MUNICIPALIDAD DISTRITAL DE RIO GRANDE M D R G SUB GERENCIA DE SUPERVISION Y LIQUIDACION VALORIZACION MENSUAL Nº 02 NOVIEMBRE DEL 2015 PROCESO : EX0 - PROC - 4 - 2015 - MDRG/CE O B R A: CONTRATISTA : CONSORCIO RANCHERIA SUPERVISOR : ING. MIGUEL ANGEL HERNANDEZ ESPINO RESIDENTE : ING. WILLIAM ROBERTO MEDINA ZEA FECHA : AL 30 DE NOVIEMBRE DEL 2015 “INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

description

valorizacion de obra

Transcript of VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

Page 1: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

MUNICIPALIDAD DISTRITAL DE RIO GRANDE

M D R G

SUB GERENCIA DE SUPERVISION Y LIQUIDACION

VALORIZACION MENSUAL Nº 02

NOVIEMBRE DEL 2015

PROCESO : EX0 - PROC - 4 - 2015 - MDRG/CE

O B R A :

CONTRATISTA : CONSORCIO RANCHERIA

SUPERVISOR : ING. MIGUEL ANGEL HERNANDEZ ESPINO

RESIDENTE : ING. WILLIAM ROBERTO MEDINA ZEA

FECHA : AL 30 DE NOVIEMBRE DEL 2015

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 2: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

FICHA DE IDENTIFICACION DE LA OBRA

1 Obra :

2 Ubicación : ICA

Region : ICA

Departamento : UCA

Provincia : PALPA

Distrito : RIO GRANDE

Localidad : CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO

Area Geografica : 2

3 Cliente : MUNICIPALIDAD DISTRITAL DE RIO GRANDE

4 Contratista : CONSORCIO RANCHERIA

5 Financiamiento : TRANSFERENCIA DEL GOBIERNO REGIONAL DE ICA

6 Sistema de Contratacion : EXONERACION

7 Modalidad de Contratacion Contractual : EXONERADO

8 Tipo de Proceso : EXO - PROC - 4 - 2015 - MDRG/CE

9 Presupuesto Base : S/. 1,090,409.40 con I.G.V. 924,075.76 sin I.G.V.

10 Contrato Nº :

11 Factor de Relacion (Fr) : 1.00000

12 Monto del Contrato : S/. 1,090,409.40 con I.G.V. 924,075.76 sin I.G.V.

13 Monto para la Elaboracion del Expediente Tecnico : S/. con I.G.V. 0.00 sin I.G.V.

14 Monto para la Ejecucion de la Obra : 1,090,409.40 con I.G.V. 924,075.76 sin I.G.V.

15 Plazo Contractual : 90 dias calendarios

16 Plazo de Ampliacion de plazo Nº 01 : 0 dias calendarios

17 Plazo de Ejecucion de Obra : 90 dias calendarios

18 Costo Directo de la Obra : S/. 803,544.13

19 Gastos Generales : S/. 80,354.41 10.00%

20 Utilidad : S/. 40,177.21 5.00%

21 Monto del Adelanto Directo - Ejecucion de Obra 20% : S/. 454,849.03 con I.G.V. 385,465.28 sin I.G.V.

22 Monto del Adelanto Directo - Expediente Tecnico : S/. 0.00 con I.G.V. 0.00 sin I.G.V.

23 Monto del Adelanto para Materiales : S/. 0.00 con I.G.V. 0.00 sin I.G.V.

Eventos:

24 Fecha del Valor Referencial : May-2015

25 Fecha de Firma de Contrato : 27-September-2015

26 Fecha de Designacion del Supervisor de Obra :

27 Fecha de cambio de Residente de Obra :

28 Fecha de Aprobacion de Expediente Tecnico :

29 Fecha de Entrega de Terreno : 16-October-2015

30 Fecha de Pago de Adelanto Directo :

31 Fecha de Inicio Contractual : 17-October-2015

32 Fecha de Fin Contractual : 14-January-2016

33 Ampliaciones de Plazo :

34 Nueva Fecha de Fin Contractual :

34 Adicionales de obra : Ninguna

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS

RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE

RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 3: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

M D R G

RESUMEN DE VALORIZACION MENSUAL No. 02PROCESO : EX0 - PROC - 4 - 2015 - MDRG/CE

OBRA :CONTRATISTA : CONSORCIO RANCHERIASUPERVISOR : ING. MIGUEL ANGEL HERNANDEZ ESPINORESIDENTE : ING. WILLIAM ROBERTO MEDINA ZEAFECHA : AL 30 DE NOVIEMBRE DEL 2015

DESCRIPCIONVALORIZACION

ANTERIOR ACTUAL ACUMULADOA: VALORIZACION CONTRACTUAL

001 - RED DE ALCANTARILLADO 714,993.81 280,261.02 192,077.85 472,338.87 66.06% 242,654.94002 - LAGUNA 209,081.95 0.00 0.00 0.00 0.00% 209,081.95

TOTAL (A) 924,075.76 280,261.02 192,077.85 472,338.87 451,736.89

AVANCE FISICO DE OBRA 30.33% 20.79% 51.12% 48.88%B: REAJUSTES

001 - RED DE ALCANTARILLADO 0.00 0.00 0.00002 - LAGUNA 0.00 0.00 0.00

TOTAL (B) 0.00 0.00 0.00VALORIZACION BRUTA (VB=A+B) 280,261.02 192,077.85 472,338.87

D: AMORTIZACIONESAMORTIZACION DEL ADELANTO EN EFECTIVO 0.00 0.00 0.00 0.00 0.00AMORTIZACION DEL ADELANTO PARA MATERIALES

TOTAL (D) 0.00 0.00 0.00 0.00 0.00VALORIZACION NETA (VN=VB-D-C) 280,261.02 192,077.85 472,338.87

E: RETENCIONESFONDO DE GARANTIA (5%*VB) 0.00 0.00 0.00GASTOS DE LICITACION 0.00 0.00 0.00MULTA POR ATRASO DE OBRA 0.00 0.00 0.00

TOTAL (E) 0.00 0.00 0.00

F: MONTO A PAGAR AL CONTRATISTAEN EFECTIVO 280,261.02 192,077.85 472,338.87EN I.G.V. (18%*VN) 50,446.98 34,574.01 85,020.99

TOTAL (F) 330,708.00 226,651.86 557,359.86

TOTAL COMPROMISO A SOLICITAR 226,651.86

% CRONOGR VALORIZ PROGRA ACUML 16.77%

% CRONOGR VALORIZ FISICO ACUMLADO 51.12% CRON VAL

% % PROG ACUML %

ANALISIS COMPARATIVO AL 80% 51.12% 80.00% 40.90% ≤ 51.12%

OBRA: ATRASADA

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

MONTO CONTRATO (S/IGV)

% AVANCE ACUMULADO

SALDO POR VALORIZAR

Page 4: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

M D R G

COEFICIENTE DE REAJUSTE

PROCESO : EX0 - PROC - 4 - 2015 - MDRG/CE

OBRA :

CONTRATISTA : CONSORCIO RANCHERIASUPERVISOR : ING. MIGUEL ANGEL HERNANDEZ ESPINORESIDENTE : ING. WILLIAM ROBERTO MEDINA ZEAFORMULA 01 : RED DE ALCANTARILLADO AREA GEOGRAFICA: 2 ICA

K = 0.351*(Mr/Mo) + 0.340*(CFr/CFo)+ 0.158*(MMDr/MMDo)+0.151*(Ir/Io) PAG. 01

SIMBOLO ELEMENTO REPRESENTATIVO CODIGOOCT'2015 NOV'2015 DIC'2015 ENE'2016 FEB'2012Ir K Ir K Ir K Ir K Ir K

M MANO DE OBRA (INC. LEYES SOC.) 47 0.351 100.00% 523.15 544.59523.15 544.59 0.365 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

