Cao Reprogramado 1 Actualizado Al 20-09

download Cao Reprogramado 1 Actualizado Al 20-09

of 35

description

prog.

Transcript of Cao Reprogramado 1 Actualizado Al 20-09

  • RESUMENDESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTA

    OBRAS CONVOCADAS A SUMA ALZADA

    OBRA MEJORAMIENTO DEL ESTADIO ROBERTO YAEZ, DISTRITO DE SAN VICENTE-PROVINCIA DE CAETE - LIMA

    Sistema de Contratacin: A SUMA ALZADA FECHA BASE: FEBRERO - 2014Item Descripcion Parcial (S/.)

    01 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUD 962,123.86

    02 ESTRUCTURAS 2,977,292.87

    03 ARQUITECTURA 3,996,057.64

    04 INSTALACIONES SANITARIAS 454,859.28

    05 INSTALACIONES ELECTRICAS 1,483,677.86

    06 INSTALACIONES MECANICAS 251,848.60

    07 INSTALACIONES DE COMUNICACIONES 77,040.27

    COSTO DIRECTO 10,202,900.38GASTOS GENERALES 9.00% 918,261.03UTILIDAD 9.00% 918,261.03

    SUB TOTAL 12,039,422.44IGV 18% 2,167,096.04TOTAL MONTO OFERTADO S/. 14,206,518.48

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    Sub-Ppto 01 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUD

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 0.0001.01 OBRAS PROVISONALES Y TRABAJOS PRELIMINARES 0.0001.01.01 OBRAS PROVISIONALES 0.0001.01.01.0 ALMACENES m2 120.00 117.98 14,157.6001.01.01.0 CASETA PARA GUARDIANIA m2 8.00 117.98 943.8401.01.01.0 SERVICIOS HIGIENICOS und 1.00 18,000.00 18,000.0001.01.01.0 SERVICIOS HIGIENICOS (DUCHA) und 6.00 3,500.00 21,000.0001.01.01.0 CERCO PROVISIONAL DE MADERA CON TRIPLAY m 350.00 65.12 22,792.0001.01.01.0 CARTEL DE OBRA DE 3.60x7.20 M und 1.00 2,888.42 2,888.4201.01.01.0 CONSUMO DE ENERGIA ELECTRICA Y AGUA glb 1.00 850.00 850.0001.01.01.0 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS, EQUIPOS Y glb 1.00 12,000.00 12,000.00

    HERRAMIENTAS P/PAVIMENTOS 0.0001.01.02 TRABAJOS PRELIMINARES 0.0001.01.02.0 LIMPIEZA DE TERRENO m2 2,157.90 1.49 3,215.2701.01.03 DEMOLICIONES 0.0001.01.03.0 DEMOLICION DE PISO DE CEMENTO INC. FALSO PISO E=2" m2 825.63 22.45 18,535.3901.01.03.0 DEMOLICION DE PISO DE CERAMICO INC. CONTRAPISO Y FALSO PISOm2 218.75 22.88 5,005.0001.01.03.0 DEMOLICION DE VEREDAS m2 120.55 15.81 1,905.9001.01.03.0 DEMOLICION DE MUROS DE ALBAILERIA - SOGA MANUAL m2 750.00 17.85 13,387.5001.01.03.0 DEMOLICION DE MUROS DE ALBAILERIA - CABEZA MANUAL m2 125.00 25.01 3,126.2501.01.03.0 DEMOLICION DE ZAPATAS DE CONCRETO ARMADO C/EQUIPO m3 249.80 211.50 52,832.7001.01.03.0 DEMOLICION DE CIMIENTOS CORRIDOS C/EQUIPO m3 98.00 189.97 18,617.0601.01.03.0 DEMOLICION DE SOBRECIMIENTOS DE CONCRETO m3 46.00 156.32 7,190.7201.01.03.0 DEMOLICION DE COLUMNAS m3 288.00 196.94 56,718.7201.01.03.1 DEMOLICION DE VIGAS m3 276.48 266.52 73,687.4501.01.03.1 DEMOLICION DE ESCALERAS DE CONCRETO m3 17.09 182.17 3,113.2901.01.03.1 DEMOLICION DE LOSA ALIGERADA H=0.20m m2 225.00 29.70 6,682.5001.01.03.1 DEMOLICION DE LOSA DE CONCRETO H=0.10m m2 1,069.78 43.39 46,417.7501.01.03.1 DEMOLICION Y ELIMINACION DE CAMERINOS,BAOS Y GRADERIAS glb 1.00 38,000.00 38,000.00

    DE TRIBUNA OCCIDENTE 0.0001.01.03.1 DEMOLICION Y ELIMINACION DE SALON DE USO MULTIPLE AL LADO glb 1.00 48,000.00 48,000.00

    TRIBUNA ORIENTE 0.0001.01.03.1 DEMOLICION DE SARDINEL Y DESMONTAJE DE CERCO DE CAMPO DEglb 1.00 18,000.00 18,000.00

    FUTBOL 0.0001.01.04 ELIMINACION DE DEMOLICIONES 0.0001.01.04.0 ACARREO INTERNO, PROCEDENTE DE DEMOLICION m3 3,437.26 16.67 57,299.1201.01.04.0 ELIMINACION DE MATERIAL PROCEDENTE DE LA DEMOLICION C/MA m3 4,468.44 33.83 151,167.3301.01.05 TRAZOS, NIVELES Y REPLANTEO 0.0001.01.05.0 TRAZO Y REPLANTEO PRELIMINAR CON EQUIPO m2 2,157.90 1.85 3,992.1201.01.05.0 REPLANTEO DURANTE LA OBRA m2 3,699.25 1.85 6,843.6101.02 SEGURIDAD Y SALUD 0.0001.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE glb 1.00 65,000.00 65,000.00

    SEGURIDAD Y SALUD EN EL TRABAJO 0.0001.02.02 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.00 24,040.20 24,040.2001.02.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 4,282.12 4,282.1201.02.04 SEALIZACION TEMPORAL DE SEGURIDAD glb 1.00 7,800.00 7,800.0001.02.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 11,856.00 11,856.0001.02.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD glb 1.00 5,100.00 5,100.00

    DURANTE EL TRABAJO 0.0001.02.07 MITIGACION AMBIENTAL glb 1.00 67,676.00 67,676.0001.03 FLETES 0.0001.03.01 TRANSPORTE DE EQUIPOS, MATERIALES Y HERRAMIENTAS glb 1.00 50,000.00 50,000.00

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    Sub-Ppto 01 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUD

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    COSTO DIRECTO 962,123.86GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 86,591.15

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    Sub-Ppto 01 ESTRUCTURAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    02 ESTRUCTURAS 0.0002.01 MOVIMIENTO DE TIERRAS 0.0002.01.01 EXCAVACION CON EQUIPO PESADO m3 1,919.21 5.07 9,730.3902.01.02 EXCAVACION CON EQUIPO LIVIANO m3 811.65 4.23 3,433.2802.01.03 EXCAVACION MANUAL DE ZANJAS m3 76.08 42.47 3,231.1202.01.04 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO Y AGUA (HASTm3 1,379.12 44.15 60,888.1502.01.05 RELLENO COMPACTADO C/EQUIPO, MATERIAL DE PRESTAMO m3 404.2 62.04 25,076.5702.01.06 NIVELACION INTERIOR Y APISONADO PARA F.PISO m2 1,407.65 13.39 18,848.4302.01.07 ACARREO INTERNO MATERIAL PROCEDENTE DE LA EXCAVACION m3 2,163.71 9.13 19,754.6702.01.08 ELIMINACION DE MATERIAL EXCEDENTE C/CARGAD. 125 HP VOLQ. m3 1,863.64 35.35 65,879.6702.02 CONCRETO SIMPLE 0.0002.02.01 SOLADOS 0.0002.02.01.0 SOLADO CONCRETO f'c=100 Kg/cm2 m3 216.09 158.27 34,200.5602.02.02 FALSA ZAPATA 0.0002.02.02.0 FALSA ZAPATA - CONCRETO F'c=100 kg/cm2 + 40% P.G. m3 309.39 158.27 48,967.1602.02.03 CIMIENTOS CORRIDOS 0.0002.02.03.0 CIMIENTOS CORRIDOS CONCRETO C:H 1:10 +30%P.G. m3 51.44 158.27 8,141.4102.02.03.0 CIMIENTOS CORRIDOS ENCOFRADO Y DESENCOFRADO m2 262.51 33.98 8,920.0902.02.04 SOBRECIMIENTOS 0.0002.02.04.0 SOBRECIMIENTOS CONCRETO f'c=140 Kg/cm2 +25% P.M. m3 19.69 259.93 5,118.0202.02.04.0 SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO m2 287.5 30.15 8,668.1302.02.05 FALSO PISO 0.0002.02.05.0 FALSO PISO 4" CONCRETO F'c=140KG/CM2 m2 1,430.00 27.65 39,539.5002.03 CONCRETO ARMADO 0.0002.03.01 ZAPATAS 0.0002.03.01.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 469.31 386.53 181,402.3902.03.01.0 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 665.55 46.58 31,001.3202.03.01.0 ACERO DE REFUERZO (200 kg/da) kg 21,437.40 5.87 125,837.5402.03.02 VIGA DE CIMENTACION 0.0002.03.02.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 55.81 386.53 21,572.2402.03.02.0 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 372.05 46.58 17,330.0902.03.02.0 ACERO DE REFUERZO (200 kg/da) kg 1,383.02 5.87 8,118.3302.03.03 SOBRECIMIENTOS REFORZADOS 0.0002.03.03.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 21.67 386.53 8,376.1102.03.03.0 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO REFORZADO m2 277.63 34.25 9,508.8302.03.03.0 ACERO DE REFUERZO (200 kg/da) kg 5,770.51 5.87 33,872.8902.03.04 MUROS DE CONCRETO ARMADO 0.0002.03.04.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 136.44 397.04 54,172.1402.03.04.0 MUROS DE CONCRETO ARMADO-ENCOFRADO Y DESENCOFRADO m2 916.83 48.9 44,832.9902.03.04.0 ACERO DE REFUERZO (200 kg/da) kg 12,243.30 5.87 71,868.1702.03.05 PLACAS 0.0002.03.05.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 279.41 397.04 110,936.9502.03.05.0 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 2,234.75 48.9 109,279.2802.03.05.0 ACERO DE REFUERZO (200 kg/da) kg 22,487.19 5.87 131,999.8102.03.06 COLUMNAS 0.0002.03.06.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 124.3 397.04 49,352.0702.03.06.0 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1,081.99 48.9 52,909.3102.03.06.0 ACERO DE REFUERZO (200 kg/da) kg 19,585.68 5.87 114,967.9402.03.07 COLUMNAS DE AMARRE 0.0002.03.07.0 CONCRETO EN COLUMNAS f'c=175 Kg/cm2 m3 32.68 357.07 11,669.0502.03.07.0 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 26.53 48.9 1,297.3202.03.07.0 ACERO DE REFUERZO (200 kg/da) kg 2,082.48 5.87 12,224.1602.03.08 VIGAS 0.0002.03.08.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 439.8 391.31 172,098.1402.03.08.0 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 2,781.37 54.51 151,612.48

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    Sub-Ppto 01 ESTRUCTURAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    02.03.08.0 ACERO DE REFUERZO (200 kg/da) kg 67,708.13 5.87 397,446.7202.03.09 VIGAS DE AMARRE 0.0002.03.09.0 CONCRETO EN VIGAS f'c= 175 Kg/cm2 m3 31.3 365.39 11,436.7102.03.09.0 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 467.03 54.51 25,457.8102.03.09.0 ACERO DE REFUERZO (200 kg/da) kg 2,498.05 5.87 14,663.5502.03.10 LOSAS MACIZAS 0.0002.03.10.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 192.47 371.08 71,421.7702.03.10.0 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m2 1,553.11 43.05 66,861.3902.03.10.0 ACERO DE REFUERZO (200 kg/da) kg 36,667.38 5.87 215,237.5202.03.11 LOSAS ALIGERADAS 0.0002.03.11.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 114.82 371.08 42,607.4102.03.11.0 LOSAS ALIGERADAS - ENCOFRADO Y DESENCOFRADO m2 834.79 39.1 32,640.2902.03.11.0 ACERO DE REFUERZO (200 kg/da) kg 8,051.84 5.87 47,264.3002.03.11.0 LOSAS ALIGERADAS - LADRILLO DE ARCILLA HUECO 20X30X30 cm Und 834.8 2.57 2,145.4402.03.12 ESCALERAS (GARGANTA Y GRADAS) 0.0002.03.12.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 84.03 397.04 33,363.2702.03.12.0 ESCALERAS - ENCOFRADO Y DESENCOFRADO m2 353.72 82.02 29,012.1102.03.12.0 ACERO DE REFUERZO (200 kg/da) kg 8,414.78 5.87 49,394.7602.03.13 GRADAS Y GRADERIAS REFORZADAS 0.0002.03.13.0 CONCRETO PREMEZCLADO f'c=210 Kg/cm2 m3 64.29 397.04 25,525.7002.03.13.0 ENCOFRADO Y DESENCOFRADO DE GRADAS Y GRADERIAS m2 121.57 59.03 7,176.2802.03.13.0 GRADAS Y GRADERIAS - ACERO Fy= 4200 Kg/CM2. kg 1,769.04 5.87 10,384.2602.04 VARIOS 0.0002.04.01 PERFORACION DE Fe= 3/4" PARA DISPOSITIVO DE ANCLAJE und 240 15.64 3,753.6002.04.02 DISPOSITIVO DE ANCLAJE 5/8 ACERO LISO und 240 14.71 3,530.4002.04.03 JUNTA DE DILATACION C/RELLENO DE POLIESTIRENO EXPANDIDO E=m2 105.7 12.61 1,332.88

    COSTO DIRECTO 2,977,292.87GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 267,956.36

