Presupuesto desagregado 06

2
EQUIPAMIENTO ALMACEN MECANICA DE PRODUCCION 04 ELECTRONICA EQUIPAMIENTO TALLER DE 07 PLANCHADO Y VAPORIZADO EQUIPAMIENTO AREA DE 06 EQUIPAMIENTO TALLER DE HERRAMIENTAS 03 02 INDUSTRIA DEL VESTIDO 01 EQUIPAMIENTO ALMACEN MATERIALES EQUIPAMIENTO TALLER DE TEJIDO 05 EQUIPAMIENTO TALLER DE 131,959.80 9,185.40 2.00 65,979.90 - - EQUIPO 2: TORNO PARALELO - 9,185.40 - 4,592.70 2.00 PZA 04.06 131,959.80 PZA 8.00 280.00 - 2,240.00 - 2,240.00 MESA DE TRABAJO 2 (1.50 x 0.50 X 0.90 m) MADERA CON 04.05 04.04 PZA 16.00 4,380.45 - 70,087.20 - 70,087.20 35,791.20 EQUIPO 1: TORNILLO DE BANCA ESTRUCTURA METALICA 675.00 5.00 550.00 - 2,750.00 - 2,750.00 EQUIPO 8: BANCO DE PLANCHADO 35,791.20 PZA VAPORIZADORA - 1,350.00 - 1,350.00 PROBADORES 06.02 PZA 34.00 CON PLANCHA PZA 04.07 PZA 2.00 17,895.60 - PZA - 247.50 PZA 05.01 05.02 1.00 17,545.00 - 17,545.00 - 17,545.00 EQUIPO 7: MAQUINA EQUIPO 3: TALADRO DE COLUMNA EQUIPO 4: FESADORA UNIVERSAL x 0.36 X 0.83 m) 247.50 03.01 PZA 20.00 52.00 - 1,040.00 - HERRAMIENTAS O SIMILARES (0.90 SILLA PERSONAL DE MADERA (0.39 ESTANTE METALICO P/ 03.02 PZA 14.00 250.00 - 3,500.00 - 3,500.00 1,040.00 x 0.54 x 1.80 m) 01.01 PZA 4.00 432.00 - 1,728.00 - 1,728.00 x 0.54 x 1.80 m) HERRAMIENTAS O SIMILARES (0.90 ESTRUCTURA METALICA 02.01 PZA 2.00 432.00 - 864.00 - 864.00 ESTANTE METALICO P/ 1.00 PZA 1.00 285.40 - 285.40 - 285.40 PIZARRA ACRILICA (4.25 x 1.20 m) MESA DE TRABAJO 1:(1.20 x 0.50 X PZA 285.40 247.50 - 2.00 - 52.00 ESCRITORIO (1.20 x 0.65 x 0.74 m) Y SILLA (0.45 x 0.38 x 0.85 m) P/ DOCENTE 04.02 Y SILLA (0.45 x 0.38 x 0.85 m) P/ 04.03 03.03 PZA 1.00 247.50 - 247.50 - 04.01 ESCRITORIO (1.20 x 0.65 x 0.74 m) PIZARRA ACRILICA (4.25 x 1.20 m) DOCENTE 03.04 PZA 1.00 285.40 - 285.40 - 0.90 m) MADERA CON 247.50 07.01 06.06 ESCRITORIO (1.20 x 0.65 x 0.74 m) 247.50 - 247.50 - 247.50 DOCENTE PZA 07.02 PIZARRA ACRILICA (4.25 x 1.20 m) 285.40 - 285.40 - 285.40 1.00 PZA 1.00 44.00 06.01 - x 0.36 X 0.83 m) SILLA PERSONAL DE MADERA (0.39 2,288.00 - 2,288.00 Y SILLA (0.45 x 0.38 x 0.85 m) P/ 52.00 285.40 PZA 07.03 PIZARRA ACRILICA (4.25 x 1.20 m) - - 285.40 1.00 PZA - 1,841.75 PZA 06.04 EQUIPO 5: MAQUINA DE COSTURA DOCENTE 1,768.00 - - 2.00 - RECTA 18.00 PZA 06.03 x 0.36 X 0.83 m) SILLA PERSONAL DE MADERA (0.39 1,768.00 285.40 33,151.50 1.00 Y SILLA (0.45 x 0.38 x 0.85 m) P/ ESCRITORIO (1.20 x 0.65 x 0.74 m) 247.50 - 247.50 - 33,151.50 247.50 280.00 PZA 560.00 06.05 ESTRUCTURA METALICA 0.90 m) MADERA CON MESA DE TRABAJO 2 (1.50 x 0.50 X 560.00 - - GUZMAN DE HUNTER, AREQUIPA" "MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GOBIERNO REGIONAL DE AREQUIPA HUNTER - AREQUIPA - AREQUIPA Abril - 2013 06 - EQUIPAMIENTO TALLERES 02 Costo a : Cliente Obra Sub Presupuesto Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES Ubicacion Material Equipo M.Obra Precio Metrado Unidad Descripción Item Total Presupuesto Desagregado P.1/2

