Presentation 2016

Post on 08-Feb-2017

186 views 0 download

Transcript of Presentation 2016

INDUSTRIALISED BUILDING SYSTEM (IBS)

It is a system which suit all architectural demands amp not a machine or component

significantly difference from traditional cast in-situ construction

which relies heavily on customized site work

- The wall is designed to provide adequate fire resistance according to demand (with minimum 2hours as per BS8110 )

- The system is designed and approved by PE and endorsed by independent checker

- Thickness of the wall can be customized according to requirement

- Our design and casting are following strictly to British Standard

HC PRECAST SYSTEM

PATENTED UNITED STATE US 6819870B2

PATENTED MALAYSIA MY - 124213-A IN 2006

PATENTED MALAYSIA MY - 139712-A IN 2009

MALAYSIA GREEN TECHNOLOGY

TRAINING UNIT

8 years expose precast wall precast staircase

half slab amp precast beam with in-situ column

- No touch-up - No water proofing

- No leaking - No crack

FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units

of single storey (1000 ft2) per year

CONTENTS

1 BENEFITS INDUSTRIALISED BUILDING SYSTEM ( GREEN TECHNOLOGY )

2 PROPOSE FOR THE GOVERNMENT amp PRIVATE

3 RM 9000(m2)RM 900(m3) SUPERSTRUCTURE (FRAME amp WALL)

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

5 CONSTRUCTION METHOD SEQUENCE

6 PRODUCTION amp DELIVERY SEQUENCE

7 QUALITY CONTROL amp ASSURANCE

8 COST COMPARISONFAST amp EASY (CONVENTIONAL vs HC PRECAST SYSTEM)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

11 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECTURAL DEMANDS

13 PRECAST ELEMENT

14 FACTORY CAPACITY

15 COMPLETED PROJECTS

16 PATENTED

17 INTERNATIONAL PUBLICATIONS

18 COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER

1 BENEFITS INDUSTRIAL BUILDING SYSTEM GREEN TECHNOLOGY

5

v) CONSULTANT

- ARCHITECT

( Flexibility amp Customized )

- CampS ( Construction Method Sequence )

- MampE ( Schematic Diagram of Shop Drawing )

- QS ( No Variation Order )

vi) SYSTEM PROVIDER

- IBSMANUFACTURE

- Payment Secure

vii) CONTRACTOR

- Payment Secure

i) COUNTRY

- 40 Labour Reduce

- Currency

- Social

ii) GOVERNMENT

- Quality

- Speed

- Environment

- Green Technology

iii) PRIVATE DEVELOPER

- Quality

- Speed

- Environment

- Green Technology

iv) END-USER

- Quality

2 PROPOSE TO GOVERNMENT amp PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility (flexibility to suit all architectural

demands) to participate to built the show unit with work below and superstructure without finishing for the

Government amp Private Developer to identify the system in terms of quality speed and environment for

supply in its development ----------------------------------------------------------------------------------------------------------------------------------------------------

1 Architect

bull Appointed by the Government amp Private Developer

bull Design of single storey bungalow of 1000 ft2 (affordable home) up to superstructure without finishing

bull With MampE requirement

bull Wall finishing with plaster or skim coat only

bull Door and window frame included except door leave

bull Ground floor without tiling

2 Industrialized building system manufacturer have formed their BQ for superstructure

(in terms of wall area) and to submit work program with sequence of work for record purposes

3 Proper record by the Government amp Private representative during construction in terms of labour and

machinery involved per day up to completion (superstructure only)

4 Conquas or QLassic consultant ( 2 ) engaged by the Government amp Private Developer

5 Cost Comparison for each Industrialized Building System Manufacturer by the Government amp Private

Developer (for superstructure only) Cost will be fixed for the selected manufacturer and supply to its

