PROYECTO LUGAR : LOCALIDAD DE KELKAYBAMBA DISTRITO : OCOBAMBA UNIDAD PPTO MEDIDA TOTAL (S/.) % S/. % S/. % S/. 01 OBRAS PROVISIONALES 01.01 MOVIMIENTO DE TIERRAS EN AREA DE INFLUENCIA 01.01.02 EXCAVACION MASIVA CON MAQUINARIA m3 5,158.76 100.0% 5,158.76 01.01.03 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 3,990.92 100.0% 3,990.92 02.02.02 ELIMINACION DE MATERIAL EXCEDENTE (D=2KM) m3 457.10 100.0% 457.10 02.02.03 EXCAVACION DE ZANJAS PARA ZAPATAS RT<2KG/CM2 H=1.30 M m3 874.90 100.0% 874.90 02.04.03.01 ACERO DE REFUERZO fy=4200kg/cm2 EN COLUMNAS kg 1,471.59 100.0% 1,471.59 02.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 849.10 100.0% 849.10 02.04.03.03 CONCRETO fc=210 kg/cm2 EN COLUMNAS m3 873.36 100.0% 873.36 02.04.06.01 ENCOFRADO Y DESENCOFRADO EN PAVIMENTOS m2 3,885.95 100.0% 3,885.95 02.04.06.02 ACERO DE REFUERZO fy=4200kg/cm2 EN PAVIMENTOS kg 7,540.41 100.0% 7,540.41 02.04.06.03 CONCRETO fc=210 kg/cm2 EN PAVIMENTOS m3 15,721.97 72.9% 11,458.83 27.1% 4,263.14 02.04.07.01 CORREAS METÁLICAS m 6,113.12 100.0% 6,113.12 02.04.07.02 TIJERAL METALICO und 6,015.00 100.0% 6,015.00 02.04.07.03 COBERTURA CON PLANCHA DE CALAMINA m2 5,312.69 100.0% 5,312.69 02.04.07.04 CUMBRERA PARA COBERTURA DE CALAMINA m 147.90 100.0% 147.90 02.04.09.01 SEÑALES INDICATIVAS ADOSADAS EN PUERTAS und 240.00 100.0% 240.00 03.01.01 MUROS DE LADRILLO KING KONG AMARRE DE SOGA C:A 1:5 m2 5,624.80 100.0% 5,624.80 03.01.02 MUROS DE LADRILLO KING KONG AMARRE DE CABEZA C:A 1:5 m2 12,228.58 100.0% 12,228.58 03.02.01 TARRAJEO EN MUROS INTERIOR Y EXTERIOR m2 577.44 100.0% 577.44 03.02.02 TARRAJEO EN COLUMNAS m2 2,272.64 100.0% 2,272.64 03.03.01 CIELORASO CON MEZCLA C:A, 1:5 m2 3,791.23 8.4% 317.97 91.6% 3,473.26 03.03.02 CIELORASO CON PLACAS DE TECNOPORT Y ESTRUCTURA METALICA m2 2,744.09 12.5% 343.01 87.5% 2,401.08 03.04.01 NIVELADO INTERIOR Y APISONADO m2 384.31 100.0% 384.31 03.04.02 EMPEDRADO BASE PIEDRA E=0.15 M m2 3,015.38 100.0% 3,015.38 03.04.03 FALSO PISO MEZCLA 1:8 E=4" (FROTACHADO) m2 4,978.33 39.3% 1,956.39 60.7% 3,021.94 03.04.04 ENCHAPE DE PISOS CON CERAMICO m2 866.58 100.0% 866.58 03.05.01 PUERTA DE TABLERO REBAJADO AGUANO m2 7,737.84 50.0% 3,868.92 50.0% 3,868.92 03.06.01 VENTANAS METALICAS C/MALLA m2 5,303.34 50.0% 2,651.67 50.0% 2,651.67 03.07.01 CERRADURA TIPO A und 856.16 61.7% 528.08 38.3% 328.08 03.08.01 VIDRIO DOBLE TRANSPARENTE DE 4.5mm p2 5,300.02 100.0% 5,300.02 03.09.01 PINTURA LATEX DOS MANOS EN VIGAS m2 555.80 100.0% 555.80 03.09.02 PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS