RFE-1-B__-MTT-IDO-002-REVC Comparativa Generadores Auxiliares.pdf
Transcript of RFE-1-B__-MTT-IDO-002-REVC Comparativa Generadores Auxiliares.pdf
PLANTA DE RESERVA FRÍA DE GENERACIÓN DE ETEN S.A
PROYECTO PROJECT
RESERVA FRÍA ETEN CONTRATISTA CONTRACTOR
TÍTULO TITLE
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Nº DE DOCUMENTO PROYECTO PROJECT DOCUMENT Nº
RFE-1-B__-MTT-IDO-002
REV C EDITADO PARA ISSUED FOR
Información FECHA DATE
23/05/13
PRV/JSA
PRV
JSA
REALIZADO DONE BY
REVISADO CHECKED BY
APROBADO APPROVED BY
ESTE DOCUMENTO CONTIENE INFORMACIÓN PROPIETARIA Y NO PUEDE SER DUPLICADO, PROCESADO O CEDIDO A TERCEROS PARA UN USO DISTINTO AL DE ESTE PROYECTO Y EL OBJETO PARA EL QUE HA SIDO PREVISTO SIN LA AUTORIZACIÓN ESCRITA DE COBRA.
THIS DOCUMENT CONTAINS PROPIETARY INFORMATION AND CAN NOT BE DUPLICATED, PROCESSED OR DISCLOSED TO THIRD PARTIES FOR ANY USE OTHER THAN THIS PROJECT AND THE PURPOSE FOR WHICH IT IS INTENDED FOR WITHOUT THE WRITTEN CONSENT OF COBRA.
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 2 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
CONTROL DE MODIFICACIONES/CHANGE LOG
Revisión
Revision
Fecha
Date
Modificaciones
Modifications
A 25/03/2013 Edición Inicial.
B 29/04/2013
Sin control de cambios
Se incorpora la Oferta de MAN 5302503-01-B001; Rev.1, recibida en RFE-CPI-IDO-EML-0307
Se modifica título del documento
Reestructuración general del documento para acoplar la oferta de MAN
Se corrigen diversos pesos y valoraciones en Anexo 02
Se suprimen redundancias en el cuerpo del documento. Aligeramiento general del documento.
Se suprime apartado de conclusiones en favor del apartado “Recomendación Técnica”
C 24/05/2013
Se incorpora al informe los comentarios de MAN remitidos a través de RFE-CPI-IDO-EML-0327.
Correcciones estilísticas menores (sin control de cambios)
Se habilita la puntuación del ítem 14 del Anexo 02 (variación de voltaje frente a escalón de potencia).
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 3 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
ÍNDICE
1. ANTECEDENTES ____________________________________________________________ 4
2. OBJETO ___________________________________________________________________ 5
3. EVALUACIÓN ______________________________________________________________ 6
3.1. TIPOLOGÍA DE OFERTA _________________________________________________________ 6
3.2. DISCREPANCIAS EN ALCANCE (GAPS) ______________________________________________ 7
3.3. VALIDEZ TÉCNICA _____________________________________________________________ 9 3.3.1. WÄRTSILÄ _________________________________________________________________________ 9 3.3.2. SOLAR-TBM _______________________________________________________________________ 9 3.3.3. MAN ____________________________________________________________________________ 10
3.4. VENTAJAS Y DESVENTAJAS _____________________________________________________ 12 3.4.1. WÄRTSILÄ ________________________________________________________________________ 12 3.4.2. SOLAR-TBM ______________________________________________________________________ 12 3.4.3. MAN ____________________________________________________________________________ 13
4. RECOMENDACIÓN TÉCNICA _________________________________________________ 14
4.1. VALIDEZ TÉCNICA ____________________________________________________________ 14
4.2. FAVORITO TÉCNICO ___________________________________________________________ 14
4.3. COMPARATIVA ECONÓMICA ___________________________________________________ 14
5. ANEXOS _________________________________________________________________ 15
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 4 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
1. ANTECEDENTES
Dentro de los suministros existentes dentro del Proyecto “Reserva Fría Eten” se encuentra
suministro y montaje de un generador auxiliar y los equipos necesarios para su
funcionamiento.
Dicho suministro se rige por la especificación técnica RFE-1-B__-MIP-IDO-001 (Rev.F)
cuyo suministro es en la modalidad de “Unidad Paquete”. La especificación contempla el
generador diésel como tecnología base y la turbina como alternativa válida.
El suministro cuenta con los siguientes ofertantes:
Ofertante Tecnología base Oferta Fecha Status
WÄRTSILÄ Motor diésel Q1201912A8R-
+
RFE-CPI-IDO-EML-0285
11/03/2013
21/03/2013
Firme
SOLAR-TBM Turbina TBM-PE11-00204C; Rev.2 21/03/2013 Firme
MAN Motor diésel 5302503-01-B001; Rev.1
+
RFE-CPI-IDO-EML-0327
15/04/2013
23/05/2013
Firme
Con objeto de clarificar y facilitar la adjudicación final, COBRA solicita a IDOM que prepare
un documento orientado a identificar ventajas y desventajas de cada uno de los dos
ofertantes. Este informe técnico constituye dicho documento.
Precediendo a este informe se emitió la tabulación técnica RFE-1-B__-MTT-IDO-001, cuyo
objeto era definir la validez técnica de las ofertas presentadas por WÄRTSILÄ y SOLAR-
TBM. La última tabulación emitida (Rev.C) es obsoleta, quedando anulada y reemplazada
por este informe.
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 5 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
2. OBJETO
Partiendo de las ofertas disponibles para el generador auxiliar (véase Aptdo. 1,
Antecedentes), el objeto de este informe es:
Identificar las discrepancias (“gaps”) de alcance existentes entre la especificación
técnica y las ofertas vigentes.
Identificar las ventajas y desventajas técnicas que presenta cada una de las ofertas.
Identificar aquellas discrepancias severas que puedan invalidar técnicamente a un
Ofertante.
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 6 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
3. EVALUACIÓN
3.1. TIPOLOGÍA DE OFERTA
Es necesario recalcar que todos los Ofertantes plantean sus ofertas desde puntos de vista
muy diferentes:
WÄRTSILÄ: Oferta una Unidad paquete completa, en modo “llaves en mano”. La
interfase con COBRA se limita, en esencia, a una serie de interconexiones
eléctricas y fluidas.
