1 PAVIMENTO, VEREDAS, CUNETAS Y SEÑALIZACION EJEMPLO TAPARACHI.xls

28
PLANILLA DE METRADOS PROYECTO COMPONENTE 01: CONSTRUCCION DE CALZADA Partida Descripción Und Medidas Parcial Total veces Largo Ancho Alto 01.00.00 OBRAS PROVISIONALES 01.01.00 CARTEL DE OBRA UND 1 --- --- --- 1.00 1.00 01.02.00 ALMACEN Y CASETA DE GUARDIANIA M2 1 Area= 80.00 --- 80.00 80.00 02.00.00 OBRAS PRELIMINARES 02.01.00 ELEMENTOS DE SEGURIDAD 02.01.01 SEGURIDAD DURANTE LA CONSTRUCCION UND 1 --- --- --- 1.00 1.00 Cinta de seguridad color amarillo rllo 2 --- --- --- 2.00 Malla de seguridad color naranja rllo 2 --- --- --- 2.00 Tanquera de madera und 3 --- --- --- 3.00 Parantes de seguridad und 3 --- --- --- 3.00 Señales en zona de trabajo und 3 --- --- --- 3.00 02.01.02 CERCO PERIMETRICO CON ARPILLA M 80.00 1 80.00 --- --- 80.00 02.02.00 TRAZO, NIVELACIÓN Y REPLANTEO 02.02.01 TRAZO Y REPLANTEO INICIAL M 685.85 Jr. Pachacutec 1 149.63 --- --- 149.63 Jr. Mayta Capac 1 121.66 --- --- 121.66 Jr. Australia 1 107.06 --- --- 107.06 Jr. Jauregui 1 303.32 --- --- 303.32 Jr. Enrique Lopéz Albujar 1 4.18 --- --- 4.18 02.02.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIÓN M2 17433.86 Jr. Pachacutec 3 Area= 1,047.26 --- 3141.77 Jr. Mayta Capac 3 Area= 915.18 --- 2745.53 Jr. Australia 3 Area= 1,092.47 --- 3277.40 Jr. Jauregui 3 Area= 2,756.39 --- 8269.17 02.03.00 MOVILIZACION Y DESMOVILIZACION DE MQUINARIA Y EQUIPO 02.03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO UND 1.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y/O M 1 --- --- --- 1.00 03.00.00 MOVIMIENTO DE TIERRAS 03.01.00 CORTES 03.01.01 CORTE DE TERRENO CON MAQUINARIA M3 4277.78 Jr. Pachacutec 1 Volum= 947.20 --- 947.20 Jr. Mayta Capac 1 Volum= 709.06 --- 709.06 Jr. Australia 1 Volum= 719.54 --- 719.54 Jr. Jauregui 1 Volum= 1,901.98 --- 1901.98 MEJORAMIENTO Y REHABILITACIÓN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIÓN MARÍA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JÁUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)

Transcript of 1 PAVIMENTO, VEREDAS, CUNETAS Y SEÑALIZACION EJEMPLO TAPARACHI.xls

CALZADAPLANILLA DE METRADOSPROYECTOMEJORAMIENTO Y REHABILITACIN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIN MARA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)COMPONENTE 01: CONSTRUCCION DE CALZADAPartidaDescripcinUndNMedidasParcialTotalvecesLargoAnchoAlto01.00.00OBRAS PROVISIONALES0.0001.01.00CARTEL DE OBRAUND1---------1.001.000.000.0001.02.00ALMACEN Y CASETA DE GUARDIANIAM21Area=80.00---80.0080.000.000.0002.00.00OBRAS PRELIMINARES0.0002.01.00ELEMENTOS DE SEGURIDAD0.0002.01.01SEGURIDAD DURANTE LA CONSTRUCCIONUND1---------1.001.00Cinta de seguridad color amarillorllo2---------2.00Malla de seguridad color naranjarllo2---------2.00Tanquera de maderaund3---------3.00Parantes de seguridadund3---------3.00Seales en zona de trabajound3---------3.000.0002.01.02CERCO PERIMETRICO CON ARPILLAM0.0080.00180.00------80.0002.02.00TRAZO, NIVELACIN Y REPLANTEO0.0002.02.01TRAZO Y REPLANTEO INICIALM0.00685.85Jr. Pachacutec1149.63------149.63Jr. Mayta Capac1121.66------121.66Jr. Australia1107.06------107.06Jr. Jauregui1303.32------303.32Jr. Enrique Lopz Albujar14.18------4.1802.02.02TRAZO Y REPLANTEO DURANTE LA CONSTRUCCINM20.0017433.86Jr. Pachacutec3Area=1,047.26---3141.77Jr. Mayta Capac3Area=915.18---2745.53Jr. Australia3Area=1,092.47---3277.40Jr. Jauregui3Area=2,756.39---8269.1702.03.00MOVILIZACION Y DESMOVILIZACION DE MQUINARIA Y