m2 6,284.34 52.0% 3,268.23 48.0% 3,016.11 03.09.03 PINTURA BARNIZ EN PUERTAS DE MADERA m2 582.62 100.0% 582.62 03.09.04 PINTURA ESMALTE EN CARPINTERIA DE MADERA m2 1,018.32 100.0% 1,018.32 04.01.01 SALIDA DE TECHO (CENTRO DE LUZ) pto 754.53 17.1% 129.36 82.9% 625.17 04.01.02 SALIDA DE TOMACORRIENTE CON PUESTA A TIERRA pto 849.06 10.7% 90.54 89.3% 758.52 04.02.01 SALIDA PARA INTERRUPTORES SIMPLES pto 347.12 23.8% 82.52 76.2% 264.60 04.03.01 SALIDA PARA INTERNET O SERVIDOR pto 697.23 24.0% 167.22 76.0% 530.01 04.03.02 SALIDA PARA INTERNET O RED pto 597.45 39.6% 236.58 60.4% 360.87 04.03.03 SALIDA PARA CENTRAL DE TELEFONO pto 127.80 54.0% 68.97 46.0% 58.83 04.04.01 CAJA DE PASO pto 384.32 34.0% 130.72 66.0% 253.60 04.05.01 EXCAVACION DE ZANJAS PARA REDES ELECTRICAS m 211.89 100.0% 211.89 - 04.05.02 RELLENO MANUAL COMPACTADO CON MATERIAL PROPIO PARA REDES ELECTRICAS m 622.44 95.5% 594.30 4.5% 28.14 04.05.03 BUZON DE PASO DE CONCRETO und 1,000.00 100.0% 1,000.00 04.06.01 ALIMENTADOR TABLERO GENERAL 3X95mm2 NYY m 4,734.40 100.0% 4,734.40 - 04.06.02 ALIMENTADOR DE T. GENERAL A T. DE DISTRIBUCION CABLE 3-1X6mm2 THW+1X4/Tmm2 m 9,127.40 84.2% 7,689.20 15.8% 1,438.20 04.06.03 TABLERO DE DISTRIBUCIÓN DE 12 POLOS und 335.89 77.4% 259.93 22.6% 75.96 04.06.04 TABLERO DE DISTRIBUCION DE 06 POLOS und 335.89 62.5% 209.93 37.5% 125.96 04.06.05 INTERRUPTOR THERMOMAGNETICO DE 35X50A und 73.78 100.0% 73.78 04.06.06 INTERRUPTOR THERMOMAGNETICO DE 35X40A und 78.78 100.0% 78.78 04.06.07 INTERRUPTOR THERMOMAGNETICO DE 20X30A und 78.78 100.0% 78.78 04.07.01 POZO PUESTA A TIERRA (10 OHMS C/BENTONITA) und 2,102.35 100.0% 2,102.35 04.08.01 ARTEFACTO FLUORESCENTE LINEAL 2X36 W CON REJILLA ALUMINIZADA Y ACCESORIOS und 6,522.90 58.0% 3,785.40 42.0% 2,737.50 04.09.01 PRUEBA ELECTRICA GLB 1,502.05 100.0% 1,502.05 05.01.04 PERFILADO Y COMPACTADO DE SUB RAZANTE m2 252.65 100.0% 252.65 05.01.05 EMPEDRADO BASE PIEDRA E=0.15 M m2 887.40 100.0% 887.40 05.01.06 .ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 445.15 100.0% 445.15 05.02.01 EXCAVACION DE TERRENO NORMAL m3 161.56 100.0% 161.56 05.02.02 ELIMINACION DE MATERIAL EXCEDENTE (D=2KM) m3 175.81 100.0% 175.81 05.