    TODAS LAS POBLACIONES CON DOTACIN INICIAL DE 70 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACIN

    DOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 2,220 70 2.16 2.70 6.48 3.24 2.97 93.24

    2010 2,242 71 2.21 2.76 6.63 3.32 3.04 95.52

    2011 2,265 72 2.26 2.83 6.79 3.40 3.11 97.83

    2012 2,287 73 2.32 2.90 6.96 3.48 3.19 100.18

    2013 2,310 74 2.37 2.97 7.12 3.56 3.26 102.57

    2014 2,333 75 2.43 3.04 7.29 3.65 3.34 105.00

    2015 2,357 76 2.49 3.11 7.46 3.73 3.42 107.46

    2016 2,380 77 2.55 3.18 7.64 3.82 3.50 109.96

    2017 2,404 78 2.60 3.26 7.81 3.91 3.58 112.50

    2018 2,428 79 2.66 3.33 7.99 4.00 3.66 115.09

    2019 2,452 80 2.72 3.41 8.17 4.09 3.75 117.71

    2020 2,477 81 2.79 3.48 8.36 4.18 3.83 120.372021 2,502 82 2.85 3.56 8.55 4.27 3.92 123.08

    2022 2,527 83 2.91 3.64 8.74 4.37 4.00 125.82

    2023 2,552 84 2.98 3.72 8.93 4.47 4.09 128.61

    2024 2,577 85 3.04 3.80 9.13 4.56 4.18 131.44

    2025 2,603 86 3.11 3.89 9.33 4.66 4.28 134.32

    2026 2,629 87 3.18 3.97 9.53 4.77 4.37 137.24

    2027 2,655 88 3.25 4.06 9.74 4.87 4.46 140.21

    2028 2,682 89 3.32 4.14 9.95 4.97 4.56 143.22

    2029 2,709 90 3.39 4.23 10.16 5.08 4.66 146.28

    2030 2,736 91 3.46 4.32 10.37 5.19 4.75 149.38

    2031 2,763 92 3.53 4.41 10.59 5.30 4.85 152.53

    2032 2,791 93 3.60 4.51 10.81 5.41 4.96 155.73

    2033 2,819 94 3.68 4.60 11.04 5.52 5.06 158.98

    2034 2,847 95 3.76 4.70 11.27 5.63 5.17 162.28

    2035 2,875 96 3.83 4.79 11.50 5.75 5.27 165.63

    2036 2,904 97 3.91 4.89 11.74 5.87 5.38 169.03

    2037 2,933 98 3.99 4.99 11.98 5.99 5.49 172.48

    2038 2,963 99 4.07 5.09 12.22 6.11 5.60 175.98

    2039 2,992 100 4.16 5.19 12.47 6.23 5.71 179.53

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMDf = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.1 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    2/40

    RED

    (Lt/s)

    6.48

    6.63

    6.79

    6.96

    7.12

    7.29

    7.46

    7.64

    7.81

    7.99

    8.17

    8.36

    8.55

    8.74

    8.93

    9.13

    9.33

    9.53

    9.74

    9.95

    10.16

    10.37

    10.59

    10.81

    11.04

    11.2711.50

    11.74

    11.98

    12.22

    12.47

  • 8/4/2019 CAUDALES DISEO

    3/40

    TODAS LAS POBLACIONES CON DOTACIN INICIAL DE 100 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACIN

    DOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 2,220 100 3.08 3.85 9.25 4.63 4.24 133.20

    2010 2,242 101 3.15 3.93 9.44 4.72 4.32 135.88

    2011 2,265 102 3.21 4.01 9.62 4.81 4.41 138.59

    2012 2,287 103 3.27 4.09 9.82 4.91 4.50 141.35

    2013 2,310 104 3.34 4.17 10.01 5.01 4.59 144.15

    2014 2,333 105 3.40 4.25 10.21 5.10 4.68 146.99

    2015 2,357 106 3.47 4.34 10.41 5.20 4.77 149.88

    2016 2,380 107 3.54 4.42 10.61 5.31 4.86 152.81

    2017 2,404 108 3.61 4.51 10.82 5.41 4.96 155.78

    2018 2,428 109 3.68 4.59 11.03 5.51 5.05 158.79

    2019 2,452 110 3.75 4.68 11.24 5.62 5.15 161.85

    2020 2,477 111 3.82 4.77 11.46 5.73 5.25 164.952021 2,502 112 3.89 4.86 11.67 5.84 5.35 168.10

    2022 2,527 113 3.97 4.96 11.90 5.95 5.45 171.30

    2023 2,552 114 4.04 5.05 12.12 6.06 5.56 174.55

    2024 2,577 115 4.12 5.15 12.35 6.17 5.66 177.84

    2025 2,603 116 4.19 5.24 12.58 6.29 5.77 181.18

    2026 2,629 117 4.27 5.34 12.82 6.41 5.87 184.57

    2027 2,655 118 4.35 5.44 13.06 6.53 5.98 188.01

    2028 2,682 119 4.43 5.54 13.30 6.65 6.10 191.49

    2029 2,709 120 4.51 5.64 13.54 6.77 6.21 195.04

    2030 2,736 121 4.60 5.75 13.79 6.90 6.32 198.63

    2031 2,763 122 4.68 5.85 14.05 7.02 6.44 202.27

    2032 2,791 123 4.77 5.96 14.30 7.15 6.56 205.97

    2033 2,819 124 4.85 6.07 14.56 7.28 6.68 209.722034 2,847 125 4.94 6.18 14.83 7.41 6.80 213.52

    2035 2,875 126 5.03 6.29 15.10 7.55 6.92 217.39

    2036 2,904 127 5.12 6.40 15.37 7.68 7.04 221.30

    2037 2,933 128 5.21 6.52 15.64 7.82 7.17 225.27

    2038 2,963 129 5.31 6.63 15.92 7.96 7.30 229.31

    2039 2,992 130 5.40 6.75 16.21 8.10 7.43 233.39

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.2 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    4/40

    RED

    (Lt/s)9.25

    9.44

    9.62

    9.82

    10.01

    10.21

    10.41

    10.61

    10.82

    11.03

    11.24

    11.46

    11.6711.90

    12.12

    12.35

    12.58

    12.82

    13.06

    13.30

    13.54

    13.79

    14.05

    14.30

    14.56

    14.8315.10

    15.37

    15.64

    15.92

    16.21

  • 8/4/2019 CAUDALES DISEO

    5/40

    TODAS LAS POBLACIONES CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 2,220 150 4.63 5.78 13.88 6.94 6.36 199.802010 2,242 151 4.70 5.88 14.11 7.05 6.47 203.14

