    March 23, 2010

    ICICIdirect.com|Equity Research

    nitiating Coverage

    On a firm footing

    Jaiprakash Power Ventures Ltd (JPVL), a part of the $7 billion Jaypeegroup, is the result of amalgamation between the erstwhile JaiprakashHydro Power (JHPL) and Jaiprakash Power Ventures (JPVL). Thecombined entity has a successful track record of operating 700 MW ofhydro projects - Baspa-II (300 MW) commissioned in 2003 and VishnuPrayag (400 MW) commissioned in 2006. In FY09, the erstwhile JHPLgenerated 1,291.9 million units (MU) while JPVL generated 2,033.3 MUvis--vis 1,280.8 MU and 1,871.0 MU in FY08, respectively. Theconglomerate entity is aiming to achieve ~13,500 MW of installedcapacity by FY19E with a diversified fuel mix. JPVL is expected tocommand an optimal 60:40 thermal-hydro mix. The upcoming hydroproject at Karcham Wangtoo (1,000 MW) is well on track to achieve the

    commissioning six months ahead of schedule in May 2011. The parentcompany (JAL) has demonstrated significant execution strengthclubbed with better operational performance at existing projects. Thus,we are initiating coverage on the stock with an ADD rating.

    Total ~16 fold growth in installed capacity over the next six years

    JPVL has an installed capacity of 700 MW as at the end of December2009. The company has an ambitious growth plan and is targeting~11,050 MW by the end of FY16E. Total ~1,500 MW is expected byFY12E. JPVL is diversifying into other fuel mix with the first thermal plantBina I expected in the second half of FY12.

    Superior asset quality getting reflected in operational numbers

    JPVL is generating at an implied plant load factor (PLF) of ~100% in thepeak flow season. This is far in excess of the overall PLF generated byhydro-based capacities in India. For FY09, the overall Indian hydrogeneration is operating at an implied PLF of ~34.1% and JPVL iscommanding a much superior implied PLF of ~54.6%.

    ValuationsAt the CMP of Rs 67, the stock offers ~6.2% upside potential. JPVL has700 MW of plants operational, which comprises Rs 17 per share and~24% in overall value. Expansion plans form the remaining portion ofoverall value. The demonstrated capability of parent company (JAL)renders significant comfort to upcoming expansion plans. Thus, we

    initiate coverage on the stock with ADDrating and target price of Rs 71.Exhibit 1:Key Financials(Rs Crore) FY08 FY09 FY10E FY11E FY12E

    Net Sales 307.6 288.9 704.8 688.0 2181.7

    EBITDA 275.7 273.3 647.9 664.9 2098.2

    Net Profit 214.9 142.9 221.3 270.9 863.0

    PE (x) 66.3 99.8 64.4 52.6 16.5

    Target PE (x) 69.7 104.8 67.6 55.3 17.3

    EV/EBITDA (x) 65.5 66.1 27.9 27.2 8.6

    P/BV (x) 3.2 3.1 4.3 3.9 3.3

    RoNW (%) 20.9 13.3 6.6 7.5 15.1

    RoCE (%) 12.2 11.8 10.7 5.5 12.0

    Source: Company, ICICIdirect.com Research

    Jaiprakash Power Ventures Ltd (JAIHYD)

    Rs 67

    ting Matrix

    ting : Add

    rget : Rs 71

    rget Period : 12-15 months

    tential Upside : 6%

    Y Growth (%)

    FY09 FY10E FY11E FY12E

    tal Revenue -1.4 137.6 2.7 236.3

    ITDA -0.9 137.1 2.6 220.1

    t Profit -33.0 56.1 22.4 145.5

    ock Data

    arket Capitalisation Rs 14251 Crore

    bt (FY10E) Rs 5087 Crore

    sh (FY10E) Rs 1280 Crore

    Rs 18058 Crore

    week H/L 105/24

    uity capital Rs 210 Crore

    ce value Rs 10

    F Holding (%) 3.3

    Holding (%) 3.3

    mparative return matrix (%)

    ock return (%) 1M 3M 6M 12M

    VL 1.0 -7.0 -18.9 146.1

    HPC -2.2 -1.6 -11.9 NA

    ta Power 8.4 1.9 2.1 104.2

    TPC 0.0 -2.8 -3.0 15.0 ice movement (Stock vs. Nifty)

    0

    20

    40

    60

    80

    100

    Mar-10 Jan-10 Nov-09 Sep-09 Aug-09

    (InRs)

    1500

    2500

    3500

    4500

    5500

    (InUnits)

    JPVL (L.H.S) Nifty (R.H.S)

    nalysts name

    itesh Bhanot

    [email protected]

  • 8/13/2019 Jaiprakash Hydro

    2/20

    ICICIdirect.com|Equity ResearchPage 2

    Company Background

    Jaiprakash Power Ventures Ltd (JPVL), part of the $7-billion JaypeeGroup, was formed as a result of amalgamation between the erstwhile

    Jaiprakash Hydro Power (JHPL) and another group company JaiprakashPower Ventures (JPVL). For pre and post merger amalgamation schemerefer to annexure. JPVL is the largest private sector hydropowerproducer with over 700 MW of operational capacity.The erstwhile JHPL was incorporated in 1994 and the company wasoperating the 300 MW Baspa-II hydroelectric project in Kinnaur district ofHimachal Pradesh since 2003. JHPL has acquired another JPVL, anothergroup company, which had 400 MW of operational capacity at theVishnu Prayag facility in Uttarakhand. Subsequently, the conglomerateentity was renamed as JPVL.Both operational plants have sold their power under the long-termofftake arrangements to the respective state government distributionutilities. Both power purchase agreements (PPA) are governed by the

    tariff policy of the respective state regulatory commission.Jaypee Associate, the parent company has demonstrated leadership inthe construction of hydropower projects over 2002-2009 with anexecution track record of over ~8,800 MW.

    Exhibit 2:Jaiprakash Associates group structure (post amalgamation)

    Hydro Power Projects

    Transmission Project

    Thermal projects

    Projects under

    implementation

    Jaiprakash Associates

    (JAL)

    Jaiprakash Power Ventures Ltd. (JPVL)

    76.3 %

    Aruachal Project

    (3,200MW)

    89.0 %

    56.87 %76.0 %

    Jaypee Powergrid Ltd

    Transmission project

    (230 km)

    74.0 %

    Karcham Wangtoo

    JKHCL (1,000MW)

    Vishnuprayag

    HEP

    (400MW)

    100.0%

    Baspa - II

    HEP

    (300MW)

    100.0%

    Bina Project

    (1,250MW)

    100.0 %

    Bara Project

    (3,300MW)

    100.0 %

    Karchana Project

    (1,980MW)

    100.0 %

    Meghalaya Projects

    (720MW)

    Nigrie Project

    (1,320MW)

    100.0 %

    Source: Company, ICICIdirect.com Research

    Share holding pattern (Q3FY10)

    Shareholder (%) holding

    Promoters 63.3

    Institutional investors 6.7

    General public 30.0

    Promoter & Institutional holding trend (%)

    63.3

    %

    63.3

    %

    63.3

    %

    63.3

    %

    6.7

    %

    5.0

    %

    3.7

    %

    2.6

    %

    0%

    20%

    40%

    60%

    80%

    100%

    Q3FY10 Q2FY10 Q1FY10 Q4FY09

    Promoter Holding Institutional Holding

    Projects under implementation

  • 8/13/2019 Jaiprakash Hydro

    3/20

    ICICIdirect.com|Equity ResearchPage 3

    Investment Rationale

    Jaiprakash Power Venture is a rapidly growing organisation with a spateof capacity additions of ~1,500 MW lined up over the next two years. JP

    Power Venture is diversifying its fuel mix and is targeting an optimalthermal: hydro mix of 60:40 by 2019. JPVL is likely to route ~38% of theoverall ~13,470 MW under the merchant route. The remaining power willbe routed under the long-term PPA route. The strong pipeline of projectsunder consideration coupled with the demonstrated capability of theJaypee group puts JP Power Ventures in a sweet spot to exploit theopportunities available in the power sector.

