METRADO PUENTE EL INGENIO
5m 5m
A A´
5m5 m
L
A = ancho total del puente = 4.80 mL = Longitud total del puente= 10.00 mA´= ancho total de estribos = 5.90 m.L´= longitud total de alas = 20.00 m# De estribos = 2 u.
PUENTE PLANTA
a2 a1 c
h3
h4
h
h2
t
B
D b D´1
a1 = 0.50 m h = 8.60 ma2 = 0.50 m h2 = 1.60 mD = 1.20 m h3 = 0.80 mb = 1.20 m h4 = 7.00 m
D´1 = 1.80 m B = 4.20 mt = 0.80 m c = 0.20 m
CORTE ESTRIBO
a´ c´
h2´
Promedio h´
h3´ t´
B´
D´ b´ D´1 "
DIMENSIONES SECCION INICIAL (i)
a´ = 0.60 m h´ = 6.23 m promedioc´ = 0.60 m h2´ = 5.85 m
D´ = 1.20 m h3´ = 1.40 mb´ = 1.20 m B´ = 4.10 m
D´1" = 1.70 m t´ = 0.80 m
DIMENSIONES SECCION FINAL (f)
a´ = 0.60 m h´ = 6.23 mc´ = 0.60 m h2´ = 5.85 m
D´ = 1.20 m h3´ = 1.40 mb´ = 1.20 m B´ = 4.10 m
D´1" = 1.70 m t´ = 0.80 m
CORTE ALA
B1 V S' V B1
g
c1 e
t1f
b1 S b1 S1
B1 = 0.00 m g = 0.90 mV = 0.60 m c1 = 0.20 mS´= 3.60 m e = 0.20 mt1 = 0.80 m f = 0.60 mb1 = 0.50 m S = 2.00 mS1 = 0.90 m
CORTE SUPERESTRUCTURA
VIGAS DIAFRAGMAS
l = LARGO DIAFRAGM 2.00 mt1´ b1´= ANCHO DIAFRAG 0.25 m
t1´= ALTO DIAFRAGM 0.50 m# DE DIFRAGMAS = 3.00
´ b1´
01,01,01 TRAZO Y REPLANTEO CON TOPOGRAFOESTRIBOS Y ALAS = A´*B*#Estribos + (B´(i)+B´(f))/2)*L´= 131.56 m2PUENTE = L*A´= 56.44 m2
TOTAL = 188.00 m2
01.01.02 LIMPIEZA MANUAL DE CAUCE DE RIOAREA A INTERVENIR 60 m2
TOTAL= 60 m2
01.01.03 DEMOLICION Y ELIMINACION DE ESTRUVTURAS EXISTENTESVOLUMEN TOTAL= 90.00 m3
TOTAL= 90.00 m3
01.02.01 EXCAVACION EN TERRENO SUELTO
VOLUMEN TOTAL= 147.71 m3TOTAL= 147.71 m3
01.02.02 EXCAVACION EN SUELO GRAVOSO BAJO AGUA
VOLUMENT TOTAL= 89.11 m3TOTAL= 89.11 m3
01.02.03 EXCAVACION EN ROCA
VOLUMEN TOTAL= 89.11 m3TOTAL= 89.11 m3
01.02.04 RELLENO Y COMPACTACION CON MATERIAL PROPIO
Se tendrá en cuenta el relleno, en ambos márgenes,(adyacente a los estribos), hasta lograr el nivel de de la carretera, que coincida con el nivel del puente, menos una capa de 30 cms, la cual será rellenada , con material de préstamo.
