Valorizacion de Pachacutec Rompemuelles

4
VALORIZACION Nº01 PRESUPUESTO DISTRITO PACHACUTEC PROVINCIA :ICA REGION :ICA SUPERVISOR RESIDENTE ITEM. CONCEPTO LIQUIDACION 1.00 VALORIZACIONES 1.10 MONTO VALORIZACION N° 01 37,968.81 2.00 REINTEGROS 2.10 REAJUSTES 2.20 DEDUCCIONES - A TOTAL VALORIZACION N° 01 37,968.81 3.00 AMORTIZACIONES 3.10 ADELANTO DIRECTO - 3.20 ADELANTO DE MATERIALES - B TOTAL AMORTIZACIONES - 4.00 RETENCIONES 4.10 GARANTIA FIEL CUMPLIMIENTO ( NO INCLUYE IGV) - C TOTAL RETENCIONES - 5.00 TOTAL ( A - B - C ) 37,968.81 6.00 I.G.V. De ( A - B -C ) 6,834.39 D MONTO A PAGAR AL CONTRATISTA ( A - B - C + IGV ) 44,803.20 A FAVOR DEL CONTRATISTA 44,803.20 AVANCE FISICO MENSUAL 100.00% CREACION DE REDUCTORES DE VELOCIDAD EN LAS CALLES DEL DISTRITO DE PACHACUTEC

description

valorizacion

Transcript of Valorizacion de Pachacutec Rompemuelles

RESUMENVALORIZACION N01PRESUPUESTOCREACION DE REDUCTORES DE VELOCIDAD EN LAS CALLES DEL DISTRITO DE PACHACUTECDISTRITOPACHACUTECPROVINCIA:ICAREGION:ICASUPERVISORRESIDENTEITEM.CONCEPTOLIQUIDACION1.00VALORIZACIONES1.10MONTO VALORIZACION N 0137,968.812.00REINTEGROS2.10REAJUSTES2.20DEDUCCIONES- 0ATOTAL VALORIZACION N 01S/.37,968.813.00AMORTIZACIONES3.10ADELANTO DIRECTO2.15%- 03.20ADELANTO DE MATERIALES0.00%- 0BTOTAL AMORTIZACIONESS/.- 04.00RETENCIONES4.10GARANTIA FIEL CUMPLIMIENTO ( NO INCLUYE IGV)- 0CTOTAL RETENCIONES- 05.00TOTAL ( A - B - C )37,968.816.00I.G.V. De ( A - B -C )19.00%6,834.39DMONTO A PAGAR AL CONTRATISTA ( A - B - C + IGV )44,803.20A FAVOR DEL CONTRATISTAS/.44,803.20AVANCE FISICO MENSUAL100.00%

K comp.CALCULO DEL COEFICIENTE DE REAJUSTE ( K ) MENSUALFORMULA POLINOMICAFORMULA POLINOMICA:K = 0.442*(Mr / Mo) + 0.361*(Mr / Mo) + 0.086*(Ar / Ao) + 0.054*(Ir / Io) + 0.058*(Mr / Mo)IoIrSimb.IndiceElementoCoef.%SetOct20112012KM47MANO DE OBRA0.442100%470.79470.790.442M49MAQUINARIA Y EQUIPO NACIONAL0.361100%229.22227.560.358A5AGREGADO GRUESO0.086100%360.26360.510.086I39INDICE GENERAL AL PRECIO AL0.054100%381.48380.860.054CONSUMIDORM44MADERA TERCIADA PARA CARPINTERIA0.058100%342.65344.060.058KOCT =0.998