    Total ~16 fold growth in installed capacity over the next six years

    JPVL has an installed capacity of 700 MW as at the end of December2009. The company has an ambitious growth plan and is targeting~11,050 MW by the end of FY16E. Total ~1,500 MW is expected byFY12E. JPVL is diversifying into other fuel mix with the first thermal plant

    Bina I expected in the second half of FY12.

    Exhibit 3:Break-up of project wise capacity addition over the next six years

    700

    700

    700 2

    200

    2200 3

    520

    7570

    11050

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    Q1

    Q2

    Q3

    Q4

    FY10E

    Q1

    Q2

    Q3

    Q4

    FY11E

    Q1

    Q2

    Q3

    Q4

    FY12E

    Q1

    Q2

    Q3

    Q4

    FY13E

    Q1

    Q2

    Q3

    Q4

    FY14E

    Q1

    Q2

    Q3

    Q4

    FY15E

    Q1

    Q2

    Q3

    Q4

    FY16E

    Capacity(MW

    )

    700 E

    E - Existing KW - Karcham Wangtoo B - Bina N - Nigrie BA - Bara K - Karchana LS - Lower Siang

    1320 K - I

    500 B - I1000 KW

    660 N - I

    660 K - II

    1500 LS - I

    1320 BA - II

    1980 BA - I

    750 B - II

    660 N - II

    Source: Company, ICICIdirect.com Research

    JPVL will derive substantial synergies from the parent company (JAL).JAL is an integrated solutions provider for hydropower project and isexpected to provide EPC services for hydro projects and civil services tothe thermal projects undertaken by JPVL.

    Sweet spot for Jaiprakash Power Ventures to exploit

    the overall opportunities in the power sector

    Total ~16 fold growth in the installed capacity is

    expected over the next six years. JPVL will continue

    to be among the largest private sector hydropower

    companies over the next decade

  • 8/13/2019 Jaiprakash Hydro

    4/20

    ICICIdirect.com|Equity ResearchPage 4

    Excellent track record of JAL as hydro-electric power (HEP) contractor

    Jaiprakash Associate (JAL) is the leader in the construction of multipurpose river valley hydro power projects and has over 40 years ofengineering and construction expertise. JAL has completed ~ 8,840 MWof HEPs over the period from 2002-09. As a contractor, JAL has executedthe largest concrete dam in India Sardar Sarovar (1,450 MW), largest

    underground power house in India - Natpha-Jhakri (1,500 MW), largestrock fill dam - Tehri (1,000 MW) and second largest surface power housein India Indira Sagar (1,000 MW).

    Exhibit 4:Projects executed by JAL as contractor

    Source: Company, ICICIdirect.com Research

    JPVL gaining market share in overall hydro generation

    JPVL has been able to maintain the run rate for electricity generation atthe operational plants even in lull years. Bad monsoons over the last fewyears have resulted in a drop in the overall hydro generation of India.Thus, JPVL has marginally improved its share of generation in the overallIndia hydro generation scenario.

    Exhibit 5:Trend in monthly generation for operational plants

    0

    150

    300

    450

    600

    750

    2007

    .01.31

    2007

    .04.30

    2007

    .07.

    31

    2007

    .10.31

    2008

    .01.31

    2008

    .04.30

    2008

    .07.

    31

    2008

    .10.31

    2009

    .01.31

    2009

    .04.30

    2009

    .07.

    31

    2009

    .10.31

    2010

    .01.31

    Monthlygeneration

    Millionunits(MU)

    0

    1

    2

    3

    4

    5

    6

    (%)

    Baspa - II (LHS) Vishnuprayag (LHS) JPVL as % of overall Hydro generation (RHS)

    Source: CEA, ICICIdirect.com Research

    JAL has executed over 8,800 MW of projects from

    2002-2009 with execution of the largest hydropower

    projects to its merit

    JPVL has been able to maintain the overall

    generation run rate and has marginally improved the

    share of generation in overall India hydel generation

  • 8/13/2019 Jaiprakash Hydro

    5/20

    ICICIdirect.com|Equity ResearchPage 5

    Superior asset quality getting reflected in operational numbers

    JPVL is generating at an implied PLF of ~100% in the peak flow seasons.This is far in excess of the overall PLF generated by other hydro-basedcapacities. For FY09, the overall India hydro generation has beenoperating at an implied PLF of ~34.1% while JPVL has been operating at amuch superior implied PLF of ~54.6%.

    Exhibit 6:Monthly PLFs for JPVL and overall hydro capacity PLF

    0

    25

    50

    75

    100

    125

    200

    7.01

    .31

    200

    7.04

    .30

    200

    7.07

    .31

    200

    7.10

    .31

    200

    8.01

    .31

    200

    8.04

    .30

    200

    8.07

    .31

    200

    8.10

    .31

    200

    9.01

    .31

    200

    9.04

    .30

    200

    9.07

    .31

    200

    9.10

    .31

    201

    0.01

    .31

    (%)

    Monthly PLF derieved for JPVL Monthly PLF derieved for India hydel capacity

    Source: CEA, ICICIdirect.com Research

    Existing hydro projects immune from bad monsoons

    Existing hydro projects (700 MW) and the upcoming Karcham Wangtoo(1,000 MW) are located on rivers that are fed by melting of glaciers to asignificant extent. These rivers are less dependent on seasonal monsoonsfor their water flow. Hence, the plants will enjoy higher generation even ina year when seasonal monsoons are not up to the mark.

    Exhibit 7:Humungous plans for Jaiprakash Power Ventures

    Source: Company, ICICIdirect.com Research

    PVL is operating at much superior implied PLF

    vels of 54.6% in FY09 compared to the overall India

    ydro PLF levels of 34.1%

    he project portfolio is less dependent on seasonal

    onsoons compared to other players. We believe

    PVL will qualify for incentives at both operational

    ants even after considering a bad monsoon in the

    esent year

  • 8/13/2019 Jaiprakash Hydro

    6/20

    ICICIdirect.com|Equity ResearchPage 6

    One of the most active participants in carbon credits market

    JPVL is expected to have three hydropower projects (1,700 MW)operational by FY16E and four thermal power (7,850 MW) projects. Sixout of the seven plants will be eligible for receiving benefit under thecarbon mechanism. The company is an active participant in the carbonmarket. JPVL has been realising income from trade of certificates called

    verified emission reductions (VERs) on existing operational plants (700MW). The company is entitled to 2.3 million VERs per annum on theexisting 700 MW project. The realisation from this certificate is close to3.5-4.0 per VER. JPVL has already sold a part of the VERs that is likely toaccrue from existing operational plants over the coming two years.