CF CEMENTO PORTLAND TIPO I 21 0.340 99.118% 367.31 367.31FLETE TERRESTRE 32 0.882% 469.08 467.08

368.21 368.19 0.340 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

MMD DÓLAR MAS INFLAMAQCION USA Y DUCTO DE 31 0.158 2.532% 398.72 398.29MAQUINARIA Y EQUIPO IMPORTADO 49 62.025% 282.51 288.48MADERA NACIONAL PARA ENCOFRADO Y CARP 43 35.443% 603.32 612.75

399.16 406.19 0.161 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

I IND. GRAL. PRECIOS AL CONSUM. 39 0.151 100.00% 413.82 418.76413.82 418.76 0.153 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

COEFICIENTE DE REAJUSTE: K = 1.000 K (NOV-15) = 1.019 K (DIC-15) = 0.000 K (ENE-16) = 0.000 K (FEB-12) 0.000 K (MAR-12) 0.000

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

COEF. INCIDEN

CIA

% INCIDENCI

A

Io IND.BASE SET 2010

Page 5: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

M D R G

COEFICIENTE DE REAJUSTE

PROCESO : EX0 - PROC - 4 - 2015 - MDRG/CE

OBRA :

CONTRATISTA : CONSORCIO RANCHERIASUPERVISOR : ING. MIGUEL ANGEL HERNANDEZ ESPINORESIDENTE : ING. WILLIAM ROBERTO MEDINA ZEA

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

FORMULA 02 : LAGUNA DE AGUAS RESIDUALES AREA GEOGRAFICA: 2 ICA

K = 0.171*(Mr/Mo) + 0.254*(CMr/CMo)+ 0.428*(Mr/Mo)+0.147*(Ir/Io) PAG. 02

SIMBOLO ELEMENTO REPRESENTATIVO CODIGOOCT'2015 NOV'2015 DIC'2015 ENE'2016 FEB'2016Ir K Ir K Ir K Ir K Ir K

M MANO DE OBRA (INC. LEYES SOC.) 47 0.171 100.00% 532.15 544.59532.15 544.59 0.175 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

CM CEMENTO PORTLAND TIPO I 21 0.254 91.73% 367.31 367.31MADERA NACIONAL PARA ENCOFRADO Y CARP 43 8.27% 603.32 612.75

386.82 387.60 0.255 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

M MAQUINARIA Y EQUIPO IMPORTADO 49 0.428 100.00% 282.51 288.48282.51 288.48 0.437 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

I IND. GRAL. PRECIOS AL CONSUM. 39 0.147 100.00% 413.82 418.76413.82 418.76 0.149 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000

COEFICIENTE DE REAJUSTE: K = 1.000 K (NOV-15) = 1.016 K (DIC-15) = 0.000 K (ENE-16) = 0.000 K (FEB-16) 0.000 K (MAR-16) 0.000

COEF. INCIDEN

CIA

% INCIDENCI

A

Io IND.BASE

OCT'09

Page 6: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

M D G R

REINTEGRO POR REAJUSTE(CONTROL DE VALORIZACIONES Y REAJUSTES)

CONTRATO PRINCIPAL

EXON. DE PROCESO : EX0 - PROC - 4 - 2015 - MDRG/CE

O B R A :

CONTRATISTA : CONSORCIO RANCHERIA

SUPERVISOR : ING. MIGUEL ANGEL HERNANDEZ ESPINO

RESIDENTE : ING. WILLIAM ROBERTO MEDINA ZEA

FECHA : AL 30 DE NOVIEMBRE DEL 2015

VALORIZACION REINTEGRO REINTEGRO DEDUCCION REINTEGRO

No. MESPROGRAMADO EJECUTADO

K-1PROGRAMADO EJECUTADO

BRUTO A.DMATERIALES

NETO

AUTORIZADO EFECTIVO AUTORIZADO

FORMULA 01: RED DE ALCANTARILLADO

1 Oct-15 154,996.56 0.00 0.019 2,944.93 0.00 0.00 #REF! 0.00 #REF!

2 Nov-15 306,983.36 0.00 0.00 0.00 0.00 #REF! 0.00 #REF!

3 Dec-15 219,851.34 0.00 0.00 0.00 0.00 #REF! 0.00 #REF!

4 Jan-16 33,162.55 0.00 0.00 0.00 0.00 #REF! 0.00 #REF!

5 Feb-16 0.00 0.00 0.00 0.00 0.00 #REF! 0.00 #REF!

SUB-TOTAL 714,993.81 0.01 2,944.93 0.00 0.00 0.00 0.00 #REF!

EN VALORIZ. ANTERIOR #REF!

REINTEGRO ACTUAL #REF!

FORMULA 02: LAGUNA

1 Oct-15 0.00 0.00 0.016 0.00 0.00 0.00 0.00 0.00 0.00

2 Nov-15 110,847.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 Dec-16 98,234.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 Jan-16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 Feb-16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SUB-TOTAL 209,081.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EN VALORIZ. ANTERIOR 0.00

REINTEGRO ACTUAL 0.00

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 7: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA No 02

NOVIEMBRE DEL 2015

RESUMEN

OBRA

PROPIETARIO MUNICIPALIDAD DISTRITAL DE RIO GRANDE

CONTRATISTA CONSORCIO RANCHERIA

SUPERVISION ING. MIGUEL ANGEL HERNANDEZ ESPINO

FECHA PRES BASE 15 de mayo de 2015

Presupuesto Base: 1,090,409.40 (con IGV)

Monto del Contrato: 1,090,409.40 (con IGV) 924,075.76 (sin IGV)

Factor de Relación: 1.00000

Plazo de Ejecución: 90 días calendario

EspecialidadMonto Valorización

Contratado 1era valorizacion 2da valorizacion 3era valorizacion 4ta valorizacion Acumulada

01 RED DE ALCANTARILLADO 714,993.81 280,261.02 192,077.85 0.00 0.00 472,338.87

02 LAGUNA 209,081.95 0.00 0.00 0.00 0.00 0.00

SUB TOTAL 924,075.76 280,261.02 192,077.85 0.00 0.00 472,338.87

100.00% 30.33% 20.79% 0.00% 0.00% 51.12%

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO

GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 8: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA No 02

NOVIEMBRE DEL 2015

RESUMEN

Valorización Saldo por

% Valorizar

66.06% 242,654.94

0.00% 209,081.95

451,736.89

48.88%

INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO

GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 9: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA Nº 02(Periodo : NOVIEMBRE 2015)

Obra :“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Ubicación : DISTRITO DE RIO GRANDE - PALPA - ICA

Tipo de Proceso : EX0 - PROC - 4 - 2015 - MDRG/CE

Contratista : CONSORCIO RANCHERIA

Plazo de Ejecucion : 90 DIAS CALENDARIOS Valor Referencial (S/.) : 1,090,409.40 con IGV

Supervisor : ING. MIGUEL ANGEL HERNANDEZ ESPINO Costos al : May-2015

Residente : ING. WILLIAM ROBERTO MEDINA ZEA Monto del Contrato (S/.) : 1,090,409.40 con IGV

