Planilla de Metrados

15
EXPEDIENTE TECNICO: METRADOS PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO FECHA : JULIO 2013 01.00.00 TRABAJOS PRELIMINARES 01.01.00 EQUIPO A TRANSPORTAR UNIDAD EQUIPO 1 CARGADOR S/LLANTAS 160-195 HP 3.5 YD3. 18,585.00 18,585.00 1.00 1 COMPRESORA NEUMATICA 250-330 PCM, 87 HP 2,000.00 2,000.00 1.00 1 MAQUINA DE PINTAR PAVIMENTOS 135.00 135.00 1.00 2 MARTILLO NEUMATICO DE 29 Kg. 29.00 58.00 1.00 1 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 2,200.00 2,200.00 1.00 1 MOTONIVELADORA DE 125 HP 11,515.00 11,515.00 1.00 1 PAVIMENTADORA DE 65 HP 12,000.00 12,000.00 1.00 1 PLANTA ASFALTO EN CALIENTE 60-115 TON/H 22,700.00 22,700.00 1.00 1 RODILLO LISO VIBR AUTOP 101-135HP 10-12T 7,300.00 7,300.00 1.00 1 RODILLO NEUMATICO AUTOP 81-100HP 5.5-20T 5,500.00 5,500.00 1.00 1 TRACTOR DE ORUGAS DE 140-160 HP 14,900.00 14,900.00 1.00 1 VIBRADOR DE CONCRETO 4 HP 1.50" 95.00 95.00 1.00 1 ZARANDA 3,500.00 3,500.00 1.00 TOTAL 8.00 5.00 EQUIPO AUTOTRANSPORTADO UNIDAD EQUIPO SUBTOTAL 1 CAMION CISTERNA 4X2 (AGUA) 2,000 GAL. 11 S/. 125.00 S/. 1,375.00 1 CAMION IMPRIMADOR DE 2000 GLS. 11 S/. 125.00 S/. 1,375.00 4 CAMION VOLQUETE DE 15 M3 11 S/. 136.00 S/. 5,984.00 8.00 CAMA BAJA 35 TN 11 S/. 276.00 ### TOTAL ### Viaje de ida 11 horas aproximadamente Movilizacion ### Desmovilizacion ### TOTAL MOVILIZACION + DESMOVILIZACION ### 01.02.00 CARTEL DE OBRA DESCRIPCION UNIDAD CANTIDAD OBSERVACIONES CARTEL DE OBRA GLB 1.00 UBICADO AL INI TOTAL (UND) : 1.00 01.03.00 TRAZO Y REPLANTEO DURANTE LA OBRA DE CARRETERA DESCRIPCION UNIDAD CANTIDAD OBSERVACIONES TRAZO Y REPLANTEO TOPOGRAFICO KM 1.00 TEODOLITO TOTAL (KM) : 1.00 01.04.00 LIMPIEZA Y DESFORESTACION MANUAL DESCRIPCION UNIDAD LIMPIEZA Y DESFORESTACION MANUAL HA 10.00 1,000.00 10,000.00 PESO (Kg) PARCIAL (Kg) CAMA BAJA (Viaje) EQUIPO PROPIO (Viaje) HORAS VIAJES ALQUILER /HORA ANCHO (m) LONGITUD (m) AREA TOTAL (m2)

description

QAA

Transcript of Planilla de Metrados

Page 1: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000FECHA : JULIO 2013

