DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : RESUMEN ACTAFECHA : 2 de marzo de 2010
ITEMS OBRA DESCRIPCION UN CANTIDADVALOR VALOR
UNITARIO TOTAL1 CTO 199-08 CONSTRUCCION DE SUMIDEROS 1.0X1.0X0.85 UN 38.00 $ 72,000 $ 2,736,000 2 CTO 199-08 SARDINEL FUNDIDO EN SITU (CON MIXEL) ML 910.00 $ 5,500 $ 5,005,000 3 CTO 199-08 SARDINEL FUNDIDO EN SITU (MEZCLA EN OBRA) M3S $ 6,500 $ - 4 CTO 199-08 INSTALACION DE TUBERIA M3S 285.00 $ 7,500 $ 2,137,500 5 CTO 199-08 EXCAVACION MANUAL TUBERIA, SUMIDEROS Y SARDINEL M3S 178.93 $ 9,000 $ 1,610,406 6 CTO 199-08 RELLENO MANUAL M3 $ 3,400 $ - 7 CTO 199-08 CARGUE DE ESCOMBROS (MANUAL) M3S $ 3,500 $ - 7 CTO 199-08 Honorario ayudante diurno (ARREGLOS POZOS) DIA 57.00 $ 32,000 $ 1,824,000 8 CTO 199-08 Honorario OFICIAL diurno (ARREGLOS POZOS) DIA 7.00 $ 38,631 $ 270,417
M3S $ - VALOR BASICO $ 13,583,323
DESCUENTOS A REALIZAR
Descuento por pago nomina UN $ 6,840,044 Aporte ARP 6,96 % UN 1.00 $ 388,917 $ 388,917 Aporte Salud 12,5 % UN 1.00 $ 698,486 $ 698,486 Aporte Pensión 16 % UN 1.00 $ 894,062 $ 894,062 Descuento aporte I.C.B.F y Caja de compensación 9,0 % (Sobre nómina) UN 1.00 $ 502,910 $ 502,910 Descuento ICA 0,69% (valor básico acta) $ 93,725 Descuento dotacion Personal $ 153,120
RETENCION DE GARANTIA (10%) $ 1,358,332 VALOR TOTAL DESCUENTOS $ 10,929,597
VALOR NETO A PAGAR $ 2,653,726
DOBLE A INGENIERIA CONTRATISTA
ING. JIMMY PRECIADO ARCELIO GARCIA
![Page 2: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/2.jpg)
DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : CONTRUCCION SUMIDEROSFECHA : 2 de marzo de 2010
FECHA ACTIVIDAD TRAMO DESDE HASTA CARRILUND
15-Feb-10 CONSTRUCCION SUMIDEROS CRA 120A CLL 69 CLL 71 IZQ 3.00 16-Feb-10 CONSTRUCCION SUMIDEROS CRA 120A CLL 69 CLL 71 DER 2.00 17-Feb-10 CONSTRUCCION SUMIDEROS CRA 120A CLL 69 CLL 71 IZQ 4.00 18-Feb-10 CONSTRUCCION SUMIDEROS CRA 120B CLL 63 CLL 63B DER 6.00 19-Feb-10 CONSTRUCCION SUMIDEROS CRA 120B CLL 63 CLL 63B IZQ 6.00 20-Feb-10 CONSTRUCCION SUMIDEROS CRA 120B CLL 63 CLL 63B DER 5.00 22-Feb-10 CONSTRUCCION SUMIDEROS CRA 120A CLL 63 CLL 63B IZQ 4.00
23-Feb-10 CONSTRUCCION SUMIDEROS CRA 120A CLL 63 CLL 63B DER 8.00
38.00
DOBLE A INGENIERIA CONTRATISTAING. JIMMY PRECIADO ARCELIO GARCIA
![Page 3: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/3.jpg)
DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : INTALACION TUBERIA 12"FECHA : 2 de marzo de 2010
FECHA ACTIVIDAD TRAMO DESDE HASTA CARRILLONG
(m)