EQUIPO02.03.01MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAUND1.00MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y/O MAQUINARIA (TIENE SEPARADOR ANALISIS COSTO UNITARIO)1---------1.0003.00.00MOVIMIENTO DE TIERRAS0.0003.01.00CORTES0.0003.01.01CORTE DE TERRENO CON MAQUINARIAM30.004277.78Jr. Pachacutec1Volum=947.20---947.20Jr. Mayta Capac1Volum=709.06---709.06Jr. Australia1Volum=719.54---719.54Jr. Jauregui1Volum=1,901.98---1901.9803.02.00EXCAVACIONES0.0003.02.01EXCAVACION EN FORMA MANUALM30.00116.23en zona de corte c/maquinaria1Area=5,811.290.02116.2303.03.00ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE0.0003.03.01ACARREO DE MATERIAL EXCEDENTEM30.00145.28volumen de excavacin manual1.25116.23------145.280.0003.03.02CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTEM30.005492.51del corte de terreno con mquinaria1.25Volum=4,277.78---5347.23del acarreo de material excedente1.25Volum=116.23---145.280.0003.04.00PERFILADO Y COMPACTADO DE ZONA DE CORTE0.0003.04.01PERFILADO Y COMPACTADO EN ZONA DE CORTEM20.005811.29Jr. Pachacutec1Area=1,047.26---1047.26Jr. Mayta Capac1Area=915.18---915.18Jr. Australia1Area=1,092.47---1092.47Jr. Jauregui1Area=2,756.39---2756.3904.00.00PAVIMENTO0.0004.01.00SUB RASANTE0.0004.01.01MATERIAL SELECCIONADOM30.001510.93Jr. Pachacutec1Area=1,047.260.20209.45Jr. Mayta Capac1Area=915.180.20183.04Jr. Australia1Area=1,092.470.20218.49Jr. Jauregui1Area=2,756.390.20551.2804.01.02PERFILADO Y COMPACTADO DE SUB RASANTEM20.005811.29Jr. Pachacutec1Area=1,047.26---1047.26Jr. Mayta Capac1Area=915.18---915.18Jr. Australia1Area=1,092.47---1092.47Jr. Jauregui1Area=2,756.39---2756.3904.02.00SUB BASE0.0004.02.01MATERIAL SELECCIONADOM30.00755.47Jr. Pachacutec1Area=1,047.260.10104.73Jr. Mayta Capac1Area=915.180.1091.52Jr. Australia1Area=1,092.470.10109.25Jr. Jauregui1Area=2,756.390.10275.6404.02.02MATERIAL HORMIGONM30.00697.35Jr. Pachacutec1Area=1,047.260.10104.73Jr. Mayta Capac1Area=915.180.1091.52Jr. Australia1Area=1,092.470.10109.25Jr. Jauregui1Area=2,756.390.10275.6404.02.03MATERIAL MEZCLADOM30.001452.82Material Seleccionado1Volum=755.47---755.47Material Hormign1Volum=697.35---697.350.0004.02.04PERFILADO Y COMPACTADO DE LA SUB BASEM20.005811.29Jr. Pachacutec1Area=1,047.26---1047.26Jr. Mayta Capac1Area=915.18---915.18Jr. Australia1Area=1,092.47---1092.47Jr. Jauregui1Area=2,756.39---2756.3904.03PAVIMENTO RIGIDO0.0004.03.01CONCRETO PREMEZCLADO F'C=210 KG/CM2M31419.91Jr Colombia Calzada 3.62269.703.600.20388.37Jr Colombia Calzada 2.75278.272.700.2084.54Jr Colombia Calzada intersecciones1area =4,735.000.20947.00Jr. Pachacutec1Area=1,211.430.20242.29Jr. Mayta Capac1Area=983.550.20196.71Jr. Australia1Area=952.260.20190.45Jr. Jauregui1Area=2,444.330.20488.87Jr. Enrique Lopz Albujar1Area=30.370.206.07Interseccin Jr. Jauregui - Av. Circunvalacin1Area=3.430.200.6904.03.02PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADOM2482.23Jr. Pachacutec3149.63---0.2089.7898.00---0.2014.40Jr. Mayta Capac3121.66---0.2072.9978.00---0.2011.20Jr. Australia3107.06---0.2064.2469.60---0.2011.52Jr. Jauregui3303.32---0.20181.99218.00---0.2033.60Jr. Enrique Lopz Albujar34.18---0.202.5104.03.03PAVIMENTO RIGIDO: CURADO DE LOSAM25625.36Jr. Pachacutec1Area=1,211.43---1211.43Jr. Mayta Capac1Area=983.55---983.55Jr. Australia1Area=952.26---952.26Jr. Jauregui1Area=2,444.33---2444.33Jr. Enrique Lopz Albujar1Area=30.37---30.37Interseccin Jr. Jauregui - Av. Circunvalacin1Area=3.43---3.4304.03.04PAVIMENTO RIGIDO: CORTE EN JUNTA TRANSVERSAL DE CONTRACCIONM1480.82Jr. Pachacutec398.00------312.00Jr. Mayta