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 202.44 100.0% 202.44 05.02.06 TUBERIA PVC SAP DE 2" m 237.24 100.0% 237.24 05.03.01 TACHOS DE BASURA und 615.92 100.0% 615.92 05.04.01 SUBCONTRATO PARA CONTRUCCION DE DEPOSITO DE MAQUINARIAS Y EQ. GLB 120,000.00 100.0% 120,000.00 06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 583.74 100.0% 583.74 06.01.02 LIMPIEZA DE TERRENO m2 836.28 100.0% 836.28 06.02.01 CORTE TERRENO CON EQUIPO m3 4,276.62 100.0% 4,276.62 06.02.02 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 2,190.89 100.0% 2,190.89 06.03.01 EXCAVACION MANUAL PARA CIMIENTOS CORRIDOS HASTA 1.50 M TERRENO NORMAL m3 2,228.98 100.0% 2,228.98 06.03.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 1,560.28 100.0% 1,560.28 06.04.01.01 CONCRETO F'C=100 Kg/cm2 PARA SOLADO EN CIMENTACIONES E=0.10 M m2 5,534.35 21.8% 1,207.22 78.2% 4,327.13 06.04.02.01 CONCRETO F'C=140 kg/cm2+25% PM EN SOBRECIMIENTOS m3 3,884.56 0.00 100.0% 3,884.56 06.04.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 5,206.46 8.0% 417.31 92.0% 4,789.15 06.05.01.01 CONCRETO FC=210KG/CM2 EN ZAPATAS m3 3,996.72 - 100.0% 3,996.72 06.05.01.02 ACERO DE REFUERZO FY=4200KG/CM2 EN ZAPATAS kg 1,776.19 13.7% 242.88 86.3% 1,533.31 06.05.02.01 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 86.72 56.7% 49.18 43.3% 37.54 06.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 375.36 - 100.0% 375.36 06.05.03.03 ACERO DE REFUERZO fy=4200kg/cm2 EN COLUMNAS kg 3,096.39 14.9% 461.01 85.1% 2,635.38 06.06.01 PAÑO CON MALLA OLIMPICA GALV. N°10 ANGULAR 1 1/2"X1/8" m2 37,878.00 16.4% 6,200.00 83.6% 31,678.00 06.06.02 PARANTE METALICO F°GALV. DE 2" X6.00 M und 5,989.50 42.0% 2,515.50 58.0% 3,474.00 06.06.03 PORTON METALICO DE INGRESO A GRIFO (6.00 X 2.80 M) und 11,740.40 - 100.0% 11,740.40 06.06.04 PORTON METALICO DE INGRESO PEATONAL (1.20 X 2.20 M) und 870.20 - 100.0% 870.20 06.06.05 PUERTA ENRREJADA METALICA INCL. ACC m2 870.20 - 100.0% 870.20 06.06.06 PORTON METALICO SEGUN DISEÑO (6.00X2.40) m2 4,032.00 - 100.0% 4,032.00 06.06.07 PORTON METALICO P/ALMACEN m2 1,725.00 - 100.0% 1,725.00 07.05.01 FLETE TERRESTRE GLB 38,695.68 100.0% 38,695.68 08.01 MOBILIARIO GLB 25,840.00 100.0% 25,840.00 MAYORES METRADOS 01.01.02 EXCAVACION MASIVA CON MAQUINARIA m3 5,557.12 5,557.12 01.01.03 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 6,662.10 6,662.10 01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 2,185.00 2,185.00 01.01.04 REFINE, NIVELACION Y COMPACTADO CON MAQ/PESADA m2 6,371.01 4,618.98 1,752.03 02.02.01 CORTE TERRENO CON EQUIPO m3 168.00 168.00 : "MEJORAMIENTO Y AMPLIACION DEL ALMACEN CENTRAL Y DEPOSITO DE MAQUINARIAS Y VEHICULOS DE LA MUNICIPALIDAD DISTRITAL DE OCOBAMBA DEPARTAMENTO PROVINCIA CUSCO LA CONVENCION C R O N O G R A M A V A L O R I Z A D O DESCRIPCION DE PARTIDA 1er MES 2do MES 3er MES

