DISEÑO CIMENTACIONES SAFE

of 32 /32
PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE PROYECTO DEPARTAMENTO : HUANCAVELICA PROVINCIA : ANGARAES DISTRITO : JULCAMARCA LUGAR : JULCAMARCA FECHA : MAYO 2011 MÓDULO: AULAS Zapata A-1 P(kg) Vx (kg) Vy(kg) Mx (kg-m) My(kg-m) Carga Muerta + Peso 14,537.27 312.34 732.18 -173.91 336.93 Carga Viva Pasadizo -1,369.20 1.16 -474.31 293.94 1.25 Carga Viva Aulas 3,351.60 169.63 335.69 -151.96 183.16 Carga Viva Techo 730.84 -15.69 60.77 -11.15 -16.92 RESUMEN P(kg) Vx (kg) Vy(kg) Mx (kg-m) My(kg-m) Carga Muerta 14,537.27 312.34 732.18 -173.91 336.93 Carga Viva 2,713.24 155.10 -77.85 130.84 167.48 Zapata A-2 P(kg) Vx (kg) Vy(kg) Mx (kg-m) My(kg-m) Carga Muerta + Peso 24,467.49 2.54 961.83 -982.94 2.92 Carga Viva Pasadizo -131.80 0.03 -206.82 300.79 0.04 Carga Viva Aulas 8,918.50 -5.04 1,257.12 -1,388.78 -5.00 Carga Viva Techo 2,346.97 2.36 1.78 1.12 2.52 : CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. J DEL DISTRITO DE JULCAMARCA

Embed Size (px)

Transcript of DISEÑO CIMENTACIONES SAFE

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA MDULO: AULAS Zapata A-1Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

P(kg) 14,537.27 -1,369.20 3,351.60 730.84 P(kg) 14,537.27 2,713.24

Vx (kg) 312.34 1.16 169.63 -15.69 Vx (kg) 312.34 155.10

Vy(kg) 732.18 -474.31 335.69 60.77 Vy(kg) 732.18 -77.85

Mx (kg-m) -173.91 293.94 -151.96 -11.15 Mx (kg-m) -173.91 130.84

My(kg-m) 336.93 1.25 183.16 -16.92 My(kg-m) 336.93 167.48

RESUMEN Carga Muerta Carga Viva

Zapata A-2Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 24,467.49 -131.80 8,918.50 2,346.97 P(kg)

Vx (kg) 2.54 0.03 -5.04 2.36 Vx (kg)

Vy(kg) 961.83 -206.82 1,257.12 1.78 Vy(kg)

Mx (kg-m) -982.94 300.79 -1,388.78 1.12 Mx (kg-m)

My(kg-m) 2.92 0.04 -5.00 2.52 My(kg-m)

RESUMEN

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA Carga Muerta Carga Viva

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 24,467.49 11,133.67 2.54 -2.65 961.83 1,052.08 -982.94 -1,086.87 2.92 -2.44

Zapata A-3Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,632.32 -1,292.31 6,629.68 1,882.75 P(kg) 22,632.32 7,220.12

Vx (kg) -0.48 0.06 0.13 -0.10 Vx (kg) -0.48 0.09

Vy(kg) 954.17 -486.74 621.58 104.30 Vy(kg) 954.17 239.14

Mx (kg-m) -249.47 239.94 -267.21 -6.49 Mx (kg-m) -249.47 -33.76

My(kg-m) -0.32 0.07 0.53 -0.11 My(kg-m) -0.32 0.48

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata A-4Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 24,525.96 -118.48 8,951.47 2,379.89 P(kg) 24,525.96 11,212.88

Vx (kg) -0.22 0.00 -0.36 0.00 Vx (kg) -0.22 -0.36

Vy(kg) 960.21 -209.85 1,257.99 1.95 Vy(kg) 960.21 1,050.09

Mx (kg-m) -981.17 304.13 -1,389.75 0.93 Mx (kg-m) -981.17 -1,084.69

My(kg-m) -0.04 0.01 0.02 0.00 My(kg-m) -0.04 0.02

RESUMEN Carga Muerta Carga Viva

Zapata A-5Carga Muerta + Peso Prop. Carga Viva Pasadizo

P(kg) 22,632.32 -1,292.32

Vx (kg) 0.48 -0.05

Vy(kg) 954.18 -486.74

Mx (kg-m) -249.47 239.94

My(kg-m) 0.71 -0.05

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 6,629.79 1,882.75 P(kg) 22,632.32 7,220.22 -0.33 0.10 Vx (kg) 0.48 -0.28 621.62 104.30 Vy(kg) 954.18 239.18 -267.23 -6.49 Mx (kg-m) -249.47 -33.78 0.04 0.11 My(kg-m) 0.71 0.10

