Basal Concreto

19
ERMINACION DE LA FUERZA DE CORTE EN LA BASE V= ZUSCP/R ASUMIENDO: Z= 0.4 (Tacna, Zona 3) U= 1.5 (Categoría C) S= 1.2 (Suelo intermedio, S2) Tp= 0.6 C=2.5*Tp/T Cx= 2.5 Tx= 0.42857142857 Cx= Cy= 2.5 Ty= 0.42857142857 Cy= R= 8 (Pórticos de C.A, estructura regular) P= 23463.223455 Kg Sobrecarga 300 kg/m2 centros educativos (LABORATO AREA TOTAL 439 m2 Pisos 5 Vx= 5279.2252775 kg Vy= 5279.2252775 kg Vbasal= 5279.2252775 Kg 0.53 Vc/bd= 7.68042967548 Ac= 49.09719062 cm2 7.00693874812 cm Col 70x70cm recomendado VIGAS 70x35 LUZ 7 m PERALTE 0.7 m Peralte secundari 0.5833333333 0.6 m Story Diaphragm Mass X Mass Y XCM kgf-s²/m kgf-s²/m m PISO - 05 LOSA 35.34408 35.34408 13.2749 PISO - 04 LOSA 52.11622 52.11622 13.2737 PISO - 03 LOSA 52.11622 52.11622 13.2737 _ =0.53 ×√( _ = /( _ ×# )

description

BASAL

Transcript of Basal Concreto

Page 1: Basal Concreto

DETERMINACION DE LA FUERZA DE CORTE EN LA BASE

V= ZUSCP/R

ASUMIENDO:

Z= 0.4 (Tacna, Zona 3)U= 1.5 (Categoría C)S= 1.2 (Suelo intermedio, S2)

Tp= 0.6 C=2.5*Tp/TCx= 2.5 Tx= 0.4285714286 Cx= 3.5Cy= 2.5 Ty= 0.4285714286 Cy= 3.5R= 8 (Pórticos de C.A, estructura regular)P= 23463.22346 Kg

Sobrecarga 300 kg/m2 centros educativos (LABORATORIOS)AREA TOTAL 439 m2

Pisos 5

Vx= 5279.225277 kgVy= 5279.225277 kg

Vbasal= 5279.225277 Kg

0.53 14.491377

Vc/bd= 7.6804296755

Ac= 49.09719062 cm2 7.0069387481 cmCol 70x70cm recomendado

VIGAS 70x35LUZ 7 m

PERALTE 0.7 mPeralte secundario0.583333333 0.6 m

Story DiaphragmMass X Mass Y XCM YCM

kgf-s²/m kgf-s²/m m mPISO - 05 LOSA 35.34408 35.34408 13.2749 8.9737PISO - 04 LOSA 52.11622 52.11622 13.2737 8.975PISO - 03 LOSA 52.11622 52.11622 13.2737 8.975

𝑉_𝑐=0.53×√(𝑓_𝑐 )×𝑏𝑑𝜏=𝑉𝑏𝑎𝑠𝑎𝑙/(𝐴_𝐶×#𝐶𝑜𝑙)

Page 2: Basal Concreto

PISO - 02 LOSA 52.11622 52.11622 13.2737 8.975PISO - 01 LOSA 52.11622 52.11622 13.2737 8.975

243.80896PESO TOTAL 2391.7658976

PESO PRIMER PISO 511.2601182 TNPESO POR M2 1.16460163599 TN/M2

PISOS Load Case/Combo Item Drift 0.75*DRIFT*RPISO - 05 SISMOXX Max Drift X 0.000701 0.000419 0.00251PISO - 04 SISMOXX Max Drift X 0.000831 0.00075 0.00450PISO - 03 SISMOXX Max Drift X 0.001042 0.001022 0.00613PISO - 02 SISMOXX Max Drift X 0.001108 0.001164 0.00698PISO - 01 SISMOXX Max Drift X 0.000721 0.000853 0.00512

PISOS Load Case/Combo Item Drift 0.75*DRIFT*RPISO - 05 SISMOYY Max Drift Y 0.000674 0.000447 0.00268PISO - 04 SISMOYY Max Drift Y 0.000815 0.000767 0.00460PISO - 03 SISMOYY Max Drift Y 0.001027 0.001028 0.00617PISO - 02 SISMOYY Max Drift Y 0.001098 0.001142 0.00685PISO - 01 SISMOYY Max Drift Y 0.000719 0.000784 0.00470

PERIODOS

Case ModePeriod

secModal 1 0.41Modal 2 0.397Modal 3 0.354Modal 4 0.133Modal 5 0.129Modal 6 0.115Modal 7 0.069Modal 8 0.068Modal 9 0.061Modal 10 0.041Modal 11 0.041Modal 12 0.037Modal 13 0.029Modal 14 0.029Modal 15 0.026

Page 3: Basal Concreto

FUERZA SISMICA EN ALTURA

Fi=

Piso Peso en Kg H P*H Fi en X1 #REF! 2.6 #REF! #REF!2 #REF! 5.2 #REF! #REF!

#REF! #REF!

P*H*V/åP*H

Page 4: Basal Concreto

PERIODO 01 0.648 EJE X-X PERIODO 02 0.481 T C SaxPERIODO 03 0.466 0.01 2.5 2.20725

0.201 0.6 2.5 2.207250.141 0.65 2.5 2.20725

entonces asumir 2.5entonces asumir 2.5

14 15

50165 451485 1028.439635535

DISTORSIONEN XX 0.001169 0.007014EN YY 0.001171 0.007026

Page 5: Basal Concreto

CUMPLE?SISISISISI

0.75*DRIFT*RSISISISISI

Page 6: Basal Concreto

Fi en Y#REF!#REF!#REF!