Capac328.00------256.00Jr. Australia269.60------249.60Jr. Jauregui808.00------640.00Pasaje Andres45.80------23.2204.03.05PAVIMENTO RIGIDO: SELLADO EN JUNTA TRANSVERSAL DE CONTRACCIONM1480.82Jr. Pachacutec398.00------312.00Jr. Mayta Capac328.00------256.00Jr. Australia269.60------249.60Jr. Jauregui808.00------640.00Pasaje Andres45.80------23.2204.03.06PAVIMENTO RIGIDO: SELLADO DE JUNTA DE DILATACIONM2411.14Jr. Pachacutec3149.63------448.8998.00------72.00Jr. Mayta Capac3121.66------364.9778.00------56.00Jr. Australia3107.06------321.1969.60------57.60Jr. Jauregui3303.32------909.95218.00------168.00Jr. Enrique Lopz Albujar34.18------12.55Jr Calixto AresteguiCdra 1 margen Izquierdo162.7205.00.00PRUEBAS DE CONTROL DE CALIDAD0.0005.01.00PRUEBAS Y ENSAYOS DE CONTROL DE CALIDADUND0.001.001---------1.0006.00.00MITIGACION DE IMPACTO AMBIENTAL06.01.00ETAPA PRELIMINAR06.01.01REUNIONES DE CONCERTACION (RESIDENTE - HABITANTES)UND1---------1.001.0006.02.00ETAPA DE CONSTRUCCION06.02.01RIEGO DE LAS VIAS AUXILIARESM21Area=3,000.00---3000.003000.0006.02.02RIEGO DE MATERIAL EN CANTERAM31Volum=283.30---283.30283.3006.02.03HABILITACION PROVISIONAL DE LETRINAS INCLUIDO CONEXIONUND21.00------2.002.0006.02.04HABILITACION PROVISIONAL DE BASUREROSUND21.00------2.002.0006.02.05MITIGACION AMBIENTALGLB1---------1.001.00Programa de educacin y capacitacin ambientalSealizacin provisional de obraglb1---------1.00Diseo y elaboracin de manuales informativosund1---------1.00Sealizacin ambiental para el personal de obraund1---------1.00Sensibilizacin ambiental para la poblacin beneficiariaund2---------2.00Programa de mitigacin y/o prevencinRehabilitacin de rea por construccin de campamentoglb1---------1.00Rehabilitacin de canterasglb1---------1.00Programa de contingenciaCapacitacin en medidas de contingencia y primeros auxiliosund1---------1.00Unidad de contigenciaund1---------1.00Programa de monitoreo ambientalUnidad de monitoreo ambientalund1---------1.0006.03.00ETAPA DE ABANDONO06.03.01RECONFORMACION DE CANTERAHA10.50------0.500.5006.03.02SEMBRADO DE ARBUSTOSUND1100.00------100.00100.0006.03.03RECONFORMACION DE BOTADEROHA10.50------0.500.5007.00.00VARIOS, LIMPIEZA Y OTROS0.0007.01.00NIVELACION DE BUZONESUND8.008---------8.0007.02.00EVALUACION Y REPARACION CONEXIONES DOMICILIARIA AGUAUND39.0039---------39.0007.03.00EVALUACION Y REPARACION CONEXIONES DOMICILIARIAS DESAGUEUND39.0039---------39.0007.04.00CAMA DE APOYO CONEXIONES DOMICILIARIAS AGUAM390.003910.00------390.0007.05.00CAMA DE APOYO CONEXIONES DOMICILIARIAS DESAGUIEM468.003912.00------468.0007.06.00PROTECCION DEL CONCRETOM2440.001Area=440.00---440.0007.07.00LIMPIEZA FINAL DE OBRAM25625.36Area de intervencin1Area=5,625.36---5625.36

VEREDAPLANILLA DE METRADOSPROYECTOMEJORAMIENTO Y REHABILITACIN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIN MARA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)COMPONENTE 02: CONSTRUCCION DE VEREDASPartidaDescripcinUndNMedidasParcialTotalvecesLargoAnchoAlto01.00.00OBRAS PRELIMINARES0.0001.01.00TRAZO, NIVELACIN Y REPLANTEO0.0001.01.01TRAZO Y REPLANTEO DURANTE LA CONSTRUCCINM20.000.00En veredas acabado coloreado - frotachado incluye rampas1Area=0.00---0.0001.02.00DEMOLICIONES0.0001.02.01DEMOLICION DE VEREDAS Y CUNETASM30.00161.63Manzana (E2)1Area=255.720.1025.57Manzana (G2)1Area=460.110.1046.01Manzana (12)1Area=318.850.1031.89Manzana (C7)1Area=29.230.102.92Manzana (11)1Area=171.180.1017.12Manzana (G1)1Area=121.920.1012.19Manzana (E1)1Area=153.400.1015.34Pasaje Andres1Area=105.890.1010.5902.00.00MOVIMIENTO