RESUMEN Carga Muerta Carga Viva

Zapata A-6Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 24,467.55 -131.80 8,918.49 2,346.99 P(kg) 24,467.55 11,133.68

Vx (kg) -2.98 -0.03 4.32 -2.36 Vx (kg) -2.98 1.93

Vy(kg) 961.83 -206.82 1,257.13 1.78 Vy(kg) 961.83 1,052.09

Mx (kg-m) -982.95 300.79 -1,388.80 1.12 Mx (kg-m) -982.95 -1,086.89

My(kg-m) -2.99 -0.03 5.03 -2.52 My(kg-m) -2.99 2.48

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata A-7Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 14,535.89 -1,369.25 3,350.56 730.86 P(kg) 14,535.89 2,712.17

Vx (kg) -312.33 -1.15 -169.68 15.68 Vx (kg) -312.33 -155.15

Vy(kg) 732.44 -474.30 335.94 60.79 Vy(kg) 732.44 -77.57

Mx (kg-m) -174.22 294.00 -152.22 -11.17 Mx (kg-m) -174.22 130.61

My(kg-m) -336.63 -1.24 -182.71 16.91 My(kg-m) -336.63 -167.04

RESUMEN Carga Muerta Carga Viva

Zapata B-1

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 P(kg) 10,677.70 137.20 2,301.23 768.85 P(kg) 10,677.70 3,207.28 Vx (kg) 8.07 1.60 2.82 -0.79 Vx (kg) 8.07 3.63 Vy(kg) -425.91 -507.40 -3.53 53.92 Vy(kg) -425.91 -457.01 Mx (kg-m) 269.22 293.47 -13.65 -13.44 Mx (kg-m) 269.22 266.38 My(kg-m) 9.12 1.81 3.20 -0.89 My(kg-m) 9.12 4.12

Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

RESUMEN Carga Muerta Carga Viva

Zapata B-3Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 13,834.27 112.28 4,515.30 1,414.74 P(kg) 13,834.27 6,042.32

Vx (kg) 0.00 -0.02 0.01 0.00 Vx (kg) 0.00 -0.01

Vy(kg) -339.37 -395.60 -39.90 85.85 Vy(kg) -339.37 -349.65

Mx (kg-m) 320.33 378.27 -21.00 -29.33 Mx (kg-m) 320.33 327.94

My(kg-m) 0.01 -0.03 0.03 0.00 My(kg-m) 0.01 0.00

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata B-5Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 13,834.25 112.28 4,515.30 1,414.73 P(kg) 13,834.25 6,042.31

Vx (kg) 0.00 0.02 -0.01 0.00 Vx (kg) 0.00 0.01

Vy(kg) -339.37 -395.60 -39.84 85.85 Vy(kg) -339.37 -349.59

Mx (kg-m) 320.32 378.27 -21.02 -29.34 Mx (kg-m) 320.32 327.92

My(kg-m) 0.01 0.03 0.00 0.00 My(kg-m) 0.01 0.03

RESUMEN Carga Muerta Carga Viva

Zapata B-7 P(kg) Vx (kg) Vy(kg) Mx (kg-m) My(kg-m)

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 10,677.59 137.17 2,301.07 768.87 P(kg) 10,677.59 3,207.11 -8.07 -1.60 -2.81 0.79 Vx (kg) -8.07 -3.62 -425.80 -507.39 -3.30 53.93 Vy(kg) -425.80 -456.76 269.22 293.48 -13.71 -13.44 Mx (kg-m) 269.22 266.33 -9.11 -1.81 -3.17 0.89 My(kg-m) -9.11 -4.09

RESUMEN Carga Muerta Carga Viva

Zapata C-1Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,888.77 4,886.02 2,299.04 2,366.51 P(kg) 22,888.77 9,551.57

Vx (kg) -353.77 -149.46 -53.77 20.69 Vx (kg) -353.77 -182.54

Vy(kg) -1,186.81 -9.27 -328.55 -69.13 Vy(kg) -1,186.81 -406.95

Mx (kg-m) 203.21 -229.74 168.32 17.43 Mx (kg-m) 203.21 -44.00

My(kg-m) 381.74 161.15 58.48 -22.30 My(kg-m) 381.74 197.33

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata C-2Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 32,233.71 6,855.78 7,327.82 4,346.03 P(kg) 32,233.71 18,529.63

