Curvas Fuller

Post on 30-Dec-2015

17 views 3 download

Transcript of Curvas Fuller

FULLER

Página 1

PORCENT. COMB. 50.0% 50.0% 0.0% 48.0% 52.0% 63.0% 0.0% 100.0% 37.0%

SUMA 100.0% TAMAÑO GRUPOS DE TAMAÑOS MEZCLA

MALLA DIAM. 2 1/2" 1 1/2" 3/4" 1/2" * 6-0 ** 6-0 GRUPOS

3 76.2 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

2 1/2 63.5 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

2 50.8 100.0 50.0 100.0 100.0 100.0 100.0 100.0 100.0

1 1/2 38.1 100.0 50.0 100.0 100.0 100.0 100.0 100.0 100.0

1 25.4 0.0 100.0 100.0 100.0 100.0 100.0 100.0

3/4 19.1 0.0 100.0 100.0 100.0 100.0 100.0 100.0

1/2 12.7 0.0 60.0 100.0 80.8 100.0 100.0 87.9

3/8 9.510 0.0 13.0 65.0 40.0 100.0 100.0 62.2

No. 4 4.760 0.0 20.0 10.4 96.9 96.9 42.4

No. 8 2.380 0.0 10.0 5.2 87.6 87.6 35.7

No. 16 1.190 0.0 0.0 69.5 69.5 25.7

No. 30 0.595 0.0 0.0 39.2 39.2 14.5

No. 50 0.297 0.0 0.0 16.4 16.4 6.1

No. 100 0.149 0.0 0.0 3.6 3.6 1.3

No. 200 0.074 0.0 1.0 1.3 1.2 1.8 1.8 1.4

TM 19.1-document.xls

PROYECTO HIDROELÉCTRICO MIEL ILABORATORIO DE MATERIALES

GRANULOMETRÍA POR MALLASAGREGADOS PARA CONCRETO - VERIFICACIÓN DE LAS ARENAS

FECHA MUESTRA LOCALIZAC. PROCEDENCIA DESCRIPCIÓN Gs ABSOR. MAT. ORG. < No. 200

12/16/1999 Planta Pionera Doña Juana Arena aluvial café claro. 1.4

FIGURA No. Planta Pionera Rezaga Tunel Triturado 3/4''

PESO UNIT. COMPACTO

MÓDULO DE FINURA

GsB:

PESO UNIT. SUELTO Gssss:

0.010 0.100 1.000 10.000 100.0000

10

20

30

40

50

60

70

80

90

100

DIAMETRO (mm)

PO

RC

EN

TA

JE Q

UE

PA

SA

No.

20

0

No.

10

0

No.

50

No.

30

No.

16

No.

4

3/8

"

1/2

"

1"

1 1

/2"

3/4

"

2"

2 1

/2"

3"

No.

8

GRADACION IDEAL FULLER PARA TM 3/4''

TM 19.1-document.xls

Planta Pionera Rezaga Tunel Triturado 1/2'' GsA:

TM 25.4-document.xls

PROYECTO HIDROELÉCTRICO MIEL ILABORATORIO DE MATERIALES

GRANULOMETRÍA POR MALLASAGREGADOS PARA CONCRETO - VERIFICACIÓN DE LAS ARENAS

FECHA MUESTRA LOCALIZAC. PROCEDENCIA DESCRIPCIÓN Gs ABSOR. MAT. ORG. < No. 200

4/19/2023 Planta Pionera Doña Juana Arena aluvial café claro. 1.4

FIGURA No. Planta Pionera Rezaga Tunel Triturado 3/4''

PESO UNIT. COMPACTO

MÓDULO DE FINURA

GsB:

PESO UNIT. SUELTO Gssss:

0.010 0.100 1.000 10.000 100.0000

10

20

30

40

50

60

70

80

90

100

DIAMETRO (mm)

PO

RC

EN

TA

JE Q

UE

PA

SA

No.

20

0

No.

10

0

No.

50

No.

30

No.

16

No.

4

3/8

"

1/2

"

1"

1 1

/2"

3/4

"

2"

2 1

/2"

3"

No.

