DAC Presentation - 150927

21
DYNAMIC ANGOLA CONTRACTORS Lda. Luanda, Angola 28/09/15

Transcript of DAC Presentation - 150927

DYNAMIC ANGOLA CONTRACTORS Lda.

Luanda, Angola28/09/15

IndexIndex

Dynamic Industries International

Dynamic Angola Contractors

Dynamic Experience in Angola

Who Are weWho Are we

Dynamic Industries, Inc (“Dynamic”) was founded in 1985 as an offshoreservices company, specializing in interconnecting pipe fabrication, associatedpipe installation and commissioning and offshore maintenance services.

Through a change of ownership in 1998 Dynamic quickly grew to become oneof the premier hook up & commissioning contractors in the Gulf of Mexico. In2007 one of the largest private equity firms in the U.S. acquired majorityownership in Dynamic. With significant investment and human assetsDynamic Industries expanded its footprint globally and now operates in WestAfrica, Mexico, Caribbean, South America and the Middle East.

In 2012 our parent company changed its name from Moreno Group, LLC toDynamic Energy Services International, LLC (DYNESI) to better representwhat it had become.

Who Are weWho Are we

Dynamic is your global partner in Fabrication, Construction and MaintenanceServices, coupled with the specialty products and services of its sistercompanies, Dynamic is able to provide its offshore and onshore clients a totalsolution to their overall needs.

Upstream EPCI Greenfield: Platform & Module Fabrication.

Upstream and Downstream EPCI Brownfield: upgrades, modification, maintenance, Hook Up & Commissioning services.

Process Pipe / Structural Fabrication.

Technical Services – Electrical / Instrumentation.

Dynamic Safety Hygiene and EnvironmentDynamic Safety Hygiene and Environment

SH&E is considered a Core Value within our organization, with our mottobeing “Everyone Arrives Home Safely.”

Our belief is every incident is preventable, and we constantly work tocommunicate Lessons Learned, through Safety Alerts, SH&E Meetings,Safety Moments in internal meetings, Key Performance Indicators (KPI’s) andanalysis of behavioral safety observation, among other methods.

Dynamic US FacilitiesDynamic US Facilities

East YardNew Iberia, LA

• 95 Acres• 30,000 Tons Annually / 5,500

Tons load out• GOM/Intercoastal Waterway

access

Lake Charles, LA Facility

• 65 Acres• 20,000 Tons Annually /

10,000 Tons load out• Deepwater / GOM access

(40’) • 1.5 hour drive from Houston

Dynamic WorldwideDynamic Worldwide

US Based Operations

International Operations

2 Major Fabrication Facilities5 Construction Support Facilities

Corporate Office – New Orleans, LA Head Operations Office – Lafayette, LA

International HQ – Houston, TX

Luanda, Angola - Project OfficeDande, Angola - Operations / FacilitiesSoyo, Angola – Support FacilityCabinda, Angola - Logistics

Saudi Arabia – El Kobar

- Operations / Facilities

– Project Office

Marabella, Trinidad- Project Office - Operations / Facilities

Barra da Tijuca - Rio de Janeiro , Brazil- Sales Project Office

Dynamic Angola ContractorsDynamic Angola Contractors

• Founded in 2007 as an Angolan company by Dynamic.

• Focused towards:

EPCI for Brownfield Modifications, Fabrication, Maintenance ofUpstream production facilities.

Fabrication of piping and structural components required for themodification works.

• Successfully completed several projects for CABGOC, ESSO, OPS,TECHNIP & TOTAL.

• DAC represents Dynamic commitment and investment to the AngolanDevelopment.

Dynamic Angola ContractorsDynamic Angola Contractors

• Presence in Luanda, Dande, Soyo and Cabinda.

• LUANDA Head Office - 230 m2.

• DANDE Fabrication Yard - 20,000 m2.

• SOYO Logistic Yard – 1,000 m2.

• CABINDA Office - 20 m2.

• Total Workforce 80 employees, 40 employees are based in Dande, almost80% National employees.

DAC Dande CapacityDAC Dande Capacity

• 20,000 m2 Dande Fabrication facility with direct Quay access

• 150,000 m2 expansion capability

• 40 men Accommodation Camp

• Capacity 100,000 Man-hours

• Ability to work assemblies up to 60MT

DAC Dande CapacityDAC Dande Capacity

• Construction areas:

Outdoor 20,000 m2 & Dimensions 80m x 250m.

