ANAL.CU. BRITANICO ADIC.04.xlsx

36
MATERIALES ITEM DESCRIPCION UNIDAD METRADO PU.S/ S/. 1.00.00 INSTALACIONES ELECTRICAS 1.00 SALIDAS TOMACORRIENTES 1.01 SALIDA P/TOMACORR.TENS. NORMAL 2P+T EN CAJA CONDULET H=1.20 Glb 1.00 0.00 1.02 SALIDA P/TOMACORR.TENS. NORMAL 2P+T EN CAJA CONDULET H=0.40 u 1.00 0.00 1.03 SALIDA TOMACORR. TIPO INDUST.3P+T GRADO IP67 CAJ. COND.H=1.20 u 1.00 0.00 1.04 SALIDA TOMACORR. TENS.NORMAL 2P+T A PRUEBA DE AGUA H=0.40 u 1.00 0.00 2.00 BANDEJAS DE ENERGIA LIZA CON TAPA BANDEJA METALICA PORTACABLES C/TAPA ENERG. 1000x100mm. M 1.00 58.00 58.00 2.01 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 900x150mm. M 1.00 0.00 0.00 2.02 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 600x150mm. M 1.00 0.00 0.00 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 500x100mm. M 1.00 32.99 32.99 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 200x100mm. M 1.00 17.11 17.11 CODO METALICA PORTACABLES 90º C/TAPA ENERG. 1000x100mm. M 1.00 82.50 82.50 CODO METALICA PORTACABLES 90º C/TAPA ENERG. 900x100mm. M 1.00 0.00 0.00 CODO METALICA PORTACABLES 90º C/TAPA ENERG. 500x100mm. M 1.00 46.10 46.10 CODO METALICA PORTACABLES 90º C/TAPA ENERG. 200x100mm. M 1.00 23.60 23.60 TEE DE BANDEJA DE ENERGIA DE 1000x100mm UND 1.00 94.30 94.30 2.03 TEE DE BANDEJA DE ENERGIA DE 500x100mm UND 1.00 52.80 52.80 2.04 TEE DE BANDEJA DE ENERGIA DE 200x100mm UND 1.00 27.38 27.38 2.05 CURVA 45° DE BANDEJA DE ENERGIA DE 900x150mm. UND 1.00 0.00 0.00 2.06 CURVA VERTICAL DE ENERGIA DE 900x150mm. UND 1.00 0.00 0.00 2.07 JUNTA DE EXPANSION PARA BANDEJA UND 1.00 0.00 0.00 0.00 CLAVO DE DISPARO u 1.00 0.30 0.30 FULMINANTE u 1.00 0.50 0.50 ALAMBRE GALVANIZADO Nº16 kg 1.00 6.00 6.00 PRENSAESTOPA kg 1.00 2.00 2.00 4.00 TUBERIAS CONDUIT CON ROSCA 4.01 TUBERIA CONDUIT 100mm. DIAM. (MARCA COLMENA) M 1.00 174.00 174.00 4.02 TUBERIA CONDUIT 80mm. DIAM. ( MARCA COLMENA) M 1.00 104.50 104.50 4.03 TUBERIA CONDUIT 65mm. DIAM. (MARCA COLMENA) M 1.00 97.80 97.80 4.04 TUBERIA CONDUIT 50mm. DIAM. (MARCA COLMENA) M 1.00 55.90 55.90 4.05 TUBERIA CONDUIT 40mm. DIAM. (MARCA COLMENA) M 1.00 42.90 42.90 4.06 TUBERIA CONDUIT 35mm. DIAM. (MARCA COLMENA) M 1.00 40.50 40.50 4.07 TUBERIA CONDUIT 25mm. DIAM. (MARCA COLMENA) M 1.00 25.50 25.50 TUBERIA CONDUIT 20mm. DIAM. (MARCA COLMENA) M 1.00 16.80 16.80 4.08 TUBERIA CONDUIT FLEXIBLE 100mm DIAM. M 1.00 116.94 116.94 4.09 TUBERIA CONDUIT FLEXIBLE 80mm DIAM. M 1.00 83.20 83.20 4.1 TUBERIA CONDUIT FLEXIBLE 65mm DIAM. M 1.00 79.32 79.32 4.11 TUBERIA CONDUIT FLEXIBLE 50mm DIAM. M 1.00 36.37 36.37 4.12 TUBERIA CONDUIT FLEXIBLE 40mm DIAM. M 1.00 28.51 28.51 4.13 TUBERIA CONDUIT FLEXIBLE 35mm DIAM. M 1.00 18.09 18.09 4.14 TUBERIA CONDUIT FLEXIBLE 25mm DIAM. M 1.00 11.40 11.40 TUBERIA CONDUIT FLEXIBLE 20mm DIAM. M 1.00 9.50 9.50 5.00 TUBERIAS CONDUIT SIN ROSCA EMT TUBERIA CONDUIT EMT 15mm: 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 6.50 0.00 TUBERIA CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA M 1.00 4.86 10.17 4.86 TUBERIA CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA M 1.00 8.51 12.33 8.51 TUBERIA CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA M 1.00 13.54 19.50 13.54 TUBERIA CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 16.67 25.60 16.67 TUBERIA CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA M 1.00 22.46 32.50 22.46 TUBERIA CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 64.33 0.00 TUBERIA CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA M 1.00 42.65 64.33 42.65 TUBERIA CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA M 1.00 61.34 64.33 61.34 UNION CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA M 1.00 0.98 3.30 0.98 5.01 UNION CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA M 1.00 1.60 1.60 P.UNITARIO S/ ADICIONAL 5% $

Transcript of ANAL.CU. BRITANICO ADIC.04.xlsx

Page 1: ANAL.CU. BRITANICO ADIC.04.xlsx

MATERIALES

ITEM DESCRIPCION UNIDADMETRADO PU.S/ S/.

1.00.00 INSTALACIONES ELECTRICAS

1.00 SALIDAS TOMACORRIENTES1.01 SALIDA P/TOMACORR.TENS. NORMAL 2P+T EN CAJA CONDULET H=1.20 Glb 1.00 0.00

1.02 SALIDA P/TOMACORR.TENS. NORMAL 2P+T EN CAJA CONDULET H=0.40 u 1.00 0.00

1.03 SALIDA TOMACORR. TIPO INDUST.3P+T GRADO IP67 CAJ. COND.H=1.20 u 1.00 0.00

1.04 SALIDA TOMACORR. TENS.NORMAL 2P+T A PRUEBA DE AGUA H=0.40 u 1.00 0.00

2.00 BANDEJAS DE ENERGIA LIZA CON TAPA

BANDEJA METALICA PORTACABLES C/TAPA ENERG. 1000x100mm. M 1.00 58.00 58.00

2.01 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 900x150mm. M 1.00 0.00 0.00

2.02 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 600x150mm. M 1.00 0.00 0.00

