PLANILLA DE METRADOS - ESTRUCTURAS Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA Fecha : ABRIL - 2010 Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA Item DESCRIPCION MEDIDAS N° DE PARCIAL TOTAL UND. LONG. ANCHO ALTO VECES 01.00.00 OBRAS PROVISIONALES 01.01.00 ALMACEN, OFICINA Y GUARDIANIA 1.00 GLB 01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA 3.60x2.40 m. 1.00 UND. 02.00.00 TRABAJOS PRELIMINARES 02.01.00 MOVILIZACION DE EQUIPO Y MAQUINARIA 1.00 GLB 02.05.00 TRAZO Y REPLANTEO 190.38 M2 AREA CAD 1.00 190.38 03.00.00 MOVIMIENTO DE TIERRAS 03.01.00 EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL 34.46 M3 EJE A-A entre 1 Y 4 Z-1 1.70 0.85 1.20 2.00 3.47 Z-2 1.60 1.45 1.20 2.00 5.57 EJE B-B entre 1 Y 4 Z-3 2.35 0.80 1.20 1.00 2.26 Z-4 1.90 1.65 1.20 2.00 7.52 Z-5 3.50 0.85 1.20 1.00 3.57 Z-6 EJE B-B entre 1 Y 4 Z-6 1.45 1.25 1.20 2.00 4.35 Z-7 1.95 1.65 1.20 2.00 7.72 03.02.00 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL 15.69 M3 EJE A-A entre 1 Y 2 1.45 0.40 0.85 1.00 0.49 6.60 0.40 0.85 1.00 2.24 0.60 0.40 0.85 1.00 0.20 3.10 0.40 0.85 1.00 1.05 EJE 1-1 entre A Y B 0.65 0.60 1.20 1.00 0.47 EJE 1-1 entre B Y C 1.90 0.60 1.20 1.00 1.37 EJE 1-1 entre C Y C´ 4.35 0.40 0.85 1.00 1.48 EJE C´-C´ entre 1 Y 4 11.10 0.40 0.85 1.00 3.77 EJE 4-4 entre C´ Y C´ 3.70 0.40 0.85 1.00 1.26 EJE 4-4 entre B Y C 3.05 0.60 1.20 1.00 2.20 EJE 4-4 entre A Y B 0.65 0.60 1.20 1.00 0.47 2.00 0.40 0.85 1.00 0.68 EXCAVACION DE VIGAS DE CIMENTACION EN TERRENO NORMAL 4.07 M3 EJE A-A entre 1 Y 4 4.85 0.25 1.10 1.00 1.33 EJE B-B entre 1 Y 4 4.35 0.25 1.10 1.00 1.20 EJE C-C entre 1 Y 4 5.60 0.25 1.10 1.00 1.54 EXCAVACION DE CISTERNA 14.14 M3 2.75 2.00 2.57 1.00 14.14 EXCAVACION DE ESCALERA 0.38 M3 0.90 0.50 0.85 1.00 0.38 EXCAVACION DE PLACA PL-1 0.73 M3 1.02 0.60 1.20 1.00 0.73 EXCAVACION PARA TABIQUERIA AREA CAD 6.48 M3 4.50 0.34 1.00 1.53 3.38 0.34 1.00 1.15 2.40 0.34 1.00 0.82 3.62 0.34 1.00 1.23 1.35 0.34 1.00 0.46 2.60 0.34 1.00 0.88 1.20 0.34 1.00 0.41 EXCAVACION PARA SARDINELES AREA CAD 0.58 M3 11.56 0.05 1.00 0.58 03.03.00 RELLENO CON MATERIAL PROPIO 23.94 M3 ZAPATAS CON MATERIAL PROPIO AREA CAD EJE A-A entre 1 Y 4 1.14 0.70 1.00 0.80 2.22 0.70 1.00 1.55 2.22 0.70 1.00 1.55 1.19 0.70 1.00 0.83 EJE B-B entre 1 Y 4 2.11 0.70 1.00 1.48 2.52 0.70 1.00 1.76 0.72 0.70 1.00 0.50 2.87 0.70 1.00 2.01 1.54 0.70 1.00 1.08 EJE C-C entre 1 Y 4 1.41 0.70 1.00 0.99 3.06 0.70 2.00 4.28 1.47 0.70 1.00 1.03 CIMIENTOS CON MATERIAL PROPIO 3.23 0.20 1.00 0.65 0.50 0.20 1.00 0.10 0.15 0.20 1.00 0.03 0.22 0.70 1.00 0.15 0.67 0.70 1.00 0.47 4.75 0.20 1.00 0.95 1.37 0.70 1.00 0.96 0.29 0.70 1.00 0.20 VIGAS DE CIMENTACION CON MATERIAL PROPIO 0.63 0.60 1.00 0.38 0.66 0.60 1.00 0.40 0.54 0.60 1.00 0.32 0.56 0.60 1.00 0.34 0.49 0.60 1.00 0.29 0.49 0.60 1.00 0.29 0.52 0.60 1.00 0.31 0.38 0.60 1.00 0.23 EXCAVACION - RELLENO 03.05.00 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA 74.11 M3

description

tabla para practicar

Transcript of Valorizacion 1 de Carabayllo (1)

Page 1: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

01.00.00 OBRAS PROVISIONALES

01.01.00 ALMACEN, OFICINA Y GUARDIANIA 1.00 GLB

01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA 3.60x2.40 m. 1.00 UND.

02.00.00 TRABAJOS PRELIMINARES

02.01.00 MOVILIZACION DE EQUIPO Y MAQUINARIA 1.00 GLB

02.05.00 TRAZO Y REPLANTEO 190.38 M2

AREA CAD 1.00 190.38

03.00.00 MOVIMIENTO DE TIERRAS

03.01.00 EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL 34.46 M3

EJE A-A entre 1 Y 4

Z-1 1.70 0.85 1.20 2.00 3.47

Z-2 1.60 1.45 1.20 2.00 5.57

EJE B-B entre 1 Y 4

Z-3 2.35 0.80 1.20 1.00 2.26

Z-4 1.90 1.65 1.20 2.00 7.52

Z-5 3.50 0.85 1.20 1.00 3.57

Z-6

EJE B-B entre 1 Y 4

Z-6 1.45 1.25 1.20 2.00 4.35

Z-7 1.95 1.65 1.20 2.00 7.72

03.02.00 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL 15.69 M3

EJE A-A entre 1 Y 2 1.45 0.40 0.85 1.00 0.49

6.60 0.40 0.85 1.00 2.24

0.60 0.40 0.85 1.00 0.20

3.10 0.40 0.85 1.00 1.05

EJE 1-1 entre A Y B 0.65 0.60 1.20 1.00 0.47

EJE 1-1 entre B Y C 1.90 0.60 1.20 1.00 1.37

EJE 1-1 entre C Y C´ 4.35 0.40 0.85 1.00 1.48

EJE C´-C´ entre 1 Y 4 11.10 0.40 0.85 1.00 3.77

EJE 4-4 entre C´ Y C´ 3.70 0.40 0.85 1.00 1.26

EJE 4-4 entre B Y C 3.05 0.60 1.20 1.00 2.20

EJE 4-4 entre A Y B 0.65 0.60 1.20 1.00 0.47

2.00 0.40 0.85 1.00 0.68

EXCAVACION DE VIGAS DE CIMENTACION EN TERRENO NORMAL 4.07 M3

EJE A-A entre 1 Y 4 4.85 0.25 1.10 1.00 1.33

EJE B-B entre 1 Y 4 4.35 0.25 1.10 1.00 1.20

EJE C-C entre 1 Y 4 5.60 0.25 1.10 1.00 1.54

EXCAVACION DE CISTERNA 14.14 M3

2.75 2.00 2.57 1.00 14.14

EXCAVACION DE ESCALERA 0.38 M3

0.90 0.50 0.85 1.00 0.38

EXCAVACION DE PLACA PL-1 0.73 M3

1.02 0.60 1.20 1.00 0.73

EXCAVACION PARA TABIQUERIA AREA CAD 6.48 M3

4.50 0.34 1.00 1.53

3.38 0.34 1.00 1.15

2.40 0.34 1.00 0.82

3.62 0.34 1.00 1.23

1.35 0.34 1.00 0.46

2.60 0.34 1.00 0.88

1.20 0.34 1.00 0.41

EXCAVACION PARA SARDINELES AREA CAD 0.58 M3

11.56 0.05 1.00 0.58

03.03.00 RELLENO CON MATERIAL PROPIO 23.94 M3

ZAPATAS CON MATERIAL PROPIO AREA CAD

EJE A-A entre 1 Y 4 1.14 0.70 1.00 0.80

2.22 0.70 1.00 1.55

2.22 0.70 1.00 1.55

1.19 0.70 1.00 0.83

EJE B-B entre 1 Y 4 2.11 0.70 1.00 1.48

2.52 0.70 1.00 1.76

0.72 0.70 1.00 0.50

2.87 0.70 1.00 2.01

1.54 0.70 1.00 1.08

EJE C-C entre 1 Y 4 1.41 0.70 1.00 0.99

3.06 0.70 2.00 4.28

1.47 0.70 1.00 1.03

CIMIENTOS CON MATERIAL PROPIO 3.23 0.20 1.00 0.65

0.50 0.20 1.00 0.10

0.15 0.20 1.00 0.03

0.22 0.70 1.00 0.15

0.67 0.70 1.00 0.47

4.75 0.20 1.00 0.95

1.37 0.70 1.00 0.96

0.29 0.70 1.00 0.20

VIGAS DE CIMENTACION CON MATERIAL PROPIO 0.63 0.60 1.00 0.38

0.66 0.60 1.00 0.40

0.54 0.60 1.00 0.32

0.56 0.60 1.00 0.34

0.49 0.60 1.00 0.29

0.49 0.60 1.00 0.29

0.52 0.60 1.00 0.31

0.38 0.60 1.00 0.23

EXCAVACION - RELLENO

03.05.00 ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA 74.11 M3

Page 2: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

04.00.00 OBRAS DE CONCRETO SIMPLE

04.01.00 SOLADOS PARA ZAPATAS 28.72 M2

EJE A-A entre 1 Y 4 (Z-1) 1.70 0.85 2.00 2.89

EJE A-A entre 1 Y 4 (Z-2) 1.45 1.60 2.00 4.64

EJE B-B entre 1 Y 4 (Z-3) 2.35 0.80 1.00 1.88

EJE B-B entre 1 Y 4 (Z-4) 1.90 1.65 2.00 6.27

EJE B-B entre 1 Y 4 (Z-5) 3.50 0.85 1.00 2.98

EJE C-C entre 1 Y 4 (Z-6) 1.45 1.25 2.00 3.63

EJE C-C entre 1 Y 4 (Z-7) 1.95 1.65 2.00 6.44

04.00.00 SOLADO PARA VIGAS DE CIMENTACION 4.80 M2

EJE A-A entre 1 Y 4 7.35 0.25 1.00 1.84

EJE B-B entre 1 Y 4 6.25 0.25 1.00 1.56

EJE C-C entre 1 Y 4 5.60 0.25 1.00 1.40

04.02.00 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS 15.51 M3

EJE A-A entre 1 Y 2 1.45 0.40 0.50 1.00 0.29

6.60 0.40 0.50 1.00 1.32

0.60 0.40 0.50 1.00 0.12

3.10 0.40 0.50 1.00 0.62

EJE 1-1 entre A Y B 0.65 0.60 0.50 1.00 0.20

EJE 1-1 entre B Y C 1.90 0.60 0.50 1.00 0.57

EJE 1-1 entre C Y C´ 4.35 0.40 0.50 1.00 0.87

EJE C´-C´ entre 1 Y 4 11.10 0.40 0.50 1.00 2.22

EJE 4-4 entre C´ Y C´ 3.70 0.40 0.50 1.00 0.74

EJE 4-4 entre B Y C 3.05 0.60 0.50 1.00 0.91

EJE 4-4 entre A Y B 0.65 0.60 0.50 1.00 0.20

2.00 0.40 0.50 1.00 0.40

TABIQUERIA AREA CAD

4.50 0.34 1.00 1.53

3.38 0.34 1.00 1.15

2.40 0.34 1.00 0.82

3.62 0.34 1.00 1.23

1.35 0.34 1.00 0.46

2.60 0.34 1.00 0.88

1.20 0.34 1.00 0.41

SARDINELES AREA CAD

11.56 0.05 1.00 0.58

04.03.00 CONCRETO EN SOBRECIMIENTO 1:8 + 25% P.M. 4.16 M3

EJE A´- A´ entre 1 Y 4 1.05 0.15 0.70 1.00 0.11

EJE 1-1 entre A Y B 1.20 0.15 0.70 1.00 0.13

EJE 1-1 entre A Y B 1.85 0.25 1.20 1.00 0.56

EJE 1-1 entre B Y C 3.10 0.25 1.20 1.00 0.93

EJE 1-1 entre C Y C´ 4.30 0.15 0.70 1.00 0.45

EJE C´-C´entre 1 Y 4 11.20 0.15 0.70 1.00 1.18

7.75 0.15 0.70 1.00 0.81

04.04.00 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 47.58 M2

EJE A´- A´ entre 1 Y 4 1.05 0.70 2.00 1.47

EJE 1-1 entre A Y B 1.20 0.70 2.00 1.68

EJE 1-1 entre A Y B 1.85 1.20 2.00 4.44

EJE 1-1 entre B Y C 3.10 1.20 2.00 7.44

EJE 1-1 entre C Y C´ 4.30 0.70 2.00 6.02

EJE C´-C´entre 1 Y 4 11.20 0.70 2.00 15.68

7.75 0.70 2.00 10.85

04.01.03 FALSO PISO DE 4" DE CONCRETO 137.61 M2

AREA CAD

24.75 1.00 24.75

76.56 1.00 76.56

36.30 1.00 36.30

Page 3: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

A ESTRUCTURAS

05.00.00 OBRAS DE CONCRETO ARMADO

05.01.00 ZAPATAS

05.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS 14.36

EJE A-A entre 1 Y 4 (Z-1) 1.70 0.85 0.50 2.00 1.44

EJE A-A entre 1 Y 4 (Z-2) 1.45 1.60 0.50 2.00 2.32

EJE B-B entre 1 Y 4 (Z-3) 2.35 0.80 0.50 1.00 0.94

EJE B-B entre 1 Y 4 (Z-4) 1.90 1.65 0.50 2.00 3.14

EJE B-B entre 1 Y 4 (Z-5) 3.50 0.85 0.50 1.00 1.49

EJE C-C entre 1 Y 4 (Z-6) 1.45 1.25 0.50 2.00 1.81

EJE C-C entre 1 Y 4 (Z-7) 1.95 1.65 0.50 2.00 3.22

05.01.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 422.15 422.15

05.02.00 SOBRECIMIENTO ARMADO

05.02.01 CONCRETO f'c=210 kg/cm2 PARA SOBRECIMIENTO ARMADO 1.05

'EJE 4-4 entre A´ Y C´ (ARMADO) 5.85 0.15 1.20 1.00 1.05

05.02.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 52.59 52.59

05.02.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO ARMADO 14.04

'EJE 4-4 entre A´ Y C´ (ARMADO) 5.85 1.20 2.00 14.04

06.01.02 'PLACA PL-1

CONCRETO f'c=210 kg/cm2 (1er piso)