La forma de relleno en ambos márgenes es triangular(ver planos)Longitud de relleno margen izquierdo (L 8.00 mLongitud de relleno margen derecho (Lm 6.00 m
VOLUMEN DE RELLENO = Lmi*(h-.30)*A´/2 + Lmd*(h-.30)*A´/2 147.71 m3
01.02.05 ELIMINACION MATERIAL EXCEDENTEVOLUMEN A ELIMINAR= 178.25 m3
TOTAL= 178.25 m3
01.03.01 SOLADO EN ZAPATASAREA= 103.72 m3
TOTAL= 103.72 m3
01.03.02 CONCRETO EN ZAPATAS f´c = 175 Kg/cm2.ZAPATA= (B . t . A') 2 = 39.63 m3ALAS= (h4 a2 + (h-t) a1 + (h-t) c/2) A'/2 22.71 m3
TOTAL 62.34 m3
01.03.03 CONCRETO EN ESTRIBOS f´c = 175 Kg/cm2.CUERPOS= (h2' a' + h2' c'/2) lt = 86.73 m3
TOTAL 86.73 m3
01.03.04 CONCRETO f´c = 140 Kg/cm2 + 30% PG ALAS.ALAS= (h4 a2 + (h-t) a1 + (h-t) c/2) A'/2 74.76 m3
TOTAL 74.76 m3
01.03.05 ACERRO fy = 4200 Kg/cm2ZAPATAS 82 fi 3/4" emplames de 1,2m 714.6 kgESTRIBO 20 fi 1" + 93 fi 3/4" empalmes 1,2m 2716.4 kg
TOTAL 6862.00 kg
01.03.06 ENCOFRADO Y DESENCOFRADO ESTRIBOSESTRIBOS = (A´ + B)*t*#Lados encofrar*#Estribos = 100.89 m2por dos unidades 100.89 m2
TOTAL 201.78 m2
01.03.07 ENCOFRADO Y DESENCOFRADO ALASESTR. = ((h4+h3)*A´+((h4+h3)^2+c^2)^(1/2)*A´+(a2+a1+b)*(h4+ 120.40 m2por dos unidades 120.40 m2
TOTAL 240.80 m2
01.03.08 CURADO DE CONCRETOAREA TOTAL ENCOFRADA 442.58 m2
TOTAL 442.58 m2
01.04.01 CONCRETO f´c = 210 Kg/cm2, LOSA, VIGAS Y VEREDAAREA= 1,74 m2LONGITUD= 10,00 m. DIAFRAGMA 2m (,50x,25) 18.25 m3
TOTAL 18.25 m3
01.04.02 ACERO fy = 4200 Kg/cm2LOSA 83 fi 3/8" + 103 fi 5/8" empalm. Ver diseño 1978.65 kgVIGAS PRINCIPALES 60 fi 1" + 23 fi 3/4" + 36 fi 3/8" 2710.17 kgVIGAS DIAFRAGMAS 7 fi 3/4"+9 fi 5/8"+ 6fi 3/ 298.98 kg
TOTAL 4688.82 kg
01.04.03 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZAAREA = (A-#VIGAS*b1)*L +L*e*2+A*e*2 = 38.60 m2
TOTAL 38.60 m2
01.04.04 ENCOFRADO Y DESENCOFRADO VIGASVIGAS = (L*f*2+L*b1)*#Vigas = 34.00 m2DIAFRAGMAS = (l*t1*2 + l*b1´)*#DIAFRAGMAS = 7.50 m2
TOTAL 41.50 m2
01.04.05 ENCOFRADO Y DESENCOFRADO DE VEREDASAREA = L*2*e*2 = 8 m2
01.04.06 CURADO DE CONCRETOAREA TOTAL ENCOFRADA 88.10 m2
TOTAL 88.10 m2
01.05.01 TARRAJEO DE VEREDAS VEREDAS = 8.00 m2
TOTAL 8.00 m2
01.05.02 TARRAJEO FROTACHADO LOSAAREA LOSA 48.00 m2
TOTAL 48.00 m2
01.06.01 CONSTRUCCION DE APOYO FIJO #APOYOS FIJOS = #VIGAS = 2.00 UND
TOTAL 2.00 UND
01.07.02 CONSTRUCCION DE APOYO MOVIL #APOYOS MOVILES = #VIGAS = 2.00 UND
TOTAL 2.00 UND
01.07.03 COLOCACION DE BARANDA DE FIERRO NEGRO LONGITUD = L*#BARANDAS = 40.00 m.#BARANDAS = 2 FIERROS PARALELOS EN CADA BARANDA 14.00 m
TOTAL 54.00 m
01.07.04 JUNTA DE CONSTRUCCION DE TECKNOPORT AREA= A*h3*2 9.44 m2
TOTAL 9.44 m2
01.07.05 DRENAJE DE ESTRIBOS Y ALAS Se colocarán 3 tubos de drenaje en los estribos y en las alas se espaciarán a cada 2 m, de preferencia en 2 hileras intercaladas en la pantalla de estribos y alas.
