelurahan 968 50.000 48.375.000 967,50 48.375.000 0,00 50.000 0 967,50 48.375.000 0,50 0Cost / Day Rp. 50.000.- 1 Day cover 2 kel

C. For City Coordinator Infrastructure and FM out of te town

1. Tulungagung to Trenggalek/Ponorogo to TrenggalekTransport (24 time x 2 person x 2 days) 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 02. Jember to Lumajang Transport (24 time x 2 person x 2 days) 7 50.000 350.000 7,00 350.000 0,00 50.000 0 7,00 350.000 0,00 03. Situbondo to Bondowoso Transport (24 time x 2 person x 2 days) 4 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 04. Pamekasan to Bangkalan Transport (24 time x 2 person x 2 days) 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 05. Pamekasan to Sumenep Transport (24 time x 4 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 06. Bojonegoro to Tuban Transport (24 time x 3 person x 2 days) 9 50.000 450.000 9,00 450.000 0,00 50.000 0 9,00 450.000 0,00 07. Malang to Kota Batu Transport (24 time x 4 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 08. Kab. Probolinggo to Kota Probolinggo Transport (24 time x 5 person x 2 days) 4 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 09. Kab. Mojokerto to Kota Mojokerto Transport (24 time x 3 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0

10. Kota Madiun to Kab. Madiun Transport (24 time x 2 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 011. Kab Blitar to Kota Blitar Transport (24 time x 4 person x 2 days) 13 50.000 650.000 13,00 650.000 0,00 50.000 0 13,00 650.000 0,00 0

MONITORING TEMATIK

Monitoring Tim Korkot Kota Surabaya di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 16 50.000 800.000 0,00 0 0,00 50.000 0 0,00 0 16,00 800.000

KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Monitoring Tim Korkot Sidoarjo di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 30 50.000 1.500.000 0,00 0 0,00 50.000 0 0,00 0 30,00 1.500.000

KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 22 50.000 1.100.000 0,00 0 0,00 50.000 0 0,00 0 22,00 1.100.000

Monitoring Tim Korkot Gresik di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Monitoring Tim Korkot Kota Surabaya Ke (1) Bangkalan, (2) Pamekasan, (3) Sumenep

Monitoring Tim Korkot Sidoarjo ke (1) Jombang, (2) Nganjuk, (3) Pacitan,(4) Ponorogo

Page 21: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Monitoring Tim Korkot Gresik ke (1) Bojonegoro, (2) Tuban, (3) LamonganKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 16 50.000 800.000 0,00 0 0,00 50.000 0 0,00 0 16,00 800.000

Monitoring Tim Korkot Malang di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Monitoring Tim Korkot Tulung Agung di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Monitoring Tim Korkot Tulung AGung ke (1) Blitar, (2) Kota BlitarKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Monitoring Tim Korkot Kota Pasuruan di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Monitoring Tim Korkot Kota Pasuruan ke PasuruanKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Monitoring Tim Korkot Kota Probolinggo di Dalam KotaKEL/DESA KUMUH DI NON KOTA SKALA KOTA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Monitoring Tim Korkot Kota Probolinggo ke (1) Probolinggo, (2) LumajangKEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/ DESA NON KUMUH 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

UJI PETIK TEMATIK

1 Monitoring Tim Korkot Kota MADIUN Ke Kab PONOROGOTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

2 Monitoring Tim Korkot Kab TULUNGAGUNG Ke Kab TULUNGAGUNGOSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

3 Monitoring Tim Korkot Kab TULUNGAGUNG Ke Kab BLITARTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

4 Monitoring Tim Korkot Kab JOMBANG Ke Kab KEDIRITransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

5 Monitoring Tim Korkot Kab JEMBER Ke Kab LUMAJANGTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Mojokerto di Dalam Kota

Monitoring Tim Korkot Kota Mojokerto ke (1) Mojokerto, (2) Kota Madiun, (3) Madiun, (4) Magetan

Page 22: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

6 Monitoring Tim Korkot Kota PROBOLINGGO Ke Kab PASURUANTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

7 Monitoring Tim Korkot Kab SIDOARJO Ke Kab MOJOKERTOTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

8 Monitoring Tim Korkot Kab GRESIK Ke Kab LAMONGANTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

9 Monitoring Tim Korkot Kab GRESIK Ke Kab GRESIKOSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

10 Monitoring Tim Korkot Kota SURABAYA Ke Kab SUMENEPTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

11 Monitoring Tim Korkot Kota MALANG Ke Kota MALANGOSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

12 Monitoring Tim Korkot Kab PROBOLINGGO Ke kab PROBOLINGGOOSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

13 Monitoring Tim Korkot Kab PROBOLINGGO Ke Kota PASURUANTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 1 150.000 150.000 0,00 0 0,00 150.000 0 0,00 0 1,00 150.000OSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

14 Monitoring Tim Korkot Kota MADIUN Ke KOTA MADIUNOSA 2 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

15 Monitoring Tim Korkot Kota SURABAYA ke Kota SURABAYAOSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

2.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 1.800.000 1.800.000 0 1.800.000 0

1. Ponorogo to Trenggalek Transport (12 time x 3 person x 1 days) 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 02. Jember to Lumajang Transport (12 time x 3 person x 1 days) 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 03. Situbondo to Bondowoso Transport (12 time x 3 person x 1 days) 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 04. Pamekasan to Bangkalan Transport (12 time x 3 person x 1 days) 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 05. Pamekasan to Sumenep Transport (12 time x 3 person x 1 days) 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 06. Bojonegoro to Tuban Transport (12 time x 3 person x 1 days) 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 0

2.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 43.150.000 43.100.000 0 43.100.000 50.000

a. From Tulungagung, Trenggalek & Pacitan To SurabayaTranport 12 time x 2 person 8 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 12 time x 2 person x 1 days 8 150.000 1.200.000 8,00 1.200.000 0,00 150.000 0 8,00 1.200.000 0,00 0OSA 12 time x 2 person x 2 days 12 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0

b. From Madiun, Kota Madiun, Nganjuk To SurabayaTranport 12 time x 2 person 9 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Acomodation 12 time x 2 person x 1 days 9 150.000 1.350.000 9,00 1.350.000 0,00 150.000 0 9,00 1.350.000 0,00 0OSA 12 time x 2 person x 2 days 14 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0

c. From Ponorogo & Magetan To SurabayaTranport 12 time x 2 person 7 200.000 1.400.000 7,00 1.400.000 0,00 200.000 0 7,00 1.400.000 0,00 0Acomodation 12 time x 2 person x 1 days 7 150.000 1.050.000 7,00 1.050.000 0,00 150.000 0 7,00 1.050.000 0,00 0OSA 12 time x 2 person x 2 days 11 50.000 550.000 11,00 550.000 0,00 50.000 0 11,00 550.000 0,00 0

Page 23: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

d. From Kota Mojokerto, Mojokerto & Jombang To SurabayaTranport 12 time x 2 person 9 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Acomodation 12 time x 2 person x 1 days 9 150.000 1.350.000 9,00 1.350.000 0,00 150.000 0 9,00 1.350.000 0,00 0OSA 12 time x 2 person x 2 days 14 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0

e. from Kota Malang, Malang & Kota Batu To SurabayaTranport 12 time x 2 person 10 200.000 2.000.000 10,00 2.000.000 0,00 200.000 0 10,00 2.000.000 0,00 0Acomodation 12 time x 2 person x 1 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 12 time x 2 person x 2 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

f. From Kota Blitar, Blitar, Kediri & Kota Kediri To SurabayaTranport 12 time x 2 person 13 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0Acomodation 12 time x 2 person x 1 days 13 150.000 1.950.000 13,00 1.950.000 0,00 150.000 0 13,00 1.950.000 0,00 0OSA 12 time x 2 person x 2 days 20 50.000 1.000.000 20,00 1.000.000 0,00 50.000 0 20,00 1.000.000 0,00 0

g. From Kota Pasuruan & Pasuruan To SurabayaTranport 12 time x 2 person 8 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 12 time x 2 person x 1 days 8 150.000 1.200.000 8,00 1.200.000 0,00 150.000 0 8,00 1.200.000 0,00 0OSA 12 time x 2 person x 2 days 12 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0

h. From Kota Probolinggo & Probolinggo To SurabayaTranport 12 time x 2 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 12 time x 2 person x 1 days 5 150.000 750.000 5,00 750.000 0,00 150.000 0 5,00 750.000 0,00 0OSA 12 time x 2 person x 2 days 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0

i. From Lumajang & Jember To SurabayaTranport 12 time x 2 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Acomodation 12 time x 2 person x 1 days 5 150.000 750.000 5,00 750.000 0,00 150.000 0 5,00 750.000 0,00 0OSA 12 time x 2 person x 2 days 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0

j. From Banyuwangi, Bondowoso & Situbondo To SurabayaTranport 12 time x 2 person 9 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Acomodation 12 time x 2 person x 1 days 9 150.000 1.350.000 9,00 1.350.000 0,00 150.000 0 9,00 1.350.000 0,00 0OSA 12 time x 2 person x 2 days 14 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0

k. From Gresik, Lamongan, Tuban & Bojonegoro To SurabayaTranport 12 time x 2 person 12 200.000 2.400.000 12,00 2.400.000 0,00 200.000 0 12,00 2.400.000 0,00 0Acomodation 12 time x 2 person x 1 days 12 150.000 1.800.000 12,00 1.800.000 0,00 150.000 0 12,00 1.800.000 0,00 0OSA 12 time x 2 person x 2 days 18 50.000 900.000 18,00 850.000 0,00 50.000 0 18,00 850.000 0,00 50.000

l. From Bangkalan, Sumenep & Pamekasan To SurabayaTranport 12 time x 2 person 6 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Acomodation 12 time x 2 person x 1 days 6 150.000 900.000 6,00 900.000 0,00 150.000 0 6,00 900.000 0,00 0OSA 12 time x 2 person x 2 days 10 50.000 500.000 10,00 500.000 0,00 50.000 0 10,00 500.000 0,00 0

2.1.1.5 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO TRAINING LOCATION 1.281.400.000 1.098.800.000 0 1.098.800.000 182.600.000

For TrainingInland Transport for Korkot & Askot (34 Kota/Kab) on OSP Consolidation

a. From Tulungagung, Trenggalek & Pacitan To Training LocationTranport 6 time x 14 person 125,0 200.000 25.000.000 108,00 21.600.000 0,00 200.000 0 108,00 21.600.000 17,00 3.400.000

b. From Madiun, Kota Madiun, Nganjuk To Training LocationTranport 6 time x 11 person 89 200.000 17.800.000 83,00 16.600.000 0,00 200.000 0 83,00 16.600.000 6,00 1.200.000

c. From Ponorogo & Magetan To Training LocationTranport 6 time x 10 person 47 200.000 9.400.000 45,00 9.000.000 0,00 200.000 0 45,00 9.000.000 2,00 400.000

d. From Kota Mojokerto, Mojokerto & Jombang To Training LocationTranport 6 time x 21 person 150 200.000 30.000.000 142,00 28.400.000 0,00 200.000 0 142,00 28.400.000 8,00 1.600.000

e. from Kota Malang, Malang & Kota Batu To Training LocationTranport 6 time x 17 person 129 200.000 25.800.000 122,00 24.400.000 0,00 200.000 0 122,00 24.400.000 7,00 1.400.000

f. From Kota Blitar, Blitar, Kediri & Kota Kediri To Training LocationTranport 6 time x 18 person 86 200.000 17.200.000 82,00 16.400.000 0,00 200.000 0 82,00 16.400.000 4,00 800.000

Page 24: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

g. From Kota Pasuruan & Pasuruan To Training LocationTranport 6 time x 13 person 89 200.000 17.800.000 87,00 17.400.000 0,00 200.000 0 87,00 17.400.000 2,00 400.000

h. From Kota Probolinggo & Probolinggo To SurabayaTranport 6 time x 8 person 49 200.000 9.800.000 43,00 8.600.000 0,00 200.000 0 43,00 8.600.000 6,00 1.200.000

i. From Lumajang & Jember To Training LocationTranport 6 time x 6 person 68 200.000 13.600.000 63,00 12.600.000 0,00 200.000 0 63,00 12.600.000 5,00 1.000.000

j. From Banyuwangi, Bondowoso & Situbondo To Training LocationTranport 6 time x 13 person 72 200.000 14.400.000 69,00 13.800.000 0,00 200.000 0 69,00 13.800.000 3,00 600.000

k. From Gresik, Lamongan, Tuban & Bojonegoro To SurabayaTranport 6 time x 21 person 157 200.000 31.400.000 149,00 29.800.000 0,00 200.000 0 149,00 29.800.000 8,00 1.600.000

l. From Bangkalan, Sumenep & Pamekasan To Training LocationTranport 6 time x 8 person 54 200.000 10.800.000 51,00 10.200.000 0,00 200.000 0 51,00 10.200.000 3,00 600.000

m. From Sidoarjo & Kota Surabaya To Training LocationTranport 6 time x 8 person 131 200.000 26.200.000 118,00 23.600.000 0,00 200.000 0 118,00 23.600.000 13,00 2.600.000

Inland Transport for SF, FT, FE, FS (34 Kota/Kab)

a. From Tulungagung, Trenggalek & Pacitan To Training LocationInland transport 2 time x 65 person 368 200.000 73.600.000 302,00 61.600.000 0,00 200.000 0 302,00 61.600.000 66,00 12.000.000

b. From Madiun, Kota Madiun, Nganjuk To Training LocationTransport 2 time x 55 person 282 200.000 56.400.000 242,00 48.400.000 0,00 200.000 0 242,00 48.400.000 40,00 8.000.000

c. From Ponorogo & Magetan To Training LocationTransport 2 time x 50 person 215 200.000 43.000.000 197,00 39.400.000 0,00 200.000 0 197,00 39.400.000 18,00 3.600.000

d. From Kota Mojokerto, Mojokerto & Jombang To Training LocationTransport 2 time x 125 person 659 200.000 131.800.000 564,00 112.800.000 0,00 200.000 0 564,00 112.800.000 95,00 19.000.000

e. From Kota Malang, Malang & Kota Batu To Training LocationTransport 2 time x 100 person 505 200.000 101.000.000 415,00 83.000.000 0,00 200.000 0 415,00 83.000.000 90,00 18.000.000

f. From Kota Blitar, Blitar, Kediri & Kota Kediri To Training LocationTransport 2 time x 90 person 401 200.000 80.200.000 360,00 72.000.000 0,00 200.000 0 360,00 72.000.000 41,00 8.200.000

g. From Kota Pasuruan & Pasuruan To Training LocationTransport 2 time x 70 person 374 200.000 74.800.000 314,00 62.800.000 0,00 200.000 0 314,00 62.800.000 60,00 12.000.000

h. From Kota Probolinggo & Probolinggo To Training LocationTransport 2 time x 40 person 223 200.000 44.600.000 175,00 35.000.000 0,00 200.000 0 175,00 35.000.000 48,00 9.600.000

i. From Lumajang & Jember To Training LocationTransport 2 time x 27 person 168 200.000 33.600.000 138,00 27.600.000 0,00 200.000 0 138,00 27.600.000 30,00 6.000.000

j. From Banyuwangi, Bondowoso, & Situbondo To Training LocationTransport 2 time x 50 person 244 200.000 48.800.000 204,00 40.800.000 0,00 200.000 0 204,00 40.800.000 40,00 8.000.000

k. From Gresik, Lamongan, Tuban, & Bojonegoro To Training LocationTransport 2 time x 90 person 543 200.000 108.600.000 443,00 88.600.000 0,00 200.000 0 443,00 88.600.000 100,00 20.000.000

l. From Bangkalan, Sumenep, & Pamekasan To Training LocationTransport 2 time x 25 person 163 200.000 32.600.000 133,00 26.600.000 0,00 200.000 0 133,00 26.600.000 30,00 6.000.000

m. From Sidoarjo & Kota Surabaya To Training LocationTransport 2 time x 25 person 996 200.000 199.200.000 821,00 164.200.000 0,00 200.000 0 821,00 164.200.000 175,00 35.000.000

Special Event (by request)

1. From Tulungagung, Trenggalek & Pacitan To SurabayaTransport 2 time x 2 person 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000

Page 25: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

2. From Madiun, Kota Madiun, Nganjuk To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

3. From Ponorogo & Magetan To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

4. From Kota Mojokerto, Mojokerto & Jombang To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

5. From Kota Malang, Malang & Kota Batu To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

6. From Kota Blitar, Blitar, Kediri & Kota Kediri To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

7. From Kota Pasuruan & Pasuruan To SurabayaTransport 2 time x 2 person 0,0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

8. From Kota Probolinggo & Probolinggo To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

9. From Lumajang & Jember To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

10. From Banyuwangi, Bondowoso, & Situbondo To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

11. From Gresik, Lamongan, Tuban, & Bojonegoro To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

12. From Bangkalan, Sumenep, & Pamekasan To SurabayaTransport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

2.1.1.6 PERCEPATAN PENYUSUNAN DOK SIAPLocal Transport for Coordination 18 200.000 3.600.000 18,00 3.600.000 0,00 200.000 0 18,00 3.600.000 0,00 0Local Transport for Training 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

2.1.2 TO JAKARTA

2.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 60.972.000 60.971.700 0 60.971.700 300Air Transport 6 time x 5 person 15 2.600.000 34.772.000 15,00 34.771.700 0,00 2.600.000 0 15,00 34.771.700 0,00 300

Page 26: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

In land Travel in Jakarta 6 time x 5 person 15 200.000 3.000.000 15,00 3.000.000 0,00 200.000 0 15,00 3.000.000 0,00 0OSA 6 time x 5 person x 4 days 104 100.000 10.400.000 104,00 10.400.000 0,00 100.000 0 104,00 10.400.000 0,00 0

ToT Pembantu Nasional untuk Korkot & AskorkotAir Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0In land Travel in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

ToT Pelatihan Penguatan PRBBK lokasi PilotAir Transport 4 2.600.000 10.400.000 4,00 10.400.000 0,00 2.600.000 0 4,00 10.400.000 0,00 0In land Travel in Jakarta 4 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0OSA 16 100.000 1.600.000 16,00 1.600.000 0,00 100.000 0 16,00 1.600.000 0,00 0

ToT Pelatihan Program LanjutanAir Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0In land Travel in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.1.2.2 FOR EGM TO JAKARTA 154.119.000 153.215.600 0 153.215.600 903.400Air TransportEGM TA/SubTA Training 5 time x 3 person 10 2.600.000 22.200.000 10,00 22.130.100 0,00 2.600.000 0 10,00 22.130.100 0,00 69.900EGM TA Sosialisasi 5 time x 1 person 5 2.600.000 10.600.000 5,00 10.532.100 0,00 2.600.000 0 5,00 10.532.100 0,00 67.900EGM TA/SubTA MK/Sub TA RLF 5 time x 3 person 7 2.600.000 14.226.000 6,00 14.225.800 0,00 2.600.000 0 6,00 14.225.800 1,00 200EGM TA/SubTA INFRA/Sub TA Safeguard5 time x 2 person 5 2.600.000 12.000.000 5,00 11.922.900 0,00 2.600.000 0 5,00 11.922.900 0,00 77.100EGM TA/SubTA Monev /Sub TA Legal HCU5 time x 4 person 8 2.600.000 18.800.000 8,00 18.562.000 0,00 2.600.000 0 8,00 18.562.000 0,00 238.000EGM TA/SubTA SIM 5 time x 2 person 7 2.600.000 13.400.000 6,00 13.400.000 0,00 2.600.000 0 6,00 13.400.000 1,00 0EGM TA Local Goverment 5 time x 1 person 5 2.600.000 8.374.000 4,00 8.373.800 0,00 2.600.000 0 4,00 8.373.800 1,00 200EGM TA Urban Planner 5 time x 1 person 5 2.600.000 9.819.000 4,00 9.818.900 0,00 2.600.000 0 4,00 9.818.900 1,00 100

In land Transport in Jakarta 5 time x 17 person 44 200.000 8.800.000 44,00 8.800.000 0,00 200.000 0 44,00 8.800.000 0,00 0Acomodation 5 time x 17 person x 4 days 69 300.000 13.500.000 69,00 13.050.000 0,00 250.000 0 69,00 13.050.000 0,00 450.000OSA 5 time x 17 person x 4 days 224 100.000 22.400.000 224,00 22.400.000 0,00 100.000 0 224,00 22.400.000 0,00 0

2.1.2.3 FOR COORDINATION MEETING TO JAKARTA AND OTHER (by request) 106.100.000 105.649.600 0 105.649.600 450.400Air Transport 7 time x 3 person 32 2.600.000 67.200.000 32,00 67.121.300 0,00 2.600.000 0 32,00 67.121.300 0,00 78.700Air Transport to Jakarta and other 7 4.600.000 17.300.000 7,00 17.228.300 0,00 4.600.000 0 7,00 17.228.300 0,00 71.700In land Transport in Jakarta 7 time x 3 person 28 200.000 5.600.000 28,00 5.600.000 0,00 200.000 0 28,00 5.600.000 0,00 0Hotel Accommodation 7 time x 3 person x 3 days 15 300.000 4.500.000 15,00 4.200.000 0,00 300.000 0 15,00 4.200.000 0,00 300.000OSA 7 time x 3 person x 4 days 124 100.000 11.500.000 115,00 11.500.000 0,00 100.000 0 115,00 11.500.000 9,00 0

