1ER PISO SANITARIOSPRESUPUESTO

Presupuesto: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS

Subpresupuesto1ER PISO ARTEFACTOS SANITARIOSClienteLugar: LA LIBERTAD - TRUJILLO - TRUJILLOCODUNIDADMETRADOP.UPARCIALSUBTOTAL1ARQUITECTURA (1ER PISO)1.01 PISO DE PORCELANATO 60 X 60 COLOR GRIS CELIMA ( SS.HH) (MANO DE OBRA, PEGAMENTO, FRAGUA, CRUCETAS)m296.8529.852,890.972,890.971.02 PISO DE PORCELANATO 60 X 60 COLOR GRIS CELIMA ( SS.HH)m296.8550.654,905.454,905.451.03 ENCHAPE DE PORCELANATO 60 X 20 COLOR GRIS CELIMA (SS.HH) H= 2.10 m2219.3953.5811,754.9211,754.921.04 ENCHAPE DE PORCELANATO 60 X 20 COLOR GRIS CELIMA (SS.HH) H= 2.10 (MANO DE OBRA, PEGAMENTO, FRAGUA, CRUCETASm2219.3932.757,185.027,185.021.05 ENCHAPE DE TABLERO DE CONCRETO A= 0.80 m 60 X 60 COLOR GRIS CELIMA (SS.HH)ml20.7220.09416.26416.261.06 SUMINISTRO E INSTALACION DE LAVADERO DE LOSA AMAZONAS TREBOL (INC. GRIFERIA)und2241.14482.28482.281.07 SUMINISTRO E INSTALACION DE LAVATORIO NACIONAL ADVANCE BLANCO (INC. GRIFERIA)und1205.07205.07205.071.08 SUMINISTRO E INSTALACION DE INODORO RAPIDJET PLUSund23187.294,307.674,307.671.09 SUMINISTRO E INSTALACION DE OVALIN TREBOL SONNET COLOR BLANCO (INC. GRIFERIA TREBOL ECO)und22184.744,064.284,064.281.10 SUMINISTRO E INSTALACION DE URINARIO CADET (INC. GRIFERIA ECO)und10232.072,320.702,320.701.11 DIVISION DE MELAMINE PARA URINARIOSund1075.00750.00750.001.12 DIVISION DE MELAMINE PARA INODOROSund22440.009,680.009,680.001.12 LAVADERO DE ACERO INOXIDABLE UNA POZA (INC. GRIFERIA)und4286.881,147.521,147.521.12 GRIFO DE RIEGO DE 1/2"und145.4245.4245.42Costo Directo50155.5685