Indoor 1400 m2 up to 2800 m2 (Modular Shelter).

Main Workshop 70m x 20m x 10m

Door sizes 20m x 10m

2 Overhead Cranes (2 x 10MT)

Hook Clearance of 6m

Mobile Crane 35MT

• Blasting and Painting area (length x width x height):

Dimensions 38m x 13,7m x 6m

Door size (width x height meters) – 13,7m x 6m

Location of DAC Fabrication Yard(Angoflex Facility in Barra do Dande)

DAC Dande LocationDAC Dande Location

Location of DAC Fabrication Yard(Angoflex Facility in Barra do Dande)

DAC Dande Fabrication YardDAC Dande Fabrication Yard

DAC Dande FacilitiesDAC Dande Facilities

P. Allard GMA

Managing Director

Andre Malau LOG

Manager M4

Tania FerreiraADM

Assistant S4

Rico JoubertPRO

Manager M1

S. MukokoHRM

Manager M2

Lucas Cabongo

SHE Manager M2

Brian DavisonProject

Manager M1

Francisco Silva

TravelAssistant S3

Caleb LendaCabinda Logistics

S3

JosiasApolinario

FINSupervisor S2

Nuno MoraisHRM

Supervisor S1

Stefano Silva FIN

Supervisor S2

Nathan Niemack

Engineering M2

Tyron AaronsFabrication Manager

M2

Production

Bruno PlachaQMS

Manager M2

EXPAT NATIONAL

Luanda Ambiente

Support TeamX2

Accounting ClerkFINE1

C. FilliesAccomodation

M3

Carlos SilveiraOPS + PRCManager M2

Bruno PlachaQAQC

Manager M2

H.MatadidiMaterail

CoordinatorE1

Miguel CastroMaterail

CoordinatorX1 E1C. Nlandu

Soyo LogisticsS3

E. RodriguesPersonnel

E1

Administrative and Logistics Support

DAC OrganizationDAC Organization

• DAC HR strategy is dedicated to our Angolanization Plan.

• DAC is promoting a climate of satisfaction, motivation and pride in thecompany’s mission and internal values amongst local employees.

• Key elements of DAC Angolanizaion Plan.

Recruitment

Training

Upskilling

Succession Plan (Management)

DAC AngolanizationDAC Angolanization

DAC TrainingDAC Training

Industrial Division

Capital Projects:• CABGOC – BANZALA LAGO PROJECT $250MM, EPCI for 2 wellhead,

platforms, 5 pipelines and 2 subsea umbilicals.• CABGOC – NEMBA ESR PROJECT $458MM, EPCI of 500t of structural

components, and 2,600 piping spools, 2 000 000 manhours.• CABGOC – NEMBA STAGE 2 PROJECT $262MM, EPC and Offshore

Hook-up of Piping, and E&I work associated.• CABGOC – CRX PROJECT BROWNFIELD SCOPE $300MM, EPC and

Offshore Hook-up of Piping, and E&I work associated with hook-up of CRXPipeline.

• CABGOC – CRX1/SPP PROJECT (ONGOING) $200MM, EPC and OffshoreHook-up of Piping, and E&I work associated with hook-up of CRX Pipeline.

Long term maintenance running contract:• CABGOC FE Asset Integrity Spool Program• Worley Parsons / ESSO Exploration Angola Maintenance Contract• OPS Frame Agreement Maintenance Contract

DII/DAC Experience in AngolaDII/DAC Experience in Angola

Dynamic Customers in AngolaDynamic Customers in Angola

Industrial Division

DAC ContactDAC Contact

Contact List

U.S.A +1 713 559 0400

S.A. +27 875 502 499

UNITEL +244 946 441 544

MOVICEL +244 914 640 181

A.T. +244 222 020 886

A.T. +244 222 020 887

A.T. (MD) +244 222 020 888

New Address

Rua Augusto Silverino Ferreira nº 10/12,7º andar, nº 34

LUANDA / ANGOLA

Email: : [email protected]: www.dynamicind.com

DYNAMIC INDUSTRIES AND DYNAMIC ANGOLA CONTRACTORS WOULD LIKE TO THANK YOU FOR GIVING US THIS OPPORTUNITY

TO HIGHLIGHT OUR COMMITMENT TO ANGOLA AND THE UPLIFTMENT OF THE ANGOLAN OIL AND GAS INDUSTRY

END