    OE.2.3.2.3 Para la armadura de acero (ZAPATAS)UBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Totalz1 4 1/2'' 10.000 40.000 1.150 46.000

    z2 1 1/2'' 14.000 14.000 1.450 20.300z3 1 1/2'' 16.000 16.000 1.550 24.800

    z4 6 1/2'' 10.000 60.000 1.050 63.000

    z5 1 1/2'' 40.000 40.000 0.450 18.000

    z5 1 1/2'' 3.000 3.000 7.850 23.550TOTAL

    OE.2.3.3.3 Para la armadura de acero ( VIGAS DE CIMENTACION)UBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Totalvigas de conexin

    eje A, C tramo 3 a 1 2 5/8'' 2.000 4.000 6.870 27.480

    2 5/8'' 2.000 4.000 6.870 27.480

    2 3/8'' 41.000 82.000 1.220 100.040

    CUADRO DE METRADOS

    DiseoFierro

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje B tramo 3 a 1 1 5/8'' 3.000 3.000 6.870 20.610

    1 5/8'' 2.000 2.000 6.870 13.740

    1 3/8'' 41.000 41.000 1.220 50.020

    eje 2 tramo A a C 1 5/8'' 2.000 2.000 8.420 16.840

    1 1/2'' 1.000 1.000 8.420 8.420

    1 5/8'' 2.000 2.000 8.420 16.840

    1 3/8'' 48.000 48.000 1.220 58.560

    eje 1 tramo A a C 1 5/8'' 4.000 4.000 8.420 33.680

    1 5/8'' 3.000 3.000 8.420 25.260

    1 3/8'' 48.000 48.000 1.120 53.760TOTAL

    OE.2.3.6.1.3 Para la armadura de aceroUBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo TotalMURO DE CONTENCION 1 3/8'' 29.000 29.000 7.920 229.680

    DiseoFierro

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    1 3/8'' 28.000 28.000 4.440 124.320

    COL. ARRIOSTRE 1 1/2'' 4.000 4.000 4.400 17.600

    1 3/8'' 29.000 29.000 1.180 34.220TOTAL

    OE.2.3.7.3 Para la armadura de acero (COLUMNAS)PRIMER NIVEL

    UBICACINcant.

    CANTIDAD Long. Ml Elemento Total Diseo Total

    C1, C2 4 5/8'' 4.000 16.000 4.960 79.360

    4 1/2'' 2.000 8.000 4.960 39.680

    4 3/8'' 26.000 104.000 1.180 122.720

    C3, C4 2 5/8'' 4.000 8.000 4.960 39.680

    2 1/2'' 4.000 8.000 4.960 39.680

    2 3/8'' 26.000 52.000 1.380 71.760TOTAL

    SEGUNDO NIVEL

    DiseoFierro

    DiseoFierro

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    UBICACINcant.

    CANTIDAD Long. Ml Elemento Total Diseo Total

    C1, C2 4 5/8'' 4.000 16.000 2.800 44.800

    4 1/2'' 2.000 8.000 2.800 22.400

    4 3/8'' 18.000 72.000 1.180 84.960

    C3, C4 2 5/8'' 4.000 8.000 2.800 22.400

    2 1/2'' 4.000 8.000 2.800 22.400

    2 3/8'' 18.000 36.000 1.380 49.680

    C5 1 5/8'' 4.000 4.000 4.560 18.240

    1 1/2'' 4.000 4.000 4.560 18.240

    1 3/8'' 23.000 23.000 1.380 31.740

    C6, C7, C8 5 5/8'' 4.000 20.000 4.560 91.200

    5 1/2'' 2.000 10.000 4.560 45.600

    5 3/8'' 23.000 115.000 1.180 135.700

    DiseoFierro

    DiseoFierro

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    TOTAL

    TERCER NIVELUBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Total

    C1, C2 4 5/8'' 4.000 16.000 2.800 44.800

    4 1/2'' 2.000 8.000 2.800 22.400

    4 3/8'' 18.000 72.000 1.180 84.960

    C3, C4 2 5/8'' 4.000 8.000 2.800 22.400

    2 1/2'' 4.000 8.000 2.800 22.400

    2 3/8'' 18.000 36.000 1.380 49.680

    C5 1 5/8'' 4.000 4.000 2.800 11.200

    1 1/2'' 4.000 4.000 2.800 11.200

    1 3/8'' 18.000 18.000 1.380 24.840

    C6, C7, C8 5 5/8'' 4.000 20.000 2.800 56.000

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    5 1/2'' 2.000 10.000 2.800 28.000

    5 3/8'' 18.000 90.000 1.180 106.200TOTAL

    PARAPETOSUBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Total

    C1,C2, C3, C4, C5, C6, C7, C8 9 1/2'' 4.000 36.000 1.160 41.760

    9 3/8'' 9.000 81.000 0.780 63.180

    COL VORDE 3 1/2'' 4.000 12.000 1.410 16.920

    3 3/8'' 5.000 15.000 0.480 7.200TOTAL

    TOTAL COLUMNAS

    OE.2.3.8.3 Para la armadura de acero (VIGAS)VIGAS PRIMER NIVEL

    UBICACINcant.

    CANTIDAD Long. Ml Elemento Total Diseo Total

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VIGA 104, 106

    25/8'' 2.000 4.000 9.170 36.680

    25/8'' 2.000 4.000 9.170 36.680

    1/2'' 1.000 0.000 1.710 0.000

    1/2'' 1.000 0.000 1.860 0.000

    5/8'' 1.000 0.000 1.850 0.000

    23/8'' 61.000 122.000 1.180 143.960

    VIGA 105

    15/8'' 2.000 2.000 9.170 18.340

    15/8'' 2.000 2.000 9.170 18.340

    1/2'' 1.000 0.000 1.100 0.000

    1/2'' 1.000 0.000 1.100 0.0001 1/2'' 1.000 1.000 8.870 8.870

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOSVIGA 105

    13/8'' 60.000 60.000 1.180 70.800

    VIGA 101, 102

    25/8'' 2.000 4.000 8.220 32.880

    25/8'' 2.000 4.000 8.220 32.880

    5/8'' 1.000 0.000 1.360 0.000

    1/2'' 1.000 0.000 1.360 0.000

    23/8'' 52.000 104.000 1.180 122.720

    VIGA 103

    15/8'' 2.000 2.000 8.220 16.440

    15/8'' 3.000 3.000 8.220 24.660

    5/8'' 2.000 0.000 1.210 0.000

    5/8'' 2.000 0.000 1.210 0.000

    13/8'' 58.000 58.000 1.540 89.320

    VB-01

    1 1/2'' 2.000 2.000 8.820 17.640

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VB-01 1 1/2'' 2.000 2.000 8.820 17.640

    13/8'' 58.000 58.000 0.580 33.640

    VB-02

    11/2'' 2.000 2.000 3.980 7.960

    11/2'' 2.000 2.000 3.980 7.960

    1 3/8'' 29.000 29.000 0.880 25.520

    VB-DUCTO

    11/2'' 1.000 1.000 3.420 3.420

    11/2'' 1.000 1.000 3.420 3.420

    1 3/8'' 31.000 31.000 0.880 27.280TOTAL

    VIGAS SEGUNDO NIVELUBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Total

    VIGA 205, 207

    25/8'' 2.000 4.000 13.720 54.880

    25/8'' 2.000 4.000 13.720 54.880

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VIGA 205, 207 1/2'' 1.000 0.000 1.710 0.000

    1/2'' 1.000 0.000 1.860 0.000

    5/8'' 1.000 0.000 1.850 0.000

    23/8'' 88.000 176.000 1.180 207.680

    VIGA 206

    15/8'' 3.000 3.000 13.720 41.160

    15/8'' 2.000 2.000 13.720 27.440

    1/2'' 1.000 0.000 1.100 0.000

    1/2'' 1.000 0.000 1.100 0.0001 1/2'' 1.000 1.000 12.820 12.820

    13/8'' 88.000 88.000 1.180 103.840

    VIGA 201, 202

    25/8'' 2.000 4.000 8.220 32.880

    DiseoFierro

    DiseoFierro

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VIGA 201, 202

    25/8'' 2.000 4.000 8.220 32.880

    5/8'' 1.000 0.000 1.360 0.000

    1/2'' 1.000 0.000 1.360 0.000

    23/8'' 52.000 104.000 1.180 122.720

    VIGA 203

    15/8'' 2.000 2.000 8.220 16.440

    15/8'' 2.000 2.000 8.220 16.440

    15/8'' 1.000 1.000 8.220 8.220

    5/8'' 2.000 0.000 1.210 0.000

    5/8'' 2.000 0.000 1.210 0.000

    13/8'' 58.000 58.000 1.180 68.440

    VIGA 204

    25/8'' 2.000 4.000 8.220 32.880

    25/8'' 2.000 4.000 8.220 32.880

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VIGA 2045/8'' 1.000 0.000 1.360 0.000