2.1.2.4 FROM LEVEL OSP TO PROVINCE 38.100.000 37.335.595 0 37.335.595 764.405Air Transport 8 2.900.000 18.200.000 8,00 17.823.750 0,00 2.900.000 0 8,00 17.823.750 0,00 376.250Air Transport 1 3.700.000 2.700.000 1,00 2.337.700 0,00 3.700.000 0 1,00 2.337.700 0,00 362.300Air Transport 2 2.900.000 5.800.000 2,00 5.800.000 0,00 2.900.000 0 2,00 5.800.000 0,00 0

In land Transport in Jakarta 6 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Accommodation 29 300.000 7.900.000 29,00 7.874.145 0,00 300.000 0 29,00 7.874.145 0,00 25.855OSA 23 100.000 2.300.000 23,00 2.300.000 0,00 100.000 0 23,00 2.300.000 0,00 0

2.1.2.5 KORKOT TO JAKARTA (by Request) 13.449.000 13.448.400 0 13.448.400 600Air Transport 6 2.600.000 11.949.000 6,00 11.948.400 0,00 2.600.000 0 6,00 11.948.400 0,00 600In land Transport in Jakarta 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 0Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 9 100.000 900.000 9,00 900.000 0,00 100.000 0 9,00 900.000 0,00 0

2.1.2.6 ACTIVITIES TO JAKARTA 2017 113.300.000 112.396.100 0 112.396.100 903.900

1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 1 2.600.000 2.600.000 1,00 2.465.500 0,00 2.600.000 0 1,00 2.465.500 0,00 134.500In land Transport in Jakarta 1 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Hotel Accommodation 1 300.000 300.000 1,00 300.000 0,00 300.000 0 1,00 300.000 0,00 0OSA 2 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0

2 ToT PEMANDU NASIONAL untuk Pelatihan Askot dan Fasilitator (Kab Skala Prioritas)Air Transport 22 2.600.000 45.000.000 22,00 44.440.000 0,00 2.600.000 0 22,00 44.440.000 0,00 560.000In land Transport in Jakarta 22 200.000 4.400.000 22,00 4.400.000 0,00 200.000 0 22,00 4.400.000 0,00 0

Page 27: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

NO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 152 100.000 15.200.000 152,00 15.200.000 0,00 100.000 0 152,00 15.200.000 0,00 0

3 ToT PEMANDU SIMAir Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0In land Transport in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSES DEDAir Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0In land Transport in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

5 BY REQUESTAir Transport 2 2.600.000 5.200.000 2,00 5.124.000 0,00 2.600.000 0 2,00 5.124.000 0,00 76.000In land Transport in Jakarta 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 100.000 1.200.000 12,00 1.200.000 0,00 100.000 0 12,00 1.200.000 0,00 0

5 TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 12 2.600.000 29.000.000 12,00 28.866.600 0,00 2.600.000 0 12,00 28.866.600 0,00 133.400In land Transport in Jakarta 12 200.000 2.400.000 12,00 2.400.000 0,00 200.000 0 12,00 2.400.000 0,00 0Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 72 100.000 7.200.000 72,00 7.200.000 0,00 100.000 0 72,00 7.200.000 0,00 0

2.1.2.7 ACTIVITIES TO JAKARTA 2018 94.500.000 0 27.834.300 27.834.300 66.665.700ToT PEMANDU PELATIHAN FASILITATOR DAN KORKOT dan EGMAir Transport 27 2.600.000 70.200.000 0,00 0 9,00 2.600.000 22.434.300 9,00 22.434.300 18,00 47.765.700In Land Transport 27 200.000 5.400.000 0,00 0 9,00 200.000 1.800.000 9,00 1.800.000 18,00 3.600.000OSA (Fixed) 189 100.000 18.900.000 0,00 0 36,00 100.000 3.600.000 36,00 3.600.000 153,00 15.300.000

TOTAL DUTY TRAVEL PROVINCE JAWA TIMUR 2.141.240.000 1.802.086.995 32.534.300 1.834.621.295 306.618.705

Page 28: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.2. Duty Travel Expenses South Kalimantan Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.2.1 In Province

2.2.1.1 For Spotcheck Province to Kelurahan (3% x Number of Kelurahan) 39.170.000 17.651.500 0 17.651.500 21.518.500

a. From Banjarmasin To Kota Baru (21 kel x 3% = 1 kel)Tranport 6 time x 1 person 9,00 200.000 1.700.000 9,00 1.700.000 0,00 200.000 0 9,00 1.700.000 0,00 0Acomodation 6 time x 1 person x 1 days 7,00 250.000 1.750.000 7,00 1.750.000 0,00 250.000 0 7,00 1.750.000 0,00 0OSA 6 time x 1 person x 2 days 16,00 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0

b. From Banjarmasin To Tabalong (25 kel x 3% = 2 kel)Tranport 6 time x 1 person 9,00 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Acomodation 6 time x 1 person x 1 days 6,00 250.000 1.350.000 6,00 1.350.000 0,00 250.000 0 6,00 1.350.000 0,00 0OSA 6 time x 1 person x 2 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

c. From Banjarmasin To Hulu Sungai Tengah dan Hulu Sungai Utara (47 kel x 3% = 2 kel)Tranport 6 time x 1 person 8,00 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 1 days 8,00 250.000 2.000.000 8,00 1.931.500 0,00 250.000 0 8,00 1.931.500 0,00 68.500OSA 6 time x 1 person x 2 days 16,00 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0

d. From Banjarmasin To Hulu Sungai Selatan dan Tanah Laut (38 kel x 3% = 2 kel)Tranport 6 time x 1 person 8,00 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 1 days 7,00 250.000 1.470.000 7,00 1.470.000 0,00 250.000 0 7,00 1.470.000 0,00 0OSA 6 time x 1 person x 2 days 16,00 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0

e. From Banjarmasin To Banjar dan Banjar Baru (45 kel x 3% = 2 kel)Transport 6 time x 1 person x 1 days 10,00 50.000 500.000 10,00 500.000 0,00 50.000 0 10,00 500.000 0,00 0

f. From Banjarmasin To Barito Kuala (9 kel x 3% = 1 kel)Transport 6 time x 1 person x 1 days 4,00 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 0

g. Banjarmasin (50 kel x 3% = 2 kel)Transport 6 time x 1 person x 1 days 4,00 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 0

MONITORING OSP-6 PROVINSI KALIMANTAN SELATANKOTA KUMUH INFRA SKALA KOTA

Dari Kota Banjarmasin ke KOTABARUTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Kota Banjarmasin ke BANJARTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Kota Banjarmasin ke KOTA BANJARMASINTransport 4 0 0 0,00 0 0,00 0 0 0,00 0 4,00 0Acomodation 12 0 0 0,00 0 0,00 0 0 0,00 0 12,00 0OSA 16 50.000 800.000 0,00 0 0,00 50.000 0 0,00 0 16,00 800.000

Dari Kota Banjarmasin ke KOTA BANJARBARUTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Kota Banjarmasin ke KOTA BARITO KUALATransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Kota Banjarmasin ke KOTA HULU SUNGAI UTARATransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

KOTA KUMUH NON INFRA SKALA KOTA

Dari Kota Banjarmasin ke TANAH LAUTTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 29: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Kota Banjarmasin ke TABALONGTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

UJI PETIK OSP KE KOTA (BDI)Dari BANJARMASIN ke HULU SUNGAI UTARATransport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000Acomodation 4 250.000 1.000.000 0,00 0 0,00 250.000 0 0,00 0 4,00 1.000.000OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Dari BANJARMASIN ke BANJARMASINTransport 2 0 0 0,00 0 0,00 0 0 0,00 0 2,00 0Acomodation 4 0 0 0,00 0 0,00 0 0 0,00 0 4,00 0OSA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

UJI PETIK TEMATIKTransport 5 200.000 1.000.000 0,00 0 0,00 200.000 0 0,00 0 5,00 1.000.000Acomodation 5 250.000 1.250.000 0,00 0 0,00 250.000 0 0,00 0 5,00 1.250.000OSA 10 50.000 500.000 0,00 0 0,00 50.000 0 0,00 0 10,00 500.000

MONITORING KE KAB/KOTA (COACHING CLINIC)

Transport 15 200.000 3.000.000 0,00 0 0,00 200.000 0 0,00 0 15,00 3.000.000Acomodation 15 250.000 3.750.000 0,00 0 0,00 250.000 0 0,00 0 15,00 3.750.000OSA 30 50.000 1.500.000 0,00 0 0,00 50.000 0 0,00 0 30,00 1.500.000

2.2.1.2 Spootcheck Kota/Kab for Ass. City Coordinator Infra and FM 39.175.000 33.225.000 0 33.225.000 5.950.000

A. For City Coordinator and Assistance City Coordinator

(226 Kel x 50%) x 6 6 time x 57 kelurahan ##### 50.000 19.525.000 390,50 19.500.000 0,00 50.000 0 390,50 19.500.000 0,50 25.000

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

B. For Ass. City Coordinator Infrastructure and FM in the city

(226 Kel - 102 Kel luar kota) x 50%) x 18 18 time x 31 kelurahan ##### 50.000 7.250.000 144,50 7.225.000 0,00 50.000 0 144,50 7.225.000 0,50 25.000Cost / Day Rp. 50.000.- 1 Day cover 2 kel

C. For City Coordinator Infrastructure and FM out of te town

1. From Tanah Laut To Kota Baru Transport (24 time x 4 person x 2 days) 18,00 100.000 1.800.000 18,00 1.800.000 0,00 100.000 0 18,00 1.800.000 0,00 02. From Tanah Laut To Hulu Sungai Selatan Transport (24 time x 3 person x 2 days) 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 03. From Banjarmasin to Barito Kuala Transport (24 time x 2 person x 2 days) 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 04. From Hulu Sungai Utara to Hulu Sungai TengahTransport (24 time x 3 person x 2 days) 26,00 100.000 2.600.000 26,00 2.600.000 0,00 100.000 0 26,00 2.600.000 0,00 0

5. From Hulu Utara Tengah to Tabalong Transport (24 time x 4 person x 2 days) 1,00 100.000 100.000 1,00 100.000 0,00 100.000 0 1,00 100.000 0,00 0

6. from Banjar to Banjar Baru Transport (24 time x 3 person x 2 days) 18,00 100.000 1.800.000 18,00 1.800.000 0,00 100.000 0 18,00 1.800.000 0,00 0

MONITORING TEMATIK

KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000

Monitoring Tim Korkot Kota Baru Ke (1) Tanah LautKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000

Monitoring Tim Korkot Banjar di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000

Monitoring Tim Korkot Banjar ke (1) TabalongKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 4,00 100.000 400.000 0,00 0 0,00 100.000 0 0,00 0 4,00 400.000

Monitoring Tim Korkot Banjarmasin di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 14,00 100.000 1.400.000 0,00 0 0,00 100.000 0 0,00 0 14,00 1.400.000KEL/DESA NON KUMUH 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

Page 30: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Monitoring Tim Korkot Banjar Baru di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000

Monitoring Tim Korkot Hulu Sungai Utara di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 100.000 400.000 0,00 0 0,00 100.000 0 0,00 0 4,00 400.000KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000

Monitoring Tim Korkot Hulu Sungai Utara ke (1) Hulu Sungai Selatan, (2) Hulu Sungai TengahKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 4,00 100.000 400.000 0,00 0 0,00 100.000 0 0,00 0 4,00 400.000

Monitoring Tim Korkot Barito Kuala di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000KEL/DESA NON KUMUH 1,00 100.000 100.000 0,00 0 0,00 100.000 0 0,00 0 1,00 100.000

UJI PETIK TEMATIK

Monitoring Tim Korkot Kab KOTABARU ke Kab KOTABARUOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kab KOTABARU ke Kab KOTABARUOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kab BANJAR ke Kab BANJAROSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kab HSU ke Kab HSUOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kab BANJARMASIN ke Kab BANJARMASINOSA 6,00 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Monitoring Tim Korkot Kab BANJARBARU ke Kab BANJARBARUOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

2.2.1.3 For CB Activity by Askot to Faskel 3.800.000 3.800.000 0 3.800.000 0

1. From Tanah Laut To Kota Baru Transport (12 time x 3 person x 1 days) 7,00 100.000 700.000 7,00 700.000 0,00 100.000 0 7,00 700.000 0,00 0

2. From Tanah Laut To Hulu Sungai Selatan Transport (12 time x 3 person x 1 days) 4,00 100.000 400.000 4,00 400.000 0,00 100.000 0 4,00 400.000 0,00 0

3. From Banjarmasin to Barito Kuala Transport (12 time x 3 person x 1 days) 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0

4. From Hulu Sungai Tengah to Hulu Sungai UtaraTransport (12 time x 3 person x 1 days) 25,00 100.000 2.500.000 25,00 2.500.000 0,00 100.000 0 25,00 2.500.000 0,00 0

5. From Hulu Utara Tengah to Tabalong Transport (12 time x 3 person x 1 days) 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

6. from Banjar to Banjar Baru Transport (12 time x 3 person x 1 days) 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.2.1.4 FrmM Kab/Kota to TL Ofiice for Coordination Meeting 59.450.000 48.800.000 0 48.800.000 10.650.000

a. Tanah Laut to BanjarmasinTranport 14 time x 2 person 10,00 200.000 2.000.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 20,00 250.000 5.000.000 17,00 4.250.000 0,00 250.000 0 17,00 4.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 29,00 50.000 1.450.000 25,00 1.250.000 0,00 50.000 0 25,00 1.250.000 4,00 200.000

b. Kota Baru to BanjarmasinTranport 14 time x 2 person 7,00 200.000 1.400.000 7,00 1.400.000 0,00 200.000 0 7,00 1.400.000 0,00 0

2,00 400.000 800.000 0,00 0 0,00 400.000 0 2,00 800.000Acomodation 14 time x 2 person x 2 days 15,00 250.000 3.750.000 13,00 3.250.000 0,00 250.000 0 13,00 3.250.000 2,00 500.000OSA 14 time x 2 person x 3 days 20,00 50.000 1.000.000 17,00 850.000 0,00 50.000 0 17,00 850.000 3,00 150.000

c. Banjar to BanjarmasinTranport 14 time x 2 person 11,00 200.000 2.200.000 10,00 2.000.000 0,00 200.000 0 10,00 2.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 22,00 250.000 5.500.000 19,00 4.750.000 0,00 250.000 0 19,00 4.750.000 3,00 750.000OSA 14 time x 2 person x 3 days 31,00 50.000 1.550.000 27,00 1.350.000 0,00 50.000 0 27,00 1.350.000 4,00 200.000

d. Barito Kuala to BanjarmasinTranport 14 time x 2 person 6,00 200.000 1.200.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 12,00 250.000 3.000.000 9,00 2.250.000 0,00 250.000 0 9,00 2.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 17,00 50.000 850.000 13,00 650.000 0,00 50.000 0 13,00 650.000 4,00 200.000

Page 31: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

e. Hulu Sungai Selatan to BanjarmasinTranport 14 time x 2 person 9,00 200.000 1.800.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 13,00 250.000 3.250.000 10,00 2.500.000 0,00 250.000 0 10,00 2.500.000 3,00 750.000OSA 14 time x 2 person x 3 days 19,00 50.000 950.000 15,00 750.000 0,00 50.000 0 15,00 750.000 4,00 200.000

f. Hulu Sungai Tengah to BanjarmasinTranport 14 time x 2 person 8,00 200.000 1.600.000 7,00 1.400.000 0,00 200.000 0 7,00 1.400.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 14,00 250.000 3.500.000 11,00 2.750.000 0,00 250.000 0 11,00 2.750.000 3,00 750.000OSA 14 time x 2 person x 3 days 19,00 50.000 950.000 15,00 750.000 0,00 50.000 0 15,00 750.000 4,00 200.000

g. Hulu Sungai Utara to BanjarmasinTranport 14 time x 2 person 6,00 200.000 1.200.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 12,00 250.000 3.000.000 9,00 2.250.000 0,00 250.000 0 9,00 2.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 17,00 50.000 850.000 13,00 650.000 0,00 50.000 0 13,00 650.000 4,00 200.000

h. Tabalong to BanjarmasinTranport 14 time x 2 person 9,00 200.000 1.800.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 18,00 250.000 4.500.000 15,00 3.750.000 0,00 250.000 0 15,00 3.750.000 3,00 750.000OSA 14 time x 2 person x 3 days 27,00 50.000 1.350.000 23,00 1.150.000 0,00 50.000 0 23,00 1.150.000 4,00 200.000

i. Kota Banjar Baru to BanjarmasinTranport 14 time x 2 person 6,00 200.000 1.200.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 12,00 250.000 3.000.000 9,00 2.250.000 0,00 250.000 0 9,00 2.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 16,00 50.000 800.000 12,00 600.000 0,00 50.000 0 12,00 600.000 4,00 200.000

2.2.1.5 From Province to Regional for Workshop & Coordination Meeting at OC 93.456.000 86.509.550 0 86.509.550 6.946.450

Workshop OC / Coordination Meeting at OCFrom Banjarmasin to SurabayaAir Transport 5 time x 9 person 20,00 2.900.000 43.756.000 20,00 43.690.050 0,00 2.900.000 0 20,00 43.690.050 0,00 65.950OSA [ Fixed ] 5 time x 9 person x 2 days 65,00 100.000 6.500.000 59,00 5.900.000 0,00 100.000 0 59,00 5.900.000 6,00 600.000Local Transport 5 time x 9 person 24,00 100.000 2.400.000 20,00 2.000.000 0,00 100.000 0 20,00 2.000.000 4,00 400.000

PELATIHAN SIMFrom Banjarmasin to SurabayaAir Transport 5 time x 9 person 12,00 2.900.000 34.800.000 12,00 28.919.500 0,00 2.900.000 0 12,00 28.919.500 0,00 5.880.500Local Transport 5 time x 9 person x 2 days 12,00 100.000 1.200.000 12,00 1.200.000 0,00 100.000 0 12,00 1.200.000 0,00 0OSA [ Fixed ] 5 time x 9 person 48,00 100.000 4.800.000 48,00 4.800.000 0,00 100.000 0 48,00 4.800.000 0,00 0

2.2.1.6 For Several Training & Special Event from Kab. to Banjarmasin 122.600.000 101.000.000 0 101.000.000 21.600.000

For TrainingTransport for Korkot &Askot (10 Kota/Kab) on OSP Consolidation

a. Tanah Laut to BanjarmasinTranport 6 time x 6 person 27,00 200.000 5.400.000 25,00 5.000.000 0,00 200.000 0 25,00 5.000.000 2,00 400.000

b. Kota Baru to BanjarmasinTranport 6 time x 1 person 22,00 200.000 4.400.000 20,00 4.000.000 0,00 200.000 0 20,00 4.000.000 2,00 400.000

c. Banjar to BanjarmasinTranport 6 time x 5 person 47,00 200.000 9.400.000 45,00 9.000.000 0,00 200.000 0 45,00 9.000.000 2,00 400.000

d. Barito Kuala to BanjarmasinTranport 6 time x 1 person 15,00 200.000 3.000.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 2,00 400.000

e. Hulu Sungai Selatan to BanjarmasinTranport 6 time x 1 person 15,00 200.000 3.000.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 2,00 400.000

f. Hulu Sungai Tengah to BanjarmasinTranport 6 time x 1 person 15,00 200.000 3.000.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 2,00 400.000

g. Hulu Sungai Utara to BanjarmasinTranport 6 time x 5 person 22,00 200.000 4.400.000 20,00 4.000.000 0,00 200.000 0 20,00 4.000.000 2,00 400.000

h. Tabalong to BanjarmasinTranport 6 time x 2 person 28,00 200.000 5.600.000 26,00 5.200.000 0,00 200.000 0 26,00 5.200.000 2,00 400.000

i. Kota Banjar Baru to BanjarmasinTranport 6 time x 1 person 14,00 200.000 2.800.000 12,00 2.400.000 0,00 200.000 0 12,00 2.400.000 2,00 400.000

Inland Transport for SF, FT, FE, FS (34 Kota/Kab)

a. Tanah Laut to BanjarmasinTranport 2 time x 15 person 38,00 200.000 7.600.000 28,00 5.600.000 0,00 200.000 0 28,00 5.600.000 10,00 2.000.000

