BOG2 a 303 Model Tarea 2

1
0 LUGAR: BATERIA OGARRIO 2 ORM ACOT. N/A ESC: S/E 01 DIAGRAMA DE TUBERIA E INSTRUMENTACION SEPARACION Y RECTIFICACION FECHA: SEPT-2009 SEP/09 0 AS BUILT DTI ACOMETIDA DE POZOS BOG2-A-301 BOG2-A-302 CRC BOG2-A-304 DTI SEPARADORES VERTICALES DTI ALMACENAMIENTO Y BOMBEO 2"/150 2"/150 2"/150 SVGBP-5 4" 2"-P-111-A51A 3" MH 4"/150 A-301 4" 2" PI SV-5 LC LG LV SV-5 2"-P-112-A51A ATM PSV SV-5 4"-GDU-206-A51A 2"-DBP-305-A51A 2" 2"-DD-256-A51A 3 X 2" 6"-CE-002-A51A FE F/O 4"-CE-028-A51A SV-5 SV-5 2"/150 2"/150 2"/150 2"/150 NC A-302 A-302 2"/150 2"/150 2"/150 SVGBP-4 4" 2"-P-113-A51A 3" MH 4"/150 A-301 4" 2" PI SV-4 LC LG LV SV-4 2"-P-114-A51A ATM PSV SV-4 4"-GDU-207-A51A 2"-DBP-306-A51A 2" 2"-DD-257-A51A 3 X 2" 6"-CE-002-A51A FE F/O 4"-CE-036-A51A 4"/150 4" 4" 4" 4" SV-4 SV-4 2" 2" 2"/150 RVBP-1 6" 2"-P-115-A51A 4" 2" PI RV-1 LC LG LV ATM RV 2"x2" 2"-DBP-307-A51A 1" 2"-DD-258-A51A 12"-GDU-209-A51A 12"/150 2" 2" 4" 12 X 6" 12"/150 4" 4" 4" 12"-GDU-201-A51A 12"/150 12"/150 RV-1 RV-1 12 X 6" NOTA 2 6" B B B B 2"/150 10 X 6" 6"/150 B B B B A-304 A TV 4-5 6"/150 B B B B FE UTI UI TE V-CONE A COMPRESORA OGARRIO 2 8"/150 12X8" 8"/150 12X8" 8X12" 8"/150 12X8" 12X8" 8"/150 8X6" 8X6" 8X6" 8X6" B B B B ANTERIORMENTE A COMPRESORA 12"-GDU-211-A51A 12"-GDU-210-A51A 12"-GDU-213-A51A 12"-GDU-212-A51A 12"-GDU-214-A51A NC 12"-GDU-216-A51A NOTAS: 2.- ENTRADA DE SERVICIO ESPECIAL(ELIPSE CON PERNOS) A-304 TV-1, TV-2 12"-GDU-208-A51A 12"-GDU-201-A51A A-302 A-302 6"-P-119-A51A 10"-P-117-A51A 6"-P-119-A51A 10"-P-117-A51A 12"-GDU-210-A51A 2"/150 A-305 2"-P-146-A51A 1.- PARA SIMBOLOGIA Y NOTAS GENERALES VER PLANO BOG2-A-300 SVGBP 5 SEPARADOR VERTICAL DE GRUPO SVGBP 4 SEPARADOR VERTICAL DE GRUPO RVBP-1 RECTIFICADOR VERTICAL 3.- ESTE DOCUMENTO SE ELABORO EN BASE AL LEVANTAMIENTO REALIZADO EN SEPTIEMBRE DE 2009. RV-1 OGARRIO 2 001 001 001 001 CRUDO DE POZOS CRUDO DE POZOS DE PRESA API 4X2" 2"x2" 2"x2" REV. OS: "ELABORACION DE AS BUILT DE LAS INSTALACIONES SUPERFICIALES, EN EL ACTIVO INTEGRAL CINCO PRESIDENTES Y/U OTROS ACTIVOS DE LA REGION" DIBUJO ELABORADO EN: AGUA DULCE, VERACRUZ, MEXICO DIBUJOS DE REFERENCIA Vo.Bo. POR FECHA R E V I S I O N E S NUM. APROBADO POR: FECHA MCA. CP D E S C R I P C I O N CONVENIO: 425109861 UNIVERSIDAD POPULAR DE LA CHONTALPA OFICINA DE VINCULACION INSTITUCIONAL COORDINADOR DE OPERACION DE POZOS E INSTALACIONES DE EXPLOTACION. ING. *,/%(572 3(f$/2=$ '8$57( COORDINADOR DE CONSTRUCCION Y MANTENIMIENTO. ING. RUFINO ORDAZ CRUZ SUPERVISOR DE PROYECTO. ING. JOEL A. SOTO RODRIGUEZ DIBUJO PROYEC. REVISO COORD. EXPLORACION Y PRODUCCION ACTIVO INTEGRAL CINCO PRESIDENTES COORDINACION DE OPERACION DE POZOS E INSTALACIONES DE EXPLOTACION PGO JVV JEFE DE SECTOR ING. $1'5e6 52'5,*8e= 52-$6 DIAM.EXT: 914 mm L.T.T: 2500 mm CAPACIDAD: 2.097 mñ SERVICIO: ACEITE / GAS 323 NJFPð 723& DIAM.EXT: 914 mm L.T.T: 3200 mm CAPACIDAD: 2.097 mñ SERVICIO: ACEITE / GAS 323 NJFPð 723& DIAM.EXT: 1524 mm L.T.T: 4876 mm CAPACIDAD: 9.03 mñ SERVICIO: ACEITE / GAS 323 NJFPð 723& ALIMENTACION A RECTIFICADOR ALIMENTACION A RECTIFICADOR ALIMENTACION A TANQUE DE ALMACENAMIENTO ALIMENTACION A TANQUE DE PRUEBA ALIMENTACION DE ACEITE ALIMENTACION DE ACEITE