    2011 2,265 152 4.78 5.98 14.34 7.17 6.57 206.53

    2012 2,287 153 4.86 6.08 14.58 7.29 6.68 209.97

    2013 2,310 154 4.94 6.18 14.82 7.41 6.79 213.46

    2014 2,333 155 5.02 6.28 15.07 7.53 6.91 216.99

    2015 2,357 156 5.11 6.38 15.32 7.66 7.02 220.58

    2016 2,380 157 5.19 6.49 15.57 7.79 7.14 224.21

    2017 2,404 158 5.28 6.59 15.83 7.91 7.25 227.89

    2018 2,428 159 5.36 6.70 16.09 8.04 7.37 231.63

    2019 2,452 160 5.45 6.81 16.35 8.17 7.49 235.42

    2020 2,477 161 5.54 6.92 16.62 8.31 7.62 239.26

    2021 2,502 162 5.63 7.04 16.89 8.44 7.74 243.15

    2022 2,527 163 5.72 7.15 17.16 8.58 7.86 247.10

    2023 2,552 164 5.81 7.27 17.44 8.72 7.99 251.10

    2024 2,577 165 5.91 7.38 17.72 8.86 8.12 255.16

    2025 2,603 166 6.00 7.50 18.00 9.00 8.25 259.27

    2026 2,629 167 6.10 7.62 18.29 9.15 8.38 263.44

    2027 2,655 168 6.20 7.75 18.59 9.29 8.52 267.67

    2028 2,682 169 6.30 7.87 18.89 9.44 8.66 271.95

    2029 2,709 170 6.40 7.99 19.19 9.59 8.79 276.30

    2030 2,736 171 6.50 8.12 19.49 9.75 8.93 280.70

    2031 2,763 172 6.60 8.25 19.80 9.90 9.08 285.17

    2032 2,791 173 6.71 8.38 20.12 10.06 9.22 289.70

    2033 2,819 174 6.81 8.52 20.44 10.22 9.37 294.28

    2034 2,847 175 6.92 8.65 20.76 10.38 9.51 298.932035 2,875 176 7.03 8.79 21.09 10.54 9.66 303.65

    2036 2,904 177 7.14 8.92 21.42 10.71 9.82 308.43

    2037 2,933 178 7.25 9.06 21.76 10.88 9.97 313.27

    2038 2,963 179 7.37 9.21 22.10 11.05 10.13 318.18

    2039 2,992 180 7.48 9.35 22.44 11.22 10.29 323.16

    CUADRO : 2-A.3 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    6/40

    RED

    (Lt/s)

    13.8814.11

    14.34

    14.58

    14.82

    15.07

    15.32

    15.57

    15.83

    16.09

    16.35

    16.62

    16.89

    17.1617.44

    17.72

    18.00

    18.29

    18.59

    18.89

    19.19

    19.49

    19.80

    20.12

    20.44

    20.76

    21.0921.42

    21.76

    22.10

    22.44

  • 8/4/2019 CAUDALES DISEO

    7/40

    DATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACIN

    DOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 3,021 150 6.29 7.87 18.88 9.44 8.65 271.89

    2010 3,051 151 6.40 8.00 19.20 9.60 8.80 276.44

    2011 3,082 152 6.51 8.13 19.52 9.76 8.95 281.05

    2012 3,113 153 6.61 8.27 19.84 9.92 9.09 285.73

    2013 3,144 154 6.72 8.40 20.17 10.09 9.25 290.47

    2014 3,175 155 6.84 8.54 20.51 10.25 9.40 295.28

    2015 3,207 156 6.95 8.69 20.84 10.42 9.55 300.16

    2016 3,239 157 7.06 8.83 21.19 10.59 9.71 305.11

    2017 3,271 158 7.18 8.97 21.54 10.77 9.87 310.12

    2018 3,304 159 7.30 9.12 21.89 10.94 10.03 315.20

    2019 3,337 160 7.42 9.27 22.25 11.12 10.20 320.36

    2020 3,370 161 7.54 9.42 22.61 11.30 10.36 325.582021 3,404 162 7.66 9.57 22.98 11.49 10.53 330.88

    2022 3,438 163 7.78 9.73 23.35 11.68 10.70 336.25

    2023 3,473 164 7.91 9.89 23.73 11.86 10.88 341.70

    2024 3,507 165 8.04 10.05 24.11 12.06 11.05 347.22

    2025 3,542 166 8.17 10.21 24.50 12.25 11.23 352.82

    2026 3,578 167 8.30 10.37 24.90 12.45 11.41 358.49

    2027 3,614 168 8.43 10.54 25.29 12.65 11.59 364.25

    2028 3,650 169 8.57 10.71 25.70 12.85 11.78 370.08

    2029 3,686 170 8.70 10.88 26.11 13.06 11.97 375.99

    2030 3,723 171 8.84 11.05 26.53 13.26 12.16 381.99

    2031 3,760 172 8.98 11.23 26.95 13.47 12.35 388.06

    2032 3,798 173 9.13 11.41 27.38 13.69 12.55 394.22

    2033 3,836 174 9.27 11.59 27.81 13.91 12.75 400.462034 3,874 175 9.42 11.77 28.25 14.12 12.95 406.79

    2035 3,913 176 9.57 11.96 28.70 14.35 13.15 413.21

    2036 3,952 177 9.72 12.14 29.15 14.57 13.36 419.71

    2037 3,992 178 9.87 12.34 29.60 14.80 13.57 426.31

    2038 4,032 179 10.02 12.53 30.07 15.03 13.78 432.99

    2039 4,072 180 10.18 12.72 30.54 15.27 14.00 439.77

    CUADRO : 2-A.4 : BASES, CAUDALES Y VOLMENES DE DISEOTODAS LAS POBLACIONES (2.220 Hab.) + 801 Hab. DE OTRAS POBLACIONES QUE SE ADICIONARAL PROYECTO EN EL FUTURO : CON DOTACIN INICIAL DE 150 Lt/Hab/Da

  • 8/4/2019 CAUDALES DISEO

    8/40

    RED

    (Lt/s)18.88

    19.20

    19.52

    19.84

    20.17

    20.51

    20.84

    21.19

    21.54

    21.89

    22.25

    22.61

    22.9823.35

    23.73

    24.11

    24.50

    24.90

    25.29

    25.70

    26.11

    26.53

    26.95

    27.38

    27.81

    28.2528.70

    29.15

    29.60

    30.07

    30.54

  • 8/4/2019 CAUDALES DISEO

    9/40

    POBLACIN GARCIA MORENO : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 820 150 1.71 2.14 5.13 2.56 2.35 73.80

    2010 828 151 1.74 2.17 5.21 2.61 2.39 75.03

    2011 836 152 1.77 2.21 5.30 2.65 2.43 76.29

    2012 845 153 1.80 2.24 5.39 2.69 2.47 77.56

    2013 853 154 1.83 2.28 5.48 2.74 2.51 78.84

    2014 862 155 1.86 2.32 5.57 2.78 2.55 80.15

    2015 870 156 1.89 2.36 5.66 2.83 2.59 81.47

    2016 879 157 1.92 2.40 5.75 2.88 2.64 82.82

    2017 888 158 1.95 2.44 5.85 2.92 2.68 84.18

    2018 897 159 1.98 2.48 5.94 2.97 2.72 85.56

    2019 906 160 2.01 2.52 6.04 3.02 2.77 86.96

    2020 915 161 2.05 2.56 6.14 3.07 2.81 88.37

    2021 924 162 2.08 2.60 6.24 3.12 2.86 89.812022 933 163 2.11 2.64 6.34 3.17 2.91 91.27

