Obra: CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
Contratista: Constructora G. Mori S.R.L.
Cliente: GOBIERNO REGIONAL DE LAMBAYEQUE Sede Central (REGIN LAMBAYEQUE)
Lugar: CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
Inspector: ING JAVIER GONZALES BERNILLA
Contrato: N 014-2014-GR.LAMB
Presupuesto: S/. 1,625,717.22
VALORIZACION 02 - MES OCTUBRE 2014ITEM DESCRIPCION Und.
01 OBRAS PROVISIONALES 01.01 CARTEL DE 3.60X8.5M TIPO BARNER PARA OBRA und.01.02 CASETA PARA GUARDIAN Y/O DEPOSITO est.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS GLB02 PAVIMENTACIN FLEXIBLE02.01 TRABAJOS PRELIMINARES02.01.01 TRAZO Y REPLANTEO m202.02 MOVIMIENTO DE TIERRAS02.02.01 CORTE DE TERRENO NATURAL m302.02.02 PERFILADO Y COMPACTADO DE LA SUBRASANTE m202.02.03 ELIMINACION DE MATERIAL EXCEDENTE m302.03 PAVIMENTOS02.03.01 SUB BASE GRANULAR E=0.25M m202.03.02 BASE GRANULAR E=0.20M m2
02.03.03 IMPRIMACIN ASFLTICA m202.03.04 CARPETA ASFLTICA EN CALIENTE DE 2" m203 VEREDAS DE CONCRETO03.01 TRABAJOS PRELIMINARES03.01.01 TRAZO NIVELES Y REPLANTEO m203.02 MOVIMIENTO DE TIERRAS03.02.01 EXCAVACION DE ZANJAS P/VEREDAS m303.02.02 DEMOLICION DE VEREDAS DE 0.10M m203.02.03 ACARREO DE MATERIAL ECXEDENTE CON CERRETILLA D=0.50M m303.02.04 NIVELACION INTERIOR APISONADO EQUIPO LIVIANO m203.02.05 ELIMINACION DE MATERIAL EXCEDENTE m303.03 VEREDAS DE CONCRETO03.03.01 CAMA DE ARENILLA E=0.10M m203.03.02 CAMA DE AFIRMADO E=0.10M m203.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m203.03.04 CONCRETO EN UA F'c= 175 kg/cm2 m303.03.05 CONCRETO EN LOSA F'c= 175 kg/cm2 m203.03.06 CURADO DE VEREDAS m203.03.07 JUNTAS ASFLTICAS 1" m04 SARDINELES DE CONCRETO04.01 TRABAJOS PRELIMINARES04.01.01 TRAZO NIVELES Y REPLANTEO m204.01.02 EXCAVACION DE ZANJAS SARDINALES m304.01.03 ACARREO DE MATERIAL ECXEDENTE CON CERRETILLA D=0.50M m304.01.04 ELIMINACION DE MATERIAL EXCEDENTE m304.02 CONCRETO PARA SARDINELES04.02.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m204.02.02 CONCRETO EN SARDINELES F'c= 175 kg/cm2 m304.02.03 JUNTAS ASFLTICAS 1" m04.02.04 PINTURA DE SARDINELES C/ESMALTE ECONMICO m05 REAS VERDES05.01 SEMBRADO DE GRAS INCLUIDO TIERRA AGRCOLA m205.02 SEMBRADO DE PLANTONES und.