    1/2'' 1.000 0.000 1.360 0.000

    23/8'' 50.000 100.000 1.180 118.000

    VB-01

    1 1/2'' 2.000 2.000 8.820 17.640

    11/2'' 2.000 2.000 8.820 17.640

    13/8'' 58.000 58.000 0.580 33.640

    VB-04

    11/2'' 2.000 2.000 3.980 7.960

    11/2'' 2.000 2.000 3.980 7.960

    1 3/8'' 29.000 29.000 0.880 25.520

    VB-03

    11/2'' 2.000 2.000 4.250 8.500

    11/2'' 2.000 2.000 4.250 8.500

    1 3/8'' 27.000 27.000 0.880 23.760

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VB-DUCTO

    11/2'' 1.000 1.000 3.420 3.420

    11/2'' 1.000 1.000 3.420 3.420

    1 3/8'' 31.000 31.000 0.880 27.280

    VB-DUCTO der

    11/2'' 1.000 1.000 1.080 1.080

    11/2'' 1.000 1.000 1.080 1.080

    1 3/8'' 5.000 5.000 0.880 4.400TOTAL

    VIGAS TERCER NIVELUBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Total

    VIGA 305, 307

    25/8'' 2.000 4.000 13.720 54.880

    25/8'' 2.000 4.000 13.720 54.880

    1/2'' 1.000 0.000 1.710 0.000

    1/2'' 1.000 0.000 1.860 0.000

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VIGA 305, 307

    5/8'' 1.000 0.000 1.850 0.000

    23/8'' 88.000 176.000 1.180 207.680

    VIGA 306

    15/8'' 2.000 2.000 13.720 27.440

    15/8'' 2.000 2.000 13.720 27.440

    1/2'' 1.000 0.000 1.100 0.000

    1/2'' 1.000 0.000 1.100 0.0001 1/2'' 1.000 1.000 12.820 12.820

    13/8'' 88.000 88.000 1.180 103.840

    VIGA 301, 302

    25/8'' 2.000 4.000 8.220 32.880

    25/8'' 2.000 4.000 8.220 32.880

    5/8'' 1.000 0.000 1.360 0.000

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VIGA 301, 302

    1/2'' 1.000 0.000 1.360 0.000

    23/8'' 52.000 104.000 1.180 122.720

    VIGA 303

    15/8'' 2.000 2.000 8.220 16.440

    15/8'' 2.000 2.000 8.220 16.440

    15/8'' 1.000 1.000 7.920 7.920

    5/8'' 2.000 0.000 1.210 0.000

    5/8'' 2.000 0.000 1.210 0.000

    13/8'' 58.000 58.000 1.180 68.440

    VIGA 304

    25/8'' 2.000 4.000 8.220 32.880

    25/8'' 2.000 4.000 8.220 32.880

    5/8'' 1.000 0.000 1.360 0.000

    1/2'' 1.000 0.000 1.360 0.000

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOSVIGA 304

    23/8'' 50.000 100.000 1.180 118.000

    VB-01

    1 1/2'' 2.000 2.000 8.820 17.640

    11/2'' 2.000 2.000 8.820 17.640

    13/8'' 58.000 58.000 0.580 33.640

    VB-04

    11/2'' 2.000 2.000 3.980 7.960

    11/2'' 2.000 2.000 3.980 7.960

    1 3/8'' 29.000 29.000 0.880 25.520

    VB-03

    11/2'' 2.000 2.000 4.250 8.500

    11/2'' 2.000 2.000 4.250 8.500

    1 3/8'' 27.000 27.000 0.880 23.760

    VB-DUCTO

    11/2'' 1.000 1.000 3.420 3.420

    11/2'' 1.000 1.000 3.420 3.420

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    VB-DUCTO

    1 3/8'' 31.000 31.000 0.880 27.280

    VB-DUCTO der

    11/2'' 1.000 1.000 1.080 1.080

    11/2'' 1.000 1.000 1.080 1.080

    1 3/8'' 5.000 5.000 0.880 4.400TOTAL

    TOTAL

    OE.2.3.9.2.3 Para la armadura de acero (LOSA ALIGERADA)UBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Total

    Losa A,B

    1 1/2'' 1.000 1.000 8.200 8.200

    1 3/8'' 1.000 1.000 8.200 8.200

    1 1/4'' 2.000 2.000 7.900 15.800

    Losa C, D

    1 1/2'' 8.000 8.000 8.200 65.600

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    Losa C, D1 3/8'' 8.000 8.000 8.200 65.600

    1 1/4'' 9.000 9.000 7.900 71.100

    Losa E, F

    1 1/2'' 8.000 8.000 5.950 47.600

    1 3/8'' 8.000 8.000 5.950 47.600

    1 1/4'' 9.000 9.000 5.650 50.850

    Losa G, H

    1 1/2'' 9.000 9.000 8.200 73.800

    1 3/8'' 9.000 9.000 8.200 73.800

    1 1/4'' 10.000 10.000 7.900 79.000

    TOTAL

    OE.2.3.10.3 Para la armadura de acero (ESCALERAS)UBICACIN

    cant.CANTIDAD Long. Ml

    Elemento Total Diseo Total

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    TRAMO 1 1 1/2'' 6.000 6.000 6.311 37.868

    1 3/8'' 29.000 29.000 0.960 27.840

    TRAMO 2, 4 2 1/2'' 6.000 12.000 3.784 45.407

    2 3/8'' 19.000 38.000 0.960 36.480

    TRAMO 3, 5 1 1/2'' 6.000 6.000 3.879 23.271

    1 3/8'' 19.000 19.000 0.960 18.240

    TOTAL

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS

    Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE

    Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

  • Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    46.46

    20.50325.048

    63.63

    18.18

    23.7855155.641 155.641

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    43.144

    43.144

    57.023

    "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

    32.358

    21.572

    28.511

    26.439

    8.5042

    26.439

    33.379

    52.878

    39.658

    30.643149.5566 8.5042 285.630 443.691

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    130.918

  • "VIVIENDA FAMILIAR"

    70.862

    17.776

    19.505221.285 17.776 0.000 239.061

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    124.595

    40.0768

    69.950

    62.298

    40.077

    40.903110.854 80.154 186.893 377.900

  • "VIVIENDA FAMILIAR"

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    70.336

    22.624

    48.427

    35.168

    22.624

    28.318

    28.637

    18.422

    18.092

    143.184

    46.056

    77.349

  • "VIVIENDA FAMILIAR"

    172.186 109.726 277.325 0.000 559.237

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    70.336

    22.624

    48.427

    35.168

    22.624

    28.318

    17.584

    11.312

    14.159

    87.920

  • "VIVIENDA FAMILIAR"

    28.280

    60.534151.438 84.840 211.008 0.000 447.286

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    42.178

    36.013

    17.089

    4.10440.117 59.267 99.383

    474.593 333.987 675.226 0.000 1483.806

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

  • "VIVIENDA FAMILIAR"

    57.588

    57.588

    0

    0

    0.000

    82.057

    28.794

    28.794

    0

    0

    8.959

  • "VIVIENDA FAMILIAR"

    40.356

    51.622

    51.622

    0.000

    0.000

    69.950

    25.811

    38.716

    0.000

    0.000

    50.912

    17.816

  • "VIVIENDA FAMILIAR"

    17.816

    19.175

    8.040

    8.040

    14.546

    3.454

    3.454

    15.550292.547 67.579 340.533 0.000 700.659

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    86.162

    86.162

  • "VIVIENDA FAMILIAR"

    0

    0

    0.000

    118.378

    64.621

    43.081

    0

    0

    12.948

    59.189

    51.622

  • "VIVIENDA FAMILIAR"

    51.622

    0.000

    0.000

    69.950

    25.811

    25.811

    8.302

    0.000

    0.000

    39.011

    51.622

    51.622

  • "VIVIENDA FAMILIAR"

    0.000

    0.000

    67.260

    17.816

    17.816

    19.175

    8.040

    8.040

    14.546

    8.585

    8.585

    13.543

  • "VIVIENDA FAMILIAR"