description

Presupuesto

Transcript of Presupuesto desagregado 06

Page 1: Presupuesto desagregado 06

EQUIPAMIENTO ALMACEN

MECANICA DE PRODUCCION04

ELECTRONICAEQUIPAMIENTO TALLER DE

07

PLANCHADO Y VAPORIZADOEQUIPAMIENTO AREA DE

06

EQUIPAMIENTO TALLER DE

HERRAMIENTAS

03

02

INDUSTRIA DEL VESTIDO

01 EQUIPAMIENTO ALMACEN MATERIALES

EQUIPAMIENTO TALLER DE TEJIDO

05

EQUIPAMIENTO TALLER DE

131,959.809,185.40

2.00 65,979.90 - - EQUIPO 2: TORNO PARALELO- 9,185.40- 4,592.702.00PZA04.06

131,959.80PZA

8.00 280.00 - 2,240.00 - 2,240.00MESA DE TRABAJO 2 (1.50 x 0.50 X 0.90 m) MADERA CON

04.0504.04

PZA16.00 4,380.45 - 70,087.20 - 70,087.20

35,791.20

EQUIPO 1: TORNILLO DE BANCAESTRUCTURA METALICA

675.00

5.00 550.00 - 2,750.00 - 2,750.00EQUIPO 8: BANCO DE PLANCHADO

35,791.20

PZA

VAPORIZADORA

- 1,350.00 - 1,350.00PROBADORES06.02 PZA 34.00

CON PLANCHA

PZA

04.07 PZA 2.00 17,895.60 -

PZA

-

247.50

PZA

05.01

05.02

1.00 17,545.00 - 17,545.00 - 17,545.00EQUIPO 7: MAQUINA

EQUIPO 3: TALADRO DE COLUMNAEQUIPO 4: FESADORA UNIVERSAL

x 0.36 X 0.83 m)

247.50

03.01 PZA 20.00 52.00 - 1,040.00 -

HERRAMIENTAS O SIMILARES (0.90

SILLA PERSONAL DE MADERA (0.39

ESTANTE METALICO P/

03.02 PZA 14.00 250.00 - 3,500.00 - 3,500.00

1,040.00

x 0.54 x 1.80 m)

01.01 PZA 4.00 432.00 - 1,728.00 - 1,728.00

x 0.54 x 1.80 m)

HERRAMIENTAS O SIMILARES (0.90

ESTRUCTURA METALICA

02.01 PZA 2.00 432.00 - 864.00 - 864.00

ESTANTE METALICO P/

1.00PZA 1.00 285.40 - 285.40 - 285.40PIZARRA ACRILICA (4.25 x 1.20 m)

MESA DE TRABAJO 1:(1.20 x 0.50 X

PZA

285.40

247.50 -

2.00

-

52.00

ESCRITORIO (1.20 x 0.65 x 0.74 m) Y SILLA (0.45 x 0.38 x 0.85 m) P/ DOCENTE

04.02

Y SILLA (0.45 x 0.38 x 0.85 m) P/

04.03

03.03 PZA 1.00 247.50 - 247.50 -

04.01

ESCRITORIO (1.20 x 0.65 x 0.74 m)