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 03 ARQUITECTURA

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    03 ARQUITECTURA 0.0003.01 MURO DE ALBAILERIA 0.0003.01.01 MUROS Y TABIQUES 0.0003.01.01.0 MURO DE LADRILLO KK SOGA C:A 1:4 m2 1,482.00 54.62 80,946.8403.01.01.0 MURO DE LADRILLO KK CABEZA C:A 1:4 m2 314.92 93.10 29,319.0503.01.01.0 MURO DE LADRILLO KK CANTO C:A, 1:4 m2 20.00 39.71 794.2003.01.01.0 MURO DE LADRILLO KK SOGA CARAVISTA 0.0003.01.02 PARAPETOS 0.0003.01.02.0 MURO DE LADRILLO KK SOGA C:A 1:4 m2 263.79 54.62 14,408.2103.02 TARRAJEO Y ENLUCIDO 0.0003.02.01 TARRAJEO PRIMARIO Y RAYADO MORTERO 1:5 m2 600.19 17.64 10,587.3503.02.02 TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A 1:5 e=1m2 2,816.85 23.59 66,449.4903.02.03 TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A 1:5 e= m2 403.29 23.59 9,513.6103.02.04 TARRAJEO DE MUROS CON IMPERMEABILIZANTE m2 450.00 25.70 11,565.0003.02.05 VESTIDURA DE DERRAMES MEZCLA 1:3 E=1.5 m 495.42 8.47 4,196.2103.02.06 RELLENO DE CEMENTO SEMIPULIDO EN GRADAS DE TRIBUNA m3 48.66 207.43 10,093.5403.02.07 BRUAS SEGUN DETALLE m 819.96 9.70 7,953.6103.03 CIELORRASOS 0.0003.03.01 CIELORASOS CON MEZCLA C:A 1:5 e=1.5cm m2 1,172.51 29.05 34,061.4203.03.02 FALSO CIELORRASO TIPO BAFFLE m2 159.82 301.38 48,166.5503.04 PISOS Y PAVIMENTOS 0.0003.04.01 CONTRAPISO E=25 mm m2 2,136.73 18.95 40,491.0303.04.02 PISO DE CEMENTO SEMIPULIDO Y BRUADO E=5cm m2 1,404.50 39.03 54,817.6403.04.03 PISO DE PORCELANATO 40 x 40 m2 2,070.25 80.38 166,406.7003.04.04 PERFIL PARA CAMBIO DE PISO m 27.70 22.08 611.6203.04.05 BASE GRANULAR E=0.10 m C/EQUIPO LIVIANO PARA VEREDAS m2 2,284.31 15.44 35,269.7503.04.06 VEREDA DE CONCRETO H=10 cm (Inc. junta de arena+asfalto) f'c= m2 2,284.31 57.93 132,330.0803.04.07 PISO DE ADOQUINES DE CONCRETO EN EXTERIORES m2 478.89 68.81 32,952.4203.04.08 RAMPA DE Co. F'C=175 KF/CM2 E=4" ACAB. FROTACHADO Y BRUA m3 4.80 400.71 1,923.4103.04.09 SARDINEL PERALTADO DE f'c=210 kg/cm2 ,15x40 CM (1M 1/[email protected]+m 65.60 48.79 3,200.6203.04.10 SARDINEL DE VEREDA Y PISTA f'c=175 Kg/cm2 (15X40) m 138.08 34.53 4,767.9003.04.11 SARDINEL DE VEREDA Y JARDIN DE f'c=175 kg/cm2 ( 15x40 CM) m 31.90 34.53 1,101.5103.04.12 SARDINEL SUMERGIDO f'c=140 Kg/cm2 (15X30) m 27.50 20.50 563.7503.04.13 SARDINEL DE DUCHA CON REVESTIMIENTO DE PORCELANATO m 2.88 68.83 198.2303.05 ZOCALOS Y CONTRAZOCALOS 0.0003.05.01 ZOCALO DE PORCELANATO DE 40 X 40 (ADHERIDO CON PEGAMENT m2 679.28 83.08 56,434.5803.05.02 CONTRAZOCALO DE PORCELANATO 40x10 CM (ADHERIDO CON PEG m 961.30 54.10 52,006.3303.05.03 CONTRAZOCALO DE CEMENTO PULIDO H=10cm m 451.59 7.74 3,495.3103.06 PREPARACIN DE GRADAS DE CONCRETO Y DESCANSO 0.0003.06.01 REVESTIMIENTO FROTACHADO EN FONDO DE ESCALERAS CON MORTm2 198.56 22.32 4,431.8603.06.02 REVESTIMIENTO SEMIPULIDO DE DESCANSO DE ESCALERA CON MORm2 165.23 20.50 3,387.2203.06.03 REVESTIMIENTO SEMIPULIDO DE PASOS Y CONTRAPASOS EN ESCAL m2 266.36 23.81 6,342.0303.06.04 REVESTIMIENTO DE PORCELANATO PASOS Y CONTRAPASOS EN ESC m2 28.73 82.03 2,356.7203.06.05 REVESTIMIENTO DE PORCELANATO EN DESCANSO DE ESCALERAS m2 27.12 81.88 2,220.5903.06.06 REVESTIMIENTO SEMIPULIDO EN FONDO DE ESCALERAS m2 48.60 22.32 1,084.7503.07 CARPINTERIA DE MADERA 0.0003.07.01 PUERTA CONTRAPLACADA CON TRUPAN 6mm m2 56.88 171.48 9,753.7803.07.02 PUERTA CONTRAPLACADA CON TRUPAN 6mm Y REJILLA m2 29.63 184.64 5,470.8803.07.03 REJILLA DE MADERA m2 23.42 71.82 1,682.0203.07.04 PUERTA DE MADERA/VIDRIO m2 9.49 186.36 1,768.5603.07.05 SOBRELUZ PUERTA DE MADERA m2 8.88 131.68 1,169.3203.07.06 MARCO DE MADERA PARA PUERTAS m 275.39 38.52 10,608.0203.07.07 DIVISIONES DE MELAMINA EN SS.HH. INC. ESTRUCTURA DE ALUMINI und 30.00 554.82 16,644.6003.07.08 DIVISIONES DE MELAMINA EN URINARIOS INC. ESTRUCTURA DE ALU und 14.00 437.50 6,125.00

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 03 ARQUITECTURA

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    03.08 CARPINTERIA METALICA Y HERRERA 0.0003.08.01 PASAMANOS DE ACERO INOXIDABLE (TUBO 2 1/2") m 140.70 80.63 11,344.6403.08.02 BARRA DE APOYO PARA DISCAPACITADOS m 1.74 56.85 98.9203.08.03 TAPAJUNTA METALICA m 102.98 43.66 4,496.1103.08.04 PUERTA METLICA PARA BOCAS (SALIDA) m2 686.48 0.0003.08.05 PUERTA METALICA PARA ANTEBOCAS(EXTERIORES) m2 112.29 686.48 77,084.8403.08.06 TUBO METLICO 6" PARA SOBRE PARAPETO CAFETERA SEGUNDO NIm 58.80 350.19 20,591.17

    (Incluye bobina de anclaje y platina de soporte de 3/8") 0.0003.08.07 TAPA METLICA DE 1" x 1" x 1/8" Y PLANCHA ESTRIADA DE 1/8" PA und 1.00 205.72 205.7203.08.08 ESCALERA TIPO GATO CON TUBOS DE F. N. DE 1 1/2" x 2" und 4.00 339.69 1,358.7603.08.09 AGARRADERAS DE AC. INOXIDABLE DE 36" D=1 1/4" PARA DISCAPACund 2.00 148.03 296.0603.08.10 BARANDA METLICA DE FG DE 2 1/2 m 200.26 74.48 14,915.3603.09 CERRAJERIA 0.0003.09.01 CERRADURA PESADA DE PERILLA PARA EXTERIOR (LLAVE Y PESTILL und 2.00 89.61 179.2203.09.02 CERRADURA DE PERILLA PARA INTERIOR (LLAVE Y PESTILLO) INC und 21.00 77.61 1,629.8103.09.03 CERRADURA DE PERILLA PARA PUERTA DE BAO INCLUYE COLOCA und 8.00 77.61 620.8803.09.04 CERRADURA DE SOBREPONER TRES GOLPES, TIPO FORTE O SIMILARund 17.00 146.41 2,488.9703.09.05 PICAPORTE PARA PUERTAS DE CERRADURA TIPO PARCHE 3G und 12.00 27.91 334.9203.09.06 CERROJO DE ALUMINIO DE 2 PARA CUBICULOS INCLUYE COLOCACund 20.00 12.92 258.4003.09.07 TIRADOR DE ALUMINIO PARA PUERTA DE CUBICULOS DE BAO DE 2 und 20.00 34.21 684.2003.09.08 BISAGRA CAPUCHINA ALUMINIZADA 2 1/2" X 2 1/2" und 186.00 5.14 956.0403.09.09 BISAGRA CAPUCHINA ALUMINIZADA 1 1/2" X 1 1/2" und 40.00 5.14 205.6003.09.10 BISAGRA DE METAL PARA PUERTA DE FIERRO und 50.00 39.64 1,982.0003.09.11 TOPE DE PUERTA EN PISO und 62.00 21.20 1,314.4003.10 VIDRIOS, CRISTALES Y SIMILARES 0.0003.10.01 VENTANA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e=6m2 34.65 375.50 13,011.0803.10.02 VENTANA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e= m2 35.52 460.87 16,370.1003.10.03 MAMPARA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e=m2 619.20 446.32 276,361.3403.10.04 MURO CORTINA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZ m2 88.16 839.39 74,000.6203.10.05 ESPEJO BISELADO DE SOBREPONER, E=6 mm (0.50 m x 1.00 m) und 26.00 60.85 1,582.1003.10.06 CRISTAL BLINDADO PARA BOLETERAS REFLEX DE 1.30 m x 1.50 m pza 4.00 710.17 2,840.6803.11 PINTURA 0.0003.11.01 PINTURA LATEX EN CIELORASO m2 3,561.70 11.80 42,028.0603.11.02 PINTURA LATEX MURO INTERIOR m2 2,146.88 10.34 22,198.7403.11.03 PINTURA LATEX MURO EXTERIOR m2 116.13 11.80 1,370.3303.11.04 PINTURA ANTICORROSIVA Y ESMALTE EN CARPINTERIA METALICA m2 314.46 15.53 4,883.5603.11.05 PINTURA ESMALTE 2 MANOS EN ZOCALOS m2 320.88 9.53 3,057.9903.12 COBERTURAS 0.0003.12.01 LADRILLO PASTELERO C/MEZCLA 1:5, E=2.5 cm, 30 x 30cm m2 180.00 31.84 5,731.2003.12.02 COBERTURA DE TENSO ESTRUCTURA m2 2,510.00 715.12 1,794,951.2003.12.03 COBERTURA LATERA DE ALUZINC (PIEL) m2 490.00 35.95 17,615.5003.13 SEALIZACIN DE SEGURIDAD 0.0003.13.01 SEALIZACIN DE SEGURIDAD - VARIAS Und 120.00 30.85 3,702.0003.13.02 UNIDAD DE ILUMINACION A BATERIAS und 69.00 91.56 6,317.6403.13.03 DETECTOR DE HUMO und 52.00 202.76 10,543.5203.14 VARIOS 0.0003.14.01 JUNTA RELLENA C/POLIURETANO E=1 Y SELLADO CON MAT. ELAST m 230.00 23.86 5,487.8003.14.02 CANTONERA DE ALUMINIO 1 1/2 x 2 x 4 mm m 638.40 33.11 21,137.4203.14.03 REJA METLICA PERIMETRAL 0.0003.14.03.0 REJA TIPO 1 - METLICA DECORATIVA m 0.0003.14.03.0 REJA TIPO 2 - METLICA DE SEGURIDAD m 63.64 212.77 13,540.6803.14.04 CERCO VERDE INC. ESTRUCTUTURA ENMALLADA DE SOPORTE m 350.00 215.34 75,369.0003.14.05 ROTULADO DE NOMBRE EN FACHADA und 1.00 604.64 604.6403.14.06 TIERRA DE CHACRA PARA JARDIN H = 0.20M m3 34.43 0.0003.14.07 SEMBRADO DE GRASS AMERICANO O SIMILAR EN CHAMPA PARA JAR m2 8.03 0.00

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 03 ARQUITECTURA

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    03.14.08 SEMBRADO DE FICUS Y OTROS H=1.50M. und 40.00 42.95 1,718.0003.14.09 SEALIZACIONES DE IDENTIFICACIN DE AMBIENTES und 95.00 30.85 2,930.7503.14.10 CONTROL DE ACCESO DE PERSONAS MEDIANTE TORNO (BRAZOS ABund 24.00 1,039.26 24,942.2403.14.11 MUEBLE DE BAOS ENCHAPADO m 16.00 204.04 3,264.6403.14.12 MUEBLE DE CAFETERAS ENCHAPADO m 18.00 204.84 3,687.1203.14.13 MUEBLE DE SALAS DE MASAJES ENCHAPADO m 6.00 204.84 1,229.0403.15 PISTA ATLETICA 0.0003.15.01 PREPARACION DE TERRENO Y AFIRMADO EN PISTA ATLETICA ( PREPAm2 221.34 0.00

    TERRENO, AFIRMADO, CAPA ASFALTICA DE 5 cm y 2 cm, dos capas ) 0.0003.15.02 ACABADO DE PISTA ATLETICA DE 14,1 mm TIPO GABS COMPETITON m2 258.89 0.00

    SANDWICH 0.0003.16 CAMPO DE FTBOL 0.0003.16.01 CAMPO DE FTBOL CESPED NATURAL 0.0003.16.02 SERVICIO DE SIEMBRA DE CESPED BERMUDA EN CAMPO DE FTBOL m2 7,140.00 34.22 244,330.8003.16.03 SERVICIO DE SIEMBRA DE CESPED BERMUDA EN CAMPO ALEDAO m2 34.22 0.00

    DE FTBOL 0.0003.16.04 ACCESORIOS PARA CAMPO DE FTBOL 0.0003.16.04.0 BANDERN REBATIBLE DE USO PROFESIONAL, H = 1.50 m, PARANTE und 6.00 200.00 1,200.00

    PLASTICOS COLOR BLANCO, BANDERAS ROJAS PLASTIFICADAS, RESORTES, 0.00BASE PARA BANDERIN 0.00

    03.16.04.0 RED DE NYLON COLOR BLANCO DEL TIPO PESADO PARA USO PROFEund 2.00 1,500.00 3,000.00COCADA HEXAGONAL DE 12 cm 0.00

    03.16.04.0 ARCO METLICO PARA FUTBOL, TUBO NEGRO 4", GANCHOS CADA und 2.00 4,500.00 9,000.00POSTES POSTERIORES P/ RED DE 2.50 m x 2", PINTURA EPOXICA 0.00

    03.16.05 SISTEMA DE RIEGO EN CAMPO DE FTBOL 0.0003.16.05.0 EQUIPO DE RIEGO POR ASPERSIN POP UP ( ROTORES ) PARA CAMP und 62.00 2,093.54 129,799.48

    FUTBOL 0.0003.16.05.0 BUTACAS VIP und 24.00 1,167.61 28,022.6403.16.05.0 BUTACAS SUPLENTES Y AUXILIARES und 16.00 94.40 1,510.4003.16.05.0 CERCO SEPARADOR TRANSPARENTE, TRIBUNA/CAMPO DE FTBOL m2 716.00 0.00

    COSTO DIRECTO 3,996,057.64GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 359,645.19

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 04 INSTALACIONES SANITARIAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    04 INSTALACIONES SANITARIAS 0.0004.01 APARATOS Y ACCESORIOS SANITARIOS 0.0004.01.01 APARATOS SANITARIOS 0.0004.01.01.0 INODORO (CON VALVULA FLUXOMETRO) und 52.00 694.00 36,088.0004.01.01.0 LAVATORIO NACIONAL BLANCO und 45.00 209.00 9,405.0004.01.01.0 DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA und 94.00 180.00 16,920.0004.01.01.0 URINARIO NACIONAL MODELO CADET und 13.00 365.00 4,745.0004.01.02 ACCESORIOS SANITARIOS 0.0004.01.02.0 DISPENSADOR DE JABON und 22.00 120.00 2,640.0004.01.02.0 DISPENSADOR DE PAPEL TOALLA und 22.00 98.00 2,156.0004.01.02.0 DISPENSADOR DE PAPEL HIGIENICO CROMADO und 22.00 95.00 2,090.0004.01.02.0 JABONERA DE LOSA COLOR BLANCO und 22.00 58.00 1,276.0004.01.03 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS 0.0004.01.03.0 COLOCACION DE APARATOS SANITARIOS und 204.00 92.81 18,933.2404.01.03.0 COLOCACION DE ACCESORIOS SANITARIOS und 204.00 21.25 4,335.0004.02 SISTEMA DE AGUA FRIA 0.0004.02.01 TRABAJOS PRELIMINARES 0.0004.02.01.0 EXCAVACION A MANO EN TERRENO NORMAL m3 328.00 36.41 11,942.4804.02.01.0 REFINE DEL TERRENO EXCAVADO m2 188.00 2.50 470.0004.02.01.0 ELIMINACION DE MATERIAL EXCEDENTE m3 140.00 35.35 4,949.0004.02.02 SALIDAS DE AGUA FRIA 0.0004.02.02.0 SALIDA DE AGUA FRIA PVC C-10 DE 1/2" pto 95.00 80.82 7,677.9004.02.02.0 SALIDA DE AGUA FRIA PVC C-10 DE 3/4" pto 19.00 91.96 1,747.2404.02.02.0 SALIDA DE AGUA FRIA PVC C-10 DE 1" pto 52.00 109.41 5,689.3204.02.03 REDES DE DISTRIBUCION 0.0004.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1/2" m 71.00 11.68 829.2804.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 3/4" m 84.00 12.19 1,023.9604.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1" m 59.00 12.72 750.4804.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1 1/4" m 16.00 17.57 281.1204.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1 1/2" m 85.00 20.04 1,703.4004.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2" m 108.00 27.40 2,959.2004.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2 1/2" m 60.00 48.28 2,896.8004.02.04 VALVULAS 0.0004.02.04.0 VALVULA COMPUERTA DE BRONCE DE 1/2" und 4.00 58.92 235.6804.02.04.0 VALVULA COMPUERTA DE BRONCE DE 3/4" pza 14.00 71.17 996.3804.02.04.0 VALVULA COMPUERTA DE BRONCE DE 1" und 10.00 97.94 979.4004.02.04.0 VALVULA COMPUERTA DE BRONCE DE 1 1/2" und 12.00 144.66 1,735.9204.02.04.0 VALVULA COMPUERTA DE BRONCE DE 2" pza 4.00 200.81 803.2404.02.05 RED EXTERIOR 0.0004.02.05.0 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2 1/2" m 98.00 48.28 4,731.4404.02.06 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 0.0004.02.06.0 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA D AGUA m 581.00 3.62 2,103.2204.03 SISTEMA DE AGUA CALIENTE 0.0004.03.01 SALIDAS DE AGUA CALIENTE 0.0004.03.01.0 SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" pto 50.00 97.68 4,884.0004.03.01.0 SALIDA DE AGUA CALIENTE TUBERIA CPVC DE 1/2" pto 50.00 97.68 4,884.0004.03.01.0 SALIDA DE AGUA CALIENTE TUBERIA CPVC C-10 O 3/4" pto 6.00 107.14 642.8404.03.01.0 SALIDA DE AGUA CALIENTE TUBERIA CPVC O 3/4" pto 6.00 107.14 642.8404.03.02 REDES DE DISTRIBUCION 0.0004.03.02.0 RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA m 40.00 26.63 1,065.20