8

GRADACION IDEAL FULLER TM 1''

TM 25.4-document.xls

Planta Pionera Rezaga Tunel Triturado 1/2'' GsA:

TM 38.1-document.xls

PROYECTO HIDROELÉCTRICO MIEL ILABORATORIO DE MATERIALES

GRANULOMETRÍA POR MALLASAGREGADOS PARA CONCRETO - VERIFICACIÓN DE LAS ARENAS

FECHA MUESTRA LOCALIZAC. PROCEDENCIA DESCRIPCIÓN Gs ABSOR. MAT. ORG. < No. 200

4/19/2023 Planta Pionera Doña Juana Arena aluvial café claro. 1.4

FIGURA No. Planta Pionera Rezaga Tunel Triturado 3/4''

PESO UNIT. COMPACTO

MÓDULO DE FINURA

GsB:

PESO UNIT. SUELTO Gssss:

0.010 0.100 1.000 10.000 100.0000

10

20

30

40

50

60

70

80

90

100

DIAMETRO (mm)

PO

RC

EN

TA

JE Q

UE

PA

SA

No.

20

0

No.

10

0

No.

50

No.

30

No.

16

No.

4

3/8

"

1/2

"

1"

1 1

/2"

3/4

"

2"

2 1

/2"

3"

No.

8

GRADACION IDEAL FULLER TM 1 1/2''

TM 38.1-document.xls

Planta Pionera Rezaga Tunel Triturado 1/2'' GsA:

TM 50.8-document.xls

PROYECTO HIDROELÉCTRICO MIEL ILABORATORIO DE MATERIALES

GRANULOMETRÍA POR MALLASAGREGADOS PARA CONCRETO - VERIFICACIÓN DE LAS ARENAS

FECHA MUESTRA LOCALIZAC. PROCEDENCIA DESCRIPCIÓN Gs ABSOR. MAT. ORG. < No. 200

4/19/2023 Planta Pionera Doña Juana Arena aluvial café claro. 1.4

FIGURA No. Planta Pionera Rezaga Tunel Triturado 3/4''

PESO UNIT. COMPACTO

MÓDULO DE FINURA

GsB:

PESO UNIT. SUELTO Gssss:

0.010 0.100 1.000 10.000 100.0000

10

20

30

40

50

60

70

80

90

100

DIAMETRO (mm)

PO

RC

EN

TA

JE Q

UE

PA

SA

No.

20

0

No.

10

0

No.

50

No.

30

No.

16

No.

4

3/8

"

1/2

"

1"

1 1

/2"

3/4

"

2"

2 1

/2"

3"

No.

8

GRADACION IDEAL FULLER TM 2''

TM 50.8-document.xls

Planta Pionera Rezaga Tunel Triturado 1/2'' GsA:

TM 76.1-document.xls

PROYECTO HIDROELÉCTRICO MIEL ILABORATORIO DE MATERIALES

GRANULOMETRÍA POR MALLASAGREGADOS PARA CONCRETO - VERIFICACIÓN DE LAS ARENAS

FECHA MUESTRA LOCALIZAC. PROCEDENCIA DESCRIPCIÓN Gs ABSOR. MAT. ORG. < No. 200

4/19/2023 Planta Pionera Doña Juana Arena aluvial café claro. 1.4

FIGURA No. Planta Pionera Rezaga Tunel Triturado 3/4''

PESO UNIT. COMPACTO

MÓDULO DE FINURA

GsB:

PESO UNIT. SUELTO Gssss:

0.010 0.100 1.000 10.000 100.0000

10

20

30

40

50

60

70

80

90

100

DIAMETRO (mm)

PO

RC

EN

TA

JE Q

UE

PA

SA

No.

20

0

No.

10

0

No.

50

No.

30

No.

16

No.

4

3/8

"

1/2

"

1"

1 1

/2"

3/4

"

2"

2 1

/2"

3"

No.

8

GRADACION IDEAL FULLER TM 3''

TM 76.1-document.xls

Planta Pionera Rezaga Tunel Triturado 1/2'' GsA:

Limites-Marcas

Página 12

TAMAÑOMALLA DIAM.

3 76.22 1/2 63.52 50.81 1/2 38.11 25.4 3/4 19.05 1/2 12.7 3/8 9.530No. 4 4.750No. 8 2.380No. 16 1.211No. 30 0.582No. 50 0.300No. 100 0.150No. 200 0.074