    Exhibit 8:Significant upside expected from the carbon credit market

    0

    400

    800

    1200

    1600

    2000

    4/3/2008

    6/3/2008

    8/3/2008

    10/3/2008

    12/3/2008

    2/3/2009

    4/3/2009

    6/3/2009

    8/3/2009

    10/3/2009

    12/3/2009

    2/3/2010

    Rs./CER

    Spot price* Assumed price

    Source: Company, Bloomberg, ICICIdirect.com Research

    * Conversion rate of Rs 60 per Euro is assumed for converting the spot rate of CERs

    In addition to VERs, the company is eligible to claim the benefit fromanother certificate called CERs. The management has indicated that

    projects will also be eligible for carbon credits on the three projects likelyto come up in the super critical technology. In all, plants will receive 8.15million CERs per annum by FY15E. New projects like Karcham Wangtoo,Nigrie, Bara and Karchana are likely to receive registration from theUNFCCC. CERs are trading at a significant premium compared to VERs.We believe that with the commencement of income from CERs, thecompany will witness a significant boost in operating income. Carbonincome under the present mechanism is expected to grow ~11 folds fromthe present levels of Rs 40 crore in FY10E.

    Exhibit 9:Boost in operating income expected from the carbon credit market

    8 10 10 10 10 10 1032 27 27 27 27 27 27

    251 251 251 251

    30 30

    9456

    0

    100

    200

    300

    400

    500

    FY09 FY10E FY11E FY12E FY13E FY14E FY15E

    RsCrore

    Baspa Vishnu Prayag Karcham Wangtoo Nigrie Bara Karchana

    40 40 40

    288318

    468

    288

    Source: Company, ICICIdirect.com Research

    A majority of the projects executed by JPVL

    encourages the reduction of greenhouse gases. 6Six

    out of the seven upcoming projects qualify for the

    benefits of carbon credit

    Total ~11 fold growth in the income from the

    carbon credits business. We have assumed an

    average realisation of Rs 750 per CER and ~Rs 210

    per VER.

    ('millions)

    Projects Basis VER's CER's

    Baspa - II Hydro 1 -

    Vishnuprayag Hydro 1.32 -

    Karcham Wangtoo Hydro - 3.35

    Bina Power Thermal - Subcritical - -

    Jaypee Nigrie Thermal - Supercritical - 0.8

    Karchana Thermal - Supercritical - 1.5

    Bara Thermal - Supercritical - 2.5

    Total 2.32 8.15

  • 8/13/2019 Jaiprakash Hydro

    7/20

    ICICIdirect.com|Equity ResearchPage 7

    Better operational metrics help sustain better RoE

    Both operating projects Vishnuprayag and Baspa are required to supply12% of power free of cost to the respective states. For the remaining88%, they have entered into long term off take arrangements withrespective state utilities. Both PPAs of Vishnuprayag and Baspa providefor a return on equity (RoE) of 16%. In addition to the fixed RoE both

    projects are receiving benefit from the sale of carbon credits and alsoqualify for incentives under two different clauses :a. On the secondary energy (capped @ 10% of RoE),b. On the plant availability in excess of 90% availability (capped @

    2% of RoE for BASPA and capped @ 6.6% of RoE)

    Exhibit 10:Calculation of core RoE for BASPA and VishnuprayagBaspa Project

    Calculation of Core ROE

    Equity invested 460.2

    Return on equity @ 16% 73.6

    Incentive on secondary generation 21.0

    incentive on higher plant availability 9.0

    Income from sale of 40% VER's 9.6

    Total Return 113.2

    Core ROE (%) 25

    Vishnuprayag Project

    Calculation of Core ROE

    Equity invested 505.2

    Return on equity @ 16% 80.8

    Incentive on secondary generation 10.0

    incentive on higher plant availability* 26.3

    Income from sale of 100% VER's 27.3

    Total Return 144.4

    Core ROE (%) 29

    Source: Company, ICICIdirect.com Research

    * Incentive on higher plant availability has been calculated assuming availability of 98%

    Plant availability for Vishnuprayag has been 99.1% in the nine months ended Dec-09 & 98.6% in FY09.

    EBITDA to grow more than 4.4 folds in next three years

    The installed capacity is expected to reach 2,200 MW by FY12E. Theincremental capacity will boost the overall EBITDA by over four folds inthe next three years. The existing two operational plants (700 MW) willcontribute only ~20.7%of the overall EBITDA by FY13E.

    Exhibit 11:Project wise EBITDA trend for JPVL

    275.8 277.4 268.3 259.5 250.9

    380.0 370.5 360.5 350.8 341.2

    907.91,495.6

    356.6

    763.2

    0.0

    500.0

    1,000.0

    1,500.0

    2,000.0

    2,500.0

    3,000.0

    FY09 FY10E FY11E FY12E FY13E

    RsCrore

    Baspa Vishnu Prayag Karcham Wangtoo Bina - I

    655.8 647.9 628.9

    1,874.7

    2,850.8

    Source: Company, ICICIdirect.com Research

    The existing plants are enjoying a premium core ROE

    in the range of 25-29% compared to other industry

    players mainly owing to higher incentives and

    benefit from the carbon credits market

    Incremental installed capacity to give a leg up to the

    overall EBITDA for the company

  • 8/13/2019 Jaiprakash Hydro

    8/20

    ICICIdirect.com|Equity ResearchPage 8

    Portfolio backed by equipment from reputed manufacturers

    All existing operational projects and equipment for upcoming projects areplaced with reputed vendors. This provides significant comfort that theplants will be able to achieve the rated output on a sustainable basis. Thereputed names in the business would also ensure the deadlines are met.

    Exhibit 12:Reputed vendors short listed for expansion plansProjects Fuel MW

    Budgeted

    Cost

    Cost incurred till Dec -

    09

    Expected

    CoD Vendors to the projects

    Baspa Hydro 300 1,545 1,545 Operational VA Tech, Voith & Alstom

    Vishnu Prayag Hydro 400 1,720 1,720 Operational Alstom

    Under Construction

    Jaypee Power Grid Transmission 217 kms 1,000 492 Dec-10

    Karcham Wamgtoo Hydro 1,000 7,150 3,381 May-11 VA Tech, Voith & Areva

    Bina - I Coal 500 2,753 420 Nov-11 BTG package ordered with BHEL

    Nigrie Coal 1,320 8,118 579 Aug-13 BTG package ordered with L&T-MHI

    Bara - I Coal 1,980 11,088 257 Aug-14 BTG package ordered with BHEL -Alstom

    Karchana - I Coal 1,320 7,392 110 Dec-14

    Under Planning

    Bina - II Coal 750 4,125 NA Jul-14

    Bara - II Coal 1,320 7,392 NA Sep-15

    Karchana - II Coal 660 3,696 NA Mar-16

    Lower Siang Hydro 2,700 13,500 114 Mar-16

    Hirong Hydro 500 2,500 11 Aug-16

    Kynshi - II Hydro 450 2,250 2 Aug-16

    Umngot - I Hydro 270 1,350 1 Jul-19

    Source: Company, ICICIdirect.com Research

    Venturing into transmission sector

    Jaypee Powergrid, a 74% subsidiary of JPVL, is developing atransmission facility for evacuation of power from the Karcham Wangtooplant. The project is scheduled to achieve completion by September 2010.However, the revenue from the project will start accruing after theKarcham Wangtoo hydro electric power plant gets operational in April2011.