    2023 943 164 2.15 2.68 6.44 3.22 2.95 92.75

    2024 952 165 2.18 2.73 6.54 3.27 3.00 94.25

    2025 962 166 2.22 2.77 6.65 3.33 3.05 95.77

    2026 971 167 2.25 2.82 6.76 3.38 3.10 97.31

    2027 981 168 2.29 2.86 6.87 3.43 3.15 98.87

    2028 991 169 2.33 2.91 6.98 3.49 3.20 100.45

    2029 1,001 170 2.36 2.95 7.09 3.54 3.25 102.06

    2030 1,011 171 2.40 3.00 7.20 3.60 3.30 103.68

    2031 1,021 172 2.44 3.05 7.31 3.66 3.35 105.33

    2032 1,031 173 2.48 3.10 7.43 3.72 3.41 107.00

    2033 1,041 174 2.52 3.15 7.55 3.77 3.46 108.70

    2034 1,052 175 2.56 3.19 7.67 3.83 3.51 110.422035 1,062 176 2.60 3.25 7.79 3.89 3.57 112.16

    2036 1,073 177 2.64 3.30 7.91 3.96 3.63 113.92

    2037 1,083 178 2.68 3.35 8.04 4.02 3.68 115.71

    2038 1,094 179 2.72 3.40 8.16 4.08 3.74 117.53

    2039 1,105 180 2.76 3.45 8.29 4.14 3.80 119.37

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.5 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    10/40

    RED

    (Lt/s)

    5.135.21

    5.30

    5.39

    5.48

    5.57

    5.66

    5.75

    5.85

    5.94

    6.04

    6.14

    6.24

    6.346.44

    6.54

    6.65

    6.76

    6.87

    6.98

    7.09

    7.20

    7.31

    7.43

    7.55

    7.67

    7.79

    7.91

    8.04

    8.16

    8.29

  • 8/4/2019 CAUDALES DISEO

    11/40

    POBLACIN EL MOLINO : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 160 150 0.33 0.42 1.00 0.50 0.46 14.40

    2010 162 151 0.34 0.42 1.02 0.51 0.47 14.64

    2011 163 152 0.34 0.43 1.03 0.52 0.47 14.89

    2012 165 153 0.35 0.44 1.05 0.53 0.48 15.13

    2013 166 154 0.36 0.45 1.07 0.53 0.49 15.38

    2014 168 155 0.36 0.45 1.09 0.54 0.50 15.64

    2015 170 156 0.37 0.46 1.10 0.55 0.51 15.90

    2016 172 157 0.37 0.47 1.12 0.56 0.51 16.16

    2017 173 158 0.38 0.48 1.14 0.57 0.52 16.42

    2018 175 159 0.39 0.48 1.16 0.58 0.53 16.69

    2019 177 160 0.39 0.49 1.18 0.59 0.54 16.97

    2020 179 161 0.40 0.50 1.20 0.60 0.55 17.24

    2021 180 162 0.41 0.51 1.22 0.61 0.56 17.522022 182 163 0.41 0.52 1.24 0.62 0.57 17.81

    2023 184 164 0.42 0.52 1.26 0.63 0.58 18.10

    2024 186 165 0.43 0.53 1.28 0.64 0.59 18.39

    2025 188 166 0.43 0.54 1.30 0.65 0.59 18.69

    2026 189 167 0.44 0.55 1.32 0.66 0.60 18.99

    2027 191 168 0.45 0.56 1.34 0.67 0.61 19.29

    2028 193 169 0.45 0.57 1.36 0.68 0.62 19.60

    2029 195 170 0.46 0.58 1.38 0.69 0.63 19.91

    2030 197 171 0.47 0.59 1.40 0.70 0.64 20.23

    2031 199 172 0.48 0.59 1.43 0.71 0.65 20.55

    2032 201 173 0.48 0.60 1.45 0.72 0.66 20.88

    2033 203 174 0.49 0.61 1.47 0.74 0.68 21.21

    2034 205 175 0.50 0.62 1.50 0.75 0.69 21.542035 207 176 0.51 0.63 1.52 0.76 0.70 21.88

    2036 209 177 0.51 0.64 1.54 0.77 0.71 22.23

    2037 211 178 0.52 0.65 1.57 0.78 0.72 22.58

    2038 214 179 0.53 0.66 1.59 0.80 0.73 22.93

    2039 216 180 0.54 0.67 1.62 0.81 0.74 23.29

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.6 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    12/40

    RED

    (Lt/s)

    1.001.02

    1.03

    1.05

    1.07

    1.09

    1.10

    1.12

    1.14

    1.16

    1.18

    1.20

    1.22

    1.241.26

    1.28

    1.30

    1.32

    1.34

    1.36

    1.38

    1.40

    1.43

    1.45

    1.47

    1.50

    1.521.54

    1.57

    1.59

    1.62

  • 8/4/2019 CAUDALES DISEO

    13/40

    POBLACIONES LA POSTA - YANCON : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 250 150 0.52 0.65 1.56 0.78 0.72 22.50

    2010 253 151 0.53 0.66 1.59 0.79 0.73 22.88

    2011 255 152 0.54 0.67 1.62 0.81 0.74 23.26

    2012 258 153 0.55 0.68 1.64 0.82 0.75 23.65

    2013 260 154 0.56 0.70 1.67 0.83 0.77 24.04

    2014 263 155 0.57 0.71 1.70 0.85 0.78 24.44

    2015 265 156 0.57 0.72 1.72 0.86 0.79 24.84

    2016 268 157 0.58 0.73 1.75 0.88 0.80 25.25

    2017 271 158 0.59 0.74 1.78 0.89 0.82 25.66

    2018 273 159 0.60 0.75 1.81 0.91 0.83 26.08

    2019 276 160 0.61 0.77 1.84 0.92 0.84 26.51

    2020 279 161 0.62 0.78 1.87 0.94 0.86 26.94

    2021 282 162 0.63 0.79 1.90 0.95 0.87 27.382022 285 163 0.64 0.81 1.93 0.97 0.89 27.83

    2023 287 164 0.65 0.82 1.96 0.98 0.90 28.28

    2024 290 165 0.67 0.83 2.00 1.00 0.91 28.73

    2025 293 166 0.68 0.84 2.03 1.01 0.93 29.20

    2026 296 167 0.69 0.86 2.06 1.03 0.94 29.67

    2027 299 168 0.70 0.87 2.09 1.05 0.96 30.14

    2028 302 169 0.71 0.89 2.13 1.06 0.97 30.63

    2029 305 170 0.72 0.90 2.16 1.08 0.99 31.11

    2030 308 171 0.73 0.91 2.20 1.10 1.01 31.61

    2031 311 172 0.74 0.93 2.23 1.12 1.02 32.11

    2032 314 173 0.76 0.94 2.27 1.13 1.04 32.62

    2033 317 174 0.77 0.96 2.30 1.15 1.05 33.14

    2034 321 175 0.78 0.97 2.34 1.17 1.07 33.662035 324 176 0.79 0.99 2.37 1.19 1.09 34.19