development

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

TRAINING UNIT

8 years expose precast wall precast staircase

half slab amp precast beam with in-situ column

- No touch-up - No water proofing

- No leaking - No crack

FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units

of single storey (1000 ft2) per year

CONTENTS

1 BENEFITS INDUSTRIALISED BUILDING SYSTEM ( GREEN TECHNOLOGY )

2 PROPOSE FOR THE GOVERNMENT amp PRIVATE

3 RM 9000(m2)RM 900(m3) SUPERSTRUCTURE (FRAME amp WALL)

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

5 CONSTRUCTION METHOD SEQUENCE

6 PRODUCTION amp DELIVERY SEQUENCE

7 QUALITY CONTROL amp ASSURANCE

8 COST COMPARISONFAST amp EASY (CONVENTIONAL vs HC PRECAST SYSTEM)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

11 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECTURAL DEMANDS

13 PRECAST ELEMENT

14 FACTORY CAPACITY

15 COMPLETED PROJECTS

16 PATENTED

17 INTERNATIONAL PUBLICATIONS

18 COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER

1 BENEFITS INDUSTRIAL BUILDING SYSTEM GREEN TECHNOLOGY

5

v) CONSULTANT

- ARCHITECT

( Flexibility amp Customized )

- CampS ( Construction Method Sequence )

- MampE ( Schematic Diagram of Shop Drawing )

- QS ( No Variation Order )

vi) SYSTEM PROVIDER

- IBSMANUFACTURE

- Payment Secure

vii) CONTRACTOR

- Payment Secure

i) COUNTRY

- 40 Labour Reduce

- Currency

- Social

ii) GOVERNMENT

- Quality

- Speed

- Environment

- Green Technology

iii) PRIVATE DEVELOPER

- Quality

- Speed

- Environment

- Green Technology

iv) END-USER

- Quality

2 PROPOSE TO GOVERNMENT amp PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility (flexibility to suit all architectural

demands) to participate to built the show unit with work below and superstructure without finishing for the

Government amp Private Developer to identify the system in terms of quality speed and environment for

supply in its development ----------------------------------------------------------------------------------------------------------------------------------------------------

1 Architect

bull Appointed by the Government amp Private Developer

bull Design of single storey bungalow of 1000 ft2 (affordable home) up to superstructure without finishing

bull With MampE requirement

bull Wall finishing with plaster or skim coat only

bull Door and window frame included except door leave

bull Ground floor without tiling

2 Industrialized building system manufacturer have formed their BQ for superstructure

(in terms of wall area) and to submit work program with sequence of work for record purposes

3 Proper record by the Government amp Private representative during construction in terms of labour and

machinery involved per day up to completion (superstructure only)

4 Conquas or QLassic consultant ( 2 ) engaged by the Government amp Private Developer

5 Cost Comparison for each Industrialized Building System Manufacturer by the Government amp Private

Developer (for superstructure only) Cost will be fixed for the selected manufacturer and supply to its

development

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units

of single storey (1000 ft2) per year

CONTENTS

1 BENEFITS INDUSTRIALISED BUILDING SYSTEM ( GREEN TECHNOLOGY )

2 PROPOSE FOR THE GOVERNMENT amp PRIVATE

3 RM 9000(m2)RM 900(m3) SUPERSTRUCTURE (FRAME amp WALL)

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

5 CONSTRUCTION METHOD SEQUENCE

6 PRODUCTION amp DELIVERY SEQUENCE

7 QUALITY CONTROL amp ASSURANCE

8 COST COMPARISONFAST amp EASY (CONVENTIONAL vs HC PRECAST SYSTEM)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

11 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECTURAL DEMANDS

13 PRECAST ELEMENT

14 FACTORY CAPACITY

15 COMPLETED PROJECTS

16 PATENTED

17 INTERNATIONAL PUBLICATIONS

18 COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER

1 BENEFITS INDUSTRIAL BUILDING SYSTEM GREEN TECHNOLOGY

5

v) CONSULTANT

- ARCHITECT

( Flexibility amp Customized )

- CampS ( Construction Method Sequence )

- MampE ( Schematic Diagram of Shop Drawing )

- QS ( No Variation Order )

vi) SYSTEM PROVIDER

- IBSMANUFACTURE

- Payment Secure

vii) CONTRACTOR

- Payment Secure

i) COUNTRY

- 40 Labour Reduce

- Currency

- Social

ii) GOVERNMENT

- Quality

- Speed

- Environment

- Green Technology

iii) PRIVATE DEVELOPER

- Quality

- Speed

- Environment

- Green Technology

iv) END-USER

- Quality

2 PROPOSE TO GOVERNMENT amp PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility (flexibility to suit all architectural

demands) to participate to built the show unit with work below and superstructure without finishing for the

Government amp Private Developer to identify the system in terms of quality speed and environment for

supply in its development ----------------------------------------------------------------------------------------------------------------------------------------------------