description

instrumentacion

Transcript of BOG2 a 303 Model Tarea 2

  • 0LUGAR: BATERIA OGARRIO 2

    ORM

    ACOT. N/A

    ESC: S/E

    01

    DIAGRAMA DE TUBERIA E INSTRUMENTACION

    SEPARACION Y RECTIFICACION

    FECHA: SEPT-2009

    SEP/09

    0AS BUILT

    DTI ACOMETIDA DE POZOSBOG2-A-301

    BOG2-A-302

    CRC

    BOG2-A-304

    DTI SEPARADORES VERTICALES

    DTI ALMACENAMIENTO Y BOMBEO

    2"/150

    2"/150

    2"/150

    SVGBP-5

    4"

    2"-P

    -111-A

    51A

    3"

    MH

    4"/150

    A-30

    1

    4"

    2"

    PI

    SV-5

    LC

    LG

    LV

    SV-5

    2"-P-112-A51A

    ATM

    PSV

    SV-5

    4"-GDU-206-A51A

    2"-D

    BP

    -305-A

    51A

    2"

    2"-D

    D-256-A

    51A

    3 X 2"

    6"-C

    E-0

    02

    -A

    51

    A

    FE

    F/O

    4"-C

    E-028-A

    51A

    SV-5

    SV-5

    2"/150

    2"/150

    2"/150

    2"/150

    NC

    A-302

    A-302

    2"/150

    2"/150

    2"/150

    SVGBP-4

    4"

    2"-P

    -113-A

    51A

    3"

    MH

    4"/150

    A-30

    1

    4"

    2"

    PI

    SV-4

    LC

    LG

    LV

    SV-4

    2"-P-114-A51A

    ATM

    PSV

    SV-4

    4"-GDU-207-A51A

    2"-D

    BP

    -306-A

    51A

    2"

    2"-D

    D-257-A

    51A

    3 X 2"

    6"-C

    E-0

    02

    -A

    51

    A

    FE

    F/O

    4"-C

    E-036-A

    51A

    4"/150

    4" 4" 4" 4"

    SV-4

    SV-4

    2" 2"

    2"/150

    RVBP-1

    6"

    2"-P

    -115-A

    51A

    4"

    2"

    PI

    RV-1

    LC

    LG

    LV

    ATM

    RV

    2"x2"

    2"-D

    BP

    -307-A

    51A

    1"

    2"-D

    D-258-A

    51A

    12"-G

    DU

    -209-A

    51A

    12"/150

    2" 2"

    4"

    12 X 6"

    12"/150

    4" 4" 4"

    12"-GDU-201-A51A

    12"/150

    12"/150

    RV-1

    RV-1

    12 X 6"

    NOTA 26"

    B B B B

    2"/150

    10 X 6"

    6"/150

    B B B B A-304

    A TV 4-5

    6"/150

    B B B B

    FE UTI

    UI

    TE

    V-CONE

    A COMPRESORA OGARRIO 2

    8"/150

    12X8"

    8"/150

    12X8"

    8X12"

    8"/150

    12X8"

    12X8"

    8"/150

    8X6"

    8X6"

    8X6" 8X6"

    B B B B

    ANTERIORMENTE

    A COMPRESORA

    12"-G

    DU

    -211-A

    51A

    12"-G

    DU

    -210-A

    51A

    12"-G

    DU

    -213-A

    51A

    12"-GDU-212-A51A

    12"-GDU-214-A51A

    NC

    12"-GDU-216-A51A

    NOTAS:

    2.- ENTRADA DE SERVICIO ESPECIAL(ELIPSE CON PERNOS)

    A-304

    TV-1, TV-2

    12"-GDU-208-A51A

    12"-GDU-201-A51A

    A-302

    A-302

    6"-P-119-A51A

    10"-P-117-A51A

    6"-P-119-A51A

    10"-P-117-A51A

    12"-GDU-210-A51A

    2"/150

    A-305

    2"-P-146-A51A

    1.- PARA SIMBOLOGIA Y NOTAS GENERALES VER PLANO BOG2-A-300

    SVGBP 5

    SEPARADOR VERTICAL DE GRUPO

    SVGBP 4

    SEPARADOR VERTICAL DE GRUPO

    RVBP-1

    RECTIFICADOR VERTICAL

    3.- ESTE DOCUMENTO SE ELABORO EN BASE AL LEVANTAMIENTO

    REALIZADO EN SEPTIEMBRE DE 2009.

