25
CURSO: COSTOS Y PRESUPUESTOS CICLO: VIII UPEU HOJA DE METRADOS 1° PISO OBRA VIVIENDA URBANA FAMILIAR HOJA N~ 1 DE 6 PROPIETARI DAVID FLORES PLANO N~ FECHA 21de diciembre del 2014 HECHO POR DAVID FLORES ESPECIFICACIONES UND. MEDIDAS PARCIAL LARGO ANCHO ALTO 01.00.00 OBRAS PROVICIONALES 01.01.00 CONSTRUCCION PROVICIONAL 01.01.01 ALMACEN m2 1.00 4.00 3.50 14.000 01.01.02 CERCO 01.02.00 INSTALACIONES PROVICIONALES 01.02.01 INST. DE AGUA PARA CONSTRUCCION GBL 1.00 1.000 01.02.02 INST. ELECTRICA GBL 2.00 2.000 02.00.00 TRABAJOS PRELIMINARES 02.01.00 LIMPIEZA DE TERRENO 02.01.01 ELIMINACION DE MALEZA M2 20.00 8.00 160.000 02.02.00 TRAZO, NIVEL Y REPLANTEO 02.02.01 TRAZO, NIVEL Y REPLANTEO PRELIMINAR M2 EJE 1-1/A-E 4.18 0.40 1.672 EJE 1-1/E-F 2.43 0.50 1.215 EJE 2-2/A-F 1.65 0.50 0.825 3.03 0.50 1.515 1.43 0.50 0.715 EJE 3-3/E-F 1.73 0.50 0.865 0.45 0.50 0.225 EJE 4-4/E-F 2.25 0.50 1.125 EJE 5-5/A-F 3.48 0.50 1.740 2.13 0.50 1.065 EJE 6-6/C-D 0.75 0.50 0.375 EJE 7-7/E-F 2.33 0.50 1.165 EJE 8-8/A-F 3.13 0.50 1.565 2.33 0.50 1.165 0.50 0.50 0.250 EJE 9-9/A-F 3.73 0.50 1.865 2.78 0.50 1.390 EJE A-A/1-7 5.03 0.40 2.012 6.15 0.60 3.690 4.00 0.50 2.000 3.33 0.50 1.665 EJE C-C/6-8 3.10 0.50 1.550 EJE D-D/2-3 2.70 0.50 1.350 6.05 0.50 3.025 EJE E-E/1-9 3.98 0.50 1.990 1.75 0.6 1.050 2.35 0.6 1.410 4.75 0.6 2.850 1.78 0.5 0.890 EJE F-F/1-9 6.18 0.5 3.090 2.65 0.4 1.060 5.92 0.5 2.960 PARTIDA N° DE VECES

