METRADOS ESTRUCTURAS

Post on 16-Nov-2015

27 views 2 download

description

METRADO DE ESTRUCTURAS

Transcript of METRADOS ESTRUCTURAS

M TIERRA Y C SIMPLEMETRADO DE UNA VIVIENDA DE 200 m2PARTIDAS1.00 OBRAS PROVISIONALES

Las obras provisionales estarn constitudas por una caseta con bao y un almacen. Como es una obra pequea ser estimada.2.00 TRABAJOS PRELIMINARES2.01 Limpieza de terreno

Largo(m)Ancho(m)rea(m2)20.0010.002002.02 Trazos, niveles y replanteo2.02.01 Trazos, niveles y replanteo preliminarDescripcinLargo(m)Ancho(m)rea(m2)Eje A-A tramo 1-23.610.401.440.360.500.18Eje A-A tramo 2-45.440.502.72Eje A-A tramo 4-50.590.500.301.631.302.12Eje A-A tramo 5-63.700.501.85Eje A-A tramo 6-73.580.401.43Eje A'-A' tramo 4-51.950.500.98Eje B-B tramo 3-42.920.501.46Eje B-B tramo 4-51.950.500.98Eje B'-B' tramo 3-40.650.880.572.270.501.14Eje C-C tramo 3-41.100.500.551.820.851.55Eje C-C tramo 4-50.710.500.361.760.500.88Eje D-D tramo 1-23.610.401.440.360.500.18Eje D-D tramo 2-57.890.503.95Eje D-D tramo 5-63.460.501.73Eje D-D tramo 6-73.580.401.43Eje 3-3 tramo A-D9.000.504.50Eje 3-3 tramo B'-C0.730.200.15Eje 3'-3' tramo B'-C0.750.500.38Eje 4-4 tramo A-D9.000.504.50Eje 5-5 tramo A-C5.580.502.79Eje 5-5 tramo C-D2.330.501.17PARCIAL=40.70

ZapatasLargo(m)Ancho(m)Cantidadrea(m2)Zapata 11.101.105.006.05Zapata 21.100.902.001.98PARCIAL=8.03

TOTAL=48.732.02.02 Trazos, niveles y replanteo durante el procesoDescripcinLargo(m)Ancho(m)rea(m2)Global20.0010.00200.003.00 MOVIMIENTO DE TIERRAS3.01 Nivelacin del terrenoEl terreno no necesita nivelacin.3.02 Excavaciones3.02.01 Excavaciones de zanjasDescripcinLargo(m)Ancho(m)Z (m)Vol. (m3)Eje A-A tramo 1-23.610.400.901.300.360.501.100.20Eje A-A tramo 2-45.440.501.102.99Eje A-A tramo 4-50.590.501.100.32Eje A-A tramo 5-63.460.501.101.90Eje A-A tramo 6-73.580.400.901.29Eje A'-A' tramo 4-51.950.501.101.07Eje B-B tramo 3-42.920.501.101.61Eje B-B tramo 4-51.950.501.101.07Eje B'-B' tramo 3-40.650.881.100.632.270.501.101.25Eje C-C tramo 3-41.100.501.100.611.820.851.101.70Eje C-C tramo 4-50.710.501.100.391.760.501.100.97Eje D-D tramo 1-23.610.400.901.300.360.501.100.20Eje D-D tramo 2-57.890.501.104.34Eje D-D tramo 5-63.460.501.101.90Eje D-D tramo 6-73.580.400.901.29Eje 3-3 tramo A-D9.000.501.104.95Eje 3-3 tramo B'-C0.730.201.100.16Eje 3'-3' tramo B'-C0.750.501.100.41Eje 4-4 tramo A-D9.000.501.104.95Eje 5-5 tramo A-A'0.800.231.100.201.180.501.100.65Eje 5-5 tramo A'-C3.600.501.101.98Eje 5-5 tramo C-D2.330.501.101.28PARCIAL=40.91

3.02.02 Excavaciones de zapatas

ZapatasLargo(m)Ancho(m)CantidadZ (m)Vol. (m3)Zapata 11.101.105.001.207.26Zapata 21.100.902.001.202.38PARCIAL=9.64

3.02.03 Excavaciones de tanque cisterna

DescripcinLargo(m)Ancho(m)CantidadZ (m)Vol. (m3)Cisterna1.901.301.002.957.29PARCIAL=7.29