    1/2" 0.0004.03.02.0 RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA m 40.00 26.63 1,065.20

    1/2" 0.0004.03.02.0 RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA m 62.00 29.25 1,813.50

    3/4" 0.00

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 04 INSTALACIONES SANITARIAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    04.03.02.0 RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA m 62.00 29.25 1,813.503/4" 0.00

    04.03.03 VALVULAS 0.0004.03.03.0 VALVULA COMPUERTA DE BRONCE DE 1/2" und 4.00 58.92 235.6804.03.03.0 VALVULA COMPUERTA DE BRONCE DE 3/4" pza 14.00 71.17 996.3804.03.04 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 0.0004.03.04.0 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA D AGUA m 280.00 3.62 1,013.6004.04 SISTEMA DE AGUA CONTRAINCENDIO 0.0004.04.01 REDES DE DISTRIBUCION 0.0004.04.01.0 RED DE DISTRIBUCION INTERIOR CON TUBERIA SCH-40 O 2 1/2" m 45.00 90.05 4,052.2504.04.01.0 RED DE DISTRIBUCION INTERIOR CON TUBERIA SCH-40 O 4" m 250.00 151.67 37,917.5004.04.02 REDES DE ALIMENTACION 0.0004.04.02.0 RED DE DISTRIBUCION INTERIOR CON TUBERIA SCH-40 O 4" m 120.00 151.67 18,200.4004.04.03 INSTALACIONES ESPECIALES 0.0004.04.03.0 GABINETE PARA SISTEMA CONTRA INCENDIO und 6.00 1,071.66 6,429.9604.04.03.0 GABINETE PARA SISTEMA CONTRA INCENDIO und 6.00 1,821.66 10,929.9604.04.04 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 0.0004.04.04.0 PRUEBA HIDRAULICA DE RED DE AGUA CONTRA INCENDIO m 415.00 5.15 2,137.2504.05 SISTEMA DE DESAGUE 0.0004.05.01 SALIDAS DE DESAGUE Y VENTILACION 0.0004.05.01.0 SALIDA DE DESAGUE PVC DE 2" pto 58.00 98.89 5,735.6204.05.01.0 SALIDA DE DESAGUE PVC DE 4" pto 52.00 130.76 6,799.5204.05.02 REDES DE DISTRIBUCION 0.0004.05.02.0 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 2" m 237.00 19.36 4,588.3204.05.02.0 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 3" m 216.00 23.69 5,117.0404.05.02.0 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 4" m 281.00 29.65 8,331.6504.05.02.0 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 6" m 108.00 50.18 5,419.4404.05.03 CAJAS DE REGISTRO 0.0004.05.03.0 CAJA DE REGISTRO DE ALBAILERIA 12"x24" C/TAPA DE CONCRETO und 15.00 199.17 2,987.5504.05.03.0 CAJA DE REGISTRO DE ALBAILERIA 24"x24" C/TAPA DE CONCRETO und 4.00 251.37 1,005.4804.05.03.0 BUZON und 7.00 2,324.40 16,270.8004.05.04 ADITAMENTOS VARIOS 0.0004.05.04.0 SUMIDERO DE BRONCE 2" und 51.00 53.28 2,717.2804.05.04.0 SUMIDERO DE BRONCE 3" und 8.00 68.94 551.5204.05.04.0 REGISTRO DE BRONCE 2" pza 3.00 44.98 134.9404.05.04.0 REGISTRO DE BRONCE 3" pza 18.00 61.17 1,101.0604.05.04.0 REGISTRO DE BRONCE 4" pza 13.00 65.81 855.5304.05.04.0 REJILLA LATERAL DE VENTILACION 3" und 1.00 30.05 30.0504.05.04.0 REJILLA LATERAL DE VENTILACION 4" und 4.00 31.72 126.8804.05.05 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 0.0004.05.05.0 PRUEBA HIDRAULICA DE LA RED DE DESAGUE m 842.00 1.81 1,524.0204.05.06 TRABAJOS PRELIMINARES 0.0004.05.06.0 EXCAVACION DE ZANJAS C/EQUIPO PARA REDES (DE 1 A 2 M) m 480.00 11.63 5,582.4004.05.06.0 PERFILADO DE ZANJAS m 480.00 3.07 1,473.6004.05.06.0 RELLENO COMPACTADO C/EQUIPO, PRIMERA CAPA m 480.00 19.16 9,196.8004.05.06.0 RELLENO COMPACTADO C/EQUIPO, CAPA SUPERIOR m 480.00 19.16 9,196.8004.05.06.0 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6m 480.00 11.35 5,448.0004.06 EQUIPAMIENTO 0.0004.06.01 EQUIPAMIENTO PARA AGUA FRIA glb 1.00 12,000.00 12,000.0004.06.02 EQUIPAMIENTO DE AGUA CALIENTE glb 1.00 39,000.00 39,000.0004.06.03 EQUIPAMIENTO DE AGUA CONTRAINCENDIO glb 1.00 55,000.00 55,000.0004.07 CONEXION DOMICILIARIA 0.0004.07.01 CONEXIONES DOMICILIARIAS DE AGUA glb 1.00 2,495.56 2,495.5604.07.02 CONEXION DE DESAGUE glb 1.00 351.66 351.66

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 04 INSTALACIONES SANITARIAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    COSTO DIRECTO 454,859.28GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 40,937.34

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 05 INSTALACIONES ELECTRICAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    05 INSTALACIONES ELECTRICAS 0.0005.01 SALIDAS DE ALUMBRADO 0.0005.01.01 SALIDA DE ALUMBRADO EN TECHO PVC SAP 20 MM Und 270.00 96.58 26,076.6005.01.02 SALIDA DE ALUMBRADO BRAQUETE PVC SAP 20MM pto 44.00 97.94 4,309.3605.02 SALIDAS DE TOMACORRIENTES 0.0005.02.01 TOMACORRIENTE BIPOLAR DOBLE CON L/T PLACA ALUM pto 104.00 123.08 12,800.3205.03 SALIDA PARA INTERRUPTORES 0.0005.03.01 INTERRUPTOR UNIPOLAR DE 1 GOLPE Und 52.00 102.09 5,308.6805.03.02 INTERRUPTOR UNIPOLAR DE 2 GOLPES Und 27.00 119.32 3,221.6405.03.03 INTERRUPTOR UNIPOLAR DE 3 GOLPES Und 2.00 147.37 294.7405.04 SALIDAS DE FUERZA 0.0005.04.01 SALIDA DE FUERZA P/CALENTADOR ELECTRICO Und 3.00 940.55 2,821.6505.04.02 SALIDA DE FUERZA PARA ELECTROBOMBAS DE AGUA Y RIEGO Und 1.00 219.72 219.7205.04.03 SALIDAS PARA CONTROL DE NIVELES Und 2.00 89.70 179.4005.04.04 SALIDA DE FUERZA PARA ASCENSOR:3-1X10mm2LSOH+6mm2(T)- Und 1.00 704.40 704.4005.04.05 SALIDA DE FUERZA PARA SISTEMA DE AGUA CONTRA INCENDIO Und 1.00 98.31 98.3105.05 SUMINISTRO E INSTALACION DECAJAS DE PASE 0.0005.05.01 CAJA DE PASE OCTOGONAL DE 100x40 mm und 8.00 20.89 167.1205.05.02 CAJA DE PASE 150x150x100 MM Und 16.00 47.16 754.5605.05.03 CAJA DE PASE 200x200x100 MM Und 2.00 50.18 100.3605.05.04 CAJA DE PASE 250x250x100 MM Und 2.00 62.69 125.3805.05.05 CAJA DE PASE 300x300x150 MM Und 1.00 97.10 97.1005.06 SUMINISTRO E INSTALACION DETABLEROS 0.0005.06.01 TABLERO DE DISTRIBUCIN ELCTRICA TG, 380/220V, 60HZ, Und 1.00 10,864.73 10,864.73

    AUTOSOPORTADO, SEGN DETALLES 0.0005.06.02 TABLERO DE TRANSFERENCIA AUTOMTICA TTA, 380/220V, 60HZ, Und 1.00 20,212.47 20,212.47

    AUTOSOPORTADO, SEGN DETALLES 0.0005.06.03 TABLERO GENERAL DE EMERGENCIA TGE, 380/220V, 60HZ, AUTOS Und 1.00 18,975.16 18,975.16

    SEGN DETALLES 0.0005.06.04 TABLERO TD-01, 380/220V, 60HZ, EMPOTRADO, SEGN DETALLES Und 1.00 11,844.73 11,844.7305.06.05 TABLERO PARA ALUMBRADO EXTERIOR TD-AEX, 380/220V, 60HZ, E Und 1.00 1,173.12 1,173.12

    SEGN DETALLES 0.0005.06.06 TABLERO PARA ILUMINACIN DE CANCHA DEPORTIVA TD-AE, 380/22Und 1.00 6,223.35 6,223.35

    EMPOTRADO, SEGN DETALLES 0.0005.06.07 TABLERO PARA ASCENSORES, TD-ASC, 380/220V, 60HZ, EMPOTRAD Und 1.00 945.48 945.48

    DETALLES 0.0005.06.08 TABLERO PARA EQUIPO DE BOMBEO DE AGUA TD-EBA Y RIEGO TD-EUnd 2.00 8,303.06 16,606.12

    380/220V, 60HZ, EMPOTRADO, SEGN DETALLES 0.0005.06.09 TABLERO PARA EQUIPOS AGUA CONTRA INCENDIO, TD-ACI, 380/220VUnd 1.00 3,799.10 3,799.10

    EMPOTRADO, SEGN DETALLES 0.0005.06.10 TABLEROS TD-02 Y TD-03, 380/220V, 60HZ, EMPOTRADO, SEGN D Und 2.00 3,050.81 6,101.6205.06.11 TABLEROS T-1, T-2, T-3 Y T-4, 380/220V, 60HZ, EMPOTRADO, SEGN Und 4.00 3,050.81 12,203.2405.06.12 BANCO DE CONDESADORES 90KVAR,380/220V,4X20+10KVAR,60HZund 1.00 13,939.60 13,939.6005.07 SUMINISTRO E INSTALACION DE MONTANTES ELECTRICOS 0.0005.07.01 TUBERIA PVC SAP ELECTRICO D=65MM-PVC-P Mt 160.00 24.50 3,920.0005.07.02 TUBERIA PVC SAP ELECTRICO D=40MM-PVC-P Mt 360.00 16.32 5,875.2005.07.03 TUBERIA PVC SAP ELECTRICO D=25MM-PVC-P Mt 995.00 10.79 10,736.0505.07.04 TUBERIA PVC SAP ELECTRICO D=20MM-PVC-P Mt 580.00 8.69 5,040.2005.07.05 TUBERIA PVC SAP ELECTRICO D=80MM-PVC-P Mt 125.00 31.70 3,962.5005.07.06 TUBERIA PVC SAP ELECTRICO D=100MM-PVC-P Mt 320.00 40.35 12,912.0005.08 SUMINISTRO E INSTALACION DE CABLES Y CONDUCTORES 0.0005.08.01 CABLE ELECTRICO LSOH 6mm2 m 2,260.00 8.05 18,193.0005.08.02 CABLE ELECTRICO LSOH 4mm2 m 2,100.00 6.60 13,860.0005.09 SUMINISTRO E INSTALACION DE SISTEMAS DE PUESTA A TIERRA 0.0005.09.01 POZO A TIERRA DE PROTECCION CON VARILLA Y ACCESORIOS und 16.00 1,099.16 17,586.5605.09.02 CONDUCTOR DESNUDO DE COBRE DE 95 MM2 m 530.00 119.20 63,176.0005.09.03 CONDUCTOR DESNUDO DE COBRE DE 70 MM2 m 400.00 110.42 44,168.00

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 05 INSTALACIONES ELECTRICAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    05.10 ALIMENTADORES 0.0005.10.01 3-1x25mm2NYY+1x16mm2NYY(N)+1x10mm2NYY(T)-40mm PVC-P Mt 210.00 80.24 16,850.4005.10.02 3-1x16mm2NYY+10mm2NYY(N)+6mm2NYY(T)-35mm PVC-P Mt 130.00 50.59 6,576.7005.10.03 3-1x6mm2NYY+6mm2NYY(N)+ 6mm2NYY(T)-25mm PVC-P Mt 168.00 54.25 9,114.0005.10.04 3-1x4mm2NYY+4mm2NYY(N)+4mm2NYY(T)-20mm PVC-P Mt 127.00 33.18 4,213.8605.10.05 3-1x35mm2NYY+1x25mm2NYY(N)+1x16mm2NYY(T)-50mm PVC-P Mt 145.00 98.59 14,295.5505.10.06 3-1x50mm2NYY+1x35mm2NYY(N)+1x25mm2NYY(T)-50mm PVC-P Mt 92.50 98.71 9,130.6805.10.07 3-1x70mm2NYY+1x50mm2NYY(N)+1x25mm2NYY(T)-65mm PVC-P Mt 89.00 181.42 16,146.3805.10.08 3-1x95mm2NYY+1x70mm2NYY(N)+1x35mm2NYY(T)-65mm PVC-P Mt 71.00 167.26 11,875.4605.10.09 3-1x120mm2NYY+1x95mm2NYY(N)+1x35mm2NYY(T)-80mm PVC-PMt 130.00 213.55 27,761.5005.10.10 3-1x150mm2NYY+1x120mm2NYY(N)+1x50mm2NYY(T)-100mm PVCMt 90.00 259.73 23,375.7005.10.11 3-1x185mm2NYY+1x150mm2NYY(N)+1x70mm2NYY(T)-100mm PVCMt 90.00 279.82 25,183.8005.10.12 3-1x240mm2NYY+1x185mm2NYY(N)+1x95mm2NYY(T)-100mm PVCMt 90.00 590.83 53,174.7005.10.13 RED EXTERIOR 0.0005.10.13.0 EXCAVACION DE ZANJAS C/EQUIPO PARA REDES (DE 1 A 2 M) m 1,432.00 11.63 16,654.1605.10.13.0 PERFILADO DE ZANJAS m 1,432.00 3.07 4,396.2405.10.13.0 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO Y AGUA m 1,432.00 16.90 24,200.8005.10.13.0 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE m 1,432.00 11.35 16,253.20