BANDEJA METALICA PORTACABLES C/TAPA ENERG. 500x100mm. M 1.00 32.99 32.99

BANDEJA METALICA PORTACABLES C/TAPA ENERG. 200x100mm. M 1.00 17.11 17.11

CODO METALICA PORTACABLES 90º C/TAPA ENERG. 1000x100mm. M 1.00 82.50 82.50

CODO METALICA PORTACABLES 90º C/TAPA ENERG. 900x100mm. M 1.00 0.00 0.00

CODO METALICA PORTACABLES 90º C/TAPA ENERG. 500x100mm. M 1.00 46.10 46.10

CODO METALICA PORTACABLES 90º C/TAPA ENERG. 200x100mm. M 1.00 23.60 23.60

TEE DE BANDEJA DE ENERGIA DE 1000x100mm UND 1.00 94.30 94.30

2.03 TEE DE BANDEJA DE ENERGIA DE 500x100mm UND 1.00 52.80 52.80

2.04 TEE DE BANDEJA DE ENERGIA DE 200x100mm UND 1.00 27.38 27.38

2.05 CURVA 45° DE BANDEJA DE ENERGIA DE 900x150mm. UND 1.00 0.00 0.00

2.06 CURVA VERTICAL DE ENERGIA DE 900x150mm. UND 1.00 0.00 0.00

2.07 JUNTA DE EXPANSION PARA BANDEJA UND 1.00 0.00 0.00

0.00

CLAVO DE DISPARO u 1.00 0.30 0.30

FULMINANTE u 1.00 0.50 0.50

ALAMBRE GALVANIZADO Nº16 kg 1.00 6.00 6.00

PRENSAESTOPA kg 1.00 2.00 2.00

4.00 TUBERIAS CONDUIT CON ROSCA

4.01 TUBERIA CONDUIT 100mm. DIAM. (MARCA COLMENA) M 1.00 174.00 174.00

4.02 TUBERIA CONDUIT 80mm. DIAM. ( MARCA COLMENA) M 1.00 104.50 104.50

4.03 TUBERIA CONDUIT 65mm. DIAM. (MARCA COLMENA) M 1.00 97.80 97.80

4.04 TUBERIA CONDUIT 50mm. DIAM. (MARCA COLMENA) M 1.00 55.90 55.90

4.05 TUBERIA CONDUIT 40mm. DIAM. (MARCA COLMENA) M 1.00 42.90 42.90

4.06 TUBERIA CONDUIT 35mm. DIAM. (MARCA COLMENA) M 1.00 40.50 40.50

4.07 TUBERIA CONDUIT 25mm. DIAM. (MARCA COLMENA) M 1.00 25.50 25.50

TUBERIA CONDUIT 20mm. DIAM. (MARCA COLMENA) M 1.00 16.80 16.80

4.08 TUBERIA CONDUIT FLEXIBLE 100mm DIAM. M 1.00 116.94 116.94

4.09 TUBERIA CONDUIT FLEXIBLE 80mm DIAM. M 1.00 83.20 83.20

4.1 TUBERIA CONDUIT FLEXIBLE 65mm DIAM. M 1.00 79.32 79.32

4.11 TUBERIA CONDUIT FLEXIBLE 50mm DIAM. M 1.00 36.37 36.37

4.12 TUBERIA CONDUIT FLEXIBLE 40mm DIAM. M 1.00 28.51 28.51

4.13 TUBERIA CONDUIT FLEXIBLE 35mm DIAM. M 1.00 18.09 18.09

4.14 TUBERIA CONDUIT FLEXIBLE 25mm DIAM. M 1.00 11.40 11.40

TUBERIA CONDUIT FLEXIBLE 20mm DIAM. M 1.00 9.50 9.50

5.00 TUBERIAS CONDUIT SIN ROSCA EMT

TUBERIA CONDUIT EMT 15mm: 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 6.50 0.00

TUBERIA CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA M 1.00 4.86 10.17 4.86

TUBERIA CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA M 1.00 8.51 12.33 8.51

TUBERIA CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA M 1.00 13.54 19.50 13.54

TUBERIA CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 16.67 25.60 16.67

TUBERIA CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA M 1.00 22.46 32.50 22.46

TUBERIA CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 64.33 0.00

TUBERIA CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA M 1.00 42.65 64.33 42.65

TUBERIA CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA M 1.00 61.34 64.33 61.34

UNION CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA M 1.00 0.98 3.30 0.98

5.01 UNION CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA M 1.00 1.60 1.60

P.UNITARIO S/

ADICIONAL 5% $

Page 2: ANAL.CU. BRITANICO ADIC.04.xlsx

5.02 UNION CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA M 1.00 3.08 3.08

5.03 UNION CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 4.26 8.50 4.26

5.04 UNION CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA M 1.00 5.32 10.00 5.32

UNION CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 10.00 0.00

UNION CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA M 1.00 12.77 10.00 12.77

5.05 UNION CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA M 1.00 16.60 16.60

5.06 0.00

CONECTOR RECTO CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA M 1.00 0.98 5.60 0.98

CONECTOR RECTO CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA M 1.00 1.60 3.80 1.60

CONECTOR RECTO CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA M 1.00 2.94 2.94

CONECTOR RECTO CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 3.44 8.00 3.44

CONECTOR RECTO CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA M 1.00 4.90 9.50 4.90

CONECTOR RECTO CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 9.50 0.00

5.07 CONECTOR RECTO CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA M 1.00 14.06 9.50 14.06

5.08 CONECTOR RECTO CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA M 1.00 18.93 18.93

CURVA CONDUIT EMT 15mm: 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 0.00 0.00

CURVA CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA M 1.00 7.17 6.50 7.17

CURVA CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA M 1.00 10.95 9.00 10.95

CURVA CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA M 1.00 13.55 0.00 13.55

CURVA CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 15.76 26.50 15.76

CURVA CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA M 1.00 23.13 33.00 23.13

CURVA CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA M 1.00 0.00 33.00 0.00

CURVA CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA M 1.00 81.09 33.00 81.09

CURVA CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA M 1.00 130.06 0.00 130.06

5.09CAJA CONDULET TIPO T, 15mm: 1/2" M 1.00 0.00 0.00 0.00

CAJA CONDULET TIPO T, 20mm: 3/4" M 1.00 0.00 0.00 0.00

CAJA CONDULET TIPO T, 25mm: 1" M 1.00 12.50 12.50 12.50

CAJA CONDULET TIPO T 35mm: 1 1/4" M 1.00 0.00 0.00 0.00

CAJA CONDULET TIPO T, 40mm: 1 1/2" M 1.00 31.00 31.00 31.00

CAJA CONDULET TIPO T, 50mm: 2" M 1.00 48.00 48.00 48.00

CAJA CONDULET TIPO T, 80mm: 3" M 1.00 0.00 0.00 0.00

0.00

5.10 CAJA CONDULET TIPO LB, 15mm: 1/2" M 1.00 0.00 0.00 0.00

CAJA CONDULET TIPO LB, 20mm: 3/4" M 1.00 0.00 0.00 0.00

CAJA CONDULET TIPO LB, 25mm: 1" M 1.00 12.00 12.00 12.00

CAJA CONDULET TIPO LB 35mm: 1 1/4" M 1.00 0.00 0.00 0.00

CAJA CONDULET TIPO LB, 40mm: 1 1/2" M 1.00 29.50 29.50 29.50

CAJA CONDULET TIPO LB, 50mm: 2" M 1.00 46.50 46.50 46.50

CAJA CONDULET TIPO LB, 80mm: 3" M 1.00 0.00 0.00 0.00

0.00

6.00 SALIDAS ALUMBRADO

6.01 SALIDAS PARA ARTEFACTOS DE ALUMBRADO TIPO INDUSTRIAL U 1.00 3.00 3.00

6.02 SALIDAS PARA ARTEFACTOS DE ALUMBRADO, REFLECTORES U 1.00 3.00 3.00

6.03 SALIDAS PARA ARTEFACTOS DE ALUMBRADO TTX U 1.00 3.00 3.00

6.04 SALIDA PARA ALUMBRADO DE EMERGENCIA U 1.00 3.00 3.00

6.05 SALIDA PARA ALUMBRADO SEÑALIZACION U 1.00 3.00 3.00

7.00 SALIDAS FUERZA

7.01 SALIDA SE-1:2(3-1x150mm2 NYY + 1x16mm (PTE) - 100mm R GS)+50mm2 (T) M 1.00 0.00 0.00

7.02 SALIDA SE-2:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS M 1.00 0.00 0.00

7.03 SALIDA SE-3:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS M 1.00 0.00 0.00

7.04 SALIDA PE-1:3-1x50mm2 NYY + 1x16mm (PTE)+1x16mm2 (T), 65mm R GS M 1.00 0.00 0.00

7.05 SALIDA PE-2:3-1x95mm2 NYY + 1x16mm (PTE)+1x25mm2 (T), 80mm R GS M 1.00 0.00 0.00

7.06 SALIDA PE-3:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS M 1.00 0.00 0.00

7.07 SALIDA PE-4:3-1x35mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 50mm R GS M 1.00 0.00 0.00

7.08 SALIDA RA-1:2(3-1x240mm2 NYY + 1x16mm (PTE) - 100mm R GS)+1x70mm2 (T) M 1.00 0.00 0.00

7.09 SALIDA RA-2:3-1x70mm2 NYY + 1x16mm (PTE)+1x25mm2 (T), 65mm R GS M 1.00 0.00 0.00

7.10 SALIDA RA-3:3-1x50mm2 NYY + 1x16mm (PTE)+1x16mm2 (T), 65mm R GS M 1.00 0.00 0.00

7.11 SALIDA TH-1:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS M 1.00 0.00 0.00

7.12 SALIDA TH-2:3-1x120mm2 NYY + 1x16mm (PTE)+1x35mm2 (T), 80mm R GS M 1.00 0.00 0.00

7.13 SALIDA TH-3 2(3-1x95mm2 NYY + 1x16mm (PTE) - 80mm R GS)+1x50mm2 (T) M 1.00 0.00 0.00

7.14 SALIDA TH-4:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS M 1.00 0.00 0.00

7.15 SALIDA TH-5:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS M 1.00 0.00 0.00

7.16 SALIDA TH-6:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS M 1.00 0.00 0.00

7.17 SALIDA TE-1:3-1x16mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS M 1.00 0.00 0.00

7.18 SALIDA TE-2:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS M 1.00 0.00 0.00

7.19 SALIDA TE-3:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS M 1.00 0.00 0.00

7.20 SALIDA TE-4:3-1x35mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 50mm R GS M 1.00 0.00 0.00

7.21 SALIDA TE-5:3-1x50mm2 NYY + 1x16mm (PTE)+1x16mm2 (T), 50mm R GS M 1.00 0.00 0.00

8.00 ARTEFACTOS DE ALUMBRADO 8.01 U 1.00 363.87 363.87 ARTEFACTO DE TIPO INDUSTRIAL "HIGH BAY", CON LAMPARA HALOGENURO METALICO,

400W, HAZ ANGOSTO.