3.02.04 Excavaciones patio y terraza

Descripcinrea 1(m2)rea 2(m2)CantidadZ (m)Vol. (m3)Patio45.762.421.000.3013.00Terraza32.31- 01.000.309.69PARCIAL=22.69

TOTAL=80.53

3.03 Rellenos3.03.01 Rellenos con material propioDescripcinLargo(m)Ancho(m)Z (m)Vol. (m3)Eje A-A tramo 1-23.610.250.300.270.250.350.300.030.110.250.300.01Eje A-A tramo 2-30.140.250.300.011.780.350.300.190.120.250.300.01Eje A-A tramo 3-43.290.250.300.25Eje A-A tramo 4-50.590.350.300.06Eje A-A tramo 5-63.330.250.300.25Eje A-A tramo 6-73.580.250.300.27Eje A'-A' tramo 4-50.800.500.300.121.270.340.300.13Eje B-B tramo 3-42.920.500.300.44Eje B-B tramo 4-51.950.250.300.15Eje B'-B' tramo 3-42.260.350.300.240.620.500.300.09Eje C-C tramo 3-41.280.500.300.191.500.500.300.220.310.150.300.011.820.180.300.10Eje C-C tramo 4-50.710.350.300.07Eje D-D tramo 1-23.610.250.300.270.250.350.300.030.110.250.300.01Eje D-D tramo 2-611.350.250.300.85Eje D-D tramo 6-73.580.250.300.27Eje 3-3 tramo A-B0.650.500.300.102.430.250.300.18Eje 3-3 tramo B-C1.920.250.300.141.000.500.300.15Eje 3-3 tramo B'-C1.500.200.300.09Eje 3'-3' tramo B'-C0.650.500.300.10Eje 4-4 tramo A-A'2.100.350.300.22Eje 4-4 tramo A'-B0.850.500.300.13Eje 4-4 tramo B-C2.550.350.300.27Eje 4-4 tramo C-D2.660.500.300.40Eje 5-5 tramo A-A'0.800.120.300.031.200.250.300.09Eje 5-5 tramo A'-B0.980.500.300.15Eje 5-5 tramo B-B'1.560.350.300.16Eje 5-5 tramo B'-C0.760.500.300.11Eje 5-5 tramo C-D2.330.500.300.35PARCIAL=7.203.02.02 Relleno de zapatas

Zapatasrea 1(m2)rea 2(m2)CantidadZ (m)Vol. (m3)ObservacinZapata 11.210.062.000.601.38C. cuadradaZapata 11.210.073.000.602.05C. circularZapata 20.320.442.000.600.91PARCIAL=4.34TOTAL=11.543.04 Eliminacion de material excedenteTabla N 1Cambios VolumtricosEsponjamientoCoe. ReduccinE (%)R = 1/(1+E/100)Arena100.90Grava100.90Tierra Natural250.80Arcilla Compactada400.70Roca50 - 600.65Volumen excavado =Excavaciones*1.25/100Volumen excavado =100.66m3(Tierra natural)Volumen rellenado =Relleno*(1.00/0.80)*((1.25/1.00)Volumen rellenado =18.03m3