    RV-1

    OGARRIO 2

    001 001

    001

    001

    CRUDO DE POZOS

    CRUDO DE POZOS

    DE PRESA API

    4X2"

    2"x2"

    2"x2"

    REV.

    OS:

    "ELABORACION DE AS BUILT DE LAS INSTALACIONES SUPERFICIALES, EN EL ACTIVO

    INTEGRAL CINCO PRESIDENTES Y/U OTROS ACTIVOS DE LA REGION"

    DIBUJO ELABORADO EN: AGUA DULCE, VERACRUZ, MEXICO

    DIBUJOS DE REFERENCIA

    Vo.Bo.PORFECHA

    R E V I S I O N E S

    NUM.

    APROBADO POR:

    FECHA

    MCA.

    CP

    D E S C R I P C I O N

    CONVENIO: 425109861

    UNIVERSIDAD POPULAR DE LA

    CHONTALPA

    OFICINA DE VINCULACION

    INSTITUCIONAL

    COORDINADOR DE OPERACION DE

    POZOS E INSTALACIONES DE

    EXPLOTACION.

    ING.

    COORDINADOR DE CONSTRUCCION Y

    MANTENIMIENTO.

    ING. RUFINO ORDAZ CRUZ

    SUPERVISOR DE PROYECTO.

    ING. JOEL A. SOTO RODRIGUEZ

    DIBUJO

    PROYEC.

    REVISO

    COORD.

    EXPLORACION Y PRODUCCION

    ACTIVO INTEGRAL CINCO PRESIDENTES

    COORDINACION DE OPERACION DE

    POZOS E INSTALACIONES DE EXPLOTACION

    PGO

    JVV

    JEFE DE SECTOR

    ING.

    DIAM.EXT: 914 mm

    L.T.T: 2500 mm

    CAPACIDAD: 2.097 m

    SERVICIO: ACEITE / GAS

    DIAM.EXT: 914 mm

    L.T.T: 3200 mm

    CAPACIDAD: 2.097 m

    SERVICIO: ACEITE / GAS

    DIAM.EXT: 1524 mm

    L.T.T: 4876 mm

    CAPACIDAD: 9.03 m

    SERVICIO: ACEITE / GAS

    ALIMENTACION A RECTIFICADOR

    ALIMENTACION A RECTIFICADOR

    ALIMENTACION A

    TANQUE DE ALMACENAMIENTO

    ALIMENTACION A

    TANQUE DE PRUEBA

    ALIM

    EN

    TA

    CIO

    N D

    E A

    CE

    IT

    E

    ALIM

    EN

    TA

    CIO

    N D

    E A

    CE

    IT

    E

    antonio cruzNota adhesivavalvula de angulo

    Vlvula de relevo de presin ovlvula de seguridad, simbologeneral.

    antonio cruzNota adhesivavalvula de angulo

    Vlvula de relevo de presin ovlvula de seguridad, simbologeneral.

    antonio cruzNota adhesivavlvula general

    antonio cruzNota adhesivaSeal neumtica 2 o seal sin definir en unalnea de proceso.

    antonio cruzNota adhesivaSeal neumtica 2 o seal sin definir en unalnea de proceso.

    antonio cruzNota adhesivaSeal neumtica 2 o seal sin definir en unalnea de proceso.

    antonio cruzNota adhesivaConexin al proceso, conexin mecnica osuministro al instrumento.

    antonio cruzNota adhesivaConexin al proceso, conexin mecnica osuministro al instrumento.

    antonio cruzNota adhesivamontado locamente

    antonio cruzNota adhesivavalvula genaral

    antonio cruzNota adhesivavalvula genaral

    antonio cruzNota adhesivavalvula de angulo

    Vlvula de relevo de presin ovlvula de seguridad, simbologeneral.

    antonio cruzNota adhesivamontado localmente

    antonio cruzNota adhesivamontado localmente

    antonio cruzNota adhesivamontado localmente

    antonio cruzNota adhesivaPreferido paradiafragmaensamblado conpiloto* el ensamblees actuado por unaseal de entradaelctrica.

    antonio cruzNota adhesivaPreferido paradiafragmaensamblado conpiloto* el ensamblees actuado por unaseal de entradaelctrica.

    antonio cruzNota adhesivaRed neumtica de tapn fusible

    antonio cruzNota adhesivaPantalla de grfico,Sistema Digital deControl

    antonio cruzNota adhesivacompresor

    antonio cruzNota adhesivacompresor

    antonio cruzNota adhesivaMariposa tipo persiana.

    antonio cruzNota adhesivaMariposa tipo persiana.

    antonio cruzNota adhesivavalvula genaral

    antonio cruzNota adhesivaConexin al proceso, conexin mecnica osuministro al instrumento.

    antonio cruzNota adhesivaConexin al proceso, conexin mecnica osuministro al instrumento.

    antonio cruzNota adhesivaConexin al proceso, conexin mecnica osuministro al instrumento.

    antonio cruzNota adhesivaVlvula de dos vas, abre a falla.