15-Feb-10 INSTALACION TUBERIA 12" CRA 120A CLL 69 CLL 71 IZQ 20.00 16-Feb-10 INSTALACION TUBERIA 12" CRA 120A CLL 69 CLL 71 DER 10.00 17-Feb-10 INSTALACION TUBERIA 12" CRA 120A CLL 69 CLL 71 IZQ 30.00 18-Feb-10 INSTALACION TUBERIA 12" CRA 120B CLL 63 CLL 63B DER 30.00 19-Feb-10 INSTALACION TUBERIA 12" CRA 120B CLL 63 CLL 63B DER 20.00 20-Feb-10 INSTALACION TUBERIA 12" CRA 120B CLL 63 CLL 63B IZQ 80.00 22-Feb-10 INSTALACION TUBERIA 12" CRA 120A CLL 63 CLL 63B DER 90.00
23-Feb-10 INSTALACION TUBERIA 12" CRA 120A CLL 63 CLL 63B IZQ 5.00 285.00
DOBLE A INGENIERIA CONTRATISTAING. JIMMY PRECIADO ARCELIO GARCIA
![Page 4: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/4.jpg)
DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : EXCAVACION MANUAL FECHA : 2 de marzo de 2010
FECHA ACTIVIDAD SEGMENTO CARRILLONG ANCHO ALTURA VOLUMEN
(m) (m) M3 C/U
15-Feb-10 EXCAVACION TUBERIA 12" CRA 120A CLL 69 CLL 71 IZQ 20.00 0.4 0.7 5.60 16-Feb-10 EXCAVACION TUBERIA 12" CRA 120A CLL 69 CLL 71 DER 10.00 0.4 0.7 2.80 17-Feb-10 EXCAVACION TUBERIA 12" CRA 120A CLL 69 CLL 71 IZQ 30.00 0.4 0.7 8.40 18-Feb-10 EXCAVACION TUBERIA 12" CRA 120B CLL 63 CLL 63B DER 30.00 0.4 0.7 8.40 19-Feb-10 EXCAVACION TUBERIA 12" CRA 120B CLL 63 CLL 63B DER 20.00 0.4 0.7 5.60 20-Feb-10 EXCAVACION TUBERIA 12" CRA 120B CLL 63 CLL 63B IZQ 80.00 0.4 0.7 22.40 22-Feb-10 EXCAVACION TUBERIA 12" CRA 120A CLL 63 CLL 63B DER 90.00 0.4 0.7 25.20
23-Feb-10 EXCAVACION TUBERIA 12" CRA 120A CLL 63 CLL 63B IZQ 5.00 0.4 0.7 1.40
79.80
DOBLE A INGENIERIA CONTRATISTA
ING. JIMMY PRECIADO BERCELIO GARCIA
ABSCISA INICIAL
ABSCISA FINAL
![Page 5: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/5.jpg)
Pagina 5 de 9
DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : EXCAVACION MANUAL FECHA : 2 de marzo de 2010
FECHA ACTIVIDAD SEGMENTO CARRILCANTIDAD LONG ANCHO ALTURA VOLUMEN VOLUMEN
UND (m) (m) M3 C/U TOTAL
15-Feb-10 EXCAVACION SUMIDEROS CRA 120A CLL 69 CLL 71 IZQ 3.00 1.10 0.7 0.9 0.69 2.08 16-Feb-10 EXCAVACION SUMIDEROS CRA 120A CLL 69 CLL 71 DER 2.00 1.10 0.7 0.9 0.69 1.39 17-Feb-10 EXCAVACION SUMIDEROS CRA 120A CLL 69 CLL 71 IZQ 4.00 1.10 0.7 0.9 0.69 2.77 18-Feb-10 EXCAVACION SUMIDEROS CRA 120B CLL 63 CLL 63B DER 6.00 1.10 0.7 0.9 0.69 4.16 19-Feb-10 EXCAVACION SUMIDEROS CRA 120B CLL 63 CLL 63B IZQ 6.00 1.10 0.7 0.9 0.69 4.16 20-Feb-10 EXCAVACION SUMIDEROS CRA 120B CLL 63 CLL 63B DER 5.00 1.10 0.7 0.9 0.69 3.47 22-Feb-10 EXCAVACION SUMIDEROS CRA 120A CLL 63 CLL 63B IZQ 4.00 1.10 0.7 0.9 0.69 2.77
23-Feb-10 EXCAVACION SUMIDEROS CRA 120A CLL 63 CLL 63B DER 8.00 1.10 0.7 0.9 0.69 5.54
