05 Valorización Huascarcocha

13
HOJA DE METRADOS Obra: Entidad: MUNICIPALIDAD PROVINCIAL DE CHOTA Lugar: CAJAMARCA - CHOTA - CHOTA Item Descripción Und. Cant. Dimensiones Parcial Ancho Alto Largo 01 TRABAJOS PRELIMINARES 01.01 LIMPIEZA DE TERRENO MANUAL m2 0 0.00 02 TRABAJOS PRELIMINARES 02.01 LIMPIEZA DE TERRENO MANUAL m2 1 ### ### 02.02 TRAZO Y REPLANTEO m 1 ### ### 03 MOVIMIENTO DE TIERRAS 03.01 m3 1.15 0.40 0.50 ### 990.15 03.02 ELIMINACION MATERIAL EXCEDENTE m3 1.25 ### ### 03.03 m3 1 0.40 0.10 ### 172.20 03.04 m3 1.30 0.40 0.40 ### 895.44 04 04.01 m 1 ### ### 04.02 INSTALACION DE TUBERIA DE PVC 1" m 1 500.00 500.00 04.03 INSTALACION DE TUBERIA DE PVC 3/4" , CLASE 10 m 1 ### ### 04.04 m 1 200.00 200.00 05 CONEXIONES DOMICILIARIAS 05.01 CONEXION AGUA 1/2" und 0 0.00 06 ACCESORIOS 06.01 ACCESORIOS GLB 1 0.60 0.60 07 PRUEBA HIDRAULICA 07.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES ML 1 ### ### 08 CAMARA ROMPE PRESION ( 02) 08.01 TRABAJOS PRELIMINARES 08.01.0 LIMPIEZA DE TERRENO m2 0 0.00 08.01.0 TRAZO Y REPLANTEO m2 0 0.00 09 MOVIMIENTO DE TIERRAS 09.01 EXCAVACION MANUAL m3 0 0.00 09.02 ELIMINACION MATERIAL EXCEDENTE m3 "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE SANTA BAJO ,DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA" EXCAVACION MANUAL DE ZANJAS ( 0.40 X 0.50 X CAMA DE APOYO PARA FONDO DE TUBERIA CON RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL INSTALACION DE TUBERIA PARA LA RED DE INSTALACION DE TUBERIA DE PVC 1 1/2", INSTALACION DE TUBERIA DE PVC 1/2" , CLASE

description

fddffdf

Transcript of 05 Valorización Huascarcocha

1 Metrados

HOJA DE METRADOS

Obra:"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE SANTA ROSA BAJO ,DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"