Factor de Relacion : 1.0000

Formula : 001 RED DE ALCANTARILLADO

ITEM DESCRIPCION DE PARTIDAPRESUPUESTO

AVANCESSALDO

ANTERIOR ACTUAL ACUMULADO

UNIDAD METRADO PARCIAL Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %

01.00 OBRAS PROVISIONALES01.01 CASETA PARA OFICINA Y ALMACEN GLB 1.00 3,279.6000 3,279.60 1.00 3,279.60 100.00% 0.00 0.00 0.00% 1.00 3,279.60 100.00% 0.00 0.00 0.00%01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS, MAQUINARIAS Y HERRAMIENTAS GLB 1.00 2,779.6800 2,779.68 0.33 917.29 33.00% 0.33 917.29 33.00% 0.66 1,834.59 66.00% 0.34 945.09 34.00%01.03 TRANQUERA DE MADERA MOVIL PARA DESVIACION VEHICULAR Y/O PEATONAL UND 8.00 126.4700 1,011.76 4.00 505.88 50.00% 4.00 505.88 50.00% 8.00 1,011.76 100.00% 0.00 0.00 0.00%01.04 SEÑALIZACION EN OBRA (CINTA DE SEGURIDAD) M 3,360.27 0.8600 2,889.83 1,680.14 1,444.92 50.00% 840.07 722.46 25.00% 2,520.20 2,167.37 75.00% 840.07 722.46 25.00%01.05 PUENTE DE MADERA PARA PASE PEATONAL UND 8.00 144.3700 1,154.96 2.00 288.74 25.00% 6.00 866.22 75.00% 8.00 1,154.96 100.00% 0.00 0.00 0.00%01.06 SERVICIOS HIGIENICOS PORTATILES MES 4.00 450.0000 1,800.00 1.00 450.00 25.00% 3.00 1,350.00 75.00% 4.00 1,800.00 100.00% 0.00 0.00 0.00%02.00 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.0002.01 TRAZO, NIVELES Y REPLANTEO EN REDES DE ALCANTARILLADO M 3,360.27 0.6000 2,016.16 2,688.22 1,612.93 80.00% 672.05 403.23 20.00% 3,360.27 2,016.16 100.00% 0.00 0.00 0.00%03.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.0003.01 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO H<=1.00 m. M 23.25 5.1800 120.43 0.00 0.00 0.00% 23.00 119.14 98.92% 23.00 119.14 98.92% 0.25 1.30 1.08%03.02 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 1.00<H<=1.50 m. M 2,003.38 5.6000 11,218.93 814.00 4,558.40 40.63% 985.00 5,516.00 49.17% 1,799.00 10,074.40 89.80% 204.38 1,144.53 10.20%03.03 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 1.50<H<=2.00 m. M 210.68 8.5500 1,801.31 99.70 852.44 47.32% 44.40 379.62 21.07% 144.10 1,232.06 68.40% 66.58 569.26 31.60%03.04 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 2.00<H<=2.50 m. M 195.93 10.7700 2,110.17 80.31 864.94 40.99% 80.00 861.60 40.83% 160.31 1,726.54 81.82% 35.62 383.63 18.18%03.05 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 2.50<H<=3.00 m. M 15.51 12.2200 189.53 0.00 0.00 0.00% 15.51 189.53 100.00% 15.51 189.53 100.00% 0.00 0.00 0.00%03.06 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 3.00<H<=3.50 m. M 172.52 14.9400 2,577.45 34.50 515.49 20.00% 82.30 1,229.56 47.70% 116.80 1,745.05 67.70% 55.72 832.40 32.30%03.07 EXCAVACION MANUAL DE ZANJA PARA TENDIDO DE TUBERIA a= 0.80 m. HASTA 3.70 m. APROX. M 657.40 116.5100 76,593.67 347.25 40,458.10 52.82% 0.00 0.00 0.00% 347.25 40,458.10 52.82% 310.15 36,135.58 47.18%03.08 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO H<=1.00 m. M3 4.42 31.1100 137.51 0.00 0.00 0.00% 4.42 137.51 100.00% 4.42 137.51 100.00% 0.000000 0.00 0.00%03.09 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 1.00<H<=1.50 m. M3 125.26 35.5600 4,454.25 125.26 4,454.25 100.00% 0.00 0.00 0.00% 125.26 4,454.25 100.00% 0.00 0.00 0.00%03.10 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 1.50<H<=2.00 m. M3 28.75 41.4800 1,192.55 28.75 1,192.55 100.00% 0.00 0.00 0.00% 28.75 1,192.55 100.00% 0.00 0.00 0.00%03.11 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 2.00<H<=2.50 m. M3 14.48 49.7800 720.81 14.48 720.81 100.00% 0.00 0.00 0.00% 14.48 720.81 100.00% 0.00 0.00 0.00%03.12 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 2.50<H<=3.00 m. M3 5.83 62.2100 362.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.83 362.68 100.00%03.13 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 3.00<H<=3.50 m. M3 55.69 82.9501 4,619.49 0.00 0.00 0.00% 33.20 2,753.94 59.62% 33.20 2,753.94 59.62% 22.49 1,865.55 40.38%03.14 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 3.50<H<=4.00 m. M3 7.84 124.4300 975.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.84 975.53 100.00%03.15 ENTIBADO DE ZANJAS DESDE 2.00m A 3.70m DE PROF M 383.96 44.8600 17,224.45 153.58 6,889.78 40.00% 135.60 6,083.02 35.32% 289.18 12,972.79 75.32% 94.78 4,251.65 24.68%03.16 REFINE Y NIVELACION DE ZANJA PARA TUBERIA M 3,278.67 3.7900 12,426.16 983.60 3,727.85 30.00% 1,880.00 7,125.20 57.34% 2,863.60 10,853.05 87.34% 415.07 1,573.11 12.66%03.17 CAMA DE APOYO E=0.10cm, M 3,278.67 5.3300 17,475.31 2,295.07 12,232.72 70.00% 452.60 2,412.36 13.80% 2,747.67 14,645.08 83.80% 531.00 2,830.24 16.20%03.18 RELLENO COMPACTADO CON MATERIAL PROPIO; H<1.00m M 23.25 9.4300 219.25 0.00 0.00 0.00% 23.25 219.25 100.00% 23.25 219.25 100.00% 0.00 0.00 0.00%03.19 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 1.00<H<= 1.50 m. M 2,003.38 10.1000 20,234.14 801.35 8,093.66 40.00% 0.00 0.00 0.00% 801.35 8,093.66 40.00% 1,202.03 12,140.48 60.00%03.20 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 1.50<H<=2.00 m. M 210.68 11.5900 2,441.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 210.68 2,441.78 100.00%03.21 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 2.00>H<=2.50 m. M 195.93 16.5500 3,242.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 195.93 3,242.64 100.00%03.22 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 2.50<H<=3.00 m. M 15.51 16.6900 258.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.51 258.86 100.00%03.23 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 3.00<H<=3.50 m. M 172.52 22.7800 3,930.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 172.52 3,930.01 100.00%03.24 RELLENO COMPACTADO ZANJAS MANUAL P/TUBERIA ALCANTARILLAD0 M 657.40 25.8100 16,967.49 262.96 6,787.00 40.00% 113.50 2,929.44 17.26% 376.46 9,716.43 57.26% 280.94 7,251.06 42.74%03.25 ELIMINACION DE MATERIAL EXCEDENTE M3 430.73 15.5400 6,693.54 0.00 0.00 0.00% 235.70 3,662.78 54.72% 235.70 3,662.78 54.72% 195.03 3,030.77 45.28%04.00 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.0004.01 SUMINISTRO E INSTALACION DE TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435, S-20 D=200mm M 3,278.67 42.7200 140,064.78 983.60 42,019.43 30.00% 1,242.00 53,058.24 37.88% 2,225.60 95,077.67 67.88% 1,053.07 44,987.11 32.12%04.02 DADOS DE CONCRETO TUBERIA BUZON UND 136.00 85.2200 11,589.92 0.00 0.00 0.00% 78.00 6,647.16 57.35% 78.00 6,647.16 57.35% 58.00 4,942.76 42.65%05.00 PRUEBA HIDRAULICA 0.00 0.00 0.00 0.00 0.00 0.0005.01 DOBLE PRUEBA HIDRAULICA Y ESCORRENTIA P/TUBERIA A ZANJA TAPADA D=200mm M 3,278.67 3.6500 11,967.15 655.73 2,393.43 20.00% 1,108.00 4,044.20 33.79% 1,763.73 6,437.63 53.79% 1,514.94 5,529.52 46.21%06.00 BUZONES 0.00 0.00 0.00 0.00 0.00 0.0006.01 BUZON DE CONCRETO D=1.20m, H=1.00m, e=0.20m UND 2.00 1,133.5000 2,267.00 1.00 1,133.50 50.00% 0.00 0.00 0.00% 1.00 1,133.50 50.00% 1.00 1,133.50 50.00%06.02 BUZON DE CONCRETO D=1.20m, 1.00<H<=1.50 m. UND 44.00 1,313.4900 57,793.56 35.20 46,234.85 80.00% 6.40 8,406.34 14.55% 41.60 54,641.18 94.55% 2.40 3,152.38 5.45%06.03 BUZON DE CONCRETO D=1.20m, 1.50<H<=2.00 m. UND 7.00 1,474.8900 10,324.23 5.00 7,374.45 71.43% 1.00 1,474.89 14.29% 6.00 8,849.34 85.71% 1.00 1,474.89 14.29%06.04 BUZON DE CONCRETO D=1.20m, 2.00<H<=2.50 m. UND 3.00 1,885.0000 5,655.00 2.00 3,770.00 66.67% 0.00 0.00 0.00% 2.00 3,770.00 66.67% 1.00 1,885.00 33.33%06.05 BUZON DE CONCRETO D=1.20m, 2.50<H<=3.00 m. UND 1.00 2,397.3900 2,397.39 1.00 2,397.39 100.00% 0.00 0.00 0.00% 1.00 2,397.39 100.00% 0.00 0.00 0.00%06.05 BUZON DE CONCRETO D=1.20m, 3.00<H<=3.50 m. UND 8.00 2,887.9800 23,103.84 4.00 11,551.92 50.00% 2.00 5,775.96 25.00% 6.00 17,327.88 75.00% 2.00 5,775.96 25.00%06.05 BUZON DE CONCRETO D=1.20m, 3.50<H<=4.00 m. UND 1.00 3,727.8000 3,727.80 0.00 0.00 0.00% 1.00 3,727.80 100.00% 1.00 3,727.80 100.00% 0.00 0.00 0.00%07.00 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO 0.00 0.00 0.00 0.00 0.00 0.00