Page 3: ANAL.CU. BRITANICO ADIC.04.xlsx

8.02 U 1.00 298.56 298.56

8.03 U 1.00 363.87 363.87

8.04 U 1.00 363.00 363.00

8.05 U 1.00 121.29 121.29

9.00 SISTEMA DE PUESTA A TIERRA

9.01 MALLA DE SISTEMA DE PUESTA A TIERRA, CONDUCTOR 120mm2 Cu DESNUDO M 1.00 0.00 0.00

9.02 PUESTA A TIERRA COLUMNAS METALICAS, CONDUCTOR 70mm2 Cu DESN. U 1.00 0.00 0.00

9.03 POZOS DE PUESTA A TIERRA U 1.00 0.00 0.00

9.04 MALLA DE SISTEMA DE PUESTA A TIERRA COMPUTO, CONDUCTOR 95mm2 Cu DESNUDO M 1.00 0.00 0.00

9.05 POZOS DE PUESTA A TIERRA U 1.00 0.00 0.00

9.06 TABLERO DE CONEXIÓN DE PUESTA A TIERRA U 1.00 0.00 0.00

10.00 OTROS

10.01 MONTAJE E INSTALACION DE TABLEROS ELECTRICOS GLB 1.00 1,000.00 1,000.00

10.02 BASE METALICA PARA MONTAJE DE TABLEROS ELECTRICOS GLB 1.00 750.00 750.00

10.03 PRUEBAS Y PROTOCOLOS GLB 1.00 600.00 600.00

1.00 TABLEROS ELECTRICOS

1.01 Tablero General TG-D UND 1.00 51,915.79 51,915.79

1.02 Tablero STG-1 UND 1.00 9,590.09 9,590.09

1.03 Tablero STG-2 UND 1.00 1,655.04 1,655.04

1.04 Tablero STG-3 UND 1.00 53,405.76 53,405.76

1.05 Banco de condensadores 1 UND 1.00 28,368.65 28,368.65

1.06 Banco de condensadores 2 UND 1.00 28,368.65 28,368.65

1.07 Banco de condensadores 3 UND 1.00 5,906.96 5,906.96

1.08 Banco de condensadores 4 UND 1.00 12,220.96 12,220.96

1.09 Tablero STD-BACI UND 1.00 394.75 394.75

1.10 Tablero STD-AL P UND 1.00 213.84 213.84

1.11 Tablero STD-CAR UND 1.00 513.78 513.78

1.12 Tablero STD-UG 1 UND 1.00 804.92 804.92

1.13 Tablero STD-UG 2 UND 1.00 731.96 731.96

1.14 Tablero STD-UG 3 UND 1.00 1,061.02 1,061.02

1.15 Tablero STD-UG 4 UND 1.00 869.35 869.35

1.16 Tablero STD-AL 1 UND 1.00 326.05 326.05

1.17 Tablero STD-AL 2 UND 1.00 203.90 203.90

1.18 Tablero STD-AL 3 UND 1.00 232.08 232.08

1.19 Tablero STD-AL 4 UND 1.00 280.24 280.24

1.20 Tablero STD-ALM UND 1.00 271.34 271.34

1.21 Tablero STD-AA 1 UND 1.00 577.44 577.44

1.22 Tablero STD-AA 3 UND 1.00 424.31 424.31

1.23 Tablero STD-AA 4 UND 1.00 243.06 243.06

1.24 Tablero STD-ES 1 UND 1.00 537.66 537.66

1.25 Tablero STD-ES 2 UND 1.00 391.10 391.10

1.26 Tablero STD-ES 3 UND 1.00 391.10 391.10

1.27 Tablero STD-ES 4 UND 1.00 391.10 391.10

1.28 Tablero EST-UPS 3 UND 1.00 715.16 715.16

ACCESORIOS Y SOPORTERIA UND 1.00 15.00 15.00

2.00 INTERRUPTORES Y TOMACORRIENTES

2.01 INTERRUPTOR SIMPLE M 1.00 5.00 5.00

2.02 INTERRUPTOR DOBLE M 1.00 7.00 7.00

2.03 INTERRUPTOR TRIPLE M 1.00 9.00 9.00

2.04 INTERRUPTOR CONMUTACION M 1.00 5.00 5.00

2.05 TOMACORRIENTE NORMAL M 1.00 5.00 5.00

2.06 TOMACORRIENTE ESTABILIZADA M 1.00 11.00 11.00

2.07 TOMA EN PISO M 1.00 43.00 43.00

2.082.09

BCURVA CONDUIT 3/4" 20mm U 1.00 2.87 2.87

C CURVA CONDUIT 1" 25mm U 1.00 4.56 4.56

CURVA CONDUIT 1 1/4" 35mm U 1.00 6.31 6.31

CURVA CONDUIT 1 1/2" 40mm U 1.00 7.97 7.97

CURVA CONDUIT 2" 50mm U 1.00 11.55 11.55

CURVA CONDUIT 2 1/4" 65mm U 1.00 0.00 0.00

CURVA CONDUIT 2 1/2" 65mm U 1.00 25.99 25.99

CURVA CONDUIT 3" 80mm U 1.00 35.30 35.30

CURVA CONDUIT 4" 100mm U 1.00 63.92 63.92

UNION CONDUIT 3/4" 20mm U 1.00 0.67 0.67

UNION CONDUIT 1" 25mm U 1.00 1.10 1.10

UNION CONDUIT 1 1/4" 35mm U 1.00 1.35 1.35

UNION CONDUIT 1 1/2" 40mm U 1.00 1.75 1.75

UNION CONDUIT 2" 50mm U 1.00 2.28 2.28

UNION CONDUIT 2 1/4" 65mm U 1.00 0.00 0.00

REFLECTOR PARA USO EXTERIOR, CON LAMPARA VAPOR DE SODIO, 250W, HAZ ANCHO. ARTEFACTO TTX CON DOS LAMPARAS FLUORESCENTES DE 36W, BALASTO ELECTRONICO.ARTEFACTO PARA LUZ DE EMERGENCIA, CON DOS REFLECTORES DE 36W, AUTONOMIA DE UNA HORA.ARTEFACTO DE ALUMBRADO DE SEÑALIZACION "ESCAPE", CON UNA LAMPARA FLUORESCENTE 8W, AUTONOMIA DE UNA HORA.