Page 32: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

b. Kota Baru to BanjarmasinTranport 2 time x 10 person 43,00 200.000 8.600.000 33,00 6.600.000 0,00 200.000 0 33,00 6.600.000 10,00 2.000.000

c. Banjar to BanjarmasinTranport 2 time x 15 person 71,00 200.000 14.200.000 56,00 11.200.000 0,00 200.000 0 56,00 11.200.000 15,00 3.000.000

d. Barito Kuala to BanjarmasinTranport 2 time x 5 person 20,00 200.000 4.000.000 15,00 3.000.000 0,00 200.000 0 15,00 3.000.000 5,00 1.000.000

e. Hulu Sungai Selatan to BanjarmasinTranport 2 time x 10 person 33,00 200.000 6.600.000 28,00 5.600.000 0,00 200.000 0 28,00 5.600.000 5,00 1.000.000

f. Hulu Sungai Tengah to BanjarmasinTranport 2 time x 10 person 40,00 200.000 8.000.000 30,00 6.000.000 0,00 200.000 0 30,00 6.000.000 10,00 2.000.000

g. Hulu Sungai Utara to BanjarmasinTranport 2 time x 15 person 70,00 200.000 14.000.000 55,00 11.000.000 0,00 200.000 0 55,00 11.000.000 15,00 3.000.000

h. Tabalong to BanjarmasinTranport 2 time x 15 person 55,00 200.000 11.000.000 40,00 8.000.000 0,00 200.000 0 40,00 8.000.000 15,00 3.000.000

i. Kota Banjar Baru to BanjarmasinTranport 2 time x 10 person 38,00 200.000 7.600.000 33,00 6.600.000 0,00 200.000 0 33,00 6.600.000 5,00 1.000.000

e Inland Transport for SF, FK, FE, FS (To Assesment)Hulu Sungai Selatan to TabalongTransport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

f Hulu Sungai Tengah to TabalongTransport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

g Hulu Sungai Utara to TabalongTransport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Special Event (by request)

a. Tanah Laut to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

b. Kota Baru to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

c. Banjar to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

d. Barito Kuala to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

e. Hulu Sungai Selatan to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

f. Hulu Sungai Tengah to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

g. Hulu Sungai Utara to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Page 33: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

h. Tabalong to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

i. Kota Banjar Baru to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

j. Kota Banjar Baru to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

2.1.1.7 PERCEPATAN PENYUSUNAN DOK. SIAPLocal Transport for Coordination 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0Local Transport for Training 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0

2.2.2 To Jakarta

2.2.2.1 For Several Training to Jakarta by Request 16.812.000 16.811.403 0 16.811.403 597

Air Transport 6 time x 5 person 7,00 2.900.000 10.512.000 7,00 10.511.403 0,00 2.900.000 0 7,00 10.511.403 0,00 597In land Travel in Jakarta 6 time x 5 person 4,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0OSA 6 time x 5 person x 4 days 55,00 100.000 5.500.000 55,00 5.500.000 0,00 100.000 0 55,00 5.500.000 0,00 0

ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

ToT Pelatihan Program LanjutanAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.2.2.2 For EGM to Jakarta 130.600.000 129.791.900 0 129.791.900 808.100

Air TransportEGM TA/SubTA Training 5 time x 2 person 7,00 2.900.000 16.500.000 7,00 16.477.200 0,00 2.900.000 0 7,00 16.477.200 0,00 22.800EGM TA Sosialisasi 5 time x 1 person 5,00 2.900.000 11.600.000 5,00 11.589.800 0,00 2.900.000 0 5,00 11.589.800 0,00 10.200EGM TA/SubTA MK/Sub TA RLF 5 time x 2 person 7,00 2.900.000 13.900.000 6,00 13.822.500 0,00 2.900.000 0 6,00 13.822.500 1,00 77.500EGM TA/SubTA INFRA/Sub TA Safeguard 5 time x 1 person 5,00 2.900.000 12.000.000 5,00 11.922.800 0,00 2.900.000 0 5,00 11.922.800 0,00 77.200EGM TA/SubTA Monev /Sub TA Legal HCU 5 time x 1 person 5,00 2.900.000 11.500.000 5,00 11.293.200 0,00 2.900.000 0 5,00 11.293.200 0,00 206.800EGM TA/SubTA SIM 5 time x 1 person 5,00 2.900.000 12.500.000 5,00 12.407.100 0,00 2.900.000 0 5,00 12.407.100 0,00 92.900EGM TA Local Goverment 5 time x 1 person 5,00 2.900.000 9.500.000 4,00 9.449.200 0,00 2.900.000 0 4,00 9.449.200 1,00 50.800EGM TA Urban Planner 5 time x 1 person 4,00 2.900.000 8.300.000 3,00 8.280.100 0,00 2.900.000 0 3,00 8.280.100 1,00 19.900

In land Transport in Jakarta 5 time x 10 person 34,00 200.000 6.800.000 34,00 6.800.000 0,00 200.000 0 34,00 6.800.000 0,00 0Acomodation 5 time x 10 person x 4 days 42,00 300.000 10.000.000 39,00 9.750.000 0,00 250.000 0 39,00 9.750.000 3,00 250.000OSA 5 time x 10 person x 4 days ##### 100.000 18.000.000 180,00 18.000.000 0,00 100.000 0 180,00 18.000.000 0,00 0

2.2.2.3 For Coordination Meeting to Jakarta (by request) 51.400.000 51.108.700 0 51.108.700 291.300

Air Transport 7 time x 3 person 15,00 2.900.000 41.500.000 15,00 41.408.700 0,00 2.900.000 0 15,00 41.408.700 0,00 91.3000,00 4.900.000 0 0,00 0 0,00 4.900.000 0 0,00 0 0,00 0

In land Transport in Jakarta 7 time x 3 person 14,00 200.000 2.800.000 14,00 2.800.000 0,00 200.000 0 14,00 2.800.000 0,00 0Hotel Accommodation 7 time x 3 person x 4 days 8,00 300.000 2.400.000 8,00 2.200.000 0,00 300.000 0 8,00 2.200.000 0,00 200.000OSA 7 time x 3 person x 4 days 47,00 100.000 4.700.000 47,00 4.700.000 0,00 100.000 0 47,00 4.700.000 0,00 0

2.2.2.4 Korkot to Jakarta (by Request) 6.500.000 6.250.100 0 6.250.100 249.900

Air Transport 2,00 2.900.000 5.800.000 2,00 5.550.100 0,00 2.900.000 0 2,00 5.550.100 0,00 249.900In land Transport in Jakarta 2,00 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 3,00 100.000 300.000 3,00 300.000 0,00 100.000 0 3,00 300.000 0,00 0

2.2.2.5 ACTIVITIES TO JAKARTA 2017 68.650.000 68.561.044 0 68.561.044 88.956

1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 1,00 2.900.000 1.950.000 1,00 1.928.000 0,00 2.900.000 0 1,00 1.928.000 0,00 22.000Inland Transport 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0

Page 34: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0

2 ToT PEMANDU NASIONAL untuk Pelatihan Askot dan Fasilitator (Kab. Skala Prioritas)Air Transport 13,00 2.900.000 35.100.000 13,00 35.060.844 0,00 2.900.000 0 13,00 35.060.844 0,00 39.156Inland Transport 13,00 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0Hotel Accomodation 3,00 300.000 900.000 3,00 900.000 0,00 300.000 0 3,00 900.000 0,00 0OSA ##### 100.000 10.400.000 104,00 10.400.000 0,00 100.000 0 104,00 10.400.000 0,00 0

3 ToT PEMANDU SIMAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0Inland Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSED DEDAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0Inland Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

5 BY REQUESTAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0Inland Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 6,00 2.900.000 12.500.000 6,00 12.472.200 0,00 2.900.000 0 6,00 12.472.200 0,00 27.800Inland Transport 6,00 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 36,00 100.000 3.600.000 36,00 3.600.000 0,00 100.000 0 36,00 3.600.000 0,00 0

2.1.2.7 ACTIVITIES TO JAKARTA 2018 60.800.000 0 27.479.200 27.479.200 33.320.800ToT PEMANDU PELATIHAN FASILITATOR DAN KORKOT dan EGMAir Transport 16,00 2.900.000 46.400.000 0,00 0 8,00 2.900.000 22.679.200 8,00 22.679.200 8,00 23.720.800Inland Transport 16,00 200.000 3.200.000 0,00 0 8,00 200.000 1.600.000 8,00 1.600.000 8,00 1.600.000OSA ##### 100.000 11.200.000 0,00 0 32,00 100.000 3.200.000 32,00 3.200.000 80,00 8.000.000

TOTAL DUTY TRAVEL PROVINCE SOUTH KALIMANTAN 692.413.000 563.509.197 27.479.200 590.988.397 101.424.603

Page 35: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.3. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN TENGAH Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.3.1 IN PROVINCE

2.3.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3% x Number of Kelurahan) 5.200.000 3.700.000 0 3.700.000 1.500.000

a. Palangkaraya (30 kel x 3% = 1 kel)Transport 6 time x 1 person 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

b. To Waringin Timur (7 kel x 3% = 1 kel)Tranport 6 time x 1 person 3,00 300.000 900.000 3,00 900.000 0,00 300.000 0 3,00 900.000 0,00 0Acomodation 6 time x 1 person x 1 days 6,00 150.000 900.000 6,00 900.000 0,00 150.000 0 6,00 900.000 0,00 0OSA 6 time x 1 person x 2 days 11,00 50.000 550.000 11,00 550.000 0,00 50.000 0 11,00 550.000 0,00 0

0,00c. To Kabupaten Sukamara

Tranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

d. To Kabupaten Pulau PisauTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

d. To Kabupaten KapuasTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

MONITORING OSP PADA LEVEL KOTA

KOTA KUMUH INFRA SKALA KOTADari Kota Palangkaraya ke KOTA PALANGKARAYA 16,00 50.000 800.000 2,00 100.000 0,00 50.000 0 2,00 100.000 14,00 700.000

KOTA KUMUH NON INFRA SKALA KOTADari Kota Palangkaraya ke KOTA WARINGIN TIMURTransport 2,00 300.000 600.000 2,00 600.000 0,00 300.000 0 2,00 600.000 0,00 0Acomodation 4,00 150.000 600.000 2,00 300.000 0,00 150.000 0 2,00 300.000 2,00 300.000OSA 6,00 50.000 300.000 4,00 200.000 0,00 50.000 0 4,00 200.000 2,00 100.000

UJI PETIK KOTA KUMUH NON INFRA SKALA KOTA (BDI)Dari Kota PALANGKARAYA ke Kota PALANGKARAYAOSA 6,00 50.000 300.000 0,00 50.000 0 0,00 0 6,00 300.000

UJI PETIK TEMATIKOSA 2,00 50.000 100.000 0,00 50.000 0 0,00 0 2,00 100.000

2.3.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 3.450.000 2.050.000 0 2.050.000 1.400.000

A. For City Coordinator and Assistance City Coordinator (37 Kel x 50%) x 6 6 time x 9 kelurahan 7,00 50.000 350.000 7,00 350.000 0,00 50.000 0 7,00 350.000 0,00 0Cost / Day Rp. 50.000.- 1 Day cover 2 kel

B. For Ass. City Coordinator Infrastructure and FM in the city(37 Kel - 7 Kel luar kota) x 50%) x 18 18 time x 8 kelurahan 22,00 50.000 1.100.000 22,00 1.100.000 0,00 50.000 0 22,00 1.100.000 0,00 0Cost / Day Rp. 50.000.- 1 Day cover 2 kel

C. For City Coordinator Infrastructure and FM out of the city

a. Palangkaraya to Kota WaringinTranport 24 time x 1 person 1,00 300.000 300.000 1,00 200.000 0,00 300.000 0 1,00 200.000 0,00 100.000Acomodation 24 time x 2 person x 2 days 2,00 150.000 300.000 2,00 300.000 0,00 150.000 0 2,00 300.000 0,00 0OSA 24 time x 2 person x 3 days 2,00 50.000 100.000 2,00 100.000 0,00 50.000 0 2,00 100.000 0,00 0

b. to Kabupaten SukamaraTranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 36: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

c. to Kabupaten Pulau PisauTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

d. to Kabupaten KapuasTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

MONITORING

Monitoring Tim Korkot Kota Palangkaraya di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 8,00 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000

Monitoring Tim Korkot Kota Palangkaraya Ke (1) Kotawaringin TimurKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

UJI PETIK TEMATIKMonitoring Tim Korkot Palangkaraya di Dalam KotaOSA 6,00 50.000 300.000 0,00 50.000 0 0,00 0 6,00 300.000

2.3.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 4.150.000 4.150.000 0 4.150.000 0

a. Palangkaraya to Kota WaringinTranport 12 time x 3 person 6,00 300.000 1.800.000 6,00 1.800.000 0,00 300.000 0 6,00 1.800.000 0,00 0Acomodation 12 time x 3 person x 2 days 10,00 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 12 time x 3 person x 3 days 17,00 50.000 850.000 17,00 850.000 0,00 50.000 0 17,00 850.000 0,00 0

2.3.1.4 FROM KAB/KOTA TO TL OFICE FOR COORDINATION MEETING 2.100.000 0 0 0 2.100.000

a. From Waringin Timur to Palangkaraya Tranport 14 time x 2 person 2,00 300.000 600.000 0,00 0 0,00 300.000 0 0,00 0 2,00 600.000Acomodation 14 time x 2 person x 2 days 6,00 150.000 900.000 0,00 0 0,00 150.000 0 0,00 0 6,00 900.000OSA 14 time x 2 person x 3 days 12,00 50.000 600.000 0,00 0 0,00 50.000 0 0,00 0 12,00 600.000

b. Kabupaten Sukamara to PalangkarayaTranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

c. Kabupaten Pulau Pisau to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

d. Kabupaten Kapuas to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

2.3.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC 78.800.000 76.486.200 0 76.486.200 2.313.800

Workshop OC / Coordination Meeting at OCFrom Palangkaraya to SurabayaAir Transport 5 time x 7 person 23,00 2.900.000 54.500.000 23,00 54.419.000 0,00 2.900.000 0 23,00 54.419.000 0,00 81.000OSA [ Fixed ] 5 time x 7 person x 2 days 80,00 100.000 8.000.000 74,00 7.400.000 0,00 100.000 0 74,00 7.400.000 6,00 600.000Local Transport 5 time x 7 person 27,00 100.000 2.700.000 23,00 2.300.000 0,00 100.000 0 23,00 2.300.000 4,00 400.000

Pelatihan SIMFrom Palangkaraya to SurabayaAir Transport 4,00 2.900.000 11.600.000 4,00 10.367.200 0,00 2.900.000 0 4,00 10.367.200 0,00 1.232.800

Page 37: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Local Transport 4,00 100.000 400.000 4,00 400.000 0,00 100.000 0 4,00 400.000 0,00 0OSA (Fixed) 16,00 100.000 1.600.000 16,00 1.600.000 0,00 100.000 0 16,00 1.600.000 0,00 0

2.3.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO PALANGKARAYA 9.000.000 4.500.000 0 4.500.000 4.500.000

a. For TrainingTransport for Askot Waringin Timur on OSP Consolidation 10,00 300.000 3.000.000 5,00 1.500.000 0,00 300.000 0 5,00 1.500.000 5,00 1.500.000Inland Transport for SF, FK, FE, FS Waringin Timur 20,00 300.000 6.000.000 10,00 3.000.000 0,00 300.000 0 10,00 3.000.000 10,00 3.000.000

b. Kabupaten Sukamara to PalangkarayaTranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0

c. Kabupaten Pulau Pisau to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0

d. Kabupaten Kapuas to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0

b. Special Event (by request)

Kota Waringin to PalangkarayaTransport 2 time x 2 person 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

2.3.2 TO JAKARTA

2.3.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 8.600.000 8.483.100 0 8.483.100 116.900

Air Transport 6 time x 5 person 4,00 2.900.000 5.000.000 4,00 4.883.100 0,00 2.900.000 0 4,00 4.883.100 0,00 116.900In land Travel in Jakarta 6 time x 5 person 2,00 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0OSA 6 time x 5 person x 4 days 32,00 100.000 3.200.000 32,00 3.200.000 0,00 100.000 0 32,00 3.200.000 0,00 0

ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

ToT Pelatihan Program LanjutanAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.3.2.2 FOR EGM TO JAKARTA 86.100.000 85.666.310 0 85.666.310 433.690

Air TransportEGM TA/SubTA Training 5 time x 1 person 5,00 2.900.000 11.500.000 5,00 11.500.000 0,00 2.900.000 0 5,00 11.500.000 0,00 0EGM TA Sosialisasi 0,00 2.900.000 0EGM TA/SubTA MK/Sub TA RLF 5 time x 1 person 5,00 2.900.000 11.600.000 5,00 11.506.125 0,00 2.900.000 0 5,00 11.506.125 0,00 93.875EGM TA/SubTA INFRA/Sub TA Safeguard 5 time x 1 person 4,00 2.900.000 7.600.000 4,00 7.573.485 0,00 2.900.000 0 4,00 7.573.485 0,00 26.515EGM TA/SubTA Monev /Sub TA Legal HCUEGM TA/SubTA SIM 5 time x 1 person 6,00 2.900.000 13.800.000 6,00 13.778.000 0,00 2.900.000 0 6,00 13.778.000 0,00 22.000EGM TA Local Goverment 5 time x 1 person 5,00 2.900.000 11.100.000 5,00 11.062.700 0,00 2.900.000 0 5,00 11.062.700 0,00 37.300EGM TA Urban Planner 5 time x 1 person 3,00 2.900.000 5.600.000 3,00 5.546.000 0,00 2.900.000 0 3,00 5.546.000 0,00 54.000

In land Transport in Jakarta 5 time x 6 person 24,00 200.000 4.800.000 24,00 4.800.000 0,00 200.000 0 24,00 4.800.000 0,00 0Acomodation 5 time x 6 person x 4 days 36,00 300.000 7.200.000 36,00 7.200.000 0,00 250.000 0 36,00 7.200.000 0,00 0OSA 5 time x 6 person x 4 days 129,00 100.000 12.900.000 127,00 12.700.000 0,00 100.000 0 127,00 12.700.000 2,00 200.000

2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 25.240.000 24.839.200 0 24.839.200 400.800

Air Transport 7 time x 3 person 8,00 2.900.000 16.709.000 6,00 16.709.000 0,00 2.795.300 0 6,00 16.709.000 2,00 0Air Transport to Jakarta and Other 1,00 4.900.000 3.531.000 1,00 3.530.200 0,00 4.900.000 0 1,00 3.530.200 0,00 800In land Transport in Jakarta 7 time x 3 person 6,00 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Accommodation 7 time x 3 person x 4 days 19,00 100.000 1.900.000 12,00 1.800.000 0,00 100.000 0 12,00 1.800.000 7,00 100.000OSA 7 time x 3 person x 4 days 37,00 100.000 1.900.000 16,00 1.600.000 0,00 100.000 0 16,00 1.600.000 21,00 300.000

Page 38: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

2.1.2.5 Korkot to Jakarta (by Request) 0 0 0 0 0

Air Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.1.2.6 ACTIVITIES TO JAKARTA 2017 29.700.000 29.603.400 0 29.603.400 96.600

1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2 ToT PEMAMDU NASIONAL Untuk Pelatihan Askot dan Fasilitator (Kab. Skala Prioritas)Air Transport 5,00 2.900.000 12.100.000 5,00 12.011.400 0,00 2.900.000 0 5,00 12.011.400 0,00 88.600In land Transport in Jakarta 5,00 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Hotel Accommodation 5,00 300.000 1.200.000 4,00 1.200.000 0,00 300.000 0 4,00 1.200.000 1,00 0OSA 40,00 100.000 4.000.000 40,00 4.000.000 0,00 100.000 0 40,00 4.000.000 0,00 0

3 ToT PEMANDU SIMAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSES DEDAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

5 BY REQUESTAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 4,00 2.900.000 8.200.000 4,00 8.192.000 0,00 2.900.000 0 4,00 8.192.000 0,00 8.000In land Transport in Jakarta 4,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 24,00 100.000 2.400.000 24,00 2.400.000 0,00 100.000 0 24,00 2.400.000 0,00 0

2.1.2.7 ACTIVITIES TO JAKARTA 2018 38.000.000 27.117.300 0 27.117.300 10.882.700

ToT PEMANDU PELATIHAN FASILITATOR DAN KORKOT dan EGMAir Transport 10,00 2.900.000 29.000.000 9,00 21.717.300 0,00 2.900.000 0 9,00 21.717.300 1,00 7.282.700In land Transport 10,00 200.000 2.000.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 1,00 200.000OSA (Fixed) 70,00 100.000 7.000.000 36,00 3.600.000 0,00 100.000 0 36,00 3.600.000 34,00 3.400.000

TOTAL DUTY TRAVEL PROVINCE CENTER KALIMANTAN 290.340.000 266.595.510 0 266.595.510 23.744.490

Page 39: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.4. Duty Travel Expenses East Kalimantan Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.4.1 In Province