    KM) 0.0005.11 SUMINISTRO E INSTALACION DE EQUIPOS - ARTEFACTOS DE ALUMBRADO 0.0005.11.01 LUMINARIA DEL TIPO BRAQUETE CON PROTECTOR ACRILICO 200M und 324.00 451.62 146,324.88

    CUATRO LAMPARAS 0.0005.11.02 LUMINARIA DEL TIPO PROYECTOR REFLECTOR, PARA ILUMINACION Dund 160.00 2,503.12 400,499.20

    CANCHA DEPORTIVA DEL ESTADIO - LUZ BLANCA DE HALOGENUROS METLICOS 0.00DE 2,000 W 0.00

    05.12 SUMINISTRO E INSTALACION DE REDES EXTERIORES - ALUMBRADO EXTERIOR 0.0005.12.01 UNIDAD DE ALUMBRADO PUBLICO CON EQUIPO, POSTE Y LAMPARA und 11.00 2,404.12 26,445.32

    DE SODIO DE 250KW,INCLUYE PASTORAL Y ACCESORIOS 0.0005.12.02 UNIDAD DE ALUMBRADO PERIMETRAL CON EQUPO REFLECTOR Und 10.00 1,714.06 17,140.60

    HALOGENUROS 400W, INCLUYES SOPORTES Y ACCESORIOS 0.0005.12.03 EMPALMES DE CABLES NYY 10MM2 - 6MM2 Pza 36.00 47.08 1,694.8805.12.04 CABLES NYY DE 3 - 1 X 10MM2 NYY m 460.00 26.71 12,286.6005.12.05 CABLES NYY DE 3 - 1 X 6MM2 NYY m 240.00 21.51 5,162.4005.12.06 CABLES NYY DE 2 - 1 X 6MM2 NYY m 180.00 17.46 3,142.8005.12.07 CABLE VULCANIZADO COLOR PLOMO DE 2 X 6 MM2 m 300.00 17.84 5,352.0005.12.08 BUZON DE CONCRETO DE 1.0 X 1,0 X 1.0METROS, PARA INSTALACI Und 16.00 676.78 10,828.48

    ELCTRICAS, INCLUYE TAPA 0.0005.13 VARIOS 0.0005.13.01 GESTION PARA OBTENCION DE SUMINISTRO ELECTRICO MT (MEDID glb 1.00 12,000.00 12,000.00

    ANTE EMPRESA CONCESIONARIA EDECAETE S.A. 0.0005.13.02 SUM. E INST. DE SISTEMA DE UTILIZACIN EN MEDIA TENSIN, INC glb 1.00 184,000.00 184,000.00

    COSTO DIRECTO 1,483,677.86GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 133,531.01

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 06 INSTALACIONES MECANICAS

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    06 INSTALACIONES MECANICAS 0.0006.01 EQUIPOS MECANICOS, ELECTRICOS Y ESPECIALES 0.0006.01.01 SUMINISTRO E INSTALACION DE GRUPO ELECTROGENO DIESEL, 40 glb 0.00

    380/220V STAND BY, 4 HILOS, 60Hz INC. EQUIPAMIENTO 0.0006.01.02 SUMINISTRO E INSTALACIN DE ESTRUCTURA TIPO POSTE DE 24 MEglb 4.00 14,783.69 59,134.76

    INCLUYE PANELES,POSTE, SOPORTES Y ACCESORIOS 0.0006.01.03 SUMINISTRO E INSTALACION DE EQUIPAMIENTO DE AIRE ACONDICI glb 1.00 10,113.84 10,113.84

    380/220V, 60Hz 0.0006.01.04 SUMINISTRO E INSTALACION DE ASCENSOR SIN CUARTO DE MQUI glb 1.00 ### 117,600.0006.01.05 SUMINISTRO E INSTALACION DE PANTALLA GIGANTE 5Mx8M S/ESP.T glb 1.00 65,000.00 65,000.00

    COSTO DIRECTO 251,848.60GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 22,666.37

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • DESAGREGADO DE PARTIDAS QUE DIO ORIGEN A NUESTRA PROPUESTAOBRAS CONVOCADAS A SUMA ALZADA

    OBRA 07 INSTALACIONES DE COMUNICACIONES

    Sistema de Contratacin: A SUMA ALZADAItem Descripcion Unidad Metrado Precio (S/.) Parcial (S/.)

    07 INSTALACIONES DE COMUNICACIONES 0.0007.01 SISTEMA DE DATA Y VOZ07.01.01 SALIDA PARA DATA pto 5.00 179.24 896.2007.01.02 SALIDA PARA VOZ pto 5.00 179.24 896.2007.01.03 UPS DE 6 KVA und 1.00 11,552.82 11,552.8207.01.04 SUMINISTRO E INSTALACION DE FACE PLATE und 5.00 67.82 339.1007.01.05 SUMINISTRO E INSTALACION DE PATCH PANEL und 1.00 4,552.82 4,552.8207.01.06 SUMINISTRO E INSTALACION DE CABLEADO UTP und 105.00 54.25 5,696.2507.01.07 SUMINISTRO E INSTALACION DE PACTH CORDS Y LINE CORDS und 24.00 67.82 1,627.6807.01.08 SUMINISTRO E INSTALACION DE GABINETE DE 12 RU und 1.00 1,950.00 1,950.0007.01.09 CAJA DE FoGo DE 200x200x100 mm und 5.00 50.18 250.9007.02 COMUNICACIONES 0.0007.02.01 SALIDA TV-CABLE pto 4.00 97.68 390.7207.02.02 SALIDA PARA TELEFONIA PUBLICA pto 4.00 29.72 118.8807.03 EQUIPAMIENTO OFIMATICO 0.0007.03.01 SISTEMA DE TELEFONIA 0.0007.03.01.0 CENTRAL TELEFONICA IP und 1.00 9,800.00 9,800.0007.03.01.0 TELFONO IP USUARIO und 4.00 166.86 667.4407.03.01.0 TELFONO IP DE OPERADORA und 1.00 362.73 362.7307.03.02 CONECTIVIDAD 0.0007.03.02.0 SWITCH PARA DATOS und 2.00 1,544.31 3,088.6207.03.03 SISTEMA DE PROCESAMIENTO 0.0007.03.03.0 SERVIDOR DE RED und 1.00 10,409.61 10,409.6107.03.03.0 SWITCH KWM PARA SERVIDORES und 1.00 500.15 500.1507.03.04 COMPUTADORA PERSONAL und 4.00 4,416.86 17,667.4407.04 SISTEMA DE PERIFONEO Y MUSICA 0.0007.04.01 GATEWAY DE VOZ und 1.00 668.86 668.8607.04.02 AMPLIFICADOR DE ZONA und 1.00 668.86 668.8607.04.03 PARLANTE DE ZONA und 3.00 116.86 350.5807.04.04 CENTRAL DE MUSICA Y PERIFONEO und 1.00 768.86 768.8607.05 SISTEMA DE TELEVISION POR CABLE 0.0007.05.01 TELEVISOR und 2.00 1,512.31 3,024.6207.05.02 AMPLIFICADOR DE SEAL und 1.00 131.79 131.7907.05.03 EQUIPO REPRODUCTOR DE BLU RAY und 1.00 360.28 360.2807.05.04 MODULADOR DE SEAL und 1.00 298.86 298.86

    COSTO DIRECTO 77,040.27GASTOS GENERALES ### #NAME?UTILIDAD 9.00% 6,933.62

    SUB TOTAL #NAME?IGV 18% #NAME?TOTAL S/. #NAME?

  • RESUMENCALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO (CAO)

    PROCESO: LP 004-2014-MPC-1OBRA : MEJORAMIENTO DEL ESTADIO ROBERTO YAEZ, DISTRITO DE SAN VICENTE-PROVINCIA DE CAETE - LIMA Fecha de Inicio Contractual 20-Sep-14ENTIDAD : MUNICIPALIDAD DE CAETE Plazo de Ejecucion en (D.C.) 240EJECUTA : CONSORCIO EJECUTOR CAETE Fecha de Termino Contractual ###

    Fecha de Termino Contractual Actual 5-Aug-15F. REFER.: FEBRERO - 2014 UBICACION : DISTRITO DE SAN VICENTE-PROVINCIA DE CAETE - LIMA

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/1001/11 30/1101/12 31/1201/01 31/0101/02 28/02 01/03 31/03 01/04 30/0401/05 31/0501/06 30/0601/07 31/0701/08 05/08 TOTAL

    01 962,123.86 289,116.84 322,234.22 139,925.05 24,258.57 32,074.28 53,394.27 0.00 0.00 0.00 20,970.48 64908.31 15241.84 962,123.86

    02 ESTRUCTURAS ### 397,558.90 447,598.89 296,221.74 739,838.40 215,963.18 571,281.43 308,830.32 2,977,292.8603 ARQUITECTURA ### 0.00 0.00 0.00 0.00 122,165.30 54,109.19 0.00 0.00 22,322.46 831,904.19 ### ### 3,996,057.6404 INSTALACIONES SANITARIAS 454,859.28 0.00 0.00 0.00 0.00 0.00 102,962.62 0.00 0.00 20,609.35 117,039.03 201,751.28 12,497.00 454,859.2705 INSTALACIONES ELECTRICAS ### 0.00 0.00 0.00 65,389.58 0.00 0.00 47,756.20 366,519.92 651,327.72 330,397.76 1,461,391.1806 INSTALACIONES MECANICAS 251,848.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128,048.60 123,800.00 251,848.6007 INSTALACIONES DE COMUNICACIO 77,040.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,567.75 61,472.52 77,040.27

    Costo Directo ### 289,116.84 322,234.22 537,483.95 471,857.46 450,461.32 ### 0.00 0.00 306,651.19 ### ### ###GASTOS GENERALES (9%) 916,255.23 26,020.52 29,001.08 48,373.55 42,467.17 40,541.52 91,412.47 0.00 0.00 27,598.61 171,694.35 282,493.42 156,652.54UTILIDAD (9%) 916,255.23 26,020.51 29,001.08 48,373.55 42,467.17 40,541.52 91,412.47 0.00 0.00 27,598.61 171,694.35 282,493.42 156,652.54SUB-TOTAL ### ### ### ### ### ### ### 0.00 0.00 ### ### ### ###SUB-TOTAL x F.R. = 1.00000 ### ### ### ### ### ### ### 0.00 0.00 ### ### ### ###I.G.V (18%) ### 61,408.42 68,442.55 114,161.59 100,222.52 95,677.98 215,733.42 0.00 0.00 65,132.71 405,198.67 666,684.48 369,700.00

    TOTAL MONTO CONTRATADO S/ ### ### ### ### ### ### ### 0.00 0.00 ### ### ### ###

    PORCENTAJE PARCIAL 2.84% 3.17% 5.28% 4.63% 4.42% 9.97% 0.00% 0.00% 3.01% 18.74% 30.84% 17.11%PORCENTAJE TOTAL 2.84% 6.01% 11.29% 15.92% 20.34% 30.31% 30.31% 30.31% 33.32% 52.06% 82.90% 100.01%

    OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUD

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO OBRAS PROVISIONALES TRABAJOS PRELIMINARES SEGURIDAD Y SALUD

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/1001/11 30/1101/12 31/1201/01 31/0101/02 28/02 01/03 31/03 01/04 30/0401/05 31/0501/06 30/0601/07 31/0701/08 05/08 TOTAL

    01.01 OBRAS PROVISONALES Y TRABAJOS PRELIMINARES01.01.01 OBRAS PROVISIONALES 0.00 0.0001.01.01.01 ALMACENES 14,157.60 9,742.79 4,414.81 0.00 0.00 0.00 0.00 14,157.6001.01.01.02 CASETA PARA GUARDIANIA 943.84 943.84 0.00 0.00 0.00 0.00 0.00 943.8401.01.01.03 SERVICIOS HIGIENICOS 18,000.00 0.00 0.00 18,000.00 0.00 0.00 0.00 0.00 0.00 18,000.0001.01.01.04 SERVICIOS HIGIENICOS (DUCHA) 21,000.00 0.00 0.00 21,000.00 0.00 0.00 0.00 0.00 0.00 21,000.0001.01.01.05 CERCO PROVISIONAL DE MADERA CON TRIPLAY 22,792.00 0.00 810.74 21,981.26 0.00 0.00 0.00 22,792.0001.01.01.06 CARTEL DE OBRA DE 3.60x7.20 M 2,888.42 0.00 2,888.42 0.00 0.00 0.00 0.00 2,888.4201.01.01.07 CONSUMO DE ENERGIA ELECTRICA Y AGUA 850.00 106.25 110.50 38.25 110.50 110.50 110.50 110.50 110.50 42.50 850.0001.01.01.08 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS, EQUIPOS Y 12,000.00 3,600.00 1,800.00 600.00 0.00 0.00 1,800.00 1,800.00 2,400.00 12,000.00

    HERRAMIENTAS P/PAVIMENTOS 0.00 0.00 0.00 0.0001.01.02 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.0001.01.02.01 LIMPIEZA DE TERRENO 3,215.27 1,599.98 7.72 1,607.57 0.00 3,215.2701.01.03 DEMOLICIONES 0.00 0.00 0.00 0.00 0.00 0.0001.01.03.01 DEMOLICION DE PISO DE CEMENTO INC. FALSO PISO E=2" 18,535.39 18,535.39 0.00 0.00 0.00 0.00 0.00 18,535.3901.01.03.02 DEMOLICION DE PISO DE CERAMICO INC. CONTRAPISO Y FALSO PISO 5,005.00 5,005.00 0.00 0.00 0.00 0.00 0.00 5,005.0001.01.03.03 DEMOLICION DE VEREDAS 1,905.90 698.17 0.00 1,207.73 0.00 0.00 0.00 1,905.9001.01.03.04 DEMOLICION DE MUROS DE ALBAILERIA - SOGA MANUAL 13,387.50 13,387.50 0.00 0.00 0.00 0.00 0.00 13,387.5001.01.03.05 DEMOLICION DE MUROS DE ALBAILERIA - CABEZA MANUAL 3,126.25 3,126.25 0.00 0.00 0.00 0.00 0.00 3,126.2501.01.03.06 DEMOLICION DE ZAPATAS DE CONCRETO ARMADO C/EQUIPO 52,832.70 0.00 52,832.70 0.00 0.00 0.00 0.00 52,832.7001.01.03.07 DEMOLICION DE CIMIENTOS CORRIDOS C/EQUIPO 18,617.06 18,617.06 0.00 0.00 0.00 0.00 0.00 18,617.0601.01.03.08 DEMOLICION DE SOBRECIMIENTOS DE CONCRETO 7,190.72 7,190.72 0.00 0.00 0.00 0.00 0.00 7,190.7201.01.03.09 DEMOLICION DE COLUMNAS 56,718.72 56,718.72 0.00 0.00 0.00 0.00 0.00 56,718.7201.01.03.10 DEMOLICION DE VIGAS 73,687.45 73,687.45 0.00 0.00 0.00 0.00 0.00 73,687.4501.01.03.11 DEMOLICION DE ESCALERAS DE CONCRETO 3,113.29 3,113.29 0.00 0.00 0.00 0.00 0.00 3,113.2901.01.03.12 DEMOLICION DE LOSA ALIGERADA H=0.20m 6,682.50 6,682.50 0.00 0.00 0.00 0.00 0.00 6,682.5001.01.03.13 DEMOLICION DE LOSA DE CONCRETO H=0.10m 46,417.75 46,417.75 0.00 0.00 0.00 0.00 46,417.7501.01.03.14 38,000.00 0.00 0.00 0.00 0.00 0.00 19,000.00 19,000.00 38,000.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.0001.01.03.15 48,000.00 0.00 48,000.00 0.00 0.00 48,000.00