Es la única oferta que se ajusta estrictamente al alcance requerido por la
Especificación Técnica.
SOLAR-TBM: presenta un alcance más limitado, centrado en el suministro de i) un
conjunto de skids mecánicos básicos y ii) un paquete de paramenta eléctrica a
implantar por parte del cliente en sus salas eléctricas. Es la oferta con el alcance
más limitado.
MAN: Oferta un alcance limitado, centrado en el suministro de equipos principales
(motor, generador, skids, chimenea, sistema de refrigeración, paneles eléctricos,
etc.). Excluye totalmente edificios y sistema PCI.
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 7 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
3.2. DISCREPANCIAS EN ALCANCE (GAPS)
El Anexo 01 describe en detalle los alcances discrepantes. La siguiente tabla resume los
alcances discrepantes (gaps) existentes respecto a lo requerido por la Especificación
Técnica aplicable:
Defectos en alcance Excesos en Alcance
MAYOR Menor MAYOR Menor
SOLAR-TBM 7 12 - 1
WÄRTSILA - 1 - 5
MAN 3 10 - 1
Se entiende como discrepancia mayor aquella que tiene un impacto económico severo. La
siguiente tabla resume las discrepancias mayores observadas.
SOLAR-TBM y MAN presenta diversos gaps críticos, los cuales enmascaran un sobrecoste
que tendría que asumir COBRA. La tabla siguiente resume dichos gaps críticos:
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 8 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
ID Descripción Quién Descripción
2.1
Superstructures & enclosures for all equipment, particularly: - MV and LV equipment (including MV/LV transformer) - Turbine-gearbox-generator set
S-TBM MAN
ET: Edificaciones auxiliares previstas: - Sala de media tensión (MV) - Sala de baja tensión (BT) - Sala de Control (CR) Wärtsilä: Todas incluidas. Incorporan todas las instalaciones auxiliares (electrificación, HVAC) Solar-TBM: Excluidas todas las edificaciones auxiliares. MAN: Excluidas TODAS las edificaciones, incluyendo el propio "engine hall"
2.2 All auxiliary structures, including supports.
S-TBM MAN
Wärtsilä: Incluido. Solar-TBM: Su modalidad de suministro (sólo skids) no da pie a la incorporación de estructuras auxiliares. Esto incluye estructuras principales como, por ejemplo, tomas de aire. MAN: Su modalidad de suministro no da pie a la incorporación de estructuras auxiliares (sólo skids). Sólo incluyen plataformas de mantenimiento del motor diésel.
3.2 Daily Tank for Diesel B5 with all tank equipment.
S-TBM
Wärtsilä: Incluido (10m³) Solar-TBM: Excluido. El tanque diario no es imprescindible, pero es recomendable para otorgar independencia (limitada) al generador. MAN: Incluido (6m³)
3.2b Fuel treatment system (Filtering & preheating)
S-TBM
Wärtsilä: Incluido Solar-TBM: Excluido. (Filtros, preheater, tanques intermedios) MAN: No incluyen pre-heating, pero tampoco se requiere.
3.8
Complete cooling system via aircoolers (no water consumption) Excluded connection pipes between skids and engine hall.
S-TBM
Wärtsilä: Incluido Solar-TBM: Excluido MAN: Incluido
3.10 Complete exhaust system, including 35m stack
S-TBM
Wärtsilä: Incluido Solar-TBM: Excluido MAN: Incluido
5.1 ~ 5.9
MV, LV & Control wiring among supplied components
S-TBM MAN
Wärtsilä: Incluido Solar-TBM: Excluido MAN: Excluido
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 9 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
3.3. VALIDEZ TÉCNICA
De las últimas conversaciones con General Electric se ha determinado que el escalón
inicial de 3567 kW del LCI no se produce de forma súbita, sino con una rampa del orden de
minutos. Esta rampa, y no escalón, es mucho más fácil de solventar sin causar
oscilaciones de frecuencia ni tensión. Entonces las discrepancias críticas debidas a la
respuesta del generador frente a este escalón quedan resueltas.
3.3.1. WÄRTSILÄ
Validez técnica: VÁLIDO
3.3.2. SOLAR-TBM
Validez técnica: NO VÁLIDO solo pendiente del punto 4
Requiere resolver las discrepancias críticas identificadas en el apartado ¡Error! No se
ncuentra el origen de la referencia. y que se listan a continuación:
1. Escalón de potencia (Requisito GE): SOLAR-TBM debe confirmar la capacidad
para asumir un escalón de 3600kW en condiciones de diseño. El escalón puede
considerarse a partir de una carga mínima del 30% en el generador. La oferta
vigente (TBM-PE11-00204C; Rev.2 – Sheet 173 of 173; T13) sólo lo confirma en
condiciones ISO.
Resuelto al considerar que el LCI no arranca con escalones instantáneos sino con
rampas.
2. N/A: Resuelto en TBM-PE11-00204C; Rev.2 – Sheet 172 of 173; T.3.
3. N/A: Resuelto en TBM-PE11-00204C; Rev.2 – Sheet 172 of 173; T.4.
4. Temperatura del agua de refrigeración (Cooling Water): Dado que SOLAR-TBM
excluye el circuito de refrigeración, debe considerar una temperatura de suministro
de la misma de 40°C.
Esta discrepancia tiene que poder ser resuelta facilmente por parte SOLAR-TBM,
sin sobrecostes significativos.
C
C
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 10 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
3.3.3. MAN
Validez técnica: VÁLIDO
Requiere resolver las discrepancias críticas identificadas en su oferta base (5302503-01-
B001; Rev.1), y que se listan a continuación.
DISCREPANCIAS CRÍTICAS
1. Criterios COES no vinculantes: El documento de criterios COES (Anexo 01 de la
especificación RFE-1-B__-MIP-IDO-001) está excepcionado.
Resuelto [RFE-CPI-IDO-EML-0327]: El Anexo es aceptable
2. Escalón de potencia (Requisito GE): El generador puede asumir escalones de
hasta el 15% (gas) o 25% (diésel) de su potencia nominal. Esto es, 11700 x 0.25 =
2925kW, insuficiente para cumplir con el escalón de 3600kW en condiciones de
diseño. El problema se agrava con gas (1755kW). En el caso particular del diésel,
el escalón puede ampliarse al 30% (3510kW), pero el generador se degrada a clase
G1 y sigue siendo corto.