'EJE B-B entre 2 Y 3 ( cara) 3.45 0.20 3.50 1.00 2.42

'EJE B-B entre 2 Y 3 (base) 3.45 0.60 0.50 1.00 1.04

'2do piso 3.45 0.20 2.65 1.00 1.83

'3do piso 3.45 0.20 2.65 1.00 1.83

'4do piso 3.45 0.20 2.55 1.00 1.76

05.02.02 ACERO DE REFUERZO FY=4200 KG/CM2(1er piso) VER PLANILLA DE METRADOS DE ACERO 546.93 546.93

05.02.03 ENCOFRADO Y DESENCOFRADO PARA PL-1

1 PISO 3.45 3.50 2.00 24.15

BASE (1 PISO) 3.45 0.50 2.00 3.45

2 PISO 3.45 2.45 2.00 16.91

3 PISO 3.45 2.45 2.00 16.91

4 PISO 3.45 2.45 2.00 16.91

06.01.02 'PLACA PL-2

CONCRETO f'c=210 kg/cm2 6.53 'EJE 1-1 entre B-C ( cara) 2.30 0.25 3.50 1.00 2.01

'2do piso 2.30 0.25 2.65 1.00 1.52

'3do piso 2.30 0.25 2.65 1.00 1.52

'4do piso 2.30 0.25 2.55 1.00 1.47

05.02.03 ENCOFRADO Y DESENCOFRADO PARA PL-2 49.91

1 PISO 2.30 3.50 2.00 16.10

2 PISO 2.30 2.45 2.00 11.27

3 PISO 2.30 2.45 2.00 11.27

4 PISO 2.30 2.45 2.00 11.27

05.02.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 650.64 650.64

06.01.02 'PLACA PL-3

CONCRETO f'c=210 kg/cm2 3.26 'EJE 4-4 entre A-B ( cara) 1.15 0.25 3.50 1.00 1.01

'2do piso 1.15 0.25 2.65 1.00 0.76

'3do piso 1.15 0.25 2.65 1.00 0.76

'4do piso 1.15 0.25 2.55 1.00 0.73

05.02.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 460.07 460.07

05.02.03 ENCOFRADO Y DESENCOFRADO PARA PL-3 24.96

1 PISO 1.15 3.50 2.00 8.05

2 PISO 1.15 2.45 2.00 5.64

3 PISO 1.15 2.45 2.00 5.64

4 PISO 1.15 2.45 2.00 5.64

5.03 COLUMNAS

05.03.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 15.48

1 PISO

C1 0.50 0.25 3.50 4.00 1.75

C2 0.40 0.25 3.50 2.00 0.70

C3 0.50 0.25 3.50 2.00 0.88

C4 0.65 0.25 3.50 2.00 1.14

C5 0.25 0.15 3.50 1.00 0.13

COLUMNETA CT-2 0.20 0.15 3.50 4.00 0.42

0.20 0.15 4.45 6.00 0.80

0.20 0.15 3.35 6.00 0.60

2 PISO

C1 0.50 0.25 2.65 4.00 1.33

C2 0.40 0.25 2.65 2.00 0.53

Page 4: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

C3 0.50 0.25 2.65 2.00 0.66

C4 0.65 0.25 2.65 2.00 0.86

C5 0.25 0.15 2.65 1.00 0.10

COLUMNETA CT-2 0.20 0.15 2.65 4.00 0.32

3 PISO

C1 0.50 0.25 2.65 4.00 1.33

C2 0.40 0.25 2.65 2.00 0.53

C3 0.50 0.25 2.65 2.00 0.66

C4 0.65 0.25 2.65 2.00 0.86

C5 0.25 0.15 2.65 1.00 0.10

COLUMNETA CT-2 0.20 0.15 2.65 4.00 0.32

4 PISO

C1 0.50 0.25 2.55 3.00 0.96

C4 0.65 0.25 2.55 1.00 0.41

C5 0.25 0.15 2.55 1.00 0.10

05.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 4,070.97 4,070.97

05.03.04 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 109.91

1 PISO

C1 3.50 3.30 1.00 11.55

C2 2.60 3.30 1.00 8.58

C3 2.00 3.30 1.00 6.60

C4 2.50 3.30 1.00 8.25

C5 0.50 3.30 1.00 1.65

COLUMNETA CT-2 1.60 3.30 1.00 5.28

2 PISO

C1 4.00 2.45 1.00 9.80

C2 1.60 2.45 1.00 3.92

C3 1.60 2.45 1.00 3.92

C4 2.90 2.45 1.00 7.11

C5 0.50 2.45 1.00 1.23

COLUMNETA CT-2 0.40 2.45 1.00 0.98

3 PISO

C1 3.95 2.45 1.00 9.68

C2 2.60 2.45 1.00 6.37

C3 2.00 2.45 1.00 4.91

C4 2.65 2.45 1.00 6.49

C5 0.50 2.45 1.00 1.23

COLUMNETA CT-2 0.40 2.45 1.00 0.98

4 PISO

C1 2.50 2.45 1.00 6.13

C4 1.65 2.45 1.00 4.04

C5 0.50 2.45 1.00 1.23

05.03.04 VIGAS DE CIMENTACION

CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMEMTACION 2.40 EJE A-A entre 1 Y 4 7.35 0.25 0.50 1.00 0.92

EJE B-B entre 1 Y 4 6.25 0.25 0.50 1.00 0.78

EJE C-C entre 1 Y 4 5.60 0.25 0.50 1.00 0.70

05.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 519.77 519.77

05.03.04 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION 9.60 EJE A-A entre 1 Y 4 7.35 0.50 1.00 3.68

EJE B-B entre 1 Y 4 6.25 0.50 1.00 3.13

EJE C-C entre 1 Y 4 5.60 0.50 1.00 2.80

05.04.00 VIGAS

05.04.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS 21.01

1° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V101) 10.90 0.40 0.20 1.00 0.87

EJE B-B ENTRE 1 Y 4 (V102) 6.95 0.25 0.20 1.00 0.35

EJE C-C ENTRE 1 Y 4 (V103) 9.60 0.25 0.40 1.00 0.96

EJE 2-2 ENTRE A Y C (V104) 3.75 0.25 0.20 1.00 0.19

5.15 0.25 0.40 1.00 0.52

EJE 3-3 ENTRE A Y C (V105) 3.15 0.25 0.20 1.00 0.16

5.75 0.25 0.40 1.00 0.58

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.20 0.20 1.00 0.44

EJE 1-1 ENTRE A Y C 6.15 0.25 0.30 1.00 0.46

EJE 4-4 ENTRE A Y C 7.30 0.25 0.30 1.00 0.55

EJE C-C ENTRE 2 Y 3 3.70 0.15 0.20 1.00 0.11

EJE C´-C´ENTRE 1 Y 2 3.70 0.25 0.20 1.00 0.19

VIGUETA DE COSTURA 4.75 0.10 0.20 1.00 0.10

6.95 0.10 0.20 1.00 0.14

8.10 0.10 0.20 1.00 0.16

2° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V201) 10.90 0.40 0.20 1.00 0.87

EJE B-B ENTRE 2 Y 4 (V202) 4.30 0.25 0.20 1.00 0.22

EJE C-C ENTRE 1 Y 4 (V203) 9.60 0.25 0.40 1.00 0.96

EJE 2-2 ENTRE A Y C (V204) 3.75 0.25 0.20 1.00 0.19

Page 5: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

EJE 3-3 ENTRE A Y C (V205) 3.15 0.25 0.20 1.00 0.16

5.75 0.25 0.40 1.00 0.58

VIGAS SECUNDARIAS

EJE A-A ENTRE 2 Y 4 7.20 0.20 0.20 1.00 0.29

EJE 1-1 ENTRE A Y C 4.95 0.25 0.30 1.00 0.37

EJE B´-B´ ENTRE 1 Y 3 7.55 0.40 0.20 1.00 0.60

VOLADO ARMADO 4.45 0.20 0.20 1.00 0.18

EJE 4-4 ENTRE A Y C 7.30 0.25 0.30 1.00 0.55

EJE C-C ENTRE 2 Y 3 3.70 0.15 0.20 1.00 0.11

VIGUETA DE COSTURA 3.85 0.10 0.20 1.00 0.08

7.20 0.10 0.20 1.00 0.14

8.10 0.10 0.20 1.00 0.16

3° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V301) 10.90 0.40 0.20 1.00 0.87

EJE B-B ENTRE 2 Y 4 (V302) 4.30 0.25 0.20 1.00 0.22

EJE C-C ENTRE 1 Y 4 (V303) 9.60 0.25 0.40 1.00 0.96

EJE 2-2 ENTRE A Y C (V304) 2.30 0.25 0.20 1.00 0.11

5.15 0.25 0.40 1.00 0.52

EJE 3-3 ENTRE A Y C (V305) 0.35 0.25 0.20 1.00 0.02

7.10 0.25 0.40 1.00 0.71

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.15 0.20 1.00 0.33

EJE 1-1 ENTRE A Y C 4.95 0.25 0.30 1.00 0.37

EJE 4-4 ENTRE A Y C 6.45 0.25 0.30 1.00 0.48

EJE C-C ENTRE 1 Y 2 4.50 0.15 0.20 1.00 0.13

VIGUETA DE COSTURA 7.10 0.10 0.20 2.00 0.28

5.95 0.10 0.20 1.00 0.12

4° PISO

VIGAS PRINCIPALES

EJE B-B ENTRE 2 Y 4 (V402) 4.30 0.25 0.20 1.00 0.22

EJE C-C ENTRE 1 Y 4 (V403) 9.60 0.25 0.40 1.00 0.96

EJE 1-1 ENTRE B Y C (V404)(V405) 5.15 0.40 0.25 2.00 1.03

VIGAS SECUNDARIAS

VOLADO ARMADO 10.95 0.15 0.20 1.00 0.33

EJE 1-1 ENTRE B Y C 3.60 0.25 0.30 1.00 0.27

EJE 4-4 ENTRE B Y C 4.75 0.25 0.30 1.00 0.36

EJE B´-B´ ENTRE 1 Y 3 7.55 0.20 0.20 1.00 0.30

EJE B´-B´ ENTRE 3 Y 4 3.50 0.15 0.20 1.00 0.11

LOSA ARMADA 5.00 0.25 0.20 1.00 0.25

VIGUETAS DE AMARRE EN CERCO 19.55 0.15 0.20 1.00 0.59

9.40 0.15 0.20 1.00 0.28

05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 4,050.71 4,050.71

05.04.04 ENCOFRADO Y DESENCOFRADO EN VIGAS 161.82

1° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V101) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 1 Y 4 (V102) 4.60 0.25 1.00 1.15

7.00 0.10 1.00 0.70

EJE C-C ENTRE 1 Y 4 (V103) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V104) 3.75 0.25 1.00 0.94

5.15 0.40 1.00 2.06

5.15 0.20 2.00 2.06

EJE 3-3 ENTRE A Y C (V105) 1.20 0.25 1.00 0.30

8.23 0.25 1.00 2.06

8.23 0.20 2.00 3.29

2.60 0.10 1.00 0.26

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.20 2.00 4.36

EJE 1-1 ENTRE A Y C 6.15 0.10 1.00 0.62

6.15 0.30 1.00 1.85

EJE 4-4 ENTRE A Y C 7.30 0.30 1.00 2.19

7.30 0.10 2.00 1.46

EJE C-C ENTRE 2 Y 3 3.70 0.35 1.00 1.30

EJE C´-C´ENTRE 1 Y 2 3.70 0.20 1.00 0.74

3.70 0.25 1.00 0.93

VIGUETA DE COSTURA 4.75 0.10 1.00 0.48

6.95 0.10 1.00 0.70

8.10 0.10 1.00 0.81

2° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V201) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 2 Y 4 (V202) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V203) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

Page 6: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

EJE 2-2 ENTRE A Y C (V204) 2.82 0.25 1.00 0.71

3.20 0.40 1.00 1.28

3.20 0.30 1.00 0.96

EJE 3-3 ENTRE A Y C (V205) 2.05 0.25 1.00 0.51

2.05 0.20 2.00 0.82

4.35 0.25 1.00 1.09

4.35 0.20 1.00 0.87

VIGAS SECUNDARIAS

EJE A-A ENTRE 2 Y 4 8.15 0.20 2.00 3.26

EJE 1-1 ENTRE A Y C 3.10 0.10 1.00 0.31

4.95 0.30 1.00 1.49

1.85 0.30 1.00 0.56

EJE B´-B´ ENTRE 1 Y 3 7.55 0.40 1.00 3.02

VOLADO ARMADO 4.45 0.20 2.00 1.78

EJE 4-4 ENTRE A Y C 7.30 0.30 1.00 2.19

7.30 0.10 2.00 1.46

EJE C-C ENTRE 2 Y 3 3.70 0.35 1.00 1.30

VIGUETA DE COSTURA 3.85 0.10 1.00 0.39

7.20 0.10 1.00 0.72

8.10 0.10 1.00 0.81

3° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V301) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 2 Y 4 (V302) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V303) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V304) 3.37 0.10 1.00 0.34

3.37 0.20 2.00 1.35

1.88 0.60 1.00 1.13

3.28 0.60 1.00 1.97

EJE 3-3 ENTRE A Y C (V305) 8.55 0.25 1.00 2.14

8.55 0.20 2.00 3.42

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.15 1.00 1.64

10.90 0.20 1.00 2.18

EJE 1-1 ENTRE A Y C 3.10 0.10 1.00 0.31

4.95 0.30 1.00 1.49

1.85 0.30 1.00 0.56

EJE 4-4 ENTRE A Y C 6.45 0.30 1.00 1.94

6.45 0.20 1.00 1.29

EJE C-C ENTRE 1 Y 2 4.50 0.20 1.00 0.90

4.50 0.15 1.00 0.67

VIGUETA DE COSTURA 7.10 0.10 2.00 1.42

5.95 0.10 1.00 0.60

4° PISO

VIGAS PRINCIPALES

EJE B-B ENTRE 2 Y 4 (V402) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V403) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 1-1 ENTRE B Y C (V404)(V405) 5.15 0.60 2.00 6.18