01.00.00 TRABAJOS PRELIMINARES01.01.00 EQUIPO A TRANSPORTAR

UNIDAD EQUIPO

1 CARGADOR S/LLANTAS 160-195 HP 3.5 YD3. 18,585.00 18,585.00 1.001 COMPRESORA NEUMATICA 250-330 PCM, 87 HP 2,000.00 2,000.00 1.001 MAQUINA DE PINTAR PAVIMENTOS 135.00 135.00 1.002 MARTILLO NEUMATICO DE 29 Kg. 29.00 58.00 1.001 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 2,200.00 2,200.00 1.001 MOTONIVELADORA DE 125 HP 11,515.00 11,515.00 1.001 PAVIMENTADORA DE 65 HP 12,000.00 12,000.00 1.001 PLANTA ASFALTO EN CALIENTE 60-115 TON/H 22,700.00 22,700.00 1.001 RODILLO LISO VIBR AUTOP 101-135HP 10-12T 7,300.00 7,300.00 1.001 RODILLO NEUMATICO AUTOP 81-100HP 5.5-20T 5,500.00 5,500.00 1.001 TRACTOR DE ORUGAS DE 140-160 HP 14,900.00 14,900.00 1.001 VIBRADOR DE CONCRETO 4 HP 1.50" 95.00 95.00 1.001 ZARANDA 3,500.00 3,500.00 1.00

TOTAL 8.00 5.00

EQUIPO AUTOTRANSPORTADO

UNIDAD EQUIPO SUBTOTAL

1 CAMION CISTERNA 4X2 (AGUA) 2,000 GAL. 11 S/. 125.00 S/. 1,375.001 CAMION IMPRIMADOR DE 2000 GLS. 11 S/. 125.00 S/. 1,375.004 CAMION VOLQUETE DE 15 M3 11 S/. 136.00 S/. 5,984.00

8.00 CAMA BAJA 35 TN 11 S/. 276.00 S/. 24,288.00

TOTAL ###

Viaje de ida 11 horas aproximadamente

Movilizacion ###Desmovilizacion ###

TOTAL MOVILIZACION + DESMOVILIZACION ###

01.02.00 CARTEL DE OBRA

DESCRIPCION UNIDAD CANTIDAD OBSERVACIONES

CARTEL DE OBRA GLB 1.00 UBICADO AL INICIO

TOTAL (UND) : 1.00

01.03.00 TRAZO Y REPLANTEO DURANTE LA OBRA DE CARRETERA

DESCRIPCION UNIDAD CANTIDAD OBSERVACIONES

TRAZO Y REPLANTEO TOPOGRAFICO KM 1.00 TEODOLITO

TOTAL (KM) : 1.00

01.04.00 LIMPIEZA Y DESFORESTACION MANUAL

DESCRIPCION UNIDAD

LIMPIEZA Y DESFORESTACION MANUAL HA 10.00 1,000.00 10,000.00

PESO (Kg)

PARCIAL (Kg)

CAMA BAJA (Viaje)

EQUIPO PROPIO (Viaje)

HORAS VIAJES

ALQUILER /HORA

ANCHO(m)

LONGITUD(m)

AREATOTAL(m2)

Page 2: Planilla de Metrados

TOTAL (HA) :

Page 3: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

: EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

COSTO (HM)