Resuelto [RFE-CPI-IDO-EML-0327]: Confirman capacidad para cubrir un escalón
de 3567kW, aunque la respuesta a dicho escalón será según G1 (-25% voltaje / -
15% frecuencia) en vez de G2 (-20% voltaje / -10% frecuencia).
La respuesta G1 se considera una desventaja respecto a sus competidores, pero
se considera aceptable ya que la previsión vigente es que el generador haga frente
a rampas (mucho más favorables) en vez de a escalones. A efectos de oferta, es
razonable pensar que mayor escalón previsible estará alrededor de los ~1000kW.
C
C
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 11 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
3. Combustible no válido: El combustible B5 no se ajusta a las características
definidas en el apartado 9.1.3.1 de la oferta. En particular:
MAN Petroperú
Flash Point >60°C ≥52°C
Ensayo Lámina de Cobre <1 ≤3
MAN debe explicitar la validez del combustible s/Anexo 02 de la especificación
RFE-1-B__-MIP-IDO-001.
Resuelto [RFE-CPI-IDO-EML-0327]: Los valores Petroperú son aceptables.
DISCREPANCIAS NO CRÍTICAS
Adicionalmente a las discrepancias críticas, existen algunas discrepancias que, aun sin ser
críticas, pueden resultar relevantes en la evaluación del Ofertante:
a. Documentación de gestión: Se excepciona la totalidad de la documentación de
referencia. Esto es:
RFE-1-DIR-PRO-CPI-002 “Codification Procedure"
RFE-1-DIR-PRO-CPI-003 “Coordination Procedure”
RFE-1-COM-PRO-CPI-007 “Quality Assurance Procedure”
RFE-1-YDC-N__-IDO-001 “KKS System Application”
b. Documentación técnica: Se excepciona la totalidad de la documentación de
referencia. Esto es:
RFE-1-YTC-E_-IDO-1000 “Electrical Design Criteria”
RFE-1-YE_-EIP-IDO-001 “Electric Motors General Specification”
RFE-1-YF_-GI_-IDO-001 ”Painting General Specification”
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 12 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
c. Normativa Alemana: Los sistemas se suministran bajo normas de diseño
alemanas y/o europeas (DIN, IEC, EN). No aplican normas de origen USA (ASME,
IEEE, ASTM). Tampoco se acoplan a normativa peruana.
d. Emisiones por encima de lo requerido (Requisito IEA): El generador emite
823ppmv de NOx y 64ppmv de CO, excediendo ligeramente los valores de emisión
descritos en el Estudio de Impacto Ambiental (EIA), con referencia IA-081-2011
(Feb/2012) (822 y 60ppmv respectivamente).
[RFE-CPI-IDO-EML-0327]: Cobra confirma que los valores son aceptables
3.4. VENTAJAS Y DESVENTAJAS
La tabla del Anexo 02 resume las ventajas / desventajas que presentan los equipos
suministrados por cada uno de los Ofertantes. A continuación, se hace un breve resumen:
3.4.1. WÄRTSILÄ
o Pro: Buena potencia (11384kW) y excelente eficiencia (43.90%), Alcance
completo (llaves en mano), robusto, buena mantenibilidad
o Cons: Excesivamente grande (desplaza 6m turbina hacia el norte, volumen
elevado de obra civil), tiempo de arranque malo (15min), resistencia
limitada al escalón de carga (ΔVoltaje: 11%; ΔFrecuencia: 10%).
3.4.2. SOLAR-TBM
o Pro: Muy compacto, obra civil simplificada, excelentes emisiones, excelente
resistencia al escalón de carga, aunque se desconoce el porcentaje de
variación en frecuencia (ΔVoltaje: 5%; ΔFrecuencia: Desconocido).
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 13 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
o Cons: Alcance muy incompleto (múltiples gaps críticos). Compatibilidad
limitada con combustible B5 (problemas en arranque), baja eficiencia
(31.40%), potencia mediocre (9719kW), requiere alimentación desde
generador de emergencia para poder arrancar (escalón de 190kW).
3.4.3. MAN
o Pro: Máxima potencia (11700kW) y máxima eficiencia (44.54%), robusto,
buena mantenibilidad, excelente tiempo de arranque (160s).
o Cons: Excesivamente grande (desplaza 6~7m turbina hacia el norte,
volumen elevado de obra civil), muy mala resistencia al escalón de
arranque (particularmente con GN), emisiones de NOx y CO mediocres,
Alcance muy incompleto (múltiples gaps críticos).
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 14 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
4. RECOMENDACIÓN TÉCNICA
4.1. VALIDEZ TÉCNICA
La puntuación técnica final es, de acuerdo a lo descrito en el Anexo 02:
Puntuación Válido Técnicamente?
WÄRTSILÄ: 32.25 (100%) Sí
MAN: 28.88 (90%) Sí
SOLAR-TBM: 29.00 (90%) No (pendientes críticos)
Nótese que en estos momentos sólo WÄRTSILÄ y MAN son técnicamente válidos, y
SOLAR-TMB tiene que resolver el tema de la temperatura del agua.
4.2. FAVORITO TÉCNICO
La valoración establece a WÄRTSILÄ como favorito técnico claro respecto a SOLAR-TBM
y MAN (≥10%).
4.3. COMPARATIVA ECONÓMICA
A efectos de comparativa económica, los precios de los ofertantes deben corregirse a
los “gaps” identificados en el Anexo 01, con particular atención a los identificados como
críticos (elevado sobrecoste).
Las ofertas económicas de SOLAR-TBM y -en menor grado- MAN están favorecidas por la
presencia de notables “gaps” (agujeros) en su alcance.
C
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 Pág/Page 15 de/of 15
Este documento contiene información propiedad de Cobra y está sujeto a las restricciones detalladas en la página de portada.
La única copia controlada de este documento es la incluida en la intranet de Cobra.
This document contains proprietary information of Cobra and is subject to the restrictions set forth on the title page. The only controlled copy of the document is located on the Cobra intranet.