    With the new Tariff policy 2009-14, transmission projects will qualify foran RoE of 15.5% instead of 14%. The total cost of the project is Rs 1,000

    crore and it will be funded by a debt equity mix of 70:30. JPVL has alreadyincurred Rs 492 crore till December 2009.

    JPVL is entering into a new vertical by venturing into

    the transmission sector. The company is

    establishing a 217 km long transmission network to

    evacuate power for its Karcham Wangtoo project

  • 8/13/2019 Jaiprakash Hydro

    9/20

    ICICIdirect.com|Equity ResearchPage 9

    Sustainable higher PLFs for existing plants

    JPVL can sustain an improved operational performance due to thestrategic positioning of operational projects. Both the Baspa andVishnuprayag plants are operating at levels in excess of design energy.The plants qualify for secondary benefit once they operate at a level in

    excess of the design energy. Also, the plants were operating at anavailability factor of 99.6% for Baspa and 98.6% for Vishnuprayag. Bothplants qualify for both incentives that are available to the hydropowerprojects. The upcoming projects are also expected to sustain a goodperformance benchmark for the overall industry.

    Exhibit 13:Projection for units produced and PLF

    131.5

    97.81

    28.1

    1

    87.1

    129.2

    203.3

    126.7

    191.4

    129.3

    198.3

    129.3

    198.3

    129.3

    198.3

    255.5

    164

    .3

    49.256.6

    50.0

    90.0

    0

    100

    200

    300

    Baspa

    Vishnu

    Prayag

    Karcham

    Wangtoo

    Bina

    (Kwhunitsincrores)

    -50.0

    -25.0

    0.0

    25.0

    50.0

    75.0

    100.0

    FY07 FY08 FY09 Till Feb10 FY10E FY11E FY12E PLF (RHS)

    Source: Company, CEA, ICICIdirect.com Research

    Long-term contracts in business model provides defensive outlook

    Total ~61% of the overall expansion capacity (13,470 MW) is tied upunder long-term power purchase agreements (PPA). Total 100% of theexisting 700 MW hydro projects are tied up for offtake arrangementsunder the long-term route. Majority of the upcoming plants also have theflexibility of passing the escalation in fuel cost to the beneficiary.

    Exhibit 14:Fuel risk controlled effectively by managing the selling arrangements

    Projects MW PPA

    Capacity tied

    under long

    term (%) Tariff Impact

    Baspa (Hydro) 300 40+20 100 Regulated returns @ 16% No risk of fuel cost

    Vishnu Prayag (Hydro) 400 30+20 100 Regulated returns @ 16% No risk of fuel cost

    Under Construction

    Jaypee Power Grid (Transmission) Regulated returns @ 15.5% No risk of fuel cost

    Karcham Wamgtoo (Hydro) 1000 35+20 80 Regulated returns @ 15.5% No risk of fuel cost

    Bina - I 500 25 60* Regulated returns @ 15.5%** Final PPA is expected soon

    Nigrie 1320 25 50 Regulated returns @ 15.5%** Captive mines mitigate the fuel risk

    Bara - I 1980 25 90 Levelised tariff @ Rs 3.02 per unit Fuel cost escalation is a pass through

    Karchana - I 1320 25 90 Levelised tariff @ Rs 2.97 per unit Fuel cost escalation is a pass through

    * MOU is signed for 42% of the generation and the company intends to enter into long term arrangements for another 18%

    ** Assumed

    Source: Company, ICICIdirect.com Research

    Strategic advantages of locations for hydro plantsand asset profile from reputed vendors also helps

    the company in achieving a better operational

    performance

    Fuel price risk that is mainly a pass through for amajority of projects along with long-term

    agreements for power offtake offer a defensive

    outlook

  • 8/13/2019 Jaiprakash Hydro

    10/20

    ICICIdirect.com|Equity ResearchPage 10

    Risks & concerns

    Execution riskJaiprakash Power Ventures Ltd (JPVL) has a significant number ofprojects that are at a nascent stage. The company is yet to enter into

    definitive EPC contracts for Karchana, projects in Arunachal Pradesh andprojects in Meghalaya. The company will have to encounter the limitationprevalent at the time of placing the final order.

    Adverse changes in regulatory regime for projects under long-term PPAAny adverse changes in the regulatory regime may significantly impairthe ability of the company to generate returns. The returns for the Baspaproject are calculated based on the tariff policy of Himachal PradeshElectricity Regulatory Commission (HPERC).

    Delays in upcoming projectsHydropower projects typically require long gestation periods. The

    completion of the project is also dependent on several factors likerequisite licenses, approvals, permit, natural disasters, labour disputesand adverse weather conditions. The company may be unable tocomplete the projects in time. This, in turn, will lead to cost escalations ofthe projects. Also, for a few thermal projects the company has placedequipment orders with the company that are in process of setting up theirplants in India. The company may face delays on account of vendorsbeing unable to fulfil their equipment order in time. Unforeseen delays inproject commissioning will, hence, hamper the future growth as well.

    Operational riskThe generation of energy by the hydro power plant is primarily

    dependent on water availability in respective rivers. In case the availabilityof the plant falls below the prescribed norm for any operational year, therevenues will be adversely impacted. In addition, the company will faceoperational challenges in thermal power projects as it has no track recordof operating big thermal power projects.

    Dilution riskThe company has a lot of projects under development and the free cashflow may not be enough to fund the expansion plans. The company maylook to raise further capital for funding the expansion plans diluting theexisting capital base of the company.

    Merchant tariff riskAt present, JPVL is not operating any capacity under the merchant route.Over the next two years, JPVL is expected to add ~376 MW at KarchamWangtoo and Bina I under the merchant set-up. A large part of theupcoming capex is dependent on internal accruals that the company islikely to generate over the coming years. For our projection purpose, wehave assumed the merchant tariff for hydro power plants are expected atRs 6.11, Rs 5.23 and Rs 4.95 per unit in FY11E, FY12E and FY13E,respectively. Subsequently, we are expecting the rates to correctgradually to Rs 3.75 levels in FY17E. For thermal power plants, we haveassumed Rs 4.75, Rs 4.50 and Rs 4.00 in FY11E, FY12E and FY13E,respectively. Subsequently, we are expecting the rates to correctgradually to Rs 3.40 levels in FY17E. Any volatility in merchant tariffs will

    pose a risk to our earnings estimate.

