Calendario Valorizado Proyectad

Calendario Valorizado de Avance de ObraObra: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATO13 de febreroUbicacion: CHARACATO - AREQUIPA - AREQUIPACosto A: Ago - 2014Cliente: MUNICIPALIDAD DISTRITAL DE CHARACATOPLAZO DE EJECUCIONItemDescripcionUnidMetradoPrecioUnitarioParcial16 Dias 30 Dias 14 DiasTOTAL60 DiasMIRADOR 01SEGURIDAD Y SALUD EN OBRA 01.01S.C. PLAN DE SEGURIDAD Y SUPERVISION DE OBRAMES2.00250.00500.00142.50250.00107.50500.00 01.02EQUIPOS DE PROTECCION COLECTIVAGLB1.001,395.701,395.70837.42418.71139.571,395.70 01.03EQUIPOS DE PROTECCION INDIVIDUALUND20.00199.593,991.801,995.901,397.13598.773,991.80 02OBRAS PROVISIONALES0.0 02.01CASETA DE ALMACEN, GUARDIANIA Y OFICINASM215.00112.851,692.751,692.751,692.75 02.02CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACINPZA1.00897.47897.47897.47897.47 02.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALESDIA15.00116.881,753.20701.28876.60175.321,753.20 03OBRAS PRELIMINARES0.0 03.01TRAZO Y REPLANTEO PRELIMINARM2572.521.63933.21933.210.0933.21 03.02LIMPIEZA DE TERRENO MANUALM2572.520.83475.19475.190.0475.19 03.03ELIMINACION DE MATERIAL EXCEDENTEM3108.4014.471,568.551,568.550.01,568.55 04MOVIMIENTO DE TIERRAS0.0 04.01EXPLANACIONES0.0 04.01.01ESCARIFICADO h=30 cmM2194.623.71722.04722.04722.04 04.01.02COMPACTADO C/PLANCHAM2194.621.43278.31278.31278.31 04.02RELLENO CON MATERIAL DE PRESTAMO0.0 04.02.01BASE COMPACTADA DE h= 20 cm PARA CALZADASM2101.5219.281,957.311,304.87652.441,957.31 04.02.02COLOCACION DE CAMA DE ARENA H=0.05 mM2110.752.49275.77275.77275.77 04.03EXCAVACIONES MASIVAS0.0 04.03.01EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL SECOM348.4231.801,539.76769.88769.881,539.76 04.03.02RELLENO COMPACTADO C/EQUIPO MAT/PROPIOM345.9016.20743.58520.51223.07743.58 05OBRAS DE CONCRETO SIMPLE0.0 05.01MUROS DE CONTENC, CONCRETO 175 kg/cm2 + 30% P.M. 4"M356.31324.9518,297.9318,297.9318,297.93 05.02MUROS DE CONTENCION, ENCOF. Y DESENCOFRADO.M2207.9754.1311,257.4211,257.4211,257.42 05.03VEREDA CONCRETO 175 kg/cm2 e=4" ACABADO PULIDO 1:2M2148.4047.177,000.035,600.021,400.017,000.03 05.04VEREDA, ENCOFRADO Y DESENCOFRADO H=0.3 mM5.6533.02186.56149.2537.31186.56 05.05CIMIENTOS CORRIDOS 1:10+30% P.G.M324.14184.754,459.87445.994,013.884,459.87 05.06SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. (1P)M35.61245.811,378.991,378.991,378.99 05.07SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADOM286.3227.092,338.412,338.412,338.41 06OBRAS DE CONCRETO ARMADO0.0 06.01COLUMNAS, ENCOFRADO Y DESENCOFRADOM237.2053.671,996.521,996.521,996.52 06.02COLUMNAS, CONCRETO 175 KG/CM2M32.79405.161,130.401,130.401,130.40 06.03COLUMNAS, ACERO fy=4200 kg/cm2KG280.675.421,521.231,521.231,521.23 07REVOQUES ENLUCIDOS Y MOLDURAS0.0 07.01TARRAJEO EN MURO: EXTERIORESM2192.4820.703,984.342,988.26996.093,984.34 07.02REVESTIMIENTO EN SILLARM242.4365.232,767.711,107.081,660.632,767.71 07.03MOLDURA EN SILLAR PARA BASEM43.60110.414,813.884,813.884,813.88 07.04MOLDURA EN SILLAR PARA CABECERAM35.20114.654,035.684,035.684,035.68 08PISOS Y PAVIMENTOS0.0 08.01PISO ADOQUIN DE CONCRETO0.0 08.01.01CALZADA DE ADOQUIN DE CONCRETOM292.9751.444,782.383,825.90956.484,782.38 08.01.02SELLADO DE JUNTASM292.974.06377.46377.45377.45 08.02PISO-LAJA CORTE REGULAR0.0 08.02.01PISO PIEDRA TALAMOLLE REGULAR ARENADO FORMATO 0.30 X 0.30 mM252.24107.675,624.683,374.812,249.875,624.68 08.02.02PISO PIEDRA TALAMOLLE NATURAL FORMATO 0.10 X 0.25M295.98187.0917,956.9014,365.523,591.3817,956.90 08.03BERMA0.0 08.03.01BERMA DE BLOCK GRASSM245.3428.651,298.99259.801,039.191,298.99 09PINTURA0.0 09.01PINTURA LATEX EN MUROS INTERIOR Y EXTERIORM277.2010.55814.46814.46814.46 10CARPINTERIA DE MADERA0.0 10.01PERGOLA DE MADERAUND1.003,060.323,060.323,060.323,060.32 11CARPINTERIA METALICA0.0 11.01BANCA METALICA ORNAMENTALUND4.00730.002,920.002,920.002,920.00 11.02POSTE METALICO ORNAMENTAL H=3.25UND6.00550.003,300.003,300.003,300.00 11.03BASURERO METALICOUND2.00180.00360.00360.00360.00 11.04BARANDAS METALICAS EN TUBO NEGRO DE 2" Y TUBO METALICO DE 5/8" X 1.5mm (TIPO ORNAMENTAL)M41.1979.223,263.073,263.073,263.07 12TRATAMIENTO DE AREAS VERDES0.0 12.01RELLENO CON TIERRA DE CHACRAM310.84144.271,563.891,563.891,563.89 12.02NIVELACION INTERIOR Y APISONADO C/EQUIPOM2108.363.55384.68384.68384.68 12.03SEMBRADO DE GRASS (AMERCICANO) EN BLOQUES DE 0.50 * 0.50 cmM2108.365.53599.23599.23599.23 12.04SEMBRADO DE PLANTONES DE ARBOLES h=1.50UND11.00100.281,103.081,103.081,103.08 12.05SEMBRADO DE FLORESUND750.005.153,862.503,862.503,862.50 13INSTALACIONES ELECTRICAS0.0 13.01CABLEADO SUBTERRANEO0.0 13.01.01EXCAVACION MANUALM36.2725.43159.4579.7379.73159.45 13.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M31.3311.90372.83111.85260.98372.83 13.01.03POZO DE TIERRAUND1.001,835.681,835.680.01,835.681,835.68 13.01.04CONDUCTOR NYY 6mm2 ALUMBRADOM49.3311.51567.79567.79567.79 13.02ACCESORIOS Y ARTEFACTOS0.0 13.02.01SUMINISTRO E INSTALACION DE LUMINARIA de 1x70 A.F. JOSFELUND12.00326.903,922.803,922.803,922.80 13.02.02TABLERO GENERAL TG 2-3x150A, 1-2x20 AUND1.00388.89388.89388.89388.89 14SISTEMA DE RIEGO0.0 14.01CANALIZACIONES Y/O TUBERIAS0.0 14.01.01EXCAVACION MANUALM36.7425.43171.4051.42119.98171.40 14.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M33.7011.90401.0380.21320.82401.03 14.01.03TUBERIA PVC CLASE 10 - 1/2"M33.7012.46419.90104.98314.93419.90 14.02ARTEFACTOS Y ACCESORIOS0.0 14.02.01LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJUELA CONCRETO f'c 140 S/DPZA4.00133.72534.88534.88534.88 14.02.02MEDIDOR DE AGUA DE 3/4"PZA1.00739.63739.63739.63739.63 15VARIOS0.0 15.01SERVICIO DE MEDIDOR DE AGUAUND1.00320.00320.00320.00320.00 15.02SERVICIO DE MEDIDOR DE LUZUND1.00487.79487.79487.79487.79 15.03PRUEBA HIDRAULICA RED DE AGUAM36.728.59315.42315.42315.42 15.04PRUEBA DE DENSIDAD DE CAMPOUND5.0055.00275.00275.00275.00 15.05PRUEBA DE CALIDAD DEL CONCRETOUND20.0024.94498.8099.76399.04498.80 15.06LIMPIEZA FINAL EN OBRAM2542.071.32715.53715.53715.53 15.07JUNTA CON SELLO ASFALTICOM47.046.10286.94286.94286.94 15.08TRASLADO DE POSTES DE ALUMBRADOUND4.001,145.974,583.884,583.884,583.88COSTO DIRECTO152,162.8917,380.0993,413.6441,369.16152,162.89GASTOS GENERALES8 %12,173.031,390.417,473.093,309.5312,173.03UTILIDAD10 %15,216.291,738.019,341.364,136.9215,216.29SUB TOTAL179,552.2120,508.51110,228.0948,815.61179,552.21IGV.18 %32,319.403,691.5319,841.068,786.8132,319.40PRESUPUESTO TOTAL211,871.6124,200.04130,069.1557,602.42211,871.61TOTAL ACUMULADO24,200.04154,269.19211,871.61PORCENTAJE DE AVANCE11.42% 61.39% 27.19% PORCENTAJE ACUMULADO11.42% 72.81% 100.00%

