PRESUPUESTO Presupuesto MEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRI Subpresupuesto MEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRI . Cliente MUNICIPALIDAD DISTRITAL DE MARIANO MELGAR Lugar AREQUIPA - AREQUIPA - MARIANO MELGAR Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) 01 OBRAS PROVISIONALES 01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO est 1.00 200.00 200.00 01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M GLB 1.00 400.00 400.00 01.03 CONSTRUCCIÓN DE ALMACENES Y OFICINA EN OBRA GLB 1.00 800.67 800.67 01.04 GUARDIANIA PARA LA OBRA mes 1.00 650.00 650.00 02 TRABAJOS PRELIMINARES 02.01 TRAZO Y REPLANTEO m2 446.93 0.68 303.91 02.02 DEMOLICION DE VEREDAS DE 0.10 M y RAMPAS m2 190.90 8.23 1,571.11 02.03 DEMOLICION DE BERMAS DETERIORADAS DE CONCRETO m2 157.89 10.54 1,664.16 02.04 DEMOLICION DE SARDINELES DE CONCRETO m 51.44 10.96 563.78 02.05 PICADO DE BERMA DE CONCRETO EXISTENTE PARA SARDINEL MEDIA LUNA m 15.32 10.41 159.48 02.06 ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE LAS DEMOLICIONES m3 47.29 23.46 1,109.42 02.07 LIMPIEZA DE TERRENO MANUAL m2 446.93 2.60 1,162.02 03 MOVIMIENTO DE TIERRAS 03.01 CORTE SUPERFICIAL MANUAL HASTA 0.05 M m3 22.35 17.90 400.07 03.02 NIVELACION Y COMPACTACION CON EQUIPO m2 360.88 3.76 1,356.91 03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 29.05 23.46 681.51 04 PISOS Y PAVIMENTOS 04.01 VEREDAS 04.01.01 CONCRETO EN VEREDAS F´C=175 KG/CM2 INCLUYE ACABADO Y BRUÑADO. m2 166.86 51.10 8,526.55 04.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 29.79 28.49 848.72 04.01.03 EMPEDRADO e=4" m2 205.67 21.85 4,493.89 04.02 BERMAS 04.02.01 CONCRETO F´C=175 KG/CM2 EN BERMAS INCLUYE ACABADO m2 166.18 51.10 8,491.80 04.02.02 EMPEDRADO e=4" m2 173.89 21.85 3,799.50 04.03 CANALETA DE CONCRETO 04.03.01 CONCRETO F'C=175 KG/CM2 EN CANALETA m3 0.79 343.07 271.03 04.03.02 ENCOFRADO Y DESENCOFRADO DE CANALETA DE CONCRETO m2 12.19 28.49 347.29 04.03.03 REJILLA FIERRO (0.20 DE ANCHO ) - CANALETA - INCLUYE SUMINISTRO m 19.63 80.00 1,570.40 05 CONCRETO VARIOS 05.01 MARTILLOS 05.01.01 CONCRETO EN MARTILLOS F´C=175 KG/CM2 INCLUYE ACABADO Y BRUÑADO. m2 38.81 51.10 1,983.19 05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MARTILLOS m2 5.63 32.41 182.47 05.02 RAMPAS 05.02.01 RAMPAS VEHICULARES 05.02.01.01 CONCRETO F'C=175 KG/CM2. EN RAMPA VEHICULAR. m3 0.07 343.07 24.01 05.02.01.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS VEHICULARES m2 0.85 28.49 24.22 05.02.02 RAMPAS PEATONALES 05.02.02.01 CONCRETO F'C=175 KG/CM2. EN RAMPA PEATONAL. m3 0.60 343.07 205.84 05.02.02.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS PEATONALES m2 2.11 28.49 60.11 05.03 SARDINELES 05.03.01 SARDINEL MEDIA LUNA DE CONCRETO F'C=175 KG/CM2. m 96.36 20.15 1,941.65 05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINEL m2 28.91 32.41 936.97 05.03.03 JUNTA ASFALTICA EN SARDINELES m 11.60 1.97 22.85 06 SEÑALIZACION 06.01 SEÑALIZACION EN VEREDAS PINTURA AMARILLA m2 54.27 7.73 419.51 07 VARIOS 07.01 INSTALACION DE TUBERIA PARA EVACUACION DE AGUA INCLUYE SUMINISTRO m 5.80 22.73 131.83 07.02 LIMPIEZA FINAL DE OBRA KM 0.12 1,504.23 180.51 TOTAL COSTO DIRECTO 45,485.38 GASTOS GENERALES 8.00% 3,638.83 UTILIDAD 7.00% 3,183.98 SUBTOTAL 52,308.19 IMPUESTO GENERAL A LAS VENTAS 18.00% 9,415.47 TOTAL PRESUPUESTO 61,723.66