Transcript of METRADOS DEL PLANO EJEMPLAR.xlsx

Hoja1HOJA DE METRADOS 1 PISOHOJA DE METRADOS 2 PISOOBRAVIVIENDA URBANA FAMILIARHOJA N~1DE6OBRAVIVIENDA URBANA FAMILIARHOJA N~1DE2PROPIETARIO: DAVID FLORESPLANO N~PROPIETARIO: DAVID FLORESPLANO N~FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:PARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESPARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESLARGOANCHOALTOLARGOANCHOALTO01.00.00OBRAS PROVICIONALES05.00.00CONCRETO ARMADO01.01.00CONSTRUCCION PROVICIONAL05.01.00COLUMNA01.01.01ALMACENm21.004.003.5014.00014.00005.01.01CONCRETO M301.01.02CERCOEJE A-A/1-93.000.150.252.600.29301.02.00INSTALACIONES PROVICIONALES5.000.250.252.600.81301.02.01INST. DE AGUA PARA CONSTRUCCIONGBL1.001.0000.400.152.600.15601.02.02INST. ELECTRICAGBL2.002.0003.000EJE B-B/1-90.150.302.600.117EJE C-C/1-90.150.302.600.11702.00.00TRABAJOS PRELIMINARESEJE D-D/1-92.000.150.302.600.23402.01.00LIMPIEZA DE TERRENO2.000.150.252.400.18002.01.01ELIMINACION DE MALEZAM220.008.00160.000160.000EJE E-E/1-90.400.152.600.15602.02.00TRAZO, NIVEL Y REPLANTEO6.000.250.252.600.97502.02.01TRAZO, NIVEL Y REPLANTEO PRELIMINARM2EJE F-F/1-92.000.250.252.400.300EJE 1-1/A-E4.180.401.6725.000.250.252.600.813EJE 1-1/E-F2.430.501.2150.400.152.400.144EJE 2-2/A-F1.650.500.8254.000.250.152.600.3903.030.501.515ENDENTADO1.150.152.600.4491.430.500.7150.350.252.600.2285.363EJE 3-3/E-F1.730.500.8650.450.500.22505.01.02ENCOFRADO Y DESENCOFRADOM2EJE 4-4/E-F2.250.501.125EJE A-A/1-96.302.6016.380EJE 5-5/A-F3.480.501.740EJE B-B/1-90.852.602.2102.130.501.065EJE C-C/1-91.802.604.680EJE 6-6/C-D0.750.500.375EJE D-D/1-92.952.607.670EJE 7-7/E-F2.330.501.165EJE E-E/1-95.852.6015.210EJE 8-8/A-F3.130.501.5651.52.603.9002.330.501.165EJE F-F/1-99.052.6023.5373.5800.500.500.250EJE 9-9/A-F3.730.501.86505.02.00VIGA2.780.501.39005.02.01CONCRETOM3EJE A-A/1-75.030.402.012VS - 134.450.250.201.7236.150.603.690VA -146.650.250.202.3334.000.502.000VA - 217.610.300.201.0573.330.501.665VS - 26.500.150.400.390EJE C-C/6-83.100.501.550VP - 14.250.150.400.255EJE D-D/2-32.700.501.350VB14.680.150.200.4406.1976.050.503.025EJE E-E/1-93.980.501.99005.02.02ENCOFRADO Y DESENCOFRADOM21.750.61.050VP - 19.300.201.8602.350.61.4101.550.150.2334.750.62.850VS - 26.500.402.6001.780.50.8906.500.201.3005.993EJE F-F/1-96.180.53.0902.650.41.06005.03.00LOSA ALIGERADO5.920.52.96005.03.01CONCRETOM31.450.40.5801 - 9/A-F9.007.850.100.151.0603.680.51.84051.7494.007.400.100.150.4446.004.480.100.150.403HOJA DE METRADOS 1 PISOHOJA DE METRADOS 2 PISOOBRAVIVIENDA URBANA FAMILIARHOJA N~2DE6OBRAVIVIENDA URBANA FAMILIARHOJA N~2DE2PROPIETARIO: DAVID FLORESPLANO N~PROPIETARIO: DAVID FLORESPLANO N~FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:PARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESPARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESLARGOANCHOALTOLARGOANCHOALTO03.00.00MOVIMIENTO DE TIERRAS7.007.200.100.150.75603.01.00NIVELACION DE TERRENO2.007.050.100.150.21203.01.01NIVELACION M220.008.00160.000160.0003.003.620.100.150.16303.02.00EXCAVACIONES5.002.850.100.150.21403.02.01EXCAVACIONES DE ZANJASM36.007.200.100.150.648EJE 1-1/A-E4.180.400.400.6691 - 9/A-F4.902.850.050.698EJE 1-1/E-F2.430.500.800.9721.857.200.050.666EJE 2-2/A-F1.650.500.800.6604.402.500.050.5503.030.500.801.2123.857.200.051.3861.430.500.800.5723.581.530.050.274EJE 3-3/E-F1.730.500.800.6922.831.950.050.2760.450.500.800.1800.511.100.050.028EJE 4-4/E-F2.250.500.800.9002.657.200.050.95410.731EJE 5-5/A-F3.480.500.801.3922.130.500.800.85205.03.01ENCOFRADO Y DESENCOFRADOM2EJE 6-6/C-D0.750.500.800.300VOLADO0.503.251.625EJE 7-7/E-F2.330.500.800.932PERIMETRO (TAPA)63.900.2012.780EJE 8-8/A-F3.130.500.801.252DORMITORIO2.604.0010.4002.330.500.800.932HALL1.052.102.2050.500.500.800.200BAO1.852.003.700EJE 9-9/A-F3.730.500.801.4921.001.951.9502.780.500.801.112SALA3.357.0023.450EJE A-A/1-74.130.400.40.6611.005.855.8506.150.600.82.952COCINA3.202.859.1204.000.500.40.800DORMITORIO2.402.856.8403.330.500.81.3322.451.102.695EJE C-C/6-83.100.500.81.240PASADIZO0.905.534.977EJE D-D/2-32.700.500.81.080DORMITORIO PRINCIPAL1.804.257.6506.050.500.82.4201.053.553.728EJE E-E/1-93.980.500.81.592DORMITORIO2.822.858.0371.750.60.80.8401.800.801.440106.4472.350.60.81.1284.750.60.82.2801.780.50.80.712EJE F-F/1-96.180.50.82.4722.650.42.652.8095.920.50.82.3681.450.40.40.2323.680.50.81.47240.711