Transcript of Cronograma valorizado almacen

Page 1: Cronograma valorizado almacen

PROYECTO

LUGAR : LOCALIDAD DE KELKAYBAMBA

DISTRITO : OCOBAMBA

UNIDAD PPTO

MEDIDA TOTAL (S/.) % S/. % S/. % S/.

01 OBRAS PROVISIONALES

01.01 MOVIMIENTO DE TIERRAS EN AREA DE INFLUENCIA

01.01.02 EXCAVACION MASIVA CON MAQUINARIA m3 5,158.76 100.0% 5,158.76

01.01.03 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 3,990.92 100.0% 3,990.92

02.02.02 ELIMINACION DE MATERIAL EXCEDENTE (D=2KM) m3 457.10 100.0% 457.10

02.02.03 EXCAVACION DE ZANJAS PARA ZAPATAS RT<2KG/CM2 H=1.30 M m3 874.90 100.0% 874.90

02.04.03.01 ACERO DE REFUERZO fy=4200kg/cm2 EN COLUMNAS kg 1,471.59 100.0% 1,471.59

02.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 849.10 100.0% 849.10

02.04.03.03 CONCRETO fc=210 kg/cm2 EN COLUMNAS m3 873.36 100.0% 873.36

02.04.06.01 ENCOFRADO Y DESENCOFRADO EN PAVIMENTOS m2 3,885.95 100.0% 3,885.95

02.04.06.02 ACERO DE REFUERZO fy=4200kg/cm2 EN PAVIMENTOS kg 7,540.41 100.0% 7,540.41

02.04.06.03 CONCRETO fc=210 kg/cm2 EN PAVIMENTOS m3 15,721.97 72.9% 11,458.83 27.1% 4,263.14

02.04.07.01 CORREAS METÁLICAS m 6,113.12 100.0% 6,113.12

02.04.07.02 TIJERAL METALICO und 6,015.00 100.0% 6,015.00

02.04.07.03 COBERTURA CON PLANCHA DE CALAMINA m2 5,312.69 100.0% 5,312.69

02.04.07.04 CUMBRERA PARA COBERTURA DE CALAMINA m 147.90 100.0% 147.90

02.04.09.01 SEÑALES INDICATIVAS ADOSADAS EN PUERTAS und 240.00 100.0% 240.00

03.01.01 MUROS DE LADRILLO KING KONG AMARRE DE SOGA C:A 1:5 m2 5,624.80 100.0% 5,624.80

03.01.02 MUROS DE LADRILLO KING KONG AMARRE DE CABEZA C:A 1:5 m2 12,228.58 100.0% 12,228.58

03.02.01 TARRAJEO EN MUROS INTERIOR Y EXTERIOR m2 577.44 100.0% 577.44

03.02.02 TARRAJEO EN COLUMNAS m2 2,272.64 100.0% 2,272.64

03.03.01 CIELORASO CON MEZCLA C:A, 1:5 m2 3,791.23 8.4% 317.97 91.6% 3,473.26

03.03.02 CIELORASO CON PLACAS DE TECNOPORT Y ESTRUCTURA METALICA m2 2,744.09 12.5% 343.01 87.5% 2,401.08

03.04.01 NIVELADO INTERIOR Y APISONADO m2 384.31 100.0% 384.31

03.04.02 EMPEDRADO BASE PIEDRA E=0.15 M m2 3,015.38 100.0% 3,015.38

03.04.03 FALSO PISO MEZCLA 1:8 E=4" (FROTACHADO) m2 4,978.33 39.3% 1,956.39 60.7% 3,021.94

03.04.04 ENCHAPE DE PISOS CON CERAMICO m2 866.58 100.0% 866.58

03.05.01 PUERTA DE TABLERO REBAJADO AGUANO m2 7,737.84 50.0% 3,868.92 50.0% 3,868.92

03.06.01 VENTANAS METALICAS C/MALLA m2 5,303.34 50.0% 2,651.67 50.0% 2,651.67

03.07.01 CERRADURA TIPO A und 856.16 61.7% 528.08 38.3% 328.08

03.08.01 VIDRIO DOBLE TRANSPARENTE DE 4.5mm p2 5,300.02 100.0% 5,300.02

03.09.01 PINTURA LATEX DOS MANOS EN VIGAS m2 555.80 100.0% 555.80

03.09.02 PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS m2 6,284.34 52.0% 3,268.23 48.0% 3,016.11

03.09.03 PINTURA BARNIZ EN PUERTAS DE MADERA m2 582.62 100.0% 582.62

03.09.04 PINTURA ESMALTE EN CARPINTERIA DE MADERA m2 1,018.32 100.0% 1,018.32

04.01.01 SALIDA DE TECHO (CENTRO DE LUZ) pto 754.53 17.1% 129.36 82.9% 625.17

04.01.02 SALIDA DE TOMACORRIENTE CON PUESTA A TIERRA pto 849.06 10.7% 90.54 89.3% 758.52

04.02.01 SALIDA PARA INTERRUPTORES SIMPLES pto 347.12 23.8% 82.52 76.2% 264.60