Page 7: Basal Concreto

DISTORSIONES EN XX

PISO DRIFTStory5 SISMOXX Max Max Drift X 0.00070Story4 SISMOXX Max Max Drift X 0.00083Story3 SISMOXX Max Max Drift X 0.00104Story2 SISMOXX Max Max Drift X 0.00111Story1 SISMOXX Max Max Drift X 0.00072

DISTORSIONES EN YY

PISO DRIFTStory5 SISMOYY Max Max Drift Y 0.00067Story4 SISMOYY Max Max Drift Y 0.00082Story3 SISMOYY Max Max Drift Y 0.00103Story2 SISMOYY Max Max Drift Y 0.00110Story1 SISMOYY Max Max Drift Y 0.00072

PESOS DE LA EDIFICACION

PISO MASA PESO PESO POR M2Story5 35344.08000 346725.42480 789.80735Story4 52116.22000 511260.11820 1164.60164Story3 52116.22000 511260.11820 1164.60164Story2 52116.22000 511260.11820 1164.60164Story1 52116.22000 511260.11820 1164.60164

Page 8: Basal Concreto

DRIFT*0.75*8 CUMPLE?0.00421 SI0.00499 SI0.00625 SI0.00665 SI0.00433 SI

DRIFT*0.75*8 CUMPLE?0.00404 SI0.00489 SI0.00616 SI0.00659 SI0.00431 SI

PESO POR M2KG/M2KG/M2KG/M2KG/M2KG/M2

Page 9: Basal Concreto

METRADO DE CARGAS PARA LOSA

CARGA MUERTALADRILLO 120 kg/m2TABIQUERIA 100 kg/m2ACABADOS 100 kg/m2CMUERTA 320 kg/m2En 0.40m en alma 128 kg/m2

CARGA VIVASOBRECARGA 300 kg/m2En 0.40m en alma 120 kg/m2

Page 10: Basal Concreto

METRADO DE CARGAS

CARGA MUERTAP. Losa Aligerada h=30cm 120 kg/cm2Peso acabados 100 kg/cm2Peso tabiqueria equivalente 100 kg/cm2Total 320 kg/cm2En 40 cm de alma 128 kg/cm2 VC

CARGA VIVASobrecarga 300 kg/cm2En 40 cm de alma 120 kg/cm2

Page 11: Basal Concreto

1938.924471.93892447 TN

Page 12: Basal Concreto

VIGAS PRINCIPALESDISEÑO DE VIGAS

1.- METRADO DE CARGAS

1º NIVEL V-P1:

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 3.00CARGA DE LOSA 1800.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.80 2400.00 672.00 TOTAL CM=

b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 3.00 900.00 TOTAL CV=

Wu=

1ºNIVEL V-P2:

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 6.50CARGA DE LOZA 3900.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.80 2400.00 672.00 TOTAL CM=

b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 6.50 1950.00 TOTAL CV=

Wu=

1ºNIVEL V-P 3:

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 6.50CARGA DE LOZA 3900.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.80 2400.00 672.00 TOTAL CM=

b) CARGAS VIVAS:

Page 13: Basal Concreto

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 6.50 1950.00 TOTAL CV=

Wu=

1ºNIVEL V-P 4:

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 6.00CARGA DE LOZA 3600.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.80 2400.00 672.00 TOTAL CM=

b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 6.00 1800.00 TOTAL CV=

Wu=

1ºNIVEL V-P 5:

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 3.00CARGA DE LOZA 1800.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.80 2400.00 672.00 TOTAL CM=

b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 3.00 900.00 TOTAL CV=

Wu=

Page 14: Basal Concreto

VIGAS PRINCIPALES VIGAS SECUNDARIASDISEÑO DE VIGAS 1.- METRADO DE CARGAS

1.- METRADO DE CARGAS 1º NIVEL V-S1:

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 1.20CARGA DE LOSA 720.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.75 2400.00 630.00

2472.00 b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 1.20 360.00

900.00 1ºNIVEL V-2:

4990.80 kg/mP. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 2.40CARGA DE LOZA 1440.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.75 2400.00 630.00

4572.00 b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 2.40 720.00

1950.00 1ºNIVEL V-S 3:

9715.80

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 2.40CARGA DE LOZA 1440.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.75 2400.00 630.00

4572.00 b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 2.40 720.00

Page 15: Basal Concreto

1950.00 1ºNIVEL V-S 4:

9715.80

P. LOSA 400.00 e= 400.00ACABADOS: 100.00 Acab.= 100.00TAB. EQUI. 100.00 T.equi= 100.00

600.00 Ancho Trib.= 1.20CARGA DE LOZA 720.00

B H Pso. Esp. TOTAL

CARGA DE V-P 0.35 0.75 2400.00 630.00

4272.00 b) CARGAS VIVAS:

USO ANCHO TRIB. TOTAL USO= 300.00CV. 300.00 1.20 360.00

1800.00

5980.80

2472.00

900.00

4990.80

Page 16: Basal Concreto

VIGAS SECUNDARIAS1.- METRADO DE CARGAS

TOTAL CM= 1350.00

TOTAL CV= 360.00

Wu= 2502.00

14.4913767 2073.71601

TOTAL CM= 2070.00

TOTAL CV= 720.00

Wu= 4122.00

TOTAL CM= 2070.00

TOTAL CV= 720.00

Page 17: Basal Concreto

Wu= 4122.00

TOTAL CM= 1350.00

TOTAL CV= 360.00

Wu= 1890.00