2.4.1.1 For Spotcheck Province to Kelurahan (3% x Number of Kelurahan) 109.500.000 70.267.000 0 70.267.000 39.233.000

a. From Samarinda to Balikpapan dan Paser (41 kel x 3% = 2 kel)Tranport 6 time x 1 person 4,00 400.000 1.600.000 4,00 1.600.000 0,00 400.000 0 4,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 2 days 7,00 350.000 2.450.000 7,00 2.440.000 0,00 350.000 0 7,00 2.440.000 0,00 10.000OSA 6 time x 1 person x 3 days 14,00 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0

b. From Samarinda to Kutai Kertanegara & Kota Bontang (36 kel x 3% = 2 kel)Tranport 6 time x 1 person 5,00 600.000 3.000.000 5,00 3.000.000 0,00 600.000 0 5,00 3.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 8,00 350.000 2.800.000 8,00 2.600.000 0,00 350.000 0 8,00 2.600.000 0,00 200.000OSA 6 time x 1 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

c. From Samarinda to Berau (6 kel x 3% = 1 kel)Tranport 6 time x 1 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 6 time x 1 person x 2 days 8,00 350.000 2.500.000 8,00 2.487.000 0,00 350.000 0 8,00 2.487.000 0,00 13.000OSA 6 time x 1 person x 3 days 14,00 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0

d. From Samarinda to Malinau (6 kel x 3% = 1 kel)Tranport 6 time x 1 person 3,00 1.700.000 5.100.000 3,00 5.100.000 0,00 1.700.000 0 3,00 5.100.000 0,00 0Acomodation 6 time x 1 person x 2 days 5,00 350.000 1.750.000 5,00 1.750.000 0,00 350.000 0 5,00 1.750.000 0,00 0OSA 6 time x 1 person x 3 days 9,00 50.000 450.000 9,00 450.000 0,00 50.000 0 9,00 450.000 0,00 0

e. From Samarinda to Bulongan (3 kel x 3% = 1 kel)Tranport 6 time x 1 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 6 time x 1 person x 2 days 9,00 350.000 3.150.000 9,00 2.970.000 0,00 350.000 0 9,00 2.970.000 0,00 180.000OSA 6 time x 1 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

f. From Samarinda to Nunukan (8 kel x 3% = 1 kel)Tranport 6 time x 1 person 4,00 1.900.000 7.600.000 4,00 7.600.000 0,00 1.900.000 0 4,00 7.600.000 0,00 0Acomodation 6 time x 1 person x 2 days 7,00 300.000 2.100.000 7,00 2.000.000 0,00 300.000 0 7,00 2.000.000 0,00 100.000OSA 6 time x 1 person x 3 days 12,00 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0

g. From Samarinda to Kota Tarakan (20 kel x 3% = 1 kel)Tranport 6 time x 1 person 8,00 1.400.000 11.200.000 8,00 11.200.000 0,00 1.400.000 0 8,00 11.200.000 0,00 0Acomodation 6 time x 1 person x 2 days 15,00 350.000 5.250.000 15,00 5.070.000 0,00 350.000 0 15,00 5.070.000 0,00 180.000OSA 6 time x 1 person x 3 days 24,00 50.000 1.200.000 24,00 1.200.000 0,00 50.000 0 24,00 1.200.000 0,00 0

h. Kota Samarinda (53 kel x 3% = 2 kel)Tranport 6 time x 1 person x 1 days 5,00 50.000 250.000 4,00 200.000 0,00 50.000 0 4,00 200.000 1,00 50.000

MONITORING OSP PADA LEVEL KOTAKOTA KUMUH INFRA SKALA KOTADari Kota Samarinda ke KOTA BALIKPAPANTransport 1,00 400.000 400.000 0,00 0 0,00 400.000 0 0,00 0 1,00 400.000Acomodation 3,00 350.000 1.050.000 0,00 0 0,00 350.000 0 0,00 0 3,00 1.050.000OSA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Dari Kota Samarinda ke KOTA SAMARINDATransport 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0Acomodation 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 6,00 50.000 300.000 2,00 100.000 0,00 50.000 0 2,00 100.000 4,00 200.000

Dari Kota Samarinda ke KOTA BONTANGTransport 1,00 600.000 600.000 0,00 0 0,00 600.000 0 0,00 0 1,00 600.000Acomodation 3,00 350.000 1.050.000 0,00 0 0,00 350.000 0 0,00 0 3,00 1.050.000OSA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

KOTA KUMUH NON INFRA SKALA KOTADari Kota Samarinda ke KOTA PASERTransport 1,00 400.000 400.000 0,00 0 0,00 400.000 0 0,00 0 1,00 400.000Acomodation 2,00 350.000 700.000 0,00 0 0,00 350.000 0 0,00 0 2,00 700.000OSA 3,00 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 40: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Dari Kota Samarinda ke KUTAI KARTANEGARATransport 1,00 600.000 600.000 0,00 0 0,00 600.000 0 0,00 0 1,00 600.000Acomodation 2,00 350.000 700.000 0,00 0 0,00 350.000 0 0,00 0 2,00 700.000OSA 3,00 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000

Dari Kota Samarinda ke BERAUTransport 1,00 1.700.000 1.700.000 0,00 0 1.700.000 0 0,00 0 1,00 1.700.000Acomodation 2,00 350.000 700.000 0,00 0 350.000 0 0,00 0 2,00 700.000OSA 3,00 50.000 150.000 0,00 0 50.000 0 0,00 0 3,00 150.000

UJI PETIK KOTA KUMUH NON INFRA SKALA KOTA (BDI)Dari SAMARINDA ke BALIKPAPANTransport 2,00 200.000 400.000 0,00 0 200.000 0 0,00 0 2,00 400.000Acomodation 4,00 350.000 1.400.000 0,00 0 350.000 0 0,00 0 4,00 1.400.000OSA 6,00 50.000 300.000 0,00 0 50.000 0 0,00 0 6,00 300.000

Dari SAMARINDA ke BONTANGTransport 2,00 400.000 800.000 0,00 0 400.000 0 0,00 0 2,00 800.000Acomodation 4,00 350.000 1.400.000 0,00 0 350.000 0 0,00 0 4,00 1.400.000OSA 6,00 50.000 300.000 0,00 0 50.000 0 0,00 0 6,00 300.000

UJI PETIK TEMATIKTransport 3,00 400.000 1.200.000 0,00 0 400.000 0 0,00 0 3,00 1.200.000Acomodation 3,00 350.000 1.050.000 0,00 0 350.000 0 0,00 0 3,00 1.050.000OSA 6,00 50.000 300.000 0,00 0 50.000 0 0,00 0 6,00 300.000

MONITORING KE KAB/KOTA (COACHING CLINIC)Transport to Balikpapan 11,00 400.000 2.400.000 0,00 0 0,00 400.000 0 0,00 0 11,00 2.400.000Acomodation 17,00 350.000 5.950.000 0,00 0 0,00 350.000 0 0,00 0 17,00 5.950.000OSA 28,00 50.000 1.400.000 0,00 0 0,00 50.000 0 0,00 0 28,00 1.400.000

Transport to Bontang 11,00 600.000 5.600.000 0,00 0 0,00 600.000 0 0,00 0 11,00 5.600.000Acomodation 17,00 350.000 5.950.000 0,00 0 0,00 350.000 0 0,00 0 17,00 5.950.000OSA 22,00 50.000 1.100.000 0,00 0 0,00 50.000 0 0,00 0 22,00 1.100.000

2.4.1.2 Spootcheck Kota/Kab for Ass. City Coordinator Infra and FM 29.550.000 27.150.000 0 27.150.000 2.400.000

A. For City Coordinator and Assistance City Coordinator (173 Kel x 50%) x 6 6 time x 43 kelurahan 65,00 50.000 3.250.000 64,00 3.150.000 0,00 50.000 0 64,00 3.150.000 1,00 100.000Cost / Day Rp. 50.000.- 1 Day cover 2 kel

B. For Ass. City Coordinator Infrastructure and FM in the city(173 Kel - 73 Kel luar kota) x 50%) x 18 18 time x 25 kelurahan 22,00 50.000 1.100.000 20,00 1.000.000 0,00 50.000 0 20,00 1.000.000 2,00 100.000Cost / Day Rp. 50.000.- 1 Day cover 2 kel

C. For City Coordinator Infrastructure and FM out of te town

a. From Kota Balikpapan to PaserTranport 28 time x 2 person 1,00 400.000 400.000 1,00 400.000 0,00 400.000 0 1,00 400.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 700.000 0,00 350.000 0 2,00 700.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

b. From Kota Samarinda to Kutai KartanegaraTranport 28 time x 3 person 1,00 250.000 250.000 1,00 250.000 0,00 250.000 0 1,00 250.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 550.000 0,00 350.000 0 2,00 550.000 0,00 150.000OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

c. From Kota Samarinda to BontangTranport 30 time x 2 person 1,00 400.000 400.000 1,00 400.000 0,00 400.000 0 1,00 400.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 700.000 0,00 350.000 0 2,00 700.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

d. From Kota Tarakan to NunukanTranport 24 time x 2 person 8,00 1.200.000 9.600.000 8,00 9.600.000 0,00 1.200.000 0 8,00 9.600.000 0,00 0Acomodation 24 time x 2 person x 2 days 11,00 300.000 3.300.000 11,00 3.300.000 0,00 300.000 0 11,00 3.300.000 0,00 0OSA 24 time x 2 person x 3 days 21,00 50.000 1.050.000 21,00 1.050.000 0,00 50.000 0 21,00 1.050.000 0,00 0

Page 41: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

e. From Kota Tarakan to BulunganTranport 24 time x 1 person 1,00 1.200.000 1.200.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 0,00 0Acomodation 24 time x 2 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 2,00 100.000 0,00 50.000 0 2,00 100.000 1,00 50.000

f. From Kota Tarakan to BerauTranport 24 time x 1 person 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 700.000 0,00 350.000 0 2,00 700.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

g. From Kota Tarakan to MalinoTranport 24 time x 1 person 1,00 1.200.000 1.200.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 300.000 600.000 2,00 600.000 0,00 300.000 0 2,00 600.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

MONITORING TEMATIKMonitoring Tim Korkot Kota Balikpapan di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000

Monitoring Tim Korkot Kota Balikpapan Ke (1) PaserKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kota Samarinda di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 6,00 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000

Monitoring Tim Korkot Kota Samarinda Ke (1) Kutai KartanegaraKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kota Bontang di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kota Bontang Ke (1) BerauKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

MONITORING TEMATIKMonitoring Tim Korkot kab BALIKPAPAN ke kab BALIKPAPANOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kota SAMARINDA ke Kota SAMARINDAOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

Monitoring Tim Korkot Kota BONTANG ke Kota BONTANGOSA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000

2.4.1.3 For CB Activity by Askot to Faskel 0 0 0 0 0

a. From Kota Balikpapan to PaserTranport 12 time x 3 person 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

b. From Kota Samarinda to Kutai KartanegaraTranport 12 time x 3 person 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

c. From Kota Samarinda to BontangTranport 12 time x 3 person 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

d. From Kota Tarakan to NunukanTranport 12 time x 3 person 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0

Page 42: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Acomodation 12 time x 3 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

e. From Kota Tarakan to BulunganTranport 12 time x 3 person 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

f. From Kota Tarakan to BerauTranport 12 time x 3 person 0,00 1.500.000 0 0,00 0 0,00 1.500.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

g. From Kota Tarakan to MalinoTranport 12 time x 3 person 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

2.4.1.4 From Kab/Kota to TL Office for Coordination Meeting 90.900.000 83.950.000 0 83.950.000 6.950.000

a. From Paser to SamarindaTranport 14 time x 2 person 7,00 600.000 4.200.000 6,00 3.600.000 0,00 600.000 0 6,00 3.600.000 1,00 600.000Acomodation 14 time x 2 person x 2 days 39,00 250.000 9.750.000 37,00 9.250.000 0,00 250.000 0 37,00 9.250.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000

b. From Kutai Kartanegara to SamarindaTranport 14 time x 2 person 6,00 600.000 3.600.000 5,00 3.000.000 0,00 600.000 0 5,00 3.000.000 1,00 600.000Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000

c. From Berau to SamarindaTranport 14 time x 2 person 6,00 1.700.000 10.200.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 1,00 1.700.000Acomodation 14 time x 2 person x 2 days 8,00 250.000 2.000.000 6,00 1.500.000 0,00 250.000 0 6,00 1.500.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000

d. From Malinau to SamarindaTranport 14 time x 2 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 14 time x 2 person x 2 days 8,00 250.000 2.000.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 0,00 0OSA 14 time x 2 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

e. From Bulongan to SamarindaTranport 14 time x 2 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 14 time x 2 person x 2 days 8,00 250.000 2.000.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 0,00 0OSA 14 time x 2 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0

f. From Nunukan to SamarindaTranport 14 time x 2 person 4,00 1.900.000 7.600.000 4,00 7.600.000 0,00 1.900.000 0 4,00 7.600.000 0,00 0Acomodation 14 time x 2 person x 2 days 6,00 250.000 1.500.000 6,00 1.500.000 0,00 250.000 0 6,00 1.500.000 0,00 0OSA 14 time x 2 person x 3 days 12,00 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0

g. From Balikpapan to SamarindaTranport 14 time x 2 person 7,00 200.000 1.400.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 2,00 500.000OSA 14 time x 2 person x 3 days 21,00 50.000 1.050.000 18,00 900.000 0,00 50.000 0 18,00 900.000 3,00 150.000

h. From Tarakan to SamarindaTranport 14 time x 2 person 6,00 1.400.000 8.400.000 6,00 8.400.000 0,00 1.400.000 0 6,00 8.400.000 0,00 0Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 10,00 2.500.000 0,00 250.000 0 10,00 2.500.000 0,00 0OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 18,00 900.000 0,00 50.000 0 18,00 900.000 0,00 0

i. From Bontang to SamarindaTranport 14 time x 2 person 6,00 600.000 3.600.000 5,00 3.000.000 0,00 600.000 0 5,00 3.000.000 1,00 600.000Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000

2.4.1.5 From Province to Regional for Workshop & Coordination Meeting at OC 89.100.000 83.635.500 0 83.635.500 5.464.500

Workshop OC / Coordination Meeting at OCFrom Samarinda to Surabaya

Page 43: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Air Transport 5 time x 9 person 19,00 3.700.000 47.000.000 19,00 46.991.500 0,00 3.700.000 0 19,00 46.991.500 0,00 8.500OSA [ Fixed ] 5 time x 9 person x 2 days 60,00 100.000 6.000.000 54,00 5.400.000 0,00 100.000 0 54,00 5.400.000 6,00 600.000Local Transport 5 time x 9 person 25,00 100.000 2.500.000 21,00 2.100.000 0,00 100.000 0 21,00 2.100.000 4,00 400.000

Pelatihan SIMFrom Samarinda to SurabayaAir Transport 5 time x 9 person 8,00 3.700.000 29.600.000 8,00 25.144.000 0,00 3.700.000 0 8,00 25.144.000 0,00 4.456.000Local Transport 5 time x 9 person x 2 days 8,00 100.000 800.000 8,00 800.000 0,00 100.000 0 8,00 800.000 0,00 0OSA (Fixed) 5 time x 9 person 32,00 100.000 3.200.000 32,00 3.200.000 0,00 100.000 0 32,00 3.200.000 0,00 0

2.4.1.6 For Several Training & Special Event from Kab. to Banjarmasin 399.000.000 350.874.000 0 350.874.000 48.126.000

For TrainingTransport for Korkot &Askot (10 Kota/Kab) on OSP Consolidation

a. From Paser to SamarindaTranport 6 time x 2 person 23,00 400.000 9.200.000 22,00 8.800.000 0,00 400.000 0 22,00 8.800.000 1,00 400.000

b. From Kutai Kartanegara to SamarindaTranport 6 time x 3 person 20,00 600.000 12.000.000 18,00 10.800.000 0,00 600.000 0 18,00 10.800.000 2,00 1.200.000

c. From Berau to SamarindaTranport 6 time x 1 person 8,00 1.700.000 13.600.000 6,00 10.200.000 0,00 1.700.000 0 6,00 10.200.000 2,00 3.400.000

d. From Malinau to SamarindaTranport 6 time x 1 person 6,00 1.700.000 10.200.000 6,00 10.200.000 0,00 1.700.000 0 6,00 10.200.000 0,00 0

e. From Bulongan to SamarindaTranport 6 time x 1 person 4,00 1.700.000 6.800.000 2,00 3.400.000 0,00 1.700.000 0 2,00 3.400.000 2,00 3.400.000

f. From Nunukan to SamarindaTranport 6 time x 1 person 7,00 1.900.000 13.300.000 7,00 13.300.000 0,00 1.900.000 0 7,00 13.300.000 0,00 0

g. From Balikpapan to SamarindaTranport 6 time x 5 person 41,00 400.000 12.800.000 38,00 11.600.000 0,00 300.000 0 38,00 11.600.000 3,00 1.200.000

h. From Tarakan to SamarindaTranport 6 time x 5 person 31,00 1.400.000 43.400.000 31,00 42.774.000 0,00 1.400.000 0 31,00 42.774.000 0,00 626.000

i. From Bontang to SamarindaTranport 6 time x 1 person 22,00 600.000 10.700.000 15,00 9.000.000 0,00 600.000 0 15,00 9.000.000 7,00 1.700.000

Inland Transport for SF, FT, FE, FS (34 Kota/Kab)

a. From Paser to SamarindaTranport 2 time x 14 person 27,00 400.000 10.800.000 17,00 6.800.000 0,00 400.000 0 17,00 6.800.000 10,00 4.000.000

b. From Kutai Kartanegara to SamarindaTranport 2 time x 13 person 35,00 600.000 21.000.000 30,00 18.000.000 0,00 600.000 0 30,00 18.000.000 5,00 3.000.000

c. From Berau to SamarindaTranport 2 time x 5 person 23,00 1.700.000 39.100.000 15,00 25.500.000 0,00 1.700.000 0 15,00 25.500.000 8,00 13.600.000

d. From Malinau to SamarindaTranport 2 time x 5 person 11,00 1.700.000 18.700.000 11,00 18.700.000 0,00 1.700.000 0 11,00 18.700.000 0,00 0

e. From Bulongan to SamarindaTranport 2 time x 2 person 4,00 1.700.000 6.800.000 4,00 6.800.000 0,00 1.700.000 0 4,00 6.800.000 0,00 0

f. From Nunukan to SamarindaTranport 2 time x 5 person 14,00 1.900.000 26.600.000 14,00 26.600.000 0,00 1.900.000 0 14,00 26.600.000 0,00 0

g. From Balikpapan to SamarindaTranport 2 time x 15 person 121,00 400.000 48.400.000 112,00 44.800.000 0,00 400.000 0 112,00 44.800.000 9,00 3.600.000

h. From Tarakan to SamarindaTranport 2 time x 10 person 28,00 1.400.000 39.200.000 28,00 39.200.000 0,00 1.400.000 0 28,00 39.200.000 0,00 0

i. From Bontang to SamarindaTranport 2 time x 12 person 60,00 600.000 36.000.000 40,00 24.000.000 0,00 600.000 0 40,00 24.000.000 20,00 12.000.000

Page 44: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Inland Transport for SF, FK, FE, FS (to Assesment)1 From Paser to Balikpapan

Transport 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0

Special Event (by request)

a. From Paser to SamarindaTranport 2 time x 2 person 1,00 600.000 600.000 1,00 600.000 0,00 600.000 0 1,00 600.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

b. From Kutai Kartanegara to SamarindaTranport 2 time x 2 person 1,00 600.000 600.000 1,00 600.000 0,00 600.000 0 1,00 600.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

c. From Berau to SamarindaTranport 2 time x 2 person 1,00 1.700.000 1.700.000 1,00 1.700.000 0,00 1.700.000 0 1,00 1.700.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

d. From Malinau to SamarindaTranport 2 time x 2 person 1,00 1.700.000 1.700.000 1,00 1.700.000 0,00 1.700.000 0 1,00 1.700.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

e. From Bulongan to SamarindaTranport 2 time x 2 person 0,00 1.700.000 0 0,00 0 0,00 1.700.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

f. From Nunukan to SamarindaTranport 2 time x 2 person 0,00 1.900.000 0 0,00 0 0,00 1.900.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

g. From Balikpapan to SamarindaTranport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

h. From Tarakan to SamarindaTranport 2 time x 2 person 3,00 1.400.000 4.200.000 3,00 4.200.000 0,00 1.400.000 0 3,00 4.200.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 9,00 50.000 450.000 9,00 450.000 0,00 50.000 0 9,00 450.000 0,00 0

i. From Bontang to SamarindaTranport 2 time x 2 person 1,00 600.000 600.000 1,00 600.000 0,00 600.000 0 1,00 600.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0

2.4.1.7 PERCEPATAN PENYUSUNAN DOK SIAPLocal Transport for Coordiantion 7,00 1.400.000 9.800.000 7,00 9.800.000 0,00 1.400.000 0 7,00 9.800.000 0,00 0local Transport for Training 0,00 1.400.000 0 0,00 0 0,00 1.400.000 0 0,00 0 0,00 0

2.4.2 To Jakarta

2.4.2.1 For Several Training to Jakarta by Request 12.984.000 12.983.700 0 12.983.700 300

Air Transport 6 time x 5 person 4,00 3.700.000 8.984.000 4,00 8.983.700 0,00 3.700.000 0 4,00 8.983.700 0,00 300In land Travel in Jakarta 6 time x 5 person 4,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0In land Transport Samarinda - Balikpapan6 time x 5 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 6 time x 5 person x 4 days 32,00 100.000 3.200.000 32,00 3.200.000 0,00 100.000 0 32,00 3.200.000 0,00 0

ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

Page 45: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

ToT Pelatihan Program lanjutanAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport (Kalimantan utara - Jakarta PP) 0,00 4.797.000 0 0,00 0 0,00 4.797.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