Vx (kg) 11.85 12.32 -0.46 1.71 Vx (kg) 11.85 13.57

Vy(kg) -17.41 1,206.38 -1,209.36 -72.24 Vy(kg) -17.41 -75.22

Mx (kg-m) 95.59 -1,256.20 1,328.27 82.68 Mx (kg-m) 95.59 154.74

My(kg-m) 12.88 13.19 -0.10 1.83 My(kg-m) 12.88 14.92

RESUMEN Carga Muerta Carga Viva

Zapata C-3Carga Muerta + Peso Prop.

P(kg) 33,896.92

Vx (kg) -1.34

Vy(kg) -1,159.59

Mx (kg-m) -127.24

My(kg-m) -1.24

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 8,527.03 4,597.51 4,297.77 P(kg) 33,896.92 17,422.31 -1.52 0.93 0.00 Vx (kg) -1.34 -0.59 363.81 -664.82 -129.25 Vy(kg) -1,159.59 -430.26 -724.02 350.03 40.49 Mx (kg-m) -127.24 -333.50 -1.62 1.38 0.00 My(kg-m) -1.24 -0.24

RESUMEN Carga Muerta Carga Viva

Zapata C-4Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 32,446.70 6,930.53 7,441.70 4,443.88 P(kg) 32,446.70 18,816.11

Vx (kg) 0.11 0.00 0.22 0.00 Vx (kg) 0.11 0.22

Vy(kg) 1.30 1,229.68 -1,194.91 -73.96 Vy(kg) 1.30 -39.19

Mx (kg-m) 74.97 -1,281.89 1,312.36 84.58 Mx (kg-m) 74.97 115.04

My(kg-m) 0.31 0.01 0.62 0.00 My(kg-m) 0.31 0.63

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata C-5Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 33,896.87 8,527.04 4,597.40 4,297.75 P(kg) 33,896.87 17,422.19

Vx (kg) 1.56 1.53 -0.51 0.00 Vx (kg) 1.56 1.02

Vy(kg) -1,159.59 363.80 -664.78 -129.24 Vy(kg) -1,159.59 -430.22

Mx (kg-m) -127.24 -724.01 350.00 40.49 Mx (kg-m) -127.24 -333.51

My(kg-m) 1.86 1.64 -0.16 0.00 My(kg-m) 1.86 1.47

RESUMEN Carga Muerta Carga Viva

Zapata C-6Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas

P(kg) 32,233.92 6,855.76 7,327.81

Vx (kg) -11.63 -12.31 0.89

Vy(kg) -17.41 1,206.38 -1,209.35

Mx (kg-m) 95.58 -1,256.20 1,328.23

My(kg-m) -12.25 -13.18 1.34

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 4,346.12 P(kg) 32,233.92 18,529.69 -1.71 Vx (kg) -11.63 -13.13 -72.23 Vy(kg) -17.41 -75.20 82.67 Mx (kg-m) 95.58 154.71 -1.83 My(kg-m) -12.25 -13.67

RESUMEN Carga Muerta Carga Viva

Zapata C-7Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,888.93 4,886.08 2,298.40 2,366.60 P(kg) 22,888.93 9,551.08

Vx (kg) -353.77 -149.46 -53.77 20.69 Vx (kg) -353.77 -182.54

Vy(kg) -1,186.81 -9.27 -328.55 -69.13 Vy(kg) -1,186.81 -406.95

Mx (kg-m) 203.14 -229.66 168.19 17.41 Mx (kg-m) 203.14 -44.06

My(kg-m) -381.55 -161.24 -57.78 22.33 My(kg-m) -381.55 -196.69

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA MDULO: AULAS Zapata A-1Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

P(kg) 14,537.27 -1,369.20 3,351.60 730.84 P(kg) 20,352.18 4,612.51

Vx (kg) 312.34 1.16 169.63 -15.69 Vx (kg) 437.28 263.67

Vy(kg) 732.18 -474.31 335.69 60.77 Vy(kg) 1,025.05 -132.35

Mx (kg-m) -173.91 293.94 -151.96 -11.15 Mx (kg-m) -243.47 222.42

My(kg-m) 336.93 1.25 183.16 -16.92 My(kg-m) 471.70 284.72

RESUMEN Carga Muerta Carga Viva

Zapata A-2Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 24,467.49 -131.80 8,918.50 2,346.97 P(kg)