VIGAS SECUNDARIAS

VOLADO ARMADO 11.90 0.35 1.00 4.17

EJE 1-1 ENTRE B Y C 3.10 0.10 1.00 0.31

EJE 4-4 ENTRE B Y C 4.75 0.10 1.00 0.48

EJE B´-B´ ENTRE 1 Y 4 7.55 0.20 1.00 1.51

EJE B´-B´ ENTRE 3 Y 4 3.50 0.15 1.00 0.53

LOSA ARMADA 2.35 0.45 1.00 1.06

1.30 0.25 1.00 0.331.40 0.45 1.00 0.63

VIGUETAS DE AMARRE EN CERCO 19.55 0.20 2.00 15.64

05.05.00 LOSAS ALIGERADAS

05.05.01 CONCRETO f'c=210 kg/cm2 EN LOSA ALIGERADA 25.92

1° PISO AREA CAD VOL./M2

EJE A-A ENTRE 1 Y 2 3.70 0.09 0.33

EJE A-A ENTRE 2 Y 3 3.83 0.09 0.34

EJE A-A ENTRE 3 Y 4 3.38 0.09 0.30

EJE B-B ENTRE 1 Y 2 7.22 0.09 0.65

EJE B-B ENTRE 2 Y 3 7.46 0.09 0.67

EJE B-B ENTRE 3 Y 4 6.55 0.09 0.59

EJE C-C ENTRE 1 Y 2 6.66 0.09 0.60

EJE C-C ENTRE 2 Y 3 15.20 0.09 1.37

EJE C-C ENTRE 3 Y 4 17.38 0.09 1.56

LOSA ARMADA 1.45 0.20 1.00 0.29

2° PISO AREA CAD

EJE A-A ENTRE 2 Y 3 3.83 0.09 0.34

EJE A-A ENTRE 3 Y 4 3.38 0.09 0.30

EJE B-B ENTRE 2 Y 3 7.45 0.09 0.67

EJE B-B ENTRE 3 Y 4 6.56 0.09 0.59

EJE C-C ENTRE 1 Y 2 14.15 0.09 1.27

Page 7: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

EJE C-C ENTRE 2 Y 3 14.63 0.09 1.32

EJE C-C ENTRE 3 Y 4 17.38 0.09 1.56

LOSA ARMADA 1.45 0.20 1.00 0.29

0.88 0.20 1.00 0.18

1.15 0.20 1.00 0.23

0.16 0.20 1.00 0.03

3° PISO AREA CAD

EJE B-B ENTRE 1 Y 2 7.22 0.09 0.65

EJE B-B ENTRE 2 Y 3 7.46 0.09 0.67

EJE B-B ENTRE 3 Y 4 6.56 0.09 0.59

EJE A-A ENTRE 1 Y 2 19.06 0.09 1.72

EJE A-A ENTRE 2 Y 3 15.20 0.09 1.37

EJE A-A ENTRE 3 Y 4 17.38 0.09 1.56

LOSA ARMADA 0.93 0.20 1.00 0.19

0.97 0.20 1.00 0.19

0.84 0.20 1.00 0.17

2.74 0.20 1.00 0.55

4°PISO AREA CAD

EJE B-B ENTRE 1 Y 2 4.82 0.09 0.43

EJE B-B ENTRE 2 Y 3 9.18 0.09 0.83

EJE C-C ENTRE 3 Y 4 7.92 0.09 0.71

LOSA ARMADA 1.26 0.20 1.00 0.25

1.31 0.20 1.00 0.26

1.18 0.20 1.00 0.24

2.91 0.20 1.00 0.58

1.34 0.20 1.00 0.27

5.64 0.20 1.00 1.13

0.30 0.20 1.00 0.06

05.05.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 1,100.33 1,100.33

05.05.03 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA AREA CAD 233.56

1° PISO

EJE A-A ENTRE 1 Y 2 3.70 1.00 3.70

EJE A-A ENTRE 2 Y 3 3.83 1.00 3.83

EJE A-A ENTRE 3 Y 4 3.38 1.00 3.38

EJE B-B ENTRE 1 Y 2 7.22 1.00 7.22

EJE B-B ENTRE 2 Y 3 7.46 1.00 7.46

EJE B-B ENTRE 3 Y 4 6.55 1.00 6.55

EJE C-C ENTRE 1 Y 2 6.66 1.00 6.66

EJE C-C ENTRE 2 Y 3 15.20 1.00 15.20

EJE C-C ENTRE 3 Y 4 17.38 1.00 17.38

2° PISO AREA CAD

EJE A-A ENTRE 2 Y 3 3.83 1.00 3.83

EJE A-A ENTRE 3 Y 4 3.38 1.00 3.38

EJE B-B ENTRE 2 Y 3 7.45 1.00 7.45

EJE B-B ENTRE 3 Y 4 6.56 1.00 6.56

EJE C-C ENTRE 1 Y 2 14.15 1.00 14.15

EJE C-C ENTRE 2 Y 3 14.63 1.00 14.63

EJE C-C ENTRE 3 Y 4 17.38 1.00 17.38

3° PISO AREA CAD

EJE B-B ENTRE 1 Y 2 7.22 1.00 7.22

EJE B-B ENTRE 2 Y 3 7.46 1.00 7.46

EJE B-B ENTRE 3 Y 4 6.56 1.00 6.56

EJE A-A ENTRE 1 Y 2 19.06 1.00 19.06

EJE A-A ENTRE 2 Y 3 15.20 1.00 15.20

EJE A-A ENTRE 3 Y 4 17.38 1.00 17.38

4°PISO AREA CAD

EJE B-B ENTRE 1 Y 2 4.82 1.00 4.82

EJE B-B ENTRE 2 Y 3 9.18 1.00 9.18

EJE C-C ENTRE 3 Y 4 7.92 1.00 7.92

05.01.05.04 LADRILLO HUECO DE ARCILLA H=15 CM PARA TECHO ALIGERADO AREA CAD 1,946

1° PISO LAD./M2

EJE A-A ENTRE 1 Y 2 3.70 8.33 30.82

EJE A-A ENTRE 2 Y 3 3.83 8.33 31.90

EJE A-A ENTRE 3 Y 4 3.38 8.33 28.16

EJE B-B ENTRE 1 Y 2 7.22 8.33 60.14

EJE B-B ENTRE 2 Y 3 7.46 8.33 62.14

EJE B-B ENTRE 3 Y 4 6.55 8.33 54.56

EJE C-C ENTRE 1 Y 2 6.66 8.33 55.48

EJE C-C ENTRE 2 Y 3 15.20 8.33 126.62

EJE C-C ENTRE 3 Y 4 17.38 8.33 144.78

2° PISO AREA CAD

EJE A-A ENTRE 2 Y 3 3.83 8.33 31.90

EJE A-A ENTRE 3 Y 4 3.38 8.33 28.16

EJE B-B ENTRE 2 Y 3 7.45 8.33 62.06

EJE B-B ENTRE 3 Y 4 6.56 8.33 54.64

EJE C-C ENTRE 1 Y 2 14.15 8.33 117.87

EJE C-C ENTRE 2 Y 3 14.63 8.33 121.87

Page 8: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

EJE C-C ENTRE 3 Y 4 17.38 8.33 144.78

3° PISO AREA CAD

EJE B-B ENTRE 1 Y 2 7.22 8.33 60.14

EJE B-B ENTRE 2 Y 3 7.46 8.33 62.14

EJE B-B ENTRE 3 Y 4 6.56 8.33 54.64

EJE A-A ENTRE 1 Y 2 19.06 8.33 158.77

EJE A-A ENTRE 2 Y 3 15.20 8.33 126.62

EJE A-A ENTRE 3 Y 4 17.38 8.33 144.78

4°PISO AREA CAD

EJE B-B ENTRE 1 Y 2 4.82 8.33 40.15

EJE B-B ENTRE 2 Y 3 9.18 8.33 76.47

EJE C-C ENTRE 3 Y 4 7.92 8.33 65.97

05.06.00 ESCALERA

05.06.01 CONCRETO f'c=210 kg/cm2 PARA ESCALERA 3.40

TRAMO 01

CIMENTACION 0.90 0.50 0.85 1.00 0.38

AREA CAD

GARGANTA,GRADAS Y DESCANZO 0.90 1.07 1.00 0.96

TRAMO 02

GARGANTA,GRADAS Y DESCANZO 0.90 1.14 1.00 1.03

TRAMO 03

GARGANTA,GRADAS Y DESCANZO 0.90 1.14 1.00 1.03

05.06.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 359.77

05.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA 22.80

TRAMO 01

CIMENTACION 2.30 0.85 1.00 1.95

GRADAS 0.90 0.180 15.00 2.43FONDO DE ESCALERA 4.68 0.90 1.00 4.21

TRAMO 02GRADAS 0.90 0.180 15.00 2.43FONDO DE ESCALERA 5.19 0.90 1.00 4.67

TRAMO 03GRADAS 0.90 0.180 15.00 2.43FONDO DE ESCALERA 5.19 0.90 1.00 4.67

05.07.00 CISTERNA DE CONCRETO

PAREDES Y-Y 1.80 0.15 1.39 1.00 0.38 3.87

1.80 0.15 2.59 2.00 1.40

PAREDES X-X 0.80 0.15 1.39 2.00 0.33

1.50 0.15 2.59 2.00 1.17

BASE 1.50 0.80 0.15 1.00 0.18

1.50 1.50 0.15 1.00 0.34

AREA CAD

TAPA 1.89 0.15 1.00 0.28

0.81 0.15 1.00 0.12

REBOSE 0.07 0.75 1.00 0.05

05.07.02 ACERO DE REFUERZO FY=4200 KG/CM2 VER PLANILLA DE METRADOS DE ACERO 407.30 407.30

05.07.03 ENCOFRADO Y DESENCOFRADO NORMAL 34.76

PAREDES Y-Y,X-X 1.80 1.22 1.00 2.20

1.50 1.22 1.00 1.83

0.95 1.22 1.00 1.16

0.8 1.22 1.00 0.98

1.9 2.24 1.00 4.26

1.5 2.24 1.00 3.36

1.8 2.24 1.00 4.03

1.5 2.24 1.00 3.36

1.65 2.24 2 7.39

0.95 1.22 1 1.16

0.8 1.22 1 0.98

TECHO AREA CAD

1.89 1 1.890.81 1 0.81

BASE 9.1 0.15 1 1.37REBOSE 0.85 0.75 1 0.64

0.85 0.65 1 0.55

Page 9: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto: : CONSTRUCCION DE LOCAL MUNICIPAL

Cliente : MUNICIPALIDAD DISTRITAL DE NEPEÑA

Fecha : ABRIL - 2010

Region : ANCASH Prov. DEL SANTA Dist. NEPEÑA

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTALLONG. ANCHO ALTO VECES

Page 10: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

M3

KG

M3

KG

M2

M3

KG

M2

M3

M2

KG

M3

KG

M2

M3

Page 11: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

KG

M2

M3

KG

M2

M3

Page 12: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

KG

M2

Page 13: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

M3

Page 14: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

KG

M2

UND

Page 15: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

M3

KG

M2

M3

KG

M2

Page 16: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS - ESTRUCTURAS

: CONSTRUCCION DE LOCAL MUNICIPAL

: MUNICIPALIDAD DISTRITAL DE NEPEÑA

: ABRIL - 2010

UND.

Page 17: Valorizacion 1 de Carabayllo (1)

17

PLANILLA DE METRADOS - ESTRUCTURAS

Proyecto::

Cliente :

Fecha :

Region : ANCASH Prov. DEL SANTA Dist.

Item ESTRUCTURA Armadura 1/4" 3/8" 1/2" 5/8" 3/4" 1" Parcial TotalUnid. Cantid. Long. 0.25 0.56 0.994 1.6 2.24 4.04 Kg Kg

ZAPATAS 422.15 Z-1 2 11 1/2 1.56 34.11 34.11

2 6 1/2 0.72 8.59 8.59 Z-2 2 11 1/2 1.46 31.93 31.93

2 10 1/2 1.31 26.04 26.04 Z-3 1 16 1/2 2.21 35.15 35.15

1 5 1/2 0.66 3.28 3.28 Z-4 2 13 1/2 1.76 45.49 45.49

2 11 1/2 1.51 33.02 33.02 Z-5 1 23 1/2 3.36 76.82 76.82

1 6 1/2 0.71 4.23 4.23 Z-6 2 8 1/2 1.11 17.65 17.65

2 10 1/2 1.31 26.04 26.04 Z-7 2 13 1/2 1.81 46.78 46.78

2 11 1/2 1.51 33.02 33.02

SOBRECIMIENTO ARMADO 52.59 EJE 4-4 ENTRE A Y C 1 12 3/8 1.74 11.69 11.69

1 7 3/8 2.27 8.90 8.90 1 7 3/8 1.67 6.55 6.55 1 9 3/8 1.74 8.77 8.77 1 7 3/8 1.77 6.94 6.94 1 10 3/8 1.74 9.74 9.74

PLACA PL-1 546.93 'EJE B-B entre 2 Y 3 ( CARA ) (1er piso) 2 18 3/8 4.20 84.67 84.67

2 23 3/8 3.65 94.02 94.02 'EJE B-B entre 2 Y 3 ( BASE )(2do piso) 2 5 3/8 3.65 20.44 20.44

2 24 3/8 1.12 30.11 30.11 '2do piso 2 18 3/8 2.65 53.42 53.42

2 13 3/8 3.65 53.14 53.14 '3do piso 2 18 3/8 2.65 53.42 53.42

2 13 3/8 3.65 53.14 53.14 '4do piso 2 18 3/8 2.55 51.41 51.41

2 13 3/8 3.65 53.14 53.14

PLACA PL-2 650.64 'EJE 1-1 entre B-C ( cara)(1er piso) 2 12 3/8 4.20 56.45 56.45

2 23 3/8 1.90 48.94 48.94 'EJE 1-1 entre B-C ( columnetas)(1er) 2 6 5/8 4.20 80.64 80.64

estribo 2 25 3/8 0.98 27.44 27.44 '2do piso (cara) 2 12 3/8 2.65 35.62 35.62

2 17 3/8 1.90 36.18 36.18 'columneta 2do piso 2 6 5/8 2.65 50.88 50.88

estribo 2 21 3/8 0.98 23.05 23.05 '3do piso (cara) 2 12 3/8 2.65 35.62 35.62

2 17 3/8 1.90 36.18 36.18 'columneta 3do piso 2 6 5/8 2.65 50.88 50.88

estribo 2 21 3/8 0.98 23.05 23.05 '4do piso (cara) 2 12 3/8 2.65 35.62 35.62

2 17 3/8 1.90 36.18 36.18 columneta 4 to piso 2 6 5/8 2.65 50.88 50.88

estribo 2 21 3/8 0.98 23.05 23.05

PLACA PL-3 460.07 'EJE 4-4 entre A-B ( cara) 2 5 3/8 4.20 23.52 23.52

2 23 3/8 0.75 19.32 19.32 150.92 'EJE 4-4 entre A-B ( columneta ) 2 6 5/8 4.20 80.64 80.64

estribo 2 25 3/8 0.98 27.44 27.44 2do piso (cara) 2 5 3/8 2.65 14.84 14.84

2 17 3/8 0.75 14.28 14.28 columneta 2 piso 2 6 5/8 2.65 50.88 50.88

estribo 2 21 3/8 0.98 23.05 23.05 3er piso (cara) 2 5 3/8 2.65 14.84 14.84

2 17 3/8 0.75 14.28 14.28 columneta 3er piso 2 6 5/8 2.65 50.88 50.88

estribo 2 21 3/8 0.98 23.05 23.05 4to piso(cara) 2 5 3/8 2.65 14.84 14.84

2 17 3/8 0.75 14.28 14.28 columneta 4to piso 2 6 5/8 2.65 50.88 50.88

estribo 2 21 3/8 0.98 23.05 23.05

COLUMNAS 4,070.97 Principal 1 PISO C1 4 8 5/8 4.20 215.04 215.04 Estribos 1 PISO C1 4 66 3/8 1.72 254.28 254.28 Principal 1 piso C2 2 8 5/8 4.20 107.52 107.52 Estribos 1 piso C2 2 66 3/8 1.52 112.36 112.36 Principal 1 piso C3 2 8 5/8 4.20 107.52 107.52 Estribos 1 piso C3 2 66 3/8 1.72 127.14 127.14 Principal 1 piso C4 2 10 5/8 4.20 134.40 134.40 Estribos 1 piso C4 2 66 3/8 2.02 149.32 149.32 Principal

f"