    0.00 0.00 0.00 0.0001.01.03.16 DEMOLICION DE SARDINEL Y DESMONTAJE DE CERCO DE CAMPO DE FUTBOL 18,000.00 18,000.00 0.00 18,000.0001.01.04 ELIMINACION DE DEMOLICIONES 0.00 0.00 0.00 0.0001.01.04.01 ACARREO INTERNO, PROCEDENTE DE DEMOLICION 57,299.12 52,004.73 3,042.28 916.85 916.85 418.41 57,299.1201.01.04.02 ELIMINACION DE MATERIAL PROCEDENTE DE LA DEMOLICION C/MAQUINA 151,167.33 137,199.59 8,026.51 0.00 2,418.85 2,418.85 1,103.53 151,167.3301.01.05 TRAZOS, NIVELES Y REPLANTEO 0.00 0.00 0.00 0.00 0.0001.01.05.01 TRAZO Y REPLANTEO PRELIMINAR CON EQUIPO 3,992.12 925.00 1,533.54 740.00 0.00 793.58 3,992.1201.01.05.02 REPLANTEO DURANTE LA OBRA 6,843.61 3,108.00 740.00 1,497.80 740.01 757.80 6,843.6101.02 SEGURIDAD Y SALUD 0.00 0.00 0.00

    01.02.01 65,000.00 8,450.00 11,050.00 8,450.00 8,450.00 8,450.00 7,150.00 11,050.00 1,950.00 65,000.00

    01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL 24,040.20 3,125.23 4,086.83 3,125.23 3,125.23 3,125.23 1,923.20 4,086.83 1,442.42 24,040.2001.02.03 EQUIPOS DE PROTECCION COLECTIVA 4,282.12 556.68 727.96 556.68 556.68 556.68 342.56 556.88 428.00 4,282.1201.02.04 SEALIZACION TEMPORAL DE SEGURIDAD 7,800.00 0.00 2,340.00 1,014.00 1,014.00 1,014.00 1,092.00 780.00 546.00 7,800.0001.02.05 CAPACITACION EN SEGURIDAD Y SALUD 11,856.00 1,541.28 2,015.52 1,541.28 1,541.28 1,541.28 948.48 1,541.28 1,185.60 11,856.0001.02.06 5,100.00 663.00 867.00 663.00 663.00 663.00 408.00 663.00 510.00 5,100.00

    01.02.07 MITIGACION AMBIENTAL 67,676.00 20,302.80 8,797.88 8,797.88 8,797.88 7,444.36 8,797.88 4,737.32 67,676.0001.03 FLETES 0.00 0.00 0.0001.03.01 TRANSPORTE DE EQUIPOS, MATERIALES Y HERRAMIENTAS 50,000.00 2,500.00 2,500.00 20,000.00 3,000.00 5,000.00 0.00 0.00 15,000.00 2,000.00 50,000.00

    0.00 0.00 0.00Costo Directo 962,123.86 289,116.84 322,234.22 139,925.05 24,258.57 32,074.28 53,394.27 0.00 0.00 0.00 20,970.48 64,908.31 15,241.84GASTOS GENERALES (9%) 86,591.15 26,020.52 29,001.08 12,593.25 2,183.27 2,886.69 4,805.48 0.00 0.00 0.00 1,887.34 5,841.75 1,371.77UTILIDAD (9%) 86,591.15 26,020.52 29,001.08 12,593.25 2,183.27 2,886.69 4,805.48 0.00 0.00 0.00 1,887.34 5,841.75 1,371.77SUB-TOTAL 1,135,306.16 341,157.88 380,236.38 165,111.55 28,625.11 37,847.66 63,005.23 0.00 0.00 0.00 24,745.16 76,591.81 17,985.38SUB-TOTAL x F.R. = 1.00000 1,135,306.16 341,157.88 380,236.38 165,111.55 28,625.11 37,847.66 63,005.23 0.00 0.00 0.00 24,745.16 76,591.81 17,985.38I.G.V (18%) 204,355.11 61,408.42 68,442.55 29,720.08 5,152.52 6,812.58 11,340.94 0.00 0.00 0.00 4,454.13 13,786.53 3,237.36

    TOTAL PRESUPUESTO S/. 1,339,661.27 402,566.30 448,678.93 194,831.63 33,777.63 44,660.24 74,346.17 0.00 0.00 0.00 29,199.29 90,378.34 21,222.740.000.00

    PORCENTAJE PARCIAL 30.05% 33.49% 14.54% 2.52% 3.33% 5.55% 0.00% 0.00% 0.00% 2.18% 6.75% 1.59%PORCENTAJE TOTAL 30.05% 63.54% 78.08% 80.60% 83.93% 89.48% 89.48% 89.48% 89.48% 91.66% 98.41% 100.00%

    DEMOLICION Y ELIMINACION DE CAMERINOS,BAOS Y GRADERIAS DETRS DE TRIBUNA DE OCCIDENTE

    DEMOLICION Y ELIMINACION DE SALON DE USO MULTIPLE AL LADO DE LA TRIBUNA DE ORIENTE

    ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

    RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ESTRUCTURAS

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/1001/11 30/1101/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/0601/07 31/0701/08 05/08 TOTAL

    02 ESTRUCTURAS02.01 MOVIMIENTO DE TIERRAS02.01.01 EXCAVACION CON EQUIPO PESADO 9,730.39 5,484.52 2,163.62 2,082.24 9,730.3802.01.02 EXCAVACION CON EQUIPO LIVIANO 3,433.28 987.37 1,378.13 1,067.78 3,433.2802.01.03 EXCAVACION MANUAL DE ZANJAS 3,231.12 1,189.16 2,041.96 3,231.1202.01.04 60,888.15 6,638.84 54,249.31 60,888.1502.01.05 RELLENO COMPACTADO C/EQUIPO, MATERIAL DE PRESTAM 25,076.57 9,926.40 15,150.17 25,076.5702.01.06 NIVELACION INTERIOR Y APISONADO PARA F.PISO 18,848.43 18,848.43 18,848.4302.01.07 19,754.67 4,565.37 3,975.02 11,172.11 42.18 19,754.6802.01.08 65,879.67 15,370.89 13,383.16 23,416.19 13,709.43 65,879.6702.02 CONCRETO SIMPLE02.02.01 SOLADOS02.02.01.01SOLADO CONCRETO f'c=100 Kg/cm2 34,200.56 3,801.65 4,333.43 26,065.48 34,200.5602.02.02 FALSA ZAPATA02.02.02.01FALSA ZAPATA - CONCRETO F'c=100 kg/cm2 + 40% P.G. 48,967.16 26,893.24 19,902.45 2,171.47 48,967.1602.02.03 CIMIENTOS CORRIDOS02.02.03.01CIMIENTOS CORRIDOS CONCRETO C:H 1:10 +30%P.G. 8,141.41 2,946.99 5,194.42 8,141.4102.02.03.02CIMIENTOS CORRIDOS ENCOFRADO Y DESENCOFRADO 8,920.09 3,253.59 2,074.14 3,592.36 8,920.0902.02.04 SOBRECIMIENTOS02.02.04.01SOBRECIMIENTOS CONCRETO f'c=140 Kg/cm2 +25% P.M. 5,118.02 1,848.10 3,269.92 5,118.0202.02.04.02SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO 8,668.13 2,919.42 5,748.70 8,668.1202.02.05 FALSO PISO02.02.05.01FALSO PISO 4" CONCRETO F'c=140KG/CM2 39,539.50 34,803.06 4,736.44 39,539.5002.03 CONCRETO ARMADO02.03.01 ZAPATAS02.03.01.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 181,402.39 96,365.79 82,187.88 2,848.72 181,402.3902.03.01.02ENCOFRADO Y DESENCOFRADO DE ZAPATAS 31,001.32 15,363.48 13,215.68 2,422.16 31,001.3202.03.01.03ACERO DE REFUERZO (200 kg/da) 125,837.54 74,581.05 51,256.49 125,837.5402.03.02 VIGA DE CIMENTACION02.03.02.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 21,572.24 6,026.00 15,546.24 21,572.2402.03.02.02ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIO 17,330.09 4,841.99 12,344.63 143.47 17,330.0902.03.02.03ACERO DE REFUERZO (200 kg/da) 8,118.33 8,118.33 8,118.3302.03.03 SOBRECIMIENTOS REFORZADOS02.03.03.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 8,376.11 3,022.66 5,353.44 8,376.1002.03.03.02ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO REFO 9,508.83 3,174.29 6,334.54 9,508.8302.03.03.03ACERO DE REFUERZO (200 kg/da) 33,872.89 20,716.58 9,038.10 4,118.22 33,872.9002.03.04 MUROS DE CONCRETO ARMADO02.03.04.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 54,172.14 36,638.85 17,533.29 54,172.1402.03.04.02MUROS DE CONCRETO ARMADO-ENCOFRADO Y DESENCOF 44,832.99 44,832.99 44,832.9902.03.04.03ACERO DE REFUERZO (200 kg/da) 71,868.17 24,087.02 47,781.15 71,868.1702.03.05 PLACAS02.03.05.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 110,936.95 0.00 34,018.39 16,945.67 12,187.39 27,500.00 20,285.50 110,936.9502.03.05.02ENCOFRADO Y DESENCOFRADO EN PLACAS 109,279.28 15,204.96 36,382.58 14,088.09 5,057.31 23,324.70 15,221.64 109,279.2802.03.05.03ACERO DE REFUERZO (200 kg/da) 131,999.81 72,282.95 59,716.86 -8,354.65 8,354.65 131,999.8102.03.06 COLUMNAS02.03.06.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 49,352.07 22,023.81 5,023.81 17,047.62 5,256.83 49,352.0702.03.06.02ENCOFRADO Y DESENCOFRADO EN COLUMNAS 52,909.31 23,261.73 6,785.00 12,865.00 9,997.58 52,909.3102.03.06.03ACERO DE REFUERZO (200 kg/da) 114,967.94 61,857.59 53,110.35 -5,106.25 3,200.00 1,906.25 114,967.9402.03.07 COLUMNAS DE AMARRE02.03.07.01CONCRETO EN COLUMNAS f'c=175 Kg/cm2 11,669.05 2,681.60 6,232.05 2,755.40 11,669.0502.03.07.02ENCOFRADO Y DESENCOFRADO EN COLUMNAS 1,297.32 308.56 680.20 308.56 1,297.3202.03.07.03ACERO DE REFUERZO (200 kg/da) 12,224.16 1,018.68 5,348.10 3,857.38 2,000.00 12,224.1602.03.08 VIGAS02.03.08.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 172,098.14 24,182.96 34,200.00 63,444.51 50,270.67 172,098.1402.03.08.02ENCOFRADO Y DESENCOFRADO DE VIGAS 151,612.48 29,643.08 38,790.00 45,483.74 37,695.66 151,612.4802.03.08.03ACERO DE REFUERZO (200 kg/da) 397,446.72 18,424.35 193,822.59 111,299.70 73,900.08 397,446.7202.03.09 VIGAS DE AMARRE02.03.09.01CONCRETO EN VIGAS f'c= 175 Kg/cm2 11,436.71 2,130.22 2,046.71 7,259.78 11,436.71

    RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO Y AGUA (HASTA 1 M)ACARREO INTERNO MATERIAL PROCEDENTE DE LA EXCAVACIONELIMINACION DE MATERIAL EXCEDENTE C/CARGAD. 125 HP VOLQ. 6M3 D>5KM

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ESTRUCTURAS02.03.09.02ENCOFRADO Y DESENCOFRADO DE VIGAS 25,457.81 5,823.85 9,988.25 9,645.71 25,457.8102.03.09.03ACERO DE REFUERZO (200 kg/da) 14,663.55 3,029.68 5,035.55 6,598.32 14,663.5502.03.10 LOSAS MACIZAS02.03.10.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 71,421.77 35,942.81 21,342.00 14,136.96 71,421.7702.03.10.02ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS 66,861.39 21,543.51 23,456.00 21,861.88 66,861.3902.03.10.03ACERO DE REFUERZO (200 kg/da) 215,237.52 123,132.99 92,104.53 215,237.5202.03.11 LOSAS ALIGERADAS02.03.11.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 42,607.41 12,305.01 10,305.01 19,997.39 42,607.4102.03.11.02LOSAS ALIGERADAS - ENCOFRADO Y DESENCOFRADO 32,640.29 9,259.66 8,320.14 15,060.49 32,640.2902.03.11.03ACERO DE REFUERZO (200 kg/da) 47,264.30 9,006.11 18,675.00 19,583.19 47,264.3002.03.11.04LOSAS ALIGERADAS - LADRILLO DE ARCILLA HUECO 20X30 2,145.44 629.65 1,200.00 315.79 2,145.4402.03.12 ESCALERAS (GARGANTA Y GRADAS)02.03.12.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 33,363.27 11,395.05 6,681.64 15,286.58 33,363.2702.03.12.02ESCALERAS - ENCOFRADO Y DESENCOFRADO 29,012.11 9,848.14 4,506.06 14,657.91 29,012.1102.03.12.03ACERO DE REFUERZO (200 kg/da) 49,394.76 16,464.94 14,697.38 18,232.44 49,394.7602.03.13 GRADAS Y GRADERIAS REFORZADAS02.03.13.01CONCRETO PREMEZCLADO f'c=210 Kg/cm2 25,525.70 25,525.70 25,525.7002.03.13.02ENCOFRADO Y DESENCOFRADO DE GRADAS Y GRADERIAS 7,176.28 7,176.28 7,176.2802.03.13.03GRADAS Y GRADERIAS - ACERO Fy= 4200 Kg/CM2. 10,384.26 10,384.26 10,384.2602.04 VARIOS02.04.01 PERFORACION DE Fe= 3/4" PARA DISPOSITIVO DE ANCLAJE 3,753.60 3,753.60 3,753.6002.04.02 DISPOSITIVO DE ANCLAJE 5/8 ACERO LISO 3,530.40 3,530.40 3,530.4002.04.03 JUNTA DE DILATACION C/RELLENO DE POLIESTIRENO EXPA 1,332.88 1,332.88 1,332.88

    Costo Directo ### 397,558.90 447,598.89 296,221.74 739,838.40 215,963.18 571,281.43 ###GASTOS GENERALES (9%) 267,956.36 35,780.30 40,283.90 26,659.96 66,585.46 19,436.68 51,415.33 27,794.73UTILIDAD (9%) 267,956.36 35,780.30 40,283.90 26,659.96 66,585.46 19,436.68 51,415.33 27,794.73SUB-TOTAL ### 469,119.50 528,166.69 349,541.66 873,009.32 254,836.54 674,112.09 ###SUB-TOTAL x F.R. = 1.00000 ### 469,119.50 528,166.69 349,541.66 873,009.32 254,836.54 674,112.09 ###I.G.V (18%) 632,377.01 84,441.51 95,070.00 62,917.50 157,141.68 45,870.58 121,340.18 65,595.56TOTAL PRESUPUESTO S/. ### 553,561.01 623,236.69 412,459.16 ### 300,707.12 795,452.27 ###

    PORCENTAJE PARCIAL 0.00% 0.00% 13.35% 15.03% 9.95% 24.85% 0.00% 0.00 7.25% 19.19% 10.37% 0.00PORCENTAJE TOTAL 0.00% 0.00% 13.35% 28.39% 38.34% 63.19% 63.19% 63.19% 70.44% 89.63% 100.00% 100.00%

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ARQUITECTURA

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/10 01/11 30/11 01/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/06 01/07 31/07 01/08 05/08 TOTAL