&"Times New Roman,Negrita Cursiva"&8Pgina &P de &N

Valorizacion de Obra 01

CALENDARIO VALORIZADO DE AVANCE DE OBRA

Obra: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATOUbicacion: CHARACATO - AREQUIPA - AREQUIPACosto A: Ago - 2014Cliente: MUNICIPALIDAD DISTRITAL DE CHARACATOInicio de Obra: 13 de Febrero

ITEM DESCRIPCIONUNDPRESUPUESTO PROGRAMADOANTERIORACTUALACUMULADOSALDOMetradoP.U. S/.Parcial S/.MetradoValorizado S/.%MetradoValorizado S/.%MetradoValorizado S/.%MetradoValorizado S/.% 01SEGURIDAD Y SALUD EN OBRA 01.01S.C. PLAN DE SEGURIDAD Y SUPERVISION DE OBRAMES2.00250.00500.000.000.000.00%0.50125.0025.00%0.50125.0025.00%1.50375.0075.00% 01.02EQUIPOS DE PROTECCION COLECTIVAGLB1.001,395.701,395.700.000.000.00%1.001,395.70100.00%1.001,395.70100.00%0.000.000.00% 01.03EQUIPOS DE PROTECCION INDIVIDUALUND20.00199.593,991.800.000.000.00%18.003,592.6290.00%18.003,592.6290.00%2.00399.1810.00% 02OBRAS PROVISIONALES 02.01CASETA DE ALMACEN, GUARDIANIA Y OFICINASM215.00112.851,692.750.000.000.00%15.001,692.75100.00%15.001,692.75100.00%0.000.000.00% 02.02CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACINPZA1.00897.47897.470.000.000.00%1.00897.47100.00%1.00897.47100.00%0.000.000.00% 02.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALESDIA15.00116.881,753.200.000.000.00%11.001,285.6873.33%11.001,285.6873.33%4.00467.5226.67% 03OBRAS PRELIMINARES0.00 03.01TRAZO Y REPLANTEO PRELIMINARM2572.521.63933.210.000.000.00%572.52933.21100.00%572.52933.21100.00%0.000.000.00% 03.02LIMPIEZA DE TERRENO MANUALM2572.520.83475.190.000.000.00%572.52475.19100.00%572.52475.19100.00%0.000.000.00% 03.03ELIMINACION DE MATERIAL EXCEDENTEM3108.4014.471,568.550.000.000.00%108.401,568.55100.00%108.401,568.55100.00%0.000.000.00% 04MOVIMIENTO DE TIERRAS 04.01EXPLANACIONES 04.01.01ESCARIFICADO h=30 cmM2194.623.71722.040.000.000.00%194.62722.04100.00%194.62722.04100.00%0.000.000.00% 04.01.02COMPACTADO C/PLANCHAM2194.621.43278.310.000.000.00%194.62278.31100.00%194.62278.31100.00%0.000.000.00% 04.02RELLENO CON MATERIAL DE PRESTAMO 04.02.01BASE COMPACTADA DE h= 20 cm PARA CALZADASM2101.5219.281,957.310.000.000.00%20.45394.2820.14%20.45394.2820.14%81.071,563.0379.86% 04.02.02COLOCACION DE CAMA DE ARENA H=0.05 mM2110.752.49275.770.000.000.00%20.0049.8018.06%20.0049.8018.06%90.75225.9781.94% 04.03EXCAVACIONES MASIVAS 04.03.01EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL SECOM348.4231.801,539.760.000.000.00%48.421,539.76100.00%48.421,539.76100.00%0.000.000.00% 04.03.02RELLENO COMPACTADO C/EQUIPO MAT/PROPIOM345.9016.20743.580.000.000.00%45.90743.58100.00%45.90743.58100.00%0.000.000.00% 05OBRAS DE CONCRETO SIMPLE 05.01MUROS DE CONTENC, CONCRETO 175 kg/cm2 + 30% P.M. 4"M356.31324.9518,297.930.000.000.00%21.156,872.6937.56%21.156,872.6937.56%35.1611,425.2462.44% 05.02MUROS DE CONTENCION, ENCOF. Y DESENCOFRADO.M2207.9754.1311,257.420.000.000.00%80.454,354.7638.68%80.454,354.7638.68%127.526,902.6661.32% 05.03VEREDA CONCRETO 175 kg/cm2 e=4" ACABADO PULIDO 1:2M2148.4047.177,000.030.000.000.00%0.000.000.00%0.000.000.00%148.407,000.03100.00% 05.04VEREDA, ENCOFRADO Y DESENCOFRADO H=0.3 mM5.6533.02186.560.000.000.00%0.000.000.00%0.000.000.00%5.65186.56100.00% 05.05CIMIENTOS CORRIDOS 1:10+30% P.G.M324.14184.754,459.870.000.000.00%8.451,561.1435.00%8.451,561.1435.00%15.692,898.7365.00% 05.06SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. (1P)M35.61245.811,378.990.000.000.00%1.85454.7532.98%1.85454.7532.98%3.76924.2567.02% 05.07SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADOM286.3227.092,338.410.000.000.00%29.68804.0334.38%29.68804.0334.38%56.641,534.3865.62% 06OBRAS DE CONCRETO ARMADO 06.01COLUMNAS, ENCOFRADO Y DESENCOFRADOM237.2053.671,996.520.000.000.00%12.52671.9533.66%12.52671.9533.66%24.681,324.5866.34% 06.02COLUMNAS, CONCRETO 175 KG/CM2M32.79405.161,130.400.000.000.00%0.87352.4931.18%0.87352.4931.18%1.92777.9168.82% 06.03COLUMNAS, ACERO fy=4200 kg/cm2KG280.675.421,521.230.000.000.00%165.78898.5359.07%165.78898.5359.07%114.89622.7040.93% 07REVOQUES ENLUCIDOS Y MOLDURAS 07.01TARRAJEO EN MURO: EXTERIORESM2192.4820.703,984.340.000.000.00%0.000.000.00%0.000.000.00%192.483,984.34100.00% 07.02REVESTIMIENTO EN SILLARM242.4365.232,767.710.000.000.00%0.000.000.00%0.000.000.00%42.432,767.71100.00% 07.03MOLDURA EN SILLAR PARA BASEM43.60110.414,813.880.000.000.00%0.000.000.00%0.000.000.00%43.604,813.88100.00% 07.04MOLDURA EN SILLAR PARA CABECERAM35.20114.654,035.680.000.000.00%0.000.000.00%0.000.000.00%35.204,035.68100.00% 08PISOS Y PAVIMENTOS 08.01PISO ADOQUIN DE CONCRETO 08.01.01CALZADA DE ADOQUIN DE CONCRETOM292.9751.444,782.380.000.000.00%0.000.000.00%0.000.000.00%92.974,782.38100.00% 08.01.02SELLADO DE JUNTASM292.974.06377.460.000.000.00%0.000.000.00%0.000.000.00%92.97377.46100.00% 