description

PRESUPUESTO

Transcript of PRESUPUESTO, CRONOGRAMASrev1

PRESUPUESTOPRESUPUESTOPresupuestoMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRISubpresupuestoMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRI.ClienteMUNICIPALIDAD DISTRITAL DE MARIANO MELGARLugarAREQUIPA - AREQUIPA - MARIANO MELGARItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)01OBRAS PROVISIONALES01.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOest1.00200.00200.0001.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40MGLB1.00400.00400.0001.03CONSTRUCCIN DE ALMACENES Y OFICINA EN OBRAGLB1.00800.67800.6701.04GUARDIANIA PARA LA OBRAmes1.00650.00650.0002TRABAJOS PRELIMINARES02.01TRAZO Y REPLANTEOm2446.930.68303.9102.02DEMOLICION DE VEREDAS DE 0.10 M y RAMPASm2190.908.231,571.1102.03DEMOLICION DE BERMAS DETERIORADAS DE CONCRETOm2157.8910.541,664.1602.04DEMOLICION DE SARDINELES DE CONCRETOm51.4410.96563.7802.05PICADO DE BERMA DE CONCRETO EXISTENTE PARA SARDINEL MEDIA LUNAm15.3210.41159.4802.06ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE LAS DEMOLICIONESm347.2923.461,109.4202.07LIMPIEZA DE TERRENO MANUALm2446.932.601,162.0203MOVIMIENTO DE TIERRAS03.01CORTE SUPERFICIAL MANUAL HASTA 0.05 Mm322.3517.90400.0703.02NIVELACION Y COMPACTACION CON EQUIPOm2360.883.761,356.9103.03ELIMINACION DE MATERIAL EXCEDENTEm329.0523.46681.5104PISOS Y PAVIMENTOS04.01VEREDAS04.01.01CONCRETO EN VEREDAS FC=175 KG/CM2 INCLUYE ACABADO Y BRUADO.m2166.8651.108,526.5504.01.02ENCOFRADO Y DESENCOFRADO DE VEREDASm229.7928.49848.7204.01.03EMPEDRADO e=4"m2205.6721.854,493.8904.02BERMAS04.02.01CONCRETO FC=175 KG/CM2 EN BERMAS INCLUYE ACABADOm2166.1851.108,491.8004.02.02EMPEDRADO e=4"m2173.8921.853,799.5004.03CANALETA DE CONCRETO04.03.01CONCRETO F'C=175 KG/CM2 EN CANALETAm30.79343.07271.0304.03.02ENCOFRADO Y DESENCOFRADO DE CANALETA DE CONCRETOm212.1928.49347.2904.03.03REJILLA FIERRO (0.20 DE ANCHO ) - CANALETA - INCLUYE SUMINISTRO E INSTALACIONm19.6380.001,570.4005CONCRETO VARIOS05.01MARTILLOS05.01.01CONCRETO EN MARTILLOS FC=175 KG/CM2 INCLUYE ACABADO Y BRUADO.m238.8151.101,983.1905.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN MARTILLOSm25.6332.41182.4705.02RAMPAS05.02.01RAMPAS VEHICULARES05.02.01.01CONCRETO F'C=175 KG/CM2. EN RAMPA VEHICULAR.m30.07343.0724.0105.02.01.02ENCOFRADO Y DESENCOFRADO EN RAMPAS VEHICULARESm20.8528.4924.2205.02.02RAMPAS PEATONALES05.02.02.01CONCRETO F'C=175 KG/CM2. EN RAMPA PEATONAL.m30.60343.07205.8405.02.02.02ENCOFRADO Y DESENCOFRADO EN RAMPAS PEATONALESm22.1128.4960.1105.03SARDINELES05.03.01SARDINEL MEDIA LUNA DE CONCRETO F'C=175 KG/CM2.m96.3620.151,941.6505.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELm228.9132.41936.9705.03.03JUNTA ASFALTICA EN SARDINELESm11.601.9722.8506SEALIZACION06.01SEALIZACION EN VEREDAS PINTURA AMARILLAm254.277.73419.5107VARIOS07.01INSTALACION DE TUBERIA PARA EVACUACION DE AGUA INCLUYE SUMINISTROm5.8022.73131.8307.02LIMPIEZA FINAL DE OBRAKM0.121,504.23180.51TOTAL COSTO DIRECTO45,485.38GASTOS GENERALES8.00%3,638.83UTILIDAD7.00%3,183.98SUBTOTAL52,308.19IMPUESTO GENERAL A LAS VENTAS18.00%9,415.47TOTAL PRESUPUESTO61,723.66