Volumen Eliminado =Vol. Excavado - Vol. RellenoVolumen Eliminado =82.64m33.05 Nivelacin interior y apisonado4.00 OBRAS DE CONCRETO SIMPLE4.01 Cimientos corridos Cemento - Homigon 1:10 + 30% Piedra Grande 6" MAXDescripcinN VECESLargoAnchoProf.Volumen (m3)Eje A-A tramo 1-213.610.400.600.8710.370.500.800.15Eje A-A tramo 2-312.010.500.800.80Eje A-A tramo 3-413.41860.500.801.37Eje A-A tramo 4-510.570.500.800.23Eje A-A tramo 5-613.4500.500.801.38Eje A-A tramo 6-713.5800.400.600.86Eje A'-A' tramo 4-510.800.400.600.1911.270.400.600.30Eje B-B tramo 3-412.920.500.801.17Eje B-B tramo 4-511.950.500.800.78Eje B'-B' tramo 3-412.260.500.800.9010.620.500.800.25Eje C-C tramo 3-411.280.500.800.5111.500.500.800.6010.310.500.800.1211.820.500.800.73Eje C-C tramo 4-510.710.500.800.28Eje D-D tramo 1-213.610.400.600.8710.250.400.600.0610.110.400.600.03Eje D-D tramo 2-6111.350.500.804.54Eje D-D tramo 6-713.580.400.600.86Eje 3-3 tramo A-B10.650.500.800.2612.420.500.800.97Eje 3-3 tramo B-C11.920.500.800.7711.000.500.800.40Eje 3-3 tramo B'-C11.500.500.800.60Eje 3'-3' tramo B'-C10.650.500.800.26Eje 4-4 tramo A-A'12.100.500.800.84Eje 4-4 tramo A'-B10.850.500.800.34Eje 4-4 tramo B-C12.550.500.801.02Eje 4-4 tramo C-D12.660.500.801.06Eje 5-5 tramo A-A'10.800.500.800.3211.200.500.800.48Eje 5-5 tramo A'-B10.980.500.800.39Eje 5-5 tramo B-B'11.560.500.800.62Eje 5-5 tramo B'-C10.760.500.800.30Eje 5-5 tramo C-D12.330.500.800.93CORTE 211.400.500.400.28CORTE 312.130.500.400.43CORTE 512.340.500.400.47TOTAL28.594.02 Sobrecimientos4.02.01 ConcretoDescripcinN VECESLargoAnchoProf.Volumen (m3)Eje A-A tramo 1-213.610.150.400.2210.370.150.400.02Eje A-A tramo 2-312.010.250.400.20Eje A-A tramo 3-413.41860.250.400.34Eje A-A tramo 4-510.570.250.400.06Eje A-A tramo 5-613.4500.250.400.35Eje A-A tramo 6-713.5800.250.400.36Eje A'-A' tramo 4-510.800.250.400.0811.270.250.400.13Eje B-B tramo 3-412.920.150.400.18Eje B-B tramo 4-511.950.250.400.20Eje B'-B' tramo 3-412.260.150.400.1410.620.150.400.04Eje C-C tramo 3-411.280.150.400.0811.500.150.400.0910.310.150.400.0211.820.150.400.11Eje C-C tramo 4-510.710.150.400.04Eje D-D tramo 1-213.610.150.400.2210.250.150.400.0210.110.150.400.01Eje D-D tramo 2-6111.350.250.401.14Eje D-D tramo 6-713.580.150.400.21Eje 3-3 tramo A-B10.650.250.400.0712.420.250.400.24Eje 3-3 tramo B-C11.920.250.400.1911.000.250.400.10Eje 3-3 tramo B'-C11.500.250.400.15Eje 3'-3' tramo B'-C10.650.250.400.07Eje 4-4 tramo A-A'12.100.150.400.13Eje 4-4 tramo A'-B10.850.150.400.05Eje 4-4 tramo B-C12.550.150.400.15Eje 4-4 tramo C-D12.660.150.400.16Eje 5-5 tramo A-A'10.800.250.400.0811.200.150.400.07Eje 5-5 tramo A'-B10.980.150.400.06Eje 5-5 tramo B-B'11.560.150.400.09Eje 5-5 tramo B'-C10.760.150.400.05Eje 5-5 tramo C-D12.330.150.400.14CORTE 211.400.250.400.14CORTE 312.130.250.400.21CORTE 512.340.250.400.23TOTAL6.60