    3.454

    3.454

    15.550

    1.091

    1.091

    2.508419.110 99.222 538.133

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    86.162

    86.162

    0

    0

  • "VIVIENDA FAMILIAR"

    0.000

    118.378

    43.081

    43.081

    0

    0

    12.948

    59.189

    51.622

    51.622

    0.000

  • "VIVIENDA FAMILIAR"

    0.000

    69.950

    25.811

    25.811

    7.999

    0.000

    0.000

    39.011

    51.622

    51.622

    0.000

    0.000

  • "VIVIENDA FAMILIAR"

    67.260

    17.816

    17.816

    19.175

    8.040

    8.040

    14.546

    8.585

    8.585

    13.543

    3.454

    3.454

  • "VIVIENDA FAMILIAR"

    15.550

    1.091

    1.091

    2.508419.110 98.919 516.593

    1130.766 265.721 1395.259 0.000 2791.746

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

    8.282

    4.674

    4.266

    66.256

  • "VIVIENDA FAMILIAR"

    37.392

    19.197

    48.076

    27.132

    13.730

    74.538

    42.066

    21.330

    58.523 111.264 197.152 366.939

    Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''

  • "VIVIENDA FAMILIAR"

    38.246

    15.869

    45.861

    20.794

    23.504

    10.397

    47.059 107.611 154.670

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • "VIVIENDA FAMILIAR"

  • MANO DE OBRA DESCRIPCION

    OPERARIO OFICIAL PEON

    SANITARIASDESCRIPCION

    ADEX FORMADOR DE EMPAQUE X 1/32 3H T/ AVIACIONALAMBRE NEGRO #16 AACERRADURA CANTOL BAO BLISTIER BRONCE PULIDOCINTA TEFLON METUSA 1/2" x 12MCODO FG 90 X1/2"CODO PP C/R 90 X 1/2" IPSCODO PP INSERTO 90 X 1/2" IPSCODO PVC SAL 45X4" DESAGUE (IM) CODO PVC SAL 45X2"(IM)CODO PVC SAL 90X2"(IM)CODO PVC SAP 90 X 1/2"(IM)CODO SAL PVC 90X1/2" IPSCODO SANITARIO PVC 4" (IM)CODO SANITARIO PVC 4"X2"(IM)COMBO DE GOMA 24 ONZ SCHUBERTDESAGUE PARA LAVATORIO DISCO D/CORTE P/CONCRETO 9" UYUSTOOLSDISCO DIAM CONTINUO D/CORTE P/CERAMICO 4-1/2" UYUSTOOLSHOJA DE SIERRA JABONERA KOVENKIT BASICO 1/2 BAO METUSALAVADERO 1 POZA C/ESC AC. INOX ORANGE 40 X75LAVATORIO TREBOL MANCORALENTES DE SEGURIDAD TRANSPARENTELLAVE LAVAT ITALGRIF PUNTA SAL CRMANGA PLASTICA 1.5 AMEZC DUCHA ITALGRIF PUNTA SAL C/SAL CRMEZC MONOC LAVAD MUEBLE PREMIER PICO ALTO CRMEZCLADOR DE LAVAORIO 40MMEZCLADORA DUCHA ITALGRIFMEZCLADORA LAVAT. 4"(ITALGRIF) PUNTA SAL CROM. GR 45NIPLE PP 1/2" X 1 1/2" IPSPEDESTAL TREBOL UNIVERSALPERCHERO KOVENPILON ESFERICO BOTADERO CIM36 1/2" 150 LBSPORTA CEPILLO KOVENPORTA ROLLO TRAD.KOVEN

  • REDUCCION SAL 4"X2"(IM)REGISTRO DE BRONCE 2" C/RREGISTRO DE BRONCE 4" C/RSELLARROSCA 50 cm3 HIDROSIKA BOOM X 500MLSUMIDERO DE BRONCE DE 3" C/RSUMIDERO DE BRONCE DE 4" C/ROSCATANQUE TREBOL SIFON JETTARRAJA DE 1/2"TAZA INOD TREBOL SIFON JET TEE PP 1/2" IPSTEE PVC 1/2" IPSTEE PVC SAL 2"X2"(IM)TEE PVC SAL 4"X4"(IM)TEE PVC SP 1/2"(IM)TEE SANIT SAL 4"X4"TOALLERO BARRA 60CM KOVENTRAMPA PVC COMPLETA RECORDTRAMPA SAL 2"(IM)TUBO ABASTO METUSA 1/2" X 1/2" X 40 TUBO DE ABASTO 1/2" X1TUBO PP 1/2"*6M SALADILLOTUBO PVC 1/2" IPSTUBO PVC SAL 2"X3MTUBO PVC SAL 4"X4"TUBO PVC SAP 1/2"TUBO ROSACADO PVC 1/2" X 5MTUBOS SIKAFLEX X 300 ML BLANCOU - AS SOPORT PARA LAVATORIO UNION SIMPLE SP DE 1/2" SAP (IM)UNION UNIVERSAL PP 1/2" IPSUNION UNIVERSAL PVC SAP 1/2"(IM)VALVULA 14 PES 1/2" LBS CIMVALVULA ESFERICA CIM14 PES 400 LBS 1/2"VAVULA PVC 1/2"YEE SAL 2"X2"(IM)YEE SAL 4"X2"(IM)YEE SAL 4"X4"(IM)

    ELECTRICASDESCRIPCION

    ABRAZ P/TUBO DE 2" SAP C/2 OREJA MENTALABRAZ P/TUBO DE 21/2" SAP C/1 OREJA METALAMARRACABLE BLANCO 8" CV-200 X 100 UND KSSBALASTRO ELECTRONICO 2X36W P/FLUORESCENTE TLD EB-C PHBROCA 3/8"CABLE THW-90 450/750V 10AWG INDECOCABLE THW-90 450/750V 12AWG INDECOCABLE THW-90 450/750V 14 AWG INDECO

  • CAJA OCTOGONAL P/EMPOT/PVC PAVCOCAJA PASE 12X12X4 P1/27 FG JORMENCAJA RECTANGULAR P/EMPOT/PVC PAVCOCAJA TOMA METAL ELSE 02 24AX40HX16P SIN CHAPA PESADOCINTA AISLANTE 1600 20MTS NEGRO 3MCONECTORES DE 1 1/2"CONECTORES DE 1"CURVA DE 1 1/2" SELCURVA DE 1" SELCURVA DE 2 1/2" 60MM LUZCURVA DE 2" 50MM LUZ TIPO PVC-U PESADOCURVA DE 3/4" SELCURVA DE 5/8" SELEQP FLUORESCENTE LINEAL 2X36W T765 ELECTROMAGNETICO CFLUORESCENTE LINEAL 36W F765 LUZ BLANCA PHILIPSFOCO AHORRADOR ESPIRAL ECOHOME TWISTER 15W LUZ BLANCAFOCO AHORRADOR GLOBO 30W E-27 LUZ DIA GLB30D NOVALAMFULMINANTE MARRONINTERRUPTOR SIMPLE P/EMPOTRAR MARFIL OPALUXINTERRUPTOR DOBLE 10A AVANT TICINOINTERRUPTOR SIMPLE 10A TICINOINTERRUPTOR SIMPLE P/EMPOTRAR 3 VIAS TICINOINTERRUPTOR TERMOMAG. RIEL BTDIN 2PX16A 220V 10KA TIINTERRUPTOR TERMOMAG. RIEL BTDIN 2PX20A 220V 10KA TIINTERRUPTOR TERMOMAG. RIEL BTDIN 2PX40A 220V 10KA TIINTERRUPTOR TRIPLE 10A TICINOLAMPARA AHORRADOE DECO GLOBO 42W ULIXLAMPARA DE EMERGENCIA LINEAL 90LEDSLAMPARA DE EMERGENCIA TIPO REFLECTOR 64LEDS 9HRS 910LAMPARA DE EMERGENCIA TIPO REFLECTOR LED 2X1 .8W/90MILLAVE N4 SANLEYLUMINARIA RECTANGULAR ALUMINIO P/ADOSAR REJILLA 2X36PEGAMENTO DORADO PERNOS 3/8" X1 + VOLD. PRESIONSOCKET DE TECHO OVAL BLANCO E-27 P21B TICINOSOCKET DE TECHO PLANO MARFIL E-27 TICINOSOCKET DE TECHO BAQUELITA 250V 21 NEW OPALUXTARUGO AZUL 5/6 X 1. 3/8"TARUGO NARANJA 11/4TERMINAL COMPRIMIBLE BARRIL CORTO CU/ES 1/0 AMG 50 MM2 OJAL 8.3MMTERMINAL COMPRIMIBLE BARRIL CORTO CU/ES 2 AMG 35 MM2 OJAL 8.3MMTERMOMAGNETICO FUERZA 3X150 AMP LSTIRAFON DE1/4 X2"TOMACORRIENTE DOBLE 16A TICINOTOMACORRIENTE DOBLE LINEA 15A TOMACORRIENTE PARA EMPOTRAR DOBLE UNIVERSAL C/L TIERTOMACORRIENTE PARA EMPOTRAR SIMPLW CJ1112 OPALUXTOMACORRIENTE SIMPLE 16A TICINO