PRECIO UNITARIO

Page 10: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA Nº 02(Periodo : NOVIEMBRE 2015)

Obra :“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Ubicación : DISTRITO DE RIO GRANDE - PALPA - ICA

Tipo de Proceso : EX0 - PROC - 4 - 2015 - MDRG/CE

Contratista : CONSORCIO RANCHERIA

Plazo de Ejecucion : 90 DIAS CALENDARIOS Valor Referencial (S/.) : 1,090,409.40 con IGV

Supervisor : ING. MIGUEL ANGEL HERNANDEZ ESPINO Costos al : May-2015

Residente : ING. WILLIAM ROBERTO MEDINA ZEA Monto del Contrato (S/.) : 1,090,409.40 con IGV

Factor de Relacion : 1.0000

Formula : 001 RED DE ALCANTARILLADO

ITEM DESCRIPCION DE PARTIDAPRESUPUESTO

AVANCESSALDO

ANTERIOR ACTUAL ACUMULADO

UNIDAD METRADO PARCIAL Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %PRECIO UNITARIO

07.01 EXCAVACION DE ZANJA P/CONEX. DOMICILIARIAS Hprom= 1.00 HASTA 3.00m M 1,550.20 6.7300 10,432.85 0.00 0.00 0.00% 723.00 4,865.79 46.64% 723.00 4,865.79 46.64% 827.20 5,567.06 53.36%07.02 REFINE Y NIVELACION DE ZANJA TN P/TUB 6”-8” HASTA 3.00 m DE PROFUNDIDAD M 1,550.20 3.1100 4,821.12 0.00 0.00 0.00% 723.00 2,248.53 46.64% 723.00 2,248.53 46.64% 827.20 2,572.59 53.36%07.03 CAMA DE APOYO E=10CM PARA TUBO HASTA 10” CON MATERIAL SELECTO COMPACTADO M 1,550.20 3.8100 5,906.26 0.00 0.00 0.00% 652.00 2,484.12 42.06% 652.00 2,484.12 42.06% 898.20 3,422.14 57.94%07.04 RELLENO COMPACTADO DE ZANJAS @ 0.30m EN CONEX. DOMIC. C/MAT. PROPIO M 1,550.20 15.9800 24,772.20 0.00 0.00 0.00% 652.00 10,418.96 42.06% 652.00 10,418.96 42.06% 898.20 14,353.24 57.94%07.05 CONEXIONES DOMICILIARIAS SIMPLE DE DESAGUE INCLUYE CAJA Y TAPA CA HASTA L=7.00m 160mm UND 133.00 547.4100 72,805.53 46.55 25,481.94 35.00% 38.00 20,801.58 28.57% 84.55 46,283.52 63.57% 48.45 26,522.01 36.43%07.06 DOBLE PRUEBA HIDRAULICA DE DESAGUE TUBERIA HASTA 160 mm M 1,550.20 2.8700 4,449.07 0.00 0.00 0.00% 522.00 1,498.14 33.67% 522.00 1,498.14 33.67% 1,028.20 2,950.93 66.33%07.07 ELIMINACION DE MATERIAL EXCEDENTE M3 34.24 15.5400 532.09 0.00 0.00 0.00% 12.00 186.48 35.05% 12.00 186.48 35.05% 22.24 345.61 64.95%08.00 COSTOS AMBIENTALES 0.00 0.00 0.00 0.00 0.00 0.0008.01 RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO GB 1.00 4,204.0200 4,204.02 0.25 1,051.01 25.00% 0.50 2,102.01 50.00% 0.75 3,153.02 75.00% 0.25 1,051.01 25.00%09.00 FLETE TERRESTRE 0.00 0.00 0.00 0.00 0.0009.01 FLETE DE MATERIALES, PALPA A OBRA EST 1.00 1,800.0000 1,800.00 0.25 450.00 25.00% 0.50 900.00 50.00% 0.75 1,350.00 75.00% 0.25 450.00 25.00%

0.00 0.00COSTO DIRECTO 621,733.75 243,705.24 39.20% 167,024.22 26.86% 410,729.46 66.06% 211,004.29 33.94%

GASTOS GENERALES % 10.00% 62,173.38 24,370.52 16,702.42 41,072.94 21,100.44UTILIDAD % 5.00% 31,086.69 12,185.26 8,351.21 20,536.47 10,550.22SUB TOTAL 714,993.82 280,261.02 192,077.85 472,338.87 242,654.95FACTOR RELACION 1.00000 1.00000 1.00000 1.00000 1.00000SUB TOTAL * FR 714,993.82 280,261.02 192,077.85 472,338.87 242,654.95I.G.V % 18.00% 128,698.89 50,446.98 34,574.01 85,020.99 43,677.90

COSTO TOTAL 843,692.71 330,708.00 226,651.86 557,359.86 286,332.85

Page 11: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA Nº 02(Periodo : NOVIEMBRE 2015)

Obra : “INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Ubicación : DISTRITO DE RIO GRANDE - PALPA - ICA

Tipo de Proceso : EX0 - PROC - 4 - 2015 - MDRG/CE

Contratista : CONSORCIO RANCHERIA

Plazo de Ejecucion : 90 DIAS CALENDARIOS Valor Referencial (S/.) : 1,090,409.40 con IGV

Supervisor : ING. MIGUEL ANGEL HERNANDEZ ESPINO Costos al : May-2015

Residente : ING. WILLIAM ROBERTO MEDINA ZEA Monto del Contrato (S/.) : 1,090,409.40 con IGV

Factor de Relacion : 1.0000

Formula : 002 LAGUNA

ITEM DESCRIPCION DE PARTIDAPRESUPUESTO

AVANCESSALDO

ANTERIOR ACTUAL ACUMULADO

UNIDAD METRADO PARCIAL Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %

01.00 TRABAJOS PRELIMINARES01.01 TRAZO Y REPLANTEO M2 2511.800 0.550 1,381.4900 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,511.800 1,381.49 100.00%01.02 TALA Y RETIRO DE MALEZA M2 2511.800 0.490 1,230.7820 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,511.80 1,230.78 100.00%02.00 MOVIMIENTO DE TIERRAS 0.0000 0.0002.01 CORTE DE TERRENO NORMAL CON MAQUINARIAS M3 4623.880 5.600 25,893.7280 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4,623.88 25,893.73 100.00%02.02 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO H=1.20M M 118.910 5.600 665.8960 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 118.91 665.90 100.00%02.03 CONFORMACION DE SUELO BASE PARA PISO Y TALUDES DE LAGUNA M3 199.140 21.120 4,205.8368 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 199.14 4,205.84 100.00%02.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 118.910 7.680 913.2288 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 118.91 913.23 100.00%02.05 AFIRMADO DE 4” PARA CORONA M2 754.480 7.210 5,439.8008 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 754.48 5,439.80 100.00%02.06 ELIMINACION DE MATERIAL EXCEDENTE M3 4349.290 15.540 67,587.9666 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4,349.29 67,587.97 100.00%03.00 DISPOSITIVO DE LLEGADA 0.0000 0.0003.01 BUZONES DE LLEGADA 0.0000 0.00