1 Architect

bull Appointed by the Government amp Private Developer

bull Design of single storey bungalow of 1000 ft2 (affordable home) up to superstructure without finishing

bull With MampE requirement

bull Wall finishing with plaster or skim coat only

bull Door and window frame included except door leave

bull Ground floor without tiling

2 Industrialized building system manufacturer have formed their BQ for superstructure

(in terms of wall area) and to submit work program with sequence of work for record purposes

3 Proper record by the Government amp Private representative during construction in terms of labour and

machinery involved per day up to completion (superstructure only)

4 Conquas or QLassic consultant ( 2 ) engaged by the Government amp Private Developer

5 Cost Comparison for each Industrialized Building System Manufacturer by the Government amp Private

Developer (for superstructure only) Cost will be fixed for the selected manufacturer and supply to its

development

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

CONTENTS

1 BENEFITS INDUSTRIALISED BUILDING SYSTEM ( GREEN TECHNOLOGY )

2 PROPOSE FOR THE GOVERNMENT amp PRIVATE

3 RM 9000(m2)RM 900(m3) SUPERSTRUCTURE (FRAME amp WALL)

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

5 CONSTRUCTION METHOD SEQUENCE

6 PRODUCTION amp DELIVERY SEQUENCE

7 QUALITY CONTROL amp ASSURANCE

8 COST COMPARISONFAST amp EASY (CONVENTIONAL vs HC PRECAST SYSTEM)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

11 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECTURAL DEMANDS

13 PRECAST ELEMENT

14 FACTORY CAPACITY

15 COMPLETED PROJECTS

16 PATENTED

17 INTERNATIONAL PUBLICATIONS

18 COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER

1 BENEFITS INDUSTRIAL BUILDING SYSTEM GREEN TECHNOLOGY

5

v) CONSULTANT

- ARCHITECT

( Flexibility amp Customized )

- CampS ( Construction Method Sequence )

- MampE ( Schematic Diagram of Shop Drawing )

- QS ( No Variation Order )

vi) SYSTEM PROVIDER

- IBSMANUFACTURE

- Payment Secure

vii) CONTRACTOR

- Payment Secure

i) COUNTRY

- 40 Labour Reduce

- Currency

- Social

ii) GOVERNMENT

- Quality

- Speed

- Environment

- Green Technology

iii) PRIVATE DEVELOPER

- Quality

- Speed

- Environment

- Green Technology

iv) END-USER

- Quality

2 PROPOSE TO GOVERNMENT amp PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility (flexibility to suit all architectural

demands) to participate to built the show unit with work below and superstructure without finishing for the

Government amp Private Developer to identify the system in terms of quality speed and environment for

supply in its development ----------------------------------------------------------------------------------------------------------------------------------------------------

1 Architect

bull Appointed by the Government amp Private Developer

bull Design of single storey bungalow of 1000 ft2 (affordable home) up to superstructure without finishing

bull With MampE requirement

bull Wall finishing with plaster or skim coat only

bull Door and window frame included except door leave

bull Ground floor without tiling

2 Industrialized building system manufacturer have formed their BQ for superstructure

(in terms of wall area) and to submit work program with sequence of work for record purposes

3 Proper record by the Government amp Private representative during construction in terms of labour and

machinery involved per day up to completion (superstructure only)

4 Conquas or QLassic consultant ( 2 ) engaged by the Government amp Private Developer

5 Cost Comparison for each Industrialized Building System Manufacturer by the Government amp Private

Developer (for superstructure only) Cost will be fixed for the selected manufacturer and supply to its

development

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1 BENEFITS INDUSTRIAL BUILDING SYSTEM GREEN TECHNOLOGY

5

v) CONSULTANT

- ARCHITECT

( Flexibility amp Customized )

- CampS ( Construction Method Sequence )

- MampE ( Schematic Diagram of Shop Drawing )

- QS ( No Variation Order )

vi) SYSTEM PROVIDER

- IBSMANUFACTURE

- Payment Secure

vii) CONTRACTOR

- Payment Secure

i) COUNTRY

- 40 Labour Reduce

- Currency

- Social

ii) GOVERNMENT

- Quality

- Speed

- Environment

- Green Technology

iii) PRIVATE DEVELOPER

- Quality

- Speed

- Environment

- Green Technology

iv) END-USER

- Quality

2 PROPOSE TO GOVERNMENT amp PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility (flexibility to suit all architectural

demands) to participate to built the show unit with work below and superstructure without finishing for the