  • TUBO DE 1"X3MTS SELTUBO DE 1.1/2"X3MTS LUZ SELTUBO DE 2 1/2" 60MMX 3MT TUBO DE 2" 50MM X3MTS PVC-U PESADO TUBO DE 3/4"X3MTS SELTUBO DE 5/8"X3MTS SELINTERRUPTOR DOBLE P/EMPOTRAR MARFIL

    PINTURASDESCRIPCION

    IMPRIMANTE DE 5GLNSSELLADOR DE 5GLNSSACO DE TIZA MOLIDACOLA SINTETICALIJA #40LIJA #80LIJA #120LIJA #100ESPONJA DUNLOPILLO X 6 UNPINTURA BLANCA (20L) PATOOLEO MATE BLANCOTHINERPINTURA ESMALTEPLANCHA DE EMPASTAR STANLEY

    PISOSDESCRIPCION

    CEMENTO PORTLAND IPPEGAMENTO EN POLVO GRIS EXTERIORESPEGAMENTO EN POLVO GRIS INTERIORESPORCELANATO SS 60X60 BEIGE NANO 1.44M2PORCELANATO FB 60X60 SUPER BLACK NANO 1.44 M2WAYPE CARDADO X 250 GRRODOPLAST 8.5 MMRODOPLAST MAX ALMENDRA 9.5MMCRUCETAS DE 3MM(100UND)CRUCETAS CON TOMADOR 2MM(200)MAQUINA CORTA MANUAL STAR 60 N PLUS S/E + ESCLISTELO 40X5 TURIN KANTUPARED 20X30 BLANCO BASIC 1.5M2PARED 20X30 BEIGE BASIC 1.5M2FRAGUA CREMAFRAGUA BEIGEFRAGUA CHAMPAGNEFRAGUA PORC MARRONLAPIZ DE VIDRIO NARANJA BRILLANTEPISO 45X45 PRISMA 2.08 M2 SLPISO 60X60 GERVASONI BEIGE 1.44 M2 SLPISO 45X45 TOMASSO 2.08M2 SLPISO 45X45 MADERA AUSTIN NATURAL 2.03M2 CL

  • PISO 45X45 BLANCO LSO 2.08 M2 SCOPPISO MAD LIRIA NATURAL 45X45 UNI SM PISO 45X45 ARENAM SCOP 2.08M2PORCELANATO DC 60X60 MARRON ARANDI NANO FRAGUA PREM BLANCA

    OTROSDESCRIPCION

    VARILLA DE TUBO RECTANGULAR DE 3 1/4" X 1 1/2"PERFIL A MATE ALUMINIOPERNO ANCLAJE INODTUERCA M6VARILLA M6CLAVIJA DE 1"

  • MANO DE OBRA UND CANT P.U TOTAL P.u

    HH S/. 16.01 13.5677966HH S/. 13.50 11.440678HH S/. 12.12 10.2711864

    SANITARIASUND CANT P.U TOTAL P.u

    UND S/. 5.00 S/. 0.00 4.23728814KG S/. 3.00 2.54237288UND S/. 33.90 S/. 0.00 28.7288136UND S/. 1.30 S/. 0.00 1.10169492UND S/. 0.89 S/. 0.00 0.75423729UND S/. 0.90 S/. 0.00 0.76271186UND S/. 7.80 S/. 0.00 6.61016949UND S/. 4.05 S/. 0.00 3.43220339UND S/. 1.20 S/. 0.00 1.01694915UND S/. 1.30 S/. 0.00 1.10169492UND S/. 1.07 S/. 0.00 0.90677966UND S/. 7.80 S/. 0.00 6.61016949UND S/. 1.10 S/. 0.00 0.93220339UND S/. 6.40 S/. 0.00 5.42372881UND S/. 12.00 S/. 0.00 10.1694915UND S/. 10.90 S/. 0.00 9.23728814UND S/. 33.00 S/. 0.00 27.9661017UND S/. 12.00 S/. 0.00 10.1694915UND S/. 5.00 S/. 0.00 4.23728814UND S/. 20.90 S/. 0.00 17.7118644UND S/. 54.90 S/. 0.00 46.5254237UND S/. 89.90 S/. 0.00 76.1864407UND S/. 47.90 S/. 0.00 40.5932203UND S/. 5.00 S/. 0.00 4.23728814UND S/. 32.90 S/. 0.00 27.8813559UND S/. 3.40 S/. 0.00 2.88135593UND S/. 104.90 S/. 0.00 88.8983051UND S/. 103.60 S/. 0.00 87.7966102UND S/. 98.90 S/. 0.00 83.8135593UND S/. 104.90 S/. 0.00 88.8983051UND S/. 60.50 S/. 0.00 51.2711864UND S/. 1.00 S/. 0.00 0.84745763UND S/. 46.80 S/. 0.00 39.6610169UND S/. 17.90 S/. 0.00 15.1694915UND S/. 24.20 S/. 0.00 20.5084746UND S/. 20.90 S/. 0.00 17.7118644UND S/. 24.90 S/. 0.00 21.1016949

  • UND S/. 3.40 S/. 0.00 2.88135593UND S/. 2.00 S/. 0.00 1.69491525UND S/. 9.30 S/. 0.00 7.88135593UND S/. 13.50 S/. 0.00 11.440678UND S/. 27.00 S/. 0.00 22.8813559UND S/. 6.20 S/. 0.00 5.25423729UND S/. 9.40 S/. 0.00 7.96610169UND S/. 91.20 S/. 0.00 77.2881356UND S/. 15.00 S/. 0.00 12.7118644UND S/. 164.30 S/. 0.00 139.237288UND S/. 1.30 S/. 0.00 1.10169492UND S/. 9.40 S/. 0.00 7.96610169UND S/. 2.30 S/. 0.00 1.94915254UND S/. 7.00 S/. 0.00 5.93220339UND S/. 1.40 S/. 0.00 1.18644068UND S/. 13.70 S/. 0.00 11.6101695UND S/. 30.90 S/. 0.00 26.1864407UND S/. 15.90 S/. 0.00 13.4745763UND S/. 7.50 S/. 0.00 6.3559322UND S/. 9.50 S/. 0.00 8.05084746UND S/. 14.90 S/. 0.00 12.6271186UND S/. 33.50 S/. 0.00 28.3898305UND S/. 33.50 S/. 0.00 28.3898305UND S/. 9.80 S/. 0.00 8.30508475UND S/. 22.90 S/. 0.00 19.4067797UND S/. 11.80 S/. 0.00 10UND S/. 10.50 S/. 0.00 8.89830508UND S/. 23.50 S/. 0.00 19.9152542UND S/. 6.30 S/. 0.00 5.33898305UND S/. 0.80 S/. 0.00 0.6779661UND S/. 2.50 S/. 0.00 2.11864407UND S/. 1.78 S/. 0.00 1.50847458UND S/. 21.50 S/. 0.00 18.220339UND S/. 19.47 S/. 0.00 16.5UND S/. 7.80 S/. 0.00 6.61016949UND S/. 2.80 S/. 0.00 2.37288136UND S/. 6.10 S/. 0.00 5.16949153UND S/. 10.10 S/. 0.00 8.55932203

    ELECTRICASUND CANT P.U TOTAL

    UND S/. 2.45 S/. 0.00 2.07627119UND S/. 3.00 S/. 0.00 2.54237288BLS S/. 13.00 S/. 0.00 11.0169492UND S/. 16.80 S/. 0.00 14.2372881UND S/. 13.00 S/. 0.00 11.0169492UND S/. 1.99 S/. 0.00 1.68644068UND S/. 1.34 S/. 0.00 1.13559322UND S/. 0.88 S/. 0.00 0.74576271

