CALCULO DEL MONTO MAXIMO PARA ADELANTO DE MATERIALES
FORMULA POLINOMICA
COSTO DIRECTO 1,129,392.42GASTOS GENERALES 8.2% 92610.1782678001UTILIDAD 5% 56469.620895SUB TOTAL 1,278,472.22
IGV 18% 230124.999071304TOTAL 1,508,597.22
MONTO SOLICITADO (MS)
INDICE DESCRIPCION FACTOR COSTO DIRECTO IGV TOTAL MM>MS47 MANO DE OBRA INC. LEYES SOCIALES 0.329 496,328.48 OK21 CEMENTO PORTLAND TIPO I 0.164 247,409.94 91,296.72 16,433.41 107,730.13 OK43 MADERA NACIONAL PARA ENOFRADO Y CARP. 0.132 199,134.83 OK
5 AGREGADO GRUESO 0.084 126,722.17 52,396.93 9431.4474 61,828.38 OK3 ACERO DE CONSTRUCCION CORRUGADO 0.086 129,739.36 60,861.91 10955.1438 71,817.05 OK
48 MAQUINARIA Y EQUIPO NACIONAL 0.11 165,945.69 OK39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.095 143,316.74 OK
TOTAL 100% 1,508,597.22 TOTAL SOLICITADO 241,375.56PORCENTAJE MAXIMO PARA DELANTO DE MATERIALES 40% 40% 603,438.89 PORCENTAJE SOLICITADO 16.00% OK
MONTO MAXIMO INC IGV (MM)
ADELANTO DE MATERIALESProyecto : “SUSTITUCIÓN Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA Nº 36508 DE ALLPACHACA – LIRCAY – ANGARAES – HUANCAVELICA”
Entidad : GOBIERNO REGIONAL DE HUANCAVELICA Depto. : HUANCAVELICA
ContratistaCONSORCIO SAN JUAN Prov. : ANGARAES
Fecha : ENERO 2016 Dist. : LIRCAY
Lugar : ALLPACHACA
ITEM DESCRIPCION PRESUPUESTO NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL1 CEMENTO PORTLAND TIPO 1 91,296.72 69,349.27 21,947.452 AGREGADO GRUESO 52,396.93 40,345.88 12,051.05
PIEDRA CHANCADA 1/2" 12787.76 10,581.67 2206.09ARENA FINA 7653.79 4,498.79 3155.00ARENA GRUESA 16577.84 13,080.07 3497.77HORMIGON 8266.22 5,074.03 3192.19LADRILLO DE ARCILLA PARA TECHO 30x30 h=15cm 7111.32 7,111.32 0.00
3 ACERO DE CONSTRUCCION CORRUGADO 60,861.91 58,346.05 2,515.86
ALAMBRE NEGRO RECOCIDO N° 16 6446.49 6180.01 266.48ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 54415.42 52166.04 2249.38
COSTO DIRECTO 204,555.56 0.00 0.00 168,041.20 36,514.36 0.00 0.00
IGV 18% 36,820.00 0.00 0.00 30,247.42 6,572.58 0.00 0.00
COSTO TOTAL 241,375.56 0.00 0.00 198,288.62 43,086.94 0.00 0.00
FORMULA POLINOMICA PARA ADELANTO DE MATERIALESProyecto
Entidad : GOBIERNO REGIONAL DE HUANCAVELICA Depto. : HUANCAVELICA
ContratistaCONSORCIO SAN JUAN Prov. : ANGARAES
Fecha : ENERO 2016 Dist. : LIRCAY
Lugar : ALLPACHACA
ITEM DESCRIPCION PRESUPUESTO1 CEMENTO PORTLAND TIPO 1 0.164 91,296.722 AGREGADO GRUESO 0.084 52,396.93
PIEDRA CHANCADA 1/2" 12787.76ARENA FINA 7653.79ARENA GRUESA 16577.84HORMIGON 8266.22LADRILLO DE ARCILLA PARA TECHO 30x30 h=15cm 7111.32
3 ACERO DE CONSTRUCCION CORRUGADO 0.086 60,861.91
ALAMBRE NEGRO RECOCIDO N° 16 6446.49ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 54415.42
COSTO DIRECTO 204,555.56
IGV 18% 36,820.00
COSTO TOTAL 241,375.56