08.02PISO-LAJA CORTE REGULAR 08.02.01PISO PIEDRA TALAMOLLE REGULAR ARENADO FORMATO 0.30 X 0.30 mM252.24107.675,624.680.000.000.00%0.000.000.00%0.000.000.00%52.245,624.68100.00% 08.02.02PISO PIEDRA TALAMOLLE NATURAL FORMATO 0.10 X 0.25M295.98187.0917,956.900.000.000.00%0.000.000.00%0.000.000.00%95.9817,956.90100.00% 08.03BERMA 08.03.01BERMA DE BLOCK GRASSM245.3428.651,298.990.000.000.00%0.000.000.00%0.000.000.00%45.341,298.99100.00% 09PINTURA 09.01PINTURA LATEX EN MUROS INTERIOR Y EXTERIORM277.2010.55814.460.000.000.00%0.000.000.00%0.000.000.00%77.20814.46100.00% 10CARPINTERIA DE MADERA 10.01PERGOLA DE MADERAUND1.003,060.323,060.320.000.000.00%0.000.000.00%0.000.000.00%1.003,060.32100.00% 11CARPINTERIA METALICA 11.01BANCA METALICA ORNAMENTALUND4.00730.002,920.000.000.000.00%0.000.000.00%0.000.000.00%4.002,920.00100.00% 11.02POSTE METALICO ORNAMENTAL H=3.25UND6.00550.003,300.000.000.000.00%0.000.000.00%0.000.000.00%6.003,300.00100.00% 11.03BASURERO METALICOUND2.00180.00360.000.000.000.00%0.000.000.00%0.000.000.00%2.00360.00100.00% 11.04BARANDAS METALICAS EN TUBO NEGRO DE 2" Y TUBO METALICO DE 5/8" X 1.5mm (TIPO ORNAMENTAL)M41.1979.223,263.070.000.000.00%0.000.000.00%0.000.000.00%41.193,263.07100.00% 12TRATAMIENTO DE AREAS VERDES 12.01RELLENO CON TIERRA DE CHACRAM310.84144.271,563.890.000.000.00%1.10158.7010.15%1.10158.7010.15%9.741,405.1989.85% 12.02NIVELACION INTERIOR Y APISONADO C/EQUIPOM2108.363.55384.680.000.000.00%0.000.000.00%0.000.000.00%108.36384.68100.00% 12.03SEMBRADO DE GRASS (AMERCICANO) EN BLOQUES DE 0.50 * 0.50 cmM2108.365.53599.230.000.000.00%0.000.000.00%0.000.000.00%108.36599.23100.00% 12.04SEMBRADO DE PLANTONES DE ARBOLES h=1.50UND11.00100.281,103.080.000.000.00%0.000.000.00%0.000.000.00%11.001,103.08100.00% 12.05SEMBRADO DE FLORESUND750.005.153,862.500.000.000.00%0.000.000.00%0.000.000.00%750.003,862.50100.00% 13INSTALACIONES ELECTRICAS 13.01CABLEADO SUBTERRANEO 13.01.01EXCAVACION MANUALM36.2725.43159.450.000.000.00%6.27159.45100.00%6.27159.45100.00%0.000.000.00% 13.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M31.3311.90372.830.000.000.00%31.33372.83100.00%31.33372.83100.00%0.000.000.00% 13.01.03POZO DE TIERRAUND1.001,835.681,835.680.000.000.00%0.000.000.00%0.000.000.00%1.001,835.68100.00% 13.01.04CONDUCTOR NYY 6mm2 ALUMBRADOM49.3311.51567.790.000.000.00%0.000.000.00%0.000.000.00%49.33567.79100.00% 13.02ACCESORIOS Y ARTEFACTOS 13.02.01SUMINISTRO E INSTALACION DE LUMINARIA de 1x70 A.F. JOSFELUND12.00326.903,922.800.000.000.00%0.000.000.00%0.000.000.00%12.003,922.80100.00% 13.02.02TABLERO GENERAL TG 2-3x150A, 1-2x20 AUND1.00388.89388.890.000.000.00%0.000.000.00%0.000.000.00%1.00388.89100.00% 14SISTEMA DE RIEGO 14.01CANALIZACIONES Y/O TUBERIAS 14.01.01EXCAVACION MANUALM36.7425.43171.400.000.000.00%3.5089.0151.93%3.5089.0151.93%3.2482.3948.07% 14.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M33.7011.90401.030.000.000.00%8.45100.5625.08%8.45100.5625.07%25.25300.4874.93% 14.01.03TUBERIA PVC CLASE 10 - 1/2"M33.7012.46419.900.000.000.00%11.42142.2933.89%11.42142.2933.89%22.28277.6166.11% 14.02ARTEFACTOS Y ACCESORIOS 14.02.01LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJUELA CONCRETO f'c 140 S/DPZA4.00133.72534.880.000.000.00%0.000.000.00%0.000.000.00%4.00534.88100.00% 14.02.02MEDIDOR DE AGUA DE 3/4"PZA1.00739.63739.630.000.000.00%0.000.000.00%0.000.000.00%1.00739.63100.00% 15VARIOS 15.01SERVICIO DE MEDIDOR DE AGUAUND1.00320.00320.000.000.000.00%1.00320.00100.00%1.00320.00100.00%0.000.000.00% 15.02SERVICIO DE MEDIDOR DE LUZUND1.00487.79487.790.000.000.00%1.00487.79100.00%1.00487.79100.00%0.000.000.00% 15.03PRUEBA HIDRAULICA RED DE AGUAM36.728.59315.420.000.000.00%0.000.000.00%0.000.000.00%36.72315.42100.00% 15.04PRUEBA DE DENSIDAD DE CAMPOUND5.0055.00275.000.000.000.00%0.000.000.00%0.000.000.00%5.00275.00100.00% 15.05PRUEBA DE CALIDAD DEL CONCRETOUND20.0024.94498.800.000.000.00%0.000.000.00%0.000.000.00%20.00498.80100.00% 15.06LIMPIEZA FINAL EN OBRAM2542.071.32715.530.000.000.00%0.000.000.00%0.000.000.00%542.07715.53100.00% 15.07JUNTA CON SELLO ASFALTICOM47.046.10286.940.000.000.00%0.000.000.00%0.000.000.00%47.04286.94100.00% 15.08TRASLADO DE POSTES DE ALUMBRADOUND4.001,145.974,583.880.000.000.00%4.004,583.88100.00%4.004,583.88100.00%0.000.000.00%COSTO DIRECTO152,162.890.0038,078.7938,078.75114,084.13GASTOS GENERALES8%12,173.030.003,046.303,046.309,126.73UTILIDAD10%15,216.290.003,807.883,807.8811,408.41SUB TOTAL179,552.210.0044,932.9744,932.93134,619.27IGV.18%32,319.400.008,087.938,087.9324,231.47PRESUPUESTO TOTAL211,871.610.0053,020.9153,020.86158,850.74TOTAL ACUMULADOPORCENTAJE DE AVANCE0.00%25.03%25.02%74.98%PORCENTAJE ACUMULADO0.00%25.03%25.02%74.98%