Entidad:MUNICIPALIDAD PROVINCIAL DE CHOTA

Lugar:CAJAMARCA - CHOTA - CHOTA

ItemDescripcinUnd.Cant.DimensionesParcialTotalAnchoAltoLargo 01TRABAJOS PRELIMINARES 01.01 LIMPIEZA DE TERRENO MANUALm2 0.007,896.5700.00 02TRABAJOS PRELIMINARES 02.01 LIMPIEZA DE TERRENO MANUALm2 7,896.577,896.5717,896.577,896.57 02.02 TRAZO Y REPLANTEOm 7,896.577896.5717,896.577,896.57 03MOVIMIENTO DE TIERRAS 03.01 EXCAVACION MANUAL DE ZANJAS ( 0.40 X 0.50 X 7896.57)m3 990.151,816.211.150.400.504,305.00990.15 03.02 ELIMINACION MATERIAL EXCEDENTEm3 1,237.692,270.261.25990.151,237.69 03.03 CAMA DE APOYO PARA FONDO DE TUBERIA CON MATERIAL CLASIFICADO h= 0.10m3 172.20315.8610.400.104,305.00172.20 03.04 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIOm3 895.441,642.491.300.400.404,305.00895.44 04INSTALACION DE TUBERIA PARA LA RED DE DISTRIBUCION DE AGUA 04.01 INSTALACION DE TUBERIA DE PVC 1 1/2", CLASE 10m 2,000.002,572.3812,000.002,000.00 04.02 INSTALACION DE TUBERIA DE PVC 1"m 500.001,158.461500.00500.00 04.03 INSTALACION DE TUBERIA DE PVC 3/4" , CLASE 10m 1,605.003,825.7311,605.001,605.00 04.04 INSTALACION DE TUBERIA DE PVC 1/2" , CLASE 10m 200.00340.001200.00200.00 05CONEXIONES DOMICILIARIAS 05.01 CONEXION AGUA 1/2" und 0.0056.0000.00 06ACCESORIOS 06.01 ACCESORIOSGLB 0.601.0010.600.60 07PRUEBA HIDRAULICA 07.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDESML 4,305.007,896.5714,305.004,305.00 08CAMARA ROMPE PRESION ( 02) 08.01 TRABAJOS PRELIMINARES 08.01.01 LIMPIEZA DE TERRENOm2 0.0036.5800.00 08.01.02 TRAZO Y REPLANTEOm2 0.0025.4800.00 09MOVIMIENTO DE TIERRAS 09.01 EXCAVACION MANUAL m3 0.009.6000.00 09.02 ELIMINACION MATERIAL EXCEDENTEm3 0.0012.0000.00 09.03 NIVELACION INTERIOR APISONADO MANUALm2 0.0010.6000.00 09.04 RELLENO DE TERRENOm3 0.007.2000.00 09.05 PIEDRA 4", ASENTADA CON MORTERO 1:8m2 0.0016.0000.00 10CONCRETO ARMADO 10.01 CONCRETO CICLOPEO FC=140KG/CM2m3 0.000.1000.00 10.02 CONCRETO EN LOSA DE TECHO F`C= 175KG/CM2M3 0.000.7400.00 10.03 CONCRETO EN PAREDES F'C= 175 KG/CM2m3 0.005.1800.00 10.04 CONCRETO EN LOSA DE FONDO F'C=175 KG/CM2m3 0.002.0200.00 10.05 PIEDRA 4", ASENTADA CON MORTERO 1:8m2 0.002.0000.00 10.06 ACERO 3/8" FY =4200 KG/CM2kg 0.0090.7200.00 10.07 ENCOFRADO Y DESENCOFRADO DE LOSAm2 0.006.2400.00 10.08 ENCOFRADO Y DESENCOFRADO EN PAREDES Y BASEm2 0.0048.0000.00 11TARRAJEOS 11.01 TARRAJEO DE INTERIORES CON IMPERMEABILIZANTE, e= 1.00 cmm2 0.0026.5600.00 11.02 TARRAJEO EN EXTERIORESm2 0.0029.9500.00 11.03 MORTERO CEMENTO ARENA 1:2 PENDIENTE DE FONDOm2 0.002.4000.00 12ACCESORIOS Y OTROS 12.01 ACCESORIOS DE CRP -7und 0.002.0000.00 13VARIOS 13.01 TAPA METALICA SANITARIA 0.60 X 0.60, e=1/8"und 0.002.0000.00 13.02 PINTURA EN MUROS AL LATEXm2 0.0029.9500.00 14FLETES 14.01 FLETE TERRESTREGLB 0.701.0010.700.70

2 Valorizacin

VALORIZACION N 01

ENERO - FEBRERO 2012

OBRA:"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE HUASCARCOCHA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"

FINANCIA: MUNICIPALIDAD PROVINCIAL DE CHOTA.INSPECTOR DE OBRA:Ing. TAMER FELITO MAGUIA CORONEL, CIP: 58294EJECUTA:MUNICIPALIDAD PROVINCIAL DE CHOTA.RESIDENTE DE OBRA:Ing. WILLY OCTAVIO CUBAS TERN, CIP: 110211REGION : CAJAMARCA MODALIDAD:ADMINISTRACION DIRECTAPROVINCIA : CHOTAPLAZO DE EJECUCION:60 Das (2.0 Meses)DISTRITO : CHOTALOCALIDAD :HUASCARCOCHA

ItemDescripcinUnid.MetradoPrecioParcial VALORIZ. ANTERIOR VALORIZ. ACTUAL VALRIZ. ACUMULADA S A L D OMetrad.COSTOMetrad.Costo Metrad.Costo %Metrad.Costo%

