Transcript of Presupuesto desagregado 03

OBRAS DE CONCRETO SIMPLE

05 REVOQUES, ENLUCIDOS Y

MOVIMIENTO DE TIERRAS02

03

BANCAS

COLUMNAS / PEDESTALES

MOLDURAS

ZAPATAS

OBRAS DE CONCRETO ARMADO04

TRABAJOS PRELIMINARES01

ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60

769.82

436.2704.02.01 M3 4.90

20.53576.51

04.02612.79

172.78

55.57 2,137.72CONCRETO EN COLUMNAS F'C=210 KG/CM2

04.02.02 M2 52.32 51.65 1,655.41 997.22 49.70 2,702.33

1,469.36

M2

ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINELES

04.0104.01.01 M3 8.64 352.36 411.70 2,573.33 59.36 3,044.39CONCRETO EN ZAPATAS

04.01.03

04.01.02

4.50

28.80 44.95 728.93 543.74 21.89 1,294.56ENCOFRADO Y DESENCOFRADO NORMAL EN

4.66

ZAPATAS

ENCOFRADO Y

KG 171.07

F'C=210 KG/CM2

45.98

KG

BANCAS04.03.03 KG 40.42 4.50 40.82 136.22 4.85 181.89ACERO ESTRUCTURAL

FY=4200 KG/CM2 GRADO 60

05.01

ENCOFRADO Y

BANCAS6,549.292,684.683,750.7823.59277.63

M2

05.02

58.08TARRAJEO EN SUPERFICIE DE 2,670.5255.76750.981,863.78

892.51

M2

457.42

COLUMNAS04.02.03

5,715.36

529.54

34.31

561.31 1,784.55 121.80 2,467.66ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60

04.0304.03.01

DESENCOFRADO NORMAL EN

EN BANCAS16.42329.36546.7351.6517.28

M3

04.03.02

1.41CONCRETO F'C=210 KG/CM2 644.9629.65405.71209.60

DESENCOFRADO NORMAL EN

M2

REMOCION DE ARBOLES

1,319.31

305.98 - 132.16 438.14DEMOLICION DE PISO DE CONCRETO

01.05 UND 4.00 62.80 243.88 -

119.06

2,100.08

27.62M302.02TERRENONIVELACION Y COMPACTACION DE

7.32

707.01

251.20

1,565.898.35523.71M202.01

M2

4,372.98

244.3801.01 M2 523.71 1.49 743.67 - 36.66 780.33LIMPIEZA DE TERRENO MANUAL01.02 M2 1,110.81 1.16

3.68

561.91

01.04Y MATERIALESTRANSPORTE DE HERRAMIENTAS 2,809.551,947.95

810.89486.60

233.275.00VJE01.03

TRAZO DE NIVELES Y REPLANTEO 1,288.54

-

375.00

23.69

2,138.77ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIA

03.01 M3 6.88 177.57 284.76 908.71 28.21 1,221.68CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% P.G.

39.01

CONCRETO EN SARDINELES

C/MORTERO 1:5 X 1.5CM.

4,267.78

TARRAJEO EN SARDINELES

166.58M2

03.02MEZCLA 1:8 + 25% P.M.

M3 6,690.29214.633,958.122,517.54282.41

592.15

03.03

M3

1,546.62

694.0620.31- 673.75HASTA 0.80 MT TERRENO NORMAL

26.37

02.04

02.03HASTA 2.00 MT TERRENO NORMALEXCAVACION PARA CIMIENTOS 1,077.4631.49

128.27

26.32

889.12

1,045.97

70.5430.32M302.05

EXCAVACION PARA SARDINELES

RELLENO COMPACTADO CON

-

207.713.18678.2355.9915.88M3MATERIAL PROPIO

113.83

GOBIERNO REGIONAL DE AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

HUNTER - AREQUIPA - AREQUIPA Abril - 2013

03 - CONSTRUCCION DE PISOS Y COBERTURA

Costo a :