DE TIERRAS0.0002.01.00EXCAVACIONES0.0002.01.01EXCAVACION EN FORMA MANUALM30.000.00En veredas acabado coloreado - frotachado incluye rampas1Area =0.000.100.0002.02.00ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE0.0002.02.01ACARREO DE MATERIAL EXCEDENTEM30.000.00Volumen de excavacin en forma manual1.250.00------0.000.0002.02.02CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTEM30.00226.28Volumen de demolicin de veredas1.40161.63------226.28Volumen de excavacin en forma manual1.250.00------0.0002.03.00NIVELADO Y COMPACTADO0.0002.03.01MATERIAL SELECCIONADOM3389.23Manzana (E2)1Area=347.830.1034.78Manzana (G2)1Area=619.730.1061.97Manzana (12)1Area=623.160.1062.32Manzana (C7)1Area=213.070.1021.31Manzana (11)1Area=220.920.1022.09Manzana (G1)1Area=349.360.1034.94Manzana (E1)1Area=187.160.1018.72Pasaje Andres1Area=432.870.1043.2902.03.02RELLENO MANUAL CON MATERIAL DE PRESTAMOM30.00389.23Del volumen de Material Seleccionado1Volum=389.23---389.230.0002.03.03NIVELADO Y COMPACTADO C/EQUIPO LIVIANOM20.002994.09Manzana (E2)1Area=347.83---347.83Manzana (G2)1Area=619.73---619.73Manzana (12)1Area=623.16---623.16Manzana (C7)1Area=213.07---213.07Manzana (11)1Area=220.92---220.92Manzana (G1)1Area=349.36---349.36Manzana (E1)1Area=187.16---187.16Pasaje Andres1Area=432.87---432.8703.00.00CONCRETO SIMPLE0.0003.01.00SARDINELES03.01.01SARDINELES: CONCRETO F'C=175 KG/CM2M3Jr ColombiaMargen Derecho62.000.150.450.81Margen Izquierdo62.000.150.450.81Jr BahamasMargen Derecho22.000.150.450.27Margen Izquierdo22.000.150.450.2703.02.00Jr Argentina03.02.01Margen Derecho72.000.150.450.95Margen Izquierdo72.000.150.450.95jr. ChileMargen Derecho12.000.150.450.14Margen Izquierdo12.000.150.450.14jr. Nilo0.00Margen Derecho12.000.150.450.14Margen Izquierdo12.000.150.450.14jr. Huayana0.00Margen derecho52.000.150.450.68Margen izquierdo52.000.150.450.68jr. Colorado0.00Margen Derecho42.000.150.450.54Margen Izquierdo42.000.150.450.54Jr Huallaga0.00Margen Derecho82.000.150.451.08Margen Izquierdo82.000.150.451.08jr. HaIti0.00Margen Derecho22.000.150.450.27Margen Izquierdo22.000.150.450.27jr. Montevideo0.00Margen Derecho42.000.150.450.54Margen Izquierdo42.000.150.450.54Jr Guatemala0.00Margen Derecho82.000.150.451.08Margen Izquierdo82.000.150.451.08jr. Bogota0.00Margen Derecho42.000.150.450.54Margen Izquierdo42.000.150.450.54Jr Canada0.00Margen Derecho62.000.150.450.81Margen Izquierdo62.000.150.450.81Jr Panama0.00Margen Derecho22.000.150.450.27Margen Izquierdo22.000.150.450.27Jr Mexico0.00Margen Derecho12.000.150.450.14Margen Izquierdo12.000.150.450.14Jr La HabanaMargen Derecho12.000.150.450.14Margen Izquierdo12.000.150.450.14Jr Honduras0.00Margen Derecho62.000.150.450.81Margen Izquierdo62.000.150.450.81SARDINELES: ENCOFRADO Y DESENCOFRADOJr ColombiaMargen DerechoMargen IzquierdoVEREDASVEREDAS: CONCRETO F'C=175 KG/CM2, E=10 CM. ACABADO ESCARCHADOJr Colombia0.00Margen Derecho0.00Cdra 011Area =89.290.108.9303.02.03Cdra 021Area =89.300.108.93Cdra 031Area =122.130.1012.21Cdra 041Area =102.120.1010.21Margen Izquierdo0.00Cdra 011Area =194.290.1019.43Cdra 021Area =188.820.1018.88Cdra 031Area =120.370.1012.04Jr Bahamas0.00Margen Derecho0.00Cdra 011Area =185.470.1018.55Margen Izquierdo0.00Cdra 011Area =182.150.1018.2203.03.00Jr Argentina0.0003.03.01Margen Derecho0.00Cdra 011Area =42.950.104.30Cdra 021Area =24.460.102.45Cdra 031Area =198.270.1019.83Cdra 041Area =85.330.108.53Margen Izquierdo0.00Cdra 011Area =184.340.1018.43Cdra 021Area =86.710.108.67Cdra 031Area =82.680.108.27jr. Chile0.00Margen