PIZARRA ACRILICA (4.25 x 1.20 m)DOCENTE

03.04 PZA 1.00 285.40 - 285.40 -

0.90 m) MADERA CON

247.50

07.01

06.06

ESCRITORIO (1.20 x 0.65 x 0.74 m) 247.50- 247.50- 247.50

DOCENTE

PZA

07.02

PIZARRA ACRILICA (4.25 x 1.20 m) 285.40- 285.40- 285.401.00PZA

1.00

44.00

06.01-

x 0.36 X 0.83 m)SILLA PERSONAL DE MADERA (0.39 2,288.00- 2,288.00

Y SILLA (0.45 x 0.38 x 0.85 m) P/

52.00285.40

PZA07.03PIZARRA ACRILICA (4.25 x 1.20 m) - - 285.401.00PZA

-

1,841.75

PZA06.04

EQUIPO 5: MAQUINA DE COSTURA

DOCENTE

1,768.00

-

-

2.00

- RECTA

18.00PZA06.03x 0.36 X 0.83 m)SILLA PERSONAL DE MADERA (0.39 1,768.00

285.40

33,151.50

1.00Y SILLA (0.45 x 0.38 x 0.85 m) P/ ESCRITORIO (1.20 x 0.65 x 0.74 m) 247.50- 247.50-

33,151.50

247.50

280.00

PZA

560.00

06.05ESTRUCTURA METALICA0.90 m) MADERA CON MESA DE TRABAJO 2 (1.50 x 0.50 X 560.00- -

GUZMAN DE HUNTER, AREQUIPA""MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y

GOBIERNO REGIONAL DE AREQUIPA

HUNTER - AREQUIPA - AREQUIPA Abril - 2013

06 - EQUIPAMIENTO TALLERES 02

Costo a :

Cliente

Obra

Sub Presupuesto

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Ubicacion

Material EquipoM.ObraPrecioMetradoUnidadDescripciónItem Total

Presupuesto Desagregado

P.1/2

Page 2: Presupuesto desagregado 06

404,435.20 - -

550.005.00PZA07.08VAPORIZADORAEQUIPO 7: MAQUINA 17,545.00- 17,545.00-

-

1.00

1,350.00

17,545.00

2,750.00 - 2,750.00EQUIPO 8: BANCO DE PLANCHADO CON PLANCHA

07.09 PZA 2.00 - - 1,350.00PROBADORES

07.04

PZA

675.00

ESTRUCTURA METALICA

07.07

PZA 10.00 250.00 - 2,500.00 - 2,500.000.90 m) MADERA CON

07.05 PZA 6.00 1,841.75 -

51,300.00EQUIPO 6: MAQUINA TEJEDORA

MESA DE TRABAJO 1:(1.20 x 0.50 X

-

11,050.50

- 2,850.0018.0007.06RECTAEQUIPO 5: MAQUINA DE COSTURA 11,050.50

PZA 51,300.00

-

454,989.59

SOLES

COSTO TOTAL PRESUPUESTAL

Son : CUATROCIENTOS CINCUENTA Y CUATRO MIL NOVECIENTOS OCHENTA Y NUEVE CON 59/100 NUEVOS

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y

HUNTER - AREQUIPA - AREQUIPA

GUZMAN DE HUNTER, AREQUIPA"

29,928.20

GASTOS DE LIQUIDACION

GOBIERNO REGIONAL DE AREQUIPA

7.40 %

7,279.83GASTOS DE SUPERVISION 3.30 % 13,346.36

404,435.20COSTO DIRECTOGASTOS GENERALES

1.80 %

06 - EQUIPAMIENTO TALLERES 02

Abril - 2013

Sub Presupuesto

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Ubicacion

Obra

Cliente

Costo a :

Equipo TotalM.ObraItem PrecioMetradoUnidadDescripción Material

Presupuesto Desagregado

P.2/2