ToT Pelatihan Program LanjutanAir Transport (Kalimantan utara - Jakarta PP) 0,00 4.797.000 0 0,00 0 0,00 4.797.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.4.2.2 For EGM to Jakarta 152.205.000 151.975.890 0 151.975.890 229.110

Air TransportEGM TA/SubTA Training 5 time x 2 person 7,00 3.700.000 20.300.000 7,00 20.288.600 0,00 3.700.000 0 7,00 20.288.600 0,00 11.400EGM TA Sosialisasi 5 time x 1 person 5,00 3.700.000 13.300.000 5,00 13.242.090 0,00 3.700.000 0 5,00 13.242.090 0,00 57.910EGM TA/SubTA MK/Sub TA RLF 5 time x 2 person 7,00 3.700.000 18.300.000 6,00 18.222.500 0,00 3.700.000 0 6,00 18.222.500 1,00 77.500EGM TA/SubTA INFRA/Sub TA Safeguard5 time x 1 person 5,00 3.700.000 16.400.000 5,00 16.362.800 0,00 3.700.000 0 5,00 16.362.800 0,00 37.200EGM TA/SubTA Monev /Sub TA Legal HCU5 time x 1 person 5,00 3.700.000 13.300.000 5,00 13.257.000 0,00 3.700.000 0 5,00 13.257.000 0,00 43.000EGM TA/SubTA SIM 5 time x 1 person 6,00 3.700.000 16.546.000 5,00 16.545.200 0,00 3.700.000 0 5,00 16.545.200 1,00 800EGM TA Local Goverment 5 time x 1 person 5,00 3.700.000 12.792.000 4,00 12.791.500 0,00 3.700.000 0 4,00 12.791.500 1,00 500EGM TA Urban Planner 5 time x 1 person 3,00 3.700.000 5.917.000 2,00 5.916.200 0,00 3.700.000 0 2,00 5.916.200 1,00 800

In land Transport in Jakarta 5 time x 10 person 36,00 200.000 6.800.000 34,00 6.800.000 0,00 200.000 0 34,00 6.800.000 2,00 0In land Transport Samarinda - Balikpapan5 time x 10 person 6,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 2,00 0Acomodation 5 time x 10 person x 4 days 54,00 300.000 9.750.000 51,00 9.750.000 0,00 250.000 0 51,00 9.750.000 3,00 0OSA 5 time x 10 person x 4 days 183,00 100.000 18.000.000 180,00 18.000.000 0,00 100.000 0 180,00 18.000.000 3,00 0

2.4.2.3 For Coordination Meeting to Jakarta (by request) 83.194.000 83.192.200 0 83.192.200 1.800

Air Transport 7 time x 3 person 21,00 3.700.000 54.413.000 21,00 54.412.100 0,00 3.700.000 0 21,00 54.412.100 0,00 9004,00 5.700.000 12.881.000 4,00 12.880.100 0,00 5.700.000 0 4,00 12.880.100 0,00 900

In land Transport in Jakarta 7 time x 3 person 21,00 200.000 4.200.000 21,00 4.200.000 0,00 200.000 0 21,00 4.200.000 0,00 0In land Transport Samarinda - Balikpapan7 time x 3 person x 4 days 6,00 200.000 1.200.000 5,00 1.200.000 0,00 200.000 0 5,00 1.200.000 1,00 0OSA 7 time x 3 person x 4 days 40,00 100.000 4.000.000 34,00 4.000.000 0,00 100.000 0 34,00 4.000.000 6,00 0Hotel Accommodation 7 time x 3 person x 4 days 25,00 300.000 6.500.000 25,00 6.500.000 0,00 300.000 0 25,00 6.500.000 0,00 0

2.4.2.5 Korkot to Jakarta (by Request) 6.668.000 6.668.000 0 6.668.000 0

Air Transport 2,00 3.700.000 3.035.000 2,00 3.035.000 0,00 3.700.000 0 2,00 3.035.000 0,00 0In land Transport in Jakarta 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0In land Transport Samarinda-Balikpapan 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0

Air Transport (Kalimantan Utara - Jakarta PP) 1,00 4.797.000 3.033.000 1,00 3.033.000 0,00 4.797.000 0 1,00 3.033.000 0,00 0In land Transport Tarakan -Balikpapan 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

2.4.2.6 ACTIVITIES TO JAKARTA 2017 56.300.000 55.894.500 0 55.894.500 405.500

1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 1,00 3.700.000 2.200.000 1,00 2.165.000 0,00 3.700.000 0 1,00 2.165.000 0,00 35.000In Land Transport 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Hotel Acomodation 1,00 300.000 300.000 1,00 300.000 0,00 300.000 0 1,00 300.000 0,00 0OSA 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0

2 ToT PEMANDU NASIONAL untuk Pelatihan Askot dan Failitator (Kab skala prioritas)Air Transport 9,00 3.700.000 26.400.000 9,00 26.358.300 0,00 3.700.000 0 9,00 26.358.300 0,00 41.700In Land Transport 9,00 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 72,00 100.000 7.200.000 72,00 7.200.000 0,00 100.000 0 72,00 7.200.000 0,00 0

3 ToT PEMANDU SIMAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0

Page 46: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

In Land Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSES DEDAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In Land Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

5 BY REQUESTAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In Land Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0

TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 6,00 3.700.000 13.200.000 6,00 12.871.200 0,00 3.700.000 0 6,00 12.871.200 0,00 328.800In Land Transport 6,00 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 36,00 100.000 3.600.000 36,00 3.600.000 0,00 100.000 0 36,00 3.600.000 0,00 0

2.1.2.7 ACTIVITIES TO JAKARTA 2018 41.400.000 0 35.846.100 35.846.100 5.553.900

ToT PEMANDU PELATIHAN FASILITATOR DAN KORKOT dan EGMAir Transport 9,00 3.700.000 33.300.000 0,00 0 9,00 3.700.000 30.446.100 9,00 30.446.100 0,00 2.853.900In Land Transport 9,00 200.000 1.800.000 0,00 0 9,00 200.000 1.800.000 9,00 1.800.000 0,00 0OSA 63,00 100.000 6.300.000 0,00 0 36,00 100.000 3.600.000 36,00 3.600.000 27,00 2.700.000

TOTAL DUTY TRAVEL PROVINCE EAST KALIMANTAN 1.070.801.000 926.590.790 35.846.100 962.436.890 108.364.110

Page 47: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.5. Office Operational Expenses Mei 20180

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.5.1 Office Running Cost 2.691.762.000 2.624.021.982 32.153.463 2.656.175.445 35.586.555

2.5.1.1 OSP Office 392.812.000 376.321.982 5.528.463 381.850.445 10.961.555a East Java Province (Surabaya) 1 prov x 20 months 24,00 2.000.000 48.000.000 24,00 47.786.653 0,00 2.000.000 0 24,00 47.786.653 0,00 213.347

48,00 2.264.000 108.672.000 46,00 102.594.794 1,00 2.264.000 2.264.000 47,00 104.858.794 1,00 3.813.206b South Kalimantan Province (Banjarmasin) 1 prov x 20 months 24,00 1.000.000 24.000.000 24,00 23.952.904 0,00 1.000.000 0 24,00 23.952.904 0,00 47.096

48,00 1.132.000 54.336.000 46,00 51.846.389 1,00 1.132.000 1.000.463 47,00 52.846.852 1,00 1.489.148c Center Kalimantan Province (Palangkaraya)1 prov x 20 months 24,00 1.000.000 24.000.000 24,00 22.553.722 0,00 1.000.000 0 24,00 22.553.722 0,00 1.446.278

48,00 1.132.000 54.336.000 46,00 50.989.360 1,00 1.132.000 1.132.000 47,00 52.121.360 1,00 2.214.640d East Kalimantan Province (Samarinda) 1 prov x 20 months 24,00 1.000.000 24.000.000 24,00 23.844.340 0,00 1.000.000 0 24,00 23.844.340 0,00 155.660

49,00 1.132.000 55.468.000 47,00 52.753.820 1,00 1.132.000 1.132.000 48,00 53.885.820 1,00 1.582.180

2.5.1.2 City Coordinator Office 1.901.750.000 1.862.900.000 19.425.000 1.882.325.000 19.425.000

a East Java Province 25 city x 20 months 599,00 500.000 299.500.000 599,00 299.500.000 0,00 500.000 0 599,00 299.500.000 0,00 0KATEGORI -1

1 Korkot Kab. Pacitan (25 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 02 Korkot Kab. Kediri (46 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 03 Korkot Kota Kediri (46 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 04 Korkot Kota Madiun (41 Kel) 46,00 950.000 43.700.000 44,00 41.800.000 1,00 950.000 950.000 45,00 42.750.000 1,00 950.0005 Korkot Magetan (42 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 06 Korkot Bojonegoro (35 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 07 Korkot Lamongan (37 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 08 Korkot Pasuruan (34 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 09 Korkot Jember (49 Kel) 46,00 950.000 43.700.000 44,00 41.800.000 1,00 950.000 950.000 45,00 42.750.000 1,00 950.000

10 Korkot Situbondo (41 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 011 Korkot Banywangi (45 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 012 Korkot Trenggalek (13 kel) 5,00 950.000 4.750.000 5,00 4.750.000 0,00 950.000 0 5,00 4.750.000 0,00 013 Korkot Kota Probolinggo (29 kel) 13,00 950.000 12.350.000 11,00 10.450.000 1,00 950.000 950.000 12,00 11.400.000 1,00 950.00014 Korkot Bondowoso (11 Kel) 3,00 950.000 2.850.000 3,00 2.850.000 0,00 950.000 0 3,00 2.850.000 0,00 0

KATEGORI -21 Korkot Kab. Ponorogo (50 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 02 Korkot Kab. Tulungagung (81 Kel) 50,00 1.100.000 55.000.000 48,00 52.800.000 1,00 1.100.000 1.100.000 49,00 53.900.000 1,00 1.100.0003 Korkot Kab. Blitar (58 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 04 Korkot Kab. Nganjuk (50 Kel) 33,00 1.100.000 36.300.000 33,00 36.300.000 0,00 1.100.000 0 33,00 36.300.000 0,00 05 Korkot Kab. Malang (98 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 06 Korkot Kota. Malang (81 Kel) 50,00 1.100.000 55.000.000 48,00 52.800.000 1,00 1.100.000 1.100.000 49,00 53.900.000 1,00 1.100.0007 Korkot Kab. Pasuruan (91 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 08 Korkot Kab. Probolinggo (76 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 09 Korkot Kab. Pamekasan (54 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0

KATEGORI -31 Korkot Kab. Jombang (113 kel) 50,00 1.250.000 62.500.000 48,00 60.000.000 1,00 1.250.000 1.250.000 49,00 61.250.000 1,00 1.250.0002 Korkot Kab. Gresik (103 kel) 48,00 1.250.000 60.000.000 46,00 57.500.000 1,00 1.250.000 1.250.000 47,00 58.750.000 1,00 1.250.0003 Korkot Kab. Mojokerto (118 kel) 35,00 1.250.000 43.750.000 35,00 43.750.000 0,00 1.250.000 0 35,00 43.750.000 0,00 04 Korkot Kota Surabaya (160 kel) 48,00 1.250.000 60.000.000 46,00 57.500.000 1,00 1.250.000 1.250.000 47,00 58.750.000 1,00 1.250.000

KATEGORI -41 Korkot Kab. Sidoarjo (291 kel) 50,00 1.475.000 73.750.000 48,00 70.800.000 1,00 1.475.000 1.475.000 49,00 72.275.000 1,00 1.475.000

b South Kalimantan Province 4 citiy x 20 months 96,00 500.000 48.000.000 96,00 48.000.000 0,00 500.000 0 96,00 48.000.000 0,00 0

KATEGORI -1Korkot 4 Tanah Laut (41 kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0Korkot Hulu Sungai Utara (29 Kel) 15,00 950.000 14.250.000 13,00 12.350.000 1,00 950.000 950.000 14,00 13.300.000 1,00 950.000Korkot Banjar Baru (20 Kel) 15,00 950.000 14.250.000 13,00 12.350.000 1,00 950.000 950.000 14,00 13.300.000 1,00 950.000Korkot Kota Baru (21 Kel) 15,00 950.000 14.250.000 13,00 12.350.000 1,00 950.000 950.000 14,00 13.300.000 1,00 950.000

KATEGORI -2Korkot 1 Banjarmasin (62 kel) 50,00 1.100.000 55.000.000 48,00 52.800.000 1,00 1.100.000 1.100.000 49,00 53.900.000 1,00 1.100.000Korkot 2 Tabalong (72 kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0Korkot 3 Banjar (64 kel) 50,00 1.100.000 55.000.000 48,00 52.800.000 1,00 1.100.000 1.100.000 49,00 53.900.000 1,00 1.100.000

c Center Kalimantan Province 1 city x 20 months 24,00 500.000 12.000.000 24,00 12.000.000 0,00 500.000 0 24,00 12.000.000 0,00 0

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 48: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

KATEGORI -11 Korkot Palangkaraya 50,00 950.000 47.500.000 48,00 45.600.000 1,00 950.000 950.000 49,00 46.550.000 1,00 950.000

d East Kalimantan Province 3 city x 20 months 72,00 500.000 36.000.000 72,00 36.000.000 0,00 500.000 0 72,00 36.000.000 0,00 0

KATEGORI -1Korkot 2 (Balikpapan, Paser 48 kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0Korkot 3 (Tarakan, Malinau bulungan, Nunukan 44 kel) 33,00 950.000 31.350.000 33,00 31.350.000 0,00 950.000 0 33,00 31.350.000 0,00 0Korkot 2 (new) (bontang , Kukar 36 Kel) 15,00 950.000 14.250.000 13,00 12.350.000 1,00 950.000 950.000 14,00 13.300.000 1,00 950.000

KATEGORI -2Korkot 1 (Samarinda, Kukar 89 kel) 50,00 1.100.000 55.000.000 48,00 52.800.000 1,00 1.100.000 1.100.000 49,00 53.900.000 1,00 1.100.000Korkot 3 (paser, balikpapan, berau 56 kel) 15,00 1.100.000 16.500.000 13,00 14.300.000 1,00 1.100.000 1.100.000 14,00 15.400.000 1,00 1.100.000

2.5.1.3 Assitant CD City Coordinator Office 397.200.000 384.800.000 7.200.000 392.000.000 5.200.000a East Java Province 11 city x 20 months 1036,00 200.000 207.200.000 994,00 198.800.000 27,00 200.000 5.400.000 1021,00 204.200.000 15,00 3.000.000b South Kalimantan Province 6 citiy x 20 months 422,00 200.000 84.400.000 414,00 82.800.000 5,00 200.000 1.000.000 419,00 83.800.000 3,00 600.000c Center Kalimantan Province 1 city x 20 months 74,00 200.000 14.800.000 72,00 14.400.000 1,00 200.000 200.000 73,00 14.600.000 1,00 200.000d East Kalimantan Province 7 city x 20 months 454,00 200.000 90.800.000 444,00 88.800.000 3,00 200.000 600.000 447,00 89.400.000 7,00 1.400.000

2.5.2 Office Supply & Consumable 1.057.089.000 1.023.743.480 11.657.150 1.035.400.630 21.688.370

2.5.2.1 OSP Office 176.539.000 166.643.480 2.332.150 168.975.630 7.563.370

a East Java Province (Surabaya) 1 prov x 20 months 24,00 750.000 18.000.000 24,00 17.578.000 0,00 750.000 0 24,00 17.578.000 0,00 422.00049,00 849.000 41.601.000 47,00 39.268.800 1,00 849.000 849.000 48,00 40.117.800 1,00 1.483.200

b South Kalimantan Province (Banjarmasin) 1 prov x 20 months 24,00 500.000 12.000.000 24,00 11.754.150 0,00 500.000 0 24,00 11.754.150 0,00 245.85047,00 566.000 26.602.000 45,00 24.535.980 1,00 566.000 506.000 46,00 25.041.980 1,00 1.560.020

c Center Kalimantan Province (Palangkaraya)1 prov x 20 months 24,00 500.000 12.000.000 24,00 11.476.250 0,00 500.000 0 24,00 11.476.250 0,00 523.75047,00 566.000 26.602.000 45,00 23.889.200 1,00 566.000 411.150 46,00 24.300.350 1,00 2.301.650

d East Kalimantan Province (Samarinda) 1 prov x 20 months 24,00 500.000 12.000.000 24,00 11.918.000 0,00 500.000 0 24,00 11.918.000 0,00 82.00049,00 566.000 27.734.000 47,00 26.223.100 1,00 566.000 566.000 48,00 26.789.100 1,00 944.900

2.5.2.2 City Coordinator Office 644.350.000 628.700.000 5.725.000 634.425.000 9.925.000a East Java Province 25 city x 20 months 600,00 250.000 150.000.000 600,00 150.000.000 0,00 250.000 0 600,00 150.000.000 0,00 0

KATEGORI -11 Korkot Kab. Pacitan (25 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 02 Korkot Kab. Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 03 Korkot Kota Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 04 Korkot Kota Madiun (41 Kel) 48,00 250.000 12.000.000 44,00 11.000.000 1,00 250.000 250.000 45,00 11.250.000 3,00 750.0005 Korkot Magetan (42 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 06 Korkot Bojonegoro (35 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 07 Korkot Lamongan (37 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 08 Korkot Pasuruan (34 Kel) 38,00 250.000 9.500.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 3,00 750.0009 Korkot Jember (49 Kel) 48,00 250.000 12.000.000 44,00 11.000.000 1,00 250.000 250.000 45,00 11.250.000 3,00 750.000

10 Korkot Situbondo (41 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 011 Korkot Banywangi (45 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 012 Korkot Trenggalek (13 kel) 3,00 250.000 750.000 3,00 750.000 0,00 250.000 0 3,00 750.000 0,00 013 Korkot Kota Probolinggo (29 kel) 15,00 250.000 3.750.000 11,00 2.750.000 1,00 250.000 250.000 12,00 3.000.000 3,00 750.00014 Korkot Bondowoso (11 Kel) 3,00 250.000 750.000 3,00 750.000 0,00 250.000 0 3,00 750.000 0,00 0

KATEGORI -21 Korkot Kab. Ponorogo (50 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 02 Korkot Kab. Tulungagung (81 Kel) 50,00 300.000 15.000.000 48,00 14.400.000 1,00 300.000 300.000 49,00 14.700.000 1,00 300.0003 Korkot Kab. Blitar (58 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 04 Korkot Kab. Nganjuk (50 Kel) 33,00 300.000 9.900.000 33,00 9.900.000 0,00 300.000 0 33,00 9.900.000 0,00 05 Korkot Kab. Malang (98 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 06 Korkot Kota. Malang (81 Kel) 50,00 300.000 15.000.000 48,00 14.400.000 1,00 300.000 300.000 49,00 14.700.000 1,00 300.0007 Korkot Kab. Pasuruan (91 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 08 Korkot Kab. Probolinggo (76 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 09 Korkot Kab. Pamekasan (54 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0

KATEGORI -31 Korkot Kab. Jombang (113 kel) 50,00 500.000 25.000.000 48,00 24.000.000 1,00 500.000 500.000 49,00 24.500.000 1,00 500.0002 Korkot Kab. Gresik (103 kel) 48,00 500.000 24.000.000 46,00 23.000.000 1,00 500.000 500.000 47,00 23.500.000 1,00 500.0003 Korkot Kab. Mojokerto (118 kel) 35,00 500.000 17.500.000 35,00 17.500.000 0,00 500.000 0 35,00 17.500.000 0,00 04 Korkot Kota Surabaya (160 kel) 48,00 500.000 24.000.000 46,00 23.000.000 1,00 500.000 500.000 47,00 23.500.000 1,00 500.000

KATEGORI -41 Korkot Kab. Sidoarjo (291 kel) 50,00 725.000 36.250.000 48,00 34.800.000 1,00 725.000 725.000 49,00 35.525.000 1,00 725.000

Page 49: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

b South Kalimantan Province 4 citiy x 20 months 96,00 250.000 24.000.000 96,00 24.000.000 0,00 250.000 0 96,00 24.000.000 0,00 0

KATEGORI -1Korkot 4 Tanah Laut (41 kel) 36,00 250.000 9.000.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 1,00 250.000Korkot Hulu Sungai Utara (29 Kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000Korkot Banjar Baru (20 Kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000Korkot Kota Baru (21 Kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000

KATEGORI -2Korkot 1 Banjarmasin (62 kel) 50,00 300.000 15.000.000 48,00 14.400.000 1,00 300.000 300.000 49,00 14.700.000 1,00 300.000Korkot 2 Tabalong (72 kel) 36,00 300.000 10.800.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 1,00 300.000Korkot 3 Banjar (64 kel) 50,00 300.000 15.000.000 48,00 14.400.000 1,00 300.000 300.000 49,00 14.700.000 1,00 300.000

c Center Kalimantan Province 1 city x 20 months 24,00 250.000 6.000.000 24,00 6.000.000 0,00 250.000 0 24,00 6.000.000 0,00 0

KATEGORI -11 Korkot Palangkaraya 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.000

d East Kalimantan Province 3 city x 20 months 72,00 250.000 18.000.000 72,00 18.000.000 0,00 250.000 0 72,00 18.000.000 0,00 0