    03 ARQUITECTURA03.01 MURO DE ALBAILERIA03.01.01 MUROS Y TABIQUES03.01.01.0 MURO DE LADRILLO KK SOGA C:A 1:4 80,946.84 26,217.05 9,067.00 35,662.79 10,000.00 80,946.8403.01.01.0 MURO DE LADRILLO KK CABEZA C:A 1:4 29,319.05 12,731.43 12,523.33 4,064.29 29,319.0503.01.01.0 MURO DE LADRILLO KK CANTO C:A, 1:4 794.20 397.10 397.10 794.2003.01.01.0 MURO DE LADRILLO KK SOGA CARAVISTA 0.00 0.0003.01.02 PARAPETOS 0.00 0.0003.01.02.0 MURO DE LADRILLO KK SOGA C:A 1:4 14,408.21 0.00 7,204.10 7,204.11 14,408.2103.02 TARRAJEO Y ENLUCIDO 0.00 0.0003.02.01 TARRAJEO PRIMARIO Y RAYADO MORTERO 1:5 10,587.35 0.00 10,587.35 10,587.3503.02.02 66,449.49 0.00 6,224.75 30,024.74 30,200.00 66,449.4903.02.03 9,513.61 0.00 6,513.61 3,000.00 9,513.6103.02.04 TARRAJEO DE MUROS CON IMPERMEABILIZANTE 11,565.00 11,565.00 11,565.0003.02.05 VESTIDURA DE DERRAMES MEZCLA 1:3 E=1.5 4,196.21 0.00 3,100.21 1,096.00 4,196.2103.02.06 RELLENO DE CEMENTO SEMIPULIDO EN GRADAS DE TRIBUNA 10,093.54 533.10 4,513.67 5,046.77 10,093.5403.02.07 BRUAS SEGUN DETALLE 7,953.61 0.00 5,953.61 2,000.00 7,953.6103.03 CIELORRASOS 0.00 0.0003.03.01 CIELORASOS CON MEZCLA C:A 1:5 e=1.5cm 34,061.42 0.00 7,030.71 27,030.71 34,061.4203.03.02 FALSO CIELORRASO TIPO BAFFLE 48,166.55 0.00 48,166.55 48,166.5503.04 PISOS Y PAVIMENTOS 0.00 0.0003.04.01 CONTRAPISO E=25 mm 40,491.03 2,665.51 20,245.52 17,580.00 40,491.0303.04.02 PISO DE CEMENTO SEMIPULIDO Y BRUADO E=5cm 54,817.64 0.00 27,408.82 27,408.82 54,817.6403.04.03 PISO DE PORCELANATO 40 x 40 166,406.70 0.00 83,203.35 83,203.35 166,406.7003.04.04 PERFIL PARA CAMBIO DE PISO 611.62 0.00 305.81 305.81 611.6203.04.05 BASE GRANULAR E=0.10 m C/EQUIPO LIVIANO PARA VEREDAS 35,269.75 0.00 17,634.88 17,634.87 35,269.7503.04.06 132,330.08 0.00 66,165.04 66,165.04 132,330.08

    03.04.07 PISO DE ADOQUINES DE CONCRETO EN EXTERIORES 32,952.42 0.00 16,476.21 16,476.21 32,952.4203.04.08 1,923.41 0.00 1,923.41 1,923.41

    03.04.09 3,200.62 0.00 1,600.31 1,600.31 3,200.62

    03.04.10 SARDINEL DE VEREDA Y PISTA f'c=175 Kg/cm2 (15X40) 4,767.90 0.00 2,383.95 2,383.95 4,767.9003.04.11 SARDINEL DE VEREDA Y JARDIN DE f'c=175 kg/cm2 ( 15x40 CM) 1,101.51 0.00 550.76 550.76 1,101.5103.04.12 SARDINEL SUMERGIDO f'c=140 Kg/cm2 (15X30) 563.75 0.00 281.88 281.88 563.7503.04.13 SARDINEL DE DUCHA CON REVESTIMIENTO DE PORCELANATO 198.23 0.00 99.12 99.12 198.2303.05 ZOCALOS Y CONTRAZOCALOS 0.00 0.0003.05.01 56,434.58 0.00 28,217.29 28,217.29 56,434.5803.05.02 52,006.33 0.00 26,003.17 26,003.17 52,006.3303.05.03 CONTRAZOCALO DE CEMENTO PULIDO H=10cm 3,495.31 0.00 1,747.66 1,747.66 3,495.3103.06 PREPARACIN DE GRADAS DE CONCRETO Y DESCANSO 0.00 0.0003.06.01 4,431.86 0.00 0.00 4,431.86 4,431.86

    03.06.02 3,387.22 0.00 0.00 3,387.22 3,387.22

    03.06.03 6,342.03 0.00 6,342.03 6,342.03

    03.06.04 2,356.72 0.00 2,356.72 2,356.7203.06.05 REVESTIMIENTO DE PORCELANATO EN DESCANSO DE ESCALERAS 2,220.59 0.00 2,220.59 2,220.5903.06.06 REVESTIMIENTO SEMIPULIDO EN FONDO DE ESCALERAS 1,084.75 0.00 1,084.75 1,084.7503.07 CARPINTERIA DE MADERA 0.00 0.0003.07.01 PUERTA CONTRAPLACADA CON TRUPAN 6mm 9,753.78 0.00 4,876.89 4,876.89 9,753.7803.07.02 PUERTA CONTRAPLACADA CON TRUPAN 6mm Y REJILLA 5,470.88 0.00 2,735.44 2,735.44 5,470.8803.07.03 REJILLA DE MADERA 1,682.02 0.00 841.01 841.01 1,682.0203.07.04 PUERTA DE MADERA/VIDRIO 1,768.56 0.00 884.28 884.28 1,768.5603.07.05 SOBRELUZ PUERTA DE MADERA 1,169.32 0.00 584.66 584.66 1,169.3203.07.06 MARCO DE MADERA PARA PUERTAS 10,608.02 0.00 5,304.01 5,304.01 10,608.0203.07.07 16,644.60 0.00 8,322.30 8,322.30 16,644.60

    03.07.08 6,125.00 0.00 6,125.00 6,125.0003.08 CARPINTERIA METALICA Y HERRERA 0.00 0.00

    TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A 1:5 e=1.5cmTARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A 1:5 e=1.5cm

    VEREDA DE CONCRETO H=10 cm (Inc. junta de arena+asfalto) f'c= 175 kg/cm2

    RAMPA DE Co. F'C=175 KF/CM2 E=4" ACAB. FROTACHADO Y BRUADO E=0.10m.SARDINEL PERALTADO DE f'c=210 kg/cm2 ,15x40 CM (1M 1/[email protected]+1M 1/2" LON)

    ZOCALO DE PORCELANATO DE 40 X 40 (ADHERIDO CON PEGAMENTO)CONTRAZOCALO DE PORCELANATO 40x10 CM (ADHERIDO CON PEGAMENTO)

    REVESTIMIENTO FROTACHADO EN FONDO DE ESCALERAS CON MORTERO C:A 1:4REVESTIMIENTO SEMIPULIDO DE DESCANSO DE ESCALERA CON MORTERO C:A 1:4REVESTIMIENTO SEMIPULIDO DE PASOS Y CONTRAPASOS EN ESCALERAS CON MORTERO C:A 1:4REVESTIMIENTO DE PORCELANATO PASOS Y CONTRAPASOS EN ESCALERA

    DIVISIONES DE MELAMINA EN SS.HH. INC. ESTRUCTURA DE ALUMINIO Y PUERTADIVISIONES DE MELAMINA EN URINARIOS INC. ESTRUCTURA DE ALUMINIO

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ARQUITECTURA

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/10 01/11 30/11 01/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/06 01/07 31/07 01/08 05/08 TOTAL

    03.08.01 PASAMANOS DE ACERO INOXIDABLE (TUBO 2 1/2") 11,344.64 11,344.64 11,344.6403.08.02 BARRA DE APOYO PARA DISCAPACITADOS 98.92 98.92 98.9203.08.03 TAPAJUNTA METALICA 4,496.11 4,496.11 4,496.1103.08.04 PUERTA METLICA PARA BOCAS (SALIDA) 0.00 0.0003.08.05 PUERTA METALICA PARA ANTEBOCAS(EXTERIORES) 77,084.84 38,542.42 38,542.42 77,084.8403.08.06 20,591.17 10,295.59 10,295.59 20,591.17

    03.08.07 205.72 205.72 205.72

    03.08.08 ESCALERA TIPO GATO CON TUBOS DE F. N. DE 1 1/2" x 2" 1,358.76 1,358.76 1,358.7603.08.09 296.06 296.06 296.06

    03.08.10 BARANDA METLICA DE FG DE 2 1/2 14,915.36 14,915.36 14,915.3603.09 CERRAJERIA 0.00 0.0003.09.01 179.22 179.22 179.22

    03.09.02 1,629.81 1,629.81 1,629.81

    03.09.03 620.88 620.88 620.8803.09.04 CERRADURA DE SOBREPONER TRES GOLPES, TIPO FORTE O SIMILAR 2,488.97 2,488.97 2,488.9703.09.05 PICAPORTE PARA PUERTAS DE CERRADURA TIPO PARCHE 3G 334.92 334.92 334.9203.09.06 CERROJO DE ALUMINIO DE 2 PARA CUBICULOS INCLUYE COLOCAC 258.40 258.40 258.4003.09.07 TIRADOR DE ALUMINIO PARA PUERTA DE CUBICULOS DE BAO DE 2 1 684.20 684.20 684.2003.09.08 BISAGRA CAPUCHINA ALUMINIZADA 2 1/2" X 2 1/2" 956.04 956.04 956.0403.09.09 BISAGRA CAPUCHINA ALUMINIZADA 1 1/2" X 1 1/2" 205.60 205.60 205.6003.09.10 BISAGRA DE METAL PARA PUERTA DE FIERRO 1,982.00 1,982.00 1,982.0003.09.11 TOPE DE PUERTA EN PISO 1,314.40 1,314.40 1,314.4003.10 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00 0.00 0.0003.10.01 13,011.08 6,505.54 6,505.54 13,011.08

    03.10.02 16,370.10 8,185.05 8,185.05 16,370.10

    03.10.03 276,361.34 138,180.67 138,180.67 276,361.3403.10.04 74,000.62 37,000.31 37,000.31 74,000.62

    03.10.05 ESPEJO BISELADO DE SOBREPONER, E=6 mm (0.50 m x 1.00 m) 1,582.10 1,582.10 1,582.1003.10.06 2,840.68 2,840.68 2,840.68

    03.11 PINTURA 0.00 0.0003.11.01 PINTURA LATEX EN CIELORASO 42,028.06 21,014.03 21,014.03 42,028.0603.11.02 PINTURA LATEX MURO INTERIOR 22,198.74 11,099.37 11,099.37 22,198.7403.11.03 PINTURA LATEX MURO EXTERIOR 1,370.33 685.17 685.17 1,370.3303.11.04 PINTURA ANTICORROSIVA Y ESMALTE EN CARPINTERIA METALICA 4,883.56 2,441.78 2,441.78 4,883.5603.11.05 PINTURA ESMALTE 2 MANOS EN ZOCALOS 3,057.99 1,529.00 1,529.00 3,057.9903.12 COBERTURAS 0.00 0.0003.12.01 LADRILLO PASTELERO C/MEZCLA 1:5, E=2.5 cm, 30 x 30cm 5,731.20 5,731.20 5,731.2003.12.02 COBERTURA DE TENSO ESTRUCTURA ### 358,990.24 753,879.50 682,081.46 1,794,951.2003.12.03 COBERTURA LATERA DE ALUZINC (PIEL) 17,615.50 17,615.50 17,615.5003.13 SEALIZACIN DE SEGURIDAD 0.00 0.0003.13.01 SEALIZACIN DE SEGURIDAD - VARIAS 3,702.00 3,702.00 3,702.0003.13.02 UNIDAD DE ILUMINACION A BATERIAS 6,317.64 6,317.64 6,317.6403.13.03 DETECTOR DE HUMO 10,543.52 10,543.52 10,543.5203.14 VARIOS 0.00 0.0003.14.01 JUNTA RELLENA C/POLIURETANO E=1 Y SELLADO CON MAT. ELAST 5,487.80 5,487.80 5,487.8003.14.02 CANTONERA DE ALUMINIO 1 1/2 x 2 x 4 mm 21,137.42 21,137.42 21,137.4203.14.03 REJA METLICA PERIMETRAL 0.00 0.0003.14.03.0 REJA TIPO 1 - METLICA DECORATIVA 0.00 0.0003.14.03.0 REJA TIPO 2 - METLICA DE SEGURIDAD 13,540.68 13,540.68 13,540.6803.14.04 CERCO VERDE INC. ESTRUCTUTURA ENMALLADA DE SOPORTE 75,369.00 37,684.50 37,684.50 75,369.0003.14.05 ROTULADO DE NOMBRE EN FACHADA 604.64 604.64 604.6403.14.06 TIERRA DE CHACRA PARA JARDIN H = 0.20M 0.00 0.0003.14.07 SEMBRADO DE GRASS AMERICANO O SIMILAR EN CHAMPA PARA JAR 0.00 0.00

    TUBO METLICO 6" PARA SOBRE PARAPETO CAFETERA SEGUNDO NIVEL (Incluye bobina de anclaje y platina de soporte de 3/8")TAPA METLICA DE 1" x 1" x 1/8" Y PLANCHA ESTRIADA DE 1/8" PARA CISTERNA

    AGARRADERAS DE AC. INOXIDABLE DE 36" D=1 1/4" PARA DISCAPACITADOS SS.HH.

    CERRADURA PESADA DE PERILLA PARA EXTERIOR (LLAVE Y PESTILLO) INCLUYE COLOCACINCERRADURA DE PERILLA PARA INTERIOR (LLAVE Y PESTILLO) INCLUYE COLOCACIONCERRADURA DE PERILLA PARA PUERTA DE BAO INCLUYE COLOCACIN

    VENTANA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e=6 mm. FIJAVENTANA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e=6 mm. BATIENTEMAMPARA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e=6 mm.MURO CORTINA DE ALUMINIO DE CRISTAL TEMPLADO DE COLOR AZUL e=8 mm

    CRISTAL BLINDADO PARA BOLETERAS REFLEX DE 1.30 m x 1.50 m (SEGN PLANOS)

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ARQUITECTURA

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/10 01/11 30/11 01/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/06 01/07 31/07 01/08 05/08 TOTAL

    03.14.08 SEMBRADO DE FICUS Y OTROS H=1.50M. 1,718.00 1,718.00 1,718.0003.14.09 SEALIZACIONES DE IDENTIFICACIN DE AMBIENTES 2,930.75 2,930.75 2,930.7503.14.10 CONTROL DE ACCESO DE PERSONAS MEDIANTE TORNO (BRAZOS AB 24,942.24 24,942.24 24,942.2403.14.11 MUEBLE DE BAOS ENCHAPADO 3,264.64 3,264.64 3,264.6403.14.12 MUEBLE DE CAFETERAS ENCHAPADO 3,687.12 3,687.12 3,687.1203.14.13 MUEBLE DE SALAS DE MASAJES ENCHAPADO 1,229.04 1,229.04 1,229.0403.15 PISTA ATLETICA 0.00 0.0003.15.01 PREPARACION DE TERRENO Y AFIRMADO EN PISTA ATLETICA ( PREPA 0.00 0.00

    TERRENO, AFIRMADO, CAPA ASFALTICA DE 5 cm y 2 cm, dos capas ) 0.00 0.0003.15.02 ACABADO DE PISTA ATLETICA DE 14,1 mm TIPO GABS COMPETITON 0.00 0.00

    SANDWICH 0.00 0.0003.16 CAMPO DE FTBOL 0.00 0.0003.16.01 CAMPO DE FTBOL CESPED NATURAL 0.00 0.0003.16.02 SERVICIO DE SIEMBRA DE CESPED BERMUDA EN CAMPO DE FTBOL 244,330.80 122,165.30 61,082.75 61,082.75 244,330.8003.16.03 0.00

    0.0003.16.04 ACCESORIOS PARA CAMPO DE FTBOL 0.00 0.00

    1,200.00 1,200.00 1,200.00

    03.16.04.0 RED DE NYLON COLOR BLANCO DEL TIPO PESADO PARA USO PROFES 3,000.00 3,000.00 3,000.00COCADA HEXAGONAL DE 12 cm 0.00 0.00

    9,000.009,000.00 9,000.00

    03.16.05 SISTEMA DE RIEGO EN CAMPO DE FTBOL 0.00 0.00129,799.48 64,899.74 64,899.74 129,799.48

    03.16.05.0 BUTACAS VIP 28,022.64 28,022.64 28,022.6403.16.05.0 BUTACAS SUPLENTES Y AUXILIARES 1,510.40 1,510.40 1,510.4003.16.05.0 CERCO SEPARADOR TRANSPARENTE, TRIBUNA/CAMPO DE FTBOL 0.00