Page 18: Valorizacion 1 de Carabayllo (1)

18

Item ESTRUCTURA Armadura 1/4" 3/8" 1/2" 5/8" 3/4" 1" Parcial TotalUnid. Cantid. Long. 0.25 0.56 0.994 1.6 2.24 4.04 Kg Kgf"

1 piso C5 1 4 1/2 4.20 16.70 16.70 Estribos 1 piso C5 1 33 3/8 0.74 13.68 13.68 Columnetas CT-2 (principal) 1 piso 4 4 3/8 4.20 37.63 37.63 Estribos CT-2 1 PISO 4 27 1/4 0.60 16.20 16.20 Columnetas CT-2 (principal) 1 piso 12 4 3/8 0.74 19.89 19.89 Estribos CT-2 1 PISO 12 28 1/4 0.60 201.60 201.60

Principal 2 PISO C1 4 8 5/8 2.65 135.68 135.68 Estribos 2 PISO C1 4 50 3/8 1.72 192.64 192.64 Principal 2 piso C2 2 8 5/8 2.65 67.84 67.84 Estribos 2 piso C2 2 50 3/8 1.52 85.12 85.12 Principal 2 piso C3 2 8 5/8 2.65 67.84 67.84 Estribos 2 piso C3 2 50 3/8 1.72 96.32 96.32 Principal 2 piso C4 2 10 5/8 2.65 84.80 84.80 Estribos 2 piso C4 2 50 3/8 2.02 113.12 113.12 Principal 2 piso C5 1 4 1/2 2.65 10.54 10.54 Estribos 2 piso C5 1 25 3/8 0.74 10.36 10.36 Columnetas CT-2 (principal) 2 piso 16 4 3/8 2.65 94.98 94.98 Estribos CT-2 2 PISO 16 21 1/4 0.60 50.40 50.40

Principal 3 PISO C1 4 8 5/8 2.65 135.68 135.68 Estribos 3 PISO C1 4 50 3/8 1.72 192.64 192.64 Principal 3 piso C2 2 8 5/8 2.65 67.84 67.84 Estribos 3 piso C2 2 50 3/8 1.52 85.12 85.12 Principal 3 piso C3 2 8 5/8 2.65 67.84 67.84 Estribos 3 piso C3 2 50 3/8 1.72 96.32 96.32 Principal 3 piso C4 2 10 5/8 2.65 84.80 84.80 Estribos 3 piso C4 2 50 3/8 2.02 113.12 113.12 Principal 3 piso C5 1 4 1/2 2.65 10.54 10.54 Estribos 3 piso C5 1 25 3/8 0.74 10.36 10.36 Columnetas CT-2 (principal) 3 piso 16 4 3/8 2.65 94.98 94.98 Estribos CT-2 3 PISO 16 21 1/4 0.60 50.40 50.40

Principal 4 piso 4 8 5/8 2.55 130.56 130.56 C1 Estribo 4 piso C1 4 50 3/8 1.72 192.64 192.64 Principal 4 piso C4 2 10 5/8 2.55 81.60 81.60 Estribos 4 piso C4 2 50 3/8 2.02 113.12 113.12 Principal 4 piso C5 1 4 1/2 2.55 10.14 10.14 Estribos 4 piso C5 1 25 3/8 0.74 10.36 10.36

VIGAS DE CIMENTACION 519.77 EJE A-A entre 1 Y 4 principal 1 6 5/8 12.10 116.16 116.16

1 2 1/2 12.10 24.05 24.05 'Estribos 1 60 3/8 1.38 46.37 46.37 EJE B-B entre 1 Y 4 principal 1 6 5/8 8.65 83.04 83.04

1 2 1/2 8.65 17.20 17.20 'Estribos 1 60 3/8 1.38 46.37 46.37 EJE C-C entre 1 Y 4 principal 1 6 5/8 12.10 116.16 116.16

1 2 1/2 12.10 24.05 24.05 'Estribos 1 60 3/8 1.38 46.37 46.37

Page 19: Valorizacion 1 de Carabayllo (1)

19

Item ESTRUCTURA Armadura 1/4" 3/8" 1/2" 5/8" 3/4" 1" Parcial TotalUnid. Cantid. Long. 0.25 0.56 0.994 1.6 2.24 4.04 Kg Kgf"

VIGAS 4,050.71 1° PISO PRINCIPAL

EJE 2-2 (V104) VOLADO 1 4 5/8 1.26 8.06 8.06

A-B 1 4 5/8 2.35 15.04 15.04 B-C 1 2 5/8 1.95 6.24 6.24

1 3 5/8 2.08 9.98 9.98 1 2 5/8 0.75 2.40 2.40 1 2 1/2 1.84 3.66 3.66 1 3 5/8 2.16 10.37 10.37 1 3 1/2 1.65 4.92 4.92 1 2 5/8 1.72 5.50 5.50 1 2 1/2 1.72 3.42 3.42 1 3 5/8 1.72 8.26 8.26 1 1 5/8 2.95 4.72 4.72 1 2 5/8 1.95 6.24 6.24 1 1 5/8 2.08 3.33 3.33 1 2 5/8 1.67 5.34 5.34 1 3 5/8 2.16 10.37 10.37

VOLADO 1 2 5/8 0.66 2.11 2.11 1 2 5/8 1.41 4.51 4.51

ESTRIBOS 1 36 3/8 0.78 15.72 15.72

1 36 3/8 1.18 23.79 23.79

EJE 3-3 (V105) VOLADO 1 2 5/8 1.26 4.03 4.03

1 2 5/8 2.16 6.91 6.91 A-B 1 2 5/8 2.35 7.52 7.52

1 2 1/2 2.22 4.41 4.41 1 3 5/8 2.47 11.86 11.86

B-C 1 2 5/8 1.95 6.24 6.24 1 3 5/8 2.64 12.67 12.67 1 2 1/2 1.95 3.88 3.88 1 2 5/8 1.95 6.24 6.24 1 3 1/2 1.65 4.92 4.92 1 2 5/8 2.95 9.44 9.44 1 2 5/8 1.72 5.50 5.50 1 2 5/8 1.72 5.50 5.50 1 3 5/8 1.72 8.26 8.26 1 2 5/8 1.95 6.24 6.24 1 2 5/8 2.05 6.56 6.56 1 2 1/2 1.67 3.32 3.32 1 3 5/8 2.15 10.32 10.32

VOLADO 1 2 5/8 0.66 2.11 2.11 1 2 5/8 1.41 4.51 4.51

ESTRIBOS 1 15 3/8 0.78 6.55 6.55

1 56 3/8 1.18 37.00 37.00

EJE A-A (V101) 1 8 1/2 12.02 95.58 95.58 3 27 3/8 1.08 48.99 48.99

EJE B-B(V102) 1 4 5/8 12.02 76.93 76.93 3 27 3/8 0.78 35.38 35.38

EJE C-C (V103) 1 4 5/8 12.02 76.93 76.93 1 2 3/8 12.02 13.46 13.46 3 28 3/8 1.18 55.51 55.51

SECUNDARIOS

CORTE D-D 1 4 3/8 12.02 26.92 26.92 ESTRIBOS 3 29 3/8 0.88 42.87 42.87 CORTE A-A 1 6 1/2 9.32 55.58 55.58 ESTRIBOS 1 51 3/8 0.98 27.99 27.99 CORTE C-C 2 4 5/8 4.35 55.68 55.68 ESTRIBOS 2 32 3/8 0.78 27.96 27.96 CORTE B-B 1 6 1/2 9.32 55.58 55.58 ESTRIBOS 1 45 3/8 0.98 24.70 24.70 CORTE E-E 1 4 3/8 4.37 9.79 9.79

1 27 3/8 0.58 8.77 8.77 VIGUETA DE COSTURA 1 2 1/2 5.97 11.87 11.87

ESTRIBOS 1 21 1/4 0.35 1.84 1.84 1 2 1/2 8.54 16.98 16.98

ESTRIBOS 1 32 1/4 0.35 2.80 2.80 1 2 1/2 9.32 18.53 18.53

ESTRIBOS 1 38 1/4 0.35 3.32 3.32

2° PISO PRINCIPAL

EJE 2-2 (V204) VOLADO 1 4 5/8 1.26 8.06 8.06

A-B 1 4 5/8 2.35 15.04 15.04 B-C 1 2 5/8 1.95 6.24 6.24

1 3 5/8 2.08 9.98 9.98 1 2 5/8 0.75 2.40 2.40 1 2 1/2 1.84 3.66 3.66 1 3 5/8 2.16 10.37 10.37 1 3 1/2 1.65 4.92 4.92 1 2 5/8 1.72 5.50 5.50 1 2 1/2 1.72 3.42 3.42 1 3 5/8 1.72 8.26 8.26 1 1 5/8 2.95 4.72 4.72 1 2 5/8 1.95 6.24 6.24 1 1 5/8 2.08 3.33 3.33 1 2 5/8 1.67 5.34 5.34 1 3 5/8 2.16 10.37 10.37

VOLADO 1 2 5/8 0.66 2.11 2.11 1 2 5/8 1.41 4.51 4.51

ESTRIBOS 1 36 3/8 0.78 15.72 15.72

1 36 3/8 1.18 23.79 23.79

EJE 3-3 (V205) VOLADO 1 2 5/8 1.26 4.03 4.03

1 2 5/8 2.16 6.91 6.91 A-B 1 2 5/8 2.35 7.52 7.52

1 2 1/2 2.22 4.41 4.41 1 3 5/8 2.47 11.86 11.86

B-C 1 2 5/8 1.95 6.24 6.24

Page 20: Valorizacion 1 de Carabayllo (1)

20

Item ESTRUCTURA Armadura 1/4" 3/8" 1/2" 5/8" 3/4" 1" Parcial TotalUnid. Cantid. Long. 0.25 0.56 0.994 1.6 2.24 4.04 Kg Kgf"

1 3 5/8 2.64 12.67 12.67 1 2 1/2 1.95 3.88 3.88 1 2 5/8 1.95 6.24 6.24 1 3 1/2 1.65 4.92 4.92 1 2 5/8 2.95 9.44 9.44 1 2 5/8 1.72 5.50 5.50 1 2 5/8 1.72 5.50 5.50 1 3 5/8 1.72 8.26 8.26 1 2 5/8 1.95 6.24 6.24 1 2 5/8 2.05 6.56 6.56 1 2 1/2 1.67 3.32 3.32 1 3 5/8 2.15 10.32 10.32

VOLADO 1 2 5/8 0.66 2.11 2.11 1 2 5/8 1.41 4.51 4.51

ESTRIBOS 1 15 3/8 0.78 6.55 6.55

1 56 3/8 1.18 37.00 37.00

EJE A-A (V201) 1 8 1/2 12.02 95.58 95.58 3 27 3/8 1.08 48.99 48.99

EJE B-B(V202) 1 4 5/8 9.07 58.05 58.05 2 30 3/8 0.78 26.21 26.21

EJE C-C (V203) 1 4 5/8 12.02 76.93 76.93

1 2 3/8 12.02 13.46 13.46 3 28 3/8 1.18 55.51 55.51

SECUNDARIOS

CORTE A-A 1 6 1/2 8.12 48.43 48.43 ESTRIBOS 1 45 3/8 0.98 24.70 24.70 CORTE B-B 1 6 1/2 9.32 55.58 55.58 ESTRIBOS 1 45 3/8 0.98 24.70 24.70 CORTE D-D 1 4 3/8 8.07 18.08 18.08 ESTRIBOS 2 29 3/8 0.88 28.58 28.58 CORTE F-F 1 8 1/2 8.42 66.96 66.96 ESTRIBOS 2 28 3/8 1.08 33.87 33.87

CORTE E-E 1 4 3/8 5.37 12.03 12.03 ESTRIBOS 1 33 3/8 0.58 10.72 10.72 CORTE E-E 1 4 3/8 4.37 9.79 9.79

1 27 3/8 0.58 8.77 8.77 VIGUETA DE COSTURA 1 2 1/2 4.62 9.18 9.18

ESTRIBOS 1 18 1/4 0.35 1.58 1.58 1 2 1/2 8.54 16.98 16.98

ESTRIBOS 1 32 1/4 0.35 2.80 2.80 1 2 1/2 9.32 18.53 18.53

ESTRIBOS 1 38 1/4 0.35 3.32 3.32

3° PISO PRINCIPAL

EJE 2-2 (V304) VOLADO 1 4 5/8 0.41 2.62 2.62

A-B 1 4 5/8 2.35 15.04 15.04 B-C 1 2 5/8 1.95 6.24 6.24

1 3 5/8 2.08 9.98 9.98 1 2 5/8 0.75 2.40 2.40 1 2 1/2 1.84 3.66 3.66 1 3 5/8 2.16 10.37 10.37 1 3 1/2 1.65 4.92 4.92 1 2 5/8 1.72 5.50 5.50 1 2 1/2 1.72 3.42 3.42 1 3 5/8 1.72 8.26 8.26 1 1 5/8 2.95 4.72 4.72 1 2 5/8 1.95 6.24 6.24 1 1 5/8 2.08 3.33 3.33 1 2 5/8 1.67 5.34 5.34 1 3 5/8 2.16 10.37 10.37