KATEGORI -1Korkot 2 (Balikpapan, Paser 48 kel) 34,00 250.000 8.500.000 34,00 8.500.000 0,00 250.000 0 34,00 8.500.000 0,00 0Korkot 3 (Tarakan, Malinau bulungan, Nunukan 44 kel) 32,00 250.000 8.000.000 32,00 8.000.000 0,00 250.000 0 32,00 8.000.000 0,00 0Korkot 2 (new) (bontang, kukar 36 kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000

KATEGORI -2Korkot 1 (Samarinda, Kukar 89 kel) 38,00 300.000 11.400.000 34,00 10.200.000 1,00 300.000 300.000 35,00 10.500.000 3,00 900.000Korkot 3 (Paser, balikpapan, berau 36 kel) 11,00 250.000 2.750.000 8,00 1.950.000 0,00 250.000 0 8,00 1.950.000 3,00 800.000

2.5.2.3 Assitant CD City Coordinator Office 236.200.000 228.400.000 3.600.000 232.000.000 4.200.000a East Java Province 11 city x 20 months 1049,00 100.000 104.900.000 994,00 99.400.000 27,00 100.000 2.700.000 1021,00 102.100.000 28,00 2.800.000b South Kalimantan Province 6 citiy x 20 months 424,00 100.000 42.400.000 414,00 41.400.000 5,00 100.000 500.000 419,00 41.900.000 5,00 500.000c Center Kalimantan Province 1 city x 20 months 74,00 100.000 7.400.000 72,00 7.200.000 1,00 100.000 100.000 73,00 7.300.000 1,00 100.000d East Kalimantan Province 7 city x 20 months 455,00 100.000 45.500.000 444,00 44.400.000 3,00 100.000 300.000 447,00 44.700.000 8,00 800.000

OFFICE OPERATIONAL PERCEPATAN PENYUSUNAN SIAP 12,00 3.000.000 36.000.000 12,00 36.000.000 0,00 3.000.000 0 12,00 36.000.000 0,00 0BOP TIM PERCEPATAN KOTA

2.5.3 Communication Cost 1.115.955.000 1.098.130.181 8.250.000 1.106.380.181 9.574.819

2.5.3.1 OSP Office 287.000.000 278.780.181 4.000.000 282.780.181 4.219.819a East Java Province (Surabaya) 1 prov x 20 months 70,00 1.000.000 70.000.000 68,00 67.767.532 1,00 1.000.000 1.000.000 69,00 68.767.532 1,00 1.232.468b South Kalimantan Province (Banjarmasin) 1 prov x 20 months 73,00 1.000.000 73.000.000 69,00 70.678.940 1,00 1.000.000 1.000.000 70,00 71.678.940 3,00 1.321.060c Center Kalimantan Province (Palangkaraya)1 prov x 20 months 71,00 1.000.000 71.000.000 69,00 69.405.394 1,00 1.000.000 1.000.000 70,00 70.405.394 1,00 594.606d East Kalimantan Province (Samarinda) 1 prov x 20 months 73,00 1.000.000 73.000.000 69,00 70.928.315 1,00 1.000.000 1.000.000 70,00 71.928.315 3,00 1.071.685

2.5.3.2 City Coordinator Office 547.375.000 539.000.000 4.250.000 543.250.000 4.125.000a East Java Province 25 city x 20 months 600,00 250.000 150.000.000 600,00 150.000.000 0,00 250.000 0 600,00 150.000.000 0,00 0

KATEGORI -11 Korkot Kab. Pacitan (25 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 02 Korkot Kab. Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 03 Korkot Kota Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 04 Korkot Kota Madiun (41 Kel) 43,00 250.000 10.750.000 40,00 10.000.000 1,00 250.000 250.000 41,00 10.250.000 2,00 500.0005 Korkot Magetan (42 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 06 Korkot Bojonegoro (35 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 07 Korkot Lamongan (37 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 08 Korkot Pasuruan (34 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 09 Korkot Jember (49 Kel) 48,00 250.000 12.000.000 46,00 11.500.000 1,00 250.000 250.000 47,00 11.750.000 1,00 250.000

10 Korkot Situbondo (41 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 011 Korkot Banywangi (45 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 012 Korkot Trenggalek (13 kel) 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 013 Korkot Kota Probolinggo (29 kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.00014 Korkot Bondowoso (11 Kel) 6,00 250.000 1.500.000 6,00 1.500.000 0,00 250.000 0 6,00 1.500.000 0,00 0

KATEGORI -21 Korkot Kab. Ponorogo (50 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 02 Korkot Kab. Tulungagung (81 Kel) 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.0003 Korkot Kab. Blitar (58 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 04 Korkot Kab. Nganjuk (50 Kel) 33,00 250.000 8.250.000 33,00 8.250.000 0,00 250.000 0 33,00 8.250.000 0,00 05 Korkot Kab. Malang (98 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 06 Korkot Kota. Malang (81 Kel) 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.0007 Korkot Kab. Pasuruan (91 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0

Page 50: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

8 Korkot Kab. Probolinggo (76 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 09 Korkot Kab. Pamekasan (54 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0

KATEGORI -31 Korkot Kab. Jombang (113 kel) 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.0002 Korkot Kab. Gresik (103 kel) 48,00 250.000 12.000.000 46,00 11.500.000 1,00 250.000 250.000 47,00 11.750.000 1,00 250.0003 Korkot Kab. Mojokerto (118 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 04 Korkot Kota Surabaya (160 kel) 48,00 250.000 12.000.000 46,00 11.500.000 1,00 250.000 250.000 47,00 11.750.000 1,00 250.000

KATEGORI -41 Korkot Kab. Sidoarjo (291 kel) 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.000

b South Kalimantan Province 4 citiy x 20 months 96,00 250.000 24.000.000 96,00 24.000.000 0,00 250.000 0 96,00 24.000.000 0,00 0

KATEGORI -1Korkot 4 Tanah Laut (41 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0Korkot Hulu Sungai Utara (29 Kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000Korkot Banjar Baru (20 Kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000Korkot Kota Baru (21 Kel) 15,00 250.000 3.750.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 1,00 250.000

KATEGORI -2Korkot 1 Banjarmasin (62 kel) 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.000Korkot 2 Tabalong (72 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0Korkot 3 Banjar (64 kel) 50,00 250.000 12.500.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 1,00 250.000

c Center Kalimantan Province 1 city x 20 months 24,00 250.000 6.000.000 24,00 6.000.000 0,00 250.000 0 24,00 6.000.000 0,00 0

KATEGORI -11 Korkot Palangkaraya 49,50 250.000 12.375.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 0,50 125.000

d East Kalimantan Province 3 city x 20 months 72,00 250.000 18.000.000 72,00 18.000.000 0,00 250.000 0 72,00 18.000.000 0,00 0

KATEGORI -1Korkot 2 (Balikpapan, Paser 48 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0Korkot 3 (Tarakan, Malinau bulungan, Nunukan 44 kel) 33,00 250.000 8.250.000 33,00 8.250.000 0,00 250.000 0 33,00 8.250.000 0,00 0Korkot 2 (new) (bontang, kukar 36 kel) 14,50 250.000 3.625.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 0,50 125.000

KATEGORI -2Korkot 1 (Samarinda, Kukar 89 kel) 49,50 250.000 12.375.000 48,00 12.000.000 1,00 250.000 250.000 49,00 12.250.000 0,50 125.000Korkot 3 (Paser, balikpapan, berau 56 kel) 14,50 250.000 3.625.000 13,00 3.250.000 1,00 250.000 250.000 14,00 3.500.000 0,50 125.000

2.5.3.3 Assitant CD City Coordinator Office 281.580.000 280.350.000 0 280.350.000 1.230.000a East Java Province 11 city x 20 months 948,20 150.000 142.230.000 948,00 142.200.000 0,00 150.000 0 948,00 142.200.000 0,20 30.000b South Kalimantan Province 6 citiy x 20 months 410,00 150.000 61.500.000 409,00 61.350.000 0,00 150.000 0 409,00 61.350.000 1,00 150.000c Center Kalimantan Province 1 city x 20 months 74,00 150.000 11.100.000 71,00 10.650.000 0,00 150.000 0 71,00 10.650.000 3,00 450.000d East Kalimantan Province 7 city x 20 months 445,00 150.000 66.750.000 441,00 66.150.000 0,00 150.000 0 441,00 66.150.000 4,00 600.000

2.5.4 INTERNET 149.810.000 141.031.458 2.945.000 143.976.458 5.833.542

2.5.4.1 OSP OFFICE 149.810.000 141.031.458 2.945.000 143.976.458 5.833.542a East Java Province (Surabaya) 48,00 995.000 47.760.000 45,00 45.770.000 1,00 995.000 995.000 46,00 46.765.000 2,00 995.000b South Kalimantan Province (Banjarmasin) 56,00 650.000 36.400.000 54,00 34.525.531 1,00 650.000 650.000 55,00 35.175.531 1,00 1.224.469c Center Kalimantan Province (Palangkaraya) 55,00 650.000 35.750.000 53,00 32.785.927 1,00 650.000 650.000 54,00 33.435.927 1,00 2.314.073d East Kalimantan Province (Samarinda) 46,00 650.000 29.900.000 42,00 27.950.000 1,00 650.000 650.000 43,00 28.600.000 3,00 1.300.000

TOTAL OF OFFICE OPERATIONAL EXPENSES 5.014.616.000 4.886.927.101 55.005.613 4.941.932.714 72.683.286

Page 51: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.6. Office Equipment Expenses Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.6.1 OSP Office 527.478.573 511.782.410 0 511.782.410 15.696.163

2.6.1.1 East Java Province (Surabaya) Purchase 167.004.815 166.952.410 0 166.952.410 52.405

a. Desktop Computer 5 unit 5,00 7.500.000 37.500.000 5,00 37.500.000 0,00 7.500.000 0 5,00 37.500.000 0,00 0b. Laptop/Notebook 7 unit 10,00 10.000.000 100.000.000 10,00 100.000.000 0,00 10.000.000 0 10,00 100.000.000 0,00 0c. Printer Laser Jet 3 unit 3,00 1.750.000 5.250.000 3,00 5.250.000 0,00 1.750.000 0 3,00 5.250.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 2 unit 2,00 1.000.000 2.000.000 2,00 2.000.000 0,00 1.000.000 0 2,00 2.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 9.004.815 9.004.815 1,00 8.952.410 0,00 9.004.815 0 1,00 8.952.410 0,00 52.405j Peta Citra Satelit (1:5000) 0,00 100.000.000 0 0,00 0 100.000.000 0 0,00 0 0,00 0

2.6.1.2 South Kalimantan Province (Banjarmasin) Purchase 118.275.000 114.750.000 0 114.750.000 3.525.000

a. Desktop Computer 3 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0b. Laptop/Notebook 7 unit 7,00 10.000.000 70.000.000 7,00 70.000.000 0,00 10.000.000 0 7,00 70.000.000 0,00 0c. Printer Laser Jet 2 unit 2,00 1.750.000 3.500.000 2,00 3.500.000 0,00 1.750.000 0 2,00 3.500.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 1 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 8.025.000 8.025.000 0,00 4.500.000 0,00 8.025.000 0 0,00 4.500.000 1,00 3.525.000j Peta Citra Satelit (1:5000) 0,00 100.000.000 0 0,00 0 100.000.000 0 0,00 0 0,00 0

2.6.1.3 Center Kalimantan Province (Palangkaraya)Purchase 124.167.878 119.520.000 0 119.520.000 4.647.878

a. Desktop Computer 5 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0b. Laptop/Notebook 7 unit 7,00 10.000.000 70.000.000 7,00 70.000.000 0,00 10.000.000 0 7,00 70.000.000 0,00 0c. Printer Laser Jet 3 unit 2,00 1.750.000 3.500.000 2,00 3.500.000 0,00 1.750.000 0 2,00 3.500.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 2 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 13.917.878 13.917.878 0,00 9.270.000 0,00 13.917.878 0 9.270.000 1,00 4.647.878

2.6.1.4 East Kalimantan Province (Samarinda) Purchase 118.030.880 110.560.000 0 110.560.000 7.470.880

a. Desktop Computer 5 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0b. Laptop/Notebook 7 unit 7,00 10.000.000 70.000.000 7,00 70.000.000 0,00 10.000.000 0 7,00 70.000.000 0,00 0c. Printer Laser Jet 3 unit 2,00 1.750.000 3.500.000 2,00 3.500.000 0,00 1.750.000 0 2,00 3.500.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 2 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 7.780.880 7.780.880 0,00 310.000 0,00 7.780.880 0 0,00 310.000 1,00 7.470.880j Peta Citra Satelit (1:5000) 0,00 100.000.000 0 0,00 0 100.000.000 0 0,00 0 0,00 0

2.6.2 City Coordinator Office 668.250.000 668.250.000 0 668.250.000 0

2.6.2.1 East Java Province (Surabaya) Purchase 506.250.000 506.250.000 0 506.250.000 0

a. Laptop/Notebook 25 korkot x 1 unit 25,00 10.000.000 250.000.000 25,00 250.000.000 0,00 10.000.000 0 25,00 250.000.000 0,00 0b. Desktop Computer 25 korkot x 1 unit 25,00 7.500.000 187.500.000 25,00 187.500.000 0,00 7.500.000 0 25,00 187.500.000 0,00 0c. Printer Laser Jet 25 korkot x 1 unit 25,00 1.750.000 43.750.000 25,00 43.750.000 0,00 1.750.000 0 25,00 43.750.000 0,00 0d. Scanner 25 korkot x 1 unit 25,00 1.000.000 25.000.000 25,00 25.000.000 0,00 1.000.000 0 25,00 25.000.000 0,00 0

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 52: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

2.6.2.2 South Kalimantan Province (Banjarmasin) Purchase 81.000.000 81.000.000 0 81.000.000 0

a. Laptop/Notebook 4 korkot x 1 unit 4,00 10.000.000 40.000.000 4,00 40.000.000 0,00 10.000.000 0 4,00 40.000.000 0,00 0b. Desktop Computer 4 korkot x 1 unit 4,00 7.500.000 30.000.000 4,00 30.000.000 0,00 7.500.000 0 4,00 30.000.000 0,00 0c. Printer Laser Jet 4 korkot x 1 unit 4,00 1.750.000 7.000.000 4,00 7.000.000 0,00 1.750.000 0 4,00 7.000.000 0,00 0d. Scanner 4 korkot x 1 unit 4,00 1.000.000 4.000.000 4,00 4.000.000 0,00 1.000.000 0 4,00 4.000.000 0,00 0

2.6.2.3 Center Kalimantan Province (Palangkaraya) 20.250.000 20.250.000 0 20.250.000 0

a. Laptop/Notebook 1 korkot x 1 unit 1,00 10.000.000 10.000.000 1,00 10.000.000 0,00 10.000.000 0 1,00 10.000.000 0,00 0b. Desktop Computer 1 korkot x 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0c. Printer Laser Jet 1 korkot x 1 unit 1,00 1.750.000 1.750.000 1,00 1.750.000 0,00 1.750.000 0 1,00 1.750.000 0,00 0d. Scanner 1 korkot x 1 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0

2.6.2.4 East Kalimantan Province (Samarinda) 60.750.000 60.750.000 0 60.750.000 0

a. Laptop/Notebook 3 korkot x 1 unit 3,00 10.000.000 30.000.000 3,00 30.000.000 0,00 10.000.000 0 3,00 30.000.000 0,00 0b. Desktop Computer 3 korkot x 1 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0c. Printer Laser Jet 3 korkot x 1 unit 3,00 1.750.000 5.250.000 3,00 5.250.000 0,00 1.750.000 0 3,00 5.250.000 0,00 0d. Scanner 3 korkot x 1 unit 3,00 1.000.000 3.000.000 3,00 3.000.000 0,00 1.000.000 0 3,00 3.000.000 0,00 0

2.6.3 Assistant CD Mandiri Office 231.250.000 231.250.000 0 231.250.000 0

2.6.3.1 East Java Province (Surabaya) Purchase 101.750.000 101.750.000 0 101.750.000 0

a. Desktop Computer 11 korkot x 1 unit 11,00 7.500.000 82.500.000 11,00 82.500.000 0,00 7.500.000 0 11,00 82.500.000 0,00 0b. Printer Laser Jet 11 korkot x 1 unit 11,00 1.750.000 19.250.000 11,00 19.250.000 0,00 1.750.000 0 11,00 19.250.000 0,00 0

2.6.3.2 South Kalimantan Province (Banjarmasin) Purchase 55.500.000 55.500.000 0 55.500.000 0

a. Desktop Computer 6 korkot x 1 unit 6,00 7.500.000 45.000.000 6,00 45.000.000 0,00 7.500.000 0 6,00 45.000.000 0,00 0b. Printer Laser Jet 6 korkot x 1 unit 6,00 1.750.000 10.500.000 6,00 10.500.000 0,00 1.750.000 0 6,00 10.500.000 0,00 0

2.6.3.3 Center Kalimantan Province (Palangkaraya) 9.250.000 9.250.000 0 9.250.000 0

a. Desktop Computer 1 korkot x 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0b. Printer Laser Jet 1 korkot x 1 unit 1,00 1.750.000 1.750.000 1,00 1.750.000 0,00 1.750.000 0 1,00 1.750.000 0,00 0

2.6.3.4 East Kalimantan Province (Samarinda) 64.750.000 64.750.000 0 64.750.000 0

a. Desktop Computer 7 korkot x 1 unit 7,00 7.500.000 52.500.000 7,00 52.500.000 0,00 7.500.000 0 7,00 52.500.000 0,00 0b. Printer Laser Jet 7 korkot x 1 unit 7,00 1.750.000 12.250.000 7,00 12.250.000 0,00 1.750.000 0 7,00 12.250.000 0,00 0

TOTAL OF OFFICE EQUIPMENT EXPENSES 1.426.978.573 1.411.282.410 0 1.411.282.410 15.696.163

Page 53: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.7. Rental Expenses Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.7.1 OSP Office Space (Including Furniture, AC etc) 893.821.500 882.167.500 0 882.167.500 11.654.0002.7.1.1 East Java Province (Surabaya) 216 m x 20 months 14652,40 22.500 329.679.000 14652,40 329.659.000 0,00 22.500 0 14652,40 329.659.000 0,00 20.0002.7.1.2 South Kalimantan Province (Banjarmasin)124 m x 20 months 8937,80 22.500 201.100.500 8937,80 201.100.500 0,00 22.500 0 8937,80 201.100.500 0,00 02.7.1.3 Center Kalimantan Province (Palangkaraya)95 m x 20 months 7197,40 22.500 161.941.500 6681,22 150.307.500 0,00 22.500 0 6681,22 150.307.500 516,18 11.634.0002.7.1.4 East Kalimantan Province (Samarinda) 124 m x 20 months 8937,80 22.500 201.100.500 8937,80 201.100.500 0,00 22.500 0 8937,80 201.100.500 0,00 02.7.1.5 For City Coordinator 33 korkot x 20 months 0,00 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0

2.7.2 Vehicles (Minimun Y 2010 - Included driver, O & M, Insurance etc) for OSP Office 3.528.125.000 3.450.833.333 50.000.000 3.500.833.333 27.291.6672.7.2.1 East Java Province (Surabaya) 3 unit x 20 months 201,00 6.250.000 1.256.250.000 197,80 1.236.250.000 2,00 6.250.000 12.500.000 199,80 1.248.750.000 1,20 7.500.0002.7.2.2 South Kalimantan Province (Banjarmasin)2 unit x 20 months 144,10 6.250.000 900.625.000 141,03 881.458.333 2,00 6.250.000 12.500.000 143,03 893.958.333 1,07 6.666.6672.7.2.3 Center Kalimantan Province (Palangkaraya)1 unit x 20 months 74,30 6.250.000 464.375.000 71,27 445.416.667 2,00 6.250.000 12.500.000 73,27 457.916.667 1,03 6.458.3332.7.2.4 East Kalimantan Province (Samarinda) 2 unit x 20 months 145,10 6.250.000 906.875.000 142,03 887.708.333 2,00 6.250.000 12.500.000 144,03 900.208.333 1,07 6.666.667

2.7.3 Vehicles (Minimun Y 2010 - Included driver, O & M, Insurance etc) for City Cord Off. 13.281.250.000 13.026.875.000 106.250.000 13.133.125.000 148.125.000

2.7.3.1 East Java Province 25 korkot x 1 unit x 20 months 1591,50 6.250.000 9.946.875.000 1573,17 9.832.291.667 9,00 6.250.000 56.250.000 1582,17 9.888.541.667 9,33 58.333.3332.7.3.2 South Kalimantan Province 4 korkot x 1 unit x 20 months 306,00 6.250.000 1.912.500.000 296,07 1.850.416.667 5,00 6.250.000 31.250.000 301,07 1.881.666.667 4,93 30.833.3332.7.3.3 Center Kalimantan Province 1 korkot x 1 unit x 20 months 55,00 6.250.000 343.750.000 52,77 329.791.667 1,00 6.250.000 6.250.000 53,77 336.041.667 1,23 7.708.3332.7.3.4 East Kalimantan Province 3 korkot x 1 unit x 20 months 172,50 6.250.000 1.078.125.000 162,30 1.014.375.000 2,00 6.250.000 12.500.000 164,30 1.026.875.000 8,20 51.250.000