Government amp Private Developer to identify the system in terms of quality speed and environment for

supply in its development ----------------------------------------------------------------------------------------------------------------------------------------------------

1 Architect

bull Appointed by the Government amp Private Developer

bull Design of single storey bungalow of 1000 ft2 (affordable home) up to superstructure without finishing

bull With MampE requirement

bull Wall finishing with plaster or skim coat only

bull Door and window frame included except door leave

bull Ground floor without tiling

2 Industrialized building system manufacturer have formed their BQ for superstructure

(in terms of wall area) and to submit work program with sequence of work for record purposes

3 Proper record by the Government amp Private representative during construction in terms of labour and

machinery involved per day up to completion (superstructure only)

4 Conquas or QLassic consultant ( 2 ) engaged by the Government amp Private Developer

5 Cost Comparison for each Industrialized Building System Manufacturer by the Government amp Private

Developer (for superstructure only) Cost will be fixed for the selected manufacturer and supply to its

development

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

2 PROPOSE TO GOVERNMENT amp PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility (flexibility to suit all architectural

demands) to participate to built the show unit with work below and superstructure without finishing for the

Government amp Private Developer to identify the system in terms of quality speed and environment for

supply in its development ----------------------------------------------------------------------------------------------------------------------------------------------------

1 Architect

bull Appointed by the Government amp Private Developer

bull Design of single storey bungalow of 1000 ft2 (affordable home) up to superstructure without finishing

bull With MampE requirement

bull Wall finishing with plaster or skim coat only

bull Door and window frame included except door leave

bull Ground floor without tiling

2 Industrialized building system manufacturer have formed their BQ for superstructure

(in terms of wall area) and to submit work program with sequence of work for record purposes

3 Proper record by the Government amp Private representative during construction in terms of labour and

machinery involved per day up to completion (superstructure only)

4 Conquas or QLassic consultant ( 2 ) engaged by the Government amp Private Developer

5 Cost Comparison for each Industrialized Building System Manufacturer by the Government amp Private

Developer (for superstructure only) Cost will be fixed for the selected manufacturer and supply to its

development

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

3 RM 9000(m2)RM 90000(m3)

SUPERSTRUCTURE (FRAME amp WALLS)

1 ISO 9001 2008

2 Design Calculation

3 PE Endorsement

4 MampE Shop Drawing

5 Supply amp Lay

6 Flexibility Suit Architectural Demands

7 Customized

8 Quality Control amp Assurance

9 Speed as Required

10 No Leaking

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

31 RM 9000(m2)RM 90000(m3)

Scope of Work for Superstructure Included -

- Superstructure design calculation - Supply amp Install - Setting out (panel) - TBM for each block amp 4 + 2 Boundary point per unit (must )be provided - Mobile crane

- Shop drawing for MampE location layout related to panel wall casting (Subject to client consultant confirmation) Excluded -

- Substructure design by others - Supply amp install metal door amp window frame - Supply amp install MampE conduit - Skim coat - Storage yard at project site 50mm thick crusher-run base - Access road at project site - Temporary water amp electricity supply - Quarters for workers - Security at site for our material amp system formworks - Contractor all Risks Insurance

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4 INDUSTRIALISED BUILDING SYSTEM CONCEPT

a) CONVENTIONAL METHOD

i) ARCHITECT ( 2D layout plan amp Elevation )

ii) CampS ( 2D layout plan amp Structural detail )

iii) MampE ( 2D Superstructure drawing amp schematic diagram )

iv) QS ( Bill Of Quantity )

b) GREEN TECHNOLOGY 40 LABOUR REDUCE

- Approval By Client Confirmation amp Endorsement By Consultant

c) SYSTEM PROVIDER IBSMANUFACTURE

- Flexibility to suit Architectural CampS demands

- While taking care of water leakage

- Comply building by law

- In proper connections

- Less joint improve aesthetic appearance

i) ARCHITECT iii) MampE Schematic diagram

- 2D layout - Shop drawing

- 3D drawing

ii) CampS Superstructure - iv) QS

- Frame amp Wall ( 2D amp 3D layout detail of - No variation order (vo)