4.02.02 Encofrado y desencofrado sobrecimientros-SEGN LA LONGITUDDescripcinN VECESL(M)L(PIES)ALTURAAREA (M2)Eje A-A tramo 1-223.611.100.402.8920.370.110.400.30Eje A-A tramo 2-322.010.610.401.61Eje A-A tramo 3-423.41861.040.402.73Eje A-A tramo 4-520.570.170.400.46Eje A-A tramo 5-623.4501.050.402.76Eje A-A tramo 6-723.5801.090.402.86Eje A'-A' tramo 4-520.800.240.400.6421.270.390.401.02Eje B-B tramo 3-422.920.890.402.34Eje B-B tramo 4-521.950.590.401.56Eje B'-B' tramo 3-422.260.690.401.8120.620.190.400.50Eje C-C tramo 3-421.280.390.401.0221.500.460.401.2020.310.090.400.2521.820.550.401.46Eje C-C tramo 4-520.710.220.400.57Eje D-D tramo 1-223.611.100.402.8920.250.080.400.2020.110.030.400.09Eje D-D tramo 2-6211.353.460.409.08Eje D-D tramo 6-723.581.090.402.86Eje 3-3 tramo A-B20.650.200.400.5222.420.740.401.94Eje 3-3 tramo B-C21.920.590.401.5421.000.300.400.80Eje 3-3 tramo B'-C21.500.460.401.20Eje 3'-3' tramo B'-C20.650.200.400.52Eje 4-4 tramo A-A'22.100.640.401.68Eje 4-4 tramo A'-B20.850.260.400.68Eje 4-4 tramo B-C22.550.780.402.04Eje 4-4 tramo C-D22.660.810.402.13Eje 5-5 tramo A-A'20.800.240.400.6421.200.370.400.96Eje 5-5 tramo A'-B20.980.300.400.78Eje 5-5 tramo B-B'21.560.480.401.25Eje 5-5 tramo B'-C20.760.230.400.61Eje 5-5 tramo C-D22.330.710.401.86CORTE 221.400.430.401.12CORTE 322.130.650.401.70CORTE 522.340.710.401.87TOTAL(M2)64.91TOTAL(PIE2)698.74 Encofrado y desencofrado sobrecimientros-SEGN EL ANCHODescripcinN VECESL(M)L(PIES)ALTURAAREA (M2)Eje A-A tramo 1-220.150.050.400.1220.150.050.400.12Eje A-A tramo 2-320.250.080.400.20Eje A-A tramo 3-420.250.080.400.20Eje A-A tramo 4-520.250.080.400.20Eje A-A tramo 5-620.250.080.400.20Eje A-A tramo 6-720.250.080.400.20Eje A'-A' tramo 4-520.250.080.400.2020.250.080.400.20Eje B-B tramo 3-420.150.050.400.12Eje B-B tramo 4-520.250.080.400.20Eje B'-B' tramo 3-420.150.050.400.1220.150.050.400.12Eje C-C tramo 3-420.150.050.400.1220.150.050.400.1220.150.050.400.1220.150.050.400.12Eje C-C tramo 4-520.150.050.400.12Eje D-D tramo 1-220.150.050.400.1220.150.050.400.1220.150.050.400.12Eje D-D tramo 2-620.250.080.400.20Eje D-D tramo 6-720.150.050.400.12Eje 3-3 tramo A-B20.250.080.400.2020.250.080.400.20Eje 3-3 tramo B-C20.250.080.400.2020.250.080.400.20Eje 3-3 tramo B'-C20.250.080.400.20Eje 3'-3' tramo B'-C20.250.080.400.20Eje 4-4 tramo A-A'20.150.050.400.12Eje 4-4 tramo A'-B20.150.050.400.12Eje 4-4 tramo B-C20.150.050.400.12Eje 4-4 tramo C-D20.150.050.400.12Eje 5-5 tramo A-A'20.250.080.400.2020.150.050.400.12Eje 5-5 tramo A'-B20.150.050.400.12Eje 5-5 tramo B-B'20.150.050.400.12Eje 5-5 tramo B'-C20.150.050.400.12Eje 5-5 tramo C-D20.150.050.400.12CORTE 220.250.080.400.20CORTE 320.250.080.400.20CORTE 520.250.080.400.20TOTAL6.56TOTAL(PIE2)70.614.03 Falso pisoe=0.1Descripcinrea (m2)CantidadZ (m)Vol. (m3)Terraza30.551.000.103.06gradas 1 (terraza)4.181.000.100.42gradas 2(patio)6.741.000.100.67area construida82.611.000.108.26baos1.991.000.100.20base escalera5.811.000.100.58patio52.551.000.105.26PARCIAL=12.61

TOTAL=13.87

4.03.01 De 4"5.00 OBRAS DE CONCRETO ARMADO
AFE: AFE:OBRAS DE CONCRETO ARMADO, FALTA PRESENTAR...

C Armado4.00.00 Obras de Concreto Armado4.01.00 Columnas4.01.01 ConcretoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Ancho (a) Prof (p)Primer PisoTipo C10.25253.3361.875m3Tipo C20.250.253.3173.506m3Tipo C3150.253.3112.37577.76m3

Segundo PisoTipo C10.25252.7350.625m3Tipo C20.250.252.7172.869TIPO C3150.252.7110.125TIPO C515252.733037.500TIPO C615152.71607.5003708.62m3