Page 4: ANAL.CU. BRITANICO ADIC.04.xlsx

UNION CONDUIT 2 1/2" 65mm U 1.00 5.62 5.62

UNION CONDUIT 3" 80mm U 1.00 8.21 8.21

UNION CONDUIT 4" 100mm U 1.00 12.08 12.08

CAJA CONDULET TIPO T 3/4" 20mm U 1.00 3.10 9.00 3.10

CAJA CONDULET TIPO T 1" 25mm U 1.00 4.31 12.50 4.31

CAJA CONDULET TIPO T 1 1/4" 35mm U 1.00 0.00 0.00

D CAJA CONDULET TIPO T 1 1/2" 40mm U 1.00 10.69 31.00 10.69

E CAJA CONDULET TIPO T 2" 50mm U 1.00 16.55 48.00 16.55

CAJA CONDULET TIPO T 2 1/4" 65mm U 1.00 0.00 0.00

CAJA CONDULET TIPO T 3" 80mm U 1.00 0.00 0.00

CAJA CONDULET TIPO T 4" 100mm U 1.00 0.00 0.00

UNION UNIVERSAL DE 3/4" 20mm U 1.00 12.50 12.50

UNION UNIVERSAL DE 1" 25mm U 1.00 14.88 14.88

UNION UNIVERSAL DE 1 1/4" 35mm U 1.00 0.00

UNION UNIVERSAL DE 1 1/2" 40mm U 1.00 0.00

UNION UNIVERSAL DE 2" 50mm U 1.00 0.00

UNION UNIVERSAL DE 2 1/4" 65mm U 1.00 0.00

UNION UNIVERSAL DE 3" 80mm U 1.00 0.00

UNION UNIVERSAL DE 4" 100mm U 1.00 0.00

Conector Hermetico Curvo Liquid Tight de 3/4" de Ø U 1.00 14.88 14.88

Conector Hermetico Curvo Liquid Tight de 1" de Ø U 1.00 14.88 14.88

Conector Hermetico Curvo Liquid Tight de 1 1/4" de Ø U 1.00 20.38 20.38

Conector Hermetico Curvo Liquid Tight de 1 1/2" de Ø U 1.00 28.61 28.61

Conector Hermetico Curvo Liquid Tight de 2" de Ø U 1.00 39.06 39.06

Conector Hermetico Curvo Liquid Tight de 2 1/4" de Ø U 1.00 85.39 85.39

Conector Hermetico Curvo Liquid Tight de 3" de Ø U 1.00 109.97 109.97

Conector Hermetico Curvo Liquid Tight de 4" de Ø U 1.00 201.53 201.53

Conector Hermetico Recto Liquid Tight de 1" de Ø U 1.00 5.22 5.22

Conector Hermetico Recto Liquid Tight de 1 1/4" de Ø U 1.00 9.18 9.18

Conector Hermetico Recto Liquid Tight de 1 1/2" de Ø U 1.00 12.69 12.69

Conector Hermetico Recto Liquid Tight de 2" de Ø U 1.00 15.18 15.18

Conector Hermetico Recto Liquid Tight de 2 1/4" de Ø U 1.00 61.16 61.16

Conector Hermetico Recto Liquid Tight de 3" de Ø U 1.00 75.40 75.40

Conector Hermetico Recto Liquid Tight de 4" de Ø U 1.00 102.01 102.01

Contratuerca Bushing Conduit de 3/4" de Ø U 1.00 0.32 0.32

Contratuerca Bushing Conduit de 1" de Ø U 1.00 0.32 0.32

Contratuerca Bushing Conduit de 1 1/4" de Ø U 1.00 0.47 0.47

Contratuerca Bushing Conduit de 1 1/2" de Ø U 1.00 0.50 0.50

Contratuerca Bushing Conduit de 2" de Ø U 1.00 0.62 0.62

Contratuerca Bushing Conduit de 2 1/4" de Ø U 1.00 1.54 1.54

Contratuerca Bushing Conduit de 3" de Ø U 1.00 1.95 1.95

Contratuerca Bushing Conduit de 4" de Ø U 1.00 2.95 2.95

Abrazaderas Unistrut de 3/4" de Ø con Pernos de Ajuste U 1.00 0.52 1.50 0.52

Abrazaderas Unistrut de 1" de Ø con Pernos de Ajuste U 1.00 0.59 1.70 0.59

Abrazaderas Unistrut de 1 1/4" de Ø con Pernos de Ajuste U 1.00 0.00 0.00

Abrazaderas Unistrut de 1 1/2" de Ø con Pernos de Ajuste U 1.00 0.83 2.40 0.83

Abrazaderas Unistrut de 2" de Ø con Pernos de Ajuste U 1.00 1.07 3.10 1.07

Abrazaderas Unistrut de 2 1/4" de Ø con Pernos de Ajuste U 1.00 0.00 0.00

Abrazaderas Unistrut de 3" de Ø con Pernos de Ajuste U 1.00 0.00 0.00

Abrazaderas Unistrut de 4" de Ø con Pernos de Ajuste U 1.00 0.00 0.00

Reducción bushing de FE de 4" - 3" de Ø U 1.00 0.00

Reducción bushing de FE de 3" - 2" de Ø U 1.00 22.89 22.89

Reducción bushing de FE de 2" - 1" de Ø U 1.00 10.14 10.14

Reducción bushing de FE de 2" - 1 1/2" de Ø U 1.00 10.15 10.15

Reducción bushing de FE de 2" - 1 1/4" de Ø U 1.00 7.26 7.26

Reducción bushing de FE de 2 1/2" - 1" de Ø U 1.00 0.00

Reducción bushing de FE de 1" - 3/4" de Ø U 1.00 0.00

Riel unistrut P4100 X 2.4 mt, RANURADO, CHATO U 1.00 12.41 36.00 12.41

Riel unistrut P4100 X 2.4 mt, RANURADO, ALTO U 1.00 26.90 78.00 26.90

VARILLA ROSCADA DE 1/2" U 1.00 3.00 3.00

VARILLA ROSCADA DE 3/8" U 1.00 3.00 3.00

TUERCAS DE 1/2" U 1.00 1.00 1.00

TUERCAS DE 3/8" U 1.00 1.00 1.00

Page 5: ANAL.CU. BRITANICO ADIC.04.xlsx

Tuerca tipo resorte 1/2" U 1.00 3.00 3.00

Arandela U 1.00 2.00 2.00

Arandela tipo Uña U 1.00 4.00 4.00

cintillos 25.00

mangas 4.00

Taco Hulti de 1/2" 1.00 1.00 1.50

perno con tuera y arandela 1.00 1.00 1.00

TERMINAL DE COMPRESION 500MM2 = U 1.00 46.58 46.58 TALMATERMINAL DE COMPRESION 300MM2 = 500MCM U 1.00 31.54 31.54

TERMINAL DE COMPRESION 240MM2 = 400MCM U 1.00 23.21 23.21

TERMINAL DE COMPRESION 185MM2 = 300MCM U 1.00 15.92 15.92

TERMINAL DE COMPRESION 150MM2 = 250MCM U 1.00 14.42 14.42

TERMINAL DE COMPRESION 120MM2 = 4/0 U 1.00 12.26 12.26

TERMINAL DE COMPRESION 95MM2 = 3/0 U 1.00 10.23 10.23

TERMINAL DE COMPRESION 70MM2 = 2/0 U 1.00 6.40 6.40

TERMINAL DE COMPRESION 50MM2 = 1 U 1.00 5.66 5.66

TERMINAL DE COMPRESION 35MM2 = 2 U 1.00 3.71 3.71

TERMINAL DE COMPRESION 25MM2 = 4 U 1.00 2.83 2.83

TERMINAL DE COMPRESION 16MM2 = 6 U 1.00 1.904 1.90

TERMINAL DE COMPRESION 10MM2 = 8 U 1.00 1.666 1.67

TERMINAL DE COMPRESION 6MM2 = 10 U 1.00 1.428 1.43

TERMINAL DE COMPRESION 4MM2 = 12 U 1.00 1.31 1.31

TERMINAL DE COMPRESION 2.5MM2 = 14 U 1.00 1.19 1.19

TUBO PVC SAP 3/4 M 1.00 1.24 1.16 0.23 1.39

UNION M 1.00 0.11 0.32 0.06 0.38

CURVA M 1.00 0.27 0.75 0.15 0.89

CONECTOR M 1.00 0.08 0.21 0.04 0.25

TUBO PVC SAP 1 M 1.00 1.55 1.45 0.29 1.74

UNION M 1.00 0.14 0.38 0.08 0.45

CURVA M 1.00 0.36 1.00 0.20 1.19

CONECTOR M 1.00 0.08 0.23 0.05 0.27

1x500mm2 NYY M 1.00 64.01 64.01

1x300mm2 NYY M 1.00 38.41 38.41

1x240mm2 NYY M 1.00 30.79 30.79

1x185mm2 NYY M 1.00 23.42 23.42

1x150mm2 NYY M 1.00 18.77 18.77

1x120mm2 NYY M 1.00 15.29 15.29

1x95mm2 NYY M 1.00 12.17 12.17

1x70mm2 NYY M 1.00 8.82 8.82

1x50mm2 NYY M 1.00 6.17 6.17

1x35mm2 NYY M 1.00 4.61 4.61

1x25mm2 NYY M 1.00 3.41 3.41

1x16mm2 NYY M 1.00 2.18 2.18

1x10mm2 NYY M 1.00 1.42 1.42

1x6mm2 NYY M 1.00 0.93 0.93

1x500mm2 THW M 1.00 0.00 0.00

1x300mm2 THW M 1.00 0.00 0.00

1x240mm2 THW M 1.00 28.93 28.93

1x185mm2 THW M 1.00 22.15 22.15

1x150mm2 THW M 1.00 17.86 17.86

