Libyan Arab Jamahiriya system - UNECE

39
Libyan Arab Jamahiriya Environment General Authority (EGA) Methodology of EIA Application in Libya Prepared by Faraj Ali Omar Occasion : Subregional Workshop under the Convention on Evironmental Impact Assessment ( EIA ) in a Transboundary Context ( Espoo , 1991) Practical application of the Espoo Convention in the Mediterranean Sea area 20 – 21 April 2010 Tunis International Centre for Environmental Technologies ( CITET ) Tunis

Transcript of Libyan Arab Jamahiriya system - UNECE

Libyan  Arab  JamahiriyaEnvironment  General  Authority

( E G A )

Methodology of  EIA  Application in LibyaPrepared  by

Faraj   Ali  Omar

Occasion :Subregional   Workshop   under   the   Convention   on   Evironmental  Impact  Assessment ( EIA )  in 

a Transboundary  Context ( Espoo , 1991)

Practical  application of  the Espoo Convention                 in theMediterranean Sea  area

20 – 21  April 2010  Tunis  International  Centre  for  Environmental  Technologies ( CITET ) 

Tunis

Contents

Page

Introduction ……………………………………………………………………….  3

Objective  of  EIA ………………………………………………………………..  3

Legislations ………………………………………………………………………… 4

Process  of  EIA …………………………………………………………………… 6

Structure  of  EIA ………………………………………………………………… 7

Main  duties and Tasks of  EIA  department ………………………..  8

Scope  of  work …………………………………………………………………. 10

Conclusion ………………………………………………………………………….35  

*************************

1‐ Introduction :EIA is a document , prepared by a proponent, describing a proposed development , or activity ( or a plan , or program ) and  disclosing the possible , probable , or certain effects   of that proposal on  the  environment .The expected  effects  will  be  decreased  , reduced by  the mitigation  measures  later on .The EIA , some times  known  as  the  environmental  impact Statement ( EIS ) , environmental effect  statement  ( EES ) or as  the  environmental  statement ( ES ) , depending  upon country . 

2‐ objective  of  EIA :•EIA  studies  usually made to decrease ,  reduce  or prohibit the expected  effects and risks on the natural  Environment  before the execution of  any  project  by  using  of mitigation measures, alternatives or prohibition measures .

•Available database ( scientific  , practical  ) .

•Supply  a database  for the decision  makers  .

•Insure  the implementation of the project , taking into consideration total  environment  factors .

•Raise  public awareness in case of any possible significant environmental  impacts .

•Insure  the  involvement of  public  in  decision  making .

•Evaluating  the risks  of  the  project .

The studies  should  take in consideration the  evaluation  of  risks and how to deal with  them in emergency cases .   Also  the  study  aims to  improve  and  develop  a good   Plan . To  reach the  point of  reducing  the  effect  on the   environment  on  the  first  stages  of  the  project .  

3‐ Legislations :Legislations , laws and Guidelines .

Law No. 15  of   2003  is  the  main law for  protecting  and  improvement  of  the  environment  in  Libya .

The  law  specifies  public duties and  the other related parts  towards preserving  the environment  in  the  following  fields :

•General  Provision  ( Articles 1 – 8  ) ;•Air Pollution ( Articles 10 – 17 ) ;•Protection of  Sea and  Marine wealth ( Articles 18 – 38 ); •Protection of  Water  Sources  ( Articles 39 – 47 ) ;•Protection  of  Foodstuffs ( Articles 48 – 50 ) ;•Environmental Hygiene ( Article 51 ) ;•Protection from  Common Animal  Diseases ( Article 52 ); •Protection  of  Soil  and  Plants ( Article 53 – 55 ) ;•Protection of  Wildlife ( Article 56 – 57 ) ;•Biological  Safety  ( Article 58 – 63 ) ;•Penalties  ( Articles 64 – 76 ) ;•Final Provisions ( Articles 77 – 79 ) .Law No. 15  was  designed to  benefit  from  the presentand  protect  for  the  future . ( Article # 2 ) .

International  conventions  Signed  by  Libya

•Convention on  Preservation of  Fauna and  Flora in their Natural  State ( London , 1933 ) .

•African  Convention on  the  Conservation of  Nature and Natural  Resources  ( Algeria , 1968 ) .•Convention on Wetlands ( Ramsar , 1971 ) .•World  Heritage  Convention ( Paris , 1972 ) .•Convention on International Trade in Endangered  Species of  Fauna  and Flora  ( CITES Washington, 1973 ) .•Convention for  the Protection of the Mediterranean Sea against  Pollution  ( Barcelona, 1976 ) .•Convention on the Conservation of Migratory Species of Wild Animals ( Bonn, 1979 ) .•United Nations Convention on the Law of the Sea ( UNCLOS )  ( Montegoby, 1982 ) .•The Basel  Convention on the  Transboundary Movement of  Hazardous Wastes  and  their Disposal      ( Basel, 1989 ) .•Bamako Convention on the Ban of the Import Into Africa and  the  Control  of   Transboundary  Movement  and Management  of  Hazardous Wastes Within Africa ( Mali,1991 ) .•Convention on Biological Diversity ( Rio, 1992 ) .•16th November  1994 . Libya has signed  but not yet ratified  the  convention .•Cartagena Protocol  on  Biosafety  to  the convention on biological  diversity  ( Montreal , 2000 ) .•Framework  Convention on Climate Changes  (FCCC ) . 

4‐ Process  of  EIA : The Environment Impact  Assessment  includes  the  following  stages :

Project  preparation 

Notification to EGA

Screening & Scoping

Environmental studies

Usually made by the  developer ( owner )and the consultant .