190.00115.0025.0025.0035.00

210.00150.00450.00160.00150.00240.0013.006.00

S/. 1,769.00

OBSERVACIONES

UBICADO AL INICIO

OBSERVACIONES

TEODOLITO

1.00

TOTALHA

Page 4: Planilla de Metrados

1.00

Page 5: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

02.00.00 MOVIMIENTO DE TIERRAS

02.01.00 EXCAVACIÓN PARA EXPLANACIONES (02.01.01 - 02.01.02 - 02.01.03)

Km

AREAS (m2) CLASIFICACION DE MATERIAL CUNETAS

CORTE RELLENO IZQ DER

0+000 0.00 10.00 0.00 0.00 0.00 0.00 X X

0+010 33.68 10.00 168.40 168.40 168.40 X X

0+020 43.08 0.02 20.00 767.60 767.60 0.20 936.20 X X

0+040 22.58 0.08 20.00 656.60 656.60 1.00 1,593.80 X X

0+060 41.02 20.00 225.80 225.80 411.00 2,230.60 X

0+080 35.43 26.62 10.00 355.55 355.55 154.40 3,145.35 X

0+100 28.93 9.11 20.00 643.60 643.60 357.30 4,146.25 X

0+120 32.96 15.16 20.00 618.90 618.90 242.70 5,007.85 X

0+140 5.47 31.99 10.00 74.90 74.90 264.70 5,740.35 X

0+160 11.08 53.93 10.00 153.25 153.25 400.30 6,709.70 X

0+180 14.18 18.28 20.00 252.60 252.60 722.10 7,684.40 X

0+200 22.73 35.58 20.00 369.10 369.10 538.60 8,592.10 X

0+220 20.01 21.43 20.00 427.40 427.40 570.10 9,589.60 X

0+240 66.97 4.41 20.00 869.80 869.80 258.40 10,717.80 X

0+260 40.83 12.38 10.00 471.85 471.85 107.65 11,967.65 X

0+280 5.84 41.94 20.00 466.70 466.70 543.20 12,977.55 X

0+300 11.09 26.94 10.00 73.05 73.05 392.40 13,957.20 X

0+320 22.79 23.60 10.00 258.75 258.75 179.45 14,791.80 X

0+340 59.11 54.62 10.00 560.75 560.75 274.45 16,125.50 X

0+360 2.60 41.11 20.00 617.10 617.10 957.30 17,699.90 X

0+380 12.17 11.94 10.00 74.25 74.25 179.20 18,304.80 X

0+400 29.74 2.56 10.00 151.25 151.25 140.95 18,848.25 X

0+420 7.53 12.26 10.00 139.10 139.10 72.10 19,333.20 X

0+440 22.65 11.23 10.00 234.70 234.70 95.65 19,923.45 X

0+460 14.65 28.75 10.00 159.65 159.65 211.60 20,618.35 X

0+480 23.00 17.19 10.00 238.50 238.50 148.90 21,409.20 X

0+500 0.08 14.80 20.00 230.80 230.80 319.90 21,959.90

0+520 17.36 8.17 20.00 174.40 174.40 174.40 229.70 22,364.00 X

0+540 63.39 0.09 20.00 807.50 807.50 82.60 23,254.10 X

0+560 70.08 0.28 10.00 563.35 563.35 27.15 24,400.70 X

0+580 59.55 2.52 10.00 579.80 579.80 14.10 25,629.95 X

0+600 60.21 3.24 10.00 554.25 554.25 23.75 26,779.05 X

0+620 67.38 10.00 766.80 766.80 28,293.00 X X

0+640 46.73 0.06 20.00 1,141.10 1,141.10 0.60 29,434.70 X X

0+660 198.82 10.00 1,550.75 1,550.75 31,776.05 X X

0+680 177.33 4.39 20.00 3,761.50 3,761.50 43.90 35,581.45 X X

0+700 72.72 20.00 2,500.50 2,500.50 43.90 38,125.85 X X

0+720 59.69 20.00 1,324.10 1,324.10 39,449.95 X X

0+740 46.81 1.88 10.00 564.45 564.45 9.40 40,652.65 X

0+760 65.77 20.00 1,125.80 1,125.80 18.80 41,797.25 X

0+780 38.29 0.05 10.00 450.60 450.60 0.25 42,836.10 X

0+800 53.64 10.00 495.70 495.70 0.10 43,751.20 X

0+820 51.57 20.00 1,052.10 1,052.10 44,803.30 X X

0+840 46.09 0.02 10.00 459.35 459.35 0.50 45,750.30 X

0+860 34.38 1.05 10.00 353.45 353.45 35.95 46,582.50 X

0+880 62.39 10.00 513.35 513.35 47,474.40 X X

0+900 10.89 14.09 20.00 732.80 732.80 140.90 48,348.10 X

0+920 30.53 16.03 20.00 414.20 414.20 301.20 49,063.50 X

0+940 36.57 9.27 10.00 317.05 317.05 73.90 49,849.00 X

0+960 21.00 21.39 10.00 192.95 192.95 188.65 50,629.45 X

0+980 63.01 7.95 20.00 840.10 840.10 293.40 51,762.95 X

1+000 38.84 6.86 10.00 433.15 433.15 68.60 52,892.75 X

TOTALES 40,823.25 11,906.10 28,923.15 12,069.50

DISTANCIA(m)

