Instalacion Sellos de Vapor en Tanques
-
Upload
diego-alencer-rangel-rendon -
Category
Documents
-
view
2 -
download
0
description
Transcript of Instalacion Sellos de Vapor en Tanques
Operator Work Instructions 1 of 3 Mansfield, Texas, USA
Document Owner: M. Edmondson QA-000-00
Date: Operation Name
*Remember to Always wear proper PPE items: Safety glasses No. Symbol
1
2
Vapor Seal Installation
7/16" long socket, 1/4 torque wrench (5 inch-lb), Red rubber gasket, Vapor seal, round metal plate
Tools / Materials needed: Safety Enviro
Sketch Drawing / Documents/Photos(Highlight Key Points)
SOP No:QA-000-00
08/11/14Destructive Testing
na
Instructions: Obtain SOP number and template from Quality Manager. Quality manager will email the form and instructions to requester. Ask Quality manager or Manufacturing Engineer for assistance as needed.
Position red rubber gasket in line with bolt holes
assure that it is clean and clear of debris such as dirt or glass.
Do not apply lubricants, grease or adhesive products to the rubber gasket
material!
Work StationMachine Ergo Quality
Center Vapor Seal between the bolt pattern
Work Elements - What to do Key Points - How to do it
Symbols:
assure that the score side is facing up and that the glass surface is clean and
clear dirt, grease or other debris.
e
Operator Work Instructions 2 of 3 Mansfield, Texas, USA
Document Owner: M. Edmondson QA-000-00
Date: Operation Name
*Remember to Always wear proper PPE items: Safety glasses
Vapor Seal Installation
7/16" long socket, 1/4 torque wrench (5 inch-lb), Red rubber gasket, Vapor seal, round metal plate
Tools / Materials needed: Safety Enviro
Sketch Drawing / Documents/Photos(Highlight Key Points)
SOP No:QA-000-00
08/11/14Destructive Testing
na
Instructions: Obtain SOP number and template from Quality Manager. Quality manager will email the form and instructions to requester. Ask Quality manager or Manufacturing Engineer for assistance as needed.
Work StationMachine Ergo Quality
Symbols:
e
3
4
assure that it is clean and clear of debris such as dirt or glass.
Do not apply lubricants, grease or adhesive products to the rubber gasket
material!
Use the "Criss Cross" process
Align top red rubber gasket to bolt holes
Place metal ring on top and hand snug/tight each bolt
Operator Work Instructions 3 of 3 Mansfield, Texas, USA
Document Owner: M. Edmondson QA-000-00
Date: Operation Name
*Remember to Always wear proper PPE items: Safety glasses
Vapor Seal Installation
7/16" long socket, 1/4 torque wrench (5 inch-lb), Red rubber gasket, Vapor seal, round metal plate
Tools / Materials needed: Safety Enviro
Sketch Drawing / Documents/Photos(Highlight Key Points)
SOP No:QA-000-00
08/11/14Destructive Testing
na
Instructions: Obtain SOP number and template from Quality Manager. Quality manager will email the form and instructions to requester. Ask Quality manager or Manufacturing Engineer for assistance as needed.
Work StationMachine Ergo Quality
Symbols:
e
5Use a 7/16" long socket and set a 1/4 torque wrench to 5 inch - lb. Secure plate to Vapor Seal and gaskets
Use the "Criss Cross" process. Recommendation: Place one hand on
drive to "feel" the torque click when the 5 inch-lb is met