Hoja Calculo Carga Puntual
-
Upload
juliusjulitojulito -
Category
Documents
-
view
220 -
download
0
Transcript of Hoja Calculo Carga Puntual
-
7/28/2019 Hoja Calculo Carga Puntual
1/2
POINT LOAD TESTWORK SHEET
Project : Taupo Geothermal ProjectLocation : TaupoClient : Contact Energy
Borehole number: THM-12Drilled by : Boart LongyearDate Cored toSampling type : HQ3 CoreTested by Opus Project No : 121256.52
Lab Ref No : 08/333/01
Client Ref No :
Test Resultsiametral(D) Point Load
W(width) D(depth) d(diameter) Reading (MPa)
PLT001 275.75 D 60.0 3600.00 60.00 0.66 9.6E-04 0.27 1.09 0.29A 60.0 40.0 3055.77 55.28 1.26 1.8E-03 0.60 1.05 0.63
PLT002 290.89 D 61.7 3806.89 61.70 0.62 9.0E-04 0.24 1.10 0.26A 61.7 57.3 4501.42 67.09 0.34 4.9E-04 0.11 1.14 0.13A 61.7 28.3 2223.22 47.15 0.62 9.0E-04 0.40 0.97 0.39
PLT003 293.63 D 61.7 3806.89 61.70 0.96 1.4E-03 0.37 1.10 0.40A 61.7 46.0 3613.71 60.11 1.00 1.5E-03 0.40 1.09 0.44
PLT004 298.53 D 61.0 3721.00 61.00 0.62 9.0E-04 0.24 1.09 0.26A 61.0 40.0 3106.70 55.74 0.52 7.5E-04 0.24 1.05 0.25A 61.0 40.0 3106.70 55.74 0.74 1.1E-03 0.35 1.05 0.36
PLT005 302.77 D 61.0 3721.00 61.00 0.78 1.1E-03 0.30 1.09 0.33A 61.0 52.0 4038.72 63.55 0.18 2.6E-04 0.06 1.11 0.07
PLT006 305.86 A 62.0 27.0 2131.40 46.17 0.32 4.6E-04 0.22 0.96 0.21PLT007 311.81 D 61.0 3721.00 61.00 0.56 8.1E-04 0.22 1.09 0.24
A 61.0 49.0 3805.71 61.69 0.44 6.4E-04 0.17 1.10 0.18
PLT008 314.84 A 61.0 53.0 4116.38 64.16 0.76 1.1E-03 0.27 1.12 0.30PLT009 317.89 A 61.0 49.0 3805.71 61.69 N/A 0.0E+00 N/APLT010 319.34 D 61.0 3721.00 61.00 0.86 1.2E-03 0.34 1.09 0.37
A 61.0 58.0 4504.72 67.12 1.14 1.7E-03 0.37 1.14 0.42PLT011 323.79 D 60.9 3708.81 60.90 0.72 1.0E-03 0.28 1.09 0.31
A 60.9 25.2 1954.02 44.20 0.54 7.8E-04 0.40 0.95 0.38PLT012 326.21 D 61.1 3733.21 61.10 0.84 1.2E-03 0.33 1.09 0.36
A 61.1 37.2 2893.97 53.80 0.58 8.4E-04 0.29 1.03 0.30PLT013 329.69 D 61.1 3733.21 61.10 1.04 1.5E-03 0.40 1.09 0.44
A 61.1 39.1 3041.78 55.15 1.00 1.5E-03 0.48 1.05 0.50PLT014 330.92 D 61.1 3733.21 61.10 1.00 1.5E-03 0.39 1.09 0.43
A 61.1 42.1 3275.17 57.23 0.74 1.1E-03 0.33 1.06 0.35
Test MethodsPoint Load Test W(width) = (W1 + W2)/2
Diametral core test - Length / Diameter ratio >1
Axial core test - Length / Diameter ratio = 0.3 - 1.0 (Length = D(depth)and Diameter = W(width))
Block test D(depth)/W(width) ratio = 0.3 - 1.0 and L . 0.5W
P = load at failure in MNIs = uncorrected point load strength index in MPa
F = size correction factor
Is(50) = corrected point load strength index in MPa
Designation : Senior Civil Engineering Technician
Date :
CtR point loadBB( 1/07/08 ) Page 1 of 2
Is(50)Is(MPa) FP (MN)
ISRM Point Load Test
De (mm)D2(mm
2)
xial (A)or Block (B)Tes
25/07/200823/07/08
Test no Depth(m) Type
Opus International Consultants Ltd