Vx (kg) 2.54 0.03 -5.04 2.36 Vx (kg)

Vy(kg) 961.83 -206.82 1,257.12 1.78 Vy(kg)

Mx (kg-m) -982.94 300.79 -1,388.78 1.12 Mx (kg-m)

My(kg-m) 2.92 0.04 -5.00 2.52 My(kg-m)

RESUMEN

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA Carga Muerta Carga Viva

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 34,254.49 18,927.24 3.56 -4.51 1,346.56 1,788.54 -1,376.12 -1,847.68 4.09 -4.14

Zapata A-3Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,632.32 -1,292.31 6,629.68 1,882.75 P(kg) 31,685.25 12,274.20

Vx (kg) -0.48 0.06 0.13 -0.10 Vx (kg) -0.67 0.15

Vy(kg) 954.17 -486.74 621.58 104.30 Vy(kg) 1,335.84 406.54

Mx (kg-m) -249.47 239.94 -267.21 -6.49 Mx (kg-m) -349.25 -57.39

My(kg-m) -0.32 0.07 0.53 -0.11 My(kg-m) -0.45 0.82

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata A-4Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 24,525.96 -118.48 8,951.47 2,379.89 P(kg) 34,336.34 19,061.90

Vx (kg) -0.22 0.00 -0.36 0.00 Vx (kg) -0.31 -0.61

Vy(kg) 960.21 -209.85 1,257.99 1.95 Vy(kg) 1,344.29 1,785.15

Mx (kg-m) -981.17 304.13 -1,389.75 0.93 Mx (kg-m) -1,373.63 -1,843.97

My(kg-m) -0.04 0.01 0.02 0.00 My(kg-m) -0.05 0.04

RESUMEN Carga Muerta Carga Viva

Zapata A-5Carga Muerta + Peso Prop. Carga Viva Pasadizo

P(kg) 22,632.32 -1,292.32

Vx (kg) 0.48 -0.05

Vy(kg) 954.18 -486.74

Mx (kg-m) -249.47 239.94

My(kg-m) 0.71 -0.05

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 6,629.79 1,882.75 P(kg) 31,685.25 12,274.37 -0.33 0.10 Vx (kg) 0.67 -0.48 621.62 104.30 Vy(kg) 1,335.85 406.61 -267.23 -6.49 Mx (kg-m) -349.26 -57.43 0.04 0.11 My(kg-m) 0.99 0.18

RESUMEN Carga Muerta Carga Viva

Zapata A-6Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 24,467.55 -131.80 8,918.49 2,346.99 P(kg) 34,254.57 18,927.26

Vx (kg) -2.98 -0.03 4.32 -2.36 Vx (kg) -4.17 3.28

Vy(kg) 961.83 -206.82 1,257.13 1.78 Vy(kg) 1,346.56 1,788.55

Mx (kg-m) -982.95 300.79 -1,388.80 1.12 Mx (kg-m) -1,376.12 -1,847.72

My(kg-m) -2.99 -0.03 5.03 -2.52 My(kg-m) -4.19 4.21

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata A-7Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 14,535.89 -1,369.25 3,350.56 730.86 P(kg) 20,350.25 4,610.69

Vx (kg) -312.33 -1.15 -169.68 15.68 Vx (kg) -437.26 -263.76

Vy(kg) 732.44 -474.30 335.94 60.79 Vy(kg) 1,025.42 -131.87

Mx (kg-m) -174.22 294.00 -152.22 -11.17 Mx (kg-m) -243.91 222.03

My(kg-m) -336.63 -1.24 -182.71 16.91 My(kg-m) -471.28 -283.96

RESUMEN Carga Muerta Carga Viva

Zapata B-1

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 P(kg) 10,677.70 137.20 2,301.23 768.85 P(kg) 14,948.78 5,452.38 Vx (kg) 8.07 1.60 2.82 -0.79 Vx (kg) 11.30 6.17 Vy(kg) -425.91 -507.40 -3.53 53.92 Vy(kg) -596.27 -776.92 Mx (kg-m) 269.22 293.47 -13.65 -13.44 Mx (kg-m) 376.90 452.85 My(kg-m) 9.12 1.81 3.20 -0.89 My(kg-m) 12.77 7.00

Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

RESUMEN Carga Muerta Carga Viva

Zapata B-3Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 13,834.27 112.28 4,515.30 1,414.74 P(kg) 19,367.98 10,271.94