Derecho0.00Cdra 011Area =68.460.106.85Margen Izquierdo0.00Cdra 011Area =62.340.106.23jr. NiloMargen DerechoCdra 011Area =72.680.107.27Margen Izquierdo0.00Cdra 011Area =71.790.107.18jr. Huayana0.00Margen derecho0.00Cdra 011Area =62.890.106.29Cdra 021Area =26.660.102.67Cdra 031Area =78.390.107.84Margen izquierdo0.00Cdra 011Area =60.380.106.04Cdra 021Area =27.580.102.76Cdra 031Area =80.320.108.03jr. Colorado0.00Margen Derecho0.00Cdra 011Area =76.780.107.8003.03.02Cdra 021Area =76.050.107.71Margen Izquierdo0.00Cdra 011Area =78.010.107.6804.00.00Cdra 021Area =77.140.107.6104.01.00Jr Huallaga0.00Margen Derecho0.00Cdra 011Area =145.660.1014.5705.00.00Cdra 021Area =191.210.1019.1205.01.00Cdra 031Area =144.310.1014.4305.01.01Cdra 041Area =132.680.1013.27Cdra 051Area =191.190.1019.1205.02.00Cdra 061Area =78.830.107.8805.02.01Margen Izquierdo0.00Cdra 011Area =147.180.1014.7206.00.00Cdra 021Area =178.820.1017.8806.01.00Cdra 031Area =170.080.1017.01Cdra 041Area =168.410.1016.84Cdra 051Area =179.640.1017.9606.02.00Cdra 061Area =78.730.107.87jr. HaIti0.00Margen Derecho0.0006.03.00Cdra 011Area =70.290.107.03Margen Izquierdo0.00Cdra 011Area =71.080.107.1106.04.00jr. Montevideo0.00Margen Derecho0.00Cdra 011Area =69.280.106.93Cdra 021Area =77.580.107.76Margen Izquierdo0.00Cdra 011Area =82.700.108.27Cdra 021Area =80.510.108.05Jr Guatemala0.00Margen Derecho0.00Cdra 011Area =243.150.1024.32Cdra 021Area =116.770.1011.68Cdra 031Area =77.970.107.80Margen Izquierdo0.00Cdra 011Area =77.310.107.73Cdra 021Area =154.080.1015.41Cdra 031Area =114.530.1011.45Cdra 041Area =76.060.107.61jr. Bogota0.00Margen Derecho0.00Cdra 011Area =180.980.1018.10Margen Izquierdo0.00Cdra 011Area =99.650.109.97Cdra 021Area =89.190.108.92Jr Canada0.00Margen Derecho0.00Cdra 011Area =77.300.107.73Cdra 021Area =180.470.1018.05Cdra 031Area =71.420.107.14Margen Izquierdo0.00Cdra 011Area =73.050.107.31Cdra 021Area =167.220.1016.72Cdra 031Area =70.720.107.07Jr Panama0.00Margen DerechoCdra 011Area =152.960.1015.30Margen IzquierdoCdra 011Area =170.010.1017.00Jr Mexico0.00Margen DerechoCdra 011Area =121.120.1012.11Margen IzquierdoCdra 011Area =95.740.109.57Jr La HabanaMargen DerechoCdra 011Area =68.390.106.84Margen Izquierdo0.00Cdra 011Area =66.960.106.70Jr Honduras0.00Margen Derecho0.00Cdra 011Area =167.240.1016.72Cdra 021Area =171.310.1017.13Cdra 031Area =85.770.108.58Margen Izquierdo0.00Cdra 011Area =159.830.1015.98Cdra 021Area =170.180.1017.02Cdra 031Area =80.660.108.07Manzana (C7)Manzana (11)Manzana (G1)Manzana (E1)Pasaje AndresRampas Tipo I y IIVEREDAS: ENCOFRADO Y DESENCOFRADOManzana (E2)Manzana (G2)Manzana (12)Manzana (C7)Manzana (11)Manzana (G1)Manzana (E1)Pasaje AndresVEREDAS: JUNTA ASFALTICAJr ColombiaMargen DerechoMargen IzquierdoMargen IzquierdoRAMPASRAMPAS: CONCRETO F'C=175 KG/CM2, E=10 CM. BRUADORAMPAS TIPO IJr. PachacutecJr. Mayta CapacJr. JaureguiRAMPAS TIPO IIJr. Mayta CapacJr. AustraliaRAMPAS: REJILLA METALICANumero de RampasPRUEBAS DE CONTROL DE CALIDADPRUEBAS Y ENSAYOS DE CONTROL DE CALIDADMITIGACION DE IMPACTO AMBIENTALETAPA DE CONSTRUCCIONRIEGO DE MATERIAL EN CANTERAETAPA DE ABANDONORECONFORMACION DE BOTADEROVARIOS, LIMPIEZA Y OTROSCURADO: SARDINELES, VEREDAS Y RAMPASNIVELACION DE CAJAS DE REGISTRO AGUA INSTALACIONES DOMICILIARESNIVELACION DE CAJAS DE REGISTRO DESAGUE INSTALACIONES DOMICILIARIASLIMPIEZA FINAL DE OBRAArea de intervencin