  • UND S/. 0.90 S/. 0.00 0.76271186UND S/. 24.00 S/. 0.00 20.3389831UND S/. 0.90 S/. 0.00 0.76271186UND S/. 55.00 S/. 0.00 46.6101695UND S/. 4.70 S/. 0.00 3.98305085UND S/. 0.90 S/. 0.00 0.76271186UND S/. 0.30 S/. 0.00 0.25423729UND S/. 3.30 S/. 0.00 2.79661017UND S/. 0.85 S/. 0.00 0.72033898UND S/. 17.00 S/. 0.00 14.4067797UND S/. 8.70 S/. 0.00 7.37288136UND S/. 0.40 S/. 0.00 0.33898305UND S/. 0.40 S/. 0.00 0.33898305UND S/. 48.00 S/. 0.00 40.6779661UND S/. 4.20 S/. 0.00 3.55932203UND S/. 10.50 S/. 0.00 8.89830508UND S/. 17.50 S/. 0.00 14.8305085CAJA S/. 21.00 S/. 0.00 17.7966102UND S/. 3.00 S/. 0.00 2.54237288UND S/. 8.70 S/. 0.00 7.37288136UND S/. 5.60 S/. 0.00 4.74576271UND S/. 3.50 S/. 0.00 2.96610169UND S/. 34.50 S/. 0.00 29.2372881UND S/. 34.50 S/. 0.00 29.2372881UND S/. 47.50 S/. 0.00 40.2542373UND S/. 13.50 S/. 0.00 11.440678UND S/. 13.00 S/. 0.00 11.0169492UND S/. 60.00 S/. 0.00 50.8474576UND S/. 85.00 S/. 0.00 72.0338983UND S/. 79.00 S/. 0.00 66.9491525UND S/. 8.50 S/. 0.00 7.20338983UND S/. 75.00 S/. 0.00 63.559322GLN S/. 85.00 S/. 0.00 72.0338983UND S/. 1.50 S/. 0.00 1.27118644UND S/. 5.20 S/. 0.00 4.40677966UND S/. 6.30 S/. 0.00 5.33898305UND S/. 2.00 S/. 0.00 1.69491525UND S/. 0.10 S/. 0.00 0.08474576UND S/. 0.15 S/. 0.00 0.12711864UND S/. 2.00 S/. 0.00 1.69491525PZA S/. 1.50 S/. 0.00 1.27118644UND S/. 380.00 S/. 0.00 322.033898UND S/. 0.30 S/. 0.00 0.25423729UND S/. 9.50 S/. 0.00 8.05084746UND S/. 8.90 S/. 0.00 7.54237288UND S/. 4.00 S/. 0.00 3.38983051UND S/. 3.00 S/. 0.00 2.54237288UND S/. 6.60 S/. 0.00 5.59322034

  • UND S/. 5.30 S/. 0.00 4.49152542UND S/. 10.10 S/. 0.00 8.55932203UND S/. 37.50 S/. 0.00 31.779661UND S/. 25.00 S/. 0.00 21.1864407UND S/. 2.70 S/. 0.00 2.28813559UND S/. 2.80 S/. 0.00 2.37288136UND S/. 4.50 S/. 0.00 3.81355932

    PINTURASUND CANT P.U TOTAL

    BALDE S/. 91.00 S/. 0.00 77.1186441BALDE S/. 86.00 S/. 0.00 72.8813559SACO S/. 40.00 S/. 0.00 33.8983051GLN S/. 19.00 S/. 0.00 16.1016949HOJA S/. 2.40 S/. 0.00 2.03389831HOJA S/. 2.20 S/. 0.00 1.86440678HOJA S/. 1.90 S/. 0.00 1.61016949HOJA S/. 1.90 S/. 0.00 1.61016949UND S/. 4.90 S/. 0.00 4.15254237BALDE S/. 129.00 S/. 0.00 109.322034GLN S/. 44.00 S/. 0.00 37.2881356GLN S/. 22.90 S/. 0.00 19.4067797UND S/. 3.00 S/. 0.00 2.54237288UND S/. 18.00 S/. 0.00 15.2542373

    PISOS 0UND CANT P.U TOTAL #VALUE!

    BLS S/. 22.40 S/. 0.00 18.9830508BLS S/. 22.90 S/. 0.00 19.4067797BLS S/. 14.50 S/. 0.00 12.2881356CAJA S/. 43.06 S/. 0.00 36.4915254CAJA S/. 57.46 S/. 0.00 48.6949153GR S/. 2.90 S/. 0.00 2.45762712UND S/. 3.00 S/. 0.00 2.54237288UND S/. 3.85 S/. 0.00 3.26271186BLS S/. 5.00 S/. 0.00 4.23728814BLS S/. 6.38 S/. 0.00 5.40677966UND} S/. 370.00 S/. 0.00 313.559322UND S/. 9.30 S/. 0.00 7.88135593CAJA S/. 19.50 S/. 0.00 16.5254237CAJA S/. 23.85 S/. 0.00 20.2118644BLS S/. 6.27 S/. 0.00 5.31355932BLS S/. 5.90 S/. 0.00 5BLS S/. 5.90 S/. 0.00 5BLS S/. 6.90 S/. 0.00 5.84745763UND S/. 3.50 S/. 0.00 2.96610169CAJA S/. 47.63 S/. 0.00 40.3644068CAJA S/. 46.24 S/. 0.00 39.1864407CAJA S/. 60.49 S/. 0.00 51.2627119CAJA S/. 53.80 S/. 0.00 45.5932203

  • CAJA S/. 36.82 S/. 0.00 31.2033898CAJA S/. 31.00 S/. 0.00 26.2711864CAJA S/. 36.82 S/. 0.00 31.2033898CAJA S/. 57.46 S/. 0.00 48.6949153BLS S/. 4.50 S/. 0.00 3.81355932

    OTROS 0UND CANT P.U TOTAL

    UND S/. 68.00 S/. 0.00 57.6271186UND S/. 28.00 S/. 0.00 23.7288136UND S/. 2.70 S/. 0.00 2.28813559UND S/. 0.20 S/. 0.00 0.16949153UND S/. 5.00 S/. 0.00 4.23728814CAJA S/. 16.00 S/. 0.00 13.559322

  • S/. 11.23S/. 9.43S/. 8.51

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUDOE.1.1 OBRAS PROVSIONALES Y TRABAJOS PRELIMINARESOE.1.1.1 CONSTRUCCIONES PROVISIONALES

    ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    OE.1.1.1.1 Oficinas1 3.000 3.000 9.000

    OE.1.1.1.2 Almacenes1 9.000 2.000 18.000

    OE.1.1.1.3 Casetas de Guardiania1 2.000 2.000 4.000

    OE.1.1.1.6 Servicios Higinicos1 2.000 1.000 2.000

    OE.1.1.1.7 Cercos1 12.000 3.000 36.000

    OE.1.1.2 INSTALACIONES PROVISIONALES OE.1.1.2.1 AGUA PARA LA CONSTRUCCION

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    OE.1.1.2.1.1 Obtencion del Servicio1 1.000

    OE.1.1.2.1.2 Almacenamiento y Distribucion1 1.000

    OE.1.1.2.2 DESAGUE PARA LA CONSTRUCCIONUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    CUADRO DE METRADOS

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    cant. largo ancho altura Sub total cantidad 1 1.000

    OE.1.1.2.3 ENERGIA ELCTRICA PROVISIONALUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad OE.1.1.2.3.1 Conexin e instalacion

    1 1.000 OE.1.1.2.3.1 Consumo y mantenimiento

    1 1.000

    OE.1.1.3 TRABAJOS PRELIMINARES OE.1.1.3.1 LIMPIEZA DEL TERRENO

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    OE.1.1.3.1.2 Eliminacion de Maleza y Arbustos de Facil Extraccion1 8.000 12.000 96.000

    OE.1.1.9 TRAZOS, NIVELES Y REPLANTEOUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad OE.1.1.9.1 Trazos, Niveles y Replanteo Preliminar

    1 8.000 12.000 96.000 OE.1.1.9.2 Replanteo Durante el Proceso

    1 288.000

    OE.1.2 SEGURIDAD Y SALUD OE.1.2.1 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    OE.1.2.1.1 Equipos de proteccion indivudual1 30.000