03.01.01 BUZON DE CONCRETO D=1.20m, H=0.70 m. e=0.20m, (BUZONETA) UND 3.000 943.780 2,831.3400 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,831.34 100.00%03.01.02 DADO DE CONCRETO TUBERIA BUZON UND 7.000 83.240 582.6800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 582.68 100.00%

03.02 CAJA DE LLLEGADA Y CANAL DE DERIVACION (REJAS - PARSHALL) 0.0000 0.0003.02.01 SOLADO E= 10CM M2 6.300 22.350 140.8050 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 140.81 100.00%03.02.02 CONCRETO f´c = 175 kg/cm2 M3 3.040 334.650 1,017.3360 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.04 1,017.34 100.00%03.02.03 ENCOFRADO Y DESENCOFRADO NORMAL M2 32.550 35.450 1,153.8975 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.55 1,153.90 100.00%03.02.04 ACERO ESTRUCTURAL Fy = 4200 Kg/cm2 KG 168.050 4.500 756.2250 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 168.05 756.23 100.00%03.02.05 REJILLA METALICA 2” x ¼” UND 1.000 243.880 243.8800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 243.88 100.00%03.02.06 REJILLA METALICA 3/4” x ¼” UND 1.000 143.880 143.8800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 143.88 100.00%

03.03 LOSA DE CAIDA 0.0000 0.00 0.00 0.0003.03.01 SOLADO E = 10 CM M2 17.290 22.350 386.4315 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.29 386.43 100.00%03.03.02 CONCRETO EN LOSA DE CAIDAF'C= 175 KG/CM2 M3 3.460 268.060 927.4876 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.46 927.49 100.00%03.03.03 ENCOFRADO Y DESENCOFRADO LOSA DE CAIDA M2 7.200 38.400 276.4800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 276.48 100.00%03.03.04 ACERO ESTRUCTURAL f'y =4200Kg/cm2. KG 176.240 4.500 793.0800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 176.24 793.08 100.00%03.03.05 REVESTIMIENTO DE LOSA DE CAIDA CON ADITIVO E=1CM M2 18.730 23.760 445.0248 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.73 445.02 100.00%

03.04 OTROS 0.0000 0.0003.04.01 SUMINISTRO E INSTALACION DE TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435,S-25 D=200m M 57.610 42.720 2,461.0992 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 57.61 2,461.10 100.00%03.04.02 COMPUERTA DE DISPOSITIVO DE ENTRADA DE 0.30x0.22m UND 1.000 162.070 162.0700 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 162.07 100.00%

04.00 DISPOSITIVO DE SALIDA 0.0000 0.0004.01 DISPOSITIVO DE SALIDAD DE LAGUNA 0.0000 0.00

04.01.01 SOLADO E= 10CM M2 9.820 22.350 219.4770 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.82 219.48 100.00%04.01.02 CONCRETO EN LOSA DE CAIDA F'C= 175 KG/CM2 M3 11.230 268.060 3,010.3138 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.23 3,010.31 100.00%04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL M2 75.820 35.450 2,687.8190 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.82 2,687.82 100.00%04.01.04 ACERO ESTRUCTURAL Fy = 4200 Kg/cm2 KG 719.640 4.500 3,238.3800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 719.64 3,238.38 100.00%04.01.05 REVESTIMIENTO DE DISPOSITIVO DE SALIDA CON ADITIVO E=1CM M2 87.150 23.760 2,070.6840 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.15 2,070.68 100.00%

04.02 BUZON DE SALIDA 0.0000 0.0004.02.01 BUZON DE CONCRETO D=1.20m, H=2.10 m, e=0.20m. UND 2.000 1830.320 3,660.6400 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 3,660.64 100.00%04.02.02 BUZON DE CONCRETO D=1.20m, H=1.30 m, e=0.20m. UND 1.000 995.430 995.4300 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 995.43 100.00%04.02.03 DADO DE CONCRETO TUBERIA BUZON UND 7.000 83.240 582.6800 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 582.68 100.00%

04.03 SUMINISTRO E INSTALACION DE TUBERIAS 0.0000 0.0004.03.01 SUMINISTRO E INSTALACION DE TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435,S-25 D=200m M 61.300 42.720 2,618.7360 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.30 2,618.74 100.00%

04.04 OTROS 0.0000 0.0004.04.01 COMPUERTA DE FIERRO DE DISPOSITIVO DE SALIDA DE 0.50 x 1.60 M UND 1.000 1079.850 1,079.8500 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,079.85 100.00%04.04.02 COMPUERTA DE FIERRO DE DISPOSITIVO DE SALIDA DE 0.50 X 0.80 m. UND 1.000 639.920 639.9200 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 639.92 100.00%04.04.03 DOBLE PRUEBA HIDRAULICA Y ESCORRENTIA P/TUBERIA A ZANJA TAPADA D=160mm M 118.910 5.070 602.8737 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 118.91 602.87 100.00%04.04.04 CAJA DE SALIDA DE TUBERIA HACIA CANAL SEGÚN DISEÑO UND 1.000 270.380 270.3800 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 270.38 100.00%

05.00 GEOMEMBRANAS 0.0000 0.0005.01 SUMINISTRO E INSTALACION DE GEOMEMBRANA M2 1776.200 20.540 36,483.1480 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,776.20 36,483.15 100.00%06.00 CERCO PERIMETRICO 0.0000 0.0006.01 MOVIMIENTO DE TIERRAS 0.0000 0.00

PRECIO UNITARIO

Page 12: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA Nº 02(Periodo : NOVIEMBRE 2015)

Obra : “INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Ubicación : DISTRITO DE RIO GRANDE - PALPA - ICA

Tipo de Proceso : EX0 - PROC - 4 - 2015 - MDRG/CE

Contratista : CONSORCIO RANCHERIA

Plazo de Ejecucion : 90 DIAS CALENDARIOS Valor Referencial (S/.) : 1,090,409.40 con IGV

Supervisor : ING. MIGUEL ANGEL HERNANDEZ ESPINO Costos al : May-2015

Residente : ING. WILLIAM ROBERTO MEDINA ZEA Monto del Contrato (S/.) : 1,090,409.40 con IGV

Factor de Relacion : 1.0000

Formula : 002 LAGUNA

ITEM DESCRIPCION DE PARTIDAPRESUPUESTO

AVANCESSALDO

ANTERIOR ACTUAL ACUMULADO

UNIDAD METRADO PARCIAL Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %PRECIO UNITARIO

06.01.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 8.400 31.110 261.3240 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.40 261.32 100.00%06.02 OBRAS DE CONCRETO SIMPLE 0.0000 0.00

06.02.01 CONCRETO CICLOPEO PARA CIMENTACION 1:10 + 30% P.G. M3 7.200 170.710 1,229.1120 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 1,229.11 100.00%06.03 CERCO 0.0000 0.00

06.03.01 CERCO PERIMETRICO DE SEGURIDAD M 209.640 11.1501 2,337.5070 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 209.64 2,337.51 100.00%06.03.02 PUERTA DE INGRESO UND 1.000 181.660 181.6600 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 181.66 100.00%