    A large number of projects are under the

    implementation stage. This exposes the company to

    execution risk

  • 8/13/2019 Jaiprakash Hydro

    11/20

    ICICIdirect.com|Equity ResearchPage 11

    Financials

    Topline to receive a leg up from capacity addition

    We expect adjusted revenue CAGR of 48% from Rs 716 crore in FY09 to

    Rs 3,476

    crore in FY13E. The company is expected to commissionanother ~1,500 MW by FY12E. The overall installed capacity will increaseto 2,200 MW. The existing operational capacity of ~700 MW willcontribute only ~19% to the overall topline by FY13E. Total ~375 MWwill be open for trading in the merchant route.

    Exhibit 15:Significant visibility of growth in installed capacity adding to the topline

    300.8 304.3 296.3 288.6 281.1

    415.0 400.5 391.7 383.2 374.9

    980.61,625.2

    529.3

    1,195.0

    0.0

    500.0

    1,000.0

    1,500.0

    2,000.0

    2,500.0

    3,000.0

    3,500.0

    4,000.0

    FY09 FY10E FY11E FY12E FY13E

    RsCrore

    Baspa Vishnu Prayag Karcham Wangtoo Bina - I

    715.8 704.8 688.0

    2,181.7

    3,476.3

    Source: Company, ICICIdirect.com Research

    EBIDTA margin to contract owing to change in fuel mix

    At present, JPVL has ~700 MW of hydro-based operational capacity. TheEBITDA is expected to grow at a CAGR of 44% over the next four yearsfrom Rs 656 crore in FY09 to Rs 2,851 crore in FY13E. Historically, thecompany has been able to operate at EBITDA margins of ~92% in FY09.With the commencement of thermal capacity in FY12E the margins arelikely to contract.

    Exhibit 16:Substantial growth in EBITDA expected

    655.8 647.9 628.9

    1874.7

    2850.8

    91.6 91.9 91.4

    82.0

    85.9

    0

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    FY09 FY10E FY11E FY12E FY13E

    RsCrores

    75

    78

    81

    84

    87

    90

    93

    (%)

    EBITDA EBITDA Margins (%)

    Source: Company, ICICIdirect.com Research

    Substantial growth in topline of over 4.8 folds in four

    years on the back of significant increase in installed

    capacity

    We expect the company to report over 4.3 fold

    growth in EBITDA from FY09 to FY13E led by a

    spate of capacity additions, which are likely to go

    on stream over the next ~24 months

  • 8/13/2019 Jaiprakash Hydro

    12/20

    ICICIdirect.com|Equity ResearchPage 12

    Balance sheet to double from FY10E to FY12E

    The balance sheet is likely to witness ~4.6 fold jump from FY08 to FY10Eowing to amalgamation between group companies. We believe thecompany will be able to double the balance sheet size over the next twoyears from FY10E to FY12E owing to growth in installed capacity. The

    company is in the capex mode and will increase the installed capacity byover 3.1 fold from 700 MW to ~2,200 MW.

    Exhibit 17:Robust growth in balance sheet size

    1,967.4 2,113.8

    8,992.6

    13,357.4

    18,160.2

    325.4

    7.4

    48.5 36.0

    02,500

    5,000

    7,500

    10,000

    12,500

    15,000

    17,500

    20,000

    FY08 FY09 FY10E FY11E FY12E

    RsCrores

    0

    50

    100

    150

    200

    250

    300

    350

    Total Balance Sheet Growth

    Source: Company, ICICIdirect.com Research

    Net debt to equity to remain under control post conversion of FCCB

    JPVL is still in capex mode and will continue to draw substantial amountsof debt over the next three years in order to increase the installedcapacity. The debt infusion will continue to burden the debt equity profileof JPVL. We believe that post the conversion of the recently issued FCCB,the debt: equity ratio will remain under control. Overall debt includes theUS$200 million (~Rs 920 crore) FCCB issued for funding their expansionplans. FCCBs have a conversion price of Rs 85.8 and are eligible forconversion from FY11E. Post conversion, net debt: equity will stay at 2.3.

    Exhibit 18:Net debt to equity to remain under control post conversion of the FCCBPre conversion

    0.7

    0.7

    0

    .9

    2.2

    3.0

    0

    2,500

    5,000

    7,500

    10,000

    12,500

    15,000

    17,500

    FY08

    FY09

    FY10E

    FY11E

    FY12E

    -1.00

    0.00

    1.00

    2.00

    3.00

    4.00

    Net Debt - Rs Cr (LHS)

    Equity - Rs Cr (LHS)

    Net Debt : Equity (x) - (RHS)

    Post conversion

    0.7

    2.3

    1.5

    0.50.7

    0

    2,500

    5,000

    7,500

    10,000

    12,500

    15,000

    17,500

    FY08

    FY09

    FY10E

    FY11E

    FY12E

    -1.00

    0.00

    1.00

    2.00

    3.00

    4.00

    Net Debt - Rs Cr (LHS)

    Equity - Rs Cr (LHS)

    Net Debt : Equity (x) - (RHS)

    Source: Company, ICICIdirect.com Research

    The balance sheet is likely to witness a 4.6 fold

    jump from FY08 to FY10E owing to amalgamation

    between group companies. The company will be

    able to nearly double the balance sheet size over

    the next two years from FY10E to FY12E owing to

    growth in installed capacity

    We believe the company will be able to

    successfully convert the outstanding FCCB. FCCBs

    are due for redemption only by 2015. This gives

    the company ample time and the spread between

    the conversion price and the existing CMP is not

    significant

  • 8/13/2019 Jaiprakash Hydro

    13/20

    ICICIdirect.com|Equity ResearchPage 13

    Profitability set to grow significantly after a lull

    After a small blip in 2009, the profitability is set to grow led byamalgamation. For our modelling purpose, we have assumed that theincome from the sale of carbon credit will accrue with thecommencement of operations at the respective plant. Profitability is set togrow with incremental capacities coming on stream.

    Exhibit 19:Growing profits to augur well for shareholders

    146 143221 271

    644

    -2.3

    54.9

    22.4

    137.7

    0

    200

    400

    600

    800

    1,000

    FY08 FY09 FY10E FY11E FY12E

    (20)

    0

    20

    40

    60

    80

    100

    120

    140

    160

    PAT excl extraordinary items Growth (%)

    Source: Company, ICICIdirect.com Research

    Improving outlook for return ratios

    JPVL is in advanced stages of commissioning ~1,500 MW capacity overthe next 24 months. The overall asset turnover has reduced due to buildup in CWIP and is dragging the overall return on equity. The return ratiosare expected to again scale back to highs subsequent to the plantcommissioning.

    Exhibit 20:Return ratios improving subsequent to addition in the installed capacity

    20.85%

    13.29%

    7.48%

    15.10%

    12.23% 11.78%6.60%

    10.73%

    5.50%

    11.98%

    0%

    5%

    10%

    15%

    20%

    25%

    30%

    35%

    FY08 FY09 FY10E FY11E FY12E

    ROE ROCE

    Source: Company, ICICIdirect.com Research

    Profitability is set to grow ~4.5 folds over the

    three year period from FY09 to FY12E

    Return ratios are expected to scale back to earlier

    highs post the commissioning of Karcham Wangtoo

    project.

