Resumen de Materiales-losa Nivel02

17
VIGAS en Y TOTALES LOSAS INFER INFERIOR 5@4 C 3.6012 PAÑO AREA D 3.1152 1 62.27 E 3.1152 2 61.27 4@3 C 2.3784 3 49.75 D 2.3784 4 50.82 E 2.3784 5 63.48 SUPERIOR 5@4 C 3.6012 6 63.6 D 3.1152 7 52.75 E 3.1152 8 44.19 4@3 C 2.3784 D 2.3784 E 2.3784 LOSAS SUPER PAÑO AREA VIGAS en X TOTALES 1 62.27 INFERIOR C@D 5 2.24 2 61.27 4 2.688 3 49.75 3' 3.584 4 50.82 D@E 5 2.68 5 63.48 4 3.216 6 63.6 3' 7 52.75 SUPERIOR C@D 5 2.24 8 44.19 4 2.688 3' 3.584 D@E 5 2.68 4 3.216 3'

description

Secotirización de losa postensada nervada 2 direcciones.

Transcript of Resumen de Materiales-losa Nivel02

calculosVIGAS en YTOTALESLOSAS INFERIORINFERIOR5@4C3.6012PAOAREAVOLD3.1152162.277.53E3.1152261.277.414@3C2.3784349.756.02D2.3784450.826.15E2.3784563.487.68SUPERIOR5@4C3.6012663.67.70D3.1152752.756.38E3.1152844.195.354@3C2.3784D2.3784E2.3784LOSAS SUPERIORPAOAREAVOL67.446.44VIGAS en XTOTALES162.277.5353.92116.7INFERIORC@D52.24261.277.416642.688349.756.02117.273'3.584450.826.1593D@E52.68563.487.6829.1168106.3372243.216663.67.703'[email protected]'[email protected]'

concreto y casetonesCASETONESSECTOR 1ENTEROS0.50.590.810.350.45total12082173611123432342981SECTOR 2ENTEROS0.790.810.59349141414391SECTOR 3ENTEROS0.930.750.750.720.350.453521212131439334751x0.51x0.351x0.451x0.751x0.83673652726CON DESPERDICIOSIN DESPERDICIOMACIZOS DE 0.4 cmSECTOR 1m2 de malla vol real SIN desperdicio537.20521.55areavol395111.74sec19.873.95SECTOR 2m2 de malla vol real SIN desperdiciosec251.7820.71643217.39sec332.5513.02SECTOR 3m2 de malla vol real SIN desperdicio94.2037.68666208.071704CONCRETO LOSA ALIG Y VIGAS483.87118.3333333333145.55568CONCRETO MACIZO53.33

BORRADOR

CONCRETO LOSASECTORAREAVOL CONCRETO RATIO 0.19171378.9372.62600.78115.23638.82122.5COCNRETO VIGAS131.90275.18366.52173.60

PISO/ SECTORSECTOR 1SECTOR 2SECTOR 3TOTAL1FECHA: 13/05/2015FECHA: 14/05/2015FECHA: 15/05/2015629 m3VOLUMEN CONCRETO: 155m3VOLUMEN CONCRETO: 239 m3VOLUMEN CONCRETO: 235 m32FECHA: 27/05/2015FECHA: 28/05/2015FECHA: 29/05/2015629 m3VOLUMEN CONCRETO: 155m3VOLUMEN CONCRETO: 239 m3VOLUMEN CONCRETO: 235 m33FECHA: 03/06/2015FECHA: 04/06/2015FECHA: 05/06/2015629 m3VOLUMEN CONCRETO: 155m3VOLUMEN CONCRETO: 239 m3VOLUMEN CONCRETO: 235 m34FECHA: 17/06/2015FECHA: 18/06/2015FECHA: 19/06/2015629 m3VOLUMEN CONCRETO: 155m3VOLUMEN CONCRETO: 239 m3VOLUMEN CONCRETO: 235 m35FECHA: 01/07/2015FECHA: 02/07/2015FECHA: 03/07/2015629 m3VOLUMEN CONCRETO: 155m3VOLUMEN CONCRETO: 239 m3VOLUMEN CONCRETO: 235 m3

RESUMEN DE CONCRETORESUMEN DE PEDIDO DE CONCRETO X SECTORES-NIVEL 02SECTOR CONCRETO EN VIGASCONCRETO EN LOSASCONCRETO EN MACIZOS 40 cmCONCRETO EN VIGAS + LOSAS SIN DESPERDICIOCONCRETO EN VIGAS + LOSAS CON DESPERDICIO (3%)131.9072.6408813.95108.48111.74275.18115.16952620.71211.06217.39366.52122.46179413.02202.01208.07TOTALES173.60310.2737.68521.55537.20m3 * incluyendo traslape 0.20m ambos sentidos.

RESUMEN DE CORTES CASETONESRESUMEN DE PEDIDO DE CASETONES DE POLIESTIRENO (1x1x0.30m) X SECTORES-NIVEL 02

CORTADOS1x0.35m1x0.451x0.51x0.591x0.81x0.651x0.751x0.92ENTEROS (1X1M)TOTALCANTIDAD75743625732025279161271 *existen cortes a realizarce en obra por algn cambio de dimensiones.

RESUMEN DE MALLASRESUMEN DE PEDIDO DE MALLA ELECTROSOLDADA Q-69-NIVEL 02

SECTORarea m2cantidad und139534264355366657TOTALES1704146planchas de malla * incluyendo traslape 0.20m ambos sentidos