COSTO DIRECTO 181,810.38 0.00 0.00% 0.00 0.00% 0.00 0.00% 181,810.38 100.00%GASTOS GENERALES % 10.00% 18,181.04 0.00 0.00 0.00 18,181.04UTILIDAD % 5.00% 9,090.52 0.00 0.00 0.00 9,090.52SUB TOTAL 209,081.94 0.00 0.00 0.00 209,081.94FACTOR RELACION 1.00000 1.00000 1.00000 1.00000 1.00000SUB TOTAL * FR 209,081.94 0.00 0.00 0.00 209,081.94I.G.V % 18.00% 37,634.75 0.00 0.00 0.00 37,634.75

COSTO TOTAL 246,716.69 0.00 0.00 0.00 246,716.69

Page 13: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

CALENDARIO VALORIZADO DE AVANCE DE OBRA ADECUADO A LA FECHA DE INICIO

Obra :

Ubicación : DISTRITO DE RIO GRANDE - PALPA - ICA

Tipo de Proceso : EX0 - PROC - 4 - 2015 - MDRG/CE

Contratista : CONSORCIO RANCHERIA

Valor Referencial (S/.) : 1,090,409.40 con IGV

Costos al : 15-May-2015

Monto del Contrato (S/.) : 1,090,409.40 con IGV

Factor de Relacion : 1.00000

Plazo de Ejecucion : 90 dias calendarios

Supervisor : ING. MIGUEL ANGEL HERNANDEZ ESPINO

Residente : ING. WILLIAM ROBERTO MEDINA ZEA

Items Descripción Monto Total (S/.)

Mes 1 Mes 2 Mes 3 Mes 4 Mes 517-Oct-15 01-Nov-15 01-Dec-15 01-Jan-16 31-Oct-15 30-Nov-15 31-Dec-15 14-Jan-16

( 15 ) ( 30 ) ( 31 ) ( 14 )

001 RED DE ALCANTARILLADO 621,733.75 134,779.62 266,942.05 191,175.08 28,837.00002 LAGUNA 181,810.39 96,389.39 85,420.99

COSTO DIRECTO 803,544.14 134,779.62 363,331.44 276,596.07 28,837.00GASTOS GENERALES Y UTILIDAD 15.0% 120,531.62 20,216.94 54,499.72 41,489.41 4,325.55SUB TOTAL 924,075.76 154,996.56 417,831.16 318,085.48 33,162.55FACTOR DE RELACION 1.0 924,075.76 154,996.56 417,831.16 318,085.48 33,162.55I.G.V. 18.00% 166,333.64 27,899.38 75,209.61 57,255.39 5,969.26MONTO CONTRATADO 1,090,409.40 182,895.94 493,040.77 375,340.87 39,131.81

% MENSUAL 16.77% 45.22% 34.42% 3.59%% ACUMULADO 16.77% 61.99% 96.41% 100.00%

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 14: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA Nº 01 - CURVA "S"(Periodo : NOVIEMBRE 2015)

Obra : “INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Ubicación : DISTRITO DE RIO GRANDE - PALPA - ICA

Tipo de Proceso : EX0 - PROC - 4 - 2015 - MDRG/CE

Contratista : CONSORCIO RANCHERIA

Plazo de Ejecucion : 90 DIAS CALENDARIOS Valor Referencial (S/.) : 1,090,409.40 con IGV

Supervisor : ING. MIGUEL ANGEL HERNANDEZ ESPINO Costos al : May-2015

Residente : ING. WILLIAM ROBERTO MEDINA ZEA Monto del Contrato (S/.) : 1,090,409.40 con IGV

Factor de Relacion : 1.0000

SITUACIÓN ACTUAL DE LA OBRA

ADELANTADA

30.33%

0 1 2 3 4 5 6 7 8

DESCRIPCIÓN Inicio

Programado 154,996.56 417,831.16 318,085.48 33,162.55

Real 280,261.02 192,077.85 0.00 0.00% PROGR Parcial 16.77% 45.22% 34.42% 3.59%

Acumulado 0% 16.77% 61.99% 96.41% 100.00%

% REAL Parcial 30.33% 20.79%

Acumulado 0% 30.33% 51.12%

del 17 al 31/10/2015

del 01 al 30/11/2015

del 01 al 31/12/2015

del 01 al 14/01/2015

VALORIZACION

Inicio del 17 al 31/10/2015

del 01 al 30/11/2015

del 01 al 31/12/2015

del 01 al 14/01/2015

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

0%

16.77%

61.99%

96.41%

100.00%

0%

30.33%

51.12%

Programado

Ejecutado

MESES

PORC

ENTA

JE

Page 15: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA No 02

NOVIEMBRE DEL 2015

AMORTIZACION DEL ADELANTO DIRECTO

OBRA

PROPIETARIO MUNICIPALIDAD DISTRITAL DE RIO GRANDE

CONTRATISTA CONSORCIO RANCHERIA

SUPERVISION ING. MIGUEL ANGEL HERNANDEZ ESPINO

FECHA PRES BASE 5/15/2015

MONTO ADELANTO S/. - (con IGV) S/. - (sin IGV)

MONTO DEL CONTRATO S/. 1,090,409.40 (con IGV) S/. 924,075.76 (sin IGV)

PORCENTAJE DE ADELANTO 0.00%

ValorizaciónAmortización

Saldo por

Nº Mes Monto sin IGV Amortizar

01 (OCTUBRE DE 2015) 0.00 0.00 0.00

02 (NOVIEMBRE DE 2015) 0.00 0.00 0.00

03 (DICIEMBRE DE 2015) 0.00 0.00 0.00

04 (ENERO DE 2016) 0.00 0.00 0.00

05 (FEBRERO DE 2016) 0.00 0.00 0.00

TOTAL ACUMULADO 0.00

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 16: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA No 02METRADOS - OCTUBRE DEL 2015

OBRA

PROPIETARIO MUNICIPALIDAD DISTRITAL DE RIO GRANDE

CONTRATISTA CONSORCIO RANCHERIA VALORIZACION Nº : 1.00

SUPERVISION ING. MIGUEL ANGEL HERNANDEZ ESPINO FECHA : 31-Oct-15

FECHA PRES.BAS 5/15/2015 P. REFERENCIAL C/I.G.V. :

P. CONTRATO C/I.G.V. :

FACTOR DE RELACION : 1.00000 Nº

DESCRIPCION DE PARTIDA PRESUPUESTO

% EJECUTADO PART. UND METRADO OCTUBRE NOVIEMBRE DICIEMBRE ENERO TOTAL

RED DE ALCANTARILLADO

01.00 OBRAS PROVISIONALES01.01 CASETA PARA OFICINA Y ALMACEN GLB 1.00 1.00 0.00 1.00 0.00 100.00%

01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS, MAQUINARIAS Y HERRAMIENTAS GLB 1.00 0.33 0.33 0.66 0.34 66.00%

01.03 TRANQUERA DE MADERA MOVIL PARA DESVIACION VEHICULAR Y/O PEATONAL UND 8.00 4.00 4.00 8.00 0.00 100.00%

01.04 SEÑALIZACION EN OBRA (CINTA DE SEGURIDAD) M 3,360.27 1680.14 840.07 2,520.20 840.07 75.00%

01.05 PUENTE DE MADERA PARA PASE PEATONAL UND 8.00 2.00 6.00 8.00 0.00 100.00%

01.06 SERVICIOS HIGIENICOS PORTATILES MES 4.00 1.00 3.00 4.00 0.00 100.00%

02.00 TRABAJOS PRELIMINARES - 0.00

02.01 TRAZO, NIVELES Y REPLANTEO EN REDES DE ALCANTARILLADO M 3,360.27 2688.22 672.05 3,360.27 0.00 100.00%

03.00 MOVIMIENTO DE TIERRAS - 0.00

03.01 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO H<=1.00 m. M 23.25 23.00 23.00 0.25 98.92%

03.02 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 1.00<H<=1.50 m. M 2,003.38 814.00 985.00 1,799.00 204.38 89.80%

03.03 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 1.50<H<=2.00 m. M 210.68 99.70 44.40 144.10 66.58 68.40%