VOLUMENDE CORTE

(m3)

VOLUMEN DERELLENO

(m3)

VOLUMENACUMULADO

(m3)CORTE

ROCA FIJACORTE

SUELO GRAVOSO

Page 6: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

02.01.04 PERFILADO Y COMPACTACION DE SUBRASANTE:

DESCRIPCION UNIDAD

Km 0+000 AL Km 0+500 Roca Suelta M2 8.60 500.00 4,300.00

Km 0+500 AL Km 1+000 Suelo Gravoso M2 8.60 500.00 4,300.00

TOTAL (m2) : 8,600.00

02.01.05 ELIMINACION DE MATERIAL EXCEDENTE

DESCRIPCION UNIDAD CANTIDAD

PRODUCTO DE LA EXCAVACION PARA EXPLANACIONES

Km 0+000 AL Km 0+500 40,823.25 M3 40,823.25 1.20 48,987.90

Km 0+500 AL Km 1+000 12,069.50 M3 12,069.50 1.20 14,483.40

TOTAL (m3) : 34,504.50

03.00.00. PAVIMENTOS03.01.00 CAPA ANTICONTAMINANTE (e = 0.15 m)

DESCRIPCION UNIDAD

Km 0+000 AL Km 1+000 M3 8.60 1,000.00 8,600.00 1,290.00

TOTAL (m3) : 1,290.00

SOBREANCHOS

CURVA

1 23.168 6.549 151.73 22.762 18.849 1.244 23.45 3.523 23.562 2.255 53.13 7.974 16.492 2.255 37.19 5.585 15.708 1.140 17.91 2.696 15.709 2.254 35.41 5.317 15.542 3.851 59.85 8.988 19.477 8.409 163.78 24.579 32.045 8.411 269.53 40.4310 13.350 6.451 86.12 12.9211 14.923 3.250 48.50 7.2712 17.017 3.250 55.31 8.3013 14.660 1.750 25.66 3.8514 17.802 1.750 31.15 4.6715 19.111 3.250 62.11 9.3216 17.383 8.410 146.19 21.9317 14.661 8.410 123.30 18.4918 16.232 11.050 179.36 26.9019 12.741 11.050 140.79 21.1220 18.064 2.251 40.66 6.1021 16.755 3.250 54.45 8.1722 12.175 2.249 27.38 4.1123 19.635 2.250 44.18 6.63

ANCHO(m)

LONGITUD(m)

AREA(m2)

VOLUMEN CORTE

(m3)

VOLUMEN RELLENO

(m3)

FACTOR DEESPONJAM.

SUB TOTAL(m3)

ANCHO(m)

LONGITUD(m)

AREA(m2)

VOLUMEN(m3)

LONG.CURVA(m)

S/A(m)

AREA(m2)

VOLUMEN(m3)

Page 7: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

24 28.013 3.250 91.04 13.6625 17.906 8.410 150.59 22.5926 16.493 2.250 37.11 5.5727 17.802 3.251 57.87 8.6828 18.850 2.250 42.41 6.36

TOTAL (m3) : 338.43

TOTAL (m3) : 1,628.43

Page 8: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

03.02.00 SUB BASE GRANULAR (e = 0.25 m)

DESCRIPCION UNIDAD SUB BASE (0.20)