CUNETAPLANILLA DE METRADOSPROYECTOMEJORAMIENTO Y REHABILITACIN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIN MARA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)COMPONENTE 03: CONSTRUCCION DE CUNETAS LATERALESPartidaDescripcinUndNMedidasParcialTotalvecesLargoAnchoAlto01.00.00OBRAS PRELIMINARES0.0001.01.00TRAZO, NIVELACIN Y REPLANTEO0.0001.01.01TRAZO Y REPLANTEO DURANTE LA CONSTRUCCINM20.00710.14En cuneta tipo I11,306.720.50---653.36En cuneta tipo II156.781.00---56.7802.00.00MOVIMIENTO DE TIERRAS0.0002.01.00EXCAVACIONES0.0002.01.01EXCAVACION EN FORMA MANUALM30.009.94En cuneta tipo I11,306.72Area=0.0056.53En cuneta tipo II156.78Area=0.0603.4102.02.00ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE0.0002.02.01ACARREO DE MATERIAL EXCEDENTEM30.0012.43Excavacin en forma manual1.259.94------12.4302.02.02CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTEM30.0012.43Acarreo de material excedente1.25Volum=9.94---12.430.0003.00.00CONCRETO SIMPLE0.0003.01.00CUNETA TIPO I0.0003.01.01CUNETA TIPO I: CONCRETO F'C=175 KG/CM2M30.0098.00Jr. Pachacutec1305.06Area=0.07522.88Jr. Mayta Capac1248.23Area=0.07518.62Jr. Australia1168.90Area=0.07512.67Jr. Enrique Lopz Albujar14.65Area=0.0750.35Jr. Jauregui1579.89Area=0.07543.4903.01.02CUNETA TIPO I: ENCOFRADO Y DESENCOFRADOM20.0043.80Jr. Pachacutec1020.50---0.2010.20Jr. Mayta Capac830.50---0.208.30Jr. Australia570.50---0.205.70Jr. Enrique Lopz Albujar20.50---0.200.20Jr. Jauregui1940.50---0.2019.4003.01.03CUNETA TIPO I: JUNTA ASFALTICAM0.00214.00Jr. Pachacutec1000.50------50.00Jr. Mayta Capac810.50------40.50Jr. Australia550.50------27.50Jr. Enrique Lopz Albujar00.50------0.00Jr. Jauregui1920.50------96.0003.02.00CUNETA TIPO II0.0003.02.01CUNETA TIPO II: CONCRETO F'C=210 KG/CM2M30.0011.36Jr. Pachacutec123.52Area=0.204.70Jr. Mayta Capac123.52Area=0.204.70Jr. Enrique Lopez Albujar19.74Area=0.201.9503.02.02CUNETA TIPO II: ENCOFRADO Y DESENCOFRADOM20.0015.71Jr. Pachacutec81.00---0.201.60Jr. Mayta Capac81.00---0.201.60Jr. Enrique Lopez Albujar41.00---0.200.80Av. Andrs Avelino Cceres - Jr. Pachacutec112.40---0.202.48Jr. Inca Garcilaso - Jr. Pachacutec110.82---0.202.16Av. Andrs Avelino Cceres - Jr. Mayta Capac110.91---0.202.18Jr. Inca Garcilaso - Jr. Mayta Capac110.82---0.202.16Av. Andrs Avelino Cceres - Jr. Australia113.62---0.202.720.0003.02.03CUNETA TIPO II: JUNTA ASFALTICAM0.0072.57Jr. Pachacutec61.00------6.00Jr. Mayta Capac61.00------6.00Jr. Enrique Lopez Albujar21.00------2.00Av. Andrs Avelino Cceres - Jr. Pachacutec112.40------12.40Jr. Inca Garcilaso - Jr. Pachacutec110.82------10.82Av. Andrs Avelino Cceres - Jr. Mayta Capac110.91------10.91Jr. Inca Garcilaso - Jr. Mayta Capac110.82------10.82Av. Andrs Avelino Cceres - Jr. Australia113.62------13.6204.00.00PRUEBAS DE CONTROL DE CALIDAD0.0004.01.00PRUEBAS Y ENSAYOS DE CONTROL DE CALIDADUND1.001---------1.0005.00.00VARIOS, LIMPIEZA Y OTROS0.0005.01.00CURADO: CUNETAS TIPO I Y IIM2710.141Area=710.14---710.1405.02.00LIMPIEZA FINAL DE OBRAM2710.14Area de intervencin1Area=710.14---710.14

AREAS VERDESPLANILLA DE METRADOSPROYECTOMEJORAMIENTO Y REHABILITACIN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIN MARA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)COMPONENTE 05: AREAS VERDESPartidaDescripcinUndNMedidasParcialTotalvecesLargoAnchoAlto01.00.00OBRAS PRELIMINARES0.0001.01.00TRAZO, NIVELACIN Y REPLANTEO0.0001.01.01TRAZO Y REPLANTEO DURANTE LA CONSTRUCCINM20.0048.00Manzana A16Area=1.00---6.00Manzana B16Area=1.00---6.00Manzana E112Area=1.00---12.00Manzana G16Area=1.00---6.00Manzana Plaza6Area=1.00---6.00Manzana E16Area=1.00---6.00Manzana F16Area=1.00---6.0002.00.00MOVIMIENTO DE