Vx (kg) 0.00 -0.02 0.01 0.00 Vx (kg) 0.00 -0.02

Vy(kg) -339.37 -395.60 -39.90 85.85 Vy(kg) -475.12 -594.41

Mx (kg-m) 320.33 378.27 -21.00 -29.33 Mx (kg-m) 448.46 557.49

My(kg-m) 0.01 -0.03 0.03 0.00 My(kg-m) 0.02 0.00

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata B-5Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 13,834.25 112.28 4,515.30 1,414.73 P(kg) 19,367.95 10,271.93

Vx (kg) 0.00 0.02 -0.01 0.00 Vx (kg) 0.00 0.02

Vy(kg) -339.37 -395.60 -39.84 85.85 Vy(kg) -475.12 -594.30

Mx (kg-m) 320.32 378.27 -21.02 -29.34 Mx (kg-m) 448.45 557.46

My(kg-m) 0.01 0.03 0.00 0.00 My(kg-m) 0.01 0.05

RESUMEN Carga Muerta Carga Viva

Zapata B-7 P(kg) Vx (kg) Vy(kg) Mx (kg-m) My(kg-m)

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 10,677.59 137.17 2,301.07 768.87 P(kg) 14,948.63 5,452.09 -8.07 -1.60 -2.81 0.79 Vx (kg) -11.30 -6.15 -425.80 -507.39 -3.30 53.93 Vy(kg) -596.12 -776.49 269.22 293.48 -13.71 -13.44 Mx (kg-m) 376.91 452.76 -9.11 -1.81 -3.17 0.89 My(kg-m) -12.75 -6.95

RESUMEN Carga Muerta Carga Viva

Zapata C-1Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,888.77 4,886.02 2,299.04 2,366.51 P(kg) 32,044.28 16,237.67

Vx (kg) -353.77 -149.46 -53.77 20.69 Vx (kg) -495.28 -310.32

Vy(kg) -1,186.81 -9.27 -328.55 -69.13 Vy(kg) -1,661.53 -691.82

Mx (kg-m) 203.21 -229.74 168.32 17.43 Mx (kg-m) 284.50 -74.79

My(kg-m) 381.74 161.15 58.48 -22.30 My(kg-m) 534.44 335.46

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata C-2Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 32,233.71 6,855.78 7,327.82 4,346.03 P(kg) 45,127.19 31,500.37

Vx (kg) 11.85 12.32 -0.46 1.71 Vx (kg) 16.59 23.07

Vy(kg) -17.41 1,206.38 -1,209.36 -72.24 Vy(kg) -24.37 -127.87

Mx (kg-m) 95.59 -1,256.20 1,328.27 82.68 Mx (kg-m) 133.83 263.06

My(kg-m) 12.88 13.19 -0.10 1.83 My(kg-m) 18.03 25.36

RESUMEN Carga Muerta Carga Viva

Zapata C-3Carga Muerta + Peso Prop.

P(kg) 33,896.92

Vx (kg) -1.34

Vy(kg) -1,159.59

Mx (kg-m) -127.24

My(kg-m) -1.24

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 8,527.03 4,597.51 4,297.77 P(kg) 47,455.69 29,617.93 -1.52 0.93 0.00 Vx (kg) -1.88 -1.00 363.81 -664.82 -129.25 Vy(kg) -1,623.43 -731.44 -724.02 350.03 40.49 Mx (kg-m) -178.14 -566.94 -1.62 1.38 0.00 My(kg-m) -1.73 -0.41

RESUMEN Carga Muerta Carga Viva

Zapata C-4Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 32,446.70 6,930.53 7,441.70 4,443.88 P(kg) 45,425.38 31,987.39

Vx (kg) 0.11 0.00 0.22 0.00 Vx (kg) 0.15 0.37

Vy(kg) 1.30 1,229.68 -1,194.91 -73.96 Vy(kg) 1.82 -66.62

Mx (kg-m) 74.97 -1,281.89 1,312.36 84.58 Mx (kg-m) 104.96 195.57

My(kg-m) 0.31 0.01 0.62 0.00 My(kg-m) 0.44 1.06

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata C-5Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 33,896.87 8,527.04 4,597.40 4,297.75 P(kg) 47,455.62 29,617.72