    2036 327 177 0.80 1.01 2.41 1.21 1.11 34.73

    2037 330 178 0.82 1.02 2.45 1.22 1.12 35.28

    2038 334 179 0.83 1.04 2.49 1.24 1.14 35.83

    2039 337 180 0.84 1.05 2.53 1.26 1.16 36.39

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.7 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    14/40

    RED

    (Lt/s)

    1.561.59

    1.62

    1.64

    1.67

    1.70

    1.72

    1.75

    1.78

    1.81

    1.84

    1.87

    1.90

    1.931.96

    2.00

    2.03

    2.06

    2.09

    2.13

    2.16

    2.20

    2.23

    2.27

    2.30

    2.34

    2.37

    2.41

    2.45

    2.49

    2.53

  • 8/4/2019 CAUDALES DISEO

    15/40

    POBLACIN EL TAMBO : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 380 150 0.79 0.99 2.38 1.19 1.09 34.20

    2010 384 151 0.80 1.01 2.41 1.21 1.11 34.77

    2011 388 152 0.82 1.02 2.46 1.23 1.13 35.35

    2012 392 153 0.83 1.04 2.50 1.25 1.14 35.94

    2013 395 154 0.85 1.06 2.54 1.27 1.16 36.54

    2014 399 155 0.86 1.07 2.58 1.29 1.18 37.14

    2015 403 156 0.87 1.09 2.62 1.31 1.20 37.76

    2016 407 157 0.89 1.11 2.67 1.33 1.22 38.38

    2017 411 158 0.90 1.13 2.71 1.35 1.24 39.01

    2018 416 159 0.92 1.15 2.75 1.38 1.26 39.65

    2019 420 160 0.93 1.17 2.80 1.40 1.28 40.30

    2020 424 161 0.95 1.19 2.84 1.42 1.30 40.95

    2021 428 162 0.96 1.20 2.89 1.45 1.32 41.622022 432 163 0.98 1.22 2.94 1.47 1.35 42.30

    2023 437 164 0.99 1.24 2.98 1.49 1.37 42.98

    2024 441 165 1.01 1.26 3.03 1.52 1.39 43.68

    2025 446 166 1.03 1.28 3.08 1.54 1.41 44.38

    2026 450 167 1.04 1.30 3.13 1.57 1.44 45.09

    2027 455 168 1.06 1.33 3.18 1.59 1.46 45.82

    2028 459 169 1.08 1.35 3.23 1.62 1.48 46.55

    2029 464 170 1.09 1.37 3.28 1.64 1.51 47.29

    2030 468 171 1.11 1.39 3.34 1.67 1.53 48.05

    2031 473 172 1.13 1.41 3.39 1.69 1.55 48.81

    2032 478 173 1.15 1.43 3.44 1.72 1.58 49.59

    2033 482 174 1.17 1.46 3.50 1.75 1.60 50.37

    2034 487 175 1.18 1.48 3.55 1.78 1.63 51.172035 492 176 1.20 1.50 3.61 1.80 1.65 51.98

    2036 497 177 1.22 1.53 3.67 1.83 1.68 52.79

    2037 502 178 1.24 1.55 3.72 1.86 1.71 53.62

    2038 507 179 1.26 1.58 3.78 1.89 1.73 54.46

    2039 512 180 1.28 1.60 3.84 1.92 1.76 55.32

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.8 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    16/40

    RED

    (Lt/s)

    2.382.41

    2.46

    2.50

    2.54

    2.58

    2.62

    2.67

    2.71

    2.75

    2.80

    2.84

    2.89

    2.942.98

    3.03

    3.08

    3.13

    3.18

    3.23

    3.28

    3.34

    3.39

    3.44

    3.50

    3.55

    3.613.67

    3.72

    3.78

    3.84

  • 8/4/2019 CAUDALES DISEO

    17/40

    POBLACIN EL IZAL : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 260 150 0.54 0.68 1.63 0.81 0.74 23.40

    2010 263 151 0.55 0.69 1.65 0.83 0.76 23.79

    2011 265 152 0.56 0.70 1.68 0.84 0.77 24.19

    2012 268 153 0.57 0.71 1.71 0.85 0.78 24.59

    2013 271 154 0.58 0.72 1.74 0.87 0.80 25.00

    2014 273 155 0.59 0.74 1.76 0.88 0.81 25.41

    2015 276 156 0.60 0.75 1.79 0.90 0.82 25.83

    2016 279 157 0.61 0.76 1.82 0.91 0.84 26.26

    2017 282 158 0.62 0.77 1.85 0.93 0.85 26.69

    2018 284 159 0.63 0.78 1.88 0.94 0.86 27.13

    2019 287 160 0.64 0.80 1.91 0.96 0.88 27.57

    2020 290 161 0.65 0.81 1.95 0.97 0.89 28.02

    2021 293 162 0.66 0.82 1.98 0.99 0.91 28.482022 296 163 0.67 0.84 2.01 1.00 0.92 28.94

    2023 299 164 0.68 0.85 2.04 1.02 0.94 29.41

    2024 302 165 0.69 0.86 2.08 1.04 0.95 29.88

    2025 305 166 0.70 0.88 2.11 1.05 0.97 30.37

    2026 308 167 0.71 0.89 2.14 1.07 0.98 30.85

    2027 311 168 0.73 0.91 2.18 1.09 1.00 31.35

    2028 314 169 0.74 0.92 2.21 1.11 1.01 31.85

    2029 317 170 0.75 0.94 2.25 1.12 1.03 32.36

    2030 320 171 0.76 0.95 2.28 1.14 1.05 32.88

    2031 324 172 0.77 0.97 2.32 1.16 1.06 33.40

    2032 327 173 0.79 0.98 2.36 1.18 1.08 33.93

    2033 330 174 0.80 1.00 2.39 1.20 1.10 34.47

    2034 333 175 0.81 1.01 2.43 1.22 1.11 35.012035 337 176 0.82 1.03 2.47 1.23 1.13 35.56

    2036 340 177 0.84 1.05 2.51 1.25 1.15 36.12

    2037 344 178 0.85 1.06 2.55 1.27 1.17 36.69

    2038 347 179 0.86 1.08 2.59 1.29 1.19 37.26

    2039 350 180 0.88 1.10 2.63 1.31 1.20 37.85

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.9 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    18/40

    RED

    (Lt/s)

    1.631.65

    1.68

    1.71

    1.74

    1.76

    1.79

    1.82

    1.85

    1.88

    1.91

    1.95

    1.98

    2.012.04

    2.08

    2.11

    2.14

    2.18

    2.21

    2.25

    2.28

    2.32

    2.36

    2.39

    2.43

    2.472.51

    2.55

    2.59

    2.63

  • 8/4/2019 CAUDALES DISEO

    19/40

    POBLACIN CHULUNHUASI : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 50 150 0.10 0.13 0.31 0.16 0.14 4.50