precast element amp offon site work ) - 3D Superstructure drawing

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Single Storey

- i1) ARCHITECT DRAWING Layout Plan

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Single Storey

- i2) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Single Storey

- ii1) CampS DRAWING Footing Foundation Gr Flr amp Roof Layout Plan

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Single Storey

- ii2) CampS DRAWING Gr Beam Structural detail

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Single Storey

- iii1) MampE DRAWING Layout amp Schematic Diagram

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Double storey

- i1) ARCHITECT DRAWING GrFlr Layout Plan

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Double storey

- i2) ARCHITECT DRAWING 1st Flr Layout Plan

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Double Storey

- i3) ARCHITECT DRAWING Roof Plan

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Double Storey

- i4) ARCHITECT DRAWING Elevation

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Double Storey

- i5) ARCHITECT DRAWING Section Plan

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4a CONVENTIONAL METHOD Double Storey

- i6) ARCHITECT DRAWING Section Plan

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 1 Approval by Client Confirmation amp Endorsement by Consultant

86 Precast Element at Factory

14 Wet work on site (by System Formwork)

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 2 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 3 Approval by Client Confirmation amp Endorsement by Consultant

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4b GREEN TECHNOLOGY 40 LABOUR REDUCE

- 4 Approval by Client Confirmation amp Endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- i1) ARCHITECT Layout Plan

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- i2) ARCHITECT Layout 3D Wall amp Column

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- ii1) CampS Layout Plan 3D Wall amp Column Schedule

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- ii2) CampS Gr Flr Column Roof Beam amp Patty Wall Layout Plan

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- ii3) CampS Raft Foundation Column amp Beam details

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- ii4) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- iii1) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- iii2) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- iii3) MampE Shop drawing confirmation amp endorsement by Consultant

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Single Storey

- iii4) MampE Schematic Diagram Panel List amp Layout Plan

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- i1) ARCHITECT 3D drawing

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- i2) ARCHITECT Gr Flr Layout 3D drawing Wall amp Beam

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- i3) ARCHITECT 1st Flr Layout amp 3D Slab Flr Plan

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- i4) ARCHITECT 1st Flr Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- i5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia1) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia2) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia3) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia4) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia5) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia6) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia7) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- ia8) ARCHITECT Roof Patty Wall Layout 3D Wall amp Column

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER Double Storey

- i6) CampS Panel List Structural detail amp Layout with numbering

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp System Formwork detail

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- In-situ Toilet amp Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantiliver Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp Cantilever Corridor Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Half Slab amp External Mould by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit Laying before BRC amp Casting

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- BRC Laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- 1St Floor Slab Casting amp Level Checking

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Finishing Product 1St Floor Slab

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Up Stand Beam by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing Ducting

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Plumbing installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Toilet in-situ by System Formwork

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Temporary plumbing ducting laying

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Conduit laying before casting

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

Manufacturer and system

supplier of the element is

the BEST and MOST

EXPERIENCED installer

of the provided building

precast element

The same concept applies

when we buy computer

and hardware

Eliminate improper

handling installation by

3rd party contractors

4c SYSTEM PROVIDER IBSMANUFACTURER

- Recommended Installation

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- No Variation Order (VO) 3D Superstructure drawing

Absolutely no Variation Order (VO) due to -

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building

precast elements (wall beam staircase amp partition )

compared to bricks reinforcement work and

concreting at site

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 1

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

4c SYSTEM PROVIDER IBSMANUFACTURER

- Cork Joint for Split Level amp Specification 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

5 CONSTRUCTION METHOD SEQUENCE

- i) Construction Method

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

5 CONSTRUCTION METHOD SEQUENCE

- ii) Setting Out

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

5 CONSTRUCTION METHOD SEQUENCE

- iii) Leveling Check list

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

5 CONSTRUCTION METHOD SEQUENCE

- iv) Expanding Cement Motar

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

5 CONSTRUCTION METHOD SEQUENCE

- v) In-Situ Column with Precast Beam Installation

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

6 PRODUCTION amp DELIVERY SEQUENCE

61 -Logistic Option Before Production

62 -Panel Casting

63 -Panel Lifting

64 -Bay Yard Storage

65 -Panel Storage Yard

66 -External Transport

67 -Project Site Storage Yard

68 -Project Site Internal Transport

69 -Project Site Block Storage

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

61 LOGISTIC OPTION (BEFORE PRODUCTION)

i) Option 1 -

- Bay yard (factory) to block yard (project site)

ii) Option 2 -

- Bay yard (factory) to site yard (project site)

iii) Option 3 -

- Storage yard (factory) to block yard (project site)

iv) Option 4 -

- Storage yard (factory) to site yard (project site)