  • 8/13/2019 Jaiprakash Hydro

    14/20

    ICICIdirect.com|Equity ResearchPage 14

    Valuations

    At the CMP of Rs 67, the stock is offering ~6.2% upside potential. JPVLhas 700 MW of plants operational, which comprises Rs 17 per share and~24% in the overall value. The expansion plans form the remainingportion of the overall value.JPVL continues to be on a firm footing when it comes to their expansionplans. We believe the expensive valuation is justified owing to thedemonstrated capability of the Jaypee group. The expansion plans willstart to bear fruit from FY12E. JPVL can be considered a defensivecounter at lower levels considering the robust utility business, whichprovides for long-term visibility.

    Exhibit 21:JPVLs fair value based on SOTP model

    71

    89

    85

    1

    64

    63 0

    0 0 2

    9 7

    0

    20

    40

    60

    80

    100

    Baspa

    VishnuPrayag

    KarchamWamgtoo

    Bina-I

    Bina-II

    Nigrie

    Bara-I

    Bara-II

    Karchana-I

    Karchana-II

    LowerSiang

    Hirong

    Kynshi-II

    Umngot-I

    JaypeePowerGrid

    TotalValue

    Rspershare

    Source: Company, ICICIdirect.com Research

    The historical financials of the company are not depictive considering aminiscule installed capacity compared with the overall expansion plans.JPVL has only 700 MW of plants operational, which comprises ~21% ofthe overall value. JPVL is the flagship company from the Jaypee group.Considering the execution record of JAL, it provides comfort with respectto their existing expansion plans. Delays in execution of any project mayimpact our valuation case.

    Exhibit 22:Project wise valuation for the power verticalBara - I

    Bara - II

    Karchana - I

    Karchana - II

    Lower Siang

    Nigrie

    Bina - II

    Bina - I

    Baspa

    Umngot - I

    Jaypee Power Grid

    Kynshi - II

    Vishnu Prayag

    Karcham Wamgtoo

    Hirong

    Source: Company, ICICIdirect.com Research

    The existing price is already discounting the growth

    plans for the company. Considering the defensive

    business model for JPVL one can continue to

    accumulate the counter on downturns

    JPVL has shown competency by winning

    competitive bids at lucrative rates in Bara and

    Karchana.

  • 8/13/2019 Jaiprakash Hydro

    15/20

    ICICIdirect.com|Equity ResearchPage 15

    Exhibit 23:Valuation table of the generation and transmission verticalProjects Fuel

    Capacity

    (MW)

    Project

    Cost

    Ownership

    (%)

    JPVL's share

    (MW)

    Value per

    share

    Equity Value -

    JPVL

    M Cap / MW

    (Rs Cr)

    Cost of

    Equity (%)

    Baspa Hydro 300 1,545 100 300 8 1,580 5.3 12

    Vishnu Prayag Hydro 400 1,720 100 400 9 1,927 4.8 12

    Karcham Wamgtoo Hydro 1,000 7,150 57 569 8 1,729 3.0 13

    Bina - I Coal 500 2,753 100 500 5 1,109 2.2 13

    Bina - II Coal 750 4,125 100 750 1 243 0.3 13

    Nigrie Coal 1,320 8,118 100 1,320 9 1,951 1.5 13

    Bara - I Coal 1,980 11,088 100 1,980 7 1,530 0.8 13

    Bara - II Coal 1,320 7,392 100 1,320 6 1,307 1.0 13

    Karchana - I Coal 1,320 7,392 100 1,320 4 915 0.7 13

    Karchana - II Coal 660 3,696 100 660 6 1,244 1.9 13

    Lower Siang Hydro 2,700 13,500 89 2,403 3 733 0.3 16

    Hirong Hydro 500 2,500 89 445 0 83 0.2 16

    Kynshi - II Hydro 450 2,250 74 333 0 57 0.2 16

    Umngot - I Hydro 270 1,350 74 200 0 50 0.3 16

    Transmission

    Jaypee Power Grid Transmission 217kms 1,000 76 165 kms 2 513

    Total 13,470 75,579 12,500 71 14,970 1.2 Source: Company, ICICIdirect.com Research

    For valuing the transmission sector we have assigned a book valuemultiple of 2.25x. This gives the transmission venture an overall value ofRs 675 crore for the entire stake while JPVL is holding 74% stake in theventure.

    The power sector is witnessing heightened activity and will continue tooffer new opportunities over the coming decade. Post commissioning of1,500 MW capacity in the next two year, JPVL will become one of theleading private sector generation companies. The existing plants will

    contribute to the free cash flow generation, which can be furtherdeployed in growth opportunities. Strong execution track record of theparent company provides the competitive edge to JPVL with regard toexecuting the present pipeline and catering to the upcomingopportunities. Thus, we are initiating coverage on the stock with an ADDrating.

  • 8/13/2019 Jaiprakash Hydro

    16/20

    ICICIdirect.com|Equity ResearchPage 16

    Exhibit 24:Profit and Loss AccountRs Crore FY08 FY09 FY10E FY11E FY12E

    Sales 300.8 296.7 704.8 724.0 2405.2

    Growth (%) -8.6 -1.4 137.6 2.7 232.2

    Op. Expenditure 25.1 23.4 56.9 59.2 307.0EBITDA 275.7 273.3 647.9 664.9 2098.2

    Growth (%) -9.3 -0.9 137.1 2.6 215.6

    Other Income 41.7 21.2 15.0 49.0 88.0

    Depreciation 45.9 47.0 86.7 85.2 309.0

    EBIT 271.5 247.5 576.2 628.7 1877.2

    Interest 99.3 81.9 267.3 269.1 753.3

    PBT 172.2 165.6 308.9 359.6 1124.0

    Growth (%) -23.5 -3.8 86.5 16.4 212.6

    Tax 27.3 15.6 85.7 88.6 260.9

    Extraordinary Item 68.4 -7.0 0.0 0.0 0.0

    Rep. PAT before MI 213.4 142.9 223.2 270.9 863.0

    Minority interest (MI) 0.0 0.0 0.0 0.0 219.0

    Rep. PAT after MI 213.4 142.9 223.2 270.9 644.1

    Adjustments 0.0 0.0 0.0 0.0 0.0

    Adj. Net Profit 213.4 142.9 223.2 270.9 644.1

    Growth (%) 12.9 -33.0 56.1 21.4 137.7

    (Rs Crore)

    Source: Company, ICICIdirect.com Research

    Exhibit 25:Balance sheetRs Crore FY08 FY09 FY10E FY11E FY12E

    Equity Capital 491.0 491.0 2095.7 2095.7 2095.7

    Share Warrants 0.0 0.0 0.0 0.0 0.0

    Reserves & Surplus 539.5 584.2 1255.5 1526.4 2170.5

    Shareholder's Fund 1030.5 1075.2 3351.2 3622.1 4266.2

    Minority Interest 36.8 49.8 336.2 490.4 709.4

    Borrowings 286.5 191.6 3819.9 7767.5 11715.2

    Unsecured Loans 543.1 719.7 1267.5 1259.5 1251.5

    Deferred Revenue 70.6 77.6 217.9 217.9 217.9

    Source of Funds 1967.4 2113.8 8992.6 13357.4 18160.2

    Gross Block 1722.7 1848.7 4746.7 4746.7 13896.7

    Less: Acc. Depreciation 217.2 264.1 350.8 436.0 745.0

    Net Block 1505.5 1584.6 4395.9 4310.8 13151.7

    Capital WIP 90.2 195.6 2195.6 7595.6 3845.6

    Net Fixed Assets 1595.7 1780.2 6591.5 11906.3 16997.3

    Intangible asset 0.0 0.0 0.0 0.0 0.0

    Investments 0.0 55.9 1414.0 1000.0 50.0

    Cash 96.1 123.7 731.4 198.2 294.5Trade Receivables 214.4 120.6 150.6 132.3 572.3

    Loans & Advances/Other 177.5 182.8 250.6 266.3 415.5

    Inventory 5.0 4.9 0.0 0.0 0.0

    Total Current Asset 492.9 432.0 1132.6 596.8 1282.3

    Current Liab. & Prov. 121.2 154.2 145.5 145.7 169.4

    Net Current Asset 371.7 277.8 987.1 451.1 1112.9

    Application of funds 1967.4 2113.8 8992.6 13357.4 18160.2

    (Rs crore)