    2010 51 151 0.11 0.13 0.32 0.16 0.15 4.58

    2011 51 152 0.11 0.13 0.32 0.16 0.15 4.65

    2012 52 153 0.11 0.14 0.33 0.16 0.15 4.73

    2013 52 154 0.11 0.14 0.33 0.17 0.15 4.81

    2014 53 155 0.11 0.14 0.34 0.17 0.16 4.89

    2015 53 156 0.11 0.14 0.34 0.17 0.16 4.97

    2016 54 157 0.12 0.15 0.35 0.18 0.16 5.05

    2017 54 158 0.12 0.15 0.36 0.18 0.16 5.13

    2018 55 159 0.12 0.15 0.36 0.18 0.17 5.22

    2019 55 160 0.12 0.15 0.37 0.18 0.17 5.30

    2020 56 161 0.12 0.16 0.37 0.19 0.17 5.39

    2021 56 162 0.13 0.16 0.38 0.19 0.17 5.482022 57 163 0.13 0.16 0.39 0.19 0.18 5.57

    2023 57 164 0.13 0.16 0.39 0.20 0.18 5.66

    2024 58 165 0.13 0.17 0.40 0.20 0.18 5.75

    2025 59 166 0.14 0.17 0.41 0.20 0.19 5.84

    2026 59 167 0.14 0.17 0.41 0.21 0.19 5.93

    2027 60 168 0.14 0.17 0.42 0.21 0.19 6.03

    2028 60 169 0.14 0.18 0.43 0.21 0.19 6.13

    2029 61 170 0.14 0.18 0.43 0.22 0.20 6.22

    2030 62 171 0.15 0.18 0.44 0.22 0.20 6.32

    2031 62 172 0.15 0.19 0.45 0.22 0.20 6.42

    2032 63 173 0.15 0.19 0.45 0.23 0.21 6.52

    2033 63 174 0.15 0.19 0.46 0.23 0.21 6.63

    2034 64 175 0.16 0.19 0.47 0.23 0.21 6.732035 65 176 0.16 0.20 0.47 0.24 0.22 6.84

    2036 65 177 0.16 0.20 0.48 0.24 0.22 6.95

    2037 66 178 0.16 0.20 0.49 0.24 0.22 7.06

    2038 67 179 0.17 0.21 0.50 0.25 0.23 7.17

    2039 67 180 0.17 0.21 0.51 0.25 0.23 7.28

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.10 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    20/40

    RED

    (Lt/s)

    0.310.32

    0.32

    0.33

    0.33

    0.34

    0.34

    0.35

    0.36

    0.36

    0.37

    0.37

    0.38

    0.390.39

    0.40

    0.41

    0.41

    0.42

    0.43

    0.43

    0.44

    0.45

    0.45

    0.46

    0.47

    0.470.48

    0.49

    0.50

    0.51

  • 8/4/2019 CAUDALES DISEO

    21/40

    POBLACINES EL SALTO - CABRAS : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 40 150 0.08 0.10 0.25 0.13 0.11 3.60

    2010 40 151 0.08 0.11 0.25 0.13 0.12 3.66

    2011 41 152 0.09 0.11 0.26 0.13 0.12 3.72

    2012 41 153 0.09 0.11 0.26 0.13 0.12 3.78

    2013 42 154 0.09 0.11 0.27 0.13 0.12 3.85

    2014 42 155 0.09 0.11 0.27 0.14 0.12 3.91

    2015 42 156 0.09 0.11 0.28 0.14 0.13 3.97

    2016 43 157 0.09 0.12 0.28 0.14 0.13 4.04

    2017 43 158 0.10 0.12 0.29 0.14 0.13 4.11

    2018 44 159 0.10 0.12 0.29 0.14 0.13 4.17

    2019 44 160 0.10 0.12 0.29 0.15 0.14 4.24

    2020 45 161 0.10 0.12 0.30 0.15 0.14 4.31

    2021 45 162 0.10 0.13 0.30 0.15 0.14 4.382022 46 163 0.10 0.13 0.31 0.15 0.14 4.45

    2023 46 164 0.10 0.13 0.31 0.16 0.14 4.52

    2024 46 165 0.11 0.13 0.32 0.16 0.15 4.60

    2025 47 166 0.11 0.14 0.32 0.16 0.15 4.67

    2026 47 167 0.11 0.14 0.33 0.16 0.15 4.75

    2027 48 168 0.11 0.14 0.33 0.17 0.15 4.82

    2028 48 169 0.11 0.14 0.34 0.17 0.16 4.90

    2029 49 170 0.12 0.14 0.35 0.17 0.16 4.98

    2030 49 171 0.12 0.15 0.35 0.18 0.16 5.06

    2031 50 172 0.12 0.15 0.36 0.18 0.16 5.14

    2032 50 173 0.12 0.15 0.36 0.18 0.17 5.22

    2033 51 174 0.12 0.15 0.37 0.18 0.17 5.30

    2034 51 175 0.12 0.16 0.37 0.19 0.17 5.392035 52 176 0.13 0.16 0.38 0.19 0.17 5.47

    2036 52 177 0.13 0.16 0.39 0.19 0.18 5.56

    2037 53 178 0.13 0.16 0.39 0.20 0.18 5.64

    2038 53 179 0.13 0.17 0.40 0.20 0.18 5.73

    2039 54 180 0.13 0.17 0.40 0.20 0.19 5.82

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.11 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    22/40

    RED

    (Lt/s)

    0.250.25

    0.26

    0.26

    0.27

    0.27

    0.28

    0.28

    0.29

    0.29

    0.29

    0.30

    0.30

    0.310.31

    0.32

    0.32

    0.33

    0.33

    0.34

    0.35

    0.35

    0.36

    0.36

    0.37

    0.37

    0.38

    0.39

    0.39

    0.40

    0.40

  • 8/4/2019 CAUDALES DISEO

    23/40

    POBLACIN CAYALES : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 100 150 0.21 0.26 0.63 0.31 0.29 9.00

    2010 101 151 0.21 0.26 0.64 0.32 0.29 9.15

    2011 102 152 0.22 0.27 0.65 0.32 0.30 9.30

    2012 103 153 0.22 0.27 0.66 0.33 0.30 9.46

    2013 104 154 0.22 0.28 0.67 0.33 0.31 9.62

    2014 105 155 0.23 0.28 0.68 0.34 0.31 9.77

    2015 106 156 0.23 0.29 0.69 0.34 0.32 9.94

    2016 107 157 0.23 0.29 0.70 0.35 0.32 10.10

    2017 108 158 0.24 0.30 0.71 0.36 0.33 10.27

    2018 109 159 0.24 0.30 0.72 0.36 0.33 10.43

    2019 110 160 0.25 0.31 0.74 0.37 0.34 10.60

    2020 112 161 0.25 0.31 0.75 0.37 0.34 10.78

    2021 113 162 0.25 0.32 0.76 0.38 0.35 10.952022 114 163 0.26 0.32 0.77 0.39 0.35 11.13