06 VARIOS06.01 PLACA RECORDATORIA INSTALADA und.06.02 LIMPIEZA DE OBRA TERMINADA m206.03 NIVELACIN GENERAL DE BUZONES und.06.04 SEALIZACION DE PAVIMENTO m206.05 PRUEBA COMPACTACIN SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO) GLB06.06 ENSAYOS Y PRUEBAS GLB06.07 TRANSPORTE TERRESTRE - CEMENTO BOL06.08 TRANSPORTE DE MADERA p206.09 TRANSPORTE A LA OBRA - OTROS m3
COSTO DIRECTOGASTOS GENERALES(10%)UTILIDAD(8%)SUBTOTALSUB TOTAL X FACTOR DE RELACION (0.90) =SUB TOTAL CONTRACTUAL =IGV(18%)PRESUPUESTO
SON : UN MILLON SEISCIENTOS VEINTICINCO MIL SETECIENTOS DIECISIETE Y 20/100 NUEVOS SOLES
CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
GOBIERNO REGIONAL DE LAMBAYEQUE Sede Central (REGIN LAMBAYEQUE)
CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
VALORIZACION 02 - MES OCTUBRE 2014Metrado Precio Unit. Parcial
CANTERIOR ACTUAL
Metrado Costo % Metrado9,651.75
1.00 993.51 993.51 1 993.51 100.00% 05.00 1000.00 5,000.00 1 1000.00 20.00% 11.00 3658.24 3,658.24 0.6 2194.94 60.00% 0.15
911,702.1617,086.05
10,678.78 1.60 17,086.05 10678.78 17086.05 100.00% 060,069.46
1,334.85 5.93 7,915.66 1334.85 7915.66 100.00% 010,678.78 2.63 28,085.19 10678.78 28085.19 100.00% 01,735.30 13.87 24,068.61 1388.24 19254.89 80.00% 347.06
834,546.6510,678.78 16.15 172,462.30 6407.268 103477.38 60.00% 3203.63410,678.78 14.72 157,191.64 0 0.00 0.00% 9076.963
10,678.78 6.39 68,237.40 0 0.00 0.00% 010,678.78 40.89 436,655.31 0 0.00 0.00% 0
220,132.244,594.80
2,871.75 1.60 4,594.80 0 0.00 0.00% 430.762535,669.56
287.17 36.01 10,340.99 0 0.00 0.00% 43.0755415.93 8.39 3,489.65 0 0.00 0.00% 41.593373.33 31.32 11,692.70 0 0.00 0.00% 55.9995
2,871.75 1.73 4,968.13 0 0.00 0.00% 0373.33 13.87 5,178.09 0 0.00 0.00% 0
179,867.882,871.75 8.83 25,357.55 0 0.00 0.00% 287.1752,871.75 11.66 33,484.61 0 0.00 0.00% 287.175364.25 32.20 11,728.85 0 0.00 0.00% 36.42554.10 298.30 16,138.03 0 0.00 0.00% 0
2,871.75 29.99 86,123.78 0 0.00 0.00% 02,871.75 0.81 2,326.12 0 0.00 0.00% 0896.94 5.25 4,708.94 0 0.00 0.00% 0
44,275.184,503.37
900.91 1.60 1,441.46 0 0.00 0.00% 032.31 36.01 1,163.48 0 0.00 0.00% 042.01 31.32 1,315.75 0 0.00 0.00% 042.01 13.87 582.68 0 0.00 0.00% 0
39,771.81215.43 32.20 6,936.85 0 0.00 0.00% 048.47 298.30 14,458.60 0 0.00 0.00% 0
179.53 5.25 942.53 0 0.00 0.00% 01,615.74 10.79 17,433.83 0 0.00 0.00% 0
55,744.531,475.71 35.89 52,963.23 0 0.00 0.00% 0219.00 12.70 2,781.30 0 0.00 0.00% 0
55,788.351.00 498.64 498.64 0 0.00 0.00% 0
14,451.44 0.98 14,162.41 0 0.00 0.00% 025.00 523.73 13,093.25 0 0.00 0.00% 15
2,972.80 6.23 18,520.54 0 0.00 0.00% 01.00 2500.00 2,500.00 0.25 625.00 25.00% 0.251.00 2500.00 2,500.00 0 0.00 0.00% 0
3,459.00 0.95 3,286.05 0 0.00 0.00% 691.84,958.00 0.12 594.96 0 0.00 0.00% 0
10.00 63.25 632.50 6 379.50 60.00% 1 S/. 1,297,294.21 S/. 181,012.12 13.95% S/. 129,729.42 S/. 18,101.21 S/. 103,783.54 S/. 14,480.97 S/. 1,530,807.16 S/. 213,594.30 S/. 1,377,726.46 S/. 192,234.87 S/. 1,377,726.46 S/. 192,234.87 S/. 247,990.76 S/. 34,602.28 S/. 1,625,717.22 S/. 226,837.15
SON : UN MILLON SEISCIENTOS VEINTICINCO MIL SETECIENTOS DIECISIETE Y 20/100 NUEVOS SOLES
CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
VALORIZACION 02 - MES OCTUBRE 2014C