4.01.02 Encofrado y desencofrado columnas primer, segundo pisoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Prof (p)Primer PisoEje 2-2Tipo C10.25321.50m1Tipo C20.25321.50m2Eje 3-3Tipo C20.25343.00m2Eje 4-4Tipo C20.25343.00m2Eje 5-5Tipo C10.25310.75m2Tipo C20.25332.25m2Tipo C30.15310.45Eje 6-6Tipo C20.25343.00m2Sub Total15.450m2Segundo PisoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Prof (p)

Eje 2-2Tipo C1 0.252.721.35m2Eje DTipo C20.252.721.35m2Eje CEje 3-3Tipo C20.252.742.70m2Eje FEje 4-4Tipo C20.252.742.70m2Eje DTipo C60.152.710.41m2Eje CEje 5-5Tipo C1 0.252.710.68m2Eje FTipo C20.252.732.03m2Eje FTipo C30.152.710.41m2Eje 6-6Tipo C1 0.252.710.68m2Eje DSub Total12.285m2

4.02.01 Concreto en vigasDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Ancho (a) Prof (p)Primer PisoEje (A-A) Entre 2-45.440.200.2010.218m3Eje (A-A) Entre 5-64.000.250.2010.200m3Eje (B-B) Entre 2-32.200.250.2030.330m3Eje (B-B) Entre 3-69.870.250.2031.481m3Eje (2-2) Entre B-D6.430.250.2030.965m3Eje (5-5) Entre B-D6.430.250.2020.643m3Sub Total3.84m3Segundo PisoEje (A-A) Entre 2-45.440.200.201.000.22m3Eje (A-A) Entre 5-64.000.250.201.000.20m3Eje (B-B) Entre 2-32.200.250.203.000.33m3Eje (B-B) Entre 3-69.870.250.203.001.48m3Eje (2-2) Entre B-D6.430.250.203.000.96m3Eje (5-5) Entre B-D6.430.250.202.000.64Sub Total3.19m3

4.02.02 Encofrado y desencofrado vigasDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Prof (p)Primer PisoEje (A-A) Entre 2-45.440.200.2010.218m2Eje (A-A) Entre 5-64.000.250.2010.200m2Eje (B-B) Entre 2-32.200.250.2030.330m2Eje (B-B) Entre 3-69.870.250.2031.481m2Eje (2-2) Entre B-D6.430.250.2030.965m2Eje (5-5) Entre B-D6.430.250.2020.643m2Sub Total3.84m2

Segundo PisoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Prof (p)Eje (A-A) Entre 2-45.440.200.2011.088m2Eje (A-A) Entre 5-64.000.250.2010.800m2Eje (B-B) Entre 2-32.200.250.2031.320m2Eje (B-B) Entre 3-69.870.250.2035.922m2Eje (2-2) Entre B-D6.430.250.2033.858m2Eje (5-5) Entre B-D6.430.250.2022.572m2Sub Total15.56m2

4.03.00 Losa Aligerada4.03.01 ConcretoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesArea Espesor (e)Primer PisoPatio41.780.21.000m3Escalera4.50.21.000m3Cocina17.240.21.000m3Sala -Comedor31.500.21.000m3Tienda19.060.21.000m3Dormitorio11.440.21.000S.H2.700.21.000Corredor4.730.21.000m38.00m3

DescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesArea Espesor (e)Segundo pisoDormitorio 114.790.21.000m3Dormitorio 215.710.21.000m3Dormitorio 314.030.21.000m3Balcon3.660.21.000m3Bao5.910.21.000m3Corredor4.730.21.000m36.00m3

Anlisis del volumen a descontar ocupado por los ladrillos aligerantes

Para el calculo emplearemos ladrillo de C vibrado de 30*30*15cmel anlisis se efectua para 1 m2 de losa

1m28.33 ladrillosPara una losa de 0.20 m se tiene un volumen de concreto (m3/m2) :0.0875m3/m2

C de techoPisos0.0875 m3/m2Primer piso(m2)86.677.58Segundo piso(m2)58.835.15total12.73

4.03.02 Encofrado y desencofrado de losaDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesArea Espesor (e)Primer PisoPatio41.781.000m2Escalera4.51.000m2Cocina17.241.000m2Sala -Comedor31.501.000m2Tienda19.061.000m2Dormitorio11.441.000S.H2.701.000Corredor4.731.000m2132.95m2Segundo PisoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesArea Espesor (e)Primer PisoDormitorio 114.791.000m2Dormitorio 215.711.000m2Dormitorio 314.031.000m2Balcon3.661.000m2Bao5.911.000m2Corredor4.731.000m258.83m2