TIERRAS0.0002.01.00EXCAVACIONES0.0002.01.01EXCAVACION EN FORMA MANUALM30.0016.80Area Verde: Jardineras1Area =48.000.3516.8002.02.00ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE0.0002.02.01ACARREO DE MATERIAL EXCEDENTEM30.0021.00Volumen de excavacin en forma manual1.2516.80------21.000.0002.02.02CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTEM30.0021.00Volumen de excavacin en forma manual1.2516.80------21.0003.00.00JARDINERAS Y ASIENTOS DE CONCRETO03.01.00JARDINERAS03.01.01JARDINERAS: CONCRETO F'C=175 KG/CM2M3274.68Jr Colombia 1ra Cdra Margen Izq.-142.28710.150.42.54Jr Colombia 1ra Cdra Margen Izq.-1111.9269111.93Jr Colombia 1ra Cdra Margen Der.11.00Jr Colombia 1ra Cdra Margen Der.11.00Jr Colombia 1ra Cdra Margen Der.11.00Jr Colombia 2ra Cdra Margen Izq.-142.287142.29Jr Colombia 2ra Cdra Margen Izq.-1111.9269111.93Jr Colombia 2ra Cdra Margen Der11.00Jr Colombia 2ra Cdra Margen Der11.00Jr Colombia 2ra Cdra Margen Der11.00Manzana A16Area=0.511.103.37Manzana B16Area=0.511.103.37Manzana E112Area=0.511.106.73Manzana G16Area=0.511.103.37Manzana Plaza6Area=0.511.103.37Manzana E16Area=0.511.103.37Manzana F16Area=0.511.103.3703.01.02JARDINERAS: ENCOFRADO Y DESENCOFRADOM2359.04Manzana A16Perim.6.801.1044.88Manzana B16Perim.6.801.1044.88Manzana E112Perim.6.801.1089.76Manzana G16Perim.6.801.1044.88Manzana Plaza6Perim.6.801.1044.88Manzana E16Perim.6.801.1044.88Manzana F16Perim.6.801.1044.8803.01.03JARDINERAS: RELLENO MANUAL CON MATERIAL PROPIOM345.15Manzana A16Area=0.510.601.844Area=5.950.163.81Manzana B16Area=0.510.601.844Area=5.950.163.81Manzana E112Area=0.510.603.678Area=5.950.167.62Manzana G16Area=0.510.601.844Area=5.950.163.81Manzana Plaza6Area=0.510.601.844Area=5.950.163.81Manzana E16Area=0.510.601.844Area=5.950.163.81Manzana F16Area=0.510.601.844Area=5.950.163.8103.01.04JARDINERAS: PREPARACION DE TERRENO PARA AREA VERDEM338.36Manzana A16Area=0.510.401.234Area=5.950.153.57Manzana B16Area=0.510.401.224Area=5.950.153.57Manzana E112Area=0.510.402.458Area=5.950.157.14Manzana G16Area=0.510.401.224Area=5.950.153.57Manzana Plaza6Area=0.510.401.224Area=5.950.153.57Manzana E16Area=0.510.401.224Area=5.950.153.57Manzana F16Area=0.510.401.224Area=5.950.153.5703.01.05JARDINERAS: SEMBRADO DE GRASSM2214.88Manzana A16Area=0.51---3.064Area=5.95---23.80Manzana B16Area=0.51---3.064Area=5.95---23.80Manzana E112Area=0.51---6.128Area=5.95---47.60Manzana G16Area=0.51---3.064Area=5.95---23.80Manzana Plaza6Area=0.51---3.064Area=5.95---23.80Manzana E16Area=0.51---3.064Area=5.95---23.80Manzana F16Area=0.51---3.064Area=5.95---23.8003.01.06JARDINERAS: SEMBRADO DE ARBUSTOS Y ARBOLESUND90.00Manzana A16---------6.003---------3.00Manzana B16---------6.003---------3.00Manzana E112---------12.0024---------24.00Manzana G16---------6.003---------3.00Manzana Plaza6---------6.003---------3.00Manzana E16---------6.003---------3.00Manzana F16---------6.003---------3.0003.02.00ASIENTOS DE CONCRETO03.02.01ASIENTO TIPO II: CONCRETO F'C=175 KG/CM2M34.50Manzana A131.500.500.150.3431.000.150.500.23Manzana B131.500.500.150.3431.000.150.500.23Manzana E161.500.500.150.6861.000.150.500.45Manzana G131.500.500.150.3431.000.150.500.23Manzana Plaza31.500.500.150.3431.000.150.500.23Manzana E131.500.500.150.3431.000.150.500.23Manzana F131.500.500.150.3431.000.150.500.2303.02.02ASIENTO TIPO II: ENCOFRADO Y DESENCOFRADOM235.81Manzana A131.500.50---2.2532.60---0.503.90Manzana B131.500.500.150.3432.60---0.503.90Manzana E161.500.500.150.6862.60---0.507.80Manzana G131.500.500.150.3432.60---0.503.90Manzana