01OBRAS PROVISIONALES471.8401.01 CARTEL DE OBRA DE 3.60 x 2.40m ( GIGANTOGRAFIA)und1.00471.84471.840.000.000.000.000.000.000.00%1.00471.84100.00%02TRABAJOS PRELIMINARES4,264.1502.01 LIMPIEZA DE TERRENO MANUALm27,896.570.211,658.280.000.007896.571658.287896.571658.28100.00%0.000.000.00%02.02 TRAZO Y REPLANTEOm7,896.570.332,605.870.000.007896.572605.877896.572605.87100.00%0.000.000.00%03MOVIMIENTO DE TIERRAS30,344.6803.01 EXCAVACION MANUAL DE ZANJAS ( 0.40 X 0.50 X 2,913.51)m31,816.216.5911,968.820.000.00990.156525.09990.156525.0954.52%826.065443.7445.48%03.02 ELIMINACION MATERIAL EXCEDENTEm32,270.263.307,491.860.000.001237.694084.371237.694084.3754.52%1032.573407.4945.48%03.03 CAMA DE APOYO PARA FONDO DE TUBERIA CON MATERIAL CLASIFICADO h= 0.10m3315.866.432,030.980.000.00172.201107.25172.201107.2554.52%143.66923.7345.48%03.04 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIOm31642.495.398853.020.000.00895.444826.42895.444826.4254.52%747.054026.6045.48%04INSTALACION DE TUBERIA PARA LA RED DE DISTRIBUCION DE AGUA20,455.7804.01 INSTALACION DE TUBERIA DE PVC 1 1/2", CLASE 10m2572.383.428,797.540.000.002000.006840.002000.006840.0077.75%572.381957.5422.25%04.02 INSTALACION DE TUBERIA DE PVC 1"m1,158.462.542,942.490.000.00500.001270.00500.001270.0043.16%658.461672.4956.84%04.03 INSTALACION DE TUBERIA DE PVC 3/4" , CLASE 10m3,825.732.128,110.550.000.001605.003402.601605.003402.6041.95%2220.734707.9558.05%04.04 INSTALACION DE TUBERIA DE PVC 1/2" , CLASE 10m340.001.78605.200.000.00200.00356.00200.00356.0058.82%140.00249.2041.18%05CONEXIONES DOMICILIARIAS4,119.3605.01 CONEXION AGUA 1/2" und5673.564,119.360.000.000.000.000.000.000.00%56.004119.36100.00%06ACCESORIOS 1,101.3206.01 ACCESORIOSGLB11101.321,101.320.000.000.60660.790.60660.7960.00%0.40440.5340.00%07PRUEBA HIDRAULICA11,765.8907.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDESML7896.571.4911,765.890.000.004305.006414.454305.006414.4554.52%3591.575351.4445.48%08CAMARA ROMPE PRESION ( 02)15.0708.01 TRABAJOS PRELIMINARES15.0708.01.01 LIMPIEZA DE TERRENOm236.580.217.680.000.000.000.000.000.000.00%36.587.68100.00%08.01.02 TRAZO Y REPLANTEOm225.480.297.390.000.000.000.000.000.000.00%25.487.39100.00%09MOVIMIENTO DE TIERRAS2,273.8009.01 EXCAVACION MANUAL m39.66.5963.260.000.000.000.000.000.000.00%9.6063.26100.00%09.02 ELIMINACION MATERIAL EXCEDENTEm312.003.3039.600.000.000.000.000.000.000.00%12.0039.60100.00%09.03 NIVELACION INTERIOR APISONADO MANUALm210.601.7618.660.000.000.000.000.000.000.00%10.6018.66100.00%09.04 RELLENO DE TERRENOm37.202.7519.800.000.000.000.000.000.000.00%7.2019.80100.00%09.05 PIEDRA 4", ASENTADA CON MORTERO 1:8m216.00133.282,132.480.000.000.000.000.000.000.00%16.002132.48100.00%10CONCRETO ARMADO5,446.6710.01 CONCRETO CICLOPEO FC=140KG/CM2m30.1278.6527.870.000.000.000.000.000.000.00%0.1027.87100.00%10.02 CONCRETO EN LOSA DE TECHO F`C= 175KG/CM2M30.74307.69227.690.000.000.000.000.000.000.00%0.74227.69100.00%10.03 CONCRETO EN PAREDES F'C= 175 KG/CM2m35.18479.192,482.200.000.000.000.000.000.000.00%5.182482.20100.00%10.04 CONCRETO EN LOSA DE FONDO F'C=175 KG/CM2m32.02307.69621.530.000.000.000.000.000.000.00%2.02621.53100.00%10.05 PIEDRA 4", ASENTADA CON MORTERO 1:8m22.00265.82531.640.000.000.000.000.000.000.00%2.00531.64100.00%10.06 ACERO 3/8" FY =4200 KG/CM2kg90.724.94448.160.000.000.000.000.000.000.00%90.72448.16100.00%10.07 ENCOFRADO Y DESENCOFRADO DE LOSAm26.2420.42127.420.000.000.000.000.000.000.00%6.24127.42100.00%10.08 ENCOFRADO Y DESENCOFRADO EN PAREDES Y BASEm248.0020.42980.160.000.000.000.000.000.000.00%48.00980.16100.00%11TARRAJEOS2,025.5511.01 TARRAJEO DE INTERIORES CON IMPERMEABILIZANTE, e= 1.00 cmm226.5637.32991.220.000.000.000.000.000.000.00%26.56991.22100.00%11.02 TARRAJEO EN EXTERIORESm229.9533.06990.150.000.000.000.000.000.000.00%29.95990.15100.00%11.03 MORTERO CEMENTO ARENA 1:2 PENDIENTE DE FONDOm22.4018.4144.180.000.000.000.000.000.000.00%2.4044.18100.00%12ACCESORIOS Y OTROS2,331.7412.01 ACCESORIOS DE CRP -7und21165.872,331.740.000.000.000.000.000.000.00%2.002331.74100.00%13VARIOS665.6613.01 TAPA METALICA SANITARIA 0.60 X 0.60, e=1/8"und2110220.000.000.000.000.000.000.000.00%2.00220.00100.00%13.02 PINTURA EN MUROS AL LATEXm229.9514.88445.660.000.000.000.000.000.000.00%29.95445.66100.00%14FLETES1,500.0014.01 FLETE TERRESTREGLB1.001,500.001,500.000.000.000.701050.000.701050.0070.00%0.30450.0030.00%