03.04 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 2.00<H<=2.50 m. M 195.93 80.31 80.00 160.31 35.62 81.82%

03.05 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 2.50<H<=3.00 m. M 15.51 0.00 15.51 15.51 0.00 100.00%

03.06 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO 3.00<H<=3.50 m. M 172.52 34.50 82.30 116.80 55.72 67.70%

03.07 EXCAVACION MANUAL DE ZANJA PARA TENDIDO DE TUBERIA a= 0.80 m. HASTA 3.7 M 657.40 347.25 347.25 310.15 52.82%

03.08 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO H<=1.00 m. M3 4.42 4.42 4.42 0.00 100.00%

03.09 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 1.00<H<=1.50 m. M3 125.26 125.26 125.26 0.00 100.00%

03.10 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 1.50<H<=2.00 m. M3 28.75 28.75 28.75 0.00 100.00%

03.11 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 2.00<H<=2.50 m. M3 14.48 14.48 14.48 0.00 100.00%

03.12 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 2.50<H<=3.00 m. M3 5.83 - 5.83 0.00%

03.13 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 3.00<H<=3.50 m. M3 55.69 33.20 33.20 22.49 59.62%

03.14 EXCAVACION MANUAL PARA BUZON EN TERRENO GRAVOSO 3.50<H<=4.00 m. M3 7.84 - 7.84 0.00%

03.15 ENTIBADO DE ZANJAS DESDE 2.00m A 3.70m DE PROF M 383.96 153.58 135.60 289.18 94.78 75.32%

03.16 REFINE Y NIVELACION DE ZANJA PARA TUBERIA M 3,278.67 983.60 1880.00 2,863.60 415.07 87.34%

03.17 CAMA DE APOYO E=0.10cm, M 3,278.67 2295.07 452.60 2,747.67 531.00 83.80%

03.18 RELLENO COMPACTADO CON MATERIAL PROPIO; H<1.00m M 23.25 23.25 23.25 0.00 100.00%

03.19 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 1.00<H<= 1.50 m. M 2,003.38 801.35 801.35 1,202.03 40.00%

03.20 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 1.50<H<=2.00 m. M 210.68 - 210.68 0.00%

03.21 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 2.00>H<=2.50 m. M 195.93 - 195.93 0.00%

03.22 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 2.50<H<=3.00 m. M 15.51 - 15.51 0.00%

03.23 RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO 3.00<H<=3.50 m. M 172.52 - 172.52 0.00%

03.24 RELLENO COMPACTADO ZANJAS MANUAL P/TUBERIA ALCANTARILLAD0 M 657.40 262.96 113.50 376.46 280.94 57.26%

03.25 ELIMINACION DE MATERIAL EXCEDENTE M3 430.73 235.70 235.70 195.03 54.72%

04.00 SUMINISTRO E INSTALACION DE TUBERIAS - 0.00

04.01 SUMINISTRO E INSTALACION DE TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435 M 3,278.67 983.60 1242.00 2,225.60 1,053.07 67.88%

04.02 DADOS DE CONCRETO TUBERIA BUZON UND 136.00 78.00 78.00 58.00 57.35%

05.00 PRUEBA HIDRAULICA - 0.00

05.01 DOBLE PRUEBA HIDRAULICA Y ESCORRENTIA P/TUBERIA A ZANJA TAPADA D=200m M 3,278.67 655.73 1108.00 1,763.73 1,514.94 53.79%