Valorizacion de Obra 02

CALENDARIO VALORIZADO DE AVANCE DE OBRA

Obra: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATOUbicacion: CHARACATO - AREQUIPA - AREQUIPACosto A: Ago - 2014Cliente: MUNICIPALIDAD DISTRITAL DE CHARACATOInicio de Obra: 13 de Febrero

ITEM DESCRIPCIONUNDPRESUPUESTO PROGRAMADOANTERIORACTUALACUMULADOSALDOMetradoP.U. S/.Parcial S/.MetradoValorizado S/.%MetradoValorizado S/.%MetradoValorizado S/.%MetradoValorizado S/.% 01SEGURIDAD Y SALUD EN OBRA 01.01S.C. PLAN DE SEGURIDAD Y SUPERVISION DE OBRAMES2.00250.00500.000.50125.0025.00%1.00250.0050.00%1.50375.0075.00%0.50125.0025.00% 01.02EQUIPOS DE PROTECCION COLECTIVAGLB1.001,395.701,395.701.001,395.70100.00%0.000.000.00%1.001,395.70100.00%0.000.000.00% 01.03EQUIPOS DE PROTECCION INDIVIDUALUND20.00199.593,991.8018.003,592.6290.00%2.00399.1810.00%20.003,991.80100.00%0.000.000.00% 02OBRAS PROVISIONALES 02.01CASETA DE ALMACEN, GUARDIANIA Y OFICINASM215.00112.851,692.7515.001,692.75100.00%0.000.000.00%15.001,692.75100.00%0.000.000.00% 02.02CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACINPZA1.00897.47897.471.00897.47100.00%0.000.000.00%1.00897.47100.00%0.000.000.00% 02.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALESDIA15.00116.881,753.2011.001,285.6873.33%0.000.000.00%11.001,285.6873.33%4.00467.5226.67% 03OBRAS PRELIMINARES0.00 03.01TRAZO Y REPLANTEO PRELIMINARM2572.521.63933.21572.52933.21100.00%0.000.000.00%572.52933.21100.00%0.000.000.00% 03.02LIMPIEZA DE TERRENO MANUALM2572.520.83475.19572.52475.19100.00%0.000.000.00%572.52475.19100.00%0.000.000.00% 03.03ELIMINACION DE MATERIAL EXCEDENTEM3108.4014.471,568.55108.401,568.55100.00%0.000.000.00%108.401,568.55100.00%0.000.000.00% 04MOVIMIENTO DE TIERRAS 04.01EXPLANACIONES 04.01.01ESCARIFICADO h=30 cmM2194.623.71722.04194.62722.04100.00%0.000.000.00%194.62722.04100.00%0.000.000.00% 04.01.02COMPACTADO C/PLANCHAM2194.621.43278.31194.62278.31100.00%0.000.000.00%194.62278.31100.00%0.000.000.00% 04.02RELLENO CON MATERIAL DE PRESTAMO 04.02.01BASE COMPACTADA DE h= 20 cm PARA CALZADASM2101.5219.281,957.3120.45394.2820.14%81.071,563.0379.86%101.521,957.31100.00%0.000.000.00% 04.02.02COLOCACION DE CAMA DE ARENA H=0.05 mM2110.752.49275.7720.0049.8018.06%90.75225.9781.94%110.75275.77100.00%0.000.000.00% 04.03EXCAVACIONES MASIVAS 04.03.01EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL SECOM348.4231.801,539.7648.421,539.76100.00%0.000.000.00%48.421,539.76100.00%0.000.000.00% 04.03.02RELLENO COMPACTADO C/EQUIPO MAT/PROPIOM345.9016.20743.5845.90743.58100.00%0.000.000.00%45.90743.58100.00%0.000.000.00% 05OBRAS DE CONCRETO SIMPLE 05.01MUROS DE CONTENC, CONCRETO 175 kg/cm2 + 30% P.M. 4"M356.31324.9518,297.9321.156,872.6937.56%35.1611,425.2462.44%56.3118,297.93100.00%0.000.000.00% 05.02MUROS DE CONTENCION, ENCOF. Y DESENCOFRADO.M2207.9754.1311,257.4280.454,354.7638.68%127.526,902.6661.32%207.9711,257.42100.00%0.000.000.00% 05.03VEREDA CONCRETO 175 kg/cm2 e=4" ACABADO PULIDO 1:2M2148.4047.177,000.030.000.000.00%112.565,309.4675.85%112.565,309.4675.85%35.841,690.5724.15% 05.04VEREDA, ENCOFRADO Y DESENCOFRADO H=0.3 mM5.6533.02186.560.000.000.00%4.35143.6476.99%4.35143.6476.99%1.3042.9323.01% 05.05CIMIENTOS CORRIDOS 1:10+30% P.G.M324.14184.754,459.878.451,561.1435.00%15.692,898.7365.00%24.144,459.87100.00%0.000.000.00% 05.06SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. (1P)M35.61245.811,378.991.85454.7532.98%3.76924.2567.02%5.611,378.99100.00%0.000.000.00% 05.07SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADOM286.3227.092,338.4129.68804.0334.38%56.641,534.3865.62%86.322,338.41100.00%0.000.000.00% 06OBRAS DE CONCRETO ARMADO 06.01COLUMNAS, ENCOFRADO Y DESENCOFRADOM237.2053.671,996.5212.52671.9533.66%24.681,324.5866.34%37.201,996.52100.00%0.000.000.00% 06.02COLUMNAS, CONCRETO 175 KG/CM2M32.79405.161,130.400.87352.4931.18%1.92777.9168.82%2.791,130.40100.00%0.000.000.00% 06.03COLUMNAS, ACERO fy=4200 kg/cm2KG280.675.421,521.23165.78898.5359.07%114.89622.7040.93%280.671,521.23100.00%0.000.000.00% 07REVOQUES ENLUCIDOS Y MOLDURAS 07.01TARRAJEO EN MURO: EXTERIORESM2192.4820.703,984.340.000.000.00%165.563,427.0986.01%165.563,427.0986.01%26.92557.2413.99% 07.02REVESTIMIENTO EN SILLARM242.4365.232,767.710.000.000.00%35.682,327.4184.09%35.682,327.4184.09%6.75440.3015.91% 07.03MOLDURA EN SILLAR PARA BASEM43.60110.414,813.880.000.000.00%35.503,919.5681.42%35.503,919.5681.42%8.10894.3218.58% 07.04MOLDURA EN SILLAR PARA CABECERAM35.20114.654,035.680.000.000.00%28.403,256.0680.68%28.403,256.0680.68%6.80779.6219.32% 08PISOS Y PAVIMENTOS 08.01PISO ADOQUIN DE CONCRETO 08.01.01CALZADA DE ADOQUIN DE CONCRETOM292.9751.444,782.380.000.000.00%40.562,086.4143.63%40.562,086.4143.63%52.412,695.9756.37% 08.01.02SELLADO DE JUNTASM292.974.06377.460.000.000.00%0.000.000.00%0.000.000.00%92.97377.46100.00% 