COSTO DIRECTO86,781.510.0040,801.1140,801.1145,980.39GASTOS GENERALES(17%)14,752.860.006,936.196,936.197,816.67

PRESUPUESTO TOTAL101,534.370.0047,737.3047,737.3053,797.06AVANCE PARCIAL %0.00%47.02%52.98%AVANCE ACUMULADO %47.02%

3 Finan.P.Vs. E.

OBRA: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE SANTA ROSA BAJO ,DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE CHOTAUBICACIN: HUASCARCOCHA - CHOTA - CHOTA - CAJAMARCAINSPECTOR DE OBRA:: Ing. TAMER FELITO MAGUIA CORONEL, CIP: 58294RESIDENTE DE OBRA:: Ing. WILLY OCTAVIO CUBAS TERN, CIP: 110211

GRFICO DEL AVANCE FINANCIERO PROGRAMADO VS. AVANCE FINANCIERO EJECUTADOMONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOSMONTOS (Inc/ IGV)PORCENTAJESMONTOS (Inc/ IGV)PORCENTAJESMESPARCIALACUMUL.PARCIALACUMUL.MESPARCIALACUMUL.PARCIALACUMUL.S/.S/.%%S/.S/.%%23-Jan-120.000.000.00%0.00%23-Jan-120.000.000.00%0.00%29-Feb-1249,264.9849,264.9848.52%48.52%29-Feb-1247,737.3047,737.3047.02%47.02%23-Mar-1252,269.39101,534.3751.48%100.00%23-Mar-12

TOTAL101,534.37100.00%TOTAL47,737.3047.02%

4 % P. Vs. E.

OBRA: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE SANTA ROSA BAJO ,DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE CHOTAUBICACIN: HUASCARCOCHA - CHOTA - CHOTA - CAJAMARCAINSPECTOR DE OBRA:: Ing. TAMER FELITO MAGUIA CORONEL, CIP: 58294RESIDENTE DE OBRA:: Ing. WILLY OCTAVIO CUBAS TERN, CIP: 110211

GRFICO DEL AVANCE FSICO PROGRAMADO VS. AVANCE FSICO EJECUTADOMONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOSMONTOS (Inc/ IGV)PORCENTAJESMONTOS (Inc/ IGV)PORCENTAJESMESPARCIALACUMUL.PARCIALACUMUL.MESPARCIALACUMUL.PARCIALACUMUL.S/.S/.%%S/.S/.%%23-Jan-120.000.000.00%0.00%23-Jan-120.000.000.00%0.00%29-Feb-1249,264.9849,264.9848.52%48.52%29-Feb-1247,737.3047,737.3047.02%47.02%23-Mar-1252,269.39101,534.3751.48%100.00%23-Mar-12

TOTAL101,534.37100.00%TOTAL47,737.3047.02%

5 EJEC-Vrs-PROG

OBRA: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE SANTA ROSA BAJO , DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE CHOTAUBICACIN: HUASCARCOCHA - CHOTA - CHOTA - CAJAMARCAINSPECTOR DE OBRA:: Ing. TAMER FELITO MAGUIA CORONEL, CIP: 58294RESIDENTE DE OBRA:: Ing. WILLY OCTAVIO CUBAS TERN, CIP: 110211

CONTROL DE VALORIZACIONES EJECUTADAS VS. PROGRAMADAS

MESVALORIZACIN NPROGRAMADOEJECUTADO% EJEC./ PROG.AVANCE MENSUALAVANCE ACUMULADOPORCENTAJE ACUMULADOAVANCE MENSUALAVANCE ACUMULADOPORCENTAJE ACUMULADO

29-Feb-120149,264.9849,264.9848.52%47,737.3047,737.3047.02%96.90%23-Mar-120252,269.39101,534.37100.00%

TOTAL101,534.3747,737.30