VALORIZACIONVALORIZACION N01PRESUPUESTOCREACION DE REDUCTORES DE VELOCIDAD EN LAS CALLES DEL DISTRITO DE PACHACUTECDISTRITOPACHACUTECPROVINCIAICAREGION:ICAITEMDESCRIPCIONPRESUPUESTO BASEAVANCE ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO POR VALORIZARUND.CANT.P.U.PARCIALMETRADOVALORIZADO%METRADOVALORIZADO%METRADOVALORIZADO%METRADOVALORIZADO%01OBRAS PROVISIONALES01.01CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40Mund1.00500.00500.001.00500.00100.00%1.00500.00100.00%1.000.000.00%01.02CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITOglb1.001,550.001,550.001.001,550.00100.00%1.001,550.00100.00%1.000.000.00%01.03IMPLEMENTOS DE SEGURIDADund1.001,445.701,445.701.001,445.70100.00%1.001,445.70100.00%1.000.000.00%02OBRAS PRELIMINARES02.01LIMPIEZA DE TERRENOm2204.752.47505.73204.75505.73100.00%204.75505.73100.00%204.750.000.00%02.02TRAZO Y REPLANTEO DE OBRAm2204.751.16237.51204.75237.51100.00%204.75237.51100.00%204.750.000.00%02.03CORTE DE PAVIMENTOm2204.757.011,435.30204.751,435.30100.00%204.751,435.30100.00%204.750.000.00%02.04MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTASglb1.001,000.001,000.001.001,000.001.001,000.00100.00%1.000.000.00%03MOVIMIENTO DE TIERRA03.01CORTE DE MATERIALm326.6214.40383.3326.62383.33100.00%26.62383.33100.00%26.620.000.00%03.02ELIMINACION DE MATERIAL EXCEDENTEm331.9425.21805.2131.94805.21100.00%31.94805.21100.00%31.940.000.00%04CONCRETO ARMADO04.01CONCRETO f'c=210 kg/cm2m327.66262.877,270.9827.667,270.98100.00%27.667,270.98100.00%27.660.000.00%04.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg1,261.485.026,332.631,261.486,332.63100.00%1,261.486,332.63100.00%1,261.480.000.00%04.03ENCOFRADO Y DESENCOFRADO DE ROMPEMUELLEm281.4430.862,513.2481.442,513.24100.00%81.442,513.24100.00%81.440.000.00%05PINTURAS05.01PINTURAm2204.7517.453,572.89204.753,572.89100.00%204.753,572.89100.00%204.750.000.00%6TRANQUERA METALICA06.01EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOSm31.0024.9124.911.0024.91100.00%1.0024.91100.00%1.000.000.00%06.02CONCRETO CIMIENTOS MEZCLA 1:10 CEMENTO-HORMIGONm31.00190.92190.921.00190.92100.00%1.00190.92100.00%1.000.000.00%06.03TRANQUERA METALICA 6Mund4.001,312.005,248.004.005,248.00100.00%4.005,248.00100.00%4.000.000.00%COSTO DIRECTO BASES/.33,016.350.0033,016.3533,016.350.00UTILIDAD 5%5.00%S/.1,650.820.001,650.821,650.820.00GASTOS GENERALES 10%10.00%S/.3,301.640.003,301.643,301.640.00SUBTOTALS/.37,968.8137,968.8137,968.810.00IGV 18%18.00%S/.6,834.390.000.000.006,834.396,834.390.00TOTAL PRESUPUESTO OFERTADOS/.44,803.200.000.00%44,803.20100.00%44,803.20100.00%0.000.00%

PRESUPUESTOPRESUPUESTO PROYECTOPRESUPUESTOCREACION DE REDUCTORES DE VELOCIDAD EN LAS CALLES DEL DISTRITO DE PACHACUTECDISTRITOPACHACUTECPROVINCIAICAREGION:ICAPARTIDADESCRIPCIONUNDMETRADOCOSTO UNITARIOCOSTO PARCIAL01OBRAS PROVISIONALES01.01CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40Mund1.00500.00500.0001.02CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITOglb1.001,550.001,550.0001.03IMPLEMENTOS DE SEGURIDADund1.001,445.701,445.7002OBRAS PRELIMINARES02.01LIMPIEZA DE TERRENOm2204.752.47505.7302.02TRAZO Y REPLANTEO DE OBRAm2204.751.16237.5102.03CORTE DE PAVIMENTOm2204.757.011,435.3002.04MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTASglb1.001,000.001,000.0003MOVIMIENTO DE TIERRA03.01CORTE DE MATERIALm326.6214.40383.3303.02ELIMINACION DE MATERIAL EXCEDENTEm331.9425.21805.2104CONCRETO ARMADO04.01CONCRETO f'c=210 kg/cm2m327.66262.877,270.9804.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg1,261.485.026,332.6304.03ENCOFRADO Y DESENCOFRADO DE ROMPEMUELLEm281.4430.862,513.2405PINTURAS05.01PINTURAm2204.7517.453,572.896TRANQUERA METALICA06.01EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOSm31.0024.9124.9106.02CONCRETO CIMIENTOS MEZCLA 1:10 CEMENTO-HORMIGONm31.00190.92190.9206.03TRANQUERA METALICA 6Mund4.001,312.005,248.00COSTO DIRECTO BASES/.33,016.35UTILIDAD 5%S/.1,650.82GASTOS GENERALES 10 %S/.3,301.64SUBTOTALS/.37,968.81IGV 18%S/.6,834.39TOTAL PRESUPUESTO OFERTADOS/.44,803.20

Hoja1