Km 0+000 AL Km 0+500 Roca Suelta M3 8.60 500.00 0.25 1,075.00

Km 0+500 AL Km 1+000 Suelo Gravoso M3 8.60 500.00 0.25 1,075.00

TOTAL (m3) : 2,150.00

SOBREANCHOS

CURVA

1 23.168 6.5490 151.73 30.35

2 18.849 1.2440 23.45 4.69

3 23.562 2.2550 53.13 10.63

4 16.492 2.2550 37.19 7.44

5 15.708 1.1400 17.91 3.58

6 15.709 2.2540 35.41 7.08

7 15.542 3.8510 59.85 11.97

8 19.477 8.4090 163.78 32.76

9 32.045 8.4110 269.53 53.91

10 13.350 6.4510 86.12 17.22

11 14.923 3.2500 48.50 9.70

12 17.017 3.2500 55.31 11.06

13 14.660 1.7500 25.66 5.13

14 17.802 1.7500 31.15 6.23

15 19.111 3.2500 62.11 12.42

16 17.383 8.4100 146.19 29.24

17 14.661 8.4100 123.30 24.66

18 16.232 11.0500 179.36 35.87

19 12.741 11.0500 140.79 28.16

20 18.064 2.2510 40.66 8.13

21 16.755 3.2500 54.45 10.89

22 12.175 2.2490 27.38 5.48

23 19.635 2.2500 44.18 8.84

24 28.013 3.2500 91.04 18.21

25 17.906 8.4100 150.59 30.12

26 16.493 2.2500 37.11 7.42

27 17.802 3.2510 57.87 11.57

28 18.850 2.2500 42.41 8.48

TOTAL (m3) : 451.23

TOTAL (m3) : 2,601.23

03.03.00 BASE GRANULAR (e = 0.20 m)

DESCRIPCION UNIDAD BASE (0.15)

Km 0+000 AL Km 0+500 Roca Suelta M3 8.60 500.00 0.20 860.00

Km 0+500 AL Km 1+000 Suelo Gravoso M3 8.60 500.00 0.20 860.00

TOTAL (m3) : 1,720.00

SOBREANCHOS

CURVA

1 23.168 6.5490 151.73 22.76

2 18.849 1.2440 23.45 3.523 23.562 2.2550 53.13 7.974 16.492 2.2550 37.19 5.585 15.708 1.1400 17.91 2.696 15.709 2.2540 35.41 5.317 15.542 3.8510 59.85 8.988 19.477 8.4090 163.78 24.579 32.045 8.4110 269.53 40.43

10 13.350 6.4510 86.12 12.9211 14.923 3.2500 48.50 7.2712 17.017 3.2500 55.31 8.3013 14.660 1.7500 25.66 3.85

ANCHO(m)

LONGITUD(m)

VOLUMEN(m3)

LONG.CURVA(m)

S/A(m)

AREA(m2)

VOLUMEN(m3)

ANCHO(m)

LONGITUD(m)

VOLUMEN(m3)

LONG.CURVA(m)

S/A(m)

AREA(m2)

VOLUMEN(m3)

Page 9: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

14 17.802 1.7500 31.15 4.6715 19.111 3.2500 62.11 9.3216 17.383 8.4100 146.19 21.9317 14.661 8.4100 123.30 18.4918 16.232 11.0500 179.36 26.9019 12.741 11.0500 140.79 21.1220 18.064 2.2510 40.66 6.1021 16.755 3.2500 54.45 8.1722 12.175 2.2490 27.38 4.1123 19.635 2.2500 44.18 6.6324 28.013 3.2500 91.04 13.6625 17.906 8.4100 150.59 22.5926 16.493 2.2500 37.11 5.5727 17.802 3.2510 57.87 8.6828 18.850 2.2500 42.41 6.36

