CRONOGRAMA COLEGIO

Transcript of Cro No Grama COLEGIO

  • CRONOGRAMA VALORIZADO DE OBRA

    PROYECTO : MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS EN LA I.E N88128 ALFONSO UGARTE DEL CENTRO POBLADO DE CALPOC, DISTRITO DE YAUTAN, PROVINCIA DE CASMA ANCASH

    UBICACIN : Distrito: YAUTAN, Provincia: CASMA, Departamento : ANCASHFECHA : ABRIL 2013

    ITEM DESCRIPCION 210 DIAS CALENDARIOS

    PARCIAL 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES

    01.00.00 TRABAJOS PRELIMINARES 116,136.30 116,136.30 232,272.60 ### 02.00.00 ESTRUCTURAS 357,976.36 357,976.36 357,976.36 357,976.36 357,976.36 357,976.36 2,147,858.16 ### 03.00.00 ARQUITECTURA 141,717.14 141,717.14 141,717.14 141,717.14 141,717.14 141,717.14 850,302.86 ### 04.00.00 INSTALACIONES ELECTRICAS 49,445.16 49,445.16 49,445.16 148,335.47 ### 05.00.00 INSTALACIONES SANITARIAS 19,252.69 19,252.69 19,252.69 57,758.06 ### 06.00.00 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 49,389.49 49,389.49 98,778.98 ### 07.00.00 FLETE 40,000.00 40,000.00 80,000.00 ###

    COSTO DIRECTO 563502.15 675082.49 598528.15 518946.19 499693.50 549138.66 210415.00 3,615,306.13 ###GASTOS GENERALES (7.34%) 41382.34 49576.55 43954.57 38110.25 36696.37 40327.51 15452.41 265499.98###UTILIDADES (10%) 56350.22 67508.25 59852.82 51894.62 49969.35 54913.87 21041.50 361,530.61 ### SUB TOTAL 661234.70 792167.28 702335.53 608951.05 586359.23 644380.04 246908.90 4,242,336.73 ### I.G.V. (18%) 119,022.25 142,590.11 126,420.40 109,611.19 105,544.66 115,988.41 44,443.60 763,620.61 ###

    TOTAL PRESUPUESTO 780,256.95 934,757.40 828,755.93 718,562.24 691,903.89 760,368.45 291,352.50 5,005,957.33 ###

  • CRONOGRAMA DE AVANCE FISICO EN OBRA

    PROYECTO : MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS EN LA I.E N88128 ALFONSO UGARTE DEL CENTRO POBLADO DE CALPOC, DISTRITO DE YAUTAN, PROVINCIA DE CASMA ANCASHUBICACIN : Distrito: YAUTAN, Provincia: CASMA, Departamento : ANCASHFECHA : ABRIL 2013

    ITEM DESCRIPCION 180 Dias Calendarios

    1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 01.00.00 TRABAJOS PRELIMINARES 02.00.00 ESTRUCTURAS 03.00.00 ARQUITECTURA 04.00.00 INSTALACIONES ELECTRICAS 05.00.00 INSTALACIONES SANITARIAS 06.00.00 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 07.00.00 FLETE

  • ITEM DESCRIPCION 120 DIAS CALENDARIOS 1 MES 2 MES 3 MES 4 MES 5 MES 01.00.00 OBRAS PROVI 11,750.00 02.00.00 OBRAS PRELI 37,960.39 03.00.00 MOVIMIENTO DE TIERRAS. 03.01.00 EXCAVACION 37,887.68 63,146.14 63,146.14 63,146.14 25,258.46 03.02.00 NIVELACION Y 910.52 1,517.53 1,517.53 1,517.53 607.01 03.03.00 CONFORMACI 794.19 1,323.66 1,323.66 1,323.66 529.46 03.04.00 RELLENO DE 43,386.50 72,310.84 72,310.84 72,310.84 28,924.34 03.05.00 ELIMINACION DE MATERIAL 811.41 811.41 1,217.12 1,217.12 04.00.00 TUBERIAS. 04.01.01 SUMINISTRO E I 13,110.77 32,776.93 32,776.93 32,776.93 19,666.16 04.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO443 1,043.89 1,391.85 1,043.89 04.01.03 SUMINISTRO E INSTALACION DE TU 9,203.03 13,804.55 13,804.55 9,203.03 04.02.01 ALINEAMIENTO Y 164.81 412.02 412.02 412.02 247.21 04.02.02 ALINEAMIENTO Y 234.45 586.12 586.12 586.12 351.67 04.02.03 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435 11.20 14.93 11.20 04.02.04 ALINEAMIENTO Y AJUSTE DE TUBER 80.87 121.31 121.31 80.87 04.03.01 DESVIO DE AGUA 1,791.33 2,985.56 2,388.44 2,985.56 1,791.33 05.00.00 CAMARAS DE INSPECCION 05.01.01 ENCOFRADO 6,389.72 15,974.31 15,974.31 15,974.31 9,584.59 05.02.01 CONCRETO F'C 490.24 1,225.59 1,225.59 1,225.59 735.35 05.02.02 CONCRETO F' 3,867.42 9,668.54 9,668.54 9,668.54 5,801.12 05.02.03 CONCRETO F' 818.03 2,045.07 2,045.07 2,045.07 1,227.04 05.03.01 ACERO DE RE 3,878.78 9,696.95 9,696.95 9,696.95 5,818.17 05.04.01 SUMINISTRO 3,082.26 7,705.66 7,705.66 7,705.66 4,623.40 05.05.01 ENCOFRADO Y DESENCOFR 441.18 661.77 661.77 441.18 05.05.02 CONCRETO F'C = 140 Kg/cm 777.65 1,166.47 1,166.47 777.65 06.00.00 CONEXIONES DOMICILIARIAS. 06.01.0 CONEXION DOMICILIARIA DN 160MM 46,598.80 77,664.67 31,065.87

    07.00.00 PRUEBA HIDRAULICA 3,016.41 3,016.41 2,585.50 08.00.00 ROTURA Y RE 115,577.37 154,103.16 154,103.16 154,103.16 192,628.95 09.00.00 ROTURA Y RE 3,250.10 4,333.47 4,333.47 4,333.47 5,416.84

    COSTO DIRECTO 285344.56 440740.88 477516.09 431840.89 315986.04GASTOS GENERALES (15%) 42801.68 66111.13 71627.41 64776.13 47397.91UTILIDADES (10%) 28534.46 44074.09 47751.61 43184.09 31598.60 SUB TOTAL 356680.70 550926.10 596895.12 539801.11 394982.55 I.G.V. (19%) 67,769.33 104,675.96 113,410.07 102,562.21 75,046.69 TOTAL PRESUPUESTO 424,450.03 655,602.06 710,305.19 642,363.32 470,029.24

  • PARCIAL

    11,750.00 37,960.39

    252,584.55 6,070.10 5,294.63 289,243.36 4,057.06

    131,107.72 3,479.62 46,015.17 1,648.08 2,344.48 37.34 404.37 11,942.22

    63,897.24 4,902.35 38,674.15 8,180.27 38,787.80 30,822.64 2,205.90 3,888.24

    155,329.34 8,618.32 770,515.78 21,667.34 1,951,428.46 292,714.27 195,142.85 2,439,285.58 463,464.26 2,902,749.84