1x120mm2 THW M 1.00 14.51 14.51

1x95mm2 THW M 1.00 11.45 11.45

1x70mm2 THW M 1.00 8.34 8.34

1x50mm2 THW M 1.00 5.87 5.87

1x35mm2 THW M 1.00 4.25 4.25

1x25mm2 THW M 1.00 3.10 3.10

1x16mm2 THW M 1.00 1.99 1.99

1x10mm2 THW M 1.00 1.18 1.18

1x6mm2 THW M 1.00 0.72 0.72

1x4mm2 THW M 1.00 0.48 0.48

1x240mm2 TW M 1.00 28.17 28.17

Page 6: ANAL.CU. BRITANICO ADIC.04.xlsx

1x185mm2 TW M 1.00 21.50 21.50

1x150mm2 TW M 1.00 17.56 17.56

1x120mm2 TW M 1.00 14.02 14.02

1x95mm2 TW M 1.00 11.12 11.12

1X70mm2 TW (T) M 1.00 8.01 8.01

1X50mm2 TW (T) M 1.00 5.57 5.57

1X35mm2 TW (T) M 1.00 4.09 4.09

1X25mm2 TW (T) M 1.00 2.97 2.97

1X16mm2 TW (T) M 1.00 1.94 1.94

1X10mm2 TW (T) M 1.00 1.16 1.16

1X6mm2 TW (T) M 1.00 0.70 0.70

1X4mm2 TW (T) M 1.00 0.47 0.47

1X2.5mm2 TW (T) M 1.00 0.30 0.30

Cobre desnudo de 120mm2 M 1.00 46.06 46.06

Cobre desnudo de 95mm2 M 1.00 36.43 36.43

Cobre desnudo de 70mm2 M 1.00 26.19 26.19

Cobre desnudo de 50mm2 M 1.00 18.19 18.19

Cobre desnudo de 35mm2 M 1.00 13.44 13.44

Cobre desnudo de 25mm2 M 1.00 9.67 9.67

Cobre desnudo de 16mm2 M 1.00 6.11 6.11

Cobre desnudo de 10mm2 M 1.00 3.86 3.86

3-1x500mm2 XHHW U 1.00 182.08 182.08

3-1x300mm2 XHHW M 1.00 109.63 109.63

3-1x240mm2 XHHW M 1.00 96.21 96.21

3-1x185mm2 XHHW M 1.00 69.27 69.27

3-1x150mm2 XHHW M 1.00 57.76 57.76

3-1x120mm2 XHHW M 1.00 45.38 45.38

3-1x95mm2 XHHW M 1.00 35.70 35.70

3-1x70mm2 XHHW M 1.00 27.36 27.36

3-1x50mm2 XHHW M 1.00 18.88 18.88

3-1x35mm2 XHHW M 1.00 13.91 13.91

3-1x25mm2 XHHW M 1.00 10.16 10.16

3-1x16mm2 XHHW M 1.00 6.59 6.59

3-1x10mm2 XHHW M 1.00 4.31 4.31

3-1x6mm2 XHHW M 1.00 2.80 2.80

3-1x4mm2 XHHW M 1.00 2.08 2.08

1x500mm2 XHHW U 1.00 60.69 60.69

1x300mm2 XHHW M 1.00 36.54 36.54

1x240mm2 XHHW M 1.00 32.07 32.07

1x185mm2 XHHW M 1.00 23.09 23.09

1x150mm2 XHHW M 1.00 19.25 19.25

1x120mm2 XHHW M 1.00 15.13 15.13

1x95mm2 XHHW M 1.00 11.90 11.90

1x70mm2 XHHW M 1.00 9.12 9.12

1x50mm2 XHHW M 1.00 6.29 6.29

1x35mm2 XHHW M 1.00 4.64 4.64

1x25mm2 XHHW M 1.00 3.39 3.39

1x16mm2 XHHW M 1.00 2.20 2.20

1x10mm2 XHHW M 1.00 1.44 1.44

1x6mm2 XHHW M 1.00 0.93 0.93

1x4mm2 XHHW M 1.00 0.69 0.69

CONECTOR U BOLT M 1.00 2.50 2.50

ACERO DE REFUERZO kg 1.00 5.87 5.87

ENCOFRADO m2 1.00 15.55 15.55

CONCRETO FC= 280KG/CM2 m3 1.00 466.50 466.50

TAPA DE FIERRO FUNDIDO u 1.00 500.00 500.00

DUCTO DE CONCRETO 2 VIAS u 1.00 16.00 16.00

CINTILLOS DE AMARRE u 1.00 30.00 30.00

Page 7: ANAL.CU. BRITANICO ADIC.04.xlsx

PRUEBAS ELECTRICAS u 1.00 800.00 800.00

BUZON DE CONCRETO 1.00 700.00 700.00

OFICINA DE CAMPO 1.00 1,200.00 1,200.00

ALMACEN DE CAMPO 1.00 1,000.00 1,000.00

LIMPIEZA 1.00 60.00 60.00

REMOSION MATERIALES 1.00 200.00 200.00

POZO MENOR DE 25 1.00 400.00 400.00

POZO MENOR DE 5 1.00 2,500.00 2,500.00

POZO MENOR DE 10 1.00 1,300.00 1,300.00

CABLE 1X4MM2 NH-80 1 0.63 1.77 1.77

TIPO CABLE COLORPRECIO US$ tc= 2.8

CB/NH-80 (0.45/0.75Kv.) 1.5mm² 0.2400 0.67 0.13 0.81 2.8

CB/NH-80 (0.45/0.75Kv.) 2.5mm² Todos 0.3771 1.06 0.21 1.27 2.8

CB/NH-80 (0.45/0.75Kv.) 4mm² Todos 0.5772 1.62 0.32 1.94 2.8

CB/NH-80 (0.45/0.75Kv.) 6mm² Todos 0.8714 2.44 0.49 2.93 2.8

CB/NH-80 (0.45/0.75Kv.) 10mm² Negro 1.4254 3.99 0.80 4.79 2.8

CB/NH-80 (0.45/0.75Kv.) 16mm² Negro 2.0745 5.81 1.16 6.97 2.8

CB/NH-80 (0.45/0.75Kv.) 25mm² Negro 3.2323 9.05 1.81 10.86 2.8

CB/NH-80 (0.45/0.75Kv.) 35mm² Negro 4.4409 12.43 2.49 14.92 2.8

CB/NH-80 (0.45/0.75Kv.) 50mm² Negro 6.1206 17.14 3.43 20.57 2.8

CB/NH-80 (0.45/0.75Kv.) 70mm² Negro 8.7027 24.37 4.87 29.24 2.8

CB/NH-80 (0.45/0.75Kv.) 95mm² Negro 11.9648 33.50 6.70 40.20 2.8

CB/NH-80 (0.45/0.75Kv.) 120mm² Negro 15.1540 42.43 8.49 50.92 2.8

CB/NH-80 (0.45/0.75Kv.) 150mm² Negro 18.6517 52.22 10.44 62.67 2.8

CB/NH-80 (0.45/0.75Kv.) 185mm² Negro 23.1523 64.83 12.97 77.79 2.8

CB/NH-80 (0.45/0.75Kv.) 240mm² Negro 30.2549 84.71 16.94 101.66 2.8

CB/NH-80 (0.45/0.75Kv.) 300mm² Negro 37.9336 106.21 21.24 127.46 2.8

N2XHTIPO CABLE COLORPRECIO US$

CB/N2XH (0.6/1Kv.) 2.5mm² 0.5845 1.64 0.33 1.96 2.8

CB/N2XH (0.6/1Kv.) 4mm² 0.5549 1.55 0.31 1.86 2.8

CB/N2XH (0.6/1Kv.) 6mm² 0.8374 2.34 0.47 2.81 2.8

CB/N2XH (0.6/1Kv.) 10mm² 1.3682 3.83 0.77 4.60 2.8

CB/N2XH (0.6/1Kv.) 16mm² 1.9181 5.37 1.07 6.44 2.8

CB/N2XH (0.6/1Kv.) 25mm² 2.9877 8.37 1.67 10.04 2.8

CB/N2XH (0.6/1Kv.) 35mm² 4.1046 11.49 2.30 13.79 2.8

CB/N2XH (0.6/1Kv.) 50mm² 5.6577 15.84 3.17 19.01 2.8

CB/N2XH (0.6/1Kv.) 70mm² 8.0432 22.52 4.50 27.03 2.8

CB/N2XH (0.6/1Kv.) 95mm² 11.0591 30.97 6.19 37.16 2.8

CB/N2XH (0.6/1Kv.) 120mm² 14.0066 39.22 7.84 47.06 2.8

CB/N2XH (0.6/1Kv.) 150mm² 17.2385 48.27 9.65 57.92 2.8

CB/N2XH (0.6/1Kv.) 185mm² 21.3984 59.92 11.98 71.90 2.8

CB/N2XH (0.6/1Kv.) 240mm² 27.9639 78.30 15.66 93.96 2.8

CB/N2XH (0.6/1Kv.) 300mm² 35.0612 98.17 19.63 117.81 2.8

CB/N2XH (0.6/1Kv.) 400mm² 51.2078 143.38 28.68 172.06 2.8

CB/N2XH (0.6/1Kv.) 500mm² 65.4384 183.23 36.65 219.87 2.8

Page 8: ANAL.CU. BRITANICO ADIC.04.xlsx

TIPO CABLE COLORPRECIO US$CB/N2XH 2 - 1 x 6mm² 1.9993 5.60 1.12 4.48 2.8

CB/N2XH 3 - 1 x 6mm² 2.6730 7.48 1.50 8.98 2.8

CB/N2XH 3 - 1 x 10mm² 4.1337 11.57 2.31 13.89 2.8

CB/N2XH 3 - 1 x 16mm² 6.2136 17.40 3.48 20.88 2.8

CB/N2XH 3 - 1 x 25mm² 9.6205 26.94 5.39 32.32 2.8

CB/N2XH 3 - 1 x 35mm² 13.0546 36.55 7.31 43.86 2.8

CB/N2XH 3 - 1 x 50mm² 17.5562 49.16 9.83 58.99 2.8

CB/N2XH 3 - 1 x 70mm² 24.9249 69.79 13.96 83.75 2.8

CB/N2XH 3 - 1 x 95mm² 34.2569 95.92 19.18 115.10 2.8

CB/N2XH 3 - 1 x 120mm² 42.9647 120.30 24.06 144.36 2.8

CB/N2XH 3 - 1 x 150mm² 52.6887 147.53 29.51 177.03 2.8

CB/N2XH 3 - 1 x 185mm² 66.3937 185.90 37.18 223.08 2.8

CB/N2XH 3 - 1 x 240mm² 87.7036 245.57 49.11 294.68 2.8

CB/N2XH 3 - 1 x 300mm² 109.5816 306.83 61.37 368.19 2.8

CB/N2XH 3 - 1 x 400mm² 141.3574 395.80 79.16 474.96 2.8

CB/N2XH 3 - 1 x 500mm² 180.2055 504.58 100.92 605.49 2.8S/.

