  • ALCANTARILLAS DE CONCRETO ARMADO - CONTROL EN CAMPO

    RESTRICCIONES Progresiva Obra UND. TIPO Desvo Excavacin (m3) Relleno

    EJECUTADO 62+831.00 62+840.00 1.00 MCA 1.50 1.00 X X X X X X X X X XEJECUTADO 62+934.00 62+917.94 1.00 MCA 1.00 1.00 X X X X X X X X X XEJECUTADO 64+279.00 64+013.78 1.00 MCA 1.00 1.00 X X X X X X X X X XEJECUTADO 65+560.00 65+553.86 1.00 MCA 1.00 1.00 - - X X X X X X X X X XEJECUTADO 65+788.00 65+784.09 1.00 MCA 4.00 3.00 X X X X X X X X X X XEJECUTADO 68+300.00 68+300.58 1.00 MCA 2.00 2.00 - X X X X X X X X X X XEN EJECUCIN 68+731.00 68+747.03 1.00 MCA 1.50 1.00 X X X X X XEN EJECUCIN 69+530.00 69+524.54 1.00 MCA 1.00 1.00 X X X X X PROGRAMAR AL 100%EJECUTADO 69+634.00 69+638.00 1.00 MCA 1.00 1.00 X X X X X X X X X X XSE PUEDE EJECUTAR (REUBICAR 69+782) 69+740.00 69+740.18 1.00 MCA 1.00 1.00 X X X X X X X PROGRAMAR AL 100%SE PUEDE EJECUTAR (REUBICAR ENTRE 71+065-71+055) / 71+050 71+081.00 71+084.13 1.00 MCA 1.00 1.00

    SE PUEDE EJECUTAR (REUBICAR ENTRE 71+970-71+975) 71+890.00 71+894.78 1.00 MCA 1.00 1.00

    EN EJECUCIN 72+081.00 72+080.88 1.00 MCA 1.00 1.00 X X X X X X X X XEN EJECUCIN 72+339.00 72+340.34 1.00 MCA 1.00 1.00 X X X X X X X X XEJECUTADO 73+179.00 73+178.65 1.00 MCA 1.00 1.00 X X X X X X X X X XSE PUEDE EJECUTAR / PROGRAMACIN 73+357.00 73+357.50 1.00 MCA 1.00 1.00 X X X X X X XMEJORAMIENTO 73+746.00 73+744.98 1.00 MCA 1.50 1.50 X X X XRELLENO 74+792.00 74+795.59 1.00 MCA 1.00 1.00 PROGRAMAR

    EXPLANACIONES CORTE (MURO 82+355-82+383) 82+350.00 82+375.59 1.00 MCA 2.50 2.50

    EN EJECUCIN //PARALIZADO POR DISEO DE BANQUETA - SOLICITAR NUEVOS PLANOS 89+426.00 89+426.92 1.00 MCA 1.50 1.50 X X relleno de banqueta SE PUEDE EJECUTAR, HACER ACCESO L/DER. (Cambiar a 5% y mover 1.5mts adelante.) 91+005.00 90+999.01 1.00 MCA 2.00 2.00

    RELLENO (Cambiar a 5% y mover 2.5mts adelante.) 91+070.00 91+067.33 1.00 MCA 2.00 2.00

    EXPLANACIONES CORTE, CASA. (Se enviar a Lima,corregir curvas.) 94+940.00 94+929.88 1.00 MCA 0.80 0.80

    EXPLANACIONES CORTE, CANAL, POSTE, ACCESO. 97+555.00 97+555.18 1.00 MCA 2.00 2.00

    EXPLANACIONES CORTE, CANAL, POSTE, ACCESO. (Anulada por Tmc 48") 98+040.00 98+040.00 1.00 MCA 2.00 2.00

    ACCESO. 98+710.00 98+714.54 1.00 MCA 3.00 2.00TOTAL TOTAL

    Progresiva Proyecto

    Ancho (m)

    Alto (m)

    Demolicin extructura existente

    Encofrado y Desencofrado Solado

    (m2)Vaciado concreto

    fc=100 kg/cm2Encofrado y

    desencofrado Zapata (m2)

    Habilitacin y colocacin de fierro zapata (kg)

    Vaciado concreto zapata fc=210 kg/cm2

    Encofrado y desencofrado Elevacion

    + losa (m2)

    Habilitacin y colocacin de fierro Elevacin +

    losa(kg)Vaciado concreto elevacin +

    losa fc=210 kg/cm2

    Control Campo (EXE,ENC,CON,RES)