Plaza31.500.500.150.3432.60---0.503.90Manzana E131.500.500.150.3432.60---0.503.90Manzana F131.500.500.150.3432.60---0.503.9003.02.03ASIENTO TIPO II: ACERO GRADO 60KG170.65Manzana A13Peso=3.56---10.673Peso=3.56---10.67Manzana B13Peso=3.56---10.673Peso=3.56---10.67Manzana E16Peso=3.56---21.336Peso=3.56---21.33Manzana G13Peso=3.56---10.673Peso=3.56---10.67Manzana Plaza3Peso=3.56---10.673Peso=3.56---10.67Manzana E13Peso=3.56---10.673Peso=3.56---10.67Manzana F13Peso=3.56---10.673Peso=3.56---10.6704.00.00PRUEBAS DE CONTROL DE CALIDAD0.0004.01.00PRUEBAS Y ENSAYOS DE CONTROL DE CALIDADUND1.001---------1.0005.00.00VARIOS, LIMPIEZA Y OTROS0.0005.01.00CURADO: JARDINERAS Y ASIENTOSM2394.851Area=394.85---394.8505.02.00LIMPIEZA FINAL DE OBRAM248.00Area de intervencin1Area=48.00---48.00

SEALIZACIONPLANILLA DE METRADOSPROYECTOMEJORAMIENTO Y REHABILITACIN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIN MARA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)COMPONENTE 04: IMPLEMENTACION DE SEALIZACION VIALPartidaDescripcinUndNMedidasParcialTotalvecesLargoAnchoAlto01.00.00OBRAS PRELIMINARES0.0001.01.00TRAZO, NIVELACIN Y REPLANTEO0.0001.01.01TRAZO Y REPLANTEO DURANTE LA CONSTRUCCINM20.00384.16En sealizacion de via1Area =384.16---384.1602.00.00SEALIZACION HORIZONTAL0.0002.01.00PINTURA EN SARDINELESM20.00598.66Manzana (E2)1188.950.46---86.92Manzana (G2)1322.640.46---148.41Manzana (12)1302.380.46---139.10Manzana (C7)180.510.46---37.03Manzana (11)1129.200.46---59.43Manzana (G1)1166.330.46---76.51Manzana (E1)1111.430.46---51.2602.02.00PINTURA EN PAVIMENTOM20.00384.16pase peatonalJr. Pachacutec323.000.50---48.00Jr. Mayta Capac243.000.50---36.00Jr. Australia203.000.50---30.00Jr. Jauregui483.000.50---72.00flechas direccionales tipo 1 (Frente y Voltea)0.00Jr. Pachacutec4rea =1.80---7.20Jr. Mayta Capac2rea =1.80---3.60Jr. Australia2rea =1.80---3.60Jr. Jauregui6rea =1.80---10.80flechas direccionales tipo 1 (Frente y Voltea ambos lados)Jr. Pachacutec0rea =2.50---0.00Jr. Mayta Capac0rea =2.50---0.00Jr. Australia0rea =2.50---0.00Jr. Jauregui0rea =2.50---0.00flechas direccionales tipo 2 (Frente)Jr. Pachacutec2rea =1.30---2.60Jr. Mayta Capac2rea =1.30---2.60Jr. Australia2rea =1.30---2.60Jr. Jauregui6rea =1.30---7.80linea paradaJr. Pachacutec44.010.50---8.03Jr. Mayta Capac24.010.50---4.01Jr. Australia24.810.50---4.81Jr. Jauregui64.010.50---12.04linea central de paradaJr. Pachacutec215.000.10---3.00118.390.10---1.84Jr. Mayta Capac215.000.10---3.00Jr. Australia215.000.10---3.00Jr. Jauregui615.000.10---9.00linea central descontinua0.00Jr. Pachacutec103.000.10---3.00Jr. Mayta Capac63.000.10---1.80Jr. Australia33.000.10---0.90Jr. Jauregui173.000.10---5.10linea de borde del pavimentoJr. Pachacutec2113.360.10---22.67Jr. Mayta Capac280.040.10---16.01Jr. Australia260.140.10---12.03Jr. Jauregui2235.610.10---47.1203.00.00SEALIZACION VERTICAL03.01.00SEALES INFORMATIVASUND8.008---------8.0004.00.00VARIOS, LIMPIEZA Y OTROS0.0004.01.00LIMIPIEZA FINAL DE OBRAM20.00384.16En sealizacion de via1Area =384.16---384.16

EDUCACION VIALPLANILLA DE METRADOSPROYECTOMEJORAMIENTO Y REHABILITACIN DE LA INFRAESTRUCTURA VIAL EN LOS JIRONES, CALLES Y PASAJES DE LA URBANIZACIN MARA LUISA Y BELLAVISTA III ETAPA (PACHACUTEC, JUREGUI, MAYTA CAPAC, AUSTRALIA) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (PRIMERA ETAPA)COMPONENTE 05: IMPLEMENTACION DE PROGRAMA DE EDUCACION VIALPartidaDescripcinUndNMedidasParcialTotalvecesLargoAnchoAlto01.00.00EDUCACION VIAL0.0001.01.00EDUCACION VIALUND1.00Educacin Vial1---------1.00