    2023 115 164 0.26 0.33 0.79 0.39 0.36 11.31

    2024 116 165 0.27 0.33 0.80 0.40 0.37 11.49

    2025 117 166 0.27 0.34 0.81 0.41 0.37 11.68

    2026 118 167 0.27 0.34 0.82 0.41 0.38 11.87

    2027 120 168 0.28 0.35 0.84 0.42 0.38 12.06

    2028 121 169 0.28 0.35 0.85 0.43 0.39 12.25

    2029 122 170 0.29 0.36 0.86 0.43 0.40 12.45

    2030 123 171 0.29 0.37 0.88 0.44 0.40 12.64

    2031 124 172 0.30 0.37 0.89 0.45 0.41 12.85

    2032 126 173 0.30 0.38 0.91 0.45 0.42 13.05

    2033 127 174 0.31 0.38 0.92 0.46 0.42 13.26

    2034 128 175 0.31 0.39 0.94 0.47 0.43 13.472035 130 176 0.32 0.40 0.95 0.47 0.44 13.68

    2036 131 177 0.32 0.40 0.96 0.48 0.44 13.89

    2037 132 178 0.33 0.41 0.98 0.49 0.45 14.11

    2038 133 179 0.33 0.41 1.00 0.50 0.46 14.33

    2039 135 180 0.34 0.42 1.01 0.51 0.46 14.56

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.12 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    24/40

    RED

    (Lt/s)

    0.630.64

    0.65

    0.66

    0.67

    0.68

    0.69

    0.70

    0.71

    0.72

    0.74

    0.75

    0.76

    0.770.79

    0.80

    0.81

    0.82

    0.84

    0.85

    0.86

    0.88

    0.89

    0.91

    0.92

    0.94

    0.950.96

    0.98

    1.00

    1.01

  • 8/4/2019 CAUDALES DISEO

    25/40

    POBLACIN LA PIEDRA : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 40 150 0.08 0.10 0.25 0.13 0.11 3.60

    2010 40 151 0.08 0.11 0.25 0.13 0.12 3.66

    2011 41 152 0.09 0.11 0.26 0.13 0.12 3.72

    2012 41 153 0.09 0.11 0.26 0.13 0.12 3.78

    2013 42 154 0.09 0.11 0.27 0.13 0.12 3.85

    2014 42 155 0.09 0.11 0.27 0.14 0.12 3.91

    2015 42 156 0.09 0.11 0.28 0.14 0.13 3.97

    2016 43 157 0.09 0.12 0.28 0.14 0.13 4.04

    2017 43 158 0.10 0.12 0.29 0.14 0.13 4.11

    2018 44 159 0.10 0.12 0.29 0.14 0.13 4.17

    2019 44 160 0.10 0.12 0.29 0.15 0.14 4.24

    2020 45 161 0.10 0.12 0.30 0.15 0.14 4.31

    2021 45 162 0.10 0.13 0.30 0.15 0.14 4.382022 46 163 0.10 0.13 0.31 0.15 0.14 4.45

    2023 46 164 0.10 0.13 0.31 0.16 0.14 4.52

    2024 46 165 0.11 0.13 0.32 0.16 0.15 4.60

    2025 47 166 0.11 0.14 0.32 0.16 0.15 4.67

    2026 47 167 0.11 0.14 0.33 0.16 0.15 4.75

    2027 48 168 0.11 0.14 0.33 0.17 0.15 4.82

    2028 48 169 0.11 0.14 0.34 0.17 0.16 4.90

    2029 49 170 0.12 0.14 0.35 0.17 0.16 4.98

    2030 49 171 0.12 0.15 0.35 0.18 0.16 5.06

    2031 50 172 0.12 0.15 0.36 0.18 0.16 5.14

    2032 50 173 0.12 0.15 0.36 0.18 0.17 5.22

    2033 51 174 0.12 0.15 0.37 0.18 0.17 5.30

    2034 51 175 0.12 0.16 0.37 0.19 0.17 5.392035 52 176 0.13 0.16 0.38 0.19 0.17 5.47

    2036 52 177 0.13 0.16 0.39 0.19 0.18 5.56

    2037 53 178 0.13 0.16 0.39 0.20 0.18 5.64

    2038 53 179 0.13 0.17 0.40 0.20 0.18 5.73

    2039 54 180 0.13 0.17 0.40 0.20 0.19 5.82

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.13 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    26/40

    RED

    (Lt/s)

    0.250.25

    0.26

    0.26

    0.27

    0.27

    0.28

    0.28

    0.29

    0.29

    0.29

    0.30

    0.30

    0.310.31

    0.32

    0.32

    0.33

    0.33

    0.34

    0.35

    0.35

    0.36

    0.36

    0.37

    0.37

    0.380.39

    0.39

    0.40

    0.40

  • 8/4/2019 CAUDALES DISEO

    27/40

    POBLACIN GARBANZAL : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 20 150 0.04 0.05 0.13 0.06 0.06 1.80

    2010 20 151 0.04 0.05 0.13 0.06 0.06 1.83

    2011 20 152 0.04 0.05 0.13 0.06 0.06 1.86

    2012 21 153 0.04 0.05 0.13 0.07 0.06 1.89

    2013 21 154 0.04 0.06 0.13 0.07 0.06 1.92

    2014 21 155 0.05 0.06 0.14 0.07 0.06 1.95

    2015 21 156 0.05 0.06 0.14 0.07 0.06 1.99

    2016 21 157 0.05 0.06 0.14 0.07 0.06 2.02

    2017 22 158 0.05 0.06 0.14 0.07 0.07 2.05

    2018 22 159 0.05 0.06 0.14 0.07 0.07 2.09

    2019 22 160 0.05 0.06 0.15 0.07 0.07 2.12

    2020 22 161 0.05 0.06 0.15 0.07 0.07 2.16

    2021 23 162 0.05 0.06 0.15 0.08 0.07 2.192022 23 163 0.05 0.06 0.15 0.08 0.07 2.23

    2023 23 164 0.05 0.07 0.16 0.08 0.07 2.26

    2024 23 165 0.05 0.07 0.16 0.08 0.07 2.30

    2025 23 166 0.05 0.07 0.16 0.08 0.07 2.34

    2026 24 167 0.05 0.07 0.16 0.08 0.08 2.37

    2027 24 168 0.06 0.07 0.17 0.08 0.08 2.41

    2028 24 169 0.06 0.07 0.17 0.09 0.08 2.45

    2029 24 170 0.06 0.07 0.17 0.09 0.08 2.49

    2030 25 171 0.06 0.07 0.18 0.09 0.08 2.53

    2031 25 172 0.06 0.07 0.18 0.09 0.08 2.57

    2032 25 173 0.06 0.08 0.18 0.09 0.08 2.61

    2033 25 174 0.06 0.08 0.18 0.09 0.08 2.65

    2034 26 175 0.06 0.08 0.19 0.09 0.09 2.692035 26 176 0.06 0.08 0.19 0.09 0.09 2.74

    2036 26 177 0.06 0.08 0.19 0.10 0.09 2.78

    2037 26 178 0.07 0.08 0.20 0.10 0.09 2.82

    2038 27 179 0.07 0.08 0.20 0.10 0.09 2.87

    2039 27 180 0.07 0.08 0.20 0.10 0.09 2.91

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.14 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    28/40