26.33
DOBLE A INGENIERIA CONTRATISTA
ING. JIMMY PRECIADO BERCELIO GARCIA
ABSCISA INICIAL
ABSCISA FINAL
![Page 6: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/6.jpg)
DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : EXCAVACION MANUAL FECHA : 2 de marzo de 2010
FECHA ACTIVIDAD SEGMENTO CARRILLONG ANCHO ALTURA VOLUMEN
(m) (m) M3 C/U
10-Feb-10 CONSTRUCCION SARDINEL CRA 120A CLL 69 CLL 71 IZQ 110.00 0.2 0.4 8.80 12-Feb-10 CONSTRUCCION SARDINEL CRA 120A CLL 69 CLL 71 DER 120.00 0.2 0.4 9.60 15-Feb-10 CONSTRUCCION SARDINEL CRA 120A CLL 69 CLL 71 IZQ 130.00 0.2 0.4 10.40 18-Feb-10 CONSTRUCCION SARDINEL CLL 69B CRA 122 ABIS CRA 118B DER 100.00 0.2 0.4 8.00 20-Feb-10 CONSTRUCCION SARDINEL CLL 69B CRA 122 ABIS CRA 118B DER 100.00 0.2 0.4 8.00 23-Feb-10 CONSTRUCCION SARDINEL CLL 69B CRA 122 ABIS CRA 118B IZQ 90.00 0.2 0.4 7.20 24-Oct-02 CONSTRUCCION SARDINEL CRA 112C TV 112C CLL 67BIS DER 130.00 0.2 0.4 10.40 25-Feb-10 CONSTRUCCION SARDINEL CRA 112C TV 112C CLL 67BIS DER 130.00 0.2 0.4 10.40
72.80
DOBLE A INGENIERIA CONTRATISTA
ING. JIMMY PRECIADO BERCELIO GARCIA
ABSCISA INICIAL
ABSCISA FINAL
![Page 7: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/7.jpg)
DOBLE A INGENIERIAOBRA: ENGATIVA
PREACTA DE OBRA N°16ASUNTO : SUMINISTRO DE PERSONAL DIURNO
FECHA ACTIVIDAD OBRA OFICIAL AYUDANTE
11-Feb-10 DESCARGUE CEMENTO UMV 199 3
12-Feb-10 LIMPIEZA SUMIDEROS UMV 199 4
13-Feb-10 LIMPIEZA LOTE UMV 199 6
14-Feb-10 LIMPIEZA EXCAVACION UMV 199 4
15-Feb-10 LIMPIEZA SUMIDEROS UMV 199 3
16-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 6
17-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 6
18-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 5
19-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 5
20-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 5
22-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 5
22-Feb-10 ARREGLO CARGUE POZOS UMV 199 1 5
TOTAL 7 57
DOBLE A INGENIERIA CONTRATISTAING. JIMMY PRECIADO ARCELIO GARCIA
![Page 8: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/8.jpg)
DOBLE A INGENIERIAOBRA ENGATIVA PUEBLO
PREACTA DE OBRA N°16
PERIODO : 11 AL 25 FEBRERO DE 2010ASUNTO : SARDINEL FUNDIDO IN SITUFECHA : 2 de marzo de 2010
FECHA ACTIVIDAD TRAMO DESDE HASTA CARRILLONG
(m)