08.02PISO-LAJA CORTE REGULAR 08.02.01PISO PIEDRA TALAMOLLE REGULAR ARENADO FORMATO 0.30 X 0.30 mM252.24107.675,624.680.000.000.00%22.452,417.1942.97%22.452,417.1942.97%29.793,207.4957.03% 08.02.02PISO PIEDRA TALAMOLLE NATURAL FORMATO 0.10 X 0.25M295.98187.0917,956.900.000.000.00%40.067,494.8341.74%40.067,494.8341.74%55.9210,462.0758.26% 08.03BERMA 08.03.01BERMA DE BLOCK GRASSM245.3428.651,298.990.000.000.00%7.56216.5916.67%7.56216.5916.67%37.781,082.4083.33% 09PINTURA 09.01PINTURA LATEX EN MUROS INTERIOR Y EXTERIORM277.2010.55814.460.000.000.00%0.000.000.00%0.000.000.00%77.20814.46100.00% 10CARPINTERIA DE MADERA 10.01PERGOLA DE MADERAUND1.003,060.323,060.320.000.000.00%0.000.000.00%0.000.000.00%1.003,060.32100.00% 11CARPINTERIA METALICA 11.01BANCA METALICA ORNAMENTALUND4.00730.002,920.000.000.000.00%0.000.000.00%0.000.000.00%4.002,920.00100.00% 11.02POSTE METALICO ORNAMENTAL H=3.25UND6.00550.003,300.000.000.000.00%6.003,300.00100.00%6.003,300.00100.00%0.000.000.00% 11.03BASURERO METALICOUND2.00180.00360.000.000.000.00%0.000.000.00%0.000.000.00%2.00360.00100.00% 11.04BARANDAS METALICAS EN TUBO NEGRO DE 2" Y TUBO METALICO DE 5/8" X 1.5mm (TIPO ORNAMENTAL)M41.1979.223,263.070.000.000.00%41.193,263.07100.00%41.193,263.07100.00%0.000.000.00% 12TRATAMIENTO DE AREAS VERDES 12.01RELLENO CON TIERRA DE CHACRAM310.84144.271,563.891.10158.7010.15%9.741,405.1989.85%10.841,563.89100.00%0.000.000.00% 12.02NIVELACION INTERIOR Y APISONADO C/EQUIPOM2108.363.55384.680.000.000.00%108.36384.68100.00%108.36384.68100.00%0.000.000.00% 12.03SEMBRADO DE GRASS (AMERCICANO) EN BLOQUES DE 0.50 * 0.50 cmM2108.365.53599.230.000.000.00%0.000.000.00%0.000.000.00%108.36599.23100.00% 12.04SEMBRADO DE PLANTONES DE ARBOLES h=1.50UND11.00100.281,103.080.000.000.00%11.001,103.08100.00%11.001,103.08100.00%0.000.000.00% 12.05SEMBRADO DE FLORESUND750.005.153,862.500.000.000.00%0.000.000.00%0.000.000.00%750.003,862.50100.00% 13INSTALACIONES ELECTRICAS 13.01CABLEADO SUBTERRANEO 13.01.01EXCAVACION MANUALM36.2725.43159.456.27159.45100.00%0.000.000.00%6.27159.45100.00%0.000.000.00% 13.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M31.3311.90372.8331.33372.83100.00%0.000.000.00%31.33372.83100.00%0.000.000.00% 13.01.03POZO DE TIERRAUND1.001,835.681,835.680.000.000.00%1.001,835.68100.00%1.001,835.68100.00%0.000.000.00% 13.01.04CONDUCTOR NYY 6mm2 ALUMBRADOM49.3311.51567.790.000.000.00%49.33567.79100.00%49.33567.79100.00%0.000.000.00% 13.02ACCESORIOS Y ARTEFACTOS 13.02.01SUMINISTRO E INSTALACION DE LUMINARIA de 1x70 A.F. JOSFELUND12.00326.903,922.800.000.000.00%0.000.000.00%0.000.000.00%12.003,922.80100.00% 13.02.02TABLERO GENERAL TG 2-3x150A, 1-2x20 AUND1.00388.89388.890.000.000.00%1.00388.89100.00%1.00388.89100.00%0.000.000.00% 14SISTEMA DE RIEGO 14.01CANALIZACIONES Y/O TUBERIAS 14.01.01EXCAVACION MANUALM36.7425.43171.403.5089.0151.93%3.2482.3948.07%6.74171.40100.00%0.000.000.00% 14.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M33.7011.90401.038.45100.5625.08%25.25300.4874.93%33.70401.03100.00%0.000.000.00% 14.01.03TUBERIA PVC CLASE 10 - 1/2"M33.7012.46419.9011.42142.2933.89%22.28277.6166.11%33.70419.90100.00%0.000.000.00% 14.02ARTEFACTOS Y ACCESORIOS 14.02.01LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJUELA CONCRETO f'c 140 S/DPZA4.00133.72534.880.000.000.00%4.00534.88100.00%4.00534.88100.00%0.000.000.00% 14.02.02MEDIDOR DE AGUA DE 3/4"PZA1.00739.63739.630.000.000.00%1.00739.63100.00%1.00739.63100.00%0.000.000.00% 15VARIOS 15.01SERVICIO DE MEDIDOR DE AGUAUND1.00320.00320.001.00320.00100.00%0.000.000.00%1.00320.00100.00%0.000.000.00% 15.02SERVICIO DE MEDIDOR DE LUZUND1.00487.79487.791.00487.79100.00%0.000.000.00%1.00487.79100.00%0.000.000.00% 15.03PRUEBA HIDRAULICA RED DE AGUAM36.728.59315.420.000.000.00%0.000.000.00%0.000.000.00%36.72315.42100.00% 15.04PRUEBA DE DENSIDAD DE CAMPOUND5.0055.00275.000.000.000.00%5.00275.00100.00%5.00275.00100.00%0.000.000.00% 15.05PRUEBA DE CALIDAD DEL CONCRETOUND20.0024.94498.800.000.000.00%15.00374.1075.00%15.00374.1075.00%5.00124.7025.00% 15.06LIMPIEZA FINAL EN OBRAM2542.071.32715.530.000.000.00%0.000.000.00%0.000.000.00%542.07715.53100.00% 15.07JUNTA CON SELLO ASFALTICOM47.046.10286.940.000.000.00%0.000.000.00%0.000.000.00%47.04286.94100.00% 15.08TRASLADO DE POSTES DE ALUMBRADOUND4.001,145.974,583.884.004,583.88100.00%0.000.000.00%4.004,583.88100.00%0.000.000.00%COSTO DIRECTO152,162.8938,078.7974,279.34112,358.0539,804.79GASTOS GENERALES8%12,173.033,046.305,942.358,988.643,184.38UTILIDAD10%15,216.293,807.887,427.9311,235.813,980.48SUB TOTAL179,552.2144,932.9787,649.62132,582.5046,969.65IGV.18%32,319.408,087.9315,776.9323,864.858,454.54PRESUPUESTO TOTAL211,871.6153,020.91103,426.55156,447.3655,424.19TOTAL ACUMULADOPORCENTAJE DE AVANCE25.03%48.82%73.84%26.16%PORCENTAJE ACUMULADO25.03%73.84%73.84%26.16%