    RED

    (Lt/s)

    0.130.13

    0.13

    0.13

    0.13

    0.14

    0.14

    0.14

    0.14

    0.14

    0.15

    0.15

    0.15

    0.150.16

    0.16

    0.16

    0.16

    0.17

    0.17

    0.17

    0.18

    0.18

    0.18

    0.18

    0.19

    0.190.19

    0.20

    0.20

    0.20

  • 8/4/2019 CAUDALES DISEO

    29/40

    POBLACIN ALMUCHIN : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN TRATAMIENTO RESERVA

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    2009 100 150 0.21 0.26 0.63 0.31 0.29 9.00

    2010 101 151 0.21 0.26 0.64 0.32 0.29 9.15

    2011 102 152 0.22 0.27 0.65 0.32 0.30 9.30

    2012 103 153 0.22 0.27 0.66 0.33 0.30 9.46

    2013 104 154 0.22 0.28 0.67 0.33 0.31 9.62

    2014 105 155 0.23 0.28 0.68 0.34 0.31 9.77

    2015 106 156 0.23 0.29 0.69 0.34 0.32 9.94

    2016 107 157 0.23 0.29 0.70 0.35 0.32 10.10

    2017 108 158 0.24 0.30 0.71 0.36 0.33 10.27

    2018 109 159 0.24 0.30 0.72 0.36 0.33 10.43

    2019 110 160 0.25 0.31 0.74 0.37 0.34 10.60

    2020 112 161 0.25 0.31 0.75 0.37 0.34 10.78

    2021 113 162 0.25 0.32 0.76 0.38 0.35 10.952022 114 163 0.26 0.32 0.77 0.39 0.35 11.13

    2023 115 164 0.26 0.33 0.79 0.39 0.36 11.31

    2024 116 165 0.27 0.33 0.80 0.40 0.37 11.49

    2025 117 166 0.27 0.34 0.81 0.41 0.37 11.68

    2026 118 167 0.27 0.34 0.82 0.41 0.38 11.87

    2027 120 168 0.28 0.35 0.84 0.42 0.38 12.06

    2028 121 169 0.28 0.35 0.85 0.43 0.39 12.25

    2029 122 170 0.29 0.36 0.86 0.43 0.40 12.45

    2030 123 171 0.29 0.37 0.88 0.44 0.40 12.64

    2031 124 172 0.30 0.37 0.89 0.45 0.41 12.85

    2032 126 173 0.30 0.38 0.91 0.45 0.42 13.05

    2033 127 174 0.31 0.38 0.92 0.46 0.42 13.26

    2034 128 175 0.31 0.39 0.94 0.47 0.43 13.472035 130 176 0.32 0.40 0.95 0.47 0.44 13.68

    2036 131 177 0.32 0.40 0.96 0.48 0.44 13.89

    2037 132 178 0.33 0.41 0.98 0.49 0.45 14.11

    2038 133 179 0.33 0.41 1.00 0.50 0.46 14.33

    2039 135 180 0.34 0.42 1.01 0.51 0.46 14.56

    NOMENCLATURA : NOMENCLATURA :

    Qm = CONSUMO (CAUDAL) MEDIO DIARIO = f x (PxD)/86400

    QMD = CONSUMO (CAUDAL) MAXIMO DIARIO = KMD x Qm CAPTACIN = 1,2 x CMD

    QMH = CONSUMO (CAUDAL) MAXIMO HORARIO = KMH x Qm

    TRATAMIENTO = 1,1 x CMD

    f = FACTOR DE FUGAS = 20%

    P = POBLACION AL FINAL DEL PERIODO RESERVA = 0.50 x Qm

    D = DOTACION FUTURA

    KMD = FACTOR DE MAYORACION MAXIMO DIARIO = 1.25 RED DE DISTRIBUCIN = CMH x 1.00

    KMH = FACTOR DE MAYORACION MAXIMO HORARIO = 3

    DATOS COMPLEMENTARIOS : OBSERVACIONES :

    1.- TASA DE CRECIMIENTO POBLACIONAL (r) = 1,00 %

    2.- NIVEL DE SERVICIO TIPO II a - II b

    CUADRO : 2-A.15 : BASES, CAUDALES Y VOLMENES DE DISEO

  • 8/4/2019 CAUDALES DISEO

    30/40

    RED

    (Lt/s)

    0.630.64

    0.65

    0.66

    0.67

    0.68

    0.69

    0.70

    0.71

    0.72

    0.74

    0.75

    0.76

    0.770.79

    0.80

    0.81

    0.82

    0.84

    0.85

    0.86

    0.88

    0.89

    0.91

    0.92

    0.94

    0.950.96

    0.98

    1.00

    1.01

  • 8/4/2019 CAUDALES DISEO

    31/40

    RESUMEN : TODAS LAS POBLACIONES : CON DOTACIN INICIAL DE 150 Lt/Hab/DaDATOS GENERALES DOTACIONES Y CONSUMOS

    AO POBLACINDOTACIN Qm QMD QMH CAPTACIN

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s)Garca Moreno 820 150 1.71 2.14 5.13 2.56El Molino 160 150 0.33 0.42 1.00 0.50La Posta - Yascon 250 150 0.52 0.65 1.56 0.78El Tambo 380 150 0.79 0.99 2.38 1.19El Izal 260 150 0.54 0.68 1.63 0.81Chulunguasi 50 150 0.10 0.13 0.31 0.16El Salto - Cabras 40 150 0.08 0.10 0.25 0.13Cayales 100 150 0.21 0.26 0.63 0.31La Piedra 40 150 0.08 0.10 0.25 0.13Garbanzal 20 150 0.04 0.05 0.13 0.06Almulchin 100 150 0.21 0.26 0.63 0.31Otras poblaciones 801 150 1.67 2.09 5.01 2.50

    3,021

    CUADRO : 2-A.16 : BASES, CAUDALES Y VOLMENES DE DISEO -AL IN IC IO

  • 8/4/2019 CAUDALES DISEO

    32/40

    CAUDALES DE DISEO

    TRATAMIENTO RESERVA RED

    (Lt/s) (M3) (Lt/s)2.35 73.80 5.13

    0.46 14.40 1.00

    0.72 22.50 1.56

    1.09 34.20 2.38

    0.74 23.40 1.63

    0.14 4.50 0.31

    0.11 3.60 0.25

    0.29 9.00 0.63

    0.11 3.60 0.25

    0.06 1.80 0.13

    0.29 9.00 0.63

    2.29 72.09 5.01

    8.65 271.89

    EL PERODO DE DISEO

  • 8/4/2019 CAUDALES DISEO

    33/40

    RESUMEN DE TODAS LAS POBLACIONES, CLASIFICADAS POR LINEA DE CONDDATOS GENERALES DOTACIONES Y CONSUMOS CAUDALES DE DISEO

    AO POBLACINDOTACIN Qm QMD QMH TRATAMIENTO

    (Lt/Hab/da) (Lt/s) (Lt/s) (Lt/s) (Lt/s) (M3)