5. ANEXOS
Anexo 01: Comparativa de alcances
Anexo 02: Comparativa técnica
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 ANEXOS
Anexo 01:
Comparativa de Alcances
RFE-1-B__-MTT-IDO-002 ANEXO 01
Rev.: C
Esp. Técnica WÄRT. S-TBM MAN
Alcance de Alcance de Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap
# Description SUMINIST. COBRA WÄRT. COBRA SÍ/-- Mayor/-- Tipo S-TBM COBRA SÍ/-- Mayor/-- Tipo MAN COBRA SÍ/-- Mayor/-- Tipo Notas
1. General
1.1Generation Set: Engine, Gearbox and Generator with all necessary
equipment for the interconnections of them.X X -- -- -- X -- -- -- X -- -- --
1.2 [Deleted] -- -- -- -- -- -- -- -- --
1.3 [Deleted] -- -- -- -- -- -- -- -- --
1.4 On-site erection works X X -- -- -- X -- -- -- X -- -- --
1.5 Mechanical supervision during installation, commissioning and start-up. X X -- -- -- X -- -- -- X SÍ -- DEFECT.
Wärtsila: Incluye 90 días
Solar-TBM: Incluye 60 días No se considera gap ya que
la magnitud de los trabajos entre uno y otro son
diferentes.
MAN: Incluye sólo unos 33 días. Podría ser poco
1.6 Electrical supervision during installation, commissioning and start-up. X X -- -- -- X -- -- -- X SÍ -- DEFECT. Ídem 1.5
1.7 Civil supervision during installation. X X -- -- -- X SÍ -- DEFECT. X SÍ -- DEFECT.
Wärtsila: Previsión de 90 días
Solar-TBM: Excluido
MAN: Excluido
MAN: Incluye sólo unos 19 días. Podría ser poco
1.8 Operational supervision during commissioning and start-up. X X -- -- -- X -- -- -- X -- -- --
1.9 PLC programmer advisor during commissioning and start-up X X -- -- -- X -- -- -- X -- -- --
1.10 Operational and maintenance tools X X -- -- -- X -- -- -- X -- -- --
S-TBM: No se considera gap ya que sí incluye las
herramientas especializadas (alineación de generador /
gearbox).
1.11Engineering management of detailed enginnering of items supplied by
SupplierX X -- -- -- X -- -- -- X -- -- --
1.12 Process engineering of items supplied by Supplier X X -- -- -- X -- -- -- X -- -- --
1.13 Mechanical engineering of items supplied by Supplier X X -- -- -- X -- -- -- X -- -- --
1.14 Electrical engineering of items supplied by Supplier X X -- -- -- X -- -- -- X -- -- --
1.15Basic Civil engineering of items supplied by Supplier
Detailed engineering by Purchaser.X X -- -- -- X -- -- -- X -- -- --
S-TBM: No se considera gap por tratarse de una
interpretación errónea del alcance.
1.16 Layout drawings with dimensional drawings of major equipment X X -- -- -- X -- -- -- X -- -- --
1.17 Process main flow diagrams and device lists X X -- -- -- X -- -- -- X -- -- --
1.18 Main single line diagram X X -- -- -- X SÍ -- DEFECT. X -- -- --Solar-TBM: Consecuencia directa de excluir la práctica
totalidad de la instalación eléctrica (capítulo 4).
1.19 Generating set drawing X X -- -- -- X -- -- -- X -- -- --
1.20 Dimensional drawing of generating set foundation X X -- -- -- X -- -- -- X -- -- --
1.21 Factory inspection and test plan (quality plan) X X -- -- -- X -- -- -- X -- -- --
1.22 Manuals in English and Spanish (set) X X -- -- -- X -- -- -- X -- -- --
1.23 Data sheets of main equipment X X -- -- -- X -- -- -- X -- -- --
1.24 Transportation and unloading to the place of shipment X X -- -- -- X -- -- -- X -- -- --
Wärtsilä: FCA (Puerto de Europa Occidental)
S-TBM: FOB (San Diego). Tratándose de transporte en
containers, puede asimilarse a FCA.
MAN: FCA
Motor: St. Nazaire Sea port (Francia)
Auxiliares: Puerto del norte de Europa (TBD)
1.25 Transportation and unloading to the final destination X X -- -- -- X -- -- -- X -- -- --
1,26 Training courses at site in Spanish X X -- -- -- X -- -- -- X -- -- --
1,27 Factory inspections and test according to ISO and IEC standards X X -- -- -- X -- -- -- X -- -- --
1,28 Operation test on site X X -- -- -- X -- -- -- X -- -- --
2. Civil & structural
2.1
Superstructures & enclosures for all equipment, particularly:
- MV and LV equipment (including MV/LV transformer)
- Turbine-gearbox-generator set
X X -- -- -- X SÍ MAYOR DEFECT. X SÍ MAYOR --
ET: Edificaciones auxiliares previstas:
- Sala de media tensión (MV)
- Sala de baja tensión (BT)
- Sala de Control (CR)
Wärtsilä: Todas incluidas. Incorporan todas las
instalaciones auxiliares (electrificación, HVAC)
Solar-TBM: Excluidas todas las edificaciones auxiliares.
MAN: Excluidas TODAS las edificaciones, incluyendo el
propio "engine hall"
Página 1 de 5
RFE-1-B__-MTT-IDO-002 ANEXO 01
Rev.: C
Esp. Técnica WÄRT. S-TBM MAN
Alcance de Alcance de Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap
# Description SUMINIST. COBRA WÄRT. COBRA SÍ/-- Mayor/-- Tipo S-TBM COBRA SÍ/-- Mayor/-- Tipo MAN COBRA SÍ/-- Mayor/-- Tipo Notas
2.2 All auxiliary structures, including supports. X X -- -- -- X SÍ MAYOR DEFECT. X SÍ MAYOR --
Wärtsilä: Incluido.
Solar-TBM: Su modalidad de suministro (sólo skids) no
da pie a la incorporación de estructuras auxiliares. Esto
incluye estructuras principales como, por ejemplo,
tomas de aire.
MAN: Su modalidad de suministro no da pie a la
incorporación de estructuras auxiliares (sólo skids). Sólo
incluyen plataformas de mantenimiento del motor
diésel.
2.3Site soil works (removal of contamination, soil removal, excavation,
levelling, etc.)X X -- -- -- X -- -- -- X -- -- --
2.4 Underground network (gas, water, sewage, earthing, etc) X X -- -- -- X -- -- -- X -- -- --
2,5
Concrete works (basements, dikes, etc.)