Caja de paso 100x100x55mm ( espesor 1.5mm2 ) 7.93 7.93Caja de paso 100x100x50mm 7.68 7.68Caja de paso 150x150x100mm 18.17 18.17Caja de paso 200x200x100mm 24.99 24.99Caja de paso 250x250x150mm 42.28 42.28Caja de paso 300x300x120mm 51.46 51.46Caja de paso 400x400x200mm 96.1 96.1Caja de paso 500x500x200mm 132.61 132.61Caja de paso 600x600x200mm 160.48 160.48

1927.05 0 1927.05

1927.05 0 1927.05

1022.05 0 1022.05

1022.05 0 1022.05

TUBERIA PVC SAP 3/4" 1.8 1.65CURVA PVC SAP 3/4" 0.238 0.6545UNION PVC SAP 3/4" 0.102 0.2805CONETOR PVC SAP 3/4" 0.086 0.2365

TOMACORRIENTE BTICINO MAGIC 65PLACA 35 45

Varilla de Cu de 3/4"x2.40m 120 24 144Ventonita 55 11 66Thor gel 34 6.8 40.8Tierra de Chacra incluye zarandeo 80 16 96Caja de registro 35 7 42Excavacion 33 6.6 39.6Eliminacion desmonte al punto de acopio 12 2.4 14.4

Ductobarra de Fuerza tipo Sándwich Modelo SCP, Aluminio, 3F+N+T, IP55, 1600Adesde Tablero TNBT-T1. Incluye curvas,accesorios y CAJAS DE DERIVACION

Ductobarra de Fuerza tipo Sándwich, Modelo SCP,Aluminio, 3F+N+T, IP55, 1600Adesde Tablero TNBT-T2. Incluye curvas , accesorios y CAJAS DE DERIVACION

Ductobarra "A2" tipo Sándwich Modelo MR, 3F+N+T,IP55,ALUMINIO, 630A. Desdetablero TTA-5 ,Incluye curvas , accesorios y CAJAS DE DERIVACION

Ductobarra "A2" tipo Sándwich Modelo MR, 3F+N+T,IP55,ALUMINIO, 630A. Desdetablero TTA-6 ,Incluye curvas , accesorios y CAJAS DE DERIVACION

Page 9: ANAL.CU. BRITANICO ADIC.04.xlsx

Relleno del pozo 15 3 18Conexionado ( Sodadura exotermica ) 80 16 96Protocolo 65 13 78

Page 10: ANAL.CU. BRITANICO ADIC.04.xlsx

tc=2.8 11/3/20115.32 14.896 4.97 promelsa9.12 25.536 8.51 promelsa

14.51 40.628 13.54 promelsa17.86 50.008 16.67 promelsa

24.062 67.3736 22.46 promelsa0 0.00 promelsa

45.7 127.96 42.65 promelsa65.72 184.016 61.34 promelsa

0.35 0.98 0.98 promelsa0.57 1.596 1.60 promelsa

Page 11: ANAL.CU. BRITANICO ADIC.04.xlsx

1.1 3.08 3.08 promelsa1.52 4.256 4.26 promelsa

1.9 5.32 5.32 promelsa0.00 promelsa

4.56 12.768 12.77 promelsa5.93 16.604 16.60 promelsa

0.35 0.98 0.98 promelsa0.57 1.596 1.60 promelsa1.05 2.94 2.94 promelsa1.23 3.444 3.44 promelsa1.75 4.9 4.90 promelsa

0 0.00 promelsa5.02 14.056 14.06 promelsa6.76 18.928 18.93 promelsa

promelsapromelsa

2.56 7.168 7.17 promelsa3.91 10.948 10.95 promelsa4.84 13.552 13.55 promelsa5.63 15.764 15.76 promelsa8.26 23.128 23.13 promelsa

0 0.00 promelsa28.96 81.088 81.09 promelsa46.45 130.06 130.06 promelsa

Page 12: ANAL.CU. BRITANICO ADIC.04.xlsx

0.672

Page 13: ANAL.CU. BRITANICO ADIC.04.xlsx

PRESUPUESTO INSTALACIONES ELECTRICAS

ITEM DESCRIPCION UNIDAD METRADO P.PARCIAL S/.

01.01.00 Vias para Control Presurizacion de escaleras

01.01.01pto 1.00 227.00 227.00

01.01.02pto 1.00 219.50 219.50

01.01.03pto 1.00 212.00 212.00

01.02.00 Vias para Señal de Equipos UE01.02.01 pto 3.00 300.23 900.70

01.02.02 Enlace a equipo de azotea UC1-01, conduit 20mmΦ pto 1.00 417.92 417.92

01.02.04 Enlace a equipo de azotea UC2-01, PVC-SAP 20mmΦ pto 1.00 296.53 296.53

01.02.06 Enlace a equipo de azotea UC3-01, PVC-SAP 20mmΦ pto 1.00 245.75 245.75

01.04.00 Salida Sistema de intrusion01.04.01 pto 6.00 418.28 2,509.66

01.04.02 pto 1.00 299.30 299.30

01.04.03 pto 6.00 299.30 1,795.80

01.04.04 pto 1.00 299.30 299.30

01.04.07 pto 1.00 203.88 203.88

COSTO RIRECTO

PRESUPUESTO SIN IGV 7,627.35

P.UNITARIO S/.

SUBTOTAL S/.

Salida para señal de variador de frecuencia del piso 4 al techo, PVC-SAP 20mmΦSalida para señal de variador de frecuencia del piso 5 al techo, PVC-SAP 20mmΦSalida para señal de variador de frecuencia del sotano 3 al sotano 1, PVC-SAP 20mmΦ

Salida para señal de equipos conduit 20mmΦ, piso 1

Salida para pir sotano 1 al 6, conduit 25mmΦSalida para pulsador de panico piso 1, conduit 20mmΦSalida para pir piso 1, conduit 20mmΦSalida para teclado LCD piso 1, conduit 20mmΦSalida para panel piso 2, pvc-sap 20mmΦ

Page 14: ANAL.CU. BRITANICO ADIC.04.xlsx

S/.

Comprensora Neumatica 93 335-375pcm 2500 22.5 70.78 93.28

Vibrador de concreto 4 18(1.5") 2.42 4.02 6.44

Mezcladora de concreto tipo trompo 8 9P3 500 3.35 2.41 5.76

Grupo Electrogeno 38 20KW 500 6.36 3.44 9.8

Grua Hidraulica 225 18T-9mt 20,000 79.78 106.12 200

Camioneta Pick Up 4x4 107 1000kl 2450 9.46 47.34 56.8

Camion 122 6ton 10,000 46.23 73.73 119.96

TIRFORD 3TN 9.92

WINCHE DE 2TN 4.01

TEODOLITO 7.43

MIRAS Y JALONES 0.88

TECLE 1TN 1.15

POLEA PA TENDIDO DE CONDUCTORES 2.86

TALADROS 10.00

ESMERIL 7.50

PISTOLA DE DISPARO 8.75

DOBLADORA DE TUBOS 6.25

ANDAMIOS 8.75

ESCALERAS 5.63

MEGOMETRO 5.63

PINZA AMPERIMETRICA 4.38

TELUROMETRO 5.63

CIZALLA CORTACABLE 5.00

PRENSA TERMINAL MANUAL 8.50

PRENSA TERMINAL HIDRAULICA 11.88

Grua Hidraulica 225 18T-9mt 20,000 79.78 106.12 250.00

Camioneta Pick Up 2x4 107 1000kl 2450 9.46 47.34 71.00

Page 15: ANAL.CU. BRITANICO ADIC.04.xlsx

UU$193.28

6.445.76

9.8200

56.8119.96

09.924.017.430.881.152.86

10 12.57.5 9.375

8.75 10.93756.25 7.81258.75 10.9375

5.625 7.031255.625 7.031254.375 5.468755.625 7.03125

5 6.258.5 10.625

11.875 14.84375250 312.5

71 88.75

Page 16: ANAL.CU. BRITANICO ADIC.04.xlsx

Tipo de Cambio 1

MANO DE OBRA INC. LEYES SOCIALES HH $ Alojamiento

CAPATAZ hh 22.4 S/. 22.4 0.00

OPERARIO hh 20.6625 S/. 20.66 0.00

OFICIAL hh 17.3 S/. 17.30 0.00

PEON hh 15.5625 S/. 15.56 0.00

OPERADOR EQUIPO hh 16.92125 S/. 16.92 5.00

TOPOGRAFO hh 19.30125 S/. 19.3 5.00

PEON ZARANDEADOR/ACOMODADOR hh 14.64125 S/. 14.64 5.00

OPERADOR EQUIPO LIVIANO hh 16.92125 S/. 16.92 5.00

GASTOS GENERALES DIRECTOS (EN OBRA)

Descripción Unidad Cantidad S/. SubTotal S/.

Gerente de Proyecto mes 12 S/. 12,000.00 144,000.00Gerente de Construccion mes 12 S/. 12,000.00 144,000.00Residente de Obra mes 12 S/. 12,000.00 144,000.00Ingeniero de QA/QC mes 12 S/. 4,500.00 54,000.00Ingeniero de Seguridad mes 12 S/. 3,500.00 42,000.00Ingeniero Administrador mes 12 S/. 4,500.00 54,000.00Personal Admnistrativo de Obra mes 12 S/. 2,500.00 30,000.00Personal Apoyo Oficina mes 12 S/. 1,500.00 18,000.00Suministros de Oficna mes 12 S/. 600.00 7,200.00Comunicaciones (Radio,telefono, fax, etc.) mes 12 S/. 600.00 7,200.00Transporte de Personal, Equipos y Mat. en Obra mes 12 S/. 4,000.00 48,000.00Transporte de Personal Clave mes 12 S/. 4,000.00 48,000.00Mantenimiento de Campamento Global 12 S/. 1,400.00 16,800.00Alimentacion Global 12 S/. 1,500.00 18,000.00Elementos de Señalización Global 12 S/. 1,200.00 14,400.00Otros ( Pruebas ) Global 12 S/. 500.00 6,000.00Poliza de Seguro Complementario Alto Riesgo Mes 12 S/. 283.76 3,405.12Contractual y extractual una poliza Car All Rist poMes 12 S/. 7,167.36 86,008.32Garantia por Fiel Cumplimiento del 10% Monto TotGlobal 12 S/. 1,626.80 19,521.60

(agregar de ser necesario) 0.00904,535.04

Gastos Directos para Obra

Garantia por fiel Cumplimiento por el 20% $ T C S/. S/.Gastos del Contrato 330 3 990 4880.40Derecho de Imision 15.87 3 47.61 IGV 103.53 3 310.59 Pima Total 648.4 3 1945.2 Garantia Comercial 529 3 1587

Carta Fianza para Adelanto en efectivo $ T C S/. S/.Gastos del Contrato 500 3 1500 21352.08

Costo Unitario S/.