Cliente

Sub Presupuesto

Obra

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Ubicacion

Descripción M.Obra TotalEquipoMaterialPrecioUnidadItem Metrado

Presupuesto Desagregado

P.1/2

8,336.31

09

SISTEMA DE DESAGUE 11

VARIOS, LIMPIEZA

PINTURA08

12

COBERTURA

07

PISOS Y PAVIMENTOS06

SISTEMA DE AGUA FRIA

167,298.4745,505.11

CARPINTERIA METALICA

10115.0010.01 929.20 507.15 27.60 1,463.95RED DE DISTRIBUCION TUBERIA M 12.73

PVC DE 1"10.02 M 27.60 9.02 152.08 92.18 4.69 248.95TUBERIA PVC SAP 1/2" P/RIEGO

UND

414.40

10.03

284.48

07.07 M 56.00 92.40 3,314.64 5,174.40TUBO DE ACERO CIRCULAR DE 4"

08.01 M2 56.00 12.32

959.99

MALLA RACHELL AL 90 %

3.00

711.20TUBO DE ACERO CIRCULAR DE 4"

09.01 M2 143.00 13.45 833.69 1,065.35 24.31 1,923.35

12.70

3.682.00 16.57 11.02 21.78 0.34 33.14SEMBRADOD DE GRASS

12.02 UND 16.00 37.30

21.16

472.00

H=0.60

596.80PLANTADO DE ARBOLES12.03 M2 523.71 2.34 1,188.82 - 36.66 1,225.48LIMPIEZA FINAL DE OBRA

121.12

39.77

16.29 568.77 0.48 585.54GRIFO DE RIEGO DE 1/2" INC. CAJUELA DE CONCRETO+VALV.1/2" Y ACCES.

11.01 M 110.47

TENSOR P/ MALLA RACHELL

M2

1,544.48

12.01

2,337.55TUBERIA PVC SAL 4" P/DESAGUE11.02 PZA 3.00 100.32 145.35 151.26 4.35 300.96CAJA DE REGISTRO 0.60x0.30

195.18

1,337.79

52.12

6.99

06.04 M2 35.87 56.72 528.01 1,429.78

315.28

2,034.55

1,596.80

BRUÑADO DOBLE C/0.50M06.05

PISO DE CEMENTO FROTACHADO

69.15

3,105.57

739.91 2,756.32 107.87 3,604.10PISO DE CEMENTO FROTACHADO BRUÑADO DOBLE C/2.00M

06.06 M 174.79 7.15 208.00 1,034.76

M2

3,904.82

06.01 M2 225.81 56.72 3,323.92 9,000.79 483.23 12,807.94PISO DE CEMENTO FROTACHADO BRUÑADO C/0.50M

06.02 M2

BRUÑADO DOBLE C/0.40M

53.34

PISO DE CEMENTO FROTACHADO

13,223.95 567.31 17,696.08PISO DE CEMENTO FROTACHADO BRUÑADO C/1.00M

06.03 M2 52.53 59.12 883.55 2,093.85 128.17

331.76

183.25

VIGA METALICA P/ MALLA RACHELL07.04 M 124.50 243.06 1,584.89 28,628.77 47.31 30,260.97ARRIOSTRE P/ MALLA RACHELL07.05 M

35,377.56

14.32CABLE ACERO TRENZADO Ø1/4" 1,136.52 5.55 1,325.32

1,249.75

P/MALLA RASCHELL

76.76

M 80.00 19.96 226.40 1,364.00 6.40

92.55

31,035.20

07.06

604.80

JUNTA ASFALTICA C/ 3.00M

07.01 UND 8.00 3,879.40 674.96 20.24COLUMNA METALICA DE MALLA RACHELL C-1

07.02 UND

M 33,328.801,443.96

30,340.00

108.00

4.00

07.03RACHELL C-2

14,721.6010.1214,374.003,680.40COLUMNA METALICA DE MALLA

327.57

337.48

DOSCIENTOS CUARENTA Y OCHO MIL SETECIENTOS OCHENTA Y DOS CON 38/100 NUEVOS SOLES

248,782.38COSTO TOTAL PRESUPUESTAL

Son :

GUZMAN DE HUNTER, AREQUIPA"

GOBIERNO REGIONAL DE AREQUIPA

16,364.35

HUNTER - AREQUIPA - AREQUIPA

GASTOS DE LIQUIDACION

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y

GASTOS GENERALES221,139.89

1.80 %

COSTO DIRECTO

7,297.627.40 %3.30 %GASTOS DE SUPERVISION

3,980.52

03 - CONSTRUCCION DE PISOS Y COBERTURA

Abril - 2013Costo a :Ubicacion

Sub Presupuesto

Cliente

Obra

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

M.Obra Material EquipoItem Descripción Unidad Metrado Precio Total

Presupuesto Desagregado

P.2/2