Basic engineering to be provided by Supplier. Detailed engineering by
COBRA
X X -- -- -- X -- -- -- X -- -- --
2,6 Paving, landscaping X X -- -- -- X -- -- -- X -- -- --
3. Mechanical
3,1Complete Diesel B5 System (piping, auxiliary instrumentation, pumps,
filters…)X X -- -- -- X -- -- -- X -- -- --
Wärtsilä: Incluido.
Solar-TBM: A pesar de que lo excluyen, el comentario
revela que el alcance aportado es el deseado.
No se considera gap.
MAN: Piping disponible como opcional
3,2 Daily Tank for Diesel B5 with all tank equipment. X X -- -- -- X SÍ MAYOR DEFECT. X -- -- --
Wärtsilä: Incluido (10m³)
Solar-TBM: Excluido.
El tanque diario no es imprescindible, pero es
recomendable para otorgar independencia (limitada) al
generador.
MAN: Incluído (6m³)
3.2b Fuel treatment system (Filtering & preheating) X X -- -- -- X SÍ MAYOR DEFECT. X -- -- --
Wärtsilä: Incluido
Solar-TBM: Excluido.
(Filtros, preheater, tanques intermedios)
MAN: Incluido
3.3
Piping and valves for Gas System inside enclosure (for future usage):
Includes: Flow measurement, gas regulation.
Excluded: Gas filtering
X X SÍ -- DEFECT. X -- -- -- X -- -- --
Wärtsilä: Excluido, aunque el motor puede operar con
fuel gas.
Solar-TBM: Incluido, aunque el caudalímetro se
suministra suelto (a instalar por COBRA)
Nota: Se recomienda eliminar y dejar únicamente la
posibilidad de operar con gas fuel.
MAN: Excluida, aunque se dispone como opcional
3.4 Pipe supports and crossovers X X -- -- -- X SÍ -- DEFECT. X SÍ MAYOR DEFECT.
Wärtsilä: Todo incluido excepto el piping fuera de los
límites del engine hall. A efectos prácticos, sólo queda
excluida las tuberías del circuito cerrado de agua de
refrigeración.
Solar-TBM: Excluido. El gap de Solar-TBM está
constituido por las tuberías de combustible y aceite.
MAN: Excluido todo tipo de suportación
3.5 Complete Lube Oil System X X -- -- -- X SÍ -- DEFECT. X -- -- --
Wärtsilä: Incluido
Solar-TBM: Incluido, excepto las tuberías entre skids,
cuyo alcance está excluido.
MAN: Incluido, excepto las tuberías entre skids, cuyo
alcance se dispone como opcional.
3,6 Lube Oil storage tank X X -- -- -- X -- -- -- X -- -- --
3,7Waste Lube Oil tank
(Only transfer equipment is needed)
Not in
scope
Not in
scope
Not in
scope
Not in
scope-- -- --
Not in
scope
Not in
scope-- -- --
Not in
scope
Not in
scope-- -- --
3,8Complete cooling system via aircoolers (no water consumption)
Excluded connection pipes between skids and engine hall.X X -- -- -- X SÍ MAYOR DEFECT. X -- -- --
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Incluido
3,9Dry element type cleaner/filter with pre-cleaner and silencer (air intake
system)X X -- -- -- X -- -- -- X -- -- --
Página 2 de 5
RFE-1-B__-MTT-IDO-002 ANEXO 01
Rev.: C
Esp. Técnica WÄRT. S-TBM MAN
Alcance de Alcance de Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap
# Description SUMINIST. COBRA WÄRT. COBRA SÍ/-- Mayor/-- Tipo S-TBM COBRA SÍ/-- Mayor/-- Tipo MAN COBRA SÍ/-- Mayor/-- Tipo Notas
3.10 Complete exhaust system, including 35m stack X X -- -- -- X SÍ MAYOR DEFECT. X -- -- --
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Incluido
3.11Fire Protection System within generator set boundaries. Includes control
valve stations, piping, sprinklers, gas nozzles, gas cylinders, etc.X X -- -- -- X SÍ -- DEFECT. X SÍ MAYOR DEFECT.
Wärtsilä: Incluido
Solar-TBM: Incluido
El gap está constituido por los edificios auxiliares (véase
2.1), cuyo alcance está excluido por Solar-TBM.
MAN: Excluido
3.11 Portable Fire Extinguishers X X SÍ -- EXCESO X -- -- -- X -- -- --
Wärtsilä: Incluido
Solar-TBM: Excluido (no requeridos al no existir
edificios)
MAN: Excluido3.11 Fire Protection System outside generator set boundaries. X X -- -- -- X -- -- -- X -- -- --
3,12
Raw Water reservoir for Fire Protection
Note: Water & pressure provided by by the Power Station general Fire
Protection System
X X -- -- -- X -- -- -- X -- -- --
3,13
Fire Protection Pumps
Note: Water & pressure provided by by the Power Station general Fire
Protection System
X X -- -- -- X -- -- -- X -- -- --
3,14 Fire Protection Control System X X -- -- -- X -- -- -- X SÍ -- DEFECT.
Wärtsilä: Incluido
Solar-TBM: Incluido
MAN: Excluido
3,15 Hydrants X X -- -- -- X -- -- -- X -- -- --
3,16 Gas detection system for the Auxiliary Generator equipment. X X -- -- -- X -- -- -- X -- -- --
Wärtsilä: Incluido
Solar-TBM: Incluido
MAN: Incluido como opcional
3,17 Fire detection system for the Auxiliary Generator equipment. X X -- -- -- X SÍ -- DEFECT. X SÍ -- DEFECT.
Wärtsilä: Incluido
Solar-TBM: Incluido
El gap está constituido por los edificios auxiliares (véase
2.1), cuyo alcance está excluido por Solar-TBM, y por
tanto, no los protege.
MAN: Excluido en su totalidad
4. General (electrical)
4.1 MV Switchgear - Generator Circuit Breaker. ( >7,2 kV, 1250 A, 50 kA) X X SÍ -- EXCESO X -- -- -- X SÍ -- DEFECT.
Wártsilä: Incluye en exceso cabinas para trafo auxiliar,
acometida, y medida.
Solar-TBM: Se suministra suelto
MAN: Excluido
4.2Neutral resistor of low value on Generator with a switch motor for
disconnecting purpouse.X X -- -- -- X -- -- -- X SÍ -- DEFECT.