Valorizacion de Obra 03

CALENDARIO VALORIZADO DE AVANCE DE OBRA

Obra: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATOUbicacion: CHARACATO - AREQUIPA - AREQUIPACosto A: Ago - 2014Cliente: MUNICIPALIDAD DISTRITAL DE CHARACATOInicio de Obra: 13 de Febrero

ITEM DESCRIPCIONUNDPRESUPUESTO PROGRAMADOANTERIORACTUALACUMULADOSALDOMetradoP.U. S/.Parcial S/.MetradoValorizado S/.%MetradoValorizado S/.%MetradoValorizado S/.%MetradoValorizado S/.% 01SEGURIDAD Y SALUD EN OBRA 01.01S.C. PLAN DE SEGURIDAD Y SUPERVISION DE OBRAMES2.00250.00500.001.50375.0075.00%0.50125.0025.00%2.00500.00100.00%0.000.000.00% 01.02EQUIPOS DE PROTECCION COLECTIVAGLB1.001,395.701,395.701.001,395.70100.00%0.000.000.00%1.001,395.70100.00%0.000.000.00% 01.03EQUIPOS DE PROTECCION INDIVIDUALUND20.00199.593,991.8020.003,991.80100.00%0.000.000.00%20.003,991.80100.00%0.000.000.00% 02OBRAS PROVISIONALES 02.01CASETA DE ALMACEN, GUARDIANIA Y OFICINASM215.00112.851,692.7515.001,692.75100.00%0.000.000.00%15.001,692.75100.00%0.000.000.00% 02.02CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACINPZA1.00897.47897.471.00897.47100.00%0.000.000.00%1.00897.47100.00%0.000.000.00% 02.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALESDIA15.00116.881,753.2011.001,285.6873.33%4.00467.5226.67%15.001,753.20100.00%0.000.000.00% 03OBRAS PRELIMINARES0.00 03.01TRAZO Y REPLANTEO PRELIMINARM2572.521.63933.21572.52933.21100.00%0.000.000.00%572.52933.21100.00%0.000.000.00% 03.02LIMPIEZA DE TERRENO MANUALM2572.520.83475.19572.52475.19100.00%0.000.000.00%572.52475.19100.00%0.000.000.00% 03.03ELIMINACION DE MATERIAL EXCEDENTEM3108.4014.471,568.55108.401,568.55100.00%0.000.000.00%108.401,568.55100.00%0.000.000.00% 04MOVIMIENTO DE TIERRAS 04.01EXPLANACIONES 04.01.01ESCARIFICADO h=30 cmM2194.623.71722.04194.62722.04100.00%0.000.000.00%194.62722.04100.00%0.000.000.00% 04.01.02COMPACTADO C/PLANCHAM2194.621.43278.31194.62278.31100.00%0.000.000.00%194.62278.31100.00%0.000.000.00% 04.02RELLENO CON MATERIAL DE PRESTAMO 04.02.01BASE COMPACTADA DE h= 20 cm PARA CALZADASM2101.5219.281,957.31101.521,957.31100.00%0.000.000.00%101.521,957.31100.00%0.000.000.00% 04.02.02COLOCACION DE CAMA DE ARENA H=0.05 mM2110.752.49275.77110.75275.77100.00%0.000.000.00%110.75275.77100.00%0.000.000.00% 04.03EXCAVACIONES MASIVAS 04.03.01EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL SECOM348.4231.801,539.7648.421,539.76100.00%0.000.000.00%48.421,539.76100.00%0.000.000.00% 04.03.02RELLENO COMPACTADO C/EQUIPO MAT/PROPIOM345.9016.20743.5845.90743.58100.00%0.000.000.00%45.90743.58100.00%0.000.000.00% 05OBRAS DE CONCRETO SIMPLE 05.01MUROS DE CONTENC, CONCRETO 175 kg/cm2 + 30% P.M. 4"M356.31324.9518,297.9356.3118,297.93100.00%0.000.000.00%56.3118,297.93100.00%0.000.000.00% 05.02MUROS DE CONTENCION, ENCOF. Y DESENCOFRADO.M2207.9754.1311,257.42207.9711,257.42100.00%0.000.000.00%207.9711,257.42100.00%0.000.000.00% 05.03VEREDA CONCRETO 175 kg/cm2 e=4" ACABADO PULIDO 1:2M2148.4047.177,000.03112.565,309.4675.85%35.841,690.5724.15%148.407,000.03100.00%0.000.000.00% 05.04VEREDA, ENCOFRADO Y DESENCOFRADO H=0.3 mM5.6533.02186.564.35143.6476.99%1.3042.9323.01%5.65186.56100.00%0.000.000.00% 05.05CIMIENTOS CORRIDOS 1:10+30% P.G.M324.14184.754,459.8724.144,459.87100.00%0.000.000.00%24.144,459.87100.00%0.000.000.00% 05.06SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. (1P)M35.61245.811,378.995.611,378.99100.00%0.000.000.00%5.611,378.99100.00%0.000.000.00% 05.07SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADOM286.3227.092,338.4186.322,338.41100.00%0.000.000.00%86.322,338.41100.00%0.000.000.00% 06OBRAS DE CONCRETO ARMADO 06.01COLUMNAS, ENCOFRADO Y DESENCOFRADOM237.2053.671,996.5237.201,996.52100.00%0.000.000.00%37.201,996.52100.00%0.000.000.00% 06.02COLUMNAS, CONCRETO 175 KG/CM2M32.79405.161,130.402.791,130.40100.00%0.000.000.00%2.791,130.40100.00%0.000.000.00% 06.03COLUMNAS, ACERO fy=4200 kg/cm2KG280.675.421,521.23280.671,521.23100.00%0.000.000.00%280.671,521.23100.00%0.000.000.00% 07REVOQUES ENLUCIDOS Y MOLDURAS 07.01TARRAJEO EN MURO: EXTERIORESM2192.4820.703,984.34165.563,427.0986.01%26.92557.2413.99%192.483,984.34100.00%0.000.000.00% 07.02REVESTIMIENTO EN SILLARM242.4365.232,767.7135.682,327.4184.09%6.75440.3015.91%42.432,767.71100.00%0.000.000.00% 07.03MOLDURA EN SILLAR PARA BASEM43.60110.414,813.8835.503,919.5681.42%8.10894.3218.58%43.604,813.88100.00%0.000.000.00% 07.04MOLDURA EN SILLAR PARA CABECERAM35.20114.654,035.6828.403,256.0680.68%6.80779.6219.32%35.204,035.68100.00%0.000.000.00% 08PISOS Y PAVIMENTOS 08.01PISO ADOQUIN DE CONCRETO 08.01.01CALZADA DE ADOQUIN DE CONCRETOM292.9751.444,782.3840.562,086.4143.63%52.412,695.9756.37%92.974,782.38100.00%0.000.000.00% 08.01.02SELLADO DE JUNTASM292.974.06377.460.000.000.00%92.97377.46100.00%92.97377.46100.00%0.000.000.00% 08.02PISO-LAJA CORTE REGULAR 