LONGITUD DE TUB. = (3*b + L´/2*b´)*3 = 21 m.
01.07.06 LIMPIEZA GENERALY ENTREGA DE OBRALIMPIEZA DEL PUENTE Y PLACA RECORDATORIA 1.00 GLB
TOTAL 1.00 GLB
01.06.07 SEÑALIZACION INFORMATIVA
1 SEÑAL CON LA INDICACION DE LA TARA MAXIMA 1.00 UNDTOTAL 1.00 UND
Se tendrá en cuenta el relleno, en ambos márgenes,(adyacente a los estribos), hasta lograr el nivel de de la carretera, que coincida con el nivel del puente, menos una capa de 30 cms, la cual será rellenada ,
Se colocarán 3 tubos de drenaje en los estribos y en las alas se espaciarán a cada 2 m, de preferencia
METRADO DE ACERO
DESCRIPCION ELEMENT. VECES Q´ Nº LONG. DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1"ESTRUC. INTERV. MIEMB. m. m. m. m. m. m. m.
10.9 VIGA.65 1.20(TRASL) . PRINC. 2 3 13.40 1" 80.40
10.9 VIGA 1.20(TRASL) PRINC. 2 6 12.10 1" 145.20
VIGA.65 1.20(TRASL) PRINC. 2 15 13.40 1" 402.00
10.9VIGA
0.6 . PRINC. 2 56 2.40 3/8" 268.80
0.4VIGA
0.20 . PRINC. 2 37 1.50 1/4" 111.000.42.9 DIAFR.
.40 EXTER. 2 6 3.70 5/8" 44.40
2.9 DIAFR..20 EXTER. 2 4 3.30 1/2" 26.40
2.9 DIAFR..40 INTER. 1 8 3.70 3/4" 29.60
2.9 DIAFR..20 INTER. 1 4 3.30 5/8" 13.20
DESCRIPCION ELEMENT. VECES Q´ Nº LONG. DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1"ESTRUC. INTERV. MIEMB. m. m. m. m. m. m. m.
2.9 DIAFR..20 INTER. 1 2 3.30 1/2" 6.60
VIGA 0.4 . DIAFRAG. 3 14 1.40 3/8" 58.80
0.2 1.90 1.90 LOSA
MACIZA 1 53 3.80 5/8" 201.40
4.75 LOSA .175 MACIZA 1 53 5.09 5/8" 269.77
4.75 LOSA MACIZA 1 48 4.75 5/8" 228.00
11.00 LOSA MACIZA 1 31 11.00 3/8" 341.00
11.00 LOSA MACIZA 1 27 11.00 3/8" 297.00
1.20 1.20 LOSA .175 2.25 MACIZA 1 31 5.33 3/8" 165.23
.575 ..20 .30 VEREDA 2 56 2.375 1/2" 266.00 1.30 .
1.00 COLUMNABARANDA 24 4 1.00 3/8" 96.00
ESTR. .11 .11 BARANDA 24 4 0.32 1/4" 30.72
1f5/8" a .21
1f5/8" a .21
1f5/8" a .23
1f3/8" a .16
1f3/8" a .18
1f3/8" a .16
DESCRIPCION ELEMENT. VECES Q´ Nº LONG. DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1"ESTRUC. INTERV. MIEMB. m. m. m. m. m. m. m.