CRONOGRAMA VALORIZADOCRONOGRAMA VALORIZADO DE AVANCE DE OBRAObraMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRIFrmulaMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRIClienteMUNICIPALIDAD DISTRITAL DE MARIANO MELGARDepartamentoAREQUIPA - AREQUIPA - MARIANO MELGARItemUnidadMetradoParcialCronograma ValorizadoParcial01 AL 1516 AL 3001OBRAS PROVISIONALES01.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOest1.00200.00200.00200.00200.0001.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40MGLB1.00400.00400.00400.00400.0001.03CONSTRUCCIN DE ALMACENES Y OFICINA EN OBRAGLB1.00800.67800.67800.67800.6701.04GUARDIANIA PARA LA OBRAmes1.00650.00650.00650.00650.0002TRABAJOS PRELIMINARES02.01TRAZO Y REPLANTEOm2446.930.68303.91303.91303.9102.02DEMOLICION DE VEREDAS DE 0.10 M y RAMPASm2190.908.231,571.111,571.111,571.1102.03DEMOLICION DE BERMAS DETERIORADAS DE CONCRETOm2157.8910.541,664.161,664.161,664.1602.04DEMOLICION DE SARDINELES DE CONCRETOm51.4410.96563.78563.78563.7802.05PICADO DE BERMA DE CONCRETO EXISTENTE PARA SARDINEL MEDIA LUNAm15.3210.41159.48159.48159.4802.06ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE LAS DEMOLICIONESm347.2923.461,109.421,109.421,109.4202.07LIMPIEZA DE TERRENO MANUALm2446.932.601,162.021,162.021,162.0203MOVIMIENTO DE TIERRAS03.01CORTE SUPERFICIAL MANUAL HASTA 0.05 Mm322.3517.90400.07400.07400.0703.02NIVELACION Y COMPACTACION CON EQUIPOm2360.883.761,356.911,356.911,356.9103.03ELIMINACION DE MATERIAL EXCEDENTEm329.0523.46681.51681.51681.5104PISOS Y PAVIMENTOS04.01VEREDAS04.01.01CONCRETO EN VEREDAS FC=175 KG/CM2 INCLUYE ACABADO Y BRUADO.m2166.8651.108,526.558,526.558,526.5504.01.02ENCOFRADO Y DESENCOFRADO DE VEREDASm229.7928.49848.72848.72848.7204.01.03EMPEDRADO e=4"m2205.6721.854,493.894,493.894,493.8904.02BERMAS04.02.01CONCRETO FC=175 KG/CM2 EN BERMAS INCLUYE ACABADOm2166.1851.108,491.808,491.808,491.8004.02.02EMPEDRADO e=4"m2173.8921.853,799.503,799.503,799.5004.03CANALETA DE CONCRETO04.03.01CONCRETO F'C=175 KG/CM2 EN CANALETAm30.79343.07271.03271.03271.0304.03.02ENCOFRADO Y DESENCOFRADO DE CANALETA DE CONCRETOm212.1928.49347.29347.29347.2904.03.03REJILLA FIERRO (0.20 DE ANCHO ) - CANALETA - INCLUYE SUMINISTRO E INSTALACIONm19.6380.001,570.401,570.401,570.4005CONCRETO VARIOS05.01MARTILLOS05.01.01CONCRETO EN MARTILLOS FC=175 KG/CM2 INCLUYE ACABADO Y BRUADO.m238.8151.101,983.191,983.191,983.1905.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN MARTILLOSm25.6332.41182.47182.47182.4705.02RAMPAS05.02.01RAMPAS VEHICULARES05.02.01.01CONCRETO F'C=175 KG/CM2. EN RAMPA VEHICULAR.m30.07343.0724.0124.0124.0105.02.01.02ENCOFRADO Y DESENCOFRADO EN RAMPAS VEHICULARESm20.8528.4924.2224.2224.2205.02.02RAMPAS PEATONALES05.02.02.01CONCRETO F'C=175 KG/CM2. EN RAMPA PEATONAL.m30.60343.07205.84205.84205.8405.02.02.02ENCOFRADO Y DESENCOFRADO EN RAMPAS PEATONALESm22.1128.4960.1160.1160.1105.03SARDINELES05.03.01SARDINEL MEDIA LUNA DE CONCRETO F'C=175 KG/CM2.m96.3620.151,941.651,941.651,941.6505.