08.02.01PISO PIEDRA TALAMOLLE REGULAR ARENADO FORMATO 0.30 X 0.30 mM252.24107.675,624.6822.452,417.1942.97%29.793,207.4957.03%52.245,624.68100.00%0.000.000.00% 08.02.02PISO PIEDRA TALAMOLLE NATURAL FORMATO 0.10 X 0.25M295.98187.0917,956.9040.067,494.8341.74%55.9210,462.0758.26%95.9817,956.90100.00%0.000.000.00% 08.03BERMA 08.03.01BERMA DE BLOCK GRASSM245.3428.651,298.997.56216.5916.67%37.781,082.4083.33%45.341,298.99100.00%0.000.000.00% 09PINTURA 09.01PINTURA LATEX EN MUROS INTERIOR Y EXTERIORM277.2010.55814.460.000.000.00%77.20814.46100.00%77.20814.46100.00%0.000.000.00% 10CARPINTERIA DE MADERA 10.01PERGOLA DE MADERAUND1.003,060.323,060.320.000.000.00%1.003,060.32100.00%1.003,060.32100.00%0.000.000.00% 11CARPINTERIA METALICA 11.01BANCA METALICA ORNAMENTALUND4.00730.002,920.000.000.000.00%4.002,920.00100.00%4.002,920.00100.00%0.000.000.00% 11.02POSTE METALICO ORNAMENTAL H=3.25UND6.00550.003,300.006.003,300.00100.00%0.000.000.00%6.003,300.00100.00%0.000.000.00% 11.03BASURERO METALICOUND2.00180.00360.000.000.000.00%2.00360.00100.00%2.00360.00100.00%0.000.000.00% 11.04BARANDAS METALICAS EN TUBO NEGRO DE 2" Y TUBO METALICO DE 5/8" X 1.5mm (TIPO ORNAMENTAL)M41.1979.223,263.0741.193,263.07100.00%0.000.000.00%41.193,263.07100.00%0.000.000.00% 12TRATAMIENTO DE AREAS VERDES 12.01RELLENO CON TIERRA DE CHACRAM310.84144.271,563.8910.841,563.89100.00%0.000.000.00%10.841,563.89100.00%0.000.000.00% 12.02NIVELACION INTERIOR Y APISONADO C/EQUIPOM2108.363.55384.68108.36384.68100.00%0.000.000.00%108.36384.68100.00%0.000.000.00% 12.03SEMBRADO DE GRASS (AMERCICANO) EN BLOQUES DE 0.50 * 0.50 cmM2108.365.53599.230.000.000.00%108.36599.23100.00%108.36599.23100.00%0.000.000.00% 12.04SEMBRADO DE PLANTONES DE ARBOLES h=1.50UND11.00100.281,103.0811.001,103.08100.00%0.000.000.00%11.001,103.08100.00%0.000.000.00% 12.05SEMBRADO DE FLORESUND750.005.153,862.500.000.000.00%750.003,862.50100.00%750.003,862.50100.00%0.000.000.00% 13INSTALACIONES ELECTRICAS 13.01CABLEADO SUBTERRANEO 13.01.01EXCAVACION MANUALM36.2725.43159.456.27159.45100.00%0.000.000.00%6.27159.45100.00%0.000.000.00% 13.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M31.3311.90372.8331.33372.83100.00%0.000.000.00%31.33372.83100.00%0.000.000.00% 13.01.03POZO DE TIERRAUND1.001,835.681,835.681.001,835.68100.00%0.000.000.00%1.001,835.68100.00%0.000.000.00% 13.01.04CONDUCTOR NYY 6mm2 ALUMBRADOM49.3311.51567.7949.33567.79100.00%0.000.000.00%49.33567.79100.00%0.000.000.00% 13.02ACCESORIOS Y ARTEFACTOS 13.02.01SUMINISTRO E INSTALACION DE LUMINARIA de 1x70 A.F. JOSFELUND12.00326.903,922.800.000.000.00%12.003,922.80100.00%12.003,922.80100.00%0.000.000.00% 13.02.02TABLERO GENERAL TG 2-3x150A, 1-2x20 AUND1.00388.89388.891.00388.89100.00%0.000.000.00%1.00388.89100.00%0.000.000.00% 14SISTEMA DE RIEGO 14.01CANALIZACIONES Y/O TUBERIAS 14.01.01EXCAVACION MANUALM36.7425.43171.406.74171.40100.00%0.000.000.00%6.74171.40100.00%0.000.000.00% 14.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M33.7011.90401.0333.70401.03100.00%0.000.000.00%33.70401.03100.00%0.000.000.00% 14.01.03TUBERIA PVC CLASE 10 - 1/2"M33.7012.46419.9033.70419.90100.00%0.000.000.00%33.70419.90100.00%0.000.000.00% 14.02ARTEFACTOS Y ACCESORIOS 14.02.01LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJUELA CONCRETO f'c 140 S/DPZA4.00133.72534.884.00534.88100.00%0.000.000.00%4.00534.88100.00%0.000.000.00% 14.02.02MEDIDOR DE AGUA DE 3/4"PZA1.00739.63739.631.00739.63100.00%0.000.000.00%1.00739.63100.00%0.000.000.00% 15VARIOS 15.01SERVICIO DE MEDIDOR DE AGUAUND1.00320.00320.001.00320.00100.00%0.000.000.00%1.00320.00100.00%0.000.000.00% 15.02SERVICIO DE MEDIDOR DE LUZUND1.00487.79487.791.00487.79100.00%0.000.000.00%1.00487.79100.00%0.000.000.00% 15.03PRUEBA HIDRAULICA RED DE AGUAM36.728.59315.420.000.000.00%36.72315.42100.00%36.72315.42100.00%0.000.000.00% 15.04PRUEBA DE DENSIDAD DE CAMPOUND5.0055.00275.005.00275.00100.00%0.000.000.00%5.00275.00100.00%0.000.000.00% 15.05PRUEBA DE CALIDAD DEL CONCRETOUND20.0024.94498.8015.00374.1075.00%5.00124.7025.00%20.00498.80100.00%0.000.000.00% 15.06LIMPIEZA FINAL EN OBRAM2542.071.32715.530.000.000.00%542.07715.53100.00%542.07715.53100.00%0.000.000.00% 15.07JUNTA CON SELLO ASFALTICOM47.046.10286.940.000.000.00%47.04286.94100.00%47.04286.94100.00%0.000.000.00% 15.08TRASLADO DE POSTES DE ALUMBRADOUND4.001,145.974,583.884.004,583.88100.00%0.000.000.00%4.004,583.88100.00%0.000.000.00%COSTO DIRECTO152,162.89112,358.1039,804.79152,162.860.00GASTOS GENERALES8%12,173.038,988.653,184.3812,173.030.00UTILIDAD10%15,216.2911,235.813,980.4815,216.290.00SUB TOTAL179,552.21132,582.5646,969.65179,552.180.00IGV.18%32,319.4023,864.868,454.5432,319.390.00PRESUPUESTO TOTAL211,871.61156,447.4255,424.19211,871.570.00TOTAL ACUMULADOPORCENTAJE DE AVANCE73.84%26.16%100.00%0.00%PORCENTAJE ACUMULADO73.84%100.00%100.00%0.00%