4.03.03 Ladrillos para techo# LadrillosPisos1m2=8.33Primer piso86.67722.00Segundo piso58.83491.00Total1213

4.04.00 Escalera4.04.01 ConcretoDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Ancho (a) Area Espesor (e)Primer PisoPrimer tramo0.902.0811.87m3Segundo tramo0.901.7711.59m3Sub Total3.465m3Segundo PisoPrimer tramo1.002.0812.08m3Segundo tramo1.001.7711.77m3Sub Total3.850m3Total7.315m34.04.02 Encofrado y desencofrado de escaleraDescripcinMedidasVecesrepiteParcial TotalUnidadObservacionesLongitud (l)Ancho (a) Area Espesor (e)Primer Piso y Segundo PisoPrimer tramo6.300.905.67211.34m2Segundo tramo5.420.904.8829.76m221.096m2

Acero4.01.03 Acero en ColumnasCroquisTipo ColumnaVeces Repite estructuraN piezas de aceroLongitudN TraslapesLongitudDimetro1/4''3/8''1/2''5/8''ObservacionesPrimer PisoC-1443.81/2''60.80C-14200.81/4''64.00C-2843.81/2''121.60C-282011/4''160.00C-3343.83/8''45.60C-332011/4''60.00SUB TOTAL28445.6182.400TOTAL (kg)71.025.5181.310.0Segundo PisoC-1443.51/2''56.00C-152011/4''100.00Gancho de 6,5 cmC-3883.51/2''224.00C-382011/4''160.00Gancho de 6,5 cmSUB TOTAL2600280.000mTOTAL (kg)65.00.0278.320.0Kg

4.02.03 Acero en VigasCroquisTipo VigaVeces Repite estructuraN piezas de aceroLongitudN TraslapesLongitudDimetro1/4''3/8''1/2''5/8''ObservacionesPrimer PisoVS14601/2''240.00VS4670.681/4''182.24VS14831/2"332.00VS5670.681/4''227.80VS14831/2''332.00VS5670.681/4''227.80VA14561/2''224.00VA4670.681/4''182.24VA14561/2''224.00VA1670.681/4''45.56VA1456.001/8''224VA1420.681/4''28.56VA-101346.251/2''75.00VA- 1013341.001/4''102.00SUB TOTAL996.2224.001427.000mTOTAL (kg)249.1125.441418.440.0KgSegundo PisoVS14601/2"240.00VS4670.681/4''182.24VS14831/2''332.00VS5670.681/4''227.80VS14831/2''332.00VS5670.681/4''227.80VA14561/2''224.00VA1670.681/4''45.56VA1456.001/2''224.00VA1420.681/4''28.56SUB TOTAL711.9601352.000mTOTAL (kg)178.00.001343.890.0Kg

4.03.04 Acero en losa PRIMER PISON DE VARILLASSECCION-TRAMOSN VIGUETASDESCRIPCIONCANTLONGLONG TOTAL3/81/2821.3321.282A

22.235.24

811.8514.82

911.3311.971

912.4522.052

912.4522.052

921.8533.34

810.735.841

TOTAL166.49414

4.03.04 Acero en losa SEGUNDO PISON DE VARILLASSECCION-TRAMOSN VIGUETASDESCRIPCIONCANTLONGLONG TOTAL3/81/2821.3321.282A

22.235.24

811.8514.82

911.3311.971

912.4522.052

912.4522.052

921.8533.34

810.735.841

TOTAL166.49414

TOTAL DE VARILLASDIAMETRON DE VARILLAS3/841/214

4.06.03 Acero en escaleraCroquisTramoVeces Repite estructuraN piezas de aceroLongitudN TraslapesLongitudDimetro1/4''3/8''1/2''5/8''Primer tramoI511.341/2''6.70I3010.953/8''28.50Segundo tramoII511.21/2''6.00II4110.953/8''38.95Tercer tramoIII511.851/2''9.25III1510.953/8''14.25SUB TOTAL081.7021.95TOTAL (kg) Primer Nivel0.0045.7521.82TOTAL (kg) Segundo Nivel0.0045.7521.82TOTAL (kg) En escalera 0.0091.5043.64