Wärtsilä: Incluido.
Solar-TBM: Incluido
MAN: Excluido
4.3Auxiliary LV Supply: 480 VAC, 3P+PEN
(initial expected power 200 kW)X X SÍ -- EXCESO X -- -- -- X -- -- --
Wártsilä: Incluye conjunto completo de transformador
auxiliar de 315 kVA, para una carga de 220 kW.
Solar-TBM: No incluido (correcto)
MAN: No incluido (correcto)
4.4 Generator Protection Relays and all associated control circuits X X -- -- -- X -- -- -- X -- -- --
4.5 Turbine Protections and all associated control circuits X X -- -- -- X -- -- -- X -- -- --
4.6 Auxiliary Transformer Protection Relays and all associated control circuits X X SÍ -- EXCESO X -- -- -- X -- -- --
Wärtsilä: Incluye con la cabina de trafo auxiliar los relés
de protección del trafo. No se contemplaba en la
especificación
Solar-TBM: No incluido (correcto)
MAN: No incluido (correcto)
4.7 Earthing Bonding X X -- -- -- X SÍ -- DEFECT. X SÍ -- DEFECT.
Wärtsilä: Incluido
Solar-TBM: Solo dentro del contenedor. Quedan
excluidos todos los componentes suministrados sin
montaje.
MAN: Excluido
4.7 Lightning Protection System X X -- -- -- X -- -- -- X -- -- --
Wärtsilä: Opcional
Solar-TBM: Excluido
MAN: Excluido
Página 3 de 5
RFE-1-B__-MTT-IDO-002 ANEXO 01
Rev.: C
Esp. Técnica WÄRT. S-TBM MAN
Alcance de Alcance de Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap
# Description SUMINIST. COBRA WÄRT. COBRA SÍ/-- Mayor/-- Tipo S-TBM COBRA SÍ/-- Mayor/-- Tipo MAN COBRA SÍ/-- Mayor/-- Tipo Notas
4.8 Central Control Panel X X -- -- -- X -- -- -- X -- -- --
Wärtsilä: Incluido (en sala). Incluye en EXCESO un SAI
Solar-TBM: Incluido (onskid)
MAN: Incluido (a instalar en sala eléctrica)
4.9 Remote HMI for Control Room X X -- -- -- X -- -- -- X -- -- --
Wärtsilä: Incluido
Solar-TBM: Incluido
MAN: Incluido
4.10 MCC X X -- -- -- X SÍ -- DEFECT. X Sí -- DEFECT.
Wärtsilä: Suministro e instalación en sala.
Solar-TBM: Suministro, a instalar por otros.
MAN: Suministro de varios paneles, a instalar por otros.
4.11Necessary Frequency Drivers for the correct operation of the Auxiliay
Generator.X X -- -- -- X SÍ -- DEFECT. X -- -- --
Wärtsilä: Suministro e instalación en sala.
Solar-TBM: Suministro, a instalar por otros.
MAN: Incluido en armarios
4.12
Black Start unit (diesel generating set)
Black Start Power to be provided by Power Station Emergency Diesel
generator
X X -- -- -- X -- -- -- X -- -- -- Ver nota en 4.13
4.13 DC system/ Batteries for Starting Motor X X -- -- -- X SÍ -- DEFECT. X -- -- --
Wärtsilä: Sistema de arranque por aire comprimido.
Solar-TBM: Por motor de arranque, pero es de
inducción y precisa alimentación desde Grupo Diesel de
Emergencia --> Generador diésel de emergencia más
potente.
MAN: Sistema de arranque por aire comprimido.
4.14 DC system for control X X -- -- -- X SÍ -- EXCESO X SÍ -- EXCESO
Wärtsilä: Excluido
Solar-TBM: Incluido
MAN: Incorpora UPS en lugar de DC
4.14 Indoor Plant Electrification (sockets, lighting, etc.) X X -- -- -- X SÍ -- DEFECT. X SÍ DEFECT.
Wärtsilä: Incluido
Solar-TBM: Incluido (sólo en contenedor)
El gap está constituido por los edificios auxiliares (véase
2.1), cuyo alcance está excluido por Solar-TBM.
MAN: Excluido
4,15 Outdoor Plant Electrification (sockets, lighting, etc.) X X -- -- -- X -- -- -- X -- -- --
4.15 Anticondensation protection (heaters) X X -- -- -- X SÍ -- DEFECT. X -- -- --
Wärtsilä: Incluido (no explícito)
Solar-TBM: Excluido en motores eléctricos (sólo el
generador dispone de calentadores).
MAN: Incluido
4,16 Communication devices for MODBUS TCP-IP protocol X X -- -- -- X -- -- -- X -- -- --
5. Cable and Cableways
5.1MV Cable set between Generator Line and Generator Circuit Breaker.
Cable terminations and cable fittings included.X X -- -- -- X SÍ MAYOR DEFECT. X SÍ MAYOR DEFECT.
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Excluido
5.2MV Cable set between Generator Neutral Resistor and Generator. Cable
terminations and cable fittings included. X X -- -- -- X Nota 1 Nota 1 DEFECT. X Nota 1 Nota 1 DEFECT.
Wärtsilä: Incluido
Solar-TBM: Excluido
5.3MV Cable set between MV Cabinets and Auxiliary Transformer. Cable
terminations and cable fittings included.N/A X Sí -- EXCESO X -- -- -- X -- -- --
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Excluido
5.4MV Cable set between MV Cabinets and Main MV busbar of the Power
Plant (Outgoing cable). Cable terminations and cable fittings included.X X -- -- -- X -- -- -- X -- -- --
5.5 Control and instrumentation cables. X X -- -- -- X Nota 1 Nota 1 DEFECT. X Nota 1 Nota 1 DEFECT.
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Excluido
5.6Control and instrumentation cables between the Auxiliary Generator
Control Panel and the General Control System of the Power Plant.X X -- -- -- X -- -- -- X -- -- --
5.7 Low voltage cables between LV MCC and Auxiliary Loads. X X -- -- -- X Nota 1 Nota 1 DEFECT. X Nota 1 Nota 1 DEFECT.
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Excluido
Página 4 de 5
RFE-1-B__-MTT-IDO-002 ANEXO 01
Rev.: C
Esp. Técnica WÄRT. S-TBM MAN
Alcance de Alcance de Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap Alcance de Alcance de Existe Gap
# Description SUMINIST. COBRA WÄRT. COBRA SÍ/-- Mayor/-- Tipo S-TBM COBRA SÍ/-- Mayor/-- Tipo MAN COBRA SÍ/-- Mayor/-- Tipo Notas
5.8LV cable trays and conduits for the auxiliary loads of the Station Plant of
Wärtsilä.X X -- -- -- X Nota 1 Nota 1 DEFECT. X Nota 1 Nota 1 DEFECT.