Hamilton LaboratoryQuality Management Systems Certified to ISO 9001
Fox Street
Private Bag 3057
Hamilton, New Zealand
Telephone +064 7 856
2870
Facsimile +064 7 856
-
7/28/2019 Hoja Calculo Carga Puntual
2/2
POINT LOAD TESTWORK SHEET
Project : Taupo Geothermal ProjectLocation : TaupoClient : Contact Energy
Borehole number: THM-12Drilled by : Boart Longyear
Date Cored toSampling type : HQ3 CoreTested by Opus Project No : 121256.52
Lab Ref No : 08/333/01
Client Ref No :
Test Resultsiametral(D) Point Load
W(width) D(depth) d(diameter) Reading (MPa)
PLT015 335.29 D 61.0 3721.00 61.00 0.66 9.6E-04 0.26 1.09 0.28335.29 A 61.0 44.0 3417.37 58.46 0.86 1.2E-03 0.36 1.07 0.39
PLT016 344.89 D 61.0 3721.00 61.00 0.78 1.1E-03 0.30 1.09 0.33
344.89 A 61.0 32.0 2485.36 49.85 0.40 5.8E-04 0.23 1.00 0.23PLT 017 348.89 A 61.0 39.0 3029.04 55.04 0.80 1.2E-03 0.38 1.04 0.40PLT018 356.26 D 61.0 3721.00 61.00 0.36 5.2E-04 0.14 1.09 0.15
A 61.0 54.0 4194.05 64.76 0.82 1.2E-03 0.28 1.12 0.32PLT019 356.26 A 61.0 32.0 2485.36 49.85 0.40 5.8E-04 0.23 1.00 0.23PLT020 359.79 D 61.0 3721.00 61.00 0.90 1.3E-03 0.35 1.09 0.38
A 61.0 44.0 3417.37 58.46 0.84 1.2E-03 0.36 1.07 0.38PLT021 362.80 D 61.0 3721.00 61.00 0.32 4.6E-04 0.12 1.09 0.14
A 61.0 34.0 2640.70 51.39 0.24 3.5E-04 0.13 1.01 0.13PLT022 363.89 D 61.4 3769.96 61.40 0.66 9.6E-04 0.25 1.10 0.28
A 61.4 47.0 3674.31 60.62 0.20 2.9E-04 0.08 1.09 0.09PLT023 366.79 D 60.8 3696.64 60.80 0.56 8.1E-04 0.22 1.09 0.24
A 60.8 38.5 2980.40 54.59 0.18 2.6E-04 0.09 1.04 0.09PTL024 369.79 D 60.4 3648.16 60.40 0.54 7.8E-04 0.21 1.09 0.23A 60.8 39.9 3088.78 55.58 0.38 5.5E-04 0.18 1.05 0.19
PTL025 372.48 D 60.9 3708.81 60.90 0.42 6.1E-04 0.16 1.09 0.18A 60.9 48.8 3783.97 61.51 0.48 7.0E-04 0.18 1.10 0.20
PTL026 374.89 D 60.2 3624.04 60.20 1.08 1.6E-03 0.43 1.09 0.47PLT027 377.89 A 61.0 52.0 4038.72 63.55 0.52 7.5E-04 0.19 1.11 0.21PLT028 380.35 A 62.0 42.0 3315.52 57.58 0.48 7.0E-04 0.21 1.07 0.22
Test MethodsPoint Load Test W(width) = (W1 + W2)/2
Diametral core test - Length / Diameter ratio >1
Axial core test - Length / Diameter ratio = 0.3 - 1.0 (Length = D(depth)and Diameter = W(width))
Block test D(depth)/W(width) ratio = 0.3 - 1.0 and L . 0.5W
P = load at failure in MNIs = uncorrected point load strength index in MPa
F = size correction factor
Is(50) = corrected point load strength index in MPa
Designation : Senior Civil Engineering Technician Date :
CtR point loadBB( 1/07/08 ) Page 2 of 2
Is(50)
ISRM Point Load Test
D2(mm
2) De (mm) P (MN) Is(MPa)Test no Depth(m) Type
25/07/08 26/07/2008
xial (A)or Block (B)TesF
Opus International Consultants Ltd
Hamilton LaboratoryQuality Management Systems Certified to ISO 9001
Fox Street
Private Bag 3057
Hamilton, New Zealand
Telephone +064 7 856
2870
Facsimile +064 7 856
Opus Internation Consultants 2