ESTRIBOS 1 23 3/8 0.78 10.05 10.05

1 36 3/8 1.18 23.79 23.79

EJE 3-3 (V305) VOLADO 1 2 5/8 0.41 1.31 1.31

1 2 5/8 1.23 3.94 3.94 A-B 1 2 5/8 2.35 7.52 7.52

1 2 1/2 2.22 4.41 4.41 1 3 5/8 2.47 11.86 11.86

B-C 1 2 5/8 1.95 6.24 6.24 1 3 5/8 2.64 12.67 12.67 1 2 1/2 1.95 3.88 3.88 1 2 5/8 1.95 6.24 6.24 1 3 1/2 1.65 4.92 4.92 1 2 5/8 2.95 9.44 9.44 1 2 5/8 1.72 5.50 5.50 1 2 5/8 1.72 5.50 5.50 1 3 5/8 1.72 8.26 8.26 1 2 5/8 1.95 6.24 6.24 1 2 5/8 2.05 6.56 6.56 1 2 1/2 1.67 3.32 3.32 1 3 5/8 2.15 10.32 10.32

ESTRIBOS 1 3 3/8 0.78 1.31 1.31

1 56 3/8 1.18 37.00 37.00

EJE B-B(V302) 1 4 5/8 12.02 76.93 76.93 3 27 3/8 0.78 35.38 35.38

EJE C-C (V303) 1 4 5/8 12.02 76.93 76.93 1 2 3/8 12.02 13.46 13.46 3 28 3/8 1.18 55.51 55.51

EJE A-A (V301) 1 8 1/2 12.02 95.58 95.58 3 27 3/8 1.08 48.99 48.99

VIGAS SECUNDARIAS

CORTE A-A 1 6 1/2 9.27 55.29 55.29 ESTRIBOS 1 51 3/8 0.98 27.99 27.99 CORTE B-B 1 6 1/2 8.47 50.52 50.52 ESTRIBOS 1 45 3/8 0.98 24.70 24.70 CORTE C-C 2 4 5/8 4.35 55.68 55.68 ESTRIBOS 2 32 3/8 0.78 27.96 27.96

Page 21: Valorizacion 1 de Carabayllo (1)

21

Item ESTRUCTURA Armadura 1/4" 3/8" 1/2" 5/8" 3/4" 1" Parcial TotalUnid. Cantid. Long. 0.25 0.56 0.994 1.6 2.24 4.04 Kg Kgf"

CORTE E-E 1 4 3/8 12.02 26.92 26.92 ESTRIBOS 3 28 3/8 0.58 27.28 27.28 CORTE E-E 1 4 3/8 4.12 9.23 9.23 ESTRIBOS 3 29 3/8 0.78 38.00 38.00

VIGUETA DE COSTURA 1 2 1/2 8.12 16.14 16.14

ESTRIBOS 1 34 1/4 0.35 2.97 2.97 1 2 1/2 7.22 14.35 14.35

ESTRIBOS 1 28 1/4 0.35 2.45 2.45 1 2 1/2 8.12 16.14 16.14

ESTRIBOS 1 34 1/4 0.35 2.97 2.97

4° PISO PRINCIPAL

EJE B-B(V402) 1 4 5/8 12.02 76.93 76.93 3 27 3/8 0.78 35.38 35.38

EJE C-C (V403) 1 4 5/8 12.02 76.93 76.93 1 2 3/8 12.02 13.46 13.46 3 28 3/8 1.18 55.51 55.51

EJE 2-2 (V404) 1 8 3/8 6.27 28.09 28.09 ESTRIBOS 1 34 3/8 1.08 20.56 20.56

EJE 2-2 (V405) 1 8 3/8 6.27 28.09 28.09 ESTRIBOS 1 34 3/8 1.08 20.56 20.56

SECUNDARIAS

CORTE E-E=CORTE D-D 2 4 3/8 12.02 53.85 53.85 ESTRIBOS 6 29 3/8 0.78 76.00 76.00 CORTE A-A 1 6 1/2 6.27 37.39 37.39 ESTRIBOS 1 36 3/8 0.98 19.76 19.76 CORTE B-B 1 6 1/2 6.27 37.39 37.39 ESTRIBOS 1 36 3/8 0.98 19.76 19.76 CORTE C-C 1 4 5/8 2.92 18.69 18.69

1 4 5/8 3.17 20.29 ESTRIBOS 1 23 3/8 0.78 10.05 10.05

1 26 3/8 0.78 11.36 11.36 CORTE E-E 1 4 3/8 1.62 3.63 3.63 ESTRIBOS 1 8 3/8 0.78 3.49 3.49

VIGUETAS DE AMARRE EN CERCO 2 2 3/8 2.60 5.82 5.82 ESTRIBOS 2 27 1/4 0.40 5.40 5.40

2 2 3/8 12.60 28.22 28.22 ESTRIBOS 2 76 1/4 0.40 15.20 15.20

2 2 3/8 5.05 11.31 11.31 ESTRIBOS 2 27 1/4 0.40 5.40 5.40

1 2 3/8 2.35 2.63 2.63 ESTRIBOS 1 16 1/4 0.40 1.60 1.60

1 2 3/8 2.85 3.19 3.19 ESTRIBOS 1 16 1/4 0.40 1.60 1.60

1 2 3/8 1.85 2.07 2.07 ESTRIBOS 1 6 1/4 0.40 0.60 0.60

1 2 3/8 1.50 1.68 1.68 ESTRIBOS 1 4 1/4 0.40 0.40 0.40

1 2 3/8 3.35 3.75 3.75 ESTRIBOS 1 16 1/4 0.40 1.60 1.60

- LOSA ALIGERADA 1,100.33 1° PISO EJE A-A ENTRE 1 Y 2 1 8 3/8 24.85 111.33 111.33 EJE C-C ENTRE 1 Y 2 1 5 3/8 9.19 25.73 25.73 EJE C-C ENTRE 3 Y 4 1 3 3/8 8.54 14.35 14.35 EJE C-C ENTRE 2 Y 4 1 10 3/8 15.72 88.03 88.03 ACERO DE TEMPETATURA 1 15 1/4 5.77 21.64 21.64

1 15 1/4 3.72 13.95 13.95 1 15 1/4 4.42 16.58 16.58 1 14 1/4 9.12 31.92 31.92

LOSA ARMADA 1 16 5/8 2.21 56.58 56.58

2° PISO EJE B-B ENTRE 2 Y 4 1 8 3/8 15.72 70.43 70.43

1 3 3/8 8.54 14.35 14.35 1 10 3/8 24.85 139.16 139.16

ACERO DE TEMPETATURA 1 15 1/4 4.42 16.58 1 15 1/4 4.42 16.58 1 14 1/4 9.12 31.92 1 15 1/4 3.72 13.95

LOSA ARMADA 1 6 3/8 7.69 25.84 25.84 1 16 3/8 2.21 19.80 19.80

3° PISO EJE B-B ENTRE 1 Y 4 1 5 3/8 24.85 69.58 69.58 EJE C-C ENTRE 1 Y 2 - 3 Y 4 2 3 3/8 8.54 28.69 28.69 EJE C-C ENTRE 1 Y 4 1 10 3/8 24.85 139.16 139.16 ACERO DE TEMPETATURA 1 15 1/4 8.17 30.64

1 15 1/4 2.87 10.76 1 15 1/4 4.42 16.58 1 17 1/4 8.27 35.15

LOSA ARMADA 1 19 3/8 2.67 28.41 28.41

4° PISO EJE C-C ENTRE 1 Y 3 1 7 3/8 12.39 48.57 48.57 EJE C-C ENTRE 3 Y 4 1 6 3/8 7.00 23.52 23.52 ACERO DE TEMPETATURA 1 15 1/4 2.97 11.14 11.14

1 14 1/4 2.72 9.52 9.52 1 13 1/4 2.67 8.68 8.68

LOSA ARMADA 1 7 3/8 5.60 21.95 21.95 1 13 3/8 3.79 27.59 27.59 1 39 3/8 1.55 33.85 33.85

ESCALERA 359.77 1° Tramo Longitudinales 1 6 1/2 5.71 34.05 34.05

1 6 1/2 6.34 37.81 37.81 Transversales 2 24 1/2 0.86 41.03 41.03

2° Tramo Longitudinales 1 6 1/2 6.00 35.78 35.78

1 6 1/2 6.67 39.78 39.78 Transversales 2 28 1/2 0.86 47.87 47.87

Page 22: Valorizacion 1 de Carabayllo (1)

22

Item ESTRUCTURA Armadura 1/4" 3/8" 1/2" 5/8" 3/4" 1" Parcial TotalUnid. Cantid. Long. 0.25 0.56 0.994 1.6 2.24 4.04 Kg Kgf"

3° Tramo Longitudinales 1 6 1/2 6.00 35.78 35.78

1 6 1/2 6.67 39.78 39.78 Transversales 2 28 1/2 0.86 47.87 47.87

CISTERNA 407.30

ACERO 2 6 3/8 2.22 14.92 14.92 2 6 3/8 2.00 13.44 13.44 2 18 3/8 2.22 44.76 44.76 2 12 3/8 2.00 26.88 26.88 2 15 3/8 2.22 37.30 37.30 2 9 3/8 2.00 20.16 20.16 2 15 3/8 2.30 38.64 38.64 2 6 3/8 1.60 10.75 10.75 2 15 3/8 2.30 38.64 38.64 2 6 3/8 1.60 10.75 10.75 2 8 3/8 1.82 16.31 16.31 1 8 3/8 7.50 33.60 33.60 2 8 3/8 0.52 4.66 4.66 1 8 3/8 3.27 14.65 14.65 2 7 3/8 3.20 25.09 25.09 1 8 3/8 3.67 16.44 16.44 2 8 3/8 2.80 25.09 25.09 2 8 3/8 1.70 15.23 15.23