    Source: Company, ICICIdirect.com Research

  • 8/13/2019 Jaiprakash Hydro

    17/20

    ICICIdirect.com|Equity ResearchPage 17

    Exhibit 26:Cash Flow statementRs Crore FY08 FY09 FY10E FY11E FY12E

    Net Profit after Tax 213.4 142.9 223.2 270.9 644.1

    Other Non Cash Exp -1.5 0.0 1.8 0.0 0.0

    Depreciation 45.9 47.0 86.7 85.2 309.0Direct Tax Paid 27.2 15.6 85.7 88.6 260.9

    Other Non Cash Inc 0.0 0.0 0.0 0.0 0.0

    CF before change in WC 380.6 278.9 717.4 625.2 1925.3

    Inc./Dec. in WC 51.0 121.5 -103.5 2.9 -565.4

    CF from operations 431.6 400.4 613.9 628.1 1359.9

    Pur. of Fix Assets -52.9 -231.5 -4898.0 -5400.0 -5400.0

    Pur. of Inv 0.0 0.0 -1358.1 414.0 950.0

    CF from Investing -52.9 -231.5 -6256.1 -4986.0 -4450.0

    Inc./(Dec.) in Debt -193.2 -85.0 4176.1 3939.7 3939.7

    Inc./(Dec.) in Net worth 0.0 0.0 2341.1 154.2 0.0

    Others -185.5 -81.9 -267.3 -269.1 -753.3

    CF from Financing -378.7 -166.9 6249.9 3824.8 3186.4

    Opening Cash balance 59.4 96.1 123.7 731.4 198.2

    Closing Cash balance 96.1 123.7 731.4 198.2 294.5

    (Rs crore)

    Source: Company, ICICIdirect.com Research

    Exhibit 27:Key Ratios(%)

    FY08 FY09 FY10E FY11E FY12E

    Raw Material 0.0 0.0 0.0 0.0 6.0

    Operation & maint exp. 8.4 7.9 8.1 8.2 12.8

    Income from CER's/VER's 0.0 2.6 5.2 5.1 12.0

    Effective Tax rate 15.8 9.4 27.8 24.7 23.2

    Profitability ratios (%)

    EBITDA Margin 91.6 92.1 91.9 91.8 87.2

    PAT Margin 70.9 48.2 31.7 37.4 35.9

    Per share data (Rs)

    Revenue per share 1.4 1.3 2.9 3.0 10.0

    EV per share 46.9 46.3 58.9 77.5 93.6

    Book Value 20.9 21.9 16.0 17.3 20.4

    Cash per share 0.4 0.6 3.0 0.8 1.2

    EPS 1.0 0.7 0.9 1.1 2.7

    Cash EPS 1.9 1.6 1.3 1.5 4.2

    DPS 0.8 0.8 0.0 0.0 0.0

    Source: Company, ICICIdirect.com Research

  • 8/13/2019 Jaiprakash Hydro

    18/20

    ICICIdirect.com|Equity ResearchPage 18

    Exhibit 28:Key Ratios(%)

    Return ratios FY08 FY09 FY10E FY11E FY12E

    RoNW 20.9 13.3 6.6 7.5 15.1

    ROCE 12.2 11.8 10.7 5.5 12.0

    ROIC 15.1 13.3 8.7 5.3 10.7

    Financial health ratio

    Operating CF (Rs Cr) 431.6 400.4 613.9 628.1 1359.9

    FCF (Rs Cr) 246.5 147.6 -4439.4 -4820.9 -4128.1

    Cap. Emp. (Rs Cr) 1846.1 1959.6 8847.1 13211.8 17990.7

    Debt to equity (x) 0.8 0.8 1.5 2.5 3.0

    Debt to cap. emp. (x) 0.4 0.5 0.6 0.7 0.7

    Interest Coverage (x) 1.7 2.0 1.2 1.3 1.5

    Debt to EBITDA (x) 3.0 3.3 7.9 13.6 6.2

    DuPont ratio analysis

    PAT/PBT 1.2 0.9 0.7 0.8 0.6

    PBT/EBIT 0.6 0.7 0.5 0.6 0.6

    EBIT/Net sales 0.9 0.8 0.8 0.9 0.8

    Net Sales/ Tot. Asset 0.1 0.1 0.1 0.1 0.1

    Total Asset/ NW 2.0 2.1 2.7 3.7 4.3 Source: Company, ICICIdirect.com Research

    Exhibit 29:Key Ratios(x times)

    Working Capital FY08 FY09 FY10E FY11E FY12E

    Working cap./Sales (%) 123.6 93.6 140.1 62.3 46.3

    Inventory turnover NA NA NA NA NA

    Debtor turnover 1.3 1.7 5.2 4.9 6.2

    Creditor turnover 10.8 45.4 205.6 123.6 124.3

    Current Ratio 4.1 2.8 7.8 4.1 7.6 Source: Company, ICICIdirect.com Research

    Exhibit 30:Key Ratios(Rs crore)

    FCF Calculation

    EBITDA 275.7 273.3 647.9 664.9 2098.2

    Less: Tax 27.3 15.6 85.7 88.6 260.9

    NOPLAT 248.4 257.6 562.2 576.2 1837.3

    Capex -52.9 -231.5 -4898.0 -5400.0 -5400.0

    Change in working cap. 51.0 121.5 -103.5 2.9 -565.4

    FCF 246.5 147.6 -4439.4 -4820.9 -4128.1 Source: Company, ICICIdirect.com Research

    Exhibit 31:Key RatiosValuation (x times)

    FY08 FY09 FY10E FY11E FY12E

    PE (x) 47.4 70.8 49.5 40.7 17.1

    EV/EBITDA (x) 39.3 39.9 23.8 29.9 11.3

    EV/Sales (x) 36.0 36.7 21.8 27.4 9.9

    Dividend Yield (%) 1.6 1.6 0.0 0.0 0.0

    Price/BV (x) NA NA 3.3 3.0 2.6 Source: Company, ICICIdirect.com Research

  • 8/13/2019 Jaiprakash Hydro

    19/20

    ICICIdirect.com|Equity ResearchPage 19

    Annexure

    Exhibit 32:Pre and Post corporate structure for Jaiprakash AssociatePre Amalgamation Post Amalgamation

    63.30% 80.60% 76.30%

    Jaiprakash Associates Ltd. Jaiprakash Associates Ltd.

