site visit presentation

38
Dominic Egan 12325401 Health and safety placement visit.

Transcript of site visit presentation

Page 1: site visit presentation

Dominic Egan 12325401Health and safety placement visit.

Page 2: site visit presentation

What Kepak do.• Slaughter and process lamb and beef.

• Access to European and global markets,

• Athleague, lamb and beef line , lamb boning hall. Beef sent to kilbeggan plant.

• maintenance department.

• Repair and upkeep of factory.

• Breakdowns, planned maintenance of line.

• Oversee contractors on site.

Page 3: site visit presentation

Health and Safety Tasks completed!!!

• Issuing safety permitsSign in , sign out.Inspections- PPE, Signing

fire certs.• Risk assessments for the

lamb line• Fire extinguisher audit• GA3 ladder audit.• Tool box talks• General operative interviews.• Clean cert.• Internal safety audits

Page 4: site visit presentation

Daily tasks.• Issue safety permits to contractors who are participating in planned and unplanned work on site.

Page 5: site visit presentation

Other companies who I have worked with while on placement:

Page 6: site visit presentation

Safe work log in software.

Page 7: site visit presentation

Issue or hand back permit.View and update company details.Insurance doc.

Page 8: site visit presentation

Filling up the information

Page 9: site visit presentation

Getting the contractor to answer the following questions:

• Questions vary : asking questions applicable to the type of permit asked. E.g. working at heights will ask for information regarding scaffolding and edge protection while a hot works permit will ask if fire fighting equipment is in place

Page 10: site visit presentation
Page 11: site visit presentation
Page 12: site visit presentation

Risk assessment:• Contractors have the option to send in their risk assessments I prior to commencing of work, or else can fill up a daily risk and method statement.

Page 13: site visit presentation

Fire and confined area certs:• Information is filled up accordingly when issuing permit.

• Inspected and signed during the day.

Page 14: site visit presentation

Clean certs: My IDEA

• The clean cert was developed as a result of an incident where modular panels were being installed right beside the splitting of ewes in the evening.

• Dust and poor housekeeping

• Potential to contaminate meat

Page 15: site visit presentation

Risk assessments:• I was asked to complete

risk assessments and method statements for all of the work stations on the lamb line.

• A generic risk assessment that will be used in all Kepak lamb lines.

• Risk assessments for preventive and breakdown maintence.

Page 16: site visit presentation
Page 17: site visit presentation

FIRE EXTUINGUSHER AUDIT• Audit of all the fire extinguishers that were on site.

• Any irregularities were logged.

• Dates were also checked.

127 on site.CO2 AND H2O

Page 18: site visit presentation
Page 19: site visit presentation

GA3 LADDER AUDIT.

• A requirement under the general application regulations.

• Logged and inspected all the internal and external ladders on site.

Page 20: site visit presentation

General operative interviews:• Purpose is to gather information on the degree of safety awareness and training that is on site.

• One completed every month

• Interview an operative from an other department.

SITE:

Name Of the Trainer:

Name Of the Trainer:

Name the Hazards:

Name the Issues:

PPE must be worn:

Additional Comments:

I confim that I have fully understood and answered the questions above to the best of my knowledge.

Operative Signature: Date:

Interviewer Signature: Date:

Translator Signature: Date:

H & S Comments:

H & S Signature: Date:

Yes No

No

Yes No

Yes

confirming that you have been trained?

(Please name the PPE to be worn)required to be worn for this particular task?

Have you signed off any documentation NoYes

Yes No

Did you have specific machine/ equipment

(Please give the name of the trainer)

Do you have any issues when working at

or equipment used?

Do you understand what kind of PPE is

this workstation? Any issues with machine

Yes No

(Please give the name of the trainer)

Have all the hazards and safety precautions

(Please name the hazards and safeties)been explained to you during this training?

Did you have Induction Training

training which is used at this workstation?

before starting work on the line?

DEPARTMENT:

MANAGER RESPONSIBLE:

WORKSTATION:

NAME OF THE MACHINERY USED:

Employee Interview

DATE OF INTERVIEW:

EMPLOYEE NAME:

EMPLOYEE NUMBER:

Page 21: site visit presentation

Tool box talks:• Every week there is a

requirement to every department within the factory to complete a toolbox talk.

• Topics vary from hygiene issues to what characteristics you should look out for in work boots.

• Stock pile of toolbox talks completed.

Page 22: site visit presentation
Page 23: site visit presentation
Page 24: site visit presentation

Projects overseen while here.• Toilets-• A complete renovation of the welfare facility's on site.

• Tempory toilets hired in.

• King and Moffett, Sean Kelly builders, Morley and O'Connell.

• New pan line and steriliser.

• GM steel fabrications.• King and moffett

Page 25: site visit presentation

• New kill box

• Controls were changed. To make it easier for operative to use.

• Security work

Page 26: site visit presentation
Page 27: site visit presentation

Drainage system• To stop dirt from being pulled out onto the road by lorries and other transporters.

• Gerry Kelly & Berne and Beatty.

Lamb offal- room • An improved system for processing offal.

• New layout- new conveyors in john Kenny's packing area. Work completed by Morley and O'Connell.

Page 28: site visit presentation

• New refrigeration units.

• Expansion of cold storage in the packing area to allow for more to be processed.

• Hired in, connected up by king and Moffatt, door motion services completed the seals.

• Boiler refurbishment.• There is a crack in the

inside of the old boiler, which it has been commissioned to be repaired.

• Hot works permit.• Confined space permit• General permit

Page 29: site visit presentation

Other safety related tasks completed!• Contractors waste up in the attic.

• Broken barriers and manhole covers.

• helping in the design of engineering controls of issues that have been raised in the health and safety meetings.

• Papas and vets stand.

• PPE- get contractors to wear appropriate PPE.

• Kepak safety meeting with Kate Robac.

Page 30: site visit presentation
Page 31: site visit presentation
Page 32: site visit presentation
Page 33: site visit presentation
Page 34: site visit presentation
Page 35: site visit presentation
Page 36: site visit presentation

Expansion of knowledge.• Electrical-• The names of safety

parts and switches such as limit switches , MCBs, how and when the LOTO policy should be followed.

• Food industry bulbs- plastic cover over the bulb to stop glass contaminating the meat.

• Fabrication.• The importance of using

stainless steel parts in the food industry.

• Lock nuts.• LOTO POLICY.• Food grade lubricants

and silicone. • Swan necks on hot water

pipework to reduce pressure.