    Costo Directo ### 0.00 0.00 0.00 0.00 122,165.30 54,109.19 0.00 0.00 22,322.46 831,904.19 1,768,381.84 1,197,174.67GASTOS GENERALES (9%) 359,645.19 0.00 0.00 0.00 0.00 10,994.88 4,869.83 0.00 0.00 2,009.02 74,871.38 159,154.36 107,745.72UTILIDAD (9%) 359,645.19 0.00 0.00 0.00 0.00 10,994.88 4,869.83 0.00 0.00 2,009.02 74,871.38 159,154.36 107,745.72SUB-TOTAL ### 0.00 0.00 0.00 0.00 144,155.06 63,848.85 0.00 0.00 26,340.50 981,646.95 ### ###SUB-TOTAL x F.R. = 1.00000 ### 0.00 0.00 0.00 0.00 144,155.06 63,848.85 0.00 0.00 26,340.50 981,646.96 2,086,690.55 1,412,666.11I.G.V (18%) 848,762.64 0.00 0.00 0.00 0.00 25,947.91 11,492.79 0.00 0.00 4,741.29 176,696.45 375,604.30 254,279.90TOTAL PRESUPUESTO S/. ### 0.00 0.00 0.00 0.00 170,102.97 75,341.64 0.00 0.00 31,081.79 ### ### ###

    PORCENTAJE PARCIAL 0.00% 0.00% 0.00% 0.00% 3.06% 1.35% 0.00% 0.00% 0.56% 20.82% 44.25% 29.96%PORCENTAJE TOTAL 0.00% 0.00% 0.00% 0.00% 3.06% 4.41% 4.41% 4.41% 4.97% 25.79% 70.04% 100.00%

    SERVICIO DE SIEMBRA DE CESPED BERMUDA EN CAMPO ALEDAO AL CAMPO DE FUTBOL

    03.16.04.01

    BANDERN REBATIBLE DE USO PROFESIONAL, H = 1.50 m, PARANTES PLASTICOS COLOR BLANCO, BANDERAS ROJAS PLASTIFICADAS RESORTES BASE PARA BANDERIN

    03.16.04.03

    ARCO METLICO PARA FUTBOL, TUBO NEGRO 4", GANCHOS CADA 15 cm, 4 POSTES POSTERIORES P/RED DE 2.50 m x2", PINTURA EPOXICA

    03.16.05.01

    EQUIPO DE RIEGO POR ASPERSIN POP UP ( ROTORES ) PARA CAMPO DE FUTBOL

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ARQUITECTURA

    0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

    0.000.00

    0.00

    0.000.000.000.000.000.000.000.000.000.00

    0.00

    0.00

    0.000.000.000.000.000.000.000.000.000.000.00

    0.000.000.00

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ARQUITECTURA

    0.000.000.000.000.00

    0.00

    0.000.00

    0.000.000.00

    0.00

    0.000.000.000.000.000.000.000.000.000.000.00

    0.00

    0.000.00

    0.000.00

    0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO ARQUITECTURA

    0.000.000.000.000.000.000.000.000.000.000.000.000.000.00

    0.000.00

    0.000.000.00

    0.000.00

    0.000.000.000.00

  • CALENDARIO DE AVANCE DE OBRA ACELERADO VALORIZADO INSTALACIONES SANITARIAS

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/1001/11 30/11 01/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/06 01/07 31/07 01/08 05/08 TOTAL

    04.01 INSTALACIONES SANITARIAS04.01 APARATOS Y ACCESORIOS SANITARIOS04.01.01 APARATOS SANITARIOS04.01.01.01INODORO (CON VALVULA FLUXOMETRO) 36,088.00 0.00 36,088.00 0.00 36,088.00 0.0004.01.01.02LAVATORIO NACIONAL BLANCO 9,405.00 0.00 9,405.00 0.00 9,405.00 0.0004.01.01.03 16,920.00 0.00 16,920.00 0.00 16,920.00 0.0004.01.01.04URINARIO NACIONAL MODELO CADET 4,745.00 0.00 4,745.00 0.00 4,745.00 0.0004.01.02 ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.0004.01.02.01DISPENSADOR DE JABON 2,640.00 0.00 2,640.00 2,640.00 0.0004.01.02.02DISPENSADOR DE PAPEL TOALLA 2,156.00 0.00 2,156.00 2,156.00 0.0004.01.02.03DISPENSADOR DE PAPEL HIGIENICO CROMADO 2,090.00 0.00 2,090.00 2,090.00 0.0004.01.02.04JABONERA DE LOSA COLOR BLANCO 1,276.00 0.00 1,276.00 1,276.00 0.0004.01.03 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.0004.01.03.01COLOCACION DE APARATOS SANITARIOS 18,933.24 0.00 18,933.24 18,933.24 0.0004.01.03.02COLOCACION DE ACCESORIOS SANITARIOS 4,335.00 0.00 4,335.00 4,335.00 0.0004.02 SISTEMA DE AGUA FRIA 0.00 0.00 0.0004.02.01 TRABAJOS PRELIMINARES 0.00 0.00 0.0004.02.01.01EXCAVACION A MANO EN TERRENO NORMAL 11,942.48 7,828.15 4,114.33 11,942.48 0.0004.02.01.02REFINE DEL TERRENO EXCAVADO 470.00 295.00 175.00 470.00 0.0004.02.01.03ELIMINACION DE MATERIAL EXCEDENTE 4,949.00 3,535.00 1,414.00 4,949.00 0.0004.02.02 SALIDAS DE AGUA FRIA 0.00 0.00 0.0004.02.02.01SALIDA DE AGUA FRIA PVC C-10 DE 1/2" 7,677.90 5,253.30 2,424.60 7,677.90 0.0004.02.02.02SALIDA DE AGUA FRIA PVC C-10 DE 3/4" 1,747.24 919.60 827.64 1,747.24 0.0004.02.02.03SALIDA DE AGUA FRIA PVC C-10 DE 1" 5,689.32 3,829.35 1,859.97 5,689.32 0.0004.02.03 REDES DE DISTRIBUCION 0.00 0.00 0.00 0.0004.02.03.01 829.28 560.64 268.64 829.28 0.0004.02.03.02 1,023.96 633.88 390.08 1,023.96 0.0004.02.03.03SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1" 750.48 318.00 432.48 750.48 0.0004.02.03.04 281.12 175.70 105.42 281.12 0.0004.02.03.05 1,703.40 1,002.00 701.40 1,703.40 0.0004.02.03.06SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2" 2,959.20 1,918.00 1,041.20 2,959.20 0.0004.02.03.07 2,896.80 1,931.20 965.60 2,896.80 0.0004.02.04 VALVULAS 0.00 0.00 0.0004.02.04.01VALVULA COMPUERTA DE BRONCE DE 1/2" 235.68 0.00 235.68 235.68 0.0004.02.04.02VALVULA COMPUERTA DE BRONCE DE 3/4" 996.38 0.00 996.38 996.38 0.0004.02.04.03VALVULA COMPUERTA DE BRONCE DE 1" 979.40 0.00 979.40 979.40 0.0004.02.04.04VALVULA COMPUERTA DE BRONCE DE 1 1/2" 1,735.92 0.00 1,735.92 1,735.92 0.0004.02.04.05VALVULA COMPUERTA DE BRONCE DE 2" 803.24 0.00 803.24 803.24 0.0004.02.05 RED EXTERIOR 0.00 0.00 0.00 0.0004.02.05.01 4,731.44 0.00 4731.44 0.00 4,731.44 0.0004.02.06 0.00 0.00 0.0004.02.06.01 2,103.22 1,067.90 1,035.32 2,103.22 0.0004.03 SISTEMA DE AGUA CALIENTE 0.00 0.00 0.0004.03.01 SALIDAS DE AGUA CALIENTE 0.00 0.00 0.0004.03.01.01SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" 4,884.00 3,418.80 1,465.20 4,884.00 0.0004.03.01.02SALIDA DE AGUA CALIENTE TUBERIA CPVC DE 1/2" 4,884.00 3,418.80 1,465.20 4,884.00 0.0004.03.01.03SALIDA DE AGUA CALIENTE TUBERIA CPVC C-10 O 3/4" 642.84 428.56 214.28 642.84 0.0004.03.01.04SALIDA DE AGUA CALIENTE TUBERIA CPVC O 3/4" 642.84 428.56 214.28 642.84 0.0004.03.02 REDES DE DISTRIBUCION 0.00 0.00 0.00 0.00 0.0004.03.02.01 1,065.20 665.75 399.45 1,065.20 0.00

    04.03.02.02 1,065.20 665.75 399.45 1,065.20 0.0004.03.02.03 1,813.50 1,199.25 614.25 1,813.50 0.0004.03.02.04 1,813.50 1,199.25 614.25 1,813.50 0.0004.03.03 VALVULAS 0.00 0.00 0.0004.03.03.01VALVULA COMPUERTA DE BRONCE DE 1/2" 235.68 0.00 235.68 235.68 0.0004.03.03.02VALVULA COMPUERTA DE BRONCE DE 3/4" 996.38 0.00 996.38 996.38 0.0004.03.04 0.00 0.00 0.0004.03.04.01 1,013.60 477.84 535.76 1,013.60 0.0004.04 SISTEMA DE AGUA CONTRAINCENDIO 0.00 0.00 0.0004.04.01 REDES DE DISTRIBUCION 0.00 0.00 0.00

    DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA

    SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1/2"SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 3/4"SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1 1/4"SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1 1/2"SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2 1/2"

    SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2 1/2"PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIASPRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA D AGUA

    RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA CPVC DE 1/2"RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA CPVC DE 1/2"RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA CPVC DE 3/4"RED DE DISTRIBUCION INTERIOR DE AGUA CALIENTE CON TUBERIA CPVC DE 3/4"

    PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIASPRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA D AGUA

  • CALENDARIO DE AVANCE DE OBRA ACELERADO VALORIZADO INSTALACIONES SANITARIAS

    ITEM DESCRIPCION

    PLAZO DE EJECUCION (320 D.C.)MONTO

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTOS/.20/09 30/09 01/10 31/1001/11 30/11 01/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/06 01/07 31/07 01/08 05/08 TOTAL

    04.04.01.01 4,052.25 0.00 2,026.13 2,026.13 4,052.25 0.0004.04.01.02 37,917.50 0.00 18,958.75 18,958.75 37,917.50 0.0004.04.02 REDES DE ALIMENTACION 0.00 0.00 0.00 0.00 0.0004.04.02.01 18,200.40 15,167.00 3,033.40 18,200.40 0.0004.04.03 INSTALACIONES ESPECIALES 0.00 0.00 0.0004.04.03.01GABINETE PARA SISTEMA CONTRA INCENDIO 6,429.96 0.00 6,429.96 6,429.96 0.0004.04.03.02GABINETE PARA SISTEMA CONTRA INCENDIO 10,929.96 0.00 10,929.96 10,929.96 0.0004.04.04 0.00 0.00 0.00

    2,137.25 0.00 2,137.25 2,137.25 0.0004.05 SISTEMA DE DESAGUE 0.00 0.00 0.0004.05.01 SALIDAS DE DESAGUE Y VENTILACION 0.00 0.00 0.0004.05.01.01SALIDA DE DESAGUE PVC DE 2" 5,735.62 3,560.04 263.71 1,911.87 5,735.6204.05.01.02SALIDA DE DESAGUE PVC DE 4" 6,799.52 4,184.32 348.69 2,266.51 6,799.5204.05.02 REDES DE DISTRIBUCION 0.00 0.00 0.00 0.0004.05.02.01 4,588.32 3,484.80 1,103.52 4,588.32 0.0004.05.02.02 5,117.04 4,145.75 971.29 5,117.04 0.0004.05.02.03 8,331.65 6,226.50 2,105.15 8,331.65 0.0004.05.02.04 5,419.44 0.00 1,806.48 1,806.48 1,806.48 5,419.44 0.0004.05.03 CAJAS DE REGISTRO 0.00 0.00 0.0004.05.03.01 2,987.55 1,991.70 995.85 2,987.55 0.0004.05.03.02 1,005.48 502.74 502.74 1,005.48 0.0004.05.03.03BUZON 16,270.80 0.00 16,270.80 16,270.80 0.0004.05.04 ADITAMENTOS VARIOS 0.00 0.00 0.0004.05.04.01SUMIDERO DE BRONCE 2" 2,717.28 0.00 2,717.28 2,717.28 0.0004.05.04.02SUMIDERO DE BRONCE 3" 551.52 0.00 551.52 551.52 0.0004.05.04.03REGISTRO DE BRONCE 2" 134.94 0.00 134.94 134.94 0.0004.05.04.04REGISTRO DE BRONCE 3" 1,101.06 0.00 1,101.06 1,101.06 0.0004.05.04.05REGISTRO DE BRONCE 4" 855.53 0.00 855.53 855.53 0.0004.05.04.06REJILLA LATERAL DE VENTILACION 3" 30.05 0.00 30.05 30.05 0.0004.05.04.07REJILLA LATERAL DE VENTILACION 4" 126.88 0.00 126.88 126.88 0.0004.05.05 0.00 0.00 0.00 0.0004.05.05.01PRUEBA HIDRAULICA DE LA RED DE DESAGUE 1,524.02 0.00 1,524.02 1,524.02 0.0004.05.06 TRABAJOS PRELIMINARES 0.00 0.00 0.0004.05.06.01 5,582.40 4,070.50 1,511.90 5,582.40 0.0004.05.06.02PERFILADO DE ZANJAS 1,473.60 1,074.50 399.10 1,473.60 0.0004.05.06.03RELLENO COMPACTADO C/EQUIPO, PRIMERA CAPA 9,196.80 6,706.00 2,490.80 9,196.80 0.0004.05.06.04RELLENO COMPACTADO C/EQUIPO, CAPA SUPERIOR 9,196.80 6,706.00 2,490.80 9,196.80 0.0004.05.06.05 5,448.00 3,972.50 1,475.50 5,448.00

    0.0004.06 EQUIPAMIENTO 0.00 0.00 0.0004.06.01 EQUIPAMIENTO PARA AGUA FRIA 12,000.00 0.00 6,000.00 6,000.00 12,000.00 0.0004.06.02 EQUIPAMIENTO DE AGUA CALIENTE 39,000.00 0.00 19,500.00 19,500.00 39,000.00 0.0004.06.03 EQUIPAMIENTO DE AGUA CONTRAINCENDIO 55,000.00 0.00 27,500.00 27,500.00 55,000.00 0.0004.07 CONEXION DOMICILIARIA 0.00 0.00 0.0004.07.01 CONEXIONES DOMICILIARIAS DE AGUA 2,495.56 0.00 2,495.56 2,495.56 0.0004.07.02 CONEXION DE DESAGUE 351.66 0.00 351.66 351.66 0.00

    COSTO DIRECTO 454,859.28 0.00 0.00 0.00 0.00 0.00 102,962.62 0.00 0.00 20,609.35 117,039.03 201,751.28 12,497.00GASTOS GENERALES (9%) 40,937.34 0.00 0.00 0.00 0.00 0.00 9,266.64 0.00 0.00 1,854.85 10,533.50 18,157.61 1,124.74UTILIDAD (9%) 40,937.34 0.00 0.00 0.00 0.00 0.00 9,266.64 0.00 0.00 1,854.85 10,533.50 18,157.61 1,124.74SUB-TOTAL ### 0.00 0.00 0.00 0.00 0.00 121,495.90 0.00 0.00 24,319.05 138,106.03 238,066.50 14,746.48SUB-TOTAL x F.R. = 1.00000 ### 0.00 0.00 0.00 0.00 0.00 121,495.90 0.00 0.00 24,319.05 138,106.03 238,066.50 14,746.48I.G.V (18%) 96,612.11 0.00 0.00 0.00 0.00 0.00 21,869.26 0.00 0.00 4,377.42 24,859.09 42,851.97 2,654.37TOTAL PRESUPUESTO S/. ### 0.00 0.00 0.00 0.00 0.00 143,365.16 0.00 0.00 28,696.47 162,965.12 280,918.47 17,400.85

    PORCENTAJE PARCIAL 0.00% 0.00% 0.00% 0.00% 0.00% 22.64% 0.00% 0.00% 4.53% 25.73% 44.35% 2.75%PORCENTAJE TOTAL 0.00% 0.00% 0.00% 0.00% 0.00% 22.64% 22.64% 22.64% 27.17% 52.90% 97.25% 100.00%

    RED DE DISTRIBUCION INTERIOR CON TUBERIA SCH-40 2 1/2"RED DE DISTRIBUCION INTERIOR CON TUBERIA SCH-40 4"RED DE DISTRIBUCION INTERIOR CON TUBERIA SCH-40 4"

    PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIASPRUEBA HIDRAULICA DE RED DE AGUA CONTRA INCENDIO

    SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 2"SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 3"SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 4"SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 6"CAJA DE REGISTRO DE ALBAILERIA 12"x24" C/TAPA DE CONCRETOCAJA DE REGISTRO DE ALBAILERIA 24"x24" C/TAPA DE CONCRETO

    PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS

    EXCAVACION DE ZANJAS C/EQUIPO PARA REDES (DE 1 A 2 M)

    ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3 (D=5 KM)

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO INSTALACIONES ELECTRICAS

    ITEM DESCRIPCION PLAZO DE EJECUCION (320 D.C.)

    SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO

    20/09 30/09 01/10 31/10 01/11 30/11 01/12 31/12 01/01 31/01 01/02 28/02 01/03 31/03 01/04 30/04 01/05 31/05 01/06 30/06 01/07 31/07 01/08 05/08 TOTAL05 INSTALACIONES ELECTRICAS05.01 SALIDAS DE ALUMBRADO05.01.01 SALIDA DE ALUMBRADO EN TECHO PVC SAP 20 MM 26,076.60 2,414.50 10,623.80 13,038.30 26,076.6005.01.02 SALIDA DE ALUMBRADO BRAQUETE PVC SAP 20MM 4,309.36 1,762.92 2,546.44 4,309.3605.02 SALIDAS DE TOMACORRIENTES 0.00 0.00 0.0005.02.01 TOMACORRIENTE BIPOLAR DOBLE CON L/T PLACA ALUM 12,800.32 5,907.84 2,625.71 4,266.77 12,800.3205.03 SALIDA PARA INTERRUPTORES 0.00 0.0005.03.01 INTERRUPTOR UNIPOLAR DE 1 GOLPE 5,308.68 1,531.35 2,007.77 1,769.56 5,308.6805.03.02 INTERRUPTOR UNIPOLAR DE 2 GOLPES 3,221.64 1,431.84 715.92 1,073.88 3,221.6405.03.03 INTERRUPTOR UNIPOLAR DE 3 GOLPES 294.74 0.00 98.25 98.25 98.24 294.7405.04 SALIDAS DE FUERZA 0.00 0.00 0.00 0.0005.04.01 SALIDA DE FUERZA P/CALENTADOR ELECTRICO 2,821.65 940.55 940.55 940.55 2,821.6505.04.02 SALIDA DE FUERZA PARA ELECTROBOMBAS DE AGUA Y RIEGO 219.72 0.00 73.24 146.48 219.7205.04.03 SALIDAS PARA CONTROL DE NIVELES 179.40 0.00 59.80 119.60 179.4005.04.04 704.40 211.32 234.80 258.28 704.4005.04.05 SALIDA DE FUERZA PARA SISTEMA DE AGUA CONTRA INCENDIO 98.31 0.00 32.77 65.54 98.3105.05 SUMINISTRO E INSTALACION DECAJAS DE PASE 0.00 0.0005.05.01 CAJA DE PASE OCTOGONAL DE 100x40 mm 167.12 83.56 83.56 167.1205.05.02 CAJA DE PASE 150x150x100 MM 754.56 282.96 471.60 754.5605.05.03 CAJA DE PASE 200x200x100 MM 100.36 50.18 50.18 100.3605.05.04 CAJA DE PASE 250x250x100 MM 125.38 62.69 62.69 125.3805.05.05 CAJA DE PASE 300x300x150 MM 97.10 0.00 97.10 97.1005.06 SUMINISTRO E INSTALACION DETABLEROS 0.00 0.0005.06.01 TABLERO DE DISTRIBUCIN ELCTRICA TG, 380/220V, 60HZ, 10,864.73 0.00 5,432.37 5,432.37 10,864.73

    AUTOSOPORTADO, SEGN DETALLES 0.00 0.00 0.00 0.00 0.0005.06.02 20,212.47 0.00 10,106.24 10,106.24 20,212.47

    AUTOSOPORTADO, SEGN DETALLES 0.00 0.00 0.00 0.00 0.0005.06.03 18,975.16 0.00 9,487.58 9,487.58 18,975.1605.06.04 11,844.73 0.00 5,922.37 5,922.37 11,844.7305.06.05 1,173.12 0.00 586.56 586.56 1,173.1205.06.06 6,223.35 0.00 3,111.68 3,111.68 6,223.3505.06.07 945.48 0.00 472.74 472.74 945.4805.06.08 16,606.12 0.00 8,303.06 8,303.06 16,606.1205.06.09 3,799.10 0.00 1,899.55 1,899.55 3,799.1005.06.10 6,101.62 0.00 3,050.81 3,050.81 6,101.6205.06.11 12,203.24 6,101.62 6,101.62 12,203.2405.06.12 13,939.60 0.00 13,939.60 13,939.6005.07 SUMINISTRO E INSTALACION DE MONTANTES ELECTRICOS 0.00 0.00 0.0005.07.01 TUBERIA PVC SAP ELECTRICO D=65MM-PVC-P 3,920.00 0.00 1,960.00 1,960.00 3,920.0005.07.02 TUBERIA PVC SAP ELECTRICO D=40MM-PVC-P 5,875.20 0.00 2,937.60 2,937.60 5,875.2005.07.03 TUBERIA PVC SAP ELECTRICO D=25MM-PVC-P 10,736.05 5,368.03 5,368.03 10,736.0505.07.04 TUBERIA PVC SAP ELECTRICO D=20MM-PVC-P 5,040.20 2,520.10 2,520.10 5,040.2005.07.05 TUBERIA PVC SAP ELECTRICO D=80MM-PVC-P 3,962.50 2,536.00 1,426.50 3,962.5005.07.06 TUBERIA PVC SAP ELECTRICO D=100MM-PVC-P 12,912.00 8,473.50 4,438.50 12,912.0005.08 SUMINISTRO E INSTALACION DE CABLES Y CONDUCTORES 0.00 0.00 0.0005.08.01 CABLE ELECTRICO LSOH 6mm2 18,193.00 18,193.00 18,193.0005.08.02 CABLE ELECTRICO LSOH 4mm2 13,860.00 13,860.00 13,860.0005.09 0.00 0.00 0.0005.09.01 POZO A TIERRA DE PROTECCION CON VARILLA Y ACCESORIOS 17,586.56 0.00 8,793.28 8,793.28 17,586.5605.09.02 CONDUCTOR DESNUDO DE COBRE DE 95 MM2 63,176.00 31,588.00 31,588.00 63,176.0005.09.03 CONDUCTOR DESNUDO DE COBRE DE 70 MM2 44,168.00 0.00 22,084.00 22,084.00 44,168.0005.10 ALIMENTADORES 0.00 0.00 0.0005.10.01 16,850.40 8,425.20 8,425.20 16,850.4005.10.02 3-1x16mm2NYY+10mm2NYY(N)+6mm2NYY(T)-35mm PVC-P 6,576.70 0.00 3,288.35 3,288.35 6,576.7005.10.03 3-1x6mm2NYY+6mm2NYY(N)+ 6mm2NYY(T)-25mm PVC-P 9,114.00 5,425.00 3,689.00 9,114.0005.10.04 3-1x4mm2NYY+4mm2NYY(N)+4mm2NYY(T)-20mm PVC-P 4,213.86 0.00 2,106.93 2,106.93 4,213.8605.10.05 14,295.55 0.00 7,147.78 7,147.78 14,295.5505.10.06 9,130.68 0.00 4,565.34 4,565.34 9,130.68

    MONTO S/.

    SALIDA DE FUERZA PARA ASCENSOR:3-1X10mm2LSOH+6mm2(T)-25mmPVC-

    TABLERO DE TRANSFERENCIA AUTOMTICA TTA, 380/220V, 60HZ,

    TABLERO GENERAL DE EMERGENCIA TGE, 380/220V, 60HZ, AUTOSOPORTADO, SEGN DETALLESTABLERO TD-01, 380/220V, 60HZ, EMPOTRADO, SEGN DETALLESTABLERO PARA ALUMBRADO EXTERIOR TD-AEX, 380/220V, 60HZ, EMPOTRADO, SEGN DETALLESTABLERO PARA ILUMINACIN DE CANCHA DEPORTIVA TD-AE, 380/220V, 60HZ, EMPOTRADO SEGN DETALLESTABLERO PARA ASCENSORES, TD-ASC, 380/220V, 60HZ, EMPOTRADO, SEGN DETALLESTABLERO PARA EQUIPO DE BOMBEO DE AGUA TD-EBA Y RIEGO TD-EBR, 380/220V, 60Hz EMPOTRADO SEGN DETALLESTABLERO PARA EQUIPOS AGUA CONTRA INCENDIO, TD-ACI, 380/220V, 60HZ, EMPOTRADO SEGN DETALLESTABLEROS TD-02 Y TD-03, 380/220V, 60HZ, EMPOTRADO, SEGN DETALLESTABLEROS T-1, T-2, T-3 Y T-4, 380/220V, 60HZ, EMPOTRADO, SEGN DETALLESBANCO DE CONDESADORES 90KVAR,380/220V,4X20+10KVAR,60HZ

    SUMINISTRO E INSTALACION DE SISTEMAS DE PUESTA A TIERRA

    3-1x25mm2NYY+1x16mm2NYY(N)+1x10mm2NYY(T)-40mm PVC-P

    3-1x35mm2NYY+1x25mm2NYY(N)+1x16mm2NYY(T)-50mm PVC-P3-1x50mm2NYY+1x35mm2NYY(N)+1x25mm2NYY(T)-50mm PVC-P

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO INSTALACIONES ELECTRICAS

    05.10.07 16,146.38 0.00 8,073.19 8,073.19 16,146.3805.10.08 11,875.46 0.00 5,937.73 5,937.73 11,875.4605.10.09 27,761.50 0.00 13,880.75 13,880.75 27,761.5005.10.10 23,375.70 0.00 11,687.85 11,687.85 23,375.7005.10.11 25,183.80 12,591.90 12,591.90 25,183.8005.10.12 53,174.70 26,587.35 26,587.35 53,174.7005.10.13 RED EXTERIOR 0.00 0.0005.10.13.0EXCAVACION DE ZANJAS C/EQUIPO PARA REDES (DE 1 A 2 M) 16,654.16 8,548.05 8,106.11 16,654.1605.10.13.0PERFILADO DE ZANJAS 4,396.24 2,256.45 2,139.79 4,396.2405.10.13.0RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO Y AGUA 24,200.80 12,421.50 11,779.30 24,200.8005.10.13.0 16,253.20 8,342.25 7,910.95 16,253.2005.11 0.00 0.00 0.0005.11.01 146,324.88 29,264.98 97,059.90 20,000.00 146,324.88

    05.11.02 400,499.20 0.00 160,199.68 240,299.52 400,499.20

    05.12 0.00 0.00 0.0005.12.01 26,445.32 0.00 26,445.32 26,445.3205.12.02 UNIDAD DE ALUMBRADO PERIMETRAL CON EQUPO REFLECTOR 17,140.60 0.00 17,140.60 17,140.60

    HALOGENUROS 400W, INCLUYES SOPORTES Y ACCESORIOS 0.00 0.00 0.00 0.0005.12.07 CABLE VULCANIZADO COLOR PLOMO DE 2 X 6 MM2 5,352.00 0.00 5,352.00 5,352.0005.12.08 10,828.48 2,707.12 8,121.36 10,828.4805.13 VARIOS 0.00 0.0005.13.01 12,000.00 4,000.00 4,000.00 4,000.00 12,000.00

    05.13.02 184,000.00 0.00 24,000.00 90,000.00 70,000.00 184,000.00

    Costo Directo ### 0.00 0.00 0.00 65,389.58 0.00 0.00 47,756.20 366,519.92 651,327.72 330,397.76GASTOS GENERALES (9%) 131,525.21 0.00 0.00 0.00 0.00 0.00 5,885.06 0.00 0.00 4,298.06 32,986.79 58,619.50 29,735.80UTILIDAD (9%) 131,525.21 0.00 0.00 0.00 0.00 0.00 5,885.06 0.00 0.00 4,298.06 32,986.79 58,619.50 29,735.80SUB-TOTAL ### 0.00 0.00 0.00 0.00 0.00 77,159.70 0.00 0.00 56,352.32 432,493.50 768,566.72 389,869.36SUB-TOTAL x F.R. = 1.00000 ### 0.00 0.00 0.00 0.00 0.00 77,159.70 0.00 0.00 56,352.32 432,493.50 768,566.72 389,869.36I.G.V (18%) 310,399.49 0.00 0.00 0.00 13,888.75 0.00 0.00 10,143.42 77,848.83 138,342.01 70,176.48TOTAL PRESUPUESTO S/. ### 0.00 0.00 0.00 91,048.45 0.00 0.00 66,495.74 510,342.33 906,908.73 460,045.84

    PORCENTAJE PARCIAL 0.00% 0.00% 0.00% 4.47% 0.00% 0.00% 3.27% 25.08% 44.57% 22.61%PORCENTAJE TOTAL 0.00% 0.00% 0.00% 4.47% 4.47% 4.47% 7.74% 32.82% 77.39% 100.00%

    3-1x70mm2NYY+1x50mm2NYY(N)+1x25mm2NYY(T)-65mm PVC-P3-1x95mm2NYY+1x70mm2NYY(N)+1x35mm2NYY(T)-65mm PVC-P3-1x120mm2NYY+1x95mm2NYY(N)+1x35mm2NYY(T)-80mm PVC-P3-1x150mm2NYY+1x120mm2NYY(N)+1x50mm2NYY(T)-100mm PVC-P3-1x185mm2NYY+1x150mm2NYY(N)+1x70mm2NYY(T)-100mm PVC-P3-1x240mm2NYY+1x185mm2NYY(N)+1x95mm2NYY(T)-100mm PVC-P

    ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3 (D=5 KM)SUMINISTRO E INSTALACION DE EQUIPOS - ARTEFACTOS DE ALUMBRADOLUMINARIA DEL TIPO BRAQUETE CON PROTECTOR ACRILICO 200M CON CUATRO LAMPARASLUMINARIA DEL TIPO PROYECTOR REFLECTOR, PARA ILUMINACION DE CANCHA DEPORTIVA DEL ESTADIO - LUZ BLANCA DE HALOGENUROS METALICOS DE 2,000 WSUMINISTRO E INSTALACION DE REDES EXTERIORES - ALUMBRADO EXTERIORUNIDAD DE ALUMBRADO PUBLICO CON EQUIPO, POSTE Y LAMPARA DE VAPOR DE SODIO DE 250KW INCLUYE PASTORAL Y ACCESORIOS

    BUZON DE CONCRETO DE 1.0 X 1,0 X 1.0METROS, PARA INSTALACIONES ELECTRICAS INCLUYE TAPASGESTION PARA OBTENCION DE SUMINISTRO ELECTRICO MT (MEDIDOR) ANTE EMPRESA CONCESIONARIA EDECAETE S.A.SUM. E INST. DE SISTEMA DE UTILIZACIN EN MEDIA TENSIN, INCLUYE SUB ESTACION

  • CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO INSTALACIONES EL