2.7.4 MOTORCYCLE (Minimun Y 2010 - Included O & M, Insurance etc) 1.386.000.000 1.325.800.000 25.200.000 1.351.000.000 35.000.000For Assistant CD Mandiri of City Coordinators

2.7.4.1 East Java Province 11 korkot x 1 unit x 20 months 1049,00 700.000 734.300.000 986,00 690.200.000 27,00 700.000 18.900.000 1013,00 709.100.000 36,00 25.200.0002.7.4.2 South Kalimantan Province 6 korkot x 1 unit x 20 months 421,00 700.000 294.700.000 407,00 284.900.000 5,00 700.000 3.500.000 412,00 288.400.000 9,00 6.300.0002.7.4.3 Center Kalimantan Province 1 korkot x 1 unit x 20 months 74,00 700.000 51.800.000 71,00 49.700.000 1,00 700.000 700.000 72,00 50.400.000 2,00 1.400.0002.7.4.4 East Kalimantan Province 7 korkot x 1 unit x 20 months 436,00 700.000 305.200.000 430,00 301.000.000 3,00 700.000 2.100.000 433,00 303.100.000 3,00 2.100.000

2.7.5 RENT FOR PERCEPATAN 218.750.000 217.815.000 0 217.815.000 935.000

Office/Studio (6 Kota/kab) 720,00 50.000 36.000.000 720,00 36.000.000 0,00 50.000 0 720,00 36.000.000 0,00 0Vehicles (6 kota/kab) 9,00 6.250.000 56.250.000 9,00 56.250.000 0,00 6.250.000 0 9,00 56.250.000 0,00 0Laptop 48,00 1.750.000 84.000.000 48,00 84.000.000 0,00 1.750.000 0 48,00 84.000.000 0,00 0PC 20,00 1.250.000 19.000.000 20,00 18.250.000 0,00 1.250.000 0 20,00 18.250.000 0,00 750.000Printer A3 2,00 750.000 1.500.000 2,00 1.500.000 0,00 750.000 0 2,00 1.500.000 0,00 0GPS Navigator, Roll Meter dan Peralatan Survey 1,00 30.000.000 22.000.000 0,00 21.815.000 0,00 30.000.000 0 0,00 21.815.000 1,00 185.000

TOTAL OF RENTAL EXPENSES 19.307.946.500 18.903.490.833 181.450.000 19.084.940.833 223.005.667

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 54: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

2.8. Reporting Expenses Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

2.8.1 Regular Report 74.900.000 65.925.000 1.500.000 67.425.000 7.475.000

a. Inception Report 15 eks x 1 times 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0b. Monthly Report 15 eks x 12 times 1485,00 25.000 37.125.000 ###### 33.375.000 60,00 25.000 1.500.000 1395,00 34.875.000 90,00 2.250.000c. Quarterly Report 15 eks x 5 times 415,00 35.000 14.525.000 330,00 11.550.000 0,00 35.000 0 330,00 11.550.000 85,00 2.975.000d. Annual Report 15 eks x 1 times 60,00 75.000 4.500.000 30,00 2.250.000 0,00 75.000 0 30,00 2.250.000 30,00 2.250.000e. Draft Final Report 20 eks x 1 times 20,00 125.000 2.500.000 20,00 2.500.000 0,00 125.000 0 20,00 2.500.000 0,00 0f. Final Report (Indonesia & English) 40 eks x 1 times 40,00 150.000 6.000.000 40,00 6.000.000 0,00 150.000 0 40,00 6.000.000 0,00 0g. Executive Summary (Indonesia & English) 40 eks x 1 times 40,00 200.000 8.000.000 40,00 8.000.000 0,00 200.000 0 40,00 8.000.000 0,00 0

Inception Report II 15,00 100.000 1.500.000 15,00 1.500.000 0,00 100.000 0 15,00 1.500.000 0,00 0

2.8.2 Special Report 70.125.000 54.375.000 1.500.000 55.875.000 14.250.000

a. Performance Evaluation of OSP 15 eks x 6 times 240,00 75.000 18.000.000 170,00 12.750.000 0,00 75.000 0 170,00 12.750.000 70,00 5.250.000b. Training Activity Report 50 eks x 1 times 50,00 75.000 3.750.000 0,00 0 0,00 75.000 0 0,00 0 50,00 3.750.000c. Complaint Resolution Follow-up Report 5 eks x 18 times 625,00 75.000 46.875.000 555,00 41.625.000 20,00 75.000 1.500.000 575,00 43.125.000 50,00 3.750.000d. Workshop Findings and Results 20 eks x 1 times 20,00 75.000 1.500.000 0,00 0 0,00 75.000 0 0,00 0 20,00 1.500.000

TOTAL OF RENTAL EXPENSES 145.025.000 120.300.000 3.000.000 123.300.000 21.725.000

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 55: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

III. TRAINING ACTIVITY EXPENSES

3.1. Training Activity 2012 Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

3.1.1 In Regional Levels (Surabaya) 8.000.000 8.000.000 0 8.000.000 0

a. Rakor OSP 2 times x 2 days x (11 ptcp + 4 intructor) 30,00 250.000 7.500.000 30,00 7.500.000 0,00 250.000 0 30,00 7.500.000 0,00 0b. Kits 16 ptcp 10,00 50.000 500.000 10,00 500.000 0,00 50.000 0 10,00 500.000 0,00 0c. Speaker Honorarium 4 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0

3.1.2 In Provincial Levels 801.775.000 799.751.000 0 799.751.000 2.024.000

a. OSP Consolidation Jawa Timur 3 times x 1 days x (205 ptcp + 2 intructor) 126,00 100.000 12.600.000 126,00 12.563.900 0,00 100.000 0 126,00 12.563.900 0,00 36.100b. OSP Consolidation Kalimantan Selatan 3 times x 1 days x (42 ptcp + 2 intructor) 124,00 100.000 12.400.000 14,00 12.325.000 0,00 100.000 0 14,00 12.325.000 110,00 75.000c. OSP Consolidation Kalimantan Tengah 3 times x 1 days x (15 ptcp + 2 intructor) 20,00 100.000 2.000.000 17,00 1.700.000 0,00 100.000 0 17,00 1.700.000 3,00 300.000d. OSP Consolidation Kalimantan Timur 3 times x 1 days x (42 ptcp + 2 intructor) 132,00 100.000 13.200.000 79,00 13.200.000 0,00 100.000 0 79,00 13.200.000 53,00 0e. Advance Training/Couching PLPBK for City Coordinator Assistant UP

- East Java Province 1 times x 5 days x (12 ptcp + 2 intructor) 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0- South Kalimantan Province 1 times x 5 days x (3 ptcp + 2 intructor) 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0- East Kalimantan Province 1 times x 5 days x (1 ptcp + 2 intructor) 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0

f. Training for City Coordinators Assistants (Infrastructure, 1 times x 3 days x (188 ptcp + 8 intructor) 588,00 175.000 102.900.000 588,00 102.411.900 0,00 175.000 0 588,00 102.411.900 0,00 488.100Community Dev, MIS, Urban Planner)

g. Special Training for Kelurahan Facilitators (Technic) 1 times x 3 days x (457 ptcp + 19 intructor) 1287,00 175.000 225.225.000 1281,00 224.175.000 0,00 175.000 0 1281,00 224.175.000 6,00 1.050.000h. Special Training for Kelurahan Facilitators (Economic) 1 times x 3 days x (267 ptcp + 11 intructor) 761,00 175.000 133.175.000 761,00 133.175.000 0,00 175.000 0 761,00 133.175.000 0,00 0i. Special Training for Kelurahan Facilitators (Social) 1 times x 3 days x (356 ptcp + 9 intructor) 891,00 175.000 155.925.000 891,00 155.850.200 0,00 175.000 0 891,00 155.850.200 0,00 74.800j. Special Training for Senior Facilitators 1 times x 3 days x (270 ptcp + 7 intructor) 722,00 175.000 126.350.000 722,00 126.350.000 0,00 175.000 0 722,00 126.350.000 0,00 0k. Training of AKP & Planning for Local Goverment 1 times x 5 days x (124 ptcp + 4 intructor) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0l. Special Training for Technical Team of PLPBK 1 times x 4 days x (88 ptcp + 4 intructor) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0

m. Speaker honorarium 74 intructor 36,00 500.000 18.000.000 36,00 18.000.000 0,00 500.000 0 36,00 18.000.000 0,00 00

3.1.3 In City/Regency Levels 40.750.000 39.500.000 0 39.500.000 1.250.000

a. Thematic Discussion / Reflection of KBP 3 times x 1 days x (1160 ptcp + 2 intructor) 35,00 75.000 2.625.000 20,00 1.500.000 0,00 75.000 0 20,00 1.500.000 15,00 1.125.000b. Consolidation of Kelurahan Facilitators, City Coordinators Assistants 0,00 0

and City Coordinators 6 times x 1 days x 1584 ptcp 1525,00 25.000 38.125.000 1520,00 38.000.000 0,00 25.000 0 1520,00 38.000.000 5,00 125.000c. Speaker honorarium 2 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0

TOTAL OF RENTAL EXPENSES 850.525.000 847.251.000 0 847.251.000 3.274.000

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 56: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

3.3. Training Activity 2013 Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

3.3.1 In Regional Levels (Surabaya) 39.900.000 39.900.000 0 39.900.000 0

a. Rakor OSP 2 times x 2 days x (11 ptcp + 4 intructor) 150,00 250.000 37.500.000 150,00 37.500.000 0,00 250.000 0 150,00 37.500.000 0,00 0b. Kits 16 ptcp 48,00 50.000 2.400.000 48,00 2.400.000 0,00 50.000 0 48,00 2.400.000 0,00 0c. Speaker Honorarium 4 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0

3.3.2 In Provincial Levels 2.018.641.000 2.016.783.303 0 2.016.783.303 1.857.697

a. OSP Consolidation Jawa Timur 2 times x 1 days x (205 ptcp + 2 intructor) 194,00 100.000 18.100.000 194,00 18.080.000 0,00 100.000 0 194,00 18.080.000 0,00 20.000b. OSP Consolidation Kalimantan Selatan 2 times x 1 days x (42 ptcp + 2 intructor) 6,00 100.000 600.000 6,00 600.000 0,00 100.000 0 6,00 600.000 0,00 0c. OSP Consolidation Kalimantan Tengah 2 times x 1 days x (15 ptcp + 2 intructor) 47,00 100.000 4.700.000 47,00 4.700.000 0,00 100.000 0 47,00 4.700.000 0,00 0d. OSP Consolidation Kalimantan Timur 2 times x 1 days x (42 ptcp + 2 intructor) 209,00 100.000 20.900.000 209,00 20.879.000 0,00 100.000 0 209,00 20.879.000 0,00 21.000e Advance Training/Couching PLPBK for 1 times x 3 days x (188 ptcp + 8 intructor) 12,00 175.000 2.100.000 12,00 2.100.000 0,00 175.000 0 12,00 2.100.000 0,00 0

City Coordinator Assistant UP 0,00 200.000 0 0,00 0 200.000 Special Training for Kelurahan Facilitators (Technic) 144,00 200.000 28.800.000 144,00 28.800.000 0,00 200.000 0 144,00 28.800.000 0,00 0Special Training for Kelurahan Facilitators (Economic) 693,00 200.000 135.000.000 693,00 134.342.403 0,00 200.000 0 693,00 134.342.403 0,00 657.597Special Training for Kelurahan Facilitators (Social) 104,00 200.000 20.800.000 104,00 20.685.000 0,00 200.000 0 104,00 20.685.000 0,00 115.000Special Training for Senior Facilitators 681,00 200.000 133.000.000 681,00 132.085.800 0,00 200.000 0 681,00 132.085.800 0,00 914.200

j Speaker honorarium 74 intructor 6,00 500.000 3.000.000 6,00 3.000.000 0,00 500.000 0 6,00 3.000.000 0,00 0Pelatihan Penguatan Askot dan fasilitator 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Konsolidasi Pemandu Pelatihan PLPBK 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Pelatihan Dasar PLPBK (Lokasi baru tahun 2012) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0Pelatihan Penguatan PLPBK (Lokasi baru 2012) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0Pelatihan Dasar PLPBK 72,00 200.000 14.400.000 72,00 14.400.000 0,00 200.000 0 72,00 14.400.000 0,00 0pelatihan Penguatan PLPBK 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Pelatihan Tim Teknis PLPBK 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0

30,00 175.000 84.441.000 30,00 84.421.000 0,00 175.000 0 30,00 84.421.000 0,00 20.000

Konsolidasi Pemandu Pelatihan KSB 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Pelatihan Dasar KSB 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Pelatihan Penguatan KSB 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 00,00 0

Pelatihan ITDA 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0

Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 00,00 0

Pelatihan Dasar PRBBK (Surabaya) 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0

Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 00,00 0

Pelatihan Penguatan PRBBK (Gresik) 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0

Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 00,00 0

Pelatihan Penguatan PRBBK (Gresik) 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0

Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 00,00 0

77,00 200.000 15.400.000 77,00 15.400.000 0,00 200.000 0 77,00 15.400.000 0,00 0

Pelatihan Penguatan Program Lanjutan ##### 200.000 1.508.000.000 7578,00 1.507.890.100 0,00 200.000 0 7578,00 1.507.890.100 0,00 109.900

Konsolidasi Pemandu Pelatihan Pemerintah 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0

Pelatihan Pemerintah Daerah 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0

Pelatihan Tim Teknis Pemda 0,00 300.000 0 56,00 0 0,00 300.000 0 56,00 0 -56,00 0

Pelatihan SIM 147,00 200.000 29.400.000 147,00 29.400.000 0,00 200.000 0 147,00 29.400.000 0,00 0

3.3.3 In City/Regency Levels 52.950.000 52.867.000 0 52.867.000 83.000

a. Thematic Discussion / Reflection of KBP 3 times x 1 days x (1160 ptcp + 2 intructor) 912,00 75.000 51.000.000 912,00 50.917.000 0,00 75.000 0 912,00 50.917.000 0,00 83.000b. Consolidation of Kelurahan Facilitators, City Coordinators Assistants 0,00 0

and City Coordinators 5 times x 1 days x 1584 ptcp 78,00 25.000 1.950.000 78,00 1.950.000 0,00 25.000 0 78,00 1.950.000 0,00 0c. Speaker honorarium 2 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0

0,00 0

Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan

Training for City Coordinators Assistants

(Infrastructure, Economic, Community Dev, MIS,

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Page 57: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Pelatihan Pemerintah Daerah PRBBK (lokasi filot Gresik) 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0-Kits - 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0-Speaker honorarium 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0

0,00 0Pelatihan Pemerintah Daerah PRBBK (lokasi filot Gresik) 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0-Kits 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0-Speaker honorarium 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0

2.111.491.000 2.109.550.303 0 2.109.550.303 1.940.697

4.3.1 46.600.000 45.695.000 - 45.695.000 905.000

b OSP Consolidation 116 350.000 40.600.000 106,00 39.800.000 0,00 350.000 0 106,00 39.800.000 10,00 800.000 - Kits 35 100.000 3.500.000 34,00 3.395.000 0,00 100.000 0 34,00 3.395.000 1,00 105.000 - Speaker Honorarium 5 500.000 2.500.000 5,00 2.500.000 0,00 500.000 0 5,00 2.500.000 0,00 0

4.3.2 10.534.670.000 7.958.116.927 0 7.958.116.927 2.576.553.073

258 350.000 90.300.000 256,00 89.933.000 0,00 350.000 0 256,00 89.933.000 2,00 367.00072 350.000 25.200.000 28,00 9.112.500 0,00 350.000 0 28,00 9.112.500 44,00 16.087.50052 350.000 18.200.000 26,00 9.100.000 0,00 350.000 0 26,00 9.100.000 26,00 9.100.000

136 350.000 47.600.000 102,00 35.700.000 0,00 350.000 0 102,00 35.700.000 34,00 11.900.000349 50.000 17.450.000 144,00 9.176.041 0,00 50.000 0 144,00 9.176.041 205,00 8.273.959

318 350.000 111.300.000 173,00 60.550.000 0,00 350.000 0 173,00 60.550.000 145,00 50.750.000

10.826 350.000 3.789.100.000 7602,00 2.660.700.000 0,00 350.000 0 7602,00 2.660.700.000 3.224,00 1.128.400.0004.134 350.000 1.446.900.000 2522,00 882.700.000 0,00 350.000 0 2522,00 882.700.000 1.612,00 564.200.000

61 2.000.000 122.000.000 41,00 82.000.000 0,00 2.000.000 0 41,00 82.000.000 20,00 40.000.0001.954 50.000 97.700.000 1148,00 57.400.000 0,00 50.000 0 1148,00 57.400.000 806,00 40.300.000

1.696 350.000 593.600.000 1080,00 378.000.000 0,00 350.000 0 1080,00 378.000.000 616,00 215.600.000668 350.000 233.800.000 360,00 126.000.000 0,00 350.000 0 360,00 126.000.000 308,00 107.800.00015 2.000.000 30.000.000 10,00 20.000.000 0,00 2.000.000 0 10,00 20.000.000 5,00 10.000.000

306 50.000 15.300.000 152,00 7.600.000 0,00 50.000 0 152,00 7.600.000 154,00 7.700.000

1.060 350.000 371.000.000 660,00 231.000.000 0,00 350.000 0 660,00 231.000.000 400,00 140.000.000420 350.000 147.000.000 220,00 77.000.000 0,00 350.000 0 220,00 77.000.000 200,00 70.000.000

9 2.000.000 18.000.000 6,00 12.000.000 0,00 2.000.000 0 6,00 12.000.000 3,00 6.000.000211 50.000 10.550.000 111,00 5.550.000 0,00 50.000 0 111,00 5.550.000 100,00 5.000.000

329 350.000 115.150.000 205,00 71.750.000 0,00 350.000 0 205,00 71.750.000 124,00 43.400.000130 350.000 45.500.000 68,00 23.800.000 0,00 350.000 0 68,00 23.800.000 62,00 21.700.000

3 2.000.000 6.000.000 2,00 4.000.000 0,00 2.000.000 0 2,00 4.000.000 1,00 2.000.00081 50.000 4.050.000 50,00 2.500.000 0,00 50.000 0 50,00 2.500.000 31,00 1.550.000

14 350.000 4.900.000 14,00 4.900.000 0,00 350.000 0 14,00 4.900.000 0,00 0

512 350.000 179.200.000 512,00 179.200.000 0,00 350.000 0 512,00 179.200.000 0,00 00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0

120 50.000 6.000.000 115,00 5.747.560 0,00 50.000 0 115,00 5.747.560 5,00 252.440

Percepatan Penyusunan Dok. SiapPelatihan Perencanaan bagi TAPP (Khusus 40 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

IN REGIONAL LEVELS (Surabaya)

IN PROVINCIAL LEVELS

OSP Consolidation Jawa TimurOSP Consolidation Kalimantan SelatanOSP Consolidation Kalimantan TengahOSP Consolidation Kalimantan TimurKits

Konsolidasi Pemandu Pelatihan Fasilitator

Pelatihan Fasilitator JatimIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK

Pelatihan Fasilitator KalselIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK

Pelatihan Fasilitator KaltimIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK

Pelatihan Fasilitator KaltengIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK

Konsolidasi Pemandu Pelatihan Khusus Fasilitator

Pelatihan Fasilitator Khusus

4.3 Training Activity 2016 - 2017

TOTAL OF TRAINING ACTIVITY 2013

In class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK

Page 58: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

- Jawa Timur (3 kota) 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

- Banjarmasin 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

- Samarinda 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Assesment SF dan Fasilitator (fullday)- Jawa Timur 879 175.000 153.825.000 879,00 153.720.000 0,00 175.000 0 879,00 153.720.000 0,00 105.000

- ATK 980 10.000 9.800.000 980,00 9.800.000 0,00 10.000 0 980,00 9.800.000 0,00 0

- Sewa ruangan, kursi dan makan siang peserta 40 75.000 3.000.000 40,00 3.000.000 0,00 75.000 0 40,00 3.000.000 0,00 0

- ATK 0 10.000 0 0,00 0 10.000 0,00 0 0,00 0

- Kalimantan Selatan 121 175.000 21.175.000 121,00 21.175.000 0,00 175.000 0 121,00 21.175.000 0,00 0

- ATK 140 10.000 1.400.000 140,00 1.400.000 0,00 10.000 0 140,00 1.400.000 0,00 0

- Kalimantan Timur 43 175.000 7.525.000 43,00 7.525.000 0,00 175.000 0 43,00 7.525.000 0,00 0

- ATK 46 10.000 460.000 46,00 460.000 0,00 10.000 0 46,00 460.000 0,00 0

- Kalimantan Tengah 18 175.000 3.150.000 18,00 3.150.000 0,00 175.000 0 18,00 3.150.000 0,00 0

- ATK 18 10.000 180.000 0,00 0 0,00 10.000 0 0,00 0 18,00 180.000

Assesment Askot dan Korkot (fullboard 2 - Jawa Timur 339 350.000 118.650.000 339,00 118.400.000 0,00 350.000 0 339,00 118.400.000 0,00 250.000