    Jaiprakash Hydro Pow er (JHPL)

    100% - Baspa - 300 MW

    51% - Jaypee P ower Grid

    Jaiprakash Power Ventures (JPVL)

    100% - Vishnuprayag - 400 MW

    100% - Nigrie - 1,320 MW

    23% - Jaypee Powergrid56% - Karcham Wangtoo -1,000MW

    100% - Bina Power - 1,250 MW

    100% - UP Pow er projects - 5,280 MW

    89% - Arunachal projects - 3,200 MW

    74% - Meghalaya Projects - 720 MW

    Jaiprakash Power Ventures (JPVL)

    100% - Baspa - 300 MW

    100% - Vishnuprayag - 400 MW

    100% - Nigrie - 1,320 MW74% - Jaypee Powergrid

    56.4% - Karcham Wangtoo -1,000 MW

    100% - Bina Power - 1,250 MW

    100% - UP P ower projects - 5,280 MW

    89% - Arunachal projects - 3,200 MW

    74% - Meghalaya Projects - 720 MW

    Source: Company, ICICIdirect.com Research

  • 8/13/2019 Jaiprakash Hydro

    20/20

    RATING RATIONALE

    CICIdirect.com endeavours to provide objective opinions and recommendations. ICICIdirect.com assignsratings to its stocks according to their notional target price vs. current market price and then categorises themas Outperformer, Performer, Hold, and Underperformer. The performance horizon is two years unless specified

    and the notional target price is defined as the analysts' valuation for a stock.

    Strong Buy: 20% or more;Buy: Between 10% and 20%;Add: Up to 10%;Reduce: Up to -10%Sell: -10% or more;

    Pankaj Pandey Head Research [email protected]

    ICICIdirect.com Research Desk,ICICI Securities Limited,7th Floor , Akruti Centre Point,MIDC Main Road, Marol Naka,Andheri (East)Mumbai 400 093

    [email protected]

    ANALYST CERTIFICATIONWe /I,Jitesh Bhanot CA research analysts, authors and the names subscribed to this report, hereby certify that all of the views expressed in this research report accurately reflect our personal views aboutny and all of the subject issuer(s) or securities. We also certify that no part of our compensation was, is, or will be directly or indirectly related to the specific recommendation(s) or view(s) in this report.

    Analysts aren't registered as research analysts by FINRA and might not be an associated person of the ICICI Securities Inc.

    Disclosures:CICI Securities Limited (ICICI Securities) and its affiliates are a full-service, integrated investment banking, investment management and brokerage and financing group. We along with affiliates are leadingnderwriter of securities and participate in virtually all securities trading markets in India. We and our affiliates have investment banking and other business relationship with a significant percentage ofompanies covered by our Investment Research Department. Our research professionals provide important input into our investment banking and other business selection processes. ICICI Securitiesenerally prohibits its analysts, persons reporting to analysts and their dependent family members from maintaining a financial interest in the securities or derivatives of any companies that the analystsover.

    he information and opinions in this report have been prepared by ICICI Securities and are subject to change without any notice. The report and information contained herein is strictly confidential andmeant solely for the selected recipient and may not be al tered in any way, transmitted to, copied or distributed, in part or in whole, to any other person or to the media or reproduced in any form, without

    rior written consent of ICICI Securities. While we would endeavour to update the information herein on reasonable basis, ICICI Securities, its subsidiaries and associated companies, their directors andmployees (ICICI Securities and affiliates) are under no obligation to update or keep the information current. Also, there may be regulatory, compliance or other reasons that may prevent ICICI Securitiesrom doing so. Non-rated securities indicate that rating on a particular security has been suspended temporarily and such suspension is in compliance wi th applicable regulations and/or ICICI Securitiesolicies, in circumstances where ICICI Securities is acting in an advisory capacity to this company, or in certain other circumstances.

    his report is based on information obtained from public sources and sources believed to be reliable, but no independent verification has been made nor is its accuracy or completeness guaranteed. Thiseport and information herein is solely for informational purpose and may not be used or considered as an offer document or solicitation of offer to buy or sell or subscribe for securities or other financialnstruments. Though disseminated to all the customers simultaneously, not all customers may receive this report at the same time. ICICI Securities will not treat recipients as customers by virtue of theireceiving this report. Nothing in this report constitutes investment, legal, accounting and tax advice or a representation that any investment or strategy is suitable or appropriate to your specificircumstances. The securities discussed and opinions expressed in this report may not be suitable for all investors, who must make their own investment decisions, based on their own investmentbjectives, financial positions and needs of specific recipient. This may not be taken in substitution for the exercise of independent judgment by any recipient. The recipient should independently evaluate

    he investment risks. The value and return of investment may vary because of changes in interest rates, foreign exchange rates or any other reason. ICICI Securities and affi liates accept no liabilities for anyoss or damage of any kind arising out of the use of this report. Past performance is not necessarily a guide to future performance. Investors are advised to see Risk Disclosure Document to understand thesks associated before investing in the securities markets. Actual results may differ materially from those set forth in projections. Forward-looking statements are not predictions and may be subject tohange without notice.

    CICI Securities and its affiliates might have managed or co-managed a public offering for the subject company in the preceding twelve months. ICICI Securities and affiliates might have receivedompensation from the companies mentioned in the report during the period preceding twelve months from the date of this report for services in respect of public offerings, corporate finance, investmentanking or other advisory services in a merger or specific transaction. ICICI Securities and affiliates expect to receive compensation from the companies mentioned in the report within a period of three

    months following the date of publication of the research report for services in respect of public offerings, corporate finance, investment banking or other advisory services in a merger or specificransaction. It is confirmed thatJitesh Bhanot CA research analysts and the authors of this report have not received any compensation from the companies mentioned in the report in the preceding twelve

    months. Our research professionals are paid in part based on the profitability of ICICI Securities, which include earnings from Investment Banking and other business.

    CICI Securities or its subsidiaries collectively do not own 1% or more of the equity securities of the Company mentioned in the report as of the last day of the month preceding the publication of theesearch report.

    is confirmed thatJitesh Bhanot CA research analysts and the authors of this report or any of their family members does not serve as an officer, director or advisory board member of the companiesmentioned in the report.

    CICI Securities may have issued other reports that are inconsistent with and reach different conclusion from the information presented in this report. ICICI Securities and affiliates may act upon or make usef information contained in the report prior to the publication thereof.

    his report is not directed or intended for distribution to, or use by, any person or entity who is a citizen or resident of or located in any locality, state, country or other jurisdiction, where such distribution,ublication, availability or use would be contrary to law, regulation or which would subject ICICI Securities and affiliates to any registration or licensing requirement within such jurisdiction. The securities

    escribed herein may or may not be eligible for sale in all jurisdictions or to certain category of investors. Persons in whose possession this document may come are required to inform themselves of ando observe such restriction.

    CICI Securities Limited has been mandated to act as one of the Book Running Lead Managers to manage the IPO of the subsidiary of Jaiprakash Associates, viz., JP Infratech Limited. This report isrepared on the basis of publicly available information.