1.-INTRODUCTION.
2.-IMPLANTATION PLAN.
3.-ORGANIZATION CHART.
4.-TSKZ COMPOSITES.
5.- MANUFACTURING PROCESS
6.- NEW PROJECT – Expo Astana 2017.
TSKZ
TSKZ
The origin of TSKZ comes from the need of Tecnove Security S.L. to have a holding branch in the Republic of Kazakhstan for the implementation of new project within the Kazakh and Central Asian markets.
PURPOSES OF TS KZ
• Act as the center of decision for the different projects. • Act as a commercial branch for the rest of Tecnove Security S.L. portfolio. • Act as the holding of the shares and dividends distributed by the local companies.
1.-INTRODUCTION
2.-IMPLANTATION PLAN.
Registration of TS KZ - 2015
Registration of TS Composite -
2016
Registration of TS Services -
2017
TSKZ
TS CompositeToo
Polyester and railway services.
TS Metals Too
(Future)
Metalwork and Armoured
vehicles
TS Services Too
(Future)
General services
3.- ORGANIZATION CHART.
TSKZ constituted a new company as a TOO focused in the production of Composite Materials, painting and assembly of products of the Rail way and the construction sectors mainly.
The first step taken was to instruct during a month our local staff in our Spanish facilities with the best techniques in order to give the best quality to our customers in Kazakhstan.
During this instruction time, we reconditioned the facilities and installed the new equipment:
• Air compressed system• Vacuum system• Suction walls • Dry oven • RTM and Lamination moulds• Painting Cabin • Gelcoat Cabin
4.-TS Composites TOO
PRESENTACION TSKZ
Location: We’re located at just 6,6 km from your facilities and with the possibility to have access to the Railway system.
4.-TS Composites TOO - Location
Building 1
Building 2
Building 3
We may build
another exact
building beside.
Dry oven for
curing the resin.
Painting cabins
Space to prepare
the products for
painting.
Zone to paste the
ironworkswith fiberglass and
termination.
Assemblying space
Free zone where we
could build more
facilities.
Space for the production
of the polyesterGel coat cabin
1. CONSTRUCTION OF THE MOULDS
2. TREATEMENT OF THE MOULDS
3. GELCOAT PAINTING4. LAMINATION OR RTM
INJECTION5. DRYING OF THE POLYESTER6. DEMOULDING 7. POST-CURING8. CUTTING9. POLISHING10. PAINTING11. ASSAMBLY12. QUALITY CONTROL
5.- MANUFACTURING PROCESS
6.- EQUIPMENT
Storage zone
Painting cabin
Cutting zone
Oven
Gelcoat zoneLamination
6. OUR PRODUCTS
Partitions - Перегордки
Plumbing -Трубопроводные
Toilets - Туалет Fairings
Roofs - Полоки Electric Kits
Camas
Fairings
6. NEW PROJECT – Expo Astana 2017
Our Company is involved in a new Projectrelated with Astana Expo 2017 – Wedevelopped according with thespecifications of our client a decorativesolution for the inside backyard. Ourproduct consist in a polyester fairing thatcover the concrete from each floor.
We offered our client:
• The design• The moulds• Production• Assambly• Montage in the building
We would like to become a reference provider into the Kazakh and Central Asia market as we’re nowadays in Spain and Europe.