Notes

a) ClientConsultantMain Contractor need to choose which

option to be used before production

b) Rate for RM 900m3 includes for option 1 amp 3

c) An additional of RM 30m3 to be charged for option 2 amp 4

d) Crusher run base to be provided at site yard for option 1- 4

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

61 OPTION 1

- BAY YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

61 OPTION 2

- BAY YARD (FACTORY) TO SITE YARD (PROJECT SITE)

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

61 OPTION 3

- STORAGE YARD (FACTORY) TO BLOCK YARD (PROJECT SITE)

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

61 OPTION 4

- STORAGE YARD (FACTORY) TO SITE YARD (PROJECT SITE)

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

62 PANEL CASTING

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

63 PANEL LIFITING

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

64 BAY YARD STORAGE

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

65 PANEL STORAGE YARD

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

66 EXTERNAL TRANSPORT

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

67 PROJECT SITE STORAGE YARD

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

68 PROJECT INTERNAL TRANSPORT

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

Rebound Hammer test carried out

daily amp on selected Panel

7 QUALITY CONTROL amp ASSURANCE

Ready Mixed Concrete Concrete Grade to comply Engineerrsquos requirements

- Slump Test carried out on every delivery

- Cube Test taken for every 20m3

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

71 QUALITY CONTROL amp ASSURANCE

- Lifting Of Panel only after minimum 18 hours or as specified by Engineer

- Panel stored at stock yard for 7 days or as specified by Engineer curing before delivery to site

- Panel stack individually as apposed to one on top another to prevent cracks

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

8 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

81 COST COMPARISONFAST amp EASY

- CONVENTIONAL vs HC PRECAST SYSTEM

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

82 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

83 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

84 COST COMPARISONFAST amp EASY

- CONVENTIONAL Vs HC PRECAST SYSTEM

Semi-D House Single Storey (SuperstructureFrame amp Wall)

Conventional Original Design HC Precast System

(Current Rate ndash July 2014) (Current Rate ndash July 2014)

RM 12743m2 Vs RM 9000m2

RATE CAN BE CHECKED amp CHANGE BY YOU

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

85 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

86 COST COMPARISONFAST amp EASY

- COMPARE OUR SYSTEM PRICE Superstructure (frame amp wall)

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

9 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

91 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

92 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

93 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

94 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

95 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

96 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

97 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

98 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

99 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

910 DESIGNED BY YOU PRODUCED BY HC PRECAST SYSTEM

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 1

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

10 SYSTEMATIC PRODUCTION DELIVERY amp WORK PROGRAM

300 UNITS SINGLE STOREY SEMI-D

PRODUCTION DELIVERY WORK PROGRAM

amp

INSTALLATION SCHEDULE

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

11 PERCENTAGE ON SITE amp OFF SITE WORK

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

111 PERCENTAGE ON SITE amp OFF SITE WORK

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

112 PERCENTAGE ON SITE amp OFF SITE WORK

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

113 PERCENTAGE ON SITE amp OFF SITE WORK

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

114 PERCENTAGE ON SITE amp OFF SITE WORK

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

12 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

121 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

122 FLEXIBILITY SUIT ARCHITECT DEMANDS

- MODULAR MOULD amp SHEAR KEYS

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

13 PRECAST ELEMENT

131 WALL PANEL CUSTO MIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMNPRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 PRECAST STAIRCASE 1

135a PRECAST STAIRCASE 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

131 WALL PANEL CUSTOMIZED

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

132 COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

132a COLUMN WET JOINT WITH SHEAR KEYS

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

132a COLUMN WET JOINT WITH SHEAR KEYS

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

132b PRECAST PANEL WITH SHEAR KEYS

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

133 IN-SITU COLUMN PRECAST BEAM WITH SHEAR KEYS

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

134 HALF SLAB

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

134a HALF SLAB CASTING

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

135 STAIRCASE 1

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

135a STAIRCASE 2 ( in-situ landing slab support )

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

136 BAY WINDOW

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

136a PRECAST PANEL WITH GROVE LINE

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

137 ARCH 1

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

137a ARCH 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

137b ARCH 3

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

14 FACTORY CAPACITY 21 ACRES

Existing production 8 acres 1800 to 2500 units

of single storey (1000 ft2) per year

Future development 13 acres 2500 to 3500 units of

single storey (1000 ft2) per year

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

15 COMPLETED PROJECTS

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154 - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