TOTAL (m3) : 338.43

TOTAL (m3) : 2,058.43

Page 10: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

03.04.00 IMPRIMACIÓN BITUMINOSA

DESCRIPCION UNIDAD

Km 0+000 AL Km 0+500 Roca Suelta M2 8.60 500.00 4,300.00

Km 0+500 AL Km 1+000 Suelo Gravoso M2 8.60 500.00 4,300.00

TOTAL (m2) : 8,600.00

SOBREANCHOS

CURVA

1 23.168 6.5490 151.73

2 18.849 1.2440 23.45

3 23.562 2.2550 53.13

4 16.492 2.2550 37.19

5 15.708 1.1400 17.91

6 15.709 2.2540 35.41

7 15.542 3.8510 59.85

8 19.477 8.4090 163.78

9 32.045 8.4110 269.53

10 13.350 6.4510 86.12

11 14.923 3.2500 48.50

12 17.017 3.2500 55.31

13 14.660 1.7500 25.66

14 17.802 1.7500 31.15

15 19.111 3.2500 62.11

16 17.383 8.4100 146.19

17 14.661 8.4100 123.30

18 16.232 11.0500 179.36

19 12.741 11.0500 140.79

20 18.064 2.2510 40.66

21 16.755 3.2500 54.45

22 12.175 2.2490 27.38

23 19.635 2.2500 44.18

24 28.013 3.2500 91.04

25 17.906 8.4100 150.59

26 16.493 2.2500 37.11

27 17.802 3.2510 57.87

28 18.850 2.2500 42.41

TOTAL (m3) : 2256.17

TOTAL (m2) : 10,856.17

03.05.00 CARPETA ASFALTICA EN CALIENTE (e=3")

DESCRIPCION UNIDAD

Km 0+000 AL Km 1+000 M3 6.60 1,000.00 0.0762 502.92

TOTAL (m3) : 502.92

SOBREANCHOS

CURVA

1 23.168 6.5490 151.73 7.59

2 18.849 1.2440 23.45 1.17

3 23.562 2.2550 53.13 2.66

4 16.492 2.2550 37.19 1.86

ANCHO(m)

LONGITUD(m)

AREA(m2)

LONG.CURVA(m)

S/A(m)

AREA(m2)

ANCHO(m)

LONGITUD(m)

(e =3") = 7.62 cms

VOLUMEN(m3)

LONG.CURVA(m)

S/A(m)

AREA(m2)

VOLUMEN(m3)

Page 11: Planilla de Metrados

EXPEDIENTE TECNICO: METRADOS

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

5 15.708 1.1400 17.91 0.90

6 15.709 2.2540 35.41 1.77

7 15.542 3.8510 59.85 2.99

8 19.477 8.4090 163.78 8.19

9 32.045 8.4110 269.53 13.48

10 13.350 6.4510 86.12 4.31

11 14.923 3.2500 48.50 2.42

12 17.017 3.2500 55.31 2.77

13 14.660 1.7500 25.66 1.28

14 17.802 1.7500 31.15 1.56

15 19.111 3.2500 62.11 3.11

16 17.383 8.4100 146.19 7.31

17 14.661 8.4100 123.30 6.16

18 16.232 11.0500 179.36 8.97

19 12.741 11.0500 140.79 7.04

20 18.064 2.2510 40.66 2.03

21 16.755 3.2500 54.45 2.72

22 12.175 2.2490 27.38 1.37

23 19.635 2.2500 44.18 2.21

24 28.013 3.2500 91.04 4.55

25 17.906 8.4100 150.59 7.53

26 16.493 2.2500 37.11 1.86

27 17.802 3.2510 57.87 2.89

28 18.850 2.2500 42.41 2.12

TOTAL (m3) : 112.81

TOTAL (m3) : 615.73

Page 12: Planilla de Metrados

EXPEDIENTE TECNICO

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMI(LONGITUD IZQ + LONGITUD DER)

