Fierro O.A. N°3 ᶲ Barra Largo Barra de 7 m. Largo Barra de 9 m. Largo Barra de 10 m. Largo Barra de 12 m. Unidad Kg Unidad Kg Unidad Kg Unidad Kg Fe8 4 11.06 6 21.33 72 284.4 107 507.18 823.97 Fe10 44 244.33 74 456.58 69 510.88 1211.79 Fe 12 38 404.9 405 TOTAL (Kg) 2440.69

description

Planilla para cubicar fierro

Transcript of Cantidad Fierro Obras de Arte

ResumenFierro O.A. N3 BarraLargo Barra de 7 m.Largo Barra de 9 m.Largo Barra de 10 m.Largo Barra de 12 m.UnidadKgUnidadKgUnidadKgUnidadKgFe8411.06621.3372284.4107507.18823.97Fe1044244.3374456.5869510.881211.79Fe 1238404.9405TOTAL (Kg)2440.69
O.A. N3Infraestructura Puente LajuelasFe 80.395Fe 100.617Fe 120.888Fe 161.58Fe 182Fe 222.98Fe 253.85Calculo Por MLCalculo Por BarrasCalculo Por MLCalculo Por BarrasCalculo Por MLCalculo Por BarrasCalculo Por MLCalculo Por BarrasCalculo Por MLCalculo Por BarrasCalculo Por MLCalculo Por BarrasCalculo Por MLCalculo Por BarrasElementoLargo (m)Ancho (m)Alto (m)N ArmaduraLongitud A. (m)Espaciamiento (m)Cantidad (Uni)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Total (m)Total (Kg)Barra (m)Cantidad (Uni)Total (Kg)Cajn Simple de H.A221.861.86a130.2110330203.611228207.312a21.760.2110193.6119.45922122.166a330.2110330203.611228207.312a41.760.2110193.6119.45922122.166a53.30.2220726447.941074456.6a61.760.2220387.2343.81236383.6b121.90.29197.1077.912942.710935.6b221.90.29197.1077.912942.710935.6b321.90.2541182.60467.11254256.01054213.3Muros de Cabecera Simple (2)0.21.862.22a11.961631.3619.312322.2b11.280.21823.049.109310.67b21.280.21823.049.109310.67b31.360.21824.489.677411.1Muros de Alas (4)2.20.21.48a1
Daniel Orellana: Daniel Orellana:Variable1.880.24890.2455.6812859.23a2
Daniel Orellana: Daniel Orellana:Variable1.730.24883.0432.8012733.18a3
Daniel Orellana: Daniel Orellana:Variable0.650.24831.212.3212314.22a4
Daniel Orellana: Daniel Orellana:Variable0.950.24845.618.0112418.96a5
Daniel Orellana: Daniel Orellana:Variable2.8822.413.8212214.81a62122421.312221.3b1
Daniel Orellana: Daniel Orellana:Variable2.40.2409637.9212837.92b2
Daniel Orellana: Daniel Orellana:Variable2.40.23276.830.3412733.18b3
Daniel Orellana: Daniel Orellana:Variable
Daniel Orellana: Daniel Orellana:Variable
Daniel Orellana: Daniel Orellana:Variable
Daniel Orellana: Daniel Orellana:Variable
Daniel Orellana: Daniel Orellana:Variable
Daniel Orellana: Daniel Orellana:Variable1.460.24870.0827.6812628.44PatasPatasTrabasTOTAL (Kg)8108241183121236540500000000ML (Kg)BARRAS (Kg)DIFERENCIA (Kg)PERDIDA (%)Cantidad Fierro Contrato2,357.842,440.6982.853.51