04.00.00CONCRETO SIMPLE04.01.00CIMIENTO04.01.01CIMIENTO CORRIDOM3EJE 1-1/A-E4.180.400.400.669EJE 1-1/E-F2.430.500.800.972EJE 2-2/A-F1.650.500.800.6603.030.500.801.2121.430.500.800.572HOJA DE METRADOS 1 PISOOBRAVIVIENDA URBANA FAMILIARHOJA N~3DE6PROPIETARIO: DAVID FLORESPLANO N~FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:PARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESLARGOANCHOALTOEJE 3-3/E-F1.730.500.800.6920.450.500.800.180EJE 4-4/E-F2.250.500.800.900EJE 5-5/A-F3.480.500.801.3922.130.500.800.852EJE 6-6/C-D0.750.500.800.300EJE 7-7/E-F2.330.500.800.932EJE 8-8/A-F3.130.500.801.2522.330.500.800.9320.500.500.800.200EJE 9-9/A-F3.730.500.801.4922.780.500.801.112EJE A-A/1-74.130.400.40.6616.150.600.82.9524.000.500.40.8003.330.500.81.332EJE C-C/6-83.100.500.81.240EJE D-D/2-32.700.500.81.0806.050.500.82.420EJE E-E/1-93.980.500.81.5921.750.60.80.8402.350.60.81.1284.750.60.82.2801.780.50.80.712EJE F-F/1-96.180.50.82.4722.650.42.652.8095.920.50.82.3681.450.40.40.2323.680.50.81.47246.711

04.02.00SOBRECIMIENTO04.02.01CONCRETOM3EJE 1-1/A-B1.450.150.600.131EJE 2-2/A-F0.900.150.600.0815.400.150.600.486EJE 3-3/E-F2.000.150.600.180EJE 4-4/E-F2.000.150.600.180EJE 5-5/A-F6.200.150.600.558EJE 6-6/A-D0.950.150.600.086EJE 7-7/E-F1.600.150.600.144EJE 8-8/A-F4.750.150.600.4281.650.150.600.149EJE 9-9/A-F7.100.150.600.639EJE A-A/1-94.550.150.600.4106.500.250.600.9756.580.150.600.592EJE C-C/8-92.450.150.600.221EJE D-D/1-93.650.150.600.329HOJA DE METRADOS 1 PISOOBRAVIVIENDA URBANA FAMILIARHOJA N~4DE6PROPIETARIO: DAVID FLORESPLANO N~FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:PARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESLARGOANCHOALTOEJE E-E/1-95.900.150.600.5316.050.250.600.9081.800.150.600.162EJE F-F/1-914.550.150.601.3103.950.150.600.35614.851