Page 17: ANAL.CU. BRITANICO ADIC.04.xlsx

Derecho de Imision 8.5 3 25.5 IGV 538.18 3 1614.54 Pima Total 3370.68 3 10112.04 Garantia Comercial 2700 3 8100

Poliza de Seguro Complementario de Alto Riesgo Mensual

Page 18: ANAL.CU. BRITANICO ADIC.04.xlsx

Viaticos Por DH P HH HH ESP Zapato uniforme Wantes Lentes

0.00 179.2 22.4 22.40 0 0 0 0 0

0.00 165.3 20.6625 20.66 0 0 0 0 0

0.00 138.4 17.3 17.30 0 0 0 0 0

0.00 124.5 15.5625 15.56 0 0 0 0 0

15.00 135.37 16.92125 11.89 20.25 40 60 6 6

15.00 154.41 19.30125 14.27 20.25 40 60 6 6

15.00 117.13 14.64125 9.61 20.25 40 60 6 6

15.00 135.37 16.92125 11.89 20.25 40 60 6 6

Alojto. Viaticos Sueldo

750 600 6000 12000

750 600 6000

750 600 6000

750 600 6000

750 600 6000

750 600 6000 582,000.00 582000.00

0 0 1500

0 0 1300

10 20 30 12 72000

213,600.00 213600.00

108,935.04 108935.04

Page 19: ANAL.CU. BRITANICO ADIC.04.xlsx

Protector Tapon Oidos Respiradero Total ESP

0 0 0 0 143.32 17.92 21.500 0 0 0 132.22 16.53 19.830 0 0 0 110.73 13.84 16.610 0 0 0 99.61 12.45 14.9413 2 35 162

13 2 35 162

13 2 35 162

13 2 35 162

Page 20: ANAL.CU. BRITANICO ADIC.04.xlsx

Partida 01.01.01 Salida para señal de variador de frecuencia del piso 4 al techo, PVC-SAP 20mmΦRendimiento MO. 2.00 EQ. 2.0000 Costo unitario directo por : m 227.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 0.8000 22.40 17.920 OPERARIO hh 1.0000 4.0000 20.66 82.640 OFICIAL hh 1.0000 4.0000 17.30 69.200 PEON hh 0.0000 0.0000 15.56 0.000

8.8000 169.76 Materiales

CONSUMIBLES %MT 5% 0.1000 169.76 0.849 Salida para señal de variador de frecuencia del u 0.0000 0.00 0.000 Tuberia PVC SAP 3/4" ml 20.0000 1.88 37.500 Curva PVC SAP 3/4" u 2.0000 1.50 3.000 Union PVC SAP 3/4" u 3.0000 0.53 1.575 Conector PVC SAP 3/4" u 2.0000 0.35 0.700 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja Octofonal u 1.0000 3.13 3.125

46.75 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 169.76 4.244 TALADROS hm 0.1000 0.4000 10.00 4.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.4000 5.63 2.250MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

10.49 Partida 01.01.02 Salida para señal de variador de frecuencia del piso 5 al techo, PVC-SAP 20mmΦRendimiento MO. 2.00 EQ. 2.0000 Costo unitario directo por : m 219.50

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 0.8000 22.40 17.920 OPERARIO hh 1.0000 4.0000 20.66 82.640 OFICIAL hh 1.0000 4.0000 17.30 69.200 PEON hh 0.0000 0.0000 15.56 0.000

8.8000 169.76 Materiales

CONSUMIBLES %MT 5% 0.1000 169.76 0.849 Salida para señal de variador de frecuencia del u 0.0000 0.00 0.000 Tuberia PVC SAP 3/4" ml 16.0000 1.88 30.000 Curva PVC SAP 3/4" u 2.0000 1.50 3.000 Union PVC SAP 3/4" u 3.0000 0.53 1.575 Conector PVC SAP 3/4" u 2.0000 0.35 0.700 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja Octofonal u 1.0000 3.13 3.125

39.25 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 169.76 4.244 TALADROS hm 0.1000 0.4000 10.00 4.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.4000 5.63 2.250MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

Page 21: ANAL.CU. BRITANICO ADIC.04.xlsx

10.49 Partida 01.01.03 Salida para señal de variador de frecuencia del sotano 3 al sotano 1, PVC-SAP 20mmΦRendimiento MO. 2.00 EQ. 2.0000 Costo unitario directo por : m 212.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 0.8000 22.40 17.920 OPERARIO hh 1.0000 4.0000 20.66 82.640 OFICIAL hh 1.0000 4.0000 17.30 69.200 PEON hh 0.0000 0.0000 15.56 0.000

8.8000 169.76 Materiales

CONSUMIBLES %MT 5% 0.1000 169.76 0.849 Salida para señal de variador de frecuencia de u 0.0000 0.00 0.000 Tuberia PVC SAP 3/4" ml 12.0000 1.88 22.500 Curva PVC SAP 3/4" u 2.0000 1.50 3.000 Union PVC SAP 3/4" u 3.0000 0.53 1.575 Conector PVC SAP 3/4" u 2.0000 0.35 0.700 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja Octofonal u 1.0000 3.13 3.125

31.75 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 169.76 4.244 TALADROS hm 0.1000 0.4000 10.00 4.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.4000 5.63 2.250MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

10.49 Partida 01.02.01 Salida para señal de equipos conduit 20mmΦ, piso 1Rendimiento MO. 1.50 EQ. 1.5000 Costo unitario directo por : m 300.23

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 1.0667 22.40 23.893 OPERARIO hh 1.0000 5.3333 20.66 110.187 OFICIAL hh 1.0000 5.3333 17.30 92.267 PEON hh 0.0000 0.0000 15.56 0.000

11.7333 226.35 Materiales

CONSUMIBLES %MT 5% 0.1000 226.35 1.132 Salida para señal de equipos conduit 20mmΦ, piu 0.0000 0.00 0.000 Tuberia PVC SAP 3/4" ml 9.0000 4.06 36.525 Curva PVC SAP 3/4" u 2.0000 4.11 8.225 Union PVC SAP 3/4" u 3.0000 1.69 5.063 Conector PVC SAP 3/4" u 2.0000 1.66 3.325 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100X100X50mm u 1.0000 5.63 5.625

59.89 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 226.35 5.659 TALADROS hm 0.1000 0.5333 10.00 5.333ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.5333 5.63 3.000MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

Page 22: ANAL.CU. BRITANICO ADIC.04.xlsx

13.99 Partida 01.02.02 Enlace a equipo de azotea UC1-01, conduit 20mmΦRendimiento MO. 1.50 EQ. 1.5000 Costo unitario directo por : m 417.92

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 1.0667 22.40 23.893 OPERARIO hh 1.0000 5.3333 20.66 110.187 OFICIAL hh 1.0000 5.3333 17.30 92.267 PEON hh 0.0000 0.0000 15.56 0.000

11.7333 226.35 Materiales

CONSUMIBLES %MT 5% 0.1000 226.35 1.132 Enlace a equipo de azotea UC1-01, conduit 20 u 0.0000 0.00 0.000 Tuberia PVC SAP 3/4" ml 38.0000 4.06 154.217 Curva PVC SAP 3/4" u 2.0000 4.11 8.225 Union PVC SAP 3/4" u 3.0000 1.69 5.063 Conector PVC SAP 3/4" u 2.0000 1.66 3.325 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100X100X50mm u 1.0000 5.63 5.625

177.59 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 226.35 5.659 TALADROS hm 0.1000 0.5333 10.00 5.333ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.5333 5.63 3.000MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

13.99 Partida 01.02.04 Enlace a equipo de azotea UC2-01, PVC-SAP 20mmΦRendimiento MO. 2.00 EQ. 2.0000 Costo unitario directo por : m 253.25

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 0.8000 22.40 17.920 OPERARIO hh 1.0000 4.0000 20.66 82.640 OFICIAL hh 1.0000 4.0000 17.30 69.200 PEON hh 0.0000 0.0000 15.56 0.000