    OE.1.2.1.2 Equipos de proteccion Colectiva1 5.000

    OE.2 ESTRUCTURASOE.2.1 MOVIMIENTO DE TIERRAS OE.2.1.1 NIVELACION DEL TERRENO OE.2.1.1.1 Nivelacion

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    1 12.000 8.000 96.000

    OE.2.1.2 EXCAVACIONES OE.2.1.2.1 Excavaciones Simples

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    ZapatasZ1 (todas) 4 1.300 1.300 1.900 12.844 Z2 (todas) 1 1.600 1.600 1.900 4.864 Z3 (todas) 1 1.700 1.700 1.900 5.491 Z4 (todas) 6 1.200 1.200 1.600 13.824 CIMIENTOS DE M. CONTENCION 1 8.000 0.600 1.400 6.720 3

    1 vigas de conexin

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje A tramo 3 a 2 1 2.060 0.600 1.400 1.730 1 eje B tramo 3 a 2 1 2.060 0.600 1.400 1.730 1 eje C tramo 3 a 2 1 2.060 0.600 1.400 1.730 1 eje A tramo 2 a 1 1 3.440 0.600 1.400 2.890 1

    1 eje B tramo 2 a 1 1 3.667 0.600 1.400 3.080 1

    1 eje C tramo 2 a 1 1 3.440 0.600 1.400 2.890 1

    1 eje 2 tramo A a B 1 3.500 0.600 1.400 2.940 1

    1 eje 2 tramo B a C 1 3.500 0.600 1.400 2.940 1

    1 eje 1 tramo A a B 1 3.500 0.600 1.400 2.940 1

    1 eje 1 tramo B a C 1 3.500 0.600 1.400 2.940 1

    1 Cimientos corridosentre ejes 2-3 y ejes B-C 1 2.133 0.600 1.200 1.536 entre ejes 1-2 y ejes B-C 1 2.967 0.600 1.200 2.136 eje A tramo de 3 a 4 1 2.350 0.600 1.200 1.692 entre ejes 3-4 y ejes A-B 1 2.525 0.600 1.200 1.818 entre ejes 3-4 y ejes A-B (perp.) 1 0.280 0.600 1.200 0.202 entre ejes 3-4 y ejes B-C 1 2.650 0.600 1.200 1.908 entre ejes 3-4 y ejes A-B (perp.) 1 2.080 0.600 1.200 1.498 eje C tramo de 3 a 4 1 2.350 0.600 1.200 1.692 eje 4 tramo de A a B 1 2.200 0.600 1.200 1.584 eje 4 tramo de B a C 1 2.200 0.600 1.200 1.584

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje 3 tramo de A a C 1 2.200 0.600 1.200 1.584 eje 3 tramo de A a C (perp.) 1 0.280 0.600 1.200 0.202 ESCALERASdato de concreto 1 - INSTALACIONES SANITARIASinstalacion de aguared alimentacion 1 - desaguezanja de caja 3 a 2 1 - zanja de caja 2 a1 1 - aguas pluviales 1 -

    OE.2.1.3 CORTESUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad

    OE.2.1.4 RELLENOS OE.2.1.4.1 Relleno con Material Propio

    ZapatasUBICACIN VOLUMEN

    cant. EXCAVACION CONCRETO RELLENOZ1 4 2.576 1.107 1.47Z2 8 2.208 1.179 1.03

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    vigas de conexineje A tramo 4 a 3 1 2.550 0.350 0.350 0.312 2 eje A tramo 3 a 2 1 2.240 0.350 0.350 0.274 1 eje A tramo 2 a 1 1 3.950 0.350 0.400 0.553 2 eje B tramo 4 a 3 1 2.550 0.350 0.350 0.312 2 eje B tramo 3 a 2 1 2.240 0.350 0.350 0.274 2 eje B tramo 2 a 1 1 3.950 0.350 0.400 0.553 1 eje C tramo 4 a 3 1 2.550 0.350 0.350 0.312 2 eje C tramo 3 a 2 1 2.240 0.350 0.350 0.274 2 eje C tramo 2 a 1 1 3.950 0.350 0.400 0.553 2 eje 4 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 4 tramo B a C 1 3.550 0.350 0.400 0.497 1 eje 3 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 3 tramo B a C 1 3.550 0.350 0.400 0.497 1 eje 2 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 2 tramo B a C 1 3.550 0.350 0.400 0.497 1 eje 1 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 1 tramo B a C 1 3.550 0.350 0.400 0.497 1

    SOBRECIMIENTO vigas de conexineje A tramo 4 a 3 1 2.550 0.450 0.750 0.861 2 eje A tramo 3 a 2 1 2.240 0.450 0.750 0.756 1 eje A tramo 2 a 1 1 3.950 0.450 0.700 1.244 2 eje B tramo 4 a 3 1 2.550 0.450 0.750 0.861 2 eje B tramo 3 a 2 1 2.240 0.600 0.750 1.008 2 eje B tramo 2 a 1 1 3.950 0.600 0.700 1.659 1 eje C tramo 4 a 3 1 2.550 0.450 0.750 0.861 2

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje C tramo 3 a 2 1 2.240 0.450 0.750 0.756 2 eje C tramo 2 a 1 1 3.950 0.450 0.700 1.244 2 eje 4 tramo A a B 1 5.000 0.600 0.600 1.800 1 eje 4 tramo B a C 1 3.550 0.600 0.700 1.491 1 eje 3 tramo A a B 1 5.000 0.450 0.600 1.350 1 eje 3 tramo B a C 1 3.550 0.600 0.700 1.491 1 eje 2 tramo A a B 1 5.000 0.450 0.600 1.350 1 eje 2 tramo B a C 1 3.550 0.600 0.700 1.491 1 eje 1 tramo A a B 1 5.000 0.600 0.600 1.800 1 eje 1 tramo B a C 1 3.550 0.600 0.700 1.491 1 cimientos corridoseje A tramo de 4 a 6 1 4.260 0.450 0.400 0.767 eje B tramo de 5 a 6 1 2.540 0.450 0.400 0.457 eje B tramo de 5 a 6(perpendicular) 1 1.050 0.450 0.400 0.189 eje C tramo de 4 a 5 1 1.810 0.450 0.400 0.326 eje C tramo de 5 a 6 1 2.200 0.450 0.400 0.396 eje 6 tramo de A a B 1 4.400 0.450 0.400 0.792 eje 6 tramo de A a B(perpendicular) 2 1.100 0.450 0.400 0.396 eje 6 tramo de B a C 1 3.670 0.450 0.400 0.661 eje 6 tramo de B a C(perpendicular) 1 1.600 0.450 0.400 0.288 eje 5 tramo de B a C 1 1.970 0.450 0.400 0.355 entre ejes 2-3 y ejes A-B 1 3.700 0.450 0.400 0.666 entre ejes 1-2 y ejes A-B 1 5.400 0.450 0.400 0.972 entre eje 1 y ejes A-B 1 1.000 0.450 0.400 0.180 entre eje 1 y ejes B-C 1 - - - -

    INSTALACIONES SANITARIASinstalacion de agua

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    red alimentacion 1 7.870 0.250 0.250 0.492 desaguezanja de caja 3 a 2 1 9.390 0.250 0.830 1.948 zanja de caja 2 a1 1 5.500 0.250 0.960 1.320 aguas pluviales 1 5.450 0.250 0.400 0.545

    OE.2.1.5 NIVELACION INTERIOR Y APISONADOUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad TODO 1 8.000 12.000 96.000

    OE.2.1.6 ELIMINACION DE MATERIAL EXCEDENTEUBICACIN VOLUMEN

    cant. EXCAVACION RELLENO EXCEDENTEtodo 86.962 51.550 35.412

    OE.2.2 OBRAS DE CONCRETO SIMPLE OE.2.2.1 CIMIENTOS CORRIDOS

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    Planta 1Eje B-C 1 6.050 0.400 0.800 1.936 1 Planta 2cad 1 10.240 0.800 8.192

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    OE.2.2.3 SOLADOSUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Planta 1Z1 4 1.300 1.300 0.100 0.676 Z2 1 1.600 1.600 0.100 0.256 Z3 1 1.700 1.700 0.100 0.289 Z4 6 1.200 1.200 0.100 0.864 Z5 1 8.000 0.600 0.100 0.480

    OE.2.2.6 SOBRECIMIENTOS OE.2.2.6.1 Para el Concreto

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    vigas de conexinvc-1 2 3.500 0.150 1.250 1.313 vc-2 2 3.500 0.150 1.250 1.313 vc-4 3 2.060 0.150 1.250 1.159

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    vc-4 3 3.440 0.150 1.250 1.935