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Excluido
5.9MV cable trays and conduits between Auxiliary Generator MV
equipment.X X -- -- -- X Nota 1 Nota 1 DEFECT. X Nota 1 Nota 1 DEFECT.
Wärtsilä: Incluido
Solar-TBM: Excluido
MAN: Excluido
5.10MV cable trays and cable conduits for the interconnection of Auxiliary
Generator set and the Power Plant.X X -- -- -- X -- -- -- X -- -- --
Nota 1: Los gaps 5.1 hasta 5.9 de Solar-TBM y MAN se catalogan como un único defecto mayor. Defecto Exceso Defecto Exceso Defecto Exceso
MAYOR Menor MAYOR Menor MAYOR Menor MAYOR Menor MAYOR Menor MAYOR Menor
0 1 0 5 7 12 0 1 3 10 0 1
WÄRT. S-TBM MAN
Página 5 de 5
COMPARATIVA TÉCNICA DE LAS OFERTAS DEL GENERADOR AUXILIAR
(WÄRTSILÄ, SOLAR-TBM, MAN) Rev. C
RFE-1-B__-MTT-IDO-002 ANEXOS
Anexo 02:
Comparativa Técnica
RFE-1-B__-MTT-IDO-002 ANEXO 02
Rev.: C
OFERTADO SCORING SCORING
# CONCEPTO ET WÄRTSILÄ SOLAR-TBM MAN WÄRT S-TBM MAN MULT. WÄRT S-TBM MAN COMENTARIOS
1a DIMENSIONES GENERALES Superficie
estimada 8.5 x
22m
15 x 30m 6,5 x 18,2m 16 x 27.5m 1 3 1 1 1 3 1
1b DIMENSIONES GEN-SET 4,5 x 15 m sin
carrozar
280 tn
3 x 14m
carrozado.
Masa no espec.
4.7 x 15.1 sin
carrozar.
222.6 tn
2 CIMENTACIONES A realizar por el
cliente
-- -- -- 1 2,5 1 2 2 5 2 Wärtsila: La magnitud del edificio asociado al generador hace prever una obra civil cuya magnitud podría estar
fácilmente entre 3 y 4 veces la requerida por Solar-TBM.
Solar-TBM: El suministro en configuración "skid" que ofrece Solar-TMB permite una ejecución más sencilla. En
esencia, permite ahorrar toda la obra civil asociada al edificio.
3 ALCANCE OFERTADO Véase RFE-1-B__-
MTT-IDO-002;
Anexo 01
Completo Limitado Limitado 2,5 0,5 0,5 2 5 1 1 Wärtsilä: El alcance ofertado cumple sobradamente con el alcance requerido por la ET. En algunos aspectos,
incluso excede (su configuración es más propia de una "power plant" que de un "black start").
MAN: Presenta múltiples gaps en el alcance, que deberán ser cubiertos por COBRA. Se resumen en su
excepción nº10 e incluyen:
- Edíficio completo y estructuras asociadas (salvo pasarela de motor)
- Garantías acústicas
- PCI
- Todo el cableado y suportación asociada
Solar-TBM: Presenta múltiples gaps en el alcance, que deberán ser cubiertos por COBRA. En particular,
destacan como más críticos:
- Excluye chimenea.
- Excluye montaje de cabinas y CCM eléctricos.
- Excluye cableado.
- Excluye sistema de refrigeracion.
- Excluye tanque diario (~10m³) y sistemas asociados (acondicionamiento de combustible: Filtrado y pre-
calentamiento)
4 MANTENIBILIDAD -- -- -- -- 3 2 3 1 3 2 3 Wärtsilä / MAN: El hecho de disponer de su propio edificio, plataformas de acceso y puente grúa asegura una
excelente mantenibilidad del equipo.
5 MANTENIMIENTO CORRECTIVO -- -- -- -- 2 2 2 0,5 1 1 1 En general, el mantenimiento correctivo de un motor diésel (Wärtsilä/MAN) es más sencillo que el de una
turbina (Solar-TBM) por tratarse de tecnología muy probada y robusta. Las reparaciones severas en turbinas
también tienden a ser más complejas y pueden requerir asistencia especializada.
Sin embargo, y en el caso particular de ETEN, el modo de operación habitual es la espera en frío. Ello
repercutirá en un desgaste muy bajo, por lo que las operaciones de mantenimiento correctivo deberían ser
escasas o de muy poca entidad.
Por tanto, no se considera una ventaja/desventaja significativa para ninguno de los ofertantes.
6 RENDIMIENTO >32.00% 43,90% 31,40% 44,54% 3 1 3 1 3 1 3 General: En general, los motores diésel ofrecen mejor rendimiento que una turbina , y suele ser un factor muy
a tener en cuenta para un funcionamiento a largo plazo.
Sin embargo, para un generador "black Start", el rendimiento suele ser un aspecto secundario, ya que tan sólo
se necesita para un periodo de operación muy corto.
No obstante, y dado que la previsión es que el equipo opere como apoyo a la turbina principal, se valora
positivamente un buen rendimiento.
Solar-TBM: está penalizado por estar muy cerca del límite COES (>32%). Dado que su alcance no es integral,
existe un riesgo de que no asuman el rendimiento en función de las soluciones constructivas alredededor de la
turbina (p.ej: chimenea).
7 TIEMPO DE ARRANQUE ≤300s (5min) 900s (15min) 660s (11min) 160 (2:40min) 0,5 1 3 1 0,5 1 3 Ambos proporcionan un arranque frío con tiempos muy elevados, pero todavía aceptables dentro de lo
indicado en en el correo RFE-IDO-CPI-EML-0304 (Límite absoluto: 26.5min).
Wärtsilä: Tiene el inconveniente añadido de la necesidad de mantener el circuito de agua caliente a 60°C, lo
que puede obligar a instalar un traceado eléctrico.