10-Feb-10 CONSTRUCCION SARDINEL CRA 120A CLL 69 CLL 71 IZQ 110.00 12-Feb-10 CONSTRUCCION SARDINEL CRA 120A CLL 69 CLL 71 DER 120.00 15-Feb-10 CONSTRUCCION SARDINEL CRA 120A CLL 69 CLL 71 IZQ 130.00 18-Feb-10 CONSTRUCCION SARDINEL CLL 69B CRA 122 ABIS CRA 118B DER 100.00 20-Feb-10 CONSTRUCCION SARDINEL CLL 69B CRA 122 ABIS CRA 118B DER 100.00 23-Feb-10 CONSTRUCCION SARDINEL CLL 69B CRA 122 ABIS CRA 118B IZQ 90.00 24-Oct-02 CONSTRUCCION SARDINEL CRA 112C TV 112C CLL 67BIS DER 130.00 25-Feb-10 CONSTRUCCION SARDINEL CRA 112C TV 112C CLL 67BIS DER 130.00
910.00
DOBLE A INGENIERIA CONTRATISTAING. JIMMY PRECIADO ARCELIO GARCIA
![Page 9: Acta No 021 Arcelio Engativa Jimmy](https://reader036.fdocuments.ec/reader036/viewer/2022082511/546b3067b4af9f000e8b47db/html5/thumbnails/9.jpg)
OBRA ENGATIVA PUEBLOLIQUIDACION CORRESPONDIENTE DE 26LIQUIDACIO CORLIQUIDACION CORRESPONDIENTE DE26 DE MARZO AL 10 DE ABRIL 2010
PREACTA DE OBRA N°1611 AL 25 FEBRERO DE 2010ASUNTO : NOMINA
Nombres Identificación
BASE PARA AUTOLIQUIDACION CALCULO PARA PAGO DE NOMINA
Numero de Cuenta Recibi Conforme Devengado Salario Basico Total Devengado Sub-Total Seguridad social Subtotal Devengado Cesantia Intereses Prima Vacaciones Recargo Nocturno Bonificacion
ISMAEL CARRANZA 19,204,320 15 $ 253,995.00 15 $ 16,933.00 $ 253,995.00 $ 25,750.00 $ 279,745.00 $ 21,589.58 $ 258,155.43 $ 19,229.17 $ 96.15 $ 19,229.17 $ 9,614.58 $ 109,676 $ 84,000.00 $ 241,845 $ 500,000 050-005-137-7
MARTIN SEGOVIA OLIVERO 86,441,224 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ - $ 11,408.00 $ 53,143 $ 274,000 024-21083-3
CARLOS ANDRES BERNAL 79,866,325 15 $ 253,995.00 11 $ 16,933.00 $ 186,263.00 $ 18,883.33 $ 205,146.33 $ 21,589.58 $ 183,556.76 $ 14,101.39 $ 51.71 $ 14,101.39 $ 7,050.69 $ 35,305 $ 218,862 050-065-838
HENRRI AVILA 8,867,083 15 $ 253,995.00 9 $ 16,933.00 $ 152,397.00 $ 15,450.00 $ 167,847.00 $ 21,589.58 $ 146,257.43 $ 11,537.50 $ 34.61 $ 11,537.50 $ 5,768.75 $ - $ - $ 28,878 $ 175,136 050-066-406
MIGUEL TRIVIÑO 79,240,875 15 $ 253,995.00 15 $ 16,933.00 $ 253,995.00 $ 25,750.00 $ 279,745.00 $ 21,589.58 $ 258,155.43 $ 19,229.17 $ 96.15 $ 19,229.17 $ 9,614.58 $ 253,000 $ 163,500.00 $ 464,669 $ 722,824 050-067-818
jORGE TREPALACIO 79,866,325 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-068-873
PEDRO SEGOVIA 1,085,047065 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-068-774
VICTOR MODESTO 12,401,141 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-068-782
JAIDER LUISMEJIA SEGOVIA 85,271,378 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 11,408.00 $ 8,332.64 $ 16,700 $ - $ 53,178 $ 274,034 050-068-766
FONANIS GOMEZ 12,400,723 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-070-176