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELm228.9132.41936.97936.97936.9705.03.03JUNTA ASFALTICA EN SARDINELESm11.601.9722.8522.8522.8506SEALIZACION06.01SEALIZACION EN VEREDAS PINTURA AMARILLAm254.277.73419.51419.51419.5107VARIOS07.01INSTALACION DE TUBERIA PARA EVACUACION DE AGUA INCLUYE SUMINISTROm5.8022.73131.83131.83131.8307.02LIMPIEZA FINAL DE OBRAKM0.121,504.23180.51180.51180.51COSTO DIRECTO45,485.3816,895.4128,589.9745,485.38GASTOS GENERALES (8.00%)3,638.831,351.632,287.203,638.83UTILIDAD (7.00 %)3,183.981,182.682,001.303,183.98SUBTOTAL52,308.1919,429.7232,878.4752,308.19IGV (18.00%)9,415.473,497.355,918.129,415.47TOTAL PRESUPUESTO61,723.6622,927.0738,796.5961,723.66AVANCE MENSUAL37.14%62.86%100.00%AVANCE MENSUAL ACUMULADO37.14%100.00%100.00%

CRONOG DESEMBCRONOGRAMA DE DESEMBOLSOSObraMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRIFrmulaMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRIClienteMUNICIPALIDAD DISTRITAL DE MARIANO MELGARTarjeta0001DepartamentoAREQUIPAProvinciaAREQUIPAITEMCONCEPTOUnidadMetradoPrecioParcialPARCIALCRONOGRAMA DE DESEMBOLSOSTOTALADELANTOS12'01.01CAMPAMENTO PARA CONTRATISTA Y SUPERVISIONm22028.49569.8'01.02TRAZO Y REPLANTEOm24800.66316.8'01.03MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOSest1600600'01.04LIMPIEZA DE BERMAS (INC. ELIMINACIN).m212001.9923883874.601.00VALORIZACIONES DE OBRA3,874.6022,927.0738,796.5961,723.66'02.01CONFORMACIN Y COMPACTACIN DE BERMASm29501.871776.5RENDIMIENTO 1200 m2/da'02.02CUNETAS DE BORDE, TERRENO NATURALm3252.1654'02.03CONCRETO EN CUNETAS F`C=140 kg/cm2m3110.1145.8716060.287'02.04RELLENO COMPACTADO CON EQUIPO CON MATERIALm333419.086372.7224263.507DE PRESTAMO02.00ADELANTO EN EFECTIVO 20%24263.50712,344.7312,344.730.00'03.01CORTE Y REFINE EN BASE PARA MUROm368.253.44234.780.00'03.02EXCAVACIN DE CIMENTACIN MUROm3394.5502177.45780.00'03.03ELIMINACIN DE MATERIAL EXCEDENTEm3135.146.47874.35580.00'03.04ENCOFRADO Y DESENCOFRADO NORMAL DE MUROSm245510.464759.30.00'03.05CONCRETO CICLOPEO F`C=140 KG/CM2 + 30% PGm3162.5116.3918913.37524959.26860.0003.00ADELANTO MATERIALES 40%24959.268624,689.4624,689.46'04.01EXCAVACIN PARA BADENESm3133.84.36583.368'04.02ELIMINACIN DE MATERIAL EXCEDENTEm3168.596.471090.7773'04.03SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGONm24809.454536'04.04CONCRETO F`C=210 KG/CM2 PARA PISTAS H=0.20 M.m248037.2517880'04.05ENCOFRADO Y DESENCOFRADO DE LOSAS APOYADASm26310.58666.54'04.06ENROCADO EMBOQUILLADO EN INGRESO DE BADENESm27240.332903.76e=0.40 m.'04.07CONCRETO F`C=140 KG/CM2 + 30% PG PARA MUROS DEm3112116.3913035.68SALIDA'04.08ENCOFRADO Y DESENCOFRADO NORMAL DE MUROSm214410.461506.24'04.09SARDINELES DE CONCRETO DE F`C=140 kg/cm2 e=0.20 mm12013.261591.2'04.10JUNTAS ASFALTICASm1801.26226.844020.3653'04.00REAJUSTE FORMULA POLINOMICA44020.365300'05.01DEMOLICIN DE PAVIMENTO ASFALTICO DE 2".m21202.230005267.6006'05.02REMOSIN