04.03.01 SALIDA PARA INTERNET O SERVIDOR pto 697.23 24.0% 167.22 76.0% 530.01

04.03.02 SALIDA PARA INTERNET O RED pto 597.45 39.6% 236.58 60.4% 360.87

04.03.03 SALIDA PARA CENTRAL DE TELEFONO pto 127.80 54.0% 68.97 46.0% 58.83

04.04.01 CAJA DE PASO pto 384.32 34.0% 130.72 66.0% 253.60

04.05.01 EXCAVACION DE ZANJAS PARA REDES ELECTRICAS m 211.89 100.0% 211.89 -

04.05.02 RELLENO MANUAL COMPACTADO CON MATERIAL PROPIO PARA REDES ELECTRICAS m 622.44 95.5% 594.30 4.5% 28.14

04.05.03 BUZON DE PASO DE CONCRETO und 1,000.00 100.0% 1,000.00

04.06.01 ALIMENTADOR TABLERO GENERAL 3X95mm2 NYY m 4,734.40 100.0% 4,734.40 -

04.06.02 ALIMENTADOR DE T. GENERAL A T. DE DISTRIBUCION CABLE 3-1X6mm2 THW+1X4/Tmm2 m 9,127.40 84.2% 7,689.20 15.8% 1,438.20

04.06.03 TABLERO DE DISTRIBUCIÓN DE 12 POLOS und 335.89 77.4% 259.93 22.6% 75.96

04.06.04 TABLERO DE DISTRIBUCION DE 06 POLOS und 335.89 62.5% 209.93 37.5% 125.96

04.06.05 INTERRUPTOR THERMOMAGNETICO DE 35X50A und 73.78 100.0% 73.78

04.06.06 INTERRUPTOR THERMOMAGNETICO DE 35X40A und 78.78 100.0% 78.78

04.06.07 INTERRUPTOR THERMOMAGNETICO DE 20X30A und 78.78 100.0% 78.78

04.07.01 POZO PUESTA A TIERRA (10 OHMS C/BENTONITA) und 2,102.35 100.0% 2,102.35

04.08.01 ARTEFACTO FLUORESCENTE LINEAL 2X36 W CON REJILLA ALUMINIZADA Y ACCESORIOS und 6,522.90 58.0% 3,785.40 42.0% 2,737.50

04.09.01 PRUEBA ELECTRICA GLB 1,502.05 100.0% 1,502.05

05.01.04 PERFILADO Y COMPACTADO DE SUB RAZANTE m2 252.65 100.0% 252.65

05.01.05 EMPEDRADO BASE PIEDRA E=0.15 M m2 887.40 100.0% 887.40

05.01.06 .ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 445.15 100.0% 445.15

05.02.01 EXCAVACION DE TERRENO NORMAL m3 161.56 100.0% 161.56

05.02.02 ELIMINACION DE MATERIAL EXCEDENTE (D=2KM) m3 175.81 100.0% 175.81

05.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 202.44 100.0% 202.44

05.02.06 TUBERIA PVC SAP DE 2" m 237.24 100.0% 237.24

05.03.01 TACHOS DE BASURA und 615.92 100.0% 615.92

05.04.01 SUBCONTRATO PARA CONTRUCCION DE DEPOSITO DE MAQUINARIAS Y EQ. GLB 120,000.00 100.0% 120,000.00

06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 583.74 100.0% 583.74

06.01.02 LIMPIEZA DE TERRENO m2 836.28 100.0% 836.28

06.02.01 CORTE TERRENO CON EQUIPO m3 4,276.62 100.0% 4,276.62

06.02.02 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 2,190.89 100.0% 2,190.89

06.03.01 EXCAVACION MANUAL PARA CIMIENTOS CORRIDOS HASTA 1.50 M TERRENO NORMAL m3 2,228.98 100.0% 2,228.98

06.03.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 1,560.28 100.0% 1,560.28

06.04.01.01 CONCRETO F'C=100 Kg/cm2 PARA SOLADO EN CIMENTACIONES E=0.10 M m2 5,534.35 21.8% 1,207.22 78.2% 4,327.13

06.04.02.01 CONCRETO F'C=140 kg/cm2+25% PM EN SOBRECIMIENTOS m3 3,884.56 0.00 100.0% 3,884.56

06.04.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 5,206.46 8.0% 417.31 92.0% 4,789.15

06.05.01.01 CONCRETO FC=210KG/CM2 EN ZAPATAS m3 3,996.72 - 100.0% 3,996.72

06.05.01.02 ACERO DE REFUERZO FY=4200KG/CM2 EN ZAPATAS kg 1,776.19 13.7% 242.88 86.3% 1,533.31

06.05.02.01 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 86.72 56.7% 49.18 43.3% 37.54