04.03.00FALSO PISO04.03.01DE 4" (10cm)M3GARAJE5.113.440.101.7580.984.030.100.395ESTUDIO2.604.000.101.0401.052.100.100.221HALL1.852.000.100.370BAO1.001.950.100.195PATIO2.502.850.100.713SALA3.357.000.102.3451.005.850.100.585COCINA3.202.850.100.912DORMITORIO2.402.850.100.684TERRAZA4.352.300.101.0011.751.250.100.2192.451.100.100.270PASADIZO0.905.530.100.498DORMITORIO PRINCIPAL1.804.250.100.7651.053.550.100.373DORMITORIO2.822.850.100.8041.800.80.100.14413.289

05.00.00CONCRETO ARMADO05.01.00COLUMNA05.01.01CONCRETO M3EJE A-A/1-93.000.150.252.750.3095.000.250.252.750.8590.400.152.750.165EJE B-B/1-90.150.302.750.124EJE C-C/1-90.150.302.750.124EJE D-D/1-92.000.150.302.750.2482.000.150.252.550.191EJE E-E/1-90.400.152.750.1656.000.250.252.751.031EJE F-F/1-92.000.250.252.550.3195.000.250.252.750.8590.400.152.550.1534.000.250.152.750.413ENDENTADO1.150.152.150.3710.350.252.150.1885.519

HOJA DE METRADOS 1 PISOHOJA DE METRADOS 1 PISOOBRAVIVIENDA URBANA FAMILIARHOJA N~5DE6OBRAVIVIENDA URBANA FAMILIARHOJA N~6DE6PROPIETARIO: DAVID FLORESPLANO N~PROPIETARIO: DAVIDPLANO N~FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:FECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:

PARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESPARTIDA NESPECIFICACIONESUND.N DE VECESMEDIDASPARCIALTOTALOBSERVACiONESLARGOANCHOALTOLARGOANCHOALTO05.02.00VIGA04.02.02ENCOFRADO Y DESENCOFRADOM205.02.01CONCRETOM3EJE A-A/1-92.003.430.604.116VS - 134.450.250.201.7232.007.530.609.036VA -146.650.250.202.3332.006.650.607.980VA - 217.610.300.201.057EJE C-C/1-92.002.280.602.736VS - 26.500.150.400.390EJE D-D/1-99.750.605.850VP - 14.250.150.400.255EJE E-E/1-911.400.606.840VB14.680.150.200.4406.19716.600.609.960EJE F-F/1-927.100.6016.26005.03.00LOSA ALIGERADO6.420.603.85205.03.01CONCRETOM3EJE 1-9/A-F66.750.6040.0501 - 9/A-F9.007.850.100.151.0603.220.601.932108.6124.007.400.100.150.4446.004.480.100.150.40305.01.02ENCOFRADO Y DESENCOFRADOM27.007.200.100.150.756EJE A-A/1-96.302.7017.0102.007.050.100.150.212EJE B-B/1-90.852.702.2953.003.620.100.150.163EJE C-C/1-91.802.704.8605.002.850.100.150.214EJE D-D/1-92.952.707.9656.007.200.100.150.648EJE E-E/1-95.852.7015.7951 - 9/A-F4.902.850.050.6981.52.704.0501.857.200.050.666EJE F-F/1-99.052.7024.43576.4104.402.500.050.5503.857.200.051.38605.02.02ENCOFRADO Y DESENCOFRADOM23.581.530.050.274VP - 19.300.201.8602.831.950.050.2761.550.150.2330.511.100.050.028VS - 26.500.402.6002.657.200.050.9548.7316.500.201.3005.993

05.03.01ENCOFRADO Y DESENCOFRADOM2VOLADO0.503.251.625PERIMETRO (TAPA)63.900.2012.780ESTUDIO2.604.0010.4001.052.102.205HALL1.852.003.700BAO1.001.951.950SALA3.357.0023.4501.005.855.850COCINA3.202.859.120DORMITORIO2.402.856.8402.451.102.695PASADIZO0.905.534.977DORMITORIO PRINCIPAL1.804.257.6501.053.553.728DORMITORIO2.822.858.0371.800.801.440106.447