- -

TOTAL EN ML. 2,640.1 11,795.7 1,880.2 2,312.0 - - 12,641.2 12,792.1

Page 23: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

B ARQUITECTURA

01.00.00 ALBAÑILERIA

01.01.00 MURO DE SOGA LADRILLO KING KONG CON MORTERO 1:5 (CEMENTO:ARENA) 493.69 M2

1° PISO

EJE 1-1 ENTRE A Y C 4.95 2.10 1.00 10.40

CERCO ADELANTE 2.50 2.45 1.00 6.13

2.55 2.05 1.00 5.23

1.05 2.45 1.00 2.57

0.70 2.45 1.00 1.72

2.60 2.05 1.00 5.33 160.99EJE 4-4 ENTRE A Y C 5.85 2.10 1.00 12.29

CERCO ATRÁS 19.55 3.90 1.00 76.25

BAÑO 1 1.73 2.50 1.00 4.33

1.50 1.80 1.00 2.70

1.40 1.50 1.00 2.10

COCHERA 4.50 2.50 1.00 11.25

DESPENSA 3.58 2.50 1.00 8.95

1.35 2.50 1.00 3.38

COCINA 2.60 2.50 1.00 6.50

1.65 1.15 1.00 1.90

2° PISO

EJE 1-1 ENTRE A Y C 6.15 2.45 1.00 15.07

V8 3.25 0.60 1.00 1.95

DORMITORIO 5.58 2.45 1.00 13.67

3.60 2.45 1.00 8.82

2.62 2.45 1.00 6.42

3.85 2.45 1.00 9.43

1.24 2.25 1.00 2.79

0.50 2.45 1.00 1.23

V7-V5 2.40 1.25 1.00 3.00

VA2 0.85 2.25 1.00 1.91

V6-V5-VA6 1.25 1.00

BAÑO 5.01 2.45 1.00 12.27

DORMITORIO PRINCIPAL 4.50 2.45 1.00 11.03

1.65 2.45 1.00 4.04

CLOSET 1.75 2.45 2.00 8.58

TERRAZA 4.25 0.70 1.00 2.97

V3 2.60 1.75 1.00 4.55

V4 3.90 1.75 1.00 6.83

DUCHA 3.49 0.60 1.00 2.09

3° PISO

EJE 1-1 ENTRE A Y C 6.15 2.45 1.00 15.07

V9 3.25 0.80 1.00 2.60

DORMITORIO 8.62 2.45 1.00 21.12

V11-V12 2.51 0.80 1.00 2.01

2.62 2.45 1.00 6.42

V7 0.75 1.25 1.00 0.94

V5-VA3 0.78 2.25 1.00 1.76

BAÑO 4.00 2.45 1.00 9.80

DORMITORIO 3 1.24 2.45 1.00 3.04

6.15 2.45 1.00 15.07

V10 1.65 0.80 1.00 1.32

BAÑO 4.76 2.45 1.00 11.66

DORMITORIO 4 4.34 2.45 1.00 10.63

V16 1.70 0.70 1.00 1.19

1.30 2.45 1.00 3.19

1.70 0.70 1.00 1.19

1.50 2.45 1.00 3.68

V15 1.20 0.70 1.00 0.84

0.50 2.45 1.00 1.23

V14 1.20 0.80 1.00 0.96

1.08 2.45 1.00 2.65

3.70 2.45 1.00 9.07

4° PISO

EJE 1-1 ENTRE B Y C 3.10 2.40 1.00 7.44

2.26 2.40 2.00 10.85

1.39 0.90 2.00 2.50

11.75 0.90 1.00 10.58

BAÑO 5 7.74 2.40 1.00 18.58

0.50 2.40 1.00 1.20

VA4 0.40 2.00 1.00 0.80

BAÑO SERVICIO 5.75 2.40 1.00 13.80

LAVANDERIA-CUARTO DE SERVICIO 6.51 2.40 1.00 15.62

1.63 2.40 1.00 3.91

1.78 2.40 1.00 4.27

V17 1.10 1.00 1.00 1.10

02.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS

02.01.00 TARRAJEO INTERIORES Y EXTERIORES CON CEMENTO-ARENA 1,401.06 M2

Page 24: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

1° PISO

EJE 1-1 ENTRE A Y C 4.95 2.50 1.00 12.38

CERCO ADELANTE 2.50 2.80 2.00 14.00

2.55 2.40 2.00 12.24

1.05 2.80 2.00 5.88

0.70 2.80 2.00 3.92

2.60 2.40 2.00 12.48

EJE 4-4 ENTRE A Y C 5.85 2.50 1.00 14.63

CERCO ATRÁS 19.55 3.90 1.00 76.25

BAÑO 1 1.73 2.50 2.00 8.65 233.961.50 1.80 2.00 5.40

1.40 1.50 2.00 4.20

COCHERA 4.50 2.50 2.00 22.50

DESPENSA 3.58 2.50 2.00 17.90

1.35 2.50 2.00 6.75

COCINA 2.60 2.50 2.00 13.00

1.65 1.15 2.00 3.79

0.00

2° PISO

EJE 1-1 ENTRE A Y C 6.15 2.45 1.00 15.07

V8 3.25 0.60 2.00 3.90

DORMITORIO 5.58 2.45 2.00 27.34

3.60 2.45 2.00 17.64

2.62 2.45 2.00 12.84

3.85 2.45 2.00 18.87

1.24 2.25 2.00 5.58

0.50 2.45 2.00 2.45

V7-V5 2.40 1.25 2.00 6.00

VA2 0.85 2.25 2.00 3.82

V6-V5-VA6 1.25 2.00

BAÑO 5.01 2.45 1.00 12.27

DORMITORIO PRINCIPAL 4.50 2.45 1.00 11.03

1.65 2.45 1.00 4.04

CLOSET 1.75 2.45 4.00 17.15

TERRAZA 4.25 0.70 2.00 5.95

V3 2.60 1.75 2.00 9.10

V4 3.90 1.75 2.00 13.65

DUCHA 3.49 0.60 1.00 2.09

3° PISO

EJE 1-1 ENTRE A Y C 6.15 2.45 1.00 15.07

V9 3.25 0.80 2.00 5.20

DORMITORIO 8.62 2.45 2.00 42.24

V11-V12 2.51 0.80 2.00 4.02

2.62 2.45 2.00 12.84

V7 0.75 1.25 2.00 1.88

V5-VA3 0.78 2.25 2.00 3.51

BAÑO 4.00 2.45 2.00 19.60

DORMITORIO 3 1.24 2.45 2.00 6.08

6.15 2.45 2.00 30.14

V10 1.65 0.80 2.00 2.64

BAÑO 4 4.76 2.45 2.00 23.32

DORMITORIO 4 4.34 2.45 2.00 21.27

V16 1.70 0.70 2.00 2.38

1.30 2.45 2.00 6.37

1.70 0.70 2.00 2.38

1.50 2.45 2.00 7.35

V15 1.20 0.70 2.00 1.68

0.50 2.45 2.00 2.45

V14 1.20 0.80 2.00 1.92

1.08 2.45 2.00 5.29

3.70 2.45 2.00 18.13

4° PISO

EJE 1-1 ENTRE B Y C 3.10 2.40 1.00 7.44

2.26 2.40 1.00 5.42

1.39 0.90 1.00 1.25

11.75 0.90 2.00 21.15

BAÑO 5 7.74 2.40 2.00 37.15

0.50 2.40 2.00 2.40

VA4 0.40 2.00 2.00 1.60

BAÑO SERVICIO 5.75 2.40 2.00 27.60

LAVANDERIA-CUARTO DE SERVICIO 6.51 2.40 2.00 31.25

1.63 2.40 2.00 7.82

1.78 2.40 2.00 8.54

V17 1.10 1.00 2.00 2.20

TARRAJEO EN PLACAS

PL-1

'EJE B-B entre 2 Y 3 ( cara) 3.45 2.50 2.00 17.25

'2do piso 3.45 2.45 2.00 16.91

'3do piso 3.45 2.45 2.00 16.91

'4do piso 3.45 2.40 2.00 16.56

Page 25: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

PL-2

'EJE 1-1 entre B-C ( cara) 2.30 2.50 1.00 5.75

'2do piso 2.30 2.45 1.00 5.64

'3do piso 2.30 2.45 1.00 5.64

'4do piso 2.30 2.40 1.00 5.52

0.00

PL-3 0.00

'EJE 4-4 entre A-B ( cara) 1.15 2.50 1.00 2.88

'2do piso 1.15 2.45 1.00 2.82

'3do piso 1.15 2.45 1.00 2.82

'4do piso 1.15 2.40 1.00 2.76

0.00

02.01.00 TARRAJEO EN COLUMNAS 0.00

1 PISO

C1 3.50 2.50 1.00 8.75

C2 2.60 2.50 1.00 6.50

C3 2.00 2.50 1.00 5.00 31.75

C4 2.50 2.50 1.00 6.25

C5 0.50 2.50 1.00 1.25

COLUMNETA CT-2 1.60 2.50 1.00 4.00

2 PISO

C1 4.00 2.45 1.00 9.80

C2 1.60 2.45 1.00 3.92

C3 1.60 2.45 1.00 3.92

C4 2.90 2.45 1.00 7.11

C5 0.50 2.45 1.00 1.23

COLUMNETA CT-2 0.40 2.45 1.00 0.98

3 PISO

C1 3.95 2.45 1.00 9.68

C2 2.60 2.45 1.00 6.37

C3 2.00 2.45 1.00 4.91

C4 2.65 2.45 1.00 6.49

C5 0.50 2.45 1.00 1.23

COLUMNETA CT-2 0.40 2.45 1.00 0.98

4 PISO

C1 2.50 2.45 1.00 6.13

C4 1.65 2.45 1.00 4.04

C5 0.50 2.45 1.00 1.23

02.01.00 TARRAJEO EN VIGAS

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V101) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 1 Y 4 (V102) 4.60 0.25 1.00 1.15

7.00 0.10 1.00 0.70

EJE C-C ENTRE 1 Y 4 (V103) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V104) 3.75 0.25 1.00 0.94

5.15 0.40 1.00 2.06 64.19

5.15 0.20 2.00 2.06

EJE 3-3 ENTRE A Y C (V105) 1.20 0.25 1.00 0.30

8.23 0.25 1.00 2.06

8.23 0.20 2.00 3.29

2.60 0.10 1.00 0.26

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.20 2.00 4.36

EJE 1-1 ENTRE A Y C 6.15 0.10 1.00 0.62

6.15 0.30 1.00 1.85

EJE 4-4 ENTRE A Y C 7.30 0.30 1.00 2.19

7.30 0.10 2.00 1.46

EJE C-C ENTRE 2 Y 3 3.70 0.35 1.00 1.30

EJE C´-C´ENTRE 1 Y 2 3.70 0.20 1.00 0.74

3.70 0.25 1.00 0.93

VIGUETA DE COSTURA 4.75 0.10 1.00 0.48

6.95 0.10 1.00 0.70

8.10 0.10 1.00 0.81

2° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V201) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 2 Y 4 (V202) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V203) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V204) 2.82 0.25 1.00 0.71

3.20 0.40 1.00 1.28

3.20 0.30 1.00 0.96

EJE 3-3 ENTRE A Y C (V205) 2.05 0.25 1.00 0.51

2.05 0.20 2.00 0.82

4.35 0.25 1.00 1.09

4.35 0.20 1.00 0.87

VIGAS SECUNDARIAS

EJE A-A ENTRE 2 Y 4 8.15 0.20 2.00 3.26

EJE 1-1 ENTRE A Y C 3.10 0.10 1.00 0.31

Page 26: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

4.95 0.30 1.00 1.49

1.85 0.30 1.00 0.56

EJE B´-B´ ENTRE 1 Y 3 7.55 0.40 1.00 3.02

VOLADO ARMADO 4.45 0.20 2.00 1.78

EJE 4-4 ENTRE A Y C 7.30 0.30 1.00 2.19

7.30 0.10 2.00 1.46

EJE C-C ENTRE 2 Y 3 3.70 0.35 1.00 1.30

VIGUETA DE COSTURA 3.85 0.10 1.00 0.39

7.20 0.10 1.00 0.72

8.10 0.10 1.00 0.81

3° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V301) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 2 Y 4 (V302) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V303) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V304) 3.37 0.10 1.00 0.34

3.37 0.20 2.00 1.35

1.88 0.60 1.00 1.13

3.28 0.60 1.00 1.97

EJE 3-3 ENTRE A Y C (V305) 8.55 0.25 1.00 2.14

8.55 0.20 2.00 3.42

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.15 1.00 1.64

10.90 0.20 1.00 2.18

EJE 1-1 ENTRE A Y C 3.10 0.10 1.00 0.31

4.95 0.30 1.00 1.49

1.85 0.30 1.00 0.56

EJE 4-4 ENTRE A Y C 6.45 0.30 1.00 1.94

6.45 0.20 1.00 1.29

EJE C-C ENTRE 1 Y 2 4.50 0.20 1.00 0.90

4.50 0.15 1.00 0.67

VIGUETA DE COSTURA 7.10 0.10 2.00 1.42

5.95 0.10 1.00 0.60

4° PISO

VIGAS PRINCIPALES

EJE B-B ENTRE 2 Y 4 (V402) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V403) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 1-1 ENTRE B Y C (V404)(V405) 5.15 0.60 2.00 6.18