06.00 BUZONES - 0.00

06.01 BUZON DE CONCRETO D=1.20m, H=1.00m, e=0.20m UND 2.00 1.00 1.00 1.00 50.00%

06.02 BUZON DE CONCRETO D=1.20m, 1.00<H<=1.50 m. UND 44.00 35.20 6.40 41.60 2.40 94.55%

06.03 BUZON DE CONCRETO D=1.20m, 1.50<H<=2.00 m. UND 7.00 5.00 1.00 6.00 1.00 85.71%

06.04 BUZON DE CONCRETO D=1.20m, 2.00<H<=2.50 m. UND 3.00 2.00 2.00 1.00 66.67%

06.05 BUZON DE CONCRETO D=1.20m, 2.50<H<=3.00 m. UND 1.00 1.00 1.00 0.00 100.00%

06.05 BUZON DE CONCRETO D=1.20m, 3.00<H<=3.50 m. UND 8.00 4.00 2.00 6.00 2.00 75.00%

06.05 BUZON DE CONCRETO D=1.20m, 3.50<H<=4.00 m. UND 1.00 1.00 1.00 0.00 100.00%

07.00 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO - 0.00

07.01 EXCAVACION DE ZANJA P/CONEX. DOMICILIARIAS Hprom= 1.00 HASTA 3.00m M 1550.20 723.00 723.00 827.20 46.64%

07.02 REFINE Y NIVELACION DE ZANJA TN P/TUB 6”-8” HASTA 3.00 m DE PROFUNDIDAD M 1550.20 723.00 723.00 827.20 46.64%

07.03 CAMA DE APOYO E=10CM PARA TUBO HASTA 10” CON MATERIAL SELECTO COMPA M 1550.20 652.00 652.00 898.20 42.06%

07.04 RELLENO COMPACTADO DE ZANJAS @ 0.30m EN CONEX. DOMIC. C/MAT. PROPIO M 1550.20 652.00 652.00 898.20 42.06%

07.05 CONEXIONES DOMICILIARIAS SIMPLE DE DESAGUE INCLUYE CAJA Y TAPA CA HASTA UND 133.00 46.55 38.00 84.55 48.45 63.57%

07.06 DOBLE PRUEBA HIDRAULICA DE DESAGUE TUBERIA HASTA 160 mm M 1550.20 522.00 522.00 1,028.20 33.67%

07.07 ELIMINACION DE MATERIAL EXCEDENTE M3 34.24 12.00 12.00 22.24 35.05%

08.00 COSTOS AMBIENTALES - 0.00

08.01 RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO GB 1.00 0.25 0.50 0.75 0.25 75.00%

09.00 FLETE TERRESTRE - 0.00

09.01 FLETE DE MATERIALES, PALPA A OBRA EST 1.00 0.25 0.50 0.75 0.25 75.00%

LAGUNAS

01.00 TRABAJOS PRELIMINARES01.01 TRAZO Y REPLANTEO M2 2511.80 - 2,511.80 0.00%

01.02 TALA Y RETIRO DE MALEZA M2 2511.80 - 2,511.80 0.00%

02.00 MOVIMIENTO DE TIERRAS - 0.00

02.01 CORTE DE TERRENO NORMAL CON MAQUINARIAS M3 4623.88 4,623.88

02.02 EXCAVACION CON EQUIPO T.N. P/TUBERIA ALCANTARILLADO H=1.20M M 118.91 - 118.91 0.00%

02.03 CONFORMACION DE SUELO BASE PARA PISO Y TALUDES DE LAGUNA M3 199.14 - 199.14 0.00%

02.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 118.91 - 118.91 0.00%

02.05 AFIRMADO DE 4” PARA CORONA M2 754.48 - 754.48 0.00%

02.06 ELIMINACION DE MATERIAL EXCEDENTE M3 4349.29 - 4,349.29 0.00%

03.00 DISPOSITIVO DE LLEGADA - 0.00

03.01 BUZONES DE LLEGADA - 0.00

03.01.01 BUZON DE CONCRETO D=1.20m, H=0.70 m. e=0.20m, (BUZONETA) UND 3.00 - 3.00 0.00%

03.01.02 DADO DE CONCRETO TUBERIA BUZON UND 7.00 7.00

03.02 CAJA DE LLLEGADA Y CANAL DE DERIVACION (REJAS - PARSHALL) - 0.00

03.02.01 SOLADO E= 10CM M2 6.3 - 6.30 0.00%

03.02.02 CONCRETO f´c = 175 kg/cm2 M3 3.04 3.04

03.02.03 ENCOFRADO Y DESENCOFRADO NORMAL M2 32.55 - 32.55 0.00%

03.02.04 ACERO ESTRUCTURAL Fy = 4200 Kg/cm2 KG 168.05 - 168.05 0.00%

03.02.05 REJILLA METALICA 2” x ¼” UND 1 - 1.00 0.00%

03.02.06 REJILLA METALICA 3/4” x ¼” UND 1 - 1.00 0.00%

03.03 LOSA DE CAIDA - 0.00

03.03.01 SOLADO E = 10 CM M2 17.29 - 17.29 0.00%

03.03.02 CONCRETO EN LOSA DE CAIDAF'C= 175 KG/CM2 M3 3.46 - 3.46 0.00%

03.03.03 ENCOFRADO Y DESENCOFRADO LOSA DE CAIDA M2 7.20 7.20

03.03.04 ACERO ESTRUCTURAL f'y =4200Kg/cm2. KG 176.24 - 176.24 0.00%

03.03.05 REVESTIMIENTO DE LOSA DE CAIDA CON ADITIVO E=1CM M2 18.73 - 18.73 0.00%

03.04 OTROS - 0.00

03.04.01 SUMINISTRO E INSTALACION DE TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435 M 57.61 57.61

03.04.02 COMPUERTA DE DISPOSITIVO DE ENTRADA DE 0.30x0.22m UND 1.00 - 1.00 0.00%

04.00 DISPOSITIVO DE SALIDA - 0.00

04.01 DISPOSITIVO DE SALIDAD DE LAGUNA - 0.00

04.01.01 SOLADO E= 10CM M2 9.82 - 9.82 0.00%

04.01.02 CONCRETO EN LOSA DE CAIDA F'C= 175 KG/CM2 M3 11.23 - 11.23 0.00%

04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL M2 75.82 - 75.82 0.00%

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

SALDO DE OBRA

Page 17: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

VALORIZACION DE OBRA No 02METRADOS - OCTUBRE DEL 2015

OBRA

PROPIETARIO MUNICIPALIDAD DISTRITAL DE RIO GRANDE

CONTRATISTA CONSORCIO RANCHERIA VALORIZACION Nº : 1.00

SUPERVISION ING. MIGUEL ANGEL HERNANDEZ ESPINO FECHA : 31-Oct-15

FECHA PRES.BAS 5/15/2015 P. REFERENCIAL C/I.G.V. :

P. CONTRATO C/I.G.V. :

FACTOR DE RELACION : 1.00000 Nº

DESCRIPCION DE PARTIDA PRESUPUESTO

% EJECUTADO PART. UND METRADO OCTUBRE NOVIEMBRE DICIEMBRE ENERO TOTAL

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

SALDO DE OBRA

04.01.04 ACERO ESTRUCTURAL Fy = 4200 Kg/cm2 KG 719.64 - 719.64 0.00%

04.01.05 REVESTIMIENTO DE DISPOSITIVO DE SALIDA CON ADITIVO E=1CM M2 87.15 - 87.15 0.00%

04.02 BUZON DE SALIDA - 0.00

04.02.01 BUZON DE CONCRETO D=1.20m, H=2.10 m, e=0.20m. UND 2.00 - 2.00 0.00%

04.02.02 BUZON DE CONCRETO D=1.20m, H=1.30 m, e=0.20m. UND 1.00 - 1.00 0.00%

04.02.03 DADO DE CONCRETO TUBERIA BUZON UND 7.00 - 7.00 0.00%

04.03 SUMINISTRO E INSTALACION DE TUBERIAS - 0.00

04.03.01 SUMINISTRO E INSTALACION DE TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435 M 61.30 61.30

04.04 OTROS - 0.00

04.04.01 COMPUERTA DE FIERRO DE DISPOSITIVO DE SALIDA DE 0.50 x 1.60 M UND 1.00 - 1.00 0.00%

04.04.02 COMPUERTA DE FIERRO DE DISPOSITIVO DE SALIDA DE 0.50 X 0.80 m. UND 1.00 - 1.00 0.00%

04.04.03 DOBLE PRUEBA HIDRAULICA Y ESCORRENTIA P/TUBERIA A ZANJA TAPADA D=160m M 118.91 - 118.91 0.00%

04.04.04 CAJA DE SALIDA DE TUBERIA HACIA CANAL SEGÚN DISEÑO UND 1.00 1.00

05.00 GEOMEMBRANAS 0.00

05.01 SUMINISTRO E INSTALACION DE GEOMEMBRANA M2 1,776.20 - 1,776.20 0.00%

06.00 CERCO PERIMETRICO -

06.01 MOVIMIENTO DE TIERRAS -

06.01.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 8.40 - 8.40 0.00%

06.02 OBRAS DE CONCRETO SIMPLE - 0.00

06.02.01 CONCRETO CICLOPEO PARA CIMENTACION 1:10 + 30% P.G. M3 7.20 - 7.20 0.00%

06.03 CERCO - 0.00

06.03.01 CERCO PERIMETRICO DE SEGURIDAD M 209.64 - 209.64 0.00%

06.03.02 PUERTA DE INGRESO UND 1.00 - 1.00 0.00%

Page 18: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

INFORME VAL- N°0002-2015/CR

A : ING. MIGUEL ANGEL HERNANDEZ ESPINOSupervisor de Obra

DE : ING. WILLIAM ROBERTO MEDINA ZEARESIDENTE DE OBRA

ASUNTO : VALORIZACION MENSUAL N° 02Correpondiente al mes de OCTUBRE 2015

REFERENCIA : EXO - PROC - 4 - 2015 - MDRG/CEO b r a :

Contratista: CONSORCIO RANCHERIA

FECHA : Rio Grande, 04 de Diciembre del 2015

Me dirijo a Ud. para remitirle adjunto al presente, el expediente de la Valorización Mensual N° 02 de la Obra de la referencia, correspondiente a los trabajos ejecutados al 30 de Noviembre del 2015 por la Empresa Contratista:

CONSORCIO RANCHERIALos cálculos fueron elaborados por la Supervision y se tienen como resultado lo siguiente:

A. VALORIZACION CONTRACTUAL (V)RED DE ALCANTARILLADO 192,077.85LAGUNA 0.00

SUB-TOTAL S/. 192,077.85

AVANCE PROGRAMADO ACUMULADO 61.99%AVANCE REAL ACUMULADO 51.12% ATRASADA

-10.86%B. REAJUSTE (S)

ESTRUCTURAS 0.00ARQUITECTURA 0.00INSTAL. SANITARIAS 0.00INSTAL. ELECTRICAS 0.00SUB-TOTAL 0.00

SUB-TOTAL (S) 0.00

MONTO DE LA VALORIZACION BRUTA (VB=V+S) S/. 192,077.85

C. AMORTIZACION (A)Amortización del Adelanto Directo 0.00Amortización del Adelanto de Materiales 0.00Total Amortización 0.00

MONTO DE LA VALORIZACION NETA (VN=VB-A) S/. 192,077.85

“INSTALACION DE LA RED DE ALCANTARILLADO Y DISPOSICION FINAL DE AGUAS RESIDUALES EN EL CENTRO POBLADO DE RANCHERIA Y PAUCARRASTRO, DISTRITO DE RIO GRANDE, PROVINCIA DE PALPA, DEPARTAMENTO DE ICA"

Page 19: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

D. RETENCIONES (R)

Multa por atraso de obra -

E. MONTO A PAGAR AL CONTRATISTAEn Efectivo 192,077.85En I.G.V. (18%VN) 34,574.01MONTO TOTAL DE LA VALORIZACION CON I.G.V. 226,651.86

F. TOTAL COMPROMISO A SOLICITAR S/. 226,651.86

_ Se adjunta copia de SCRT, SUNAT, CONAFOVICER, SENCICO._ El monto acumulado real supera el 80% del acumulado programado, por lo que

no es necesario una reprogramacion

Atentamente,

Page 20: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

3.2 0.1192424

13683

286

Page 21: VALORIZACION N° 02 CONSORCIO RANCHERIA - PALPA 2015 II

0.32