&"-,Negrita"CURSO&"-,Normal": COSTOS Y PRESUPUESTOS

CICLO: VIIIUPEU

Hoja2HOJA DE METRADOS DE ACEROOBRAVIVIENDA URBANA FAMILIARHOJA N1DE3PRORIETARIODAVID FLORESPLANO NFECHA21de diciembre del 2014HECHO PORDAVID FLORESPARTIDA NDESCRIPCIONDIAMETRON DE VECESN DE PIEZAS1/4"3/8"1/2"5/8"3/4"1"PARCIAL (ML)PARCIAL (KG)TOTALOBSERVACIONES05.01.03A-F/1-9C1ACERO LONGITUDINAL5/8"4.004.004.1566.40103.05ESTRIBO3/8"4.0015.001.1468.4038.30141.36

C2ACERO LONGITUDINAL1/2"14.004.004.15232.40231.01ESTRIBO1/4"14.0015.001.14239.4059.85290.86

C3ACERO LONGITUDINAL1/2"3.006.004.1574.7074.25ESTRIBO1/4"3.0015.001.2455.8013.9588.20

C4ACERO LONGITUDINAL1/2"5.004.004.1583.0082.50ESTRIBO1/4"5.0015.001.0478.0019.50102.00

C5ACERO LONGITUDINAL3/8"11.004.004.15182.60102.26ESTRIBO1/4"11.0015.000.94155.1038.78141.03

05.02.03VIGAA-A/1-9VS-1ACERO LONGITUDINAL1/2"1.004.009.7038.8038.571/2"1.004.003.4513.8013.72ESTRIBO1/4"1.0082.001.0485.2821.3273.60

HOJA DE METRADOS DE ACEROOBRAVIVIENDA URBANA FAMILIARHOJA N2DE3PRORIETARIODAVID FLORESPLANO NFECHA21de diciembre del 2014HECHO PORDAVID FLORESPARTIDA NDESCRIPCIONDIAMETRON DE VECESN DE PIEZAS1/4"3/8"1/2"5/8"3/4"1"PARCIAL (ML)PARCIAL (KG)TOTALOBSERVACIONESE-EVS-1ACERO LONGITUDINAL1/2"1.004.005.2020.8020.68ESTRIBO1/4"1.0026.001.0427.046.7627.44

VA-2ACERO LONGITUDINAL1/2"1.006.0016.1096.6096.02ESTRIBO1/4"1.0091.001.14103.7425.94121.96

VA-1ACERO LONGITUDINAL1/2"1.006.004.9529.7029.52ESTRIBO1/4"1.0024.001.2429.767.4436.96

F-FVS-2ACERO LONGITUDINAL1/2"1.004.006.8027.2027.043/8"1.002.006.8013.607.62ESTRIBO1/4"1.0041.001.2450.8412.7147.36VS-1ACERO LONGITUDINAL1/2"1.004.0011.3045.2044.93ESTRIBO1/4"1.0076.001.0479.0419.7664.69

1-9/A-FVA-1ACERO LONGITUDINAL1/2"5.004.005.15103.00102.38ESTRIBO1/4"5.0029.001.04150.8037.70ACERO LONGITUDINAL1/2"643.481.681.11ESTRIBO1/4"6211.04131.0432.76253.95

HOJA DE METRADOS DE ACEROOBRAVIVIENDA URBANA FAMILIARHOJA N3DE3PRORIETARIODAVID FLORESPLANO NFECHA21de diciembre del 2014HECHO PORDAVID FLORESREVISADO POR:PARTIDA NDESCRIPCIONDIAMETRON DE VECESN DE PIEZAS1/4"3/8"1/2"5/8"3/4"1"PARCIAL (ML)PARCIAL (KG)TOTALOBSERVACIONESVS-1ACERO LONGITUDINAL1/2"148.333.233.00ESTRIBO1/4"1481.0449.9212.4845.48

VBACERO LONGITUDINAL1/2"142.489.929.861/2"143.614.414.311/2"143.1512.612.521/2"141.76.86.761/2"143.5514.214.111/2"144.1516.616.50ESTRIBO1/4"11100.8997.924.4898.55