ACTUAL ACUMULADO SALDOCosto % Metrado Costo % Metrado Costo %
0.00 0.00% 1 993.51 100.00% 0.00 0.00 0%1000.00 20.00% 2 2000.00 40.00% 3.00 3000.00 60%
548.74 15.00% 0.75 2743.68 75.00% 0.25 914.56 25%
0.00 0.00% 10678.78 17086.05 100.00% 0.00 0.00 0%
0.00 0.00% 1334.85 7915.66 100.00% 0.00 0.00 0%0.00 0.00% 10678.78 28085.19 100.00% 0.00 0.00 0%
4813.72 20.00% 1735.3 24068.61 100.00% 0.00 0.00 0%
51738.69 30.00% 9610.902 155216.07 90.00% 1,067.88 17246.23 10%133612.90 85.00% 9076.963 133612.90 85.00% 1,601.82 23578.75 15%
0.00 0.00% 0 0.00 0.00% 10,678.78 68237.40 100%0.00 0.00% 0 0.00 0.00% 10,678.78 436655.31 100%
689.22 15.00% 430.7625 689.22 15.00% 2,440.99 3905.58 85%
1551.15 15.00% 43.0755 1551.15 15.00% 244.09 8789.84 85%348.97 10.00% 41.593 348.97 10.00% 374.34 3140.69 90%
1753.90 15.00% 55.9995 1753.90 15.00% 317.33 9938.79 85%0.00 0.00% 0 0.00 0.00% 2,871.75 4968.13 100%0.00 0.00% 0 0.00 0.00% 373.33 5178.09 100%
2535.76 10.00% 287.175 2535.76 10.00% 2,584.58 22821.80 90%3348.46 10.00% 287.175 3348.46 10.00% 2,584.58 30136.14 90%1172.89 10.00% 36.425 1172.89 10.00% 327.83 10555.97 90%
0.00 0.00% 0 0.00 0.00% 54.10 16138.03 100%0.00 0.00% 0 0.00 0.00% 2,871.75 86123.78 100%0.00 0.00% 0 0.00 0.00% 2,871.75 2326.12 100%0.00 0.00% 0 0.00 0.00% 896.94 4708.94 100%
0.00 0.00% 0 0.00 0.00% 900.91 1441.46 100%0.00 0.00% 0 0.00 0.00% 32.31 1163.48 100%0.00 0.00% 0 0.00 0.00% 42.01 1315.75 100%0.00 0.00% 0 0.00 0.00% 42.01 582.68 100%
0.00 0.00% 0 0.00 0.00% 215.43 6936.85 100%0.00 0.00% 0 0.00 0.00% 48.47 14458.60 100%0.00 0.00% 0 0.00 0.00% 179.53 942.53 100%0.00 0.00% 0 0.00 0.00% 1,615.74 17433.83 100%
0.00 0.00% 0 0.00 0.00% 1,475.71 52963.23 100%0.00 0.00% 0 0.00 0.00% 219.00 2781.30 100%
0.00 0.00% 0 0.00 0.00% 1.00 498.64 100%0.00 0.00% 0 0.00 0.00% 14,451.44 14162.41 100%
7855.95 60.00% 15 7855.95 60.00% 10.00 5237.30 40%0.00 0.00% 0 0.00 0.00% 2,972.80 18520.54 100%
625.00 25.00% 0.5 1250.00 50.00% 0.50 1250.00 50%0.00 0.00% 0 0.00 0.00% 1.00 2500.00 100%
657.21 20.00% 691.8 657.21 20.00% 2,767.20 2628.84 80%0.00 0.00% 0 0.00 0.00% 4,958.00 594.96 100%
63.25 10.00% 7 442.75 70.00% 3.00 189.75 30% S/. 212,315.79 16.37% S/. 393,327.91 30.32% S/. 903,966.30 69.68% S/. 21,231.58 S/. 39,332.79 S/. 90,396.63 S/. 16,985.26 S/. 31,466.23 S/. 72,317.30 S/. 250,532.63 S/. 464,126.94 S/. 1,066,680.24 S/. 225,479.37 S/. 417,714.24 S/. 960,012.22 S/. 225,479.37 S/. 417,714.24 S/. 960,012.22 S/. 40,586.29 S/. 75,188.56 S/. 172,802.20 S/. 266,065.66 S/. 492,902.81 S/. 1,132,814.41
RESUMEN DE VALORIZACION 02 - MES OCTUBRE
Obra: CONSTRUCCION DE LA PAVIMENTACION DE ASFALTO EN FRIO EN LAS CALLES DEL CIRCUITO VIAL DEL TRANSPORTE PUBLICO EN EL CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
Cliente: GOBIERNO REGIONAL DE LAMBAYEQUE Sede Central (REGIN LAMBAYEQUE)Lugar: CENTRO POBLADO MENOR DE SALTUR, DISTRITO DE ZAA-CHICLAYO-LAMBAYEQUE
MONTO DE CONTRATRO S/. 1,625,717.22
ITEM DESCRIPCION PRESUPUESTOVALORIZACION ANTERIOR
MONTO VALORIZADO AVANCE %
001 OBRAS PROVISIONALES S/. 9,651.75 4188.45 43.40%002 PAVIMENTACIN FLEXIBLE S/. 911,702.16 175819.17 19.28%003 VEREDAS DE CONCRETO S/. 220,132.24 0.00 0.00%004 SARDINELES DE CONCRETO S/. 44,275.18 0.00 0.00%005 REAS VERDES S/. 55,744.53 0.00 0.00