Download - insumos

Transcript
Page 1: insumos

S10 MUNICIPALIDAD PROVINCIAL Precios y cantidades de insumos requeridosMEJORAMIENTO DE Cant. Requerida

470032 TOPOGRAFO HH 6.16 44.80

470127 OBRERO A HH 6.16 2,298.45

470128 OBRERO B HH 5.44 7,639.29

020105 CLAVOS PARA MADERA C/C 3" KG 4.20 33.65

020107 CLAVOS PARA MADERA C/C 4" KG 4.20 200.79

020409 ALAMBRE NEGRO N° 16 KG 4.20 316.11

020410 ALAMBRE NEGRO N° 8 KG 4.20 69.09

020411 HOJAS DE SIERRA UND 4.00 73.23

021321 CLAVOS PARA CALAMINA KG 7.00 1.00

029702 ACERO DE REF. fy=4200 kg/cm2 G° 60 KG 2.75 5,647.33

040000 ARENA FINA M3 48.00 0.87

050003 PIEDRA CHANCADA DE 1/2" M3 42.00 116.69

050004 PIEDRA CHANCADA DE 3/4" M3 42.00 261.98

050011 DERECHO DE CANTERA M3 2.00 809.09

050104 ARENA GRUESA M3 48.00 237.37

050220 PIEDRA MEDIANA 6" M3 35.00 245.56

050221 PIEDRA GRANDE M3 35.00 376.79

130006 ASFALTO RC-250 GLN 9.00 52.30

210000 CEMENTO PORTLAND TIPO IP (42.50 Kg) BOL 25.00 4,180.94

295104 ROTURA DE BRIQUETAS UND 25.00 60.00

300204 YESO BOL 3.50 23.17

304612 TECKNOPORT 1", 1.20 x 2.40 PLN 23.00 23.52

309902 LEÑA QQ 5.00 12.45

390500 AGUA M3 1.00 255.25

431111 MADERA AGUANO P2 2.90 64.00

431112 MADERA AGUANO 1 1/2" X 8" X 10' P2 2.90 1,019.85

431113 MADERA AGUANO 2" X 3" X 10' P2 2.90 571.84

431652 REGLA DE MADERA P2 2.90 3.02

436032 ROLLIZO DE EUCALIPTO DE 4" X 10' PGM 0.55 634.65

436034 ROLLIZO DE EUCALIPTO DE 6" X 10' PGM 0.55 174.00

440121 MADERA AGUANO PARA ESTACAS P2 2.90 231.67

480406 MAQUINARIA Y EQUIPO NACIONAL GLB 1,500.00 2.00

530001 KEROSENE GLN 12.00 1.61

530002 PETROLEO GLN 12.00 44.76

560199 CALAMINA PLN 17.00 24.00

610001 CARTEL DE OBRA (FABRICADO) 3.6 x 1.8 pl. Metal s/bast. mad, UND 600.00 1.00

721316 TUB. PVC SAL DE 3" M 3.50 9.60

721318 TUBERIA PVC SAP 1" x 3 m. M 10.00 5.57

295105 PRUEBA DE COMPACTACION GLB 250.00 3.60

375401 MIRAS Y JALONES HE 2.00 99.83

375406 WINCHA DE 50 m. HE 0.50 99.83

480111 MEZCLADORA DE CONCRETO DE 9 P3 HM 7.50 373.96

480404 CAMION CISTERNA 4x2 (AGUA) 1,000 Gln. HM 50.00 28.53

480405 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1,000.00 1.00

480800 MOTOBOMBA 10 HP 4" HM 7.00 19.63

481105 CAMION VOLQUETE DE 8 m3 HM 70.00 363.88

Page 2: insumos

481106 CAMION VOLQUETE DE 6 m3 HM 60.00 11.12

490301 COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 7.50 58.47

490313 RODILLO LISO VIBR. AUTOP. 70-100 HP 7-9 Tn. HM 90.00 48.40

490407 CARGADOR S/LLANTAS 80-95 HP 1.5-1.75 Yd3 HM 120.00 37.57

490433 TRACTOR DE ORUGAS DE 140-160 HP HM 140.00 52.24

490707 VIBRADOR DE CONCRETO 4 HP 2.40" HM 4.00 367.11

490900 MOTONIVELADORA DE 125 HP HM 120.00 37.68

498802 NIVEL TOPOGRAFICO HE 5.50 99.83

498803 TEODOLITO HE 6.00 99.83

370101 HERRAMIENTAS MANUALES %MO

Page 3: insumos

Página : 1

275.97 269.49

14,158.45 14,095.92

41,557.74 41,586.05

141.33 142.34

843.32 811.32

1,327.66 1,317.09

290.18 289.75

292.92 316.11

7.00 7.00

15,530.16 15,543.66

41.76 41.66

4,900.98 4,899.98

11,003.16 11,003.71

1,618.18 1,618.18

11,393.76 11,387.29

8,594.60 8,594.43

13,187.65 13,187.38

470.70 469.03

104,523.50 104,523.47

1,500.00 1,500.00

81.10 115.83

540.96 541.02

62.25 67.41

255.25 247.02

185.60 185.60

2,957.56 2,958.27

1,658.34 1,659.02

8.76 8.76

349.06 348.84

95.70 95.70

671.84 694.99

3,000.00 3,000.00

19.32 16.09

537.12 538.23

408.00 408.00

600.00 600.00

33.60 33.60

55.70 55.74

900.00 900.00

199.66 183.20

49.91 33.69

2,804.70 2,804.67

1,426.50 1,426.37

1,000.00 1,000.00

137.41 124.92

25,471.60 25,472.76

Page 4: insumos

667.20 673.73

438.53 444.34

4,356.00 4,356.01

4,508.40 4,508.97

7,313.60 7,317.39

1,468.44 1,469.58

4,521.60 4,521.62

549.06 564.39

598.98 598.07

1,633.45