    SobrecimientoPlanta 1 1 6.450 0.150 0.750 0.726 Planta 2cad 1 10.240 0.750 7.680

    vc-4 2 1.200 0.150 1.250 0.450 vc-3 1 1.200 0.150 1.250 0.225

    OE.2.2.6.1 Para el encofrado y DesencofradoUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad vigas de conexineje A tramo 1 a 3 (cara exterior) 1 6.300 0.350 2.205 (cara interior) 1 6.300 1.250 7.875 eje C tramo 1 a 3 (cara exterior) 1 6.300 0.350 2.205 (cara interior) 1 6.300 1.250 7.875 eje B tramo 1 a 3 (cara exterior) 1 3.300 0.350 1.155 (cara interior) 1 3.300 1.250 4.125 eje B tramo 1 a 3 (cara izquierda) 1 2.900 0.350 1.015 (cara derecha 1 2.900 0.350 1.015

    eje 1 tramo A a C (cara exterior) 1 8.000 - - 0.350 2.800 - - (cara interior) 1 4.300 - - 1.250 5.375 - -

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    (cara interior) 1 3.700 1.250 4.625 eje 2 tramo A a C (cara exterior) 1 4.200 1.250 5.250 (cara interior) 1 4.200 1.250 5.250 (cara exterior) 1 3.800 0.350 1.330 (cara interior) 1 3.800 0.350 1.330 planta 2vc-4 6 1.200 - - 0.350 2.520 - -

    cimientos corridoseje B-C tramo de 1-3 (cara exterior) 1 6.450 0.350 2.258 (cara interior) 1 6.450 0.350 2.258 PLANTA 2eje 4 tramo de A a C(exterior) 1 6.770 0.350 2.370 2 eje 4 tramo de A a C(interior) 1 3.600 0.750 2.700 (cara interior) 1 3.170 0.750 2.378 eje 3 tramo de A a C (cara exterior) 1 6.560 0.750 4.920 (cara interior) 1 6.560 0.750 4.920 eje A tramo de 3 a 4 2 4.350 0.350 3.045 eje A tramo de 3 a 4 5 4.350 0.750 16.313

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    OE.2.2.9 FALSO PISOUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad PRIMER NIVEL 1 1.000 46.328 46.328 PATIO TRACERO 1 1.000 28.424 28.424

    OE.2.3 OBRAS DE CONCRETO ARMADO OE.2.3.2 ZAPATAS OE.2.3.2.1 Para el concreto

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    z1 4 1.300 1.300 0.400 2.704 z2 1 1.600 1.600 0.400 1.024 z3 1 1.700 1.700 0.400 1.156 z4 6 1.200 1.200 0.400 3.456 z5 6 8.000 0.600 0.400 11.520

    OE.2.3.2.3 para la armadura de acero

    OE.2.3.3 VIGAS DE CIMENTACION OE.2.3.3.1 Para el concreto

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    vigas de conexin

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje A tramo 3 a 2 1 2.060 0.250 0.400 0.206 eje A tramo 2 a 1 1 3.440 0.250 0.400 0.344 eje B tramo 3 a 2 1 2.060 0.250 0.400 0.206 eje B tramo 2 a 1 1 3.440 0.250 0.400 0.344 eje C tramo 3 a 2 1 2.060 0.250 0.400 0.206 eje C tramo 2 a 1 1 3.440 0.250 0.400 0.344 eje 2 tramo A a B 1 3.630 0.250 0.400 0.363 eje 2 tramo B a C 1 3.630 0.250 0.400 0.363 eje 1 tramo A a B 1 3.630 0.250 0.500 0.454 eje 1 tramo B a C 1 3.630 0.250 0.500 0.454

    OE.2.3.3.2 Para el encofrado y Desencofradoeje A tramo 3 a 2 1 2.060 0.400 0.824 eje A tramo 2 a 1 1 3.440 0.400 1.376 eje B tramo 3 a 2 1 2.060 0.400 0.824 eje B tramo 2 a 1 1 3.440 0.400 1.376 eje C tramo 3 a 2 1 2.060 0.400 0.824 eje C tramo 2 a 1 1 3.440 0.400 1.376 eje 2 tramo A a B 1 3.630 0.400 1.452 eje 2 tramo B a C 1 3.630 0.400 1.452 eje 1 tramo A a B 1 3.630 0.500 1.815 eje 1 tramo B a C 1 3.630 0.500 1.815

    OE.2.3.3.3 Para la armadura de acero

    OE.2.3.6 MUROS REFORZADOS OE.2.3.6.1.1 Para el concreto

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    cant. largo ancho altura Sub total cantidad

    TODO 1 8.000 0.150 4.000 4.800

    OE.2.3.6.1.2 Para el encofrado y Desencofradoeje A tramo 3 a 2 1 8.000 4.300 34.400

    OE.2.3.6.1.3 Para la armadura de acero

    OE.2.3.7 COLUMNAS OE.2.3.7.1 Para el concreto

    PRIMER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad C1 2 0.250 0.400 4.400 0.880 C2 2 0.250 0.400 4.400 0.880 C3 1 0.250 0.500 4.400 0.550 C4 1 0.250 0.500 4.400 0.216

    -

    SEGUNDO NIVELC1 2 0.250 0.400 2.800 0.560 C2 2 0.250 0.400 2.800 0.560 C3 1 0.250 0.500 2.800 0.350 C4 1 0.250 0.500 2.800 0.350 C5 1 0.250 0.500 2.800 0.350 C6 2 0.250 0.400 2.800 0.560 C7 2 0.250 0.400 2.800 0.560

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    C8 1 0.250 0.400 2.800 0.280

    TERCER NIVELC1 2 0.250 0.400 2.800 0.560 C2 2 0.250 0.400 2.800 0.560 C3 1 0.250 0.500 2.800 0.350 C4 1 0.250 0.500 2.800 0.350 C5 1 0.250 0.500 2.800 0.350 C6 2 0.250 0.400 2.800 0.560 C7 2 0.250 0.400 2.800 0.560 C8 1 0.250 0.400 2.800 0.280

    AZOTEAC1 2 0.250 0.200 1.200 0.120 C2 2 0.250 0.200 1.200 0.120 C6 2 0.250 0.200 1.200 0.120 C7 2 0.250 0.200 1.200 0.120 C8 1 0.250 0.200 1.200 0.060

    C-CONTORNO 3 0.200 0.150 1.200 0.108

    OE.2.3.7.2 Para el encofrado y desencofradoPRIMER NIVEL

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    C1 2 0.250 0.400 4.400 5.720 C2 2 0.250 0.400 4.400 5.720 C3 1 0.250 0.500 4.400 3.300 C4 1 0.250 0.500 4.400 3.456

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    SEGUNDO NIVELC1 2 0.250 0.400 2.800 3.640 C2 2 0.250 0.400 2.800 3.640 C3 1 0.250 0.500 2.800 2.100 C4 1 0.250 0.500 2.800 2.100 C5 1 0.250 0.500 2.800 2.100 C6 2 0.250 0.400 2.800 3.640 C7 2 0.250 0.400 2.800 3.640 C8 1 0.250 0.400 2.800 1.820

    TERCER NIVELC1 2 0.250 0.400 2.800 3.640 C2 2 0.250 0.400 2.800 3.640 C3 1 0.250 0.500 2.800 2.100 C4 1 0.250 0.500 2.800 2.100 C5 1 0.250 0.500 2.800 2.100 C6 2 0.250 0.400 2.800 3.640 C7 2 0.250 0.400 2.800 3.640 C8 1 0.250 0.400 2.800 1.820

    AZOTEAC1 2 0.250 0.200 1.200 1.080 C2 2 0.250 0.200 1.200 1.080 C6 2 0.250 0.200 1.200 1.080 C7 2 0.250 0.200 1.200 1.080 C8 1 0.250 0.200 1.200 0.540

    C-CONTORNO 3 0.200 0.150 1.200 1.260

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    OE.2.3.7.3 Para la armadura de acero

    OE.2.3.8 VIGAS OE.2.3.8.1 Para el concreto

    VIGAS PRIMER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 0.726 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 1.400 eje A, C tramo 3 a 2 2 3.410 0.250 0.400 0.682 eje B tramo 3 a 2 1 3.310 0.250 0.400 0.331 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 0.688 eje B tramo 2 a 1 1 3.670 0.250 0.400 0.367 eje A, B, C Volado 3 0.900 0.250 0.400 0.270 VB-01 1 8.000 0.250 0.200 0.400 3 VB-02 1 4.060 0.250 0.200 0.203 2 Viga contorno ducto 1 3.000 0.150 0.200 0.090