Curva SN VAL.PERIODOPROGRAMADOEJECUTADOS/.PORCENTAJES/.PORCENTAJEMENSUALACUMULADOMENSUAL ACUMULADOMENSUALACUMULADOMENSUAL ACUMULADO0.000.00%0.00%1Feb-1524,200.0424,200.0411.42%11.42%53,020.9153,020.9125.03%25.03%2Mar-15130,069.15154,269.1961.39%72.81%103,426.55156,447.4648.82%73.84%3Apr-1557,602.42211,871.6127.19%100.00%55,424.19211,871.6526.16%100.00%

TOTAL211,871.61211,871.61100.00%100.00%211,871.65211,871.65100.00%100.00%

Formula PolinomicaFACTOR DE REAJUSTE KOBRA: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATOLOCALIZACION: CHARACATO - AREQUIPA - AREQUIPACONTRATISTAPRESUPUESTO BASE211,871.61PRESUPUESTO CONTRATADO211,871.61FECHA PRESUPUESTO CONTRATADO: Ago - 2014FORMULA 01: ESTRUCTURAS
Usuario: Usuario:K DE FECHA DE ADELANTO O K DE INICIO DE OBRA.MONOMIOELEMENTO REPRESENTATIVOI.U.COEF.
Usuario: Usuario:Factor.La suma de factores es igual a 1%Aug-14Feb-15Mar-15Apr-15PROYECTADOINICIOKIKIKIKIKIKAAGREGADO GRUESO50.171100.00%602.34608.7200.173630.750.179604.040.1710.0000.0000.000

BCEMENTO PORTLAND TIPO I210.081100.00%423.83423.8300.081423.830.081423.830.0810.0000.0000.000

CDOLAR290.106100.00%390.72411.340.112419.350.114422.840.1150.0000.0000.000

DINDICE GENERAL DE PRECIOS AL CONSUMIDOR390.189100.00%402.37405.560.190406.790.191409.900.1930.0000.0000.000

EMANO DE OBRA INC. LEYES SOCIALES470.292100.00%523.70523.150.292523.150.292523.150.2920.0000.0000.000

FMAQUINARIA Y EQUIPO IMPORTADO490.161100.00%250.83268.530.172275.860.177277.020.1780.0000.0000.000

G0.00.00.0000.0ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

H0.00.00.0000.0ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

1.000K=1.020K=1.034K=1.029ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Detalle

MonomioFactorPorcentaje %IUDescripcion Indice Unificado1.000.171100.00 %05AGREGADO GRUESO1.000.081100.00 %21CEMENTO PORTLAND TIPO I2.000.106100.00 %29DOLAR5.000.189100.00 %39INDICE GENERAL DE PRECIOS AL CONSUMIDOR4.000.292100.00 %47MANO DE OBRA INC. LEYES SOCIALES3.000.161100.00 %49MAQUINARIA Y EQUIPO IMPORTADO0.00.0

K = 0.171*(1r/1o) + 0.081*(1r/1o) + 0.106*(2r/2o) + 0.189*(5r/5o) + 0.292*(4r/4o) + 0.161*(3r/3o)

Calculo de ReintegrosCALCULO DE LOS REINTEGROS

PROCESOOBRA: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATOLOCALIZACION: MUNICIPALIDAD DISTRITAL DE CHARACATO - AREQUIPA - AREQUIPACONTRATISTA: ALUMNOS ING.RODRIGUEZ S.APRESUPUESTO BASE211,871.61PRESUPUESTO CONTRATADO211,871.61FECHA PRESUPUESTO CONTRATADO8/1/14F.R=1.00000

FORMULA 01: VALORIZACION NPERIODOVALORIZACIONVALORIZACIONK-1REAJUSTEREAJUSTEREAJUSTEDEDUCCIONES POR REAJUSTESREAJUSTEVALORIZACIONREALPROGRAMADAREALPROGRAMADORECONOCIDOADEL. EFECT.ADEL. MAT.A PAGARNETA(1)(2)(3)(4)=(1)*(3)(5)=(2)*(3)(6)(7)(8)(9)=(6)-(7)-(8)(10)=(1)+(9)012/28/15MES24200.04 53020.91 1.020 24684.04 54081.33 24684.04 ACUM24200.04 53020.91 1.020 24684.04 54081.33 24684.04 023/31/15MES130069.15 103426.55 1.034 134491.50 106943.06 134491.50 ACUM154269.19 156447.46 1.034 159514.34 161766.67 159175.54 034/13/15MES57602.42 55424.19 1.029 59272.89 57031.49 59272.89 ACUM211871.61 211871.65 1.029 218015.88 218015.93 218448.43 04MESACUM05MESACUM06MESACUM

Total acumuladoIGV18%TOTAL PRESENTE LIQUIDACION