0.95 APOYOFIJO 2 3 0.95 3/8" 5.70
SUBTOTAL DE ACERO (ml.) 141.72 1232.53 299.00 756.77 29.60 627.60
PESO DEL ACERO Kg/m. 0.25 0.58 1.02 1.6 2.26 4.04
SUBTOTAL DE ACERO (Kg.) 35.43 714.87 304.98 1210.83 66.90 2535.50
TOTAL ACERO (Kg) 4868.51
METRADO PUENTE VICTORIA
5m 5m
A A´
5m5 m
L
A = ancho total del puente = 4.80 mL = Longitud total del puente= 11.00 mA´= ancho total de estribos = 5.90 m.L´= longitud total de alas = 20.00 m# De estribos = 2 u.
PUENTE PLANTA
a2 a1 c
h3
h4
h
h2
t
B
D b D´1
a1 = 0.30 m h = 3.20 ma2 = 0.50 m h2 = 0.80 mD = 0.50 m h3 = 0.70 mb = 1.40 m h4 = 2.00 m
D´1 = 1.20 m B = 3.10 mt = 0.50 m c = 0.60 m
CORTE ESTRIBO
a´ c´
h2´
h´
h3´ t´
B´
D´ b´ D´1 "
DIMENSIONES SECCION INICIAL (i)
a´ = 0.40 m h´ = 3.20 mc´ = 0.60 m h2´ = 2.70 m
D´ = 0.50 m h3´ = 0.80 mb´ = 1.00 m B´ = 2.50 m
D´1" = 1.00 m t´ = 0.50 m
DIMENSIONES SECCION FINAL (f)
a´ = 0.30 m h´ = 3.00 mc´ = 0.30 m h2´ = 2.50 m
D´ = 0.50 m h3´ = 0.80 mb´ = 0.10 m B´ = 1.80 m
D´1" = 0.60 m t´ = 0.50 m
CORTE ALA
B1 V S' V B1
g
c1 e
t1f
b1 S b1 S1
B1 = 0.15 m g = 0.70 mV = 0.60 m c1 = 0.30 mS´= 3.60 m e = 0.20 mt1 = 0.70 m f = 0.50 mb1 = 0.50 m S = 2.00 mS1 = 0.90 m
CORTE SUPERESTRUCTURA
VIGAS DIAFRAGMAS
l = LARGO DIAFRAGMA = 2.00 mt1´ b1´= ANCHO DIAFRAG. = 0.25 m
t1´= ALTO DIAFRAGMA = 0.50 m# DE DIFRAGMAS = 3.00
´ b1´
01.01.03 TRAZO Y REPLANTEO CON TOPOGRAFO
ESTRIBOS Y ALAS = A´*B*#Estribos + (B´(i)+B´(f))/2)*L´= 79.58 m2PUENTE = L*A´= 64.90 m2
TOTAL = 144.48 m2
01.02.02 EXCAVACION EN SUELO GRAVOSO BAJO AGUA
ESTRIBOS = (h2 + t)*A´*B*#Estribos = 47.55 m3ALAS = (h3´+ t´)*(B´(i) + B´(f))/2*L´ = 55.9 m3
TOTAL = 103.45 m3
01.02.03 RELLENO CON MATERIAL PROPIO
Se tendrá en cuenta el relleno, en ambos márgenes,(adyacente a los estribos), hasta lograr el nivel de de la carretera, que coincida con el nivel del puente, menos una capa de 30 cms, la cual será rellenada , con material de préstamo.
La forma de relleno en ambos márgenes es triangular(ver planos)Longitud de relleno margen izquierdo (L 5.00 mLongitud de relleno margen derecho (Lm 8.00 m
VOLUMEN DE RELLENO = Lmi*(h-.30)*A´/2 + Lmd*(h-.30)*A´/2 = 111.22 m3
01.02.04 RELLENO Y APISONADO CON MATERIAL DE PRESTAMO
VOLUMEN DE RELLENO = .30*A´*(Lmi + Lmd) = 23.01 m3
01.03.01 SOLADO PARA ZAPATAS e = 4", f´c = 100 Kg/cm2
AREA DE SOLADO ESTRIBOS = B*A´*#Estribos = 36.58 m2AREA DE SOLADO ALAS = (B´i + B´f)/2*L´ = 43.00 m2