VIGAS SECUNDARIAS

VOLADO ARMADO 11.90 0.35 1.00 4.17

EJE 1-1 ENTRE B Y C 3.10 0.10 1.00 0.31

EJE 4-4 ENTRE B Y C 4.75 0.10 1.00 0.48

EJE B´-B´ ENTRE 1 Y 4 7.55 0.20 1.00 1.51

EJE B´-B´ ENTRE 3 Y 4 3.50 0.15 1.00 0.53

LOSA ARMADA 2.35 0.45 1.00 1.06

1.30 0.25 1.00 0.33

1.40 0.45 1.00 0.63

VIGUETAS DE AMARRE EN CERCO 19.55 0.20 2.00 7.82

02.01.00 TARRAJEO EN LOSA ALIGERADA AREA CAD

1° PISO

EJE A-A ENTRE 1 Y 2 3.70 1.00 3.70

EJE A-A ENTRE 2 Y 3 3.83 1.00 3.83

EJE A-A ENTRE 3 Y 4 3.38 1.00 3.38

EJE B-B ENTRE 1 Y 2 7.22 1.00 7.22 71.38

EJE B-B ENTRE 2 Y 3 7.46 1.00 7.46

EJE B-B ENTRE 3 Y 4 6.55 1.00 6.55

EJE C-C ENTRE 1 Y 2 6.66 1.00 6.66

EJE C-C ENTRE 2 Y 3 15.20 1.00 15.20

EJE C-C ENTRE 3 Y 4 17.38 1.00 17.38

2° PISO AREA CAD

EJE A-A ENTRE 2 Y 3 3.83 1.00 3.83

EJE A-A ENTRE 3 Y 4 3.38 1.00 3.38

EJE B-B ENTRE 2 Y 3 7.45 1.00 7.45

EJE B-B ENTRE 3 Y 4 6.56 1.00 6.56

EJE C-C ENTRE 1 Y 2 14.15 1.00 14.15

EJE C-C ENTRE 2 Y 3 14.63 1.00 14.63

EJE C-C ENTRE 3 Y 4 17.38 1.00 17.38

3° PISO AREA CAD

EJE B-B ENTRE 1 Y 2 7.22 1.00 7.22

EJE B-B ENTRE 2 Y 3 7.46 1.00 7.46

EJE B-B ENTRE 3 Y 4 6.56 1.00 6.56

EJE A-A ENTRE 1 Y 2 19.06 1.00 19.06

EJE A-A ENTRE 2 Y 3 15.20 1.00 15.20

Page 27: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

EJE A-A ENTRE 3 Y 4 17.38 1.00 17.38

4°PISO AREA CAD

EJE B-B ENTRE 1 Y 2 4.82 1.00 4.82

EJE B-B ENTRE 2 Y 3 9.18 1.00 9.18

EJE C-C ENTRE 3 Y 4 7.92 1.00 7.92

02.01.00 TARRAJEO PRIMARIO RAYADO 34.92 M2

2 PISO

BAÑO 02 3.00 1.80 1.00 5.40

CUARTO DE BAÑO 6.00 1.80 1.00 10.80

3° PISO

BAÑO 03 3.00 1.80 1.00 5.40

BAÑO 04 2.90 1.80 1.00 5.22

4° PISO

BAÑO SERVICIO 2.70 1.80 1.00 4.86

BAÑO 05 1.80 1.80 1.00 3.24

02.02.00 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS 328.05 ML

PUERTAS

P-P 6.00 1.00 6.00

P-1 5.45 1.00 5.45

P-2 5.20 11.00 57.20 121.65

P-3 5.30 1.00 5.30

P-4 5.30 8.00 42.40

P-5 5.30 1.00 5.30

MAMPARAS

M-1 7.65 1.00 7.65

M-2 7.20 1.00 7.20

M-3 8.20 1.00 8.20 40.15

M-4 8.55 2.00 17.10

VENTANAS

V-1 6.40 1.00 6.40

V-2 6.00 1.00 6.00

V-3 9.10 1.00 9.10

V-4 11.30 1.00 11.30

V-5 3.80 3.00 11.40

V-6 3.40 1.00 3.40

V-7 3.50 3.00 10.50

V-8 9.80 1.00 9.80

V-9 9.80 1.00 9.80 166.25

V-10 6.60 1.00 6.60

V-11 5.50 1.00 5.50

V-12 6.20 1.00 6.20

V-13 11.50 1.00 11.50

V-14 5.70 1.00 5.70

V-15 5.70 1.00 5.70

V-16 6.90 2.00 13.80

V-17 5.00 1.00 5.00

VA-1 3.70 1.00 3.70

VA-2 1.90 1.00 1.90

VA-3 2.20 1.00 2.20

VA-4 1.60 3.00 4.80

VF-1 9.40 1.00 9.40

VF-2 6.55 1.00 6.55

02.04.00 VESTIDURA DE ESCALERA C:A 1.5 E:1.5 cm. 30.92 M2

1° TRAMO

3.65 0.90 1.00 3.29

0.60 0.90 1.00 0.54

GRADAS 0.90 0.18 15.00 2.43

0.90 0.25 14.00 3.15

0.90 0.90 1.00 0.81

2° TRAMO

4.67 0.90 1.00 4.20

0.60 0.90 1.00 0.54

GRADAS 0.90 0.18 15.00 2.43

0.90 0.25 14.00 3.15

0.90 0.90 1.00 0.81

3° TRAMO

4.67 0.90 1.00 4.20

0.60 0.90 1.00 0.54

GRADAS 0.90 0.18 4.00 0.65

0.90 0.25 15.00 3.38

Page 28: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

0.90 0.90 1.00 0.81

02.06.00 TARRAJEO CON IMPERMEABILIZANTE 18.51 M2

CISTERNA

1.50 1.050 2.00 3.15

0.80 1.050 2.00 1.68

1.50 2.280 4.00 13.68

04.00.00 PISOS Y PAVIMENTOS

04.01.00 CONTRAPISO DE 35 MM 390.65 M2

1° PISO AREA

24.75 1.00 24.75

76.56 1.00 76.56 137.61

36.30 1.00 36.30

2° PISO

21.00 1.00 21.00

11.32 1.00 11.32

43.70 1.00 43.70

3.74 1.00 3.74

3° PISO

77.43 1.00 77.43

3.74 1.00 3.74

4° PISO

92.11 1.00 92.11

04.02.00 PISO CERAMICO 385.83 M2

1° PISO AREA

INGRESO-PISO PORCELANATO 5.50 1.00 5.50

BAÑO 01-PISO PORCELANATO GRIS 3.90 1.00 3.90

PISO LAMINADO BAMBU-RECINO-SALA-COMEDOR 45.97 1.00 45.97

PISO PORCELANATO GRIS-COCINA-DESPENSA 19.69 1.00 19.69 135.72

TERRAZA-PISO PORCELANATO RUSTICO 11.60 1.00 11.60

TERRAZA-PISO MADERA DECK 13.15 1.00 13.15

COCHERA-PISO CEMENTO PULIDO 35.91 1.00 35.91

2° PISO

PISO LAMINADO BAMBU 65.88 1.00 65.88

3.74 1.00 3.74

PISO PORCELANATO BEIGE 6.60 1.00 6.60

3.36 1.00 3.36

3° PISO

PISO LAMINADO BAMBU 71.97 1.00 71.97

3.74 1.00 3.74

PISO PORCELANATO BEIGE 3.66 1.00 3.66

3.37 1.00 3.37

4° PISO

PISO CERAMICO RUSTICO ALTO TRANSITO-TERRAZA 38.72 1.00 38.72

PISO PORCELANATO-GYM 28.73 1.00 28.73

PISO MAYOLICA BLANCA TECHO POLICARBONATO-LAVANDERIA 7.04 1.00 7.04

PISO PORCELANATO BEIGE - HALL 1.14 1.00 1.14

PISO PORCELANATO BEIGE - BAÑO 3.71 1.00 3.71

PISO PORCELANATO-CUARTO DE SERVICIO 8.45 1.00 8.45

05.00.00 ZOCALOS Y CONTRAZOCALOS

05.01.00 ZOCALO DE CERAMICA 327.36 M2

2 PISO

BAÑO 02 3.00 1.80 1.00 5.40

CUARTO DE BAÑO 6.00 1.80 1.00 10.80

3° PISO

BAÑO 03 3.00 1.80 1.00 5.40

BAÑO 04 2.90 1.80 1.00 5.22

4° PISO

BAÑO SERVICIO 2.70 1.80 1.00 4.86

BAÑO 05 1.80 1.80 1.00 3.24

CONTRAZOCALO 292.44 ML

1° PISO

INGRESO-PISO PORCELANATO 1.80 1.00 1.80

BAÑO 1-PISO PORCELANATO GRIS 7.31 1.00 7.31

VESTIBULO-SALA-COMERDOR-PISO LAMINADO BAMBU 17.27 1.00 17.27 73.47

COCINA-PISO PORCELANATO GRIS 21.46 1.00 21.46

ABAJO ESCALERA-PISO LAMINADO BAMBU 2.47 1.00 2.47

TERRAZA-PISO LAMINADO BAMBU 11.60 1.00 11.60

Page 29: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

TERRAZA-PISO PORCELANATO RUSTICO 7.93 1.00 7.93

TERRAZA-PISO MADERA DECK 3.63 1.00 3.63

2° PISO

ESTAR-GALERIA-CLOSET-DORMITORIOS-TERRAZA-PISO LAMINADO BAMBU 52.53 1.00 52.53

BAÑO2-CUARTO DE BAÑO-PISO PORCELANATO BEIGE 12.07 1.00 12.07

3° PISO

CUARTO DE JUEGO-ESTUDIO-DORMITORIOS-PISO LAMINADO BAMBU 68.29 1.00 68.29

BAÑO 3 5.26 1.00 5.26

BAÑO 4 7.10 1.00 7.10

4° PISO

BALCON-GYM-PISO PORCELANATO 16.71 1.00 16.71

TERRAZA-PISO CERAMICO RUSTICO ALTO TRANSITO 24.52 1.00 24.52

HALL-PISO PORCELANATO BEIGE 1.20 1.00 1.20

LAVANDERIA-PISO MAYOLICA BLANCA 9.75 1.00 9.75

CUARTO DE SERVICIO-PISO PORCELANATO 7.91 1.00 7.91

BAÑO SERVICIO-PISO PORCELANATO 6.75 1.00 6.75

BAÑO 5- PISO PORCELANATO BEIGE 6.88 1.00 6.88

06.00.00 CARPINTERIA DE MADERA

06.01.00 PUERTA DE MADERA 328.20 P2

PP 1.20 2.40 1.00 2.88

P1 1.05 2.20 1.00 2.31

P2 0.80 2.20 11.00 19.36

P3 0.90 2.20 1.00 1.98

P4 0.90 2.20 1.00 1.98

P5 0.90 2.20 1.00 1.98

SUMA EN M2 30.49

07.00.00 CARPINTERIA METALICA

07.02.00 VENTANA DE ALUMINIO, PERFILES 38 MM (SEGÚN DISEÑO) 30.00 GLB07.03.00 BARANDA DE TUBO F°G° PASAMANO 1 1/2" - PARANTE 1" X 1 M ALT. 68.40 ML07.04.00 TAPA DE FIERRO EN CISTERNA 0.65 X 0.65 M. 1.00 UND

08.00.00 CERRAJERIA

08.01.00 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" UND. 52.00 PZA

PP 1.00 4.00 4.00

PI 1.00 4.00 4.00

P2 11.00 4.00 44.00

P3 1.00 4.00 4.00

P4 1.00 4.00 4.00

P5 1.00 4.00 4.00

08.01.01 CERRADURA 2 GOLPES 13.00 PZA

PP 1.00 1.00 1.00

PI 1.00 1.00 1.00

P2 11.00 1.00 11.00

P3 1.00 1.00 1.00

P4 1.00 1.00 1.00

P5 1.00 1.00 1.00

09.00.00 VIDRIOS,CRISTALES Y SIMILARES

09.01.00 SUMINISTRO Y COLOCACION DE VIDRIO TEMPLADO E: 6mm 956.17 P2

MAMPARAS

M-1 3.25 2.20 1.00 7.15

M-2 2.80 2.20 1.00 6.16

M-3 3.30 2.45 1.00 8.09

M-4 3.75 2.40 1.00 9.00

1.00 0.00

VENTANAS 1.00 0.00

V-1 0.75 2.45 1.00 1.84

V-2 1.65 1.37 1.00 2.26

V-3 2.80 1.75 1.00 4.90

V-4 3.90 1.75 1.00 6.83

V-5 0.90 1.00 1.00 0.90

V-6 0.70 1.00 1.00 0.70

V-7 0.75 1.00 1.00 0.75

V-8 3.25 1.65 1.00 5.36

V-9 3.25 1.65 1.00 5.36

V-10 1.65 1.65 1.00 2.72

V-11 1.10 1.65 1.00 1.82

V-12 1.45 1.65 1.00 2.39

V-13 3.30 2.45 1.00 8.09

V-14 1.20 1.65 1.00 1.98

V-15 1.20 1.75 1.00 2.10

V-16 1.70 1.75 1.00 2.98

V-17 1.10 1.40 1.00 1.54

VA-1 1.50 0.35 1.00 0.52

VA-2 0.75 0.20 1.00 0.15

VA-3 0.90 0.20 1.00 0.18

VA-4 0.40 0.40 1.00 0.16

Page 30: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

VF-1 4.25 0.45 1.00 1.91

VF-2 5.45 0.55 1.00 3.00

10.00.00 PINTURA

10.01.00 PINTURA VINILICA 2 MANOS 264.48 M2

CIELO RASO AREA CAD

1° PISO

EJE A-A ENTRE 1 Y 2 3.70 1.00 3.70

EJE A-A ENTRE 2 Y 3 3.83 1.00 3.83

EJE A-A ENTRE 3 Y 4 3.38 1.00 3.38

EJE B-B ENTRE 1 Y 2 7.22 1.00 7.22

EJE B-B ENTRE 2 Y 3 7.46 1.00 7.46

EJE B-B ENTRE 3 Y 4 6.55 1.00 6.55

EJE C-C ENTRE 1 Y 2 6.66 1.00 6.66

EJE C-C ENTRE 2 Y 3 15.20 1.00 15.20

EJE C-C ENTRE 3 Y 4 17.38 1.00 17.38

2° PISO AREA CAD

EJE A-A ENTRE 2 Y 3 3.83 1.00 3.83

EJE A-A ENTRE 3 Y 4 3.38 1.00 3.38

EJE B-B ENTRE 2 Y 3 7.45 1.00 7.45

EJE B-B ENTRE 3 Y 4 6.56 1.00 6.56

EJE C-C ENTRE 1 Y 2 14.15 1.00 14.15

EJE C-C ENTRE 2 Y 3 14.63 1.00 14.63

EJE C-C ENTRE 3 Y 4 17.38 1.00 17.38

3° PISO AREA CAD

EJE B-B ENTRE 1 Y 2 7.22 1.00 7.22

EJE B-B ENTRE 2 Y 3 7.46 1.00 7.46

EJE B-B ENTRE 3 Y 4 6.56 1.00 6.56

EJE A-A ENTRE 1 Y 2 19.06 1.00 19.06

EJE A-A ENTRE 2 Y 3 15.20 1.00 15.20

EJE A-A ENTRE 3 Y 4 17.38 1.00 17.38

4°PISO AREA CAD

EJE B-B ENTRE 1 Y 2 4.82 1.00 4.82

EJE B-B ENTRE 2 Y 3 9.18 1.00 9.18

EJE C-C ENTRE 3 Y 4 7.92 1.00 7.92

10.01.00 PINTURA DE ESCALERA

1° TRAMO

3.65 0.90 1.00 3.29

0.60 0.90 1.00 0.54

GRADAS 0.90 0.18 15.00 2.43

0.90 0.25 14.00 3.15

0.90 0.90 1.00 0.81

2° TRAMO

4.67 0.90 1.00 4.20

0.60 0.90 1.00 0.54

GRADAS 0.90 0.18 15.00 2.43

0.90 0.25 14.00 3.15

0.90 0.90 1.00 0.81

3° TRAMO

4.67 0.90 1.00 4.20

0.60 0.90 1.00 0.54

GRADAS 0.90 0.18 4.00 0.65

0.90 0.25 15.00 3.38

0.90 0.90 1.00 0.81

10.02.00 PINTURA VINILICA EN INTERIORES Y EXTERIORES 2 MANOS 1,167.50 M2

MUROS INTERIORES Y EXTERIORES

1° PISO

EJE 1-1 ENTRE A Y C 4.95 2.50 1.00 12.38

CERCO ADELANTE 2.50 2.80 2.00 14.00

2.55 2.40 2.00 12.24

1.05 2.80 2.00 5.88

0.70 2.80 2.00 3.92

2.60 2.40 2.00 12.48

EJE 4-4 ENTRE A Y C 5.85 2.50 1.00 14.63

CERCO ATRÁS 19.55 3.90 1.00 76.25

BAÑO 1 1.73 2.50 2.00 8.65

1.50 1.80 2.00 5.40

1.40 1.50 2.00 4.20

COCHERA 4.50 2.50 2.00 22.50

DESPENSA 3.58 2.50 2.00 17.90

1.35 2.50 2.00 6.75

COCINA 2.60 2.50 2.00 13.00

1.65 1.15 2.00 3.79

0.00

Page 31: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

2° PISO

EJE 1-1 ENTRE A Y C 6.15 2.45 1.00 15.07

V8 3.25 0.60 2.00 3.90

DORMITORIO 5.58 2.45 2.00 27.34

3.60 2.45 2.00 17.64

2.62 2.45 2.00 12.84

3.85 2.45 2.00 18.87

1.24 2.25 2.00 5.58

0.50 2.45 2.00 2.45

V7-V5 2.40 1.25 2.00 6.00

VA2 0.85 2.25 2.00 3.82

V6-V5-VA6 1.25 2.00

BAÑO 5.01 2.45 1.00 12.27

DORMITORIO PRINCIPAL 4.50 2.45 1.00 11.03

1.65 2.45 1.00 4.04

CLOSET 1.75 2.45 4.00 17.15

TERRAZA 4.25 0.70 2.00 5.95

V3 2.60 1.75 2.00 9.10

V4 3.90 1.75 2.00 13.65

DUCHA 3.49 0.60 1.00 2.09

3° PISO

EJE 1-1 ENTRE A Y C 6.15 2.45 1.00 15.07

V9 3.25 0.80 2.00 5.20

DORMITORIO 8.62 2.45 2.00 42.24

V11-V12 2.51 0.80 2.00 4.02

2.62 2.45 2.00 12.84

V7 0.75 1.25 2.00 1.88

V5-VA3 0.78 2.25 2.00 3.51

BAÑO 4.00 2.45 2.00 19.60

DORMITORIO 3 1.24 2.45 2.00 6.08

6.15 2.45 2.00 30.14

V10 1.65 0.80 2.00 2.64

BAÑO 4 4.76 2.45 2.00 23.32

DORMITORIO 4 4.34 2.45 2.00 21.27

V16 1.70 0.70 2.00 2.38

1.30 2.45 2.00 6.37

1.70 0.70 2.00 2.38

1.50 2.45 2.00 7.35

V15 1.20 0.70 2.00 1.68

0.50 2.45 2.00 2.45

V14 1.20 0.80 2.00 1.92

1.08 2.45 2.00 5.29

3.70 2.45 2.00 18.13

4° PISO

EJE 1-1 ENTRE B Y C 3.10 2.40 1.00 7.44

2.26 2.40 1.00 5.42

1.39 0.90 1.00 1.25

11.75 0.90 2.00 21.15

BAÑO 5 7.74 2.40 2.00 37.15

0.50 2.40 2.00 2.40

VA4 0.40 2.00 2.00 1.60

BAÑO SERVICIO 5.75 2.40 2.00 27.60

LAVANDERIA-CUARTO DE SERVICIO 6.51 2.40 2.00 31.25

1.63 2.40 2.00 7.82

1.78 2.40 2.00 8.54

V17 1.10 1.00 2.00 2.20

PINTURA EN PLACAS

PL-1

'EJE B-B entre 2 Y 3 ( cara) 3.45 2.50 2.00 17.25

'2do piso 3.45 2.45 2.00 16.91

'3do piso 3.45 2.45 2.00 16.91

'4do piso 3.45 2.40 2.00 16.56

PL-2

'EJE 1-1 entre B-C ( cara) 2.30 2.50 1.00 5.75

'2do piso 2.30 2.45 1.00 5.64

'3do piso 2.30 2.45 1.00 5.64

'4do piso 2.30 2.40 1.00 5.52

0.00

PL-3 0.00

'EJE 4-4 entre A-B ( cara) 1.15 2.50 1.00 2.88

'2do piso 1.15 2.45 1.00 2.82

'3do piso 1.15 2.45 1.00 2.82

'4do piso 1.15 2.40 1.00 2.76

0.00

PINTURA EN COLUMNAS 0.00

1 PISO

C1 3.50 2.50 1.00 8.75

C2 2.60 2.50 1.00 6.50

C3 2.00 2.50 1.00 5.00

C4 2.50 2.50 1.00 6.25

Page 32: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

C5 0.50 2.50 1.00 1.25

COLUMNETA CT-2 1.60 2.50 1.00 4.00

2 PISO

C1 4.00 2.45 1.00 9.80

C2 1.60 2.45 1.00 3.92

C3 1.60 2.45 1.00 3.92

C4 2.90 2.45 1.00 7.11

C5 0.50 2.45 1.00 1.23

COLUMNETA CT-2 0.40 2.45 1.00 0.98

3 PISO

C1 3.95 2.45 1.00 9.68

C2 2.60 2.45 1.00 6.37

C3 2.00 2.45 1.00 4.91

C4 2.65 2.45 1.00 6.49

C5 0.50 2.45 1.00 1.23

COLUMNETA CT-2 0.40 2.45 1.00 0.98

4 PISO

C1 2.50 2.45 1.00 6.13

C4 1.65 2.45 1.00 4.04

C5 0.50 2.45 1.00 1.23

PINTURA EN VIGAS

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V101) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 1 Y 4 (V102) 4.60 0.25 1.00 1.15