- ATK 183 10.000 1.830.000 183,00 1.830.000 0,00 10.000 0 183,00 1.830.000 0,00 0

- Kalimantan Selatan 108 350.000 37.800.000 108,00 37.800.000 0,00 350.000 0 108,00 37.800.000 0,00 0

- ATK 0 10.000 0 0,00 0 0,00 10.000 0 0,00 0 0,00 0

- Kalimantan Timur 59 350.000 20.650.000 59,00 20.650.000 0,00 350.000 0 59,00 20.650.000 0,00 0

- ATK 0 10.000 0 0,00 0 0,00 10.000 0 0,00 0 0,00 0

- Kalimantan Tengah 22 350.000 7.700.000 22,00 7.700.000 0,00 350.000 0 22,00 7.700.000 0,00 0

- ATK 0 10.000 0 0,00 0 0,00 10.000 0 0,00 0 0,00 0

Konsolidasi Pemandu Pelatihan Askot & 96 350.000 33.600.000 96,00 33.600.000 0,00 350.000 0 96,00 33.600.000 0,00 0

Pelatihan Askot dan Fasilitator 50 Kota - Jawa Timur 3.850 350.000 1.347.500.000 3850,00 1.347.500.000 0,00 350.000 0 3850,00 1.347.500.000 0,00 0

- ATK 496 50.000 24.800.000 496,00 24.800.000 0,00 50.000 0 496,00 24.800.000 0,00 0

- Kalimantan Selatan 980 350.000 343.000.000 980,00 343.000.000 0,00 350.000 0 980,00 343.000.000 0,00 0

- ATK 130 50.000 6.500.000 130,00 6.419.726 0,00 50.000 0 130,00 6.419.726 0,00 80.274

- Kalimantan Timur 539 350.000 188.650.000 539,00 188.650.000 0,00 350.000 0 539,00 188.650.000 0,00 0

- ATK 77 50.000 3.850.000 77,00 3.850.000 0,00 50.000 0 77,00 3.850.000 0,00 0

- Kalimantan Tengah 189 350.000 66.150.000 189,00 66.150.000 0,00 350.000 0 189,00 66.150.000 0,00 0

- ATK 24 50.000 1.200.000 24,00 1.200.000 0,00 50.000 0 24,00 1.200.000 0,00 0

Pelatihan Khusus (SIM)- Jawa Timur 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

- Kalimantan Selatan 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

- Kalimantan Timur 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

- Kalimantan Tengah 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Pelatihan Penghitungan Luasan Kumuh untuk Fasilitator (Lokasi Penanganan Kumuh 2594 kel/desa)

2 hari

Page 59: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Konsolidasi Pelatihan Khusus Tim Korkot 18 350.000 6.300.000 0,00 0 0,00 350.000 0 0,00 0 18,00 6.300.000

ToT dan Pelatihan Khusus Tim Korkot - Jawa Timur 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

- Kalimantan Selatan 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0

- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Konsolidasi Pelatihan Khusus Tim 34 350.000 11.900.000 34,00 11.900.000 0,00 350.000 0 34,00 11.900.000 0,00 0

Pelatihan Khususn Tim Fasilitator- Jawa Timur 650 350.000 227.500.000 650,00 227.500.000 0,00 350.000 0 650,00 227.500.000 0,00 0

- ATK 119 50.000 5.950.000 119,00 5.950.000 0,00 50.000 0 119,00 5.950.000 0,00 0

- Kalimantan Selatan 285 350.000 99.750.000 285,00 99.750.000 0,00 350.000 0 285,00 99.750.000 0,00 0

- ATK 51 50.000 2.550.000 51,00 2.550.000 0,00 50.000 0 51,00 2.550.000 0,00 0

- Kalimantan Timur 135 350.000 47.250.000 115,00 47.250.000 0,00 350.000 0 115,00 47.250.000 20,00 0

- ATK 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0

- Kalimantan Tengah 100 350.000 35.000.000 100,00 35.000.000 0,00 350.000 0 100,00 35.000.000 0,00 0

- ATK 16 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0

Coaching Penyiapan kegiatan Infrastruktur 429 175.000 75.075.000 62,00 10.850.000 0,00 175.000 0 62,00 10.850.000 367,00 64.225.000

ATK 135 50.000 6.750.000 35,00 1.718.100 0,00 50.000 0 35,00 1.718.100 100,00 5.031.900

Pelatihan SIM (Cluster Surabaya) 184 350.000 64.400.000 184,00 64.400.000 0,00 350.000 0 184,00 64.400.000 0,00 0

ATK 46 50.000 2.300.000 46,00 2.300.000 0,00 50.000 0 46,00 2.300.000 0,00 0

4.3.3 789.050.000 446.873.916 0 446.873.916 342.176.084

1.538 75.000 115.350.000 1538,00 115.350.000 0,00 75.000 0 1538,00 115.350.000 0,00 0

320 75.000 24.000.000 320,00 23.953.600 0,00 75.000 0 320,00 23.953.600 0,00 46.4000,00 0

Pelatihan PKP 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Coaching ClinicKab. SIDOARJO 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0KOTA SURABAYA 54 175.000 9.450.000 54,00 9.450.000 0,00 175.000 0 54,00 9.450.000 0,00 0KOTA MOJOKERTO 0 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0Kab. Gresik 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0Kab. TULUNGAGUNG 80 175.000 14.000.000 80,00 14.000.000 0,00 175.000 0 80,00 14.000.000 0,00 0KOTA MALANG 40 175.000 7.000.000 40,00 7.000.000 0,00 175.000 0 40,00 7.000.000 0,00 0KOTA PROBOLINGGO 80 175.000 14.000.000 80,00 14.000.000 0,00 175.000 0 80,00 14.000.000 0,00 0KOTA PASURUAN 0 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0KOTA MADIUN 95 175.000 16.625.000 94,86 16.500.000 0,00 175.000 0 94,86 16.500.000 0,14 125.000Kab. Jember 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0Kab. Jombang 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0ATK 609 50.000 30.450.000 608,00 30.358.116 0,00 50.000 0 608,00 30.358.116 1,00 91.884Narasumber 38 300.000 11.400.000 38,00 11.400.000 0,00 300.000 0 38,00 11.400.000 0,00 0

KOTA BARU 45 175.000 7.875.000 45,00 7.875.000 0,00 175.000 0 45,00 7.875.000 0,00 0BANJAR 50 175.000 8.750.000 45,00 8.750.000 0,00 175.000 0 45,00 8.750.000 5,00 0KOTA BANJARMASIN 50 175.000 8.750.000 50,00 8.750.000 0,00 175.000 0 50,00 8.750.000 0,00 0KOTA BANJARBARU 40 175.000 7.000.000 40,00 7.000.000 0,00 175.000 0 40,00 7.000.000 0,00 0BARITO KUALA 0 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0KOTA HULU SUNGAI UTARA 50 175.000 8.750.000 50,00 8.750.000 0,00 175.000 0 50,00 8.750.000 0,00 0ATK 250 50.000 12.500.000 250,00 12.500.000 0,00 50.000 0 250,00 12.500.000 0,00 0Narasumber 75 300.000 22.500.000 75,00 22.500.000 0,00 300.000 0 75,00 22.500.000 0,00 0

KOTA PALANGKARAYA 50 175.000 8.750.000 50,00 8.750.000 0,00 175.000 0 50,00 8.750.000 0,00 0ATK 50 50.000 2.500.000 50,00 2.500.000 0,00 50.000 0 50,00 2.500.000 0,00 0Narasumber 15 300.000 4.500.000 15,00 4.500.000 0,00 300.000 0 15,00 4.500.000 0,00 0

In City/Regency Levels

Consolidation of Kelurahan Facilitators, City Coordinators Assistants & City Coordinators

Thematic Discussion

Page 60: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

SISA KONTRAKNO URAIAN

CONTRACT AMOUNT +

AMANDEMEN 24INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

KOTA BALIKPAPAN 45 175.000 7.875.000 45,00 7.875.000 0,00 175.000 0 45,00 7.875.000 0,00 0KOTA SAMARINDA 53 175.000 9.275.000 45,00 7.875.000 0,00 175.000 0 45,00 7.875.000 8,00 1.400.000KOTA BONTANG 47 175.000 8.225.000 47,00 8.225.000 0,00 175.000 0 47,00 8.225.000 0,00 0ATK 135 50.000 6.750.000 135,00 6.712.200 0,00 50.000 0 135,00 6.712.200 0,00 37.800Narasumber 41 300.000 12.300.000 41,00 12.300.000 0,00 300.000 0 41,00 12.300.000 0,00 0

Coaching Clinic 597 175.000 104.475.000 0,00 0 0,00 175.000 0 0,00 0 597,00 104.475.000ATK 526 50.000 26.300.000 0,00 0 0,00 50.000 0 0,00 0 526,00 26.300.000

Coaching Clinic di 4 Kota Kabupaten OSP-6Kota Malang 159 350.000 55.650.000 0,00 0 0,00 350.000 0 0,00 0 159,00 55.650.000Kota Surabaya 234 350.000 81.900.000 0,00 0 0,00 350.000 0 0,00 0 234,00 81.900.000Balikpapan 99 350.000 34.650.000 0,00 0 0,00 350.000 0 0,00 0 99,00 34.650.000Bontang 69 350.000 24.150.000 0,00 0 0,00 350.000 0 0,00 0 69,00 24.150.000Narasumber 8 500.000 4.000.000 0,00 0 0,00 500.000 0 0,00 0 8,00 4.000.000ATK 187 50.000 9.350.000 0,00 0 0,00 50.000 0 0,00 0 187,00 9.350.000

11.370.320.000 8.450.685.843 0 8.450.685.843 0,00 2.919.634.157TOTAL OF TRAINING ACTIVITY 2016

Page 61: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

IV. SOCIALIZATION ACTIVITY EXPENSES

4.1. Mei 2018

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

4.1 525.350.000 402.877.534 - 402.877.534 122.472.466

4.1.1 Lokakarya Review Propinsi/midterm 525.350.000 402.877.534 - 402.877.534 122.472.466

a. Workshop Activities - Propinsi Jawa Timur 1 prov x 2 days x 1 times x 97 ptcp 97,00 250.000 24.250.000 97,00 24.250.000 0,00 250.000 0 97,00 24.250.000 0,00 0 - Propinsi Kalimantan Selatan 1 prov x 2 days x 1 times x 42 ptcp 82,00 250.000 20.500.000 81,34 20.335.080 0,00 250.000 0 81,34 20.335.080 0,66 164.920 - Propinsi Kalimantan Tengah 1 prov x 2 days x 1 times x 26 ptcp 51,00 250.000 9.500.000 51,00 9.500.000 0,00 250.000 0 51,00 9.500.000 0,00 0 - Propinsi Kalimantan Timur 1 prov x 2 days x 1 times x 42 ptcp 0,00 250.000 - 0,00 0 0,00 250.000 0 0,00 0 0,00 0

b. Press Conference 4 prov x 1 days x 1 times x 10 ptcp 30,00 200.000 6.000.000 30,00 6.000.000 0,00 200.000 0 30,00 6.000.000 0,00 0c. Provincial Key Speakers 4 prov x 1 days x 1 times x 3 ptcp 6,00 500.000 3.000.000 6,00 3.000.000 0,00 500.000 0 6,00 3.000.000 0,00 0d. Workshop Kits 1 prov x 1 days x 1 times x 230 ptcp 194,00 50.000 9.700.000 190,00 9.685.500 0,00 50.000 0 190,00 9.685.500 4,00 14.500

Lokakarya Sosialisasi KumuhKegiatan Lokakarya 580,00 300.000 148.000.000 580,00 147.700.000 0,00 300.000 0 580,00 147.700.000 0,00 300.000Press Conference 11,00 200.000 2.200.000 11,00 2.200.000 0,00 200.000 0 11,00 2.200.000 0,00 0Nara Sumber Provinsi 12,00 500.000 6.000.000 11,00 5.500.000 0,00 500.000 0 11,00 5.500.000 1,00 500.000Workshop Kits 400,00 50.000 20.000.000 392,00 19.598.500 0,00 50.000 0 392,00 19.598.500 8,00 401.500

4.1.2 Workshop Media -

a. Workshop Activities 4 prov x 2 days x 1 times x 20 ptcp 40,00 250.000 10.000.000 40,00 10.000.000 0,00 250.000 0 40,00 10.000.000 0,00 0b. Provincial Key Speakers 4 prov x 1 days x 1 times x 2 ptcp 2,00 500.000 1.000.000 2,00 1.000.000 0,00 500.000 0 2,00 1.000.000 0,00 0c. Workshop Kits 4 prov x 1 days x 1 times x 25 ptcp 0,00 50.000 - 0,00 0 0,00 50.000 0 0,00 0 0,00 0

4.1.3 Penulisan Artikel / Berita - -

a. Penulisan Artikel / Berita 4 prov x 1 days x 2 times x 1 ptcp 2,00 500.000 1.000.000 2,00 1.000.000 0,00 500.000 0 2,00 1.000.000 0,00 0Penulisan Artikel / Berita 0,00 1.000.000 - 0,00 0 0,00 1.000.000 0 0,00 0 0,00 0

4.1.4 TV Talkshow - -

b. TV Talkshow 4 prov x 1 days x 2 times x 1 ptcp 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0TV Talkshow 0,00 7.500.000 - 0,00 0 0,00 7.500.000 0 0,00 0 0,00 0

Lokakarya ProvinsiAccomodation 0,00 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0Resources Person 0,00 500.000 - 0,00 0 0,00 500.000 0 0,00 0 0,00 0Kits 0,00 50.000 - 0,00 0 0,00 50.000 0 0,00 0 0,00 0

Lokakarya Provinsi Strategi Komunikasi - Propinsi Jawa Timur 156,00 350.000 54.600.000 156,00 54.600.000 0,00 350.000 0 156,00 54.600.000 0,00 0 - Propinsi Kalimantan Selatan 68,00 350.000 23.800.000 65,00 22.800.254 0,00 350.000 0 65,00 22.800.254 3,00 999.746 - Propinsi Kalimantan Tengah 56,00 350.000 19.600.000 56,00 19.600.000 0,00 350.000 0 56,00 19.600.000 0,00 0 - Propinsi Kalimantan Timur 56,00 350.000 19.600.000 56,00 19.600.000 0,00 350.000 0 56,00 19.600.000 0,00 0Resources Person 16,00 500.000 8.000.000 16,00 8.000.000 0,00 500.000 0 16,00 8.000.000 0,00 0

Kits 176,00 100.000 17.600.000 176,00 17.508.200 0,00 100.000 0 176,00 17.508.200 0,00 91.800

4.1.5 Exhibitation 4,00 30.000.000 120.000.000 0,00 0 0,00 30.000.000 0 0,00 0 4,00 120.000.000

4.2. CITY/REGENCY LEVELS 1.897.200.500 1.895.509.650 - 1.895.509.650 1.690.850 4.2.1 Lokakarya Review /midterm

Workshop Activities 3.620 100.000 362.000.000 3620,00 362.000.000 0,00 100.000 0 3620,00 362.000.000 0,00 0 Press Conference 339 100.000 33.900.000 339,00 33.900.000 0,00 100.000 0 339,00 33.900.000 0,00 0 Provincial Key Speakers 94 300.000 28.200.000 93,00 27.900.000 0,00 300.000 0 93,00 27.900.000 1,00 300.000

Lokakarya Sosialisasi KumuhKegiatan Lokakarya 1348,00 250.000 399.000.000 1348,00 398.775.000 0,00 250.000 0 1348,00 398.775.000 0,00 225.000Press Conference 135,00 100.000 14.000.000 85,00 14.000.000 0,00 100.000 0 85,00 14.000.000 50,00 0Nara Sumber Provinsi 73,00 300.000 24.000.000 47,00 24.000.000 0,00 300.000 0 47,00 24.000.000 26,00 0Workshop Kits 1216,00 50.000 90.000.000 1216,00 89.902.500 0,00 50.000 0 1216,00 89.902.500 0,00 97.500

Lokakarya Orientasi PLPBK Workshop Activities 144 100.000 14.400.000 144,00 14.400.000 0,00 100.000 0 144,00 14.400.000 0,00 0Press Conference - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0Provincial Key Speakers - 300.000 - 0,00 0 0,00 300.000 0 0,00 0 0,00 0

INVOICE S/D SAAT INI

PROVINCIAL LEVELS (Prov Jawa Timur, Kalsel, Kalteng, Kalbar)

SISA KONTRAK

Provincial Levels (East Java, South Kalimantan, Center Kalimantan, East

NO URAIANCONTRACT AMOUNT + AMANDEMEN 24 INVOICE LALU INVOICE SAAT INI

Page 62: 103.12.84.195103.12.84.195/files/Media/Laporan/Contract Resume/osp6_phibeta_wb_inv54_1807.pdfNomor & Periode Invoice : No. 54 Periode (Mei 2018) Realisasi Invoice : 11 Juli 2018 Nomor

NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

INVOICE S/D SAAT INI SISA KONTRAKNO URAIAN

CONTRACT AMOUNT + AMANDEMEN 24 INVOICE LALU INVOICE SAAT INI

4.2.2 Radio Talkshow 139 500.000 69.500.000 139,00 69.500.000 0,00 500.000 0 139,00 69.500.000 0,00 0

- 500.000 - 0,00 0 0,00 500.000 0 0,00 0 0,00 0

4.2.3 Media Field Visit 110 500.000 55.000.000 110,00 55.000.000 0,00 500.000 0 110,00 55.000.000 0,00 0

- 500.000 - 0,00 0 500.000 0 0,00 0 0,00 0

4.2.4 Articles/News 100 500.000 50.000.000 100,00 50.000.000 0,00 500.000 0 100,00 50.000.000 0,00 0

- 500.000 - 0,00 0 0,00 500.000 0 0,00 0 0,00 0

4.2.5 Exibithion 8 5.000.000 35.000.000 8,00 34.915.750 0,00 5.000.000 0 8,00 34.915.750 0,00 84.250

- 5.000.000 - 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0

Lokakarya Strategi Komunikasia. Accomodation (Fullday) - 175.000 - 0,00 0 0,00 175.000 0 0,00 0 0,00 0b. Resources Person - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0d. Kits - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0

Lokakarya Strategi Komunikasia. Accomodation 1.292 350.000 395.000.000 1292,00 394.816.000 0,00 350.000 0 1292,00 394.816.000 0,00 184.000b. Resources Person 90 350.000 31.500.000 90,00 31.050.000 0,00 350.000 0 90,00 31.050.000 0,00 450.000d. Kits 1.850 100.000 173.000.000 1850,00 172.849.900 0,00 100.000 0 1850,00 172.849.900 0,00 150.100

Lokakarya Khususa. Accomodation - 175.000 - 0,00 0 0,00 175.000 0 0,00 0 0,00 0b. Resources Person - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0d. Kits - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0

Lokakarya Khususa. Accomodation - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0b. Resources Person - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0d. Kits - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0

Penayangan di TV Berita daerah 4 7.500.000 30.000.000 4,00 30.000.000 0,00 7.500.000 0 4,00 30.000.000 0,00 0

Pengembangan Newsletter 15.467 1.500 23.200.500 15334,00 23.000.500 0,00 1.500 0 15334,00 23.000.500 133,00 200.000

Exibithion 4 5.000.000 20.000.000 4,00 20.000.000 0,00 5.000.000 0 4,00 20.000.000 0,00 0

Workshop (Forum Konsultasi)a. Accomodation (fullboard) 105 350.000 36.750.000 105,00 36.750.000 0,00 350.000 0 105,00 36.750.000 0,00 0

b. Resources Person 7 350.000 2.450.000 7,00 2.450.000 0,00 350.000 0 7,00 2.450.000 0,00 0

c. Kits 206 50.000 10.300.000 206,00 10.300.000 0,00 50.000 0 206,00 10.300.000 0,00 0

4.3 Percepatan Penyusunan Dok. SIAP 1.898.000.000 1.898.000.000 - 1.898.000.000 -

Biaya Penyusunan Dokumen Tenaga Ahli Pendamping Masyarakat 107 5.000.000 558.000.000 45,00 558.000.000 0,00 5.000.000 0 45,00 558.000.000 62,00 0

Sosialisasi Tingkat Kelurahan 49 5.000.000 245.000.000 49,00 245.000.000 0,00 5.000.000 0 49,00 245.000.000 0,00 0

Forum Konsultasi dan uji publik 49 5.000.000 215.000.000 28,00 215.000.000 0,00 5.000.000 0 28,00 215.000.000 21,00 0

21 15.000.000 555.000.000 21,00 555.000.000 0,00 15.000.000 0 21,00 555.000.000 0,00 0

39 10.000.000 325.000.000 2,00 325.000.000 0,00 10.000.000 0 2,00 325.000.000 37,00 0

TOTAL OF SOCIAL ACTIVITY 4.320.550.500 4.196.387.184 0 4.196.387.184 124.163.316

Peralatan Survey, dukungan FGD/rembug dan Penggandaan dokumen RPLP Penguatan Masyarakat /TIPP atau DED (Opsional)