Gastos generales 7.00%3510.889795

Utilidad 10.00%5015.55685

Sub Total58682.015145

IGV 18.00%10562.7627261

TOTAL PRESUPUESTO69244.7778711

2DO PISO SANITARIOSPRESUPUESTO

Presupuesto: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS

Subpresupuesto2DO PISO ARTEFACTOS SANITARIOSClienteLugar: LA LIBERTAD - TRUJILLO - TRUJILLOCODUNIDADMETRADOP.UPARCIALSUBTOTAL1ARQUITECTURA (2DO PISO)1.01 PISO DE PORCELANATO 60 X 60 COLOR GRIS CELIMA ( SS.HH) (MANO DE OBRA, PEGAMENTO, FRAGUA, CRUCETAS)m296.8529.852,890.972,890.971.02 PISO DE PORCELANATO 60 X 60 COLOR GRIS CELIMA ( SS.HH)m296.8550.654,905.454,905.451.03 ENCHAPE DE PORCELANATO 60 X 20 COLOR GRIS CELIMA (SS.HH) H= 2.10 m2219.3953.5811,754.9211,754.921.04 ENCHAPE DE PORCELANATO 60 X 20 COLOR GRIS CELIMA (SS.HH) H= 2.10 (MANO DE OBRA, PEGAMENTO, FRAGUA, CRUCETASm2219.3932.757,185.027,185.021.05 ENCHAPE DE TABLERO DE CONCRETO A= 0.80 m 60 X 60 COLOR GRIS CELIMA (SS.HH)ml20.7220.09416.26416.261.06 SUMINISTRO E INSTALACION DE LAVADERO DE LOSA AMAZONAS TREBOL (INC. GRIFERIA)und1241.14241.14241.141.07 SUMINISTRO E INSTALACION DE LAVATORIO NACIONAL ADVANCE BLANCO (INC. GRIFERIA)und1205.07205.07205.071.08 SUMINISTRO E INSTALACION DE INODORO RAPIDJET PLUSund23187.294,307.674,307.671.09 SUMINISTRO E INSTALACION DE OVALIN TREBOL SONNET COLOR BLANCO (INC. GRIFERIA TREBOL ECO)und22184.744,064.284,064.281.10 SUMINISTRO E INSTALACION DE URINARIO CADET (INC. GRIFERIA TEMPORIZADA)und10232.072,320.702,320.701.11 DIVISION DE MELAMINE PARA URINARIOSund1075.00750.00750.001.12 DIVISION DE MELAMINE PARA INODOROSund22440.009,680.009,680.00Costo Directo48721.4885

Gastos generales 7.00%3410.504195

Utilidad 10.00%4872.14885

Sub Total57004.141545

IGV 18.00%10260.7454781

TOTAL PRESUPUESTO67264.8870231

3ER PISO SANITARIOSPRESUPUESTO

Presupuesto: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS

Subpresupuesto3ER PISO ARTEFACTOS SANITARIOSClienteLugar: LA LIBERTAD - TRUJILLO - TRUJILLOCODUNIDADMETRADOP.UPARCIALSUBTOTAL1ARQUITECTURA (3ER PISO)1.01 PISO DE PORCELANATO 60 X 60 COLOR GRIS CELIMA ( SS.HH) (MANO DE OBRA, PEGAMENTO, FRAGUA, CRUCETAS)m226.1229.85779.68779.681.02 PISO DE PORCELANATO 60 X 60 COLOR GRIS CELIMA ( SS.HH)m226.1250.651,322.981,322.981.03 ENCHAPE DE PORCELANATO 60 X 20 COLOR GRIS CELIMA (SS.HH) H= 2.10 m271.6153.583,836.863,836.861.04 ENCHAPE DE PORCELANATO 60 X 20 COLOR GRIS CELIMA (SS.HH) H= 2.10 (MANO DE OBRA, PEGAMENTO, FRAGUA, CRUCETASm271.6132.752,345.232,345.231.05 ENCHAPE DE TABLERO DE CONCRETO A= 0.80 m 60 X 60 COLOR GRIS CELIMA (SS.HH)ml5.5820.09112.10112.101.06 SUMINISTRO E INSTALACION DE LAVADERO DE LOSA AMAZONAS TREBOL (INC. GRIFERIA)und1241.14241.14241.141.07 SUMINISTRO E INSTALACION DE INODORO RAPIDJET PLUS + TANQUEund23187.294,307.674,307.671.08 SUMINISTRO E INSTALACION DE OVALIN TREBOL SONNET COLOR BLANCO (INC. GRIFERIA TREBOL ECO)und6184.741,108.441,108.441.09 SUMINISTRO E INSTALACION DE URINARIO CADET (INC. GRIFERIA TEMPORIZADA)und2232.07464.14464.141.10 DIVISION DE MELAMINE PARA URINARIOS h= 1.20 a= 0.30und275.00150.00150.001.11 DIVISION DE MELAMINE PARA INODOROSund6440.002,640.002,640.00Costo Directo17308.2435

Gastos generales 7.00%1211.577045

Utilidad 10.00%1730.82435

Sub Total20250.644895

IGV 18.00%3645.1160811