    VIGAS SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 0.680 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 0.726 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 1.400 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 0.740 eje B tramo 4 a 3 1 3.410 0.250 0.400 0.341 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 0.756

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje B tramo 3 a 2 1 3.310 0.250 0.400 0.331 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 0.688 eje B tramo 2 a 1 1 3.670 0.250 0.400 0.367 eje A, B, C Volado 3 0.900 0.250 0.400 0.270 VB-01 1 8.000 0.250 0.200 0.400 3 VB-04 1 4.060 0.250 0.200 0.203 2 VB-05 1 4.150 0.250 0.200 0.208 2 Viga contorno ducto 1 3.000 0.150 0.200 0.090 Viga contorno ducto 1 0.560 0.150 0.200 0.017

    VIGAS TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 0.680 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 0.726 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 1.400 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 0.740 eje B tramo 4 a 3 1 3.410 0.250 0.400 0.341 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 0.756 eje B tramo 3 a 2 1 3.310 0.250 0.400 0.331 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 0.688 eje B tramo 2 a 1 1 3.670 0.250 0.400 0.367 eje A, B, C Volado 3 0.900 0.250 0.400 0.270 VB-01 1 8.000 0.250 0.200 0.400 3 VB-04 1 4.060 0.250 0.200 0.203 2 VB-05 1 4.150 0.250 0.200 0.208 2 Viga contorno ducto 1 3.000 0.150 0.200 0.090 Viga contorno ducto 1 0.560 0.150 0.200 0.017

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    OE.2.3.8.2 Para el Encofrado y DesencofradoVIGAS PRIMER NIVEL

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 7.623 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 14.700 eje A, C tramo 3 a 2 2 3.410 0.250 0.400 7.161 eje B tramo 3 a 2 1 3.310 0.250 0.400 3.476 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 7.224 eje B tramo 2 a 1 1 3.670 0.250 0.400 3.854 eje A, B, C Volado 3 0.900 0.250 0.400 2.835 VB-01 1 8.000 0.250 0.200 5.200 3 VB-02 1 4.060 0.250 0.200 2.639 2 Viga contorno ducto 1 3.000 0.150 0.200 1.650

    VIGAS SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 7.140 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 7.623 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 14.700 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 7.770 eje B tramo 4 a 3 1 3.410 0.250 0.400 3.581 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 7.938 eje B tramo 3 a 2 1 3.310 0.250 0.400 3.476 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 7.224 eje B tramo 2 a 1 1 3.670 0.250 0.400 3.854

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    eje A, B, C Volado 3 0.900 0.250 0.400 2.835 VB-01 1 8.000 0.250 0.200 5.200 3 VB-04 1 4.060 0.250 0.200 2.639 2 VB-05 1 4.150 0.250 0.200 2.698 2 Viga contorno ducto 1 3.000 0.150 0.200 1.650 Viga contorno ducto 1 0.560 0.150 0.200 0.308

    -

    VIGAS TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 7.140 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 7.623 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 14.700 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 7.770 eje B tramo 4 a 3 1 3.410 0.250 0.400 3.581 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 7.938 eje B tramo 3 a 2 1 3.310 0.250 0.400 3.476 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 7.224 eje B tramo 2 a 1 1 3.670 0.250 0.400 3.854 eje A, B, C Volado 3 0.900 0.250 0.400 2.835 VB-01 1 8.000 0.250 0.200 5.200 3 VB-04 1 4.060 0.250 0.200 2.639 2 VB-05 1 4.150 0.250 0.200 2.698 2 Viga contorno ducto 1 3.000 0.150 0.200 1.650 Viga contorno ducto 1 0.560 0.150 0.200 0.308

    OE.2.3.8.3 Para la armadura de acero

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    OE.2.3.9 LOSAS OE.2.3.9.2 LOSAS ALIGERADAS CONVENCIONALES OE.2.3.9.2.1 Para el concreto

    TECHO DEL PRIMER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 0.050 0.136 losa A (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa B 1 3.630 0.750 0.050 0.136 losa B (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa C 1 3.630 3.670 0.050 0.666 losa C (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa D 1 3.630 3.670 0.050 0.666 losa D (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa E 1 3.630 3.560 0.050 0.646 losa E (viguetas) 2.5 12.923 0.100 0.150 0.485 Losa F 1 2.480 3.560 0.050 0.441 losa F (viguetas) 2.5 8.829 0.100 0.150 0.331

    TECHO DEL SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 0.050 0.136 losa A (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa B 1 3.630 0.750 0.050 0.136 losa B (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa C 1 3.630 3.670 0.050 0.666

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    losa C (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa D 1 3.630 3.670 0.050 0.666 losa D (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa E 1 3.630 3.560 0.050 0.646 losa E (viguetas) 2.5 12.923 0.100 0.150 0.485 Losa F 1 1.480 3.560 0.050 0.263 losa F (viguetas) 2.5 5.269 0.100 0.150 0.198 Losa G 1 3.630 3.780 0.050 0.686 losa G (viguetas) 2.5 13.721 0.100 0.150 0.515 Losa H 1 3.630 3.780 0.050 0.686 losa H (viguetas) 2.5 13.721 0.100 0.150 0.515

    TECHO DEL TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 0.050 0.136 losa A (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa B 1 3.630 0.750 0.050 0.136 losa B (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa C 1 3.630 3.670 0.050 0.666 losa C (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa D 1 3.630 3.670 0.050 0.666 losa D (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa E 1 3.630 3.560 0.050 0.646 losa E (viguetas) 2.5 12.923 0.100 0.150 0.485 Losa F 1 1.480 3.560 0.050 0.263 losa F (viguetas) 2.5 5.269 0.100 0.150 0.198 Losa G 1 3.630 3.780 0.050 0.686

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    losa G (viguetas) 2.5 13.721 0.100 0.150 0.515 Losa H 1 3.630 3.780 0.050 0.686 losa H (viguetas) 2.5 13.721 0.100 0.150 0.515

    OE.2.3.9.2.2 Para el Encofrado y DesencofradoTECHO DEL PRIMER NIVEL

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    Losa A 1 3.630 0.750 2.723 Losa B 1 3.630 0.750 2.723 Losa C 1 3.630 3.670 13.322 Losa D 1 3.630 3.670 13.322 Losa E 1 3.630 3.560 12.923 Losa F 1 2.480 3.560 8.829

    TECHO DEL SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 2.723 Losa B 1 3.630 0.750 2.723 Losa C 1 3.630 3.670 13.322 Losa D 1 3.630 3.670 13.322 Losa E 1 3.630 3.560 12.923 Losa F 1 1.480 3.560 5.269 Losa G 1 3.630 3.780 13.721 Losa H 1 3.630 3.780 13.721

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    TECHO DEL TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 2.723 Losa B 1 3.630 0.750 2.723 Losa C 1 3.630 3.670 13.322 Losa D 1 3.630 3.670 13.322 Losa E 1 3.630 3.560 12.923 Losa F 1 1.480 3.560 5.269 Losa G 1 3.630 3.780 13.721 Losa H 1 3.630 3.780 13.721

    OE.2.3.9.2.3 Para la armadura de acero

    OE.2.3.9.2.4 Para ladrillos bloques o elementos livianosTECHO DEL PRIMER NIVEL

    UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad

    Losa A 12.5 3.630 0.750 34.031 Losa B 12.5 3.630 0.750 34.031 Losa C 12.5 3.630 3.670 166.526 Losa D 12.5 3.630 3.670 166.526 Losa E 12.5 3.630 3.560 161.535 Losa F 12.5 2.480 3.560 110.360

    TECHO DEL SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad

  • Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA

    Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015

    CUADRO DE METRADOS

    Losa A 12.5 3.630 0.750 34.031 Losa B 12.5 3.630 0.750 34.031 Losa C 12.5 3.630 3.670 166.526 Losa D 12.5 3.630 3.670 166.526 Losa E 12.5 3.630 3.560 161.535 Losa F 12.5 1.480 3.560 65.860 Losa G 12.5 3.630 3.780 171.518 Losa H 12.5 3.630 3.780 171.518

    TECHO DEL TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS

    cant. largo ancho altura Sub total cantidad Losa A 12.5 3.630 0.750 34.031 Losa B 12.5 3.630 0.750 34.031 Losa C 12.5 3.630 3.670 166.526 Losa D 12.5 3.630 3.670 166.526 Losa E 12.5 3.630 3.560 161.535 Losa F 12.5 1.480 3.560 65.860 Losa G 12.5 3.