    Garca Moreno 820 150 1.71 2.14 5.13 2.35 73.80 35.00TOTAL 1 = 820 150 1.71 2.14 5.13 2.35 73.80 35.00

    El Molino 160 150 0.33 0.42 1.00 0.46 14.4010+20El Tambo 380 150 0.79 0.99 2.38 1.09 34.20

    La Posta - Yascon 250 150 0.52 0.65 1.56 0.72 22.50

    TOTAL 2 = 790.00 450.00 1.65 2.06 4.94 2.26 71.10 30.00

    Cayales 100 150 0.21 0.26 0.63 0.29 9.00 20.00Chulunguasi 50 150 0.10 0.13 0.31 0.14 4.50 20.00

    TOTAL 3 = 150.00 300.00 0.31 0.39 0.94 0.43 13.50 40.00El Salto - Cabras 40 150 0.08 0.10 0.25 0.11 3.60

    70+20

    El Izal 260 150 0.54 0.68 1.63 0.74 23.40La Piedra 40 150 0.08 0.10 0.25 0.11 3.60Almulchin 100 150 0.21 0.26 0.63 0.29 9.00Garbanzal 20 150 0.04 0.05 0.13 0.06 1.80

    TOTAL 4 = 460.00 750.00 0.96 1.20 2.88 1.32 41.40 90.00

    Otras poblaciones 801 150 1.67 2.09 5.01 2.29 72.09 0.00TOTAL 5 = 801.00 150.00 1.67 2.09 5.01 2.29 72.09 0.00

    CUADRO : 2-A.18 : BASES, CAUDALES, VOLMENES DE DISEO Y ANLISIS DE RESERVAS -AL IN IC

    RESERVEXISTENT

    (M3)

    RESERVAREQUERIDACALCULADA

  • 8/4/2019 CAUDALES DISEO

    34/40

    RESERVA EXISTENTE DISPONIBLE (SIN USO ACTUAL) = 64.00

    TOTAL = 5,241 8.65 271.89 259.00

  • 8/4/2019 CAUDALES DISEO

    35/40

    138.80

    241.10

    3

    0.00

    4

    0.00

    572.00

    IN ICIO EL PERODO DE DISEO

    VOLUMEN DERESERVA A

    IMPLEMENTAR(M3)

    LINEA DECONDUCCIN

    EXISTENTE

  • 8/4/2019 CAUDALES DISEO

    36/40

    151.90

  • 8/4/2019 CAUDALES DISEO

    37/40

    DATOS GENERALES

    AO

    Garca Moreno 820 35.001TOTAL 1 = 35.00

    El Molino 16010 + 20

    2El Tambo 380La Posta - Yascon 250

    TOTAL 2 = 30.00

    Cayales 100 20.00

    3Chulunguasi 50 20.00TOTAL 3 = 40.00

    El Salto - Cabras 40

    70 + 204

    El Izal 260La Piedra 40Almulchin 100Garbanzal 20

    TOTAL 4 = 90.00

    64.00

    POBLACIONES, RESERVAS EXISTENTES Y LNEAS DECONDUCCIN EN FUNCIONAMIENTO

    RESERVAEXISTENTE

    (M3)

    LINEA DECONDUCCIN

    EXISTENTEPOBLACIN

    ACTUAL (2009)

    RESERVA EXISTENTE DISPONIBLE(SIN USO ACTUAL) =

  • 8/4/2019 CAUDALES DISEO

    38/40

    TOTAL = 2,220 259.00

  • 8/4/2019 CAUDALES DISEO

    39/40

    CUADRO : 1.2UBICACIN MDULO DESCRIPCIN

    Aireador

    Desarenador

    Obras complementarias :

    Prefiltro

    Cerramiento

    PLANTA DETRATAMIENTO

    ANTIGUA

    Estado : Bueno (Nuevo)

    Tipo de estructura : Metlica

    Nmero de unidades : 3

    Estado actual de funcionamiento : En desuso

    Capacidad = Qdiseo / 3

    Dimensiones de cada unidad : Altura total = 1,88m; 4charoles de 1,00m x 1,00m x 0,25m; cada charol tiene81 orificios de = 1cm c/u.

    Obras complementarias : Cajn de salida, vlvulas decontrol, ingresos, etc.

    Estado : Regular

    Tipo de estructura : Hormign Armado

    Nmero de unidades : 1

    Estado actual de funcionamiento : En uso

    Capacidad (volmen) = 76,14 M3

    Dimensiones interiores :Longitud Neta = 10,94m;Ancho = 2,90m; Altura de agua = 2,40m. No seincluyen las estructuras de entrada y salida (Verplanos).

    Estado : Bueno (Reacondicionado)

    Tipo de estructura : Hormign armado

    Nmero de unidades : 2

    Estado actual de funcionamiento : En uso

    Capacidad (volmen) = 77,18 M3 c/u. Sin considerar el

    fondo falso ni las estructuras de ingreso y salida. (Verplanos).

    Dimensiones interiores :Longitud Neta = 16,96m;Ancho = 3,73m; Altura de agua = 1,22m (hasta fondofalso).

    Obras complementarias : Cada unidad cuenta concuatro (4) desages para mantenimiento, los mismosque descargan al sistema general de evacuacin deaguas y lodos. Cuenta con cajas de vlvulas einstalaciones para su operacin. Tiene vertederos,compuertas y vlvulas de control.

    Estado : Bueno

    Tipo de estructura : Murete de hormign + Tubos ymallas galvanizados.

    Nmero de unidades : 1

    Estado actual de funcionamiento : En uso

    Dimensiones : Longitud total = 178,70 m; incluye unapuerta de 1,12m de ancho.

    Obras complementarias : Puerta de acceso

    Instalacionesvarias

    Estado : Aceptable

    Nmero de unidades : varias

    Estado actual de funcionamiento : En uso

    Obras complementarias : Cajas de revisin, pozos,

    compuertas, vlvulas y accesorios, etc.

  • 8/4/2019 CAUDALES DISEO

    40/40

    OBSERVACIONES

    De acuerdo con el presente diseo, esta

    unidad ser modificada, ampliada a un total deseis (6) charoles por cada aireador (Ver

    captulo III, aireacin). La obrascomplementarias se mantendrn en su estado

    actual, excepto por las salidas hacia eldesarenador que sern mejoradas (Ver planos

    del proyecto).

    Esta unidad ser mejorada. Ser divididalongitudinalmente para contar con dos

    unidades que permitan el mantenimiento porseparado. Su funcionamiento se mantendr

    como desarenador, con las eficienciasadecuadas (Ver captulo III - Desarenador)

    Esta unidad fue diseada y contruidaoriginalmente como filtro dinmico,posteriormente fue remodelada para quefuncione como pre-filtro. En el presente

    proyecto se mantendr como prefiltro, pero conciertas adaptaciones para que tambin trabaje

    como lecho de contacto.

    El cerramiento se encuentra en buen estado yser empleado sin modificacin alguna.

    Las instalaciones hidro-sanitarias en generalsern mejoradas y ampliadas acorde con los

    requerimientos del proyecto. (Ver planos)