AREA TOTAL DE SOLADO 79.58 m2
01.03.02 CONCRETO CICLOPEO f´c = 140 Kg/cm2 + 30 % P.G.
ESTRIBOS = B*A´*t*#Estribos = 18.29 m3ALAS = (B´i + B´f)/2*t´*L´ = 21.5 m3
TOTAL 39.79 m3
01.03.03 ENCOFRADO Y DESENCOFRADO DE ZAPATAS
ESTRIBOS = (A´ + B)*t*#Lados encofrar*#Estribos = 36.00 m2ALAS = L´ * t´*#Lados encofrar = 20.00 m2
TOTAL 56.00 m2
01.04.01 CONCRETO f´c = 140 Kg/cm2, ESTRIBOS Y ALAS
ESTRIBOS = (h4*a2*A´+ (h4+h3)*a1*A´ + c*(h4+h3)/2*A´)*#Estribos 30.92 m3ALAS = (h2´i*a´i + h2´f*a´f)/2*L´+(h2´i*c´i + h2´f*c´f)/4*L´ = 30.15 m3
TOTAL 61.07 m3
01.04.02 CONCRETO f´c = 210 Kg/cm2, VIGAS Y DIAFRAGMAS
VIGAS = L*b1*t1*#Vigas = 7.70 m3DIAFRAGMAS = l*b1´*t1´*#Diafragmas = 0.75 m3
TOTAL 8.45 m3
01.04.03 CONCRETO f´c = 210 Kg/cm2, LOSA MACIZA
VOLUMEN LOSA = L*A*e - L*b1*e = 9.46 m3
01.04.04 CONCRETO f´c = 175 Kg/cm2, VEREDAS Y BARANDAS
# DE BARANDAS = 24 U.VEREDAS = L*V*c1*2 = 3.96 m3BARANDAS = g*B1*B1*#Barandas = 0.38 m3
TOTAL 4.34 m3
01.04.06 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS Y ALAS
ESTR. = ((h4+h3)*A´+((h4+h3)^2+c^2)^(1/2)*A´+(a2+a1+b)*(h4+h3))* 76.38 m2ALAS = (h2´i+h2´f)/2*L´*#LADOS ALAS = 104.00 m2
TOTAL 180.38 m2
01.04.07 ENCOFRADO Y DESENCOFRADO DE VIGAS Y DIAFRAGMAS
VIGAS = (L*f*2+L*b1)*#Vigas = 33.00 m2DIAFRAGMAS = (l*t1*2 + l*b1´)*#DIAFRAGMAS = 7.50 m2
TOTAL 40.50 m2
01.04.09 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA
AREA = (A-#VIGAS*b1)*L +L*e*2+A*e*2 = 59.12 m2
01.04.10 ENCOFRADO Y DESENCOFRADO DE VEREDAS Y BARANDAS
VEREDAS = (L*c1*2)*#VEREDAS = 13.20 m2BARANDAS = (B1*#LADOS*g*#BARANDAS) = 10.08 m2
TOTAL 23.28 m2
01.04.12 ACERO fy = 4200 Kg/cm2
TOTAL DE ACERO (VER CUADROS DE CALCULO DE ACERO) 4868.51 Kg
01.05.01 FALSO PUENTE
VOLUMEN = (L-2*a2)*A*H = 96.00 m3H = ALTURA DEL FONDO DE RIO A LA PARTE BAJA DEL PUENTE 2.00 m
01.06.01 TARRAJEO DE VEREDAS Y MUROS DE BARANDA
VEREDAS = L*(2*c1 + V)*#VEREDAS= 26.40 m2BARANDAS= (B1*#LADOS*g*#BARANDAS)= 10.08 m2
TOTAL 36.48 m2
01.06.02 TARRAJEO FROTACHADO 1:5 EN LOSA
AREA = L*S´= 39.60 m2
01.07.01 CONSTRUCCION DE APOYO FIJO
#APOYOS FIJOS = #VIGAS = 2.00 UNIDADES
01.07.02 CONSTRUCCION DE APOYO MOVIL
#APOYOS MOVILES = #VIGAS = 2.00 UNIDADES
01.07.03 COLOCACION DE BARANDA DE FIERRO NEGRO
LONGITUD = L*#BARANDAS = 44.00 m.#BARANDAS = 2 FIERROS PARALELOS EN CADA BARANDAL= 4.00
01.07.07 DRENAJE DE ESTRIBOS Y ALAS
Se colocarán 3 tubos de drenaje en los estribos y en las alas se espaciarán a cada 2 m, de preferencia en 3 hileras intercaladas en la pantalla de estribos y alas.
