model-Based fRamework for dependable sensing and Actuation in INtelligent decentralized IoT systems USE CASE CRITICAL INFRASTRUCTURE CECEBRE DAM This infrastructure provides water for the metropolitan area of A Coruña with a population of 400,000 inhabitants. ARTEIXO A CORUÑA OLEIROS SADA BERGONDO CAMBRE CECEBRE CULLEREDO CARRAL ABEGONDO BETANZOS 36,00 40,50 34,50 31,50 27,30 27,38 25,20 22,00 23,15 19,50 18,15 Sanitation and purification Catchement and purification Distribution Treatment MERO RIVER ETAP BARCÉS RIVER CECEBRE DAM Uses of water Basin: Galicia coast Province: A Coruña Municipalities of the dam: Abegondo · Carral · Cambre Rivers: Mero · Barcés Type of dam: Gravity Year of construction (Final): 1976 Volume of the body dam (1000 m 3 ): 22.00 1000 m 3 Reservoir surface at NMN (ha): 363 ha. Surface of the river basin: 228 km 2 Capacity to NMN (hm 3 ): 22 hm 3 Total number of spillways at the dam: 1 Spillways Regulation: Gates Spillway capacity (m 3 /s): 390 m 3 /s TECHNICAL DATA

Transcript of CARTEL USE CASE CRITICAL 1D - brain-iot.eu · A CORUÑA OLEIROS SADA BERGONDO CAMBRE CECEBRE...

Page 1: CARTEL USE CASE CRITICAL 1D - brain-iot.eu · A CORUÑA OLEIROS SADA BERGONDO CAMBRE CECEBRE CULLEREDO CARRAL ABEGONDO BETANZOS 36,00 40,50 34,50 31,50 27,30 27,38 25,20 22,00 23,15

model-Based fRamework for dependable sensingand Actuation in INtelligent decentralized IoT systems

USE CASE CRITICAL INFRASTRUCTURE

CECEBRE DAMThis infrastructure provides water for the metropolitan area of A Coruña with a population of 400,000 inhabitants.

ARTEIXO

A CORUÑA

OLEIROS

SADA

BERGONDO

CAMBRE

CECEBRE

CULLEREDO

CARRALABEGONDO

BETANZOS

36,00

40,50

34,50

31,50

27,30 27,38

25,20

22,00

23,15

19,50

18,15

Sanitation andpurification

Catchement and purification

DistributionTreatment

MERO RIVER

ETAP

BARCÉS RIVERCECEBRE DAM

Uses ofwater

Basin: Galicia coastProvince: A Coruña

Municipalities of the dam:Abegondo · Carral · Cambre

Rivers: Mero · BarcésType of dam: Gravity

Year of construction (Final): 1976Volume of the body dam

(1000 m3): 22.00 1000 m3

Reservoir surface atNMN (ha): 363 ha.Surface of the river

basin: 228 km2

Capacity to NMN (hm3): 22 hm3

Total number of spillways at the dam: 1

Spillways Regulation: GatesSpillway capacity (m3/s): 390 m3/s

TECHNICAL DATA