8.8000 169.76 Materiales

CONSUMIBLES %MT 5% 0.1000 169.76 0.849 Enlace a equipo de azotea UC2-01, PVC-SAP 2 u 0.0000 0.00 0.000 Tuberia PVC SAP 3/4" ml 34.0000 1.88 63.750 Curva PVC SAP 3/4" u 2.0000 1.50 3.000 Union PVC SAP 3/4" u 3.0000 0.53 1.575 Conector PVC SAP 3/4" u 2.0000 0.35 0.700 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100X100X50mm u 1.0000 3.13 3.125

73.00 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 169.76 4.244 TALADROS hm 0.1000 0.4000 10.00 4.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.4000 5.63 2.250MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

Page 23: ANAL.CU. BRITANICO ADIC.04.xlsx

10.49 Partida 01.02.06 Enlace a equipo de azotea UC3-01, PVC-SAP 20mmΦRendimiento MO. 2.00 EQ. 2.0000 Costo unitario directo por : m 245.75

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 0.8000 22.40 17.920 OPERARIO hh 1.0000 4.0000 20.66 82.640 OFICIAL hh 1.0000 4.0000 17.30 69.200 PEON hh 0.0000 0.0000 15.56 0.000

8.8000 169.76 Materiales

CONSUMIBLES %MT 5% 0.1000 169.76 0.849 Enlace a equipo de azotea UC3-01, PVC-SAP 2 u 0.0000 115.10 0.000 Tuberia PVC SAP 3/4" ml 30.0000 1.88 56.250 Curva PVC SAP 3/4" u 2.0000 1.50 3.000 Union PVC SAP 3/4" u 3.0000 0.53 1.575 Conector PVC SAP 3/4" u 2.0000 0.35 0.700 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100X100X50mm u 1.0000 3.13 3.125

65.50 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 169.76 4.244 TALADROS hm 0.1000 0.4000 10.00 4.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.4000 5.63 2.250MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

10.49

Partida 01.04.01 Salida para pir sotano 1 al 6, conduit 25mmΦRendimiento MO. 1.00 EQ. 1.0000 Costo unitario directo por : m 418.28

1.00Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$

Mano de ObraCAPATAZ hh 0.2000 1.6000 22.40 35.840 OPERARIO hh 1.0000 8.0000 20.66 165.280 OFICIAL hh 1.0000 8.0000 17.30 138.400 PEON hh 0.0000 0.0000 15.56 0.000

17.6000 339.52 Materiales

CONSUMIBLES %MT 5% 0.1000 339.52 1.698 Salida para pir sotano 1 al 6, conduit 25mmΦ u 0.0000 0.00 0.000 Tuberia Conduit EMT 1" ml 5.0000 6.14 30.708 Curva Conduit EMT 1" u 2.0000 4.11 8.225 Union Conduit EMT 1" u 3.0000 1.69 5.063 Conector Conduit EMT 1" u 2.0000 1.66 3.325 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100x100x50mm 1.0000 5.63 5.625 Caja Octofonal u 1.0000 3.13 3.125

57.77 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 339.52 8.488 TALADROS hm 0.1000 0.8000 10.00 8.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.8000 5.63 4.500MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000

Page 24: ANAL.CU. BRITANICO ADIC.04.xlsx

Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

20.99 Partida 01.04.02 Salida para pulsador de panico piso 1, conduit 20mmΦRendimiento MO. 1.50 EQ. 1.5000 Costo unitario directo por : m 299.30

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 1.0667 22.40 23.893 OPERARIO hh 1.0000 5.3333 20.66 110.187 OFICIAL hh 1.0000 5.3333 17.30 92.267 PEON hh 0.0000 0.0000 15.56 0.000

11.7333 226.35 Materiales

CONSUMIBLES %MT 5% 0.1000 226.35 1.132 Salida para pulsador de panico piso 1, conduit u 0.0000 0.00 0.000 Tuberia Conduit EMT 3/4" ml 8.0000 4.06 32.467 Curva Conduit EMT 3/4" u 2.0000 4.11 8.225 Union Conduit EMT 3/4" u 3.0000 1.69 5.063 Conector Conduit EMT 3/4" u 2.0000 1.66 3.325 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100x100x50mm 1.0000 5.63 5.625 Caja Octofonal u 1.0000 3.13 3.125

58.96 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 226.35 5.659 TALADROS hm 0.1000 0.5333 10.00 5.333ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.5333 5.63 3.000MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

13.99 Partida 01.04.03 Salida para pir piso 1, conduit 20mmΦRendimiento MO. 1.50 EQ. 1.5000 Costo unitario directo por : m 299.30

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 1.0667 22.40 23.893 OPERARIO hh 1.0000 5.3333 20.66 110.187 OFICIAL hh 1.0000 5.3333 17.30 92.267 PEON hh 0.0000 0.0000 15.56 0.000

11.7333 226.35 Materiales

CONSUMIBLES %MT 5% 0.1000 226.35 1.132 Salida para pir piso 1, conduit 20mmΦ u 0.0000 0.00 0.000 Tuberia Conduit EMT 1" ml 8.0000 4.06 32.467 Curva Conduit EMT 1" u 2.0000 4.11 8.225 Union Conduit EMT 1" u 3.0000 1.69 5.063 Conector Conduit EMT 1" u 2.0000 1.66 3.325 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100x100x50mm 1.0000 5.63 5.625 Caja Octofonal u 1.0000 3.13 3.125

58.96 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 226.35 5.659 TALADROS hm 0.1000 0.5333 10.00 5.333ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.5333 5.63 3.000MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000

Page 25: ANAL.CU. BRITANICO ADIC.04.xlsx

PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

13.99 Partida 01.04.04 Salida para teclado LCD piso 1, conduit 20mmΦRendimiento MO. 1.50 EQ. 1.5000 Costo unitario directo por : m 299.30

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 1.0667 22.40 23.893 OPERARIO hh 1.0000 5.3333 20.66 110.187 OFICIAL hh 1.0000 5.3333 17.30 92.267 PEON hh 0.0000 0.0000 15.56 0.000

11.7333 226.35 Materiales

CONSUMIBLES %MT 5% 0.1000 226.35 1.132 Salida para teclado LCD piso 1, conduit 20mmΦ u 0.0000 0.00 0.000 Tuberia Conduit EMT 1" ml 8.0000 4.06 32.467 Curva Conduit EMT 1" u 2.0000 4.11 8.225 Union Conduit EMT 1" u 3.0000 1.69 5.063 Conector Conduit EMT 1" u 2.0000 1.66 3.325 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100x100x50mm 1.0000 5.63 5.625 Caja Octofonal u 1.0000 3.13 3.125

58.96 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 226.35 5.659 TALADROS hm 0.1000 0.5333 10.00 5.333ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.5333 5.63 3.000MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

13.99 Partida 01.04.07 Salida para panel piso 2, pvc-sap 20mmΦRendimiento MO. 2.00 EQ. 2.0000 Costo unitario directo por : m 203.88

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio U$ Parcial U$Mano de Obra

CAPATAZ hh 0.2000 0.8000 22.40 17.920 OPERARIO hh 1.0000 4.0000 20.66 82.640 OFICIAL hh 1.0000 4.0000 17.30 69.200 PEON hh 0.0000 0.0000 15.56 0.000

8.8000 169.76 Materiales

CONSUMIBLES %MT 5% 0.1000 169.76 0.849 Salida para panel piso 2, pvc-sap 20mmΦ u 0.0000 0.00 0.000 Tuberia Conduit EMT 1" ml 6.0000 1.88 11.250 Curva Conduit EMT 1" u 2.0000 1.50 3.000 Union Conduit EMT 1" u 3.0000 0.53 1.575 Conector Conduit EMT 1" u 2.0000 0.35 0.700 Cable 1x4mm2 ml 0.0000 1.53 0.000 Cable 1x4mm2 (N) ml 0.0000 1.53 0.000 Cable 1x2.5mm2 (T) ml 0.0000 1.05 0.000 Caja 100x100x50mm 1.0000 3.13 3.125 Caja Octofonal u 1.0000 3.13 3.125

23.62 Equipos

HERRAMIENTAS DE MANIOBRA %MO 5.00% 0.5000 169.76 4.244 TALADROS hm 0.1000 0.4000 10.00 4.000ESMERIL hm 0.0000 0.0000 7.50 0.000PISTOLA DE DISPARO hm 0.0000 0.0000 8.75 0.000DOBLADORA DE TUBOS hm 0.0000 0.0000 6.25 0.000ANDAMIOS hm 0.0000 0.0000 8.75 0.000ESCALERAS hm 0.1000 0.4000 5.63 2.250MEGOMETRO hm 0.0000 0.0000 5.63 0.000PINZA AMPERIMETRICA hm 0.0000 0.0000 4.38 0.000

Page 26: ANAL.CU. BRITANICO ADIC.04.xlsx

TELUROMETRO hm 0.0000 0.0000 5.63 0.000CIZALLA CORTACABLE hm 0.0000 0.0000 5.00 0.000PRENSA TERMINAL MANUAL hm 0.0000 0.0000 8.50 0.000PRENSA TERMINAL HIDRAULICA hm 0.0000 0.0000 11.88 0.000Grua Hidraulica hm 0.0000 0.0000 250.00 0.000Camioneta Pick Up 2x4 hm 0.0000 0.0000 71.00 0.000

10.49