AIDE TOVAR TRIVIÑO 52,828,786 15 $ 253,995.00 7 $ 16,933.00 $ 118,531.00 $ 12,016.67 $ 130,547.67 $ 21,589.58 $ 108,958.09 $ 8,973.61 $ 20.94 $ 8,973.61 $ 4,486.81 $ 15,500 $ - $ 37,955 $ 146,913 010-281-038
JOSE ISIDRO ZAMORA SILVA 19,483,380 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 97,480 $ - $ 139,215 $ 360,072 050-070-705
MARCO ANTONIO RICAUTE 1,085,035,369 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-070-002
JESUS SEGOVIA 85,442,650 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-070-010
OLIVER FLORES DEL CASTILLO 1,085,170,105 15 $ 253,995.00 14 $ 16,933.00 $ 237,062.00 $ 24,033.33 $ 261,095.33 $ 21,589.58 $ 239,505.76 $ 17,947.22 $ 83.75 $ 17,947.22 $ 8,973.61 $ 96,620 $ 14,000.00 $ 155,572 $ 395,078 050-065-648
JHON ALEXANDER PUERTA BERNAL 1,070,918,649 15 $ 253,995.00 12 $ 16,933.00 $ 203,196.00 $ 20,600.00 $ 223,796.00 $ 21,589.58 $ 202,206.43 $ 15,383.33 $ 61.53 $ 15,383.33 $ 7,691.67 $ - $ - $ 38,520 $ 240,726 050-069-178
LUBER TRIVIÑO HOME 79,235,405 15 $ 253,995.00 15 $ 16,933.00 $ 253,995.00 $ 25,750.00 $ 279,745.00 $ 21,589.58 $ 258,155.43 $ 19,229.17 $ 96.15 $ 19,229.17 $ 9,614.58 $ 166,176 $ 100,000.00 $ 314,345 $ 572,500 050-071-695
JORGE LUIS SEGOVIA 85,271,785 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-070-770
MIGUEL ANGEL TRIVIÑO 1,022,330,165 15 $ 253,995.00 14 $ 16,933.00 $ 237,062.00 $ 24,033.33 $ 261,095.33 $ 21,589.58 $ 239,505.76 $ 17,947.22 $ 83.75 $ 17,947.22 $ 8,973.61 $ 91,400 $ 19,176.00 $ 155,528 $ 395,034 050-069-566
ELKIN PEÑALOZA VILLAFAÑE 85,272,869 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-070-788
CARLOS ARTURO LOPEZ 1,069,466,309 15 $ 253,995.00 5 $ 16,933.00 $ 84,665.00 $ 8,583.33 $ 93,248.33 $ 21,589.58 $ 71,658.76 $ 6,409.72 $ 10.68 $ 6,409.72 $ 3,204.86 $ 11,176 $ - $ 27,211 $ 98,870 050-071-166
TEUDULO GARCIA SEGOVIA 85,442,650 15 $ 253,995.00 13 $ 16,933.00 $ 220,129.00 $ 22,316.67 $ 242,445.67 $ 21,589.58 $ 220,856.09 $ 16,665.28 $ 72.22 $ 16,665.28 $ 8,332.64 $ 11,408 $ - $ 53,143 $ 274,000 050-068949
5,587,890 4,622,709 468,650 5,091,359 474,971 4,616,388 349,971 1,502 344,714 174,985 960,400 - 392,084 2,223,656 6,840,044
SEGURIDAD SOCIAL A CARGO DEL TRABAJADOR: 4% POR PENSION Y 4,25% POR SALUD
CONTRATISTA: LIQUIDÓ: REVISÓ AUTORIZÓ
___________________ ___________________ ____________________ _____________________ARCELIO GARCIA EDGAR MIRANDA JIMMY PRECIADO CARLOS GOMEZ
Dias No. Dias
Subsidio de Transporte
Subtotal Prestaciones
Neto a pagar (Devengado y Prestaciones)
Extras Festivas