The developer  will  notify  EGA  about  his  plan  ( field survey , activity  type …etc ) 

The field survey(data acquisition) and  the data arrangement in the  office will be made by the  consultant   according to   the  owner plan

The studies will be achieved and completed. 

Submission to EGA / EIA Dept.

Reviewing and evaluated of the Environmental studies 

Consultation with the EIA manger , staff , public , other 

parties …etc .

The final decision 

EIA , EBS  studies  are  submitted to  EGA .

The  evaluation  is  done  by the EIA dept. staff.

Discussion  with  the  manager  about the permission  condition depending on  the evaluation of the introduced study .

The  final  decision  will  be  issued  by  EIA Manager or EGA secretary .

5‐ Structure   of   EIA  :Guidelines  for  the  content  of  EIA  statements  "Methodology"  according  to  the  National EIASpecification " Tariff "  is  summarized below :

Summary  of  EIA  requirements  •Executive  Summary  .•Introduction .•Legislation ( Legislative framework ) .•Description  of  the  proposed  project .•Description  of  the  existing  environment .•Prediction    of   the  impacts  and  evaluation  of  the significant  environmental  impacts .•Description   of  the  environmental  impacts  .•Description of  the mitigation measures and alternatives.•Environmental   management  plan .•Appendices . 

Where ,  the  EIA  document  must  include  the  last  points . 

6‐Main  duties & Tasks of  EIA department :

•Control  of  damage  to  environment  resulting  from oil & gas  production  operation .

•Evaluating of  the EIA ,EBS … studies for different  projects such as  oil &  gas  projects , industrial projects …….etc  according  to  the  followed  methodology .

•Introducing  of  recommendations  to  EIA  projects .

•Following  up  of  the application & execution  operation of  the recommendations in the  field  area .

•Preparing of  detailed reports for  each job, site visitories …etc .

•Issuing  of  practicing  permissions  for  different  projects provided that it  will be in accordance with the dominant environmental  provisions .

•Issuing  of  the reports , studies  and  research  in  the environmental fields .

•Environment pollution control  ( pollution control ) in the desert  area , agricultural area and marine  area to avoid and prevent  the pollution problems  in the natural environment / habitat ( marine organisms , soil , groundwater , surface water , flora and fauna …etc . ) .

•Atmospheric  air  problems .

•The  hard  and  hazards  substances  control .

•Attendance  of  the  workshops , conferences in  side and outside  of  Libya .

•Sharing  with  the related  national and  international committees  and  programs .

•Documentation  of  data , reports , research …etc .

•Other  related  jobs .

7‐ Scope  of  work  :

The  works  in  the  department  of  studies  and  EIA are divided into  two  types :

•Office  works has  mentioned  in  the  duties  and tasks .

•Field  works  include  the  site  visitories  ( observation , supervising , inspection , sampling , photographs )  to  different  locations  mostly  are  in  the oil & gas fields during  the  exploration  activities  ( seismic ) ,  drilling activities  and  the final inspection during the restoration / rehabilitation operation in  the  offshore and onshore  areas  .Also  there are other visitories to  the  industrial projects such as cement  factories …etc  as shown in the following  figures  : 

((  MELLITAH   GAS   COMPLEX ))

Emissions   monitoring  station 

Emissions    monitoring   station 

Marine  environmental survey ( EBS )  for drilling ( area 19 )

Off shore  drilling  platform  ( Nippon co. , well # A1‐ 2/1 )

Meeting  with  the  Mud Engineer  in  July  / 22 /  2009 

Meeting  with  the  mudlogging  unit  staff 

Remote operation vehicle ( ROV )  room

The  Shale shakers  system

Mud  and  cutting  pollution 

Collection  of  wastes 

Classification   of  wastes 

Collection  and  Classification  of  different  wastes

Pictures  with  the  staff

Providing  and supporting  boat 

Helicopter  aboard 

Geochallenger  ship in Benghazi port  in  August / 4 / 2009 Indian  co.  " Marine seismic survey ( 2D , 3D – area 43 ) in Tubruq

Seismic  cable = 8100 m  ( 10 cables aboard )

Sewage  treatment  system                             

Water  treatment  system

Collection  of  garbage 

Collection   of  ash   and  classification of  wastes 

Photograph  with  the  crew   

Marine  hydrography  survey  ship in  Benghazi ( 21/2/2008 )  japex4 0/3,4

Meeting   with  the  staff  in  side  the  boat 

Driving  and  control  room 

Our  presence  with  the  owner  engineer 

Discussion  with  the  biologist  aboard                        

Meeting  the  captain , biologist , owner  and  NOC  representatives 

Collection  of  wastes 

Life vest  boat   /  Life raft 

Conclusion •The  issued  legislations are  obligating  all  the  projects to  make  EIA  studies  before    the  establishing  of  any project and until  after  that if there are any  developing  in that  project . Also the old projects  are  restricted by the last mentioned  law               (law # 15 ) .

•By  application of   EIA   guidelines  /  specifications / Procedures  the  risks  will  be disappeared  or at least decreased  to  the  requested  level . 

•We  don't  have any   subregional and  transboundary   environmental  effects .

For  more  information  you  can  check  the  EGA  website  as shown here under :[  www.environment.org.ly ]Personal  E‐mail  : [ [email protected] ]

Finally  ,  we  hope  to  see  the  application  of the Espoo  Convention   in  the  Mediterranean  Sea  area  .

Thank   you   for attention