MAN: Presenta un excelente tiempo de arranque.
8 POTENCIA MÁXIMA (bornas generador)
B5: Diésel B5
GN: Gas natural
9500kW (B5) 11384kW (B5) 9719kW (B5)
10368kW (GN)
11700 (B5) 3 1,5 3 2 6 3 6 Wärtsilä: es un ~17% más potente que Solar-TBM y es capaz de dar la potencia en condiciones de diseño
(particularmente, Tamb = 33°C)
MAN: Ídem Wärtsilä, presentando una potencial ligeramente mayor (~20%)
Solar-TBM: La potencia la suministra en condiciones ISO (25°C). En condiciones reales será inferior.
9 EMISIONES DE NOx
(@ 0°C y 1 atm)
≤822ppmv 790ppmv 390ppmv (B5)
253ppmv (GN)
823ppmv
(B5 y GN)
2 3 1,75 0,5 1 1,5 0,875 Wärtsilä: Cumple
Solar-TBM: Presenta valores óptimos
MAN: Valor muy justo pero aceptable
Wärtsilä / MAN: Las grandes dimensiones del edificio del generador obligan a desplazar la turbina principal
~6m hacia el norte. Esto no es recomendable, ya que descentra severamente la alineación de la turbina
respecto a la posición de los sondeos geológicos realizados expresamente para ella.
Solar-TBM: El diseño del conjunto Turbina-Generador es notablemente compacto (aunque precisa estructuras
para los conductos de aire) lo que permite una óptima integración en la planta.
Page 1 of 2
RFE-1-B__-MTT-IDO-002 ANEXO 02
Rev.: C
OFERTADO SCORING SCORING
# CONCEPTO ET WÄRTSILÄ SOLAR-TBM MAN WÄRT S-TBM MAN MULT. WÄRT S-TBM MAN COMENTARIOS
10 EMISIONES DE CO
(@ 0°C y 1 atm)
≤60ppmv ?? 57ppmv (B5 y
GN)
64ppmv (B5 y
GN)
1 2 1 0,5 0,5 1 0,5 Wärtsilä : [Pendiente] Deben informar los valores de emisiones y confirmar que son < 60ppmv. En cualquier
caso, se esperan valores ajustados.
Solar-TBM: Valores correctos.
MAN: Excede el valor declarado en la IEA. Aunque podrían llegar a aceptarse (probablemente no tengan
incidencia en los receptores críticos). Dicha aceptabilidad se confirma en RFE-CPI-IDO-EML-0327.
11 RUIDO 85dB @ 1m <80dB @ 1m <85dB @ 1m Excluido del
Alcance
2,5 2 1 0,5 1,25 1 0,5 Wärtsilä / Solar-TBM: Ambos ofertantes cumplen los valores requeridos, si bien Wartsïla presenta mejores
valores. En cualquier caso, y tratándose de un equipo cuyo funcionamiento normal es la "parada fría", su
importancia es relativa.
MAN: No está en su alcance al no suministrar el edificio
12 CLASE DEL GENERADOR F-B F-B F-B F-B 2 2 2 1 2 2 2 Ambos ofertantes cumplen con los valores requeridos
13 ESCALÓN DE POTENCIA: Variación en
voltaje
≤5% 11% 5% G2 1 2 0,5 1 1 2 0,5 Wärtsilä: Valor mediocre pero aceptable para aplicaciones generales. Cumple G2.
Solar-TBM: Cumple
MAN: G2 (-20%). En escalón de diseño (3600kW) se degrada a G1 (-25%). Un escalón de hasta 1755kW (GN)
permite mantener la clase G2. Dado que finalmente se anticipan rampas en vez de escalones, se considera
aceptable aunque con baja puntuación.
General: En todos los casos es necesaria validación por parte de GE.
Nota: A priori, el cumplimiento con clase G2 s/ISO 8528 debería ser suficiente.
14 ESCALÓN DE POTENCIA: Variación en
frecuencia
≤5% 10% ?? G2 genérico.
Pueden hacer
frente al escalón
de (3600kW),
pero con nivel
G1
1 2 0,5 1 1 2 0,5 Wärtsilä: Valor mediocre pero aceptable para aplicaciones generales. Cumple G2.
Solar-TBM: [Pendiente], pero dado el buen comportamiento en el escalón de voltaje, es presumible también
un buen comportamiento en frecuencia.
MAN: G2 (-10%). En escalón de diseño (3600kW) se degrada a G1 (-15%). Un escalón de hasta 1755kW (GN)
permite mantener la clase G2. Dado que finalmente se anticipan rampas en vez de escalones, se considera
aceptable aunque con baja puntuación.
General: En todos los casos es necesaria validación por parte de GE.
Nota: A priori, el cumplimiento con clase G2 s/ISO 8528 debería ser suficiente.
15 Combustible Diésel B5 OK Excede valores
permisibles:
1-Pto. De
destilación
OK 2 1 2 1 2 1 2 Wärtsïla: Sin comentarios
Solar-TBM: El punto de destilación al 90% (375°C) excede la recomendación de 360°C. El equipo puede
funcionar, pero existe riesgo de dificultades en el arranque y coking en el inyector.
MAN: Confirman validez en RFE-CPI-IDO-EML-0327.
16 Sistema DC para arranque en modo Black
Start
DC: Sistema de
Baterías (por
COBRA)
AC: No se
contempla
DC: Desde
cliente.
AC: No requiere
DC: Baterías
propias.
AC: Requiere
alimentación
desde generador
de emergencia
DC: n/a
AC: Sistema UPS
alimentado por
baterías +
ondulador
2 1,5 2 1 2 1,5 2 Wärtsïla: No requiere alimentación AC (arrancador neumático)
S-TBM:
Pro: Incorpora sus propias baterías para control.
Con: Requiere alimentación eléctrica al motor de arranque (VFD), lo que implica que el generador diésel de
emergencia que:
- Permita un escalón de 190 kW
- Permita el nivel de armónicos que inyecta el VFD o añadir filtros al VFD no incluidos en oferta.
MAN: Concepción distinta pero aceptable
Puntuación total: 32,25 29,00 28,88
Puntuación relativa: 100% 90% 90%
WÄRT S-TBM MAN
Puntuación máxima: 51,00
Page 2 of 2