DE BASE E=0.20 m.m21201.72003206.4036'05.03BASE GRANULAR e=0.20 M.m21205.93711.6'05.04CARPETA ASFALTICA EN CALIENTE DE 2".m212017.782133.63319.2042SUBTOTAL3319.204237,034.1922,927.0738,796.5998,757.85SON :CIENTO TREINTINUEVE MIL OCHOCIENTOS CUARENTIOCHO Y 41/100 NUEVOS SOLESMENOS AMORTIZACIONES0.001.00ADELANTO EN EFECTIVO 20%04,585.417,759.3212,344.7302.00ADELANTO MATERIALES 40%09,170.8315,518.6324,689.460SUBTOTAL013,756.2423,277.9537,034.190.0TOTAL PROGRAMADO37,034.199,170.8315,518.6461,723.66

CRON MATCRONOGRAMA ADQUISICION MATERIALESObraMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRIFrmulaMEJORAMIENTO DE VEREDA Y BERMAS EN FERIA UMACHIRIClienteMUNICIPALIDAD DISTRITAL DE MARIANO MELGARDepartamentoAREQUIPA - AREQUIPA - MARIANO MELGARItemUnidadcantidadprecioParcialCronograma ValorizadoParcial01 AL 1516 AL 300202000008ALAMBRE NEGRO RECOCIDO # 8kg13.483.3044.4744.4744.470202010005CLAVOS PARA MADERA C/C 3"kg15.483.3051.0851.0851.080204000000ARENA FINAm38.0243.44348.22348.22348.220205000003PIEDRA CHANCADA DE 1/2"m337.1970.082,605.922,605.922,605.920205000004PIEDRA CHANCADA DE 3/4"m34.9963.87318.71318.71318.710205000010PIEDRA MEDIANA DE 4"m375.9155.464,210.084,210.084,210.080205010004ARENA GRUESAm321.6135.29762.76762.76762.760213010003ASFALTO RC-250gln1.547.2011.1111.1111.110221000093CEMENTO PORTLAND TIPO IP (42.5KG)BOL303.3916.404,975.664,975.664,975.660226510015CERRADURA DE SOBREPONER 02 VUELTASpza0.1555.008.258.258.250229030004YESOBOL4.475.9026.3826.3826.380230460036PEGAMENTO PARA PVCL0.0616.820.980.980.980232970001MOVILIZACION Y DESMOVILIZACION DE EQUIPOest1.00200.00200.00200.00200.000239050000AGUAm364.435.50354.37354.37354.370239100100CARTEL DE OBRA 3.60x2.40 MGLB1.00400.00400.00400.00400.000239130006INSTALACION PROVISIONAL DE ENG.ELECTGLB1.00150.00150.00150.00150.000239130018CASETA PARA OFICINA Y ALMACENm210.0050.00500.00500.00500.000239300001TECNOPORT E= 1PLGm20.4520.009.069.069.060239900100REJILLA DE FIERRO (0.20 DE ANCHO) - CANALETA - INCLUYE SUMINISTRO E INSTALACIONm19.6380.001,570.401,570.401,570.400243010003MADERA TORNILLOp2119.184.43527.97527.97527.970254020036PINTURA ESMALTE PARA TRAFICOgln2.7235.2996.0296.0296.020254440098DISOLVENTE - THINERgln2.1821.0045.7845.7845.780272930002TUBERIA PVC 4" SAPund1.9125.2148.2548.2548.250279120002VIDRIOS, PESTILLO, PINTURA, ETCest1.0050.0050.0050.0050.000349020007COMPRESORA NEUMATICA 76 HP 125-175 PCMhm10.8980.00871.20871.20871.200349030003COMPACTADOR VIBR. TIPO PLANCHA 5.8 HPhm28.888.50245.48245.48245.480349060003MARTILLO NEUMATICO DE 24 Kg.hm21.7312.00260.74260.74260.740349060012BARRENOShm21.7395.002,064.072,064.072,064.070349100007MEZCLADORA CONCRETO TAMBOR 18HP 11P3hm45.6126.061,188.671,188.671,188.670349170001VOLQUETE 6 M3hm12.2252.60642.77642.77642.77COSTO DIRECTO22,588.4022,588.400.0022,588.40GASTOS GENERALES1,807.071,807.070.001,807.07UTILIDAD1,581.191,581.190.001,581.19SUBTOTAL25,976.6625,976.660.0025,976.66IGV4,935.574,935.570.004,935.57TOTAL PRESUPUESTO30,912.2330,912.230.0030,912.23AVANCE MENSUAL100.00%0.00%100.00%AVANCE MENSUAL ACUMULADO100.00%100.00%100.00%