LONGITUD DE TUB. = (3*b + L´/2*b´)*3 = 42.6 m.
Se tendrá en cuenta el relleno, en ambos márgenes,(adyacente a los estribos), hasta lograr el nivel de de la carretera, que coincida con el nivel del puente, menos una capa de 30 cms, la cual será rellenada ,
Se colocarán 3 tubos de drenaje en los estribos y en las alas se espaciarán a cada 2 m, de preferencia
METRADO DE ACERO PUENTE CARROZABLE VICTORIA
DESCRIPCION ELEMENT. VECES Q´ Nº LONG. DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1"ESTRUC. INTERV. MIEMB. m. m. m. m. m. m. m.
10.9 VIGA.65 1.20(TRASL) . PRINC. 2 3 13.40 1" 80.40
10.9 VIGA 1.20(TRASL) PRINC. 2 6 12.10 1" 145.20
VIGA.65 1.20(TRASL) PRINC. 2 15 13.40 1" 402.00
10.9VIGA
0.6 . PRINC. 2 56 2.40 3/8" 268.80
0.4VIGA
0.20 . PRINC. 2 37 1.50 1/4" 111.000.42.9 DIAFR.
.40 EXTER. 2 6 3.70 5/8" 44.40
2.9 DIAFR..20 EXTER. 2 4 3.30 1/2" 26.40
2.9 DIAFR..40 INTER. 1 8 3.70 3/4" 29.60
2.9 DIAFR..20 INTER. 1 4 3.30 5/8" 13.20
DESCRIPCION ELEMENT. VECES Q´ Nº LONG. DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1"ESTRUC. INTERV. MIEMB. m. m. m. m. m. m. m.
2.9 DIAFR..20 INTER. 1 2 3.30 1/2" 6.60
VIGA 0.4 . DIAFRAG. 3 14 1.40 3/8" 58.80
0.2 1.90 1.90 LOSA
MACIZA 1 53 3.80 5/8" 201.40
4.75 LOSA .175 MACIZA 1 53 5.09 5/8" 269.77
4.75 LOSA MACIZA 1 48 4.75 5/8" 228.00
11.00 LOSA MACIZA 1 31 11.00 3/8" 341.00
11.00 LOSA MACIZA 1 27 11.00 3/8" 297.00
1.20 1.20 LOSA .175 2.25 MACIZA 1 31 5.33 3/8" 165.23
.575 ..20 .30 VEREDA 2 56 2.375 1/2" 266.00 1.30 .
1.00 COLUMNABARANDA 24 4 1.00 3/8" 96.00
ESTR. .11 .11 BARANDA 24 4 0.32 1/4" 30.72
1f5/8" a .21
1f5/8" a .21
1f5/8" a .23
1f3/8" a .16
1f3/8" a .18
1f3/8" a .16
DESCRIPCION ELEMENT. VECES Q´ Nº LONG. DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1"ESTRUC. INTERV. MIEMB. m. m. m. m. m. m. m.
0.95 APOYOFIJO 2 3 0.95 3/8" 5.70
SUBTOTAL DE ACERO (ml.) 141.72 1232.53 299.00 756.77 29.60 627.60
PESO DEL ACERO Kg/m. 0.25 0.58 1.02 1.6 2.26 4.04
SUBTOTAL DE ACERO (Kg.) 35.43 714.87 304.98 1210.83 66.90 2535.50
TOTAL ACERO (Kg) 4868.51