1510 - 118 units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey at Rasa Factory

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

151 - 42 units 3amp5 Storey Shop Office at Andalas Klang

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

152 - 156 units Single Storey Terrace House at Kota Puteri

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

153 - 7 units Single Storey Shop Lots at Kota Puteri

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

154a - 10 units Exco Bungalows Selangor at Shah Alam

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

154b - 10 units Exco Bungalows Selangor at Shah Alam

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

154c - 10 units Exco Bungalows Selangor at Shah Alam

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

154d - 10 units Exco Bungalows Selangor at Shah Alam

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

155 - 112 units Single Storey Terrace at Kota Puteri

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

155a - 112 units Single Storey Terrace at Kota Puteri

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

156 - 119 units Double Storey Terrace House at Shah Alam

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

157 - 88 units Semi Detached Low at Bukit Botak

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

157a - 88 units Semi Detached Low at Bukit Botak

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

157b - 88 units Semi Detached Low at Bukit Botak

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

158 - 119 units Single Storey Terrace at Bernam Jaya

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

159 - 34 units Semi Detached House at Shah Alam

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

159a - 34 units Semi Detached House at Shah Alam

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

159b - 34 units Semi Detached House at Shah Alam

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1510 - 118 Units Double Storey Terrace House at Kota Puteri

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1510a - 118 Units Double Storey Terrace House at Kota Puteri

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1510b - 118 Units Double Storey Terrace House at Kota Puteri

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1511 - Show Unit Single Storey House at Rasa Factory

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1511a - Show Unit Single Storey House at Rasa Factory

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1511b - Show Unit Single Storey House at Rasa Factory

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1511c - Show Unit Single Storey House at Rasa Factory

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

1512 - Training Unit Double Storey House at Rasa Factory

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

16 PATENTED UNITED STATE US 6819870B2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

161 PATENTED MALAYSIA MY - 124213-A IN 2006

MY - 139712-A IN 2009

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

17 INTERNATIONAL PUBLICATIONS

171 USA -

- Jerome P Lynch 2013

172 PORTUGAL -

- 15th World Conference 2012

173 GERMANY -

- CPI 2011

174 MALAYSIA -

- EARTHQUAKE

RESISTANCE TEST UTM 2011

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

ldquo Earthquakes and Structures ldquo

(Impact Factor 2012 = 1381

One of the highest among other

structural earthquake engineering journals

indexed by Journal Citations Reportsreg ISI Thomson Reuters)

171 USA Jerome PLynch - 2013

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

172 PORTUGAL 15TH WORLD CONFERENCE - 2012

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

172a PORTUGAL 15TH WORLD CONFERENCE - 2012

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

173 GERMANY CPI - 2011

Malaysia IBS Company Article Appear In CPI Worldwide Journal

In 8 Different Languages (Based In GERMANY)

1 US

2 UK

3 Germany

4 French

5 Italian

6 Spanish

7 Portuguese

8 Indian

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

173a GERMANY CPI - 2011

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

EARTHQUAKE RESISTANCE

TEST OF SCALED DOWN

DOUBLE STOREY BUILDING BY

HC PRECAST SYSTEM IN

COLLABORATION WITH UTM

JOHOR BASED ON 8 MAJOR

EARTHQUAKES IN THE WORLD

174 BUILDING amp INVESTMENT - 2011

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

174a BUILDING amp INVESTMENT - 2011

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

18 COLLABORATION WITH AGENCY

181 - UTM

181a - UTM CERTIFICATE

182 - UITM

183 - CREAMCIDB

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

181 COLLABORATION WITH AGENCY

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

181a COLLABORATION WITH AGENCY

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

182 COLLABORATION WITH AGENCY

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

183 COLLABORATION WITH AGENCY

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

183a COLLABORATION WITH AGENCY

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

184b COLLABORATION WITH AGENCY

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

19 INDEPENDENT CHECKER ndash 1

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

191 INDEPENDENT CHECKER ndash 2amp3

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

192 INDEPENDENT CHECKER ndash 4amp5

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2

DESIGNED BY YOU

PRODUCED BY

HC PRECAST SYSTEM

THANK YOU

PART 2