FECHA : JULIO 2013

04.01.00 CUNETAS LATERALES

DESCRIPCION

LADO

IZQ DER

Km 0+000 AL Km 0+010 X 20.00 x 20.00

Km 0+020 AL Km 0+040 X 20.00 20.00

Km 0+040 AL Km 0+060 X 20.00 20.00

Km 0+060 AL Km 0+070 X 20.00 20.00

Km 0+080 AL Km 0+100 X 20.00 20.00

Km 0+100 AL Km 0+120 X 20.00 20.00

Km 0+140 AL Km 0+160 X

Km 0+160 AL Km 0+180 X 20.00 20.00

Km 0+180 AL Km 0+200 X

Km 0+200 AL Km 0+220 X 20.00 20.00

Km 0+220 AL Km 0+240 X 20.00 20.00

Km 0+240 AL Km 0+250 X 20.00 20.00

Km 0+260 AL Km 0+280 X 20.00 20.00

Km 0+280 AL Km 0+290 X 20.00 20.00

Km 0+300 AL Km 0+310 X 20.00 20.00

Km 0+320 AL Km 0+330 X 20.00 20.00

Km 0+340 AL Km 0+360 X 20.00 20.00

Km 0+360 AL Km 0+370 X 20.00 20.00

Km 0+380 AL Km 0+390

Km 0+400 AL Km 0+410 X 20.00 20.00

Km 0+420 AL Km 00+430 X 20.00 20.00

Km 0+440 AL Km 0+450 X 20.00 20.00

Km 0+460 AL Km 0+470 X 20.00 20.00

Km 0+480 AL Km 0+500 X 20.00 20.00

Km 0+500 AL Km 0+520

Km 0+520 AL Km 0+540 X 20.00 20.00

Km 0+540 AL Km 0+550 X 20.00 20.00

Km 0+560 AL Km 0+570 X 20.00 20.00

Km 0+580 AL Km 0+590 X 20.00 20.00

Km 0+600 AL Km 0+610 X 20.00 20.00

Km 0+620 AL Km 0+640 X 20.00 x 20.00

Km 0+640 AL Km 0+650 X 20.00 x 20.00

Km 0+660 AL Km 0+680 X 20.00 x 20.00

Km 0+680 AL Km 0+700 X 20.00 x 20.00

Km 0+700 AL Km 0+720 X 20.00 x 20.00

Km 0+720 AL Km 0+730 X 20.00 x 20.00

Km 0+740 AL Km 0+760 20.00 x 20.00

Km 0+760 AL Km 0+770 20.00 x 20.00

Km 0+780 AL Km 0+790 20.00 x 20.00

Km 0+790 AL Km 0+800 20.00 x 20.00

Km 0+800 AL Km 0+820 20.00 x 20.00

Km 0+820 AL Km 0+830 20.00 x 20.00

Km 0+840 AL Km 0+850 20.00 x 20.00

Km 0+860 AL Km 0+870 20.00 x 20.00

Km 0+880 AL Km 0+890 20.00 x 20.00

Km 0+900 AL Km 0+920 20.00 x 20.00

Km 0+920 AL Km 0+930 20.00 x 20.00

Km 0+940 AL Km 0+950 20.00 x 20.00

Km 0+960 AL Km 0+980 20.00 x 20.00

Km 0+980 AL Km 0+990 20.00 x 20.00

TOTALES (ML) : 1,480.00

LONGITUDPARCIAL

(m)LONGITUD

(m)LONGITUD

(m)

