CRONOG PROGRAMADOCRONOGRAMA PROGRAMADO DE EJECUCION DE OBRAOBRA"CREACIN DE MURO DE CONTENCIN EN EL PASAJE 10 Y 4 (MZ. I-K) DE LA ASOC. DE VIVIENDA DE JARDN DE SANTA ROSA DE LIMA,DISTRITO DE ATE - LIMA- LIMA"DISTRITOATEMODALIDAD DE EJECUCIN:PROVINCIALIMAPRESUPUESTO TOTAL DE OBRA::258874.95:REGIONLIMAPLAZO DE EJECUCION:3 MESES

ITEMDESCRIPCIONPRESUPUESTO S/.1ER. MES 2DO. MES3ER. MES

30.0060.0090.0001.00.00MURO DE CONTENCIN - MAPOSTERA DE PIEDRA

01.01.00OBRAS PROVISIONALES0.01,069.501,069.5001.01.01CARTEL DE OBRA 4.80 m x 3.60 m SEGN DETALLE1,069.500.01,069.501,016.951,016.9501.02.01ALMACEN, OFICINA Y CASETA DE GUARDIANIA1,016.950.00.001.02.00TRABAJOS PRELIMINARES0.01,443.751,443.7501.02.01LIMPIEZA DEL TERRENO MANUAL1,443.750.01,443.75762.71762.71-762.7101.02.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS762.710.0530.25530.2501.02.03TRAZO NIVELACION Y REPLANTEO INICIAL530.250.0530.250.00.001.03.00MOVIMIENTO DE TIERRAS0.01,838.071,838.071,838.071,838.071,838.071,838.071,838.071,838.071,838.071,838.0718,380.7201.03.01CORTE EN TERRENO SEMIROCOSO MANUAL18,380.720.02,502.712,502.712,502.712,502.712,502.712,502.712,502.712,502.7120,021.6901.03.02RELLENO CON MATERIAL PROPIO COMPACTACION CON EQUIPO LIVIANO20,021.690.0633.63633.63633.63633.63633.63633.63633.63633.635,069.0701.03.03ACARREO MATERIAL EXCEDENTE DIST. PROM 30 M5,069.070.07,513.037,513.03-7,513.0301.03.04ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO VOLQ. 10M3,D=10KM7,513.030.00.00.001.04.00MUROS DE MAMPOSTERA0.03,121.123,121.123,121.123,121.123,121.123,121.123,121.123,121.1224,968.9401.04.01 CONCRETO CICLOPEO 1:8 + 40% PG - CIMIENTOS CORRIDOS PARA MURO DE CONTENCION24,968.940.01,895.281,895.281,895.281,895.281,895.281,895.281,895.281,895.2801.04.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION15,162.206,727.516,727.516,727.516,727.516,727.516,727.516,727.516,727.5115,162.2001.04.03MURO DE MAMPOSTERIA DE PIEDRA MEZCLA 1:6 + 70% PG53,820.100.0880.69880.69880.69880.69880.69880.69880.69880.697,045.5101.04.04DRENAJE EN MURO TUBERIA DE 2"7,045.510.0110.17110.17110.17110.17110.17110.17110.17771.2101.04.05JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" PARA MUROS771.210.01,448.421,448.421,448.421,448.421,448.421,448.421,448.421,448.4211,587.3301.04.06BARANDAS METALICAS DE TUBO DE FIERRO GALVANIZADO DE 2"11,587.330.0167.04167.04167.04167.04668.1601.04.07COLOCACION PLATINA F.N 2"X3/16"X6M668.16411.38411.38411.38411.3801.04.08COLOCACION DE ANCLAJE QUIMICO DE 1/21,645.522,769.542,769.5401.04.09PINTURA BARANDAS METALICAS( INC. LIMPIEZA DE LA SUPERFICIE)5,539.080.00.001.05.00PLAN DE MANEJO AMBIENTAL0.00.001.05.01NORMATIVIDAD AMBIENTAL0.0296.61296.61296.61889.8301.05.01.01MONITOREO A LA APLICACION DE NORMAS DE COMPORTAMIENTO 889.830.0296.61296.61296.61889.8301.05.01.02SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES 889.830.0

01.05.02SEALIZACION0.0550.05550.0501.05.02.01LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. 550.050.0338.20338.2001.05.02.02LETREROS DE SEALIZACIONES AMBIENTAL DE 0.50x0.30 M338.200.00.001.05.03MITIGACION AMBIENTAL0.0694.28694.2801.05.03.01CONTENEDORES DE BASURA METALICO TIPO BASCULANTE SEGN DISEO694.280.0535.46535.4601.05.03.02BOTIQUIN 535.460.0785.11785.11785.112,355.3301.05.03.02MITGACION POR LEVANTAMIENTO DE POLVO 2,355.330.0

01.05.04PROGRAMA DE CONTIGENCIA0.097.6701.05.04.01SUMINISTRO Y COLOCACION DE EXTINTOR CO2 DE 10 LB. 97.670.0321.56321.5601.05.04.02CINTAS DE SEGURIDAD 321.560.00.001.06.00VARIOS0.01,625.001,625.0001.06.01KIT DE IMPLEMENTOS DE SEGURIDAD1,625.001,016.7101.06.02PLACA RECORDATORIA1,016.710.01,575.001,575.0001.06.02LIMPIEZA FINAL DE OBRA1,575.000.0

PROGRAMADO8,097.133,953.183,256.8219,047.4320,329.2418,523.9719,887.5019,157.6020,329.2419,157.6030,803.705,361.25COSTO DIRECTO187,904.6434,354.5577,898.3075,651.79GASTOS GENERALES (10.75%)20,206.633,694.378,376.928,135.34UTILIDAD (6%)11,274.282,061.274,673.904,539.11--------------------------------------------------------------------------------SUB TOTAL219,385.5540,110.1990,949.1288,326.23I.GV. (18%)39,489.407,219.8316,370.8415,898.72===================================TOTAL PRESUPUESTO258,874.9547,330.03107,319.96104,224.96FACTOR DE RELACION1.00000047,330.03107,319.96104,224.96258,874.95AVANCE 18.28%41.46%40.26%AVANCE ACUMULADO18.28%59.74%100.00%