06.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 375.36 - 100.0% 375.36

06.05.03.03 ACERO DE REFUERZO fy=4200kg/cm2 EN COLUMNAS kg 3,096.39 14.9% 461.01 85.1% 2,635.38

06.06.01 PAÑO CON MALLA OLIMPICA GALV. N°10 ANGULAR 1 1/2"X1/8" m2 37,878.00 16.4% 6,200.00 83.6% 31,678.00

06.06.02 PARANTE METALICO F°GALV. DE 2" X6.00 M und 5,989.50 42.0% 2,515.50 58.0% 3,474.00

06.06.03 PORTON METALICO DE INGRESO A GRIFO (6.00 X 2.80 M) und 11,740.40 - 100.0% 11,740.40

06.06.04 PORTON METALICO DE INGRESO PEATONAL (1.20 X 2.20 M) und 870.20 - 100.0% 870.20

06.06.05 PUERTA ENRREJADA METALICA INCL. ACC m2 870.20 - 100.0% 870.20

06.06.06 PORTON METALICO SEGUN DISEÑO (6.00X2.40) m2 4,032.00 - 100.0% 4,032.00

06.06.07 PORTON METALICO P/ALMACEN m2 1,725.00 - 100.0% 1,725.00

07.05.01 FLETE TERRESTRE GLB 38,695.68 100.0% 38,695.68

08.01 MOBILIARIO GLB 25,840.00 100.0% 25,840.00

MAYORES METRADOS

01.01.02 EXCAVACION MASIVA CON MAQUINARIA m3 5,557.12 5,557.12

01.01.03 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 6,662.10 6,662.10

01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 2,185.00 2,185.00

01.01.04 REFINE, NIVELACION Y COMPACTADO CON MAQ/PESADA m2 6,371.01 4,618.98 1,752.03

02.02.01 CORTE TERRENO CON EQUIPO m3 168.00 168.00

: "MEJORAMIENTO Y AMPLIACION DEL ALMACEN CENTRAL Y DEPOSITO DE MAQUINARIAS Y VEHICULOS DE LA MUNICIPALIDAD DISTRITAL DE OCOBAMBA

DEPARTAMENTO

PROVINCIA

CUSCO

LA CONVENCION

C R O N O G R A M A V A L O R I Z A D O

DESCRIPCION DE

PARTIDA

1er MES 2do MES 3er MES

Page 2: Cronograma valorizado almacen

02.04.04.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1,729.00 1,729.00

02.04.04.02 ACERO DE REFUERZO FY=4200KG/CM2 EN VIGAS kg 13,161.22 13,161.22

02.04.04.03 CONCRETO fc=210 kg/cm2 EN VIGAS m3 1,907.59 1,907.59

02.04.07.04 CUMBRERA PARA COBERTURA DE CALAMINA m 113.16 113.16

03.02.01 TARRAJEO EN MUROS INTERIOR Y EXTERIOR m2 70.32 70.32

03.03.01 CIELORASO CON MEZCLA C:A, 1:5 m2 660.39 660.39

03.08.01 VIDRIO DOBLE TRANSPARENTE DE 4.5mm p2 5,922.62 5,922.62

04.05.01 EXCAVACION DE ZANJAS PARA REDES ELECTRICAS m 127.26 127.26

06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 852.84 852.84

06.02.01 CORTE TERRENO CON EQUIPO m3 2,517.12 2,517.12

06.02.02 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 5,610.53 5,610.53

06.03.01 EXCAVACION MANUAL PARA CIMIENTOS CORRIDOS HASTA 1.50 M TERRENO NORMAL m3 1,114.48 1,114.48

06.03.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 778.90 778.90

06.05.01.01 CONCRETO FC=210KG/CM2 EN ZAPATAS m3 57.60 57.60

06.05.02.02 CONCRETO fc=210 kg/cm2 EN VIGAS DE CIMENTACION m3 299.66 299.66

06.05.03.01 CONCRETO fc=210 kg/cm2 EN COLUMNAS m3 294.66 294.66

495,671.93 56.3% 278,929.34 17.6% 87,307.11 26.1% 129,435.48

GASTOS GENERALES (12%) 59,480.63 33,471.52 10,476.85 15,532.26

GASTOS DE SUPERVISION (5% CD.) 24,783.60 13,946.47 4,365.36 6,471.77

LIQUIDACION (1%) 4,956.72 2,789.29 873.07 1,294.35

EXPEDIENTE TECNICO (1.5% CD) 7,435.08 4,183.94 1,309.61 1,941.53

PRESUPUESTO TOTAL DE OBRA 592,327.95 333,320.57 104,332.00 154,675.39

56.3% 73.9% 100.0%% DE AVANCE ACUMULADO

COSTO DIRECTO