7.00 0.10 1.00 0.70

EJE C-C ENTRE 1 Y 4 (V103) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V104) 3.75 0.25 1.00 0.94

5.15 0.40 1.00 2.06

5.15 0.20 2.00 2.06

EJE 3-3 ENTRE A Y C (V105) 1.20 0.25 1.00 0.30

8.23 0.25 1.00 2.06

8.23 0.20 2.00 3.29

2.60 0.10 1.00 0.26

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.20 2.00 4.36

EJE 1-1 ENTRE A Y C 6.15 0.10 1.00 0.62

6.15 0.30 1.00 1.85

EJE 4-4 ENTRE A Y C 7.30 0.30 1.00 2.19

7.30 0.10 2.00 1.46

EJE C-C ENTRE 2 Y 3 3.70 0.35 1.00 1.30

EJE C´-C´ENTRE 1 Y 2 3.70 0.20 1.00 0.74

3.70 0.25 1.00 0.93

VIGUETA DE COSTURA 4.75 0.10 1.00 0.48

6.95 0.10 1.00 0.70

8.10 0.10 1.00 0.81

2° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V201) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 2 Y 4 (V202) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V203) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V204) 2.82 0.25 1.00 0.71

3.20 0.40 1.00 1.28

3.20 0.30 1.00 0.96

EJE 3-3 ENTRE A Y C (V205) 2.05 0.25 1.00 0.51

2.05 0.20 2.00 0.82

4.35 0.25 1.00 1.09

4.35 0.20 1.00 0.87

VIGAS SECUNDARIAS

EJE A-A ENTRE 2 Y 4 8.15 0.20 2.00 3.26

EJE 1-1 ENTRE A Y C 3.10 0.10 1.00 0.31

4.95 0.30 1.00 1.49

1.85 0.30 1.00 0.56

EJE B´-B´ ENTRE 1 Y 3 7.55 0.40 1.00 3.02

VOLADO ARMADO 4.45 0.20 2.00 1.78

EJE 4-4 ENTRE A Y C 7.30 0.30 1.00 2.19

7.30 0.10 2.00 1.46

EJE C-C ENTRE 2 Y 3 3.70 0.35 1.00 1.30

VIGUETA DE COSTURA 3.85 0.10 1.00 0.39

7.20 0.10 1.00 0.72

8.10 0.10 1.00 0.81

3° PISO

VIGAS PRINCIPALES

EJE A-A ENTRE 1 Y 4 (V301) 10.90 0.40 1.00 4.36

EJE B-B ENTRE 2 Y 4 (V302) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V303) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 2-2 ENTRE A Y C (V304) 3.37 0.10 1.00 0.34

Page 33: Valorizacion 1 de Carabayllo (1)

PLANILLA DE METRADOS

Proyecto: :

Cliente :

Fecha :

Region : Prov. Dist.

Item DESCRIPCIONMEDIDAS N° DE

PARCIAL TOTAL UND.LONG. ANCHO ALTO VECES

3.37 0.20 2.00 1.35

1.88 0.60 1.00 1.13

3.28 0.60 1.00 1.97

EJE 3-3 ENTRE A Y C (V305) 8.55 0.25 1.00 2.14

8.55 0.20 2.00 3.42

VIGAS SECUNDARIAS

EJE A-A ENTRE 1 Y 4 10.90 0.15 1.00 1.64

10.90 0.20 1.00 2.18

EJE 1-1 ENTRE A Y C 3.10 0.10 1.00 0.31

4.95 0.30 1.00 1.49

1.85 0.30 1.00 0.56

EJE 4-4 ENTRE A Y C 6.45 0.30 1.00 1.94

6.45 0.20 1.00 1.29

EJE C-C ENTRE 1 Y 2 4.50 0.20 1.00 0.90

4.50 0.15 1.00 0.67

VIGUETA DE COSTURA 7.10 0.10 2.00 1.42

5.95 0.10 1.00 0.60

4° PISO

VIGAS PRINCIPALES

EJE B-B ENTRE 2 Y 4 (V402) 3.40 0.25 1.00 0.85

EJE C-C ENTRE 1 Y 4 (V403) 9.60 0.25 1.00 2.40

9.60 0.40 2.00 7.68

EJE 1-1 ENTRE B Y C (V404)(V405) 5.15 0.60 2.00 6.18

VIGAS SECUNDARIAS

VOLADO ARMADO 11.90 0.35 1.00 4.17

EJE 1-1 ENTRE B Y C 3.10 0.10 1.00 0.31

EJE 4-4 ENTRE B Y C 4.75 0.10 1.00 0.48

EJE B´-B´ ENTRE 1 Y 4 7.55 0.20 1.00 1.51

EJE B´-B´ ENTRE 3 Y 4 3.50 0.15 1.00 0.53

LOSA ARMADA 2.35 0.45 1.00 1.06

1.30 0.25 1.00 0.33

1.40 0.45 1.00 0.63

PINTURA EN VIGUETAS DE AMARRE EN CERCO 19.55 0.20 2.00 7.82

10.03.00 PINTURA EN PUERTAS C/BARNIZ 2 MANOS 26.53 M2

PP 1.20 2.40 1.00 2.88

PI 1.05 2.20 1.00 2.31

P2 0.80 2.20 11.00 19.36

P3 0.90 2.20 1.00 1.98

P4 0.90 2.20 8.00 15.84

P5 0.90 2.20 1.00 1.98

Page 34: Valorizacion 1 de Carabayllo (1)

PRESUPUESTO - ESTRUCTURAS

Obra construccion de vivienda unifamiliar carabayllo

Subpresup.

Lugar

Item Descripción

01 OBRAS PROVISIONALES

01.01.01 OFICINA, CASETA Y ALMACÉN

01.01.02 CARTEL DE OBRA

01.01.03 TRANSPORTE DE MATERIALES Y EQUIPOS

02 TRABAJOS PRELIMINARES

02.04 TRAZO Y REPLANTEO PRELIMINAR

02.05 LIMPIEZA DE TERRENO MANUAL

03 MOVIMIENTO DE TIERRAS

03.01 EXCAVACION DE ZAPATA, MANUAL., EN TERRENO NORMAL

03.02 EXCAVACION DE ZANJA PARA CIMIENTOS, MANUAL., EN TERRENO NORMAL

03.03 EXCAVACION DE VIGA DE CIMENTACION, MANUAL., EN TERRENO NORMAL

03.04 EXCAVACION DE CISTERNA, C/MAQ., EN TERRENO NORMAL

03.05 EXCAVACION DE ESCALERA, MANUAL., EN TERRENO NORMAL

03.06 EXCAVACION DE PLACAS,MANUAL, EN TERRENO NORMAL

03.07 EXCAVACION PARA TABIQUERIA, MANUAL , EN TERRENO NORMAL

03.08 EXCAVACION PARA SARDINELES, MANUAL., EN TERRENO NORMAL

03.09 EXCAVACION PARA PISCINA, C/MAQ., EN TERRENO NORMAL

03.10 RELLENO COMPACATDO C/EQUIPO MATERIAL DE PRESTAMO

03.11 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

04 OBRAS DE CONCRETO SIMPLE

04.01 SOLADO PARA ZAPATAS

04.02 SOLADO PARA VIGAS DE CIMENTACION

04.03 SOLADO PARA CISTERNA Y CUARTO DE MAQUINA

04.04 SOLADO PARA PISCINA

04.05 CONCRETO 1:10 + 30% P.G. PARA CIMIENTOS CORRIDOS

04.06 TABIQUERIA Y SARDINELES

04.07 CONCRETO 1:8 + 25% P.M. PARA SOBRECIMIENTOS

04.08 FALSO PISO E=4"

05 OBRAS DE CONCRETO ARMADO

05.01 ZAPATAS

05.01.01 ZAPATAS - CONCRETO F'C= 210 KG/CM2

05.01.02 ZAPATA - ENCOFRADO Y DESENCOFRADO

05.01.03 ZAPÀTA - ACERO FY=4200 KG/CM2

05.02 VIGAS DE CIMENTACION

05.02.01 VIGA DE CIMENTACION - CONCRETO F'C= 210 KG/CM2

05.02.02 VIGA DE CIMENTACION - ENCOFRADO Y DESENCOFRADO

05.02.03 VIGA DE CIMENTACION - ACERO FY=4200 KG/CM2

05.03 SOBRECIMIENTOS

05.03.01 SOBRECIMIENTO - CONCRETO F'C= 210 KG/CM2

05.03.02 SOBRECIMIENTO - ACERO FY=4200 KG/CM2

Page 35: Valorizacion 1 de Carabayllo (1)

05.03.03 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRADO

05.04 COLUMNAS

05.04.01 COLUMNAS - CONCRETO F'C= 210 KG/CM2

05.04.03 COLUMNAS - ENCOFRADO Y DESENCOFRADO

05.04.04 COLUMNAS - ACERO FY=4200 KG/CM2

05.05 VIGAS

05.05.01 VIGAS - CONCRETO F'C= 210 KG/CM2

05.05.03 VIGAS - ENCOFRADO Y DESENCOFRADO

05.05.04 VIGAS - ACERO FY=4200 KG/CM2

05.05 VIGUETA DE AMARRE CERCO

05.05.01 VIGUETA - CONCRETO F'C= 210 KG/CM2

05.05.03 VIGUETA - ENCOFRADO Y DESENCOFRADO

05.05.04 VIGUETA - ACERO FY=4200 KG/CM2

05.06 LOSAS ALIGERADAS

05.06.01 LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2

05.06.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO

05.06.03 LOSA ALIGERADA - ACERO FY=4200 KG/CM2

05.06.04 LOSA ALIGERADA - LADRILLO DE ARCILLA HUECO 15X30X30

05.06 LOSAARMADA

05.06.01 LOSA ARMADA - CONCRETO F'C= 210 KG/CM2

05.06.02 LOSA ARMADA - ENCOFRADO Y DESENCOFRADO

05.06.03 LOSA ARMADA - ACERO FY=4200 KG/CM2

05.07 CISTERNA

05.07.01 CISTERNA - CONCRETO F'C= 210 KG/CM2

05.07.02 CISTERNA - ENCOFRADO Y DESENCOFRADO

05.07.03 CISTERNA - ACERO FY=4200 KG/CM2

05.08 ESCALERAS

05.08.01 ESCALERAS - CONCRETO F'C= 210 KG/CM2

05.08.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO

05.08.03 ESCALERAS - ACERO FY=4200 KG/CM2

05.09 PLACAS

05.09.01 MUROS ARMADOS - CONCRETO F'C= 210 KG/CM2

05.09.02 MUROS ARMADOS - ENCOFRADO Y DESENCOFRADO

05.09.03 MUROS ARMADOS - ACERO FY=4200 KG/CM2

5.10 PISCINA

05.10.01 PISCINA - CONCRETO F'C= 210 KG/CM2

05.10.02 PISCINA - ENCOFRADO Y DESENCOFRADO

05.10.03 PISCINA - ACERO FY=4200 KG/CM2

06 ALBAÑILERIA

06.01 MURO DE LADRILLO KK ARCILLA 18 HUECOS - SOGA 9 x 13 x 24

07 REVOQUES ENLUCIDOS Y MOLDADURAS

07.01 TARRAJEO EN MUROS

07.02 TARRAJEO EN PLACAS

07.03 TARRAJEO EN COLUMNAS

07.04 TARRAJEO EN VIGAS

07.05 VIGUETAS DE AMARRE EN CERCO

Page 36: Valorizacion 1 de Carabayllo (1)

07.03 TARRAJEO EN LOSA ALIGERADA 1 PISO

08 VESTIDURAS DE DERRAME

08.01 PUERTAS

08.02 VENTANAS

08.03 MAMPARA

08.04 ESCALERA

09 TARRAJEOS

09.01 TARRAJEO CON IMPERMEABILIZANTE DE CISTERNA

10 PISOS Y CONTRAPISOS

10.01 CONTRAPISO DE 35MM

11.01 PISOS CERAMICO

12 ZOCALOS Y CONTRAZOCALO

12.01 CONTRAZOCALO

SON : CIENTO SESENTA Y UN MIL QUINIENTOS VEITISEIS CON 40/100 NUEVOS SOLES

Page 37: Valorizacion 1 de Carabayllo (1)

PRESUPUESTO - ESTRUCTURAS

Costo al :

Und. Metrado Precio Parcial

GLB 1.00 0.00

GLB 1.00 0.00

GLB 1.00 0.00

M2 191.55 0.00

M2 191.55 0.00

M3 34.46 0.00

M3 15.69 0.00

M3 4.07 0.00

M3 14.04 0.00

M3 0.38 0.00

M3 0.73 0.00

M3 6.48 0.00

M3 0.58 0.00

M3 22.54 0.00

M3 23.94 0.00

M3 74.11 0.00

M2 28.71 0.00

M3 4.80 0.00

M3 0.47 0.00

M2 1.33 0.00

M2 8.46 0.00

M2 7.05 0.00

M3 4.16 0.00

M2 137.61 0.00

M3 14.36 0.00

M2 0.00 0.00

KG 422.15 0.00

M3 1.05 0.00

M2 14.04 0.00

KG 52.60 0.00

M3 49.05 0.00

KG 52.59 0.00

Page 38: Valorizacion 1 de Carabayllo (1)

M2 14.04 0.00

M3 6.42 0.00

M2 41.91 0.00

KG 1,513.28 0.00

M3 5.75 0.00

M2 42.67 0.00

KG 1,121.96 0.00

M3 6.33 0.00

M2 77.82 0.00

KG 346.73 0.00

M3 6.71 0.00

M2 71.38 0.00

KG 232.52 0.00

UND 818.00 0.00

M3 0.29 0.00

M2 2.88 0.00

KG 56.80 0.00

M3 3.87 0.00

M2 34.76 0.00

KG 407.30 0.00

M3 3.40 0.00

M2 22.80 0.00

KG 359.77 0.00

M3 21.92 0.00

M2 51.75 0.00

KG 593.63 0.00

M3 5.85 0.00

M2 48.12 0.00

KG 536.00 0.00

M2 160.99 0.00

M2 236.93 0.00

M2 26 0.00

M2 31.75 0.00

M2 64.19 0.00

M2 7.82 0.00

Page 39: Valorizacion 1 de Carabayllo (1)

M2 71.38 0.00

M2 121.65 0.00

M2 166.25 0.00

M2 40.15 0.00

M2 30.924 0.00

M2 18.51 0.00

M2 137.61 0.00

M2 135.72 0.00

M2 73.47 0.00

COSTO DIRECTO 0.00