Page 13: Planilla de Metrados

EXPEDIENTE TECNICO

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

05.01.00 MARCAS EN EL PAVIMENTO

DESCRIPCION LINEA

IZQ CEN DER

Km 0+000 AL Km 1+000 1,000.00 x 1,000.00

Km 0+000 AL Km 1+000 1,000.00 x 1,000.00

Km 0+000 AL Km 1+000 1,000.00 x 1,000.00

TOTAL (ML) : 3,000.00

05.02.00 POSTES KILOMETRICOS

DESCRIPCION UNIDAD CANTIDAD

IZQ DER

Km 0+000 UND X 1.00

Km 0+500 UND X 1.00

Km 1+000 UND X 1.00

TOTAL (UND) : 3.00

05.03.00 SEÑAL PREVENTIVA

DESCRIPCION UBICACIÓN

IZQ DER

SEÑAL DE LOCALIZACION 1.00 X I - 18 KM 0+000

ZONA URBANA 1.00 X P - 56 KM 0+000

CURVA DERECHA 1.00 X P - 2A KM 0+00

CURVA IZQUIERDA 1.00 X P - 2B KM 0+080

CURVA DERECHA 1.00 X P - 2A KM 0+120

CURVA IZQUIERDA 1.00 X P - 2B KM 0+140

CURVA IZQUIERDA 1.00 X P - 2B KM 0+160

CURVA DERECHA 1.00 X P - 2A KM 0+240

CURVA DERECHA 1.00 X P - 2A KM 0+280

CURVA IZQUIERDA 1.00 X P - 2B KM 0+320

CURVA DERECHA 1.00 X P - 2A KM 0+340

CURVA IZQUIERDA 1.00 X P - 2B KM 0+380

CURVA DERECHA 1.00 X P - 2A KM 0+420

CURVA IZQUIERDA 1.00 X P - 2B KM 0+440

CURVA IZQUIERDA 1.00 X P - 2B KM 0+460

CURVA DERECHA 1.00 X P - 2A KM 0+480

CURVA IZQUIERDA 1.00 X P - 2B KM 0+520

CURVA DERECHA 1.00 X P - 2A KM 0+540

CURVA IZQUIERDA 1.00 X P - 2B KM 0+580

CURVA IZQUIERDA 1.00 X P - 2B KM 0+600

CURVA IZQUIERDA 1.00 X P - 2B KM 0+620

CURVA DERECHA 1.00 X P - 2A KM 0+640

CURVA IZQUIERDA 1.00 X P - 2B KM 0+640

CURVA DERECHA 1.00 X P - 2A KM 0+740

CURVA DERECHA 1.00 X P - 2A KM 0+780

CURVA DERECHA 1.00 X P - 2A KM 0+820

CURVA IZQUIERDA 1.00 X P - 2B KM 0+860

CURVA IZQUIERDA 1.00 X P - 2B KM 0+900

CURVA DERECHA 1.00 X P - 2A KM 0+960

CURVA DERECHA 1.00 X P - 2A KM 0+980

SEÑAL DE LOCALIZACION 1.00 X I - 18 KM 1+000Ç

TOTAL (UND) : 31.00

DISTANCIA(m)

LONGITUDTOTAL

(m)

LADO DE UBICACIÓN

CANTIDAD(UND)

LADO DE INSTALACION CODIGO

DE SEÑAL

Page 14: Planilla de Metrados

EXPEDIENTE TECNICO

PROYECTO : EVALUACION ECONOMICA DE LA CARRETRA TIALANGO - DUMIA CHICO ( LUYA AMAZONAS ) DEL TRAMO 0+000 - KM 1+000

FECHA : JULIO 2013

05.04.00 SEÑAL REGLAMENTARIA

DESCRIPCION UBICACIÓN

IZQ DER

ZONA DE DERRUMBES 1.00 X P - 37 KM 10+500

ZONA DE DERRUMBES 1.00 X R - 37 KM 10+800

TOTAL (UND) : 2.50

05.05.00 SEÑAL INFORMATIVA

DESCRIPCION DE LA SEÑAL

MEDIDAS

PROGRESIVA

IZQ DER

TIALANGO 1.00 X I - 18 2.15 0.60 1.29 Km +000

DUMA- CHICO 1.00 X I - 18 2.15 0.60 1.29 Km 1+000

TOTAL (M2) : 2.00

CANTIDAD(UND)

LADO DE INSTALACION CODIGO

DE SEÑAL

CANTIDAD(UND)

LADO DE INSTALACION CODIGO

DE SEÑAL LARGO(m)

ALTO(m)

AREA(m2)