Vx (kg) 1.56 1.53 -0.51 0.00 Vx (kg) 2.18 1.73

Vy(kg) -1,159.59 363.80 -664.78 -129.24 Vy(kg) -1,623.43 -731.37

Mx (kg-m) -127.24 -724.01 350.00 40.49 Mx (kg-m) -178.14 -566.97

My(kg-m) 1.86 1.64 -0.16 0.00 My(kg-m) 2.60 2.50

RESUMEN Carga Muerta Carga Viva

Zapata C-6Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas

P(kg) 32,233.92 6,855.76 7,327.81

Vx (kg) -11.63 -12.31 0.89

Vy(kg) -17.41 1,206.38 -1,209.35

Mx (kg-m) 95.58 -1,256.20 1,328.23

My(kg-m) -12.25 -13.18 1.34

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHACarga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 4,346.12 P(kg) 45,127.49 31,500.47 -1.71 Vx (kg) -16.28 -22.32 -72.23 Vy(kg) -24.37 -127.84 82.67 Mx (kg-m) 133.81 263.01 -1.83 My(kg-m) -17.15 -23.24

RESUMEN Carga Muerta Carga Viva

Zapata C-7Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,888.93 4,886.08 2,298.40 2,366.60 P(kg) 32,044.50 16,236.84

Vx (kg) -353.77 -149.46 -53.77 20.69 Vx (kg) -495.28 -310.32

Vy(kg) -1,186.81 -9.27 -328.55 -69.13 Vy(kg) -1,661.53 -691.82

Mx (kg-m) 203.14 -229.66 168.19 17.41 Mx (kg-m) 284.39 -74.90

My(kg-m) -381.55 -161.24 -57.78 22.33 My(kg-m) -534.17 -334.38

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA MDULO: AULAS Zapata A-1Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

P(kg) 14,537.27 -1,369.20 3,351.60 730.84 P(kg) 14,537.27 2,713.24

Vx (kg) 312.34 1.16 169.63 -15.69 Vx (kg) 312.34 155.10

Vy(kg) 732.18 -474.31 335.69 60.77 Vy(kg) 732.18 -77.85

Mx (kg-m) -173.91 293.94 -151.96 -11.15 Mx (kg-m) -173.91 130.84

My(kg-m) 336.93 1.25 183.16 -16.92 My(kg-m) 336.93 167.48

RESUMEN Carga Muerta Carga Viva

Zapata A-7Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 14,535.89 -1,369.25 3,350.56 730.86 P(kg)

Vx (kg) -312.33 -1.15 -169.68 15.68 Vx (kg)

Vy(kg) 732.44 -474.30 335.94 60.79 Vy(kg)

Mx (kg-m) -174.22 294.00 -152.22 -11.17 Mx (kg-m)

My(kg-m) -336.63 -1.24 -182.71 16.91 My(kg-m)

RESUMEN

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA Carga Muerta Carga Viva

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011 14,535.89 2,712.17 -312.33 -155.15 732.44 -77.57 -174.22 130.61 -336.63 -167.04

Zapata C-1Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,888.77 4,886.02 2,299.04 2,366.51 P(kg) 22,888.77 9,551.57

Vx (kg) -353.77 -149.46 -53.77 20.69 Vx (kg) -353.77 -182.54

Vy(kg) -1,186.81 -9.27 -328.55 -69.13 Vy(kg) -1,186.81 -406.95

Mx (kg-m) 203.21 -229.74 168.32 17.43 Mx (kg-m) 203.21 -44.00

My(kg-m) 381.74 161.15 58.48 -22.30 My(kg-m) 381.74 197.33

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011

Zapata C-7Carga Muerta + Peso Prop. Carga Viva Pasadizo Carga Viva Aulas Carga Viva Techo

P(kg) 22,888.93 4,886.08 2,298.40 2,366.60 P(kg) 22,888.93 9,551.08

Vx (kg) -353.77 -149.46 -53.77 20.69 Vx (kg) -353.77 -182.54

Vy(kg) -1,186.81 -9.27 -328.55 -69.13 Vy(kg) -1,186.81 -406.95

Mx (kg-m) 203.14 -229.66 168.19 17.41 Mx (kg-m) 203.14 -44.06

My(kg-m) -381.55 -161.24 -57.78 22.33 My(kg-m) -381.55 -196.69

RESUMEN Carga Muerta Carga Viva

PREDIMENSIONAMIENTO DE CIMENTACIONES - SAFE

PROYECTO DEPARTAMENTO PROVINCIA DISTRITO LUGAR FECHA

: CONSTRUCCION, MEJORAMIENTO E IMPLEMENTACION DE LA I.E. JESUS NAZARENO DEL DISTRITO DE JULCAMARCA : HUANCAVELICA : ANGARAES : JULCAMARCA : JULCAMARCA : MAYO 2011