____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
Presupuesto VIVIENDA FAMILIAR
Lugar CUSCO - CUSCO - SAN SEBASTIAN
Item Descripción Und. Metrado Precio S/.
01.00.00 OBRAS PROVISIONALES
01.01.00 CONSTRUCCIONES PROVISIONALES
01.01.02 ALMACEN DE OBRA m2 36.00 35.30
01.01.03 CASETA PARA GUARDIANIA m2 4.00 100.36
01.01.07 CERCO ml 9.00 14.77
01.02.00 INSTALACIONES PROVISIONALES
01.02.01 AGUA PARA LA CONSTRUCCION GLB 1.00 263.72
01.02.02 DESAGUE PARA CONSTRUCCION GLB 1.00 842.39
01.02.03 ENERGIA ELECTRICA PROV. GLB 1.00 258.10
02.00.00 TRABAJOS PRELIMINARES
02.01.00 LIMPIEZA DE TERRENO
02.01.01 ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS m3 20.16 16.32
02.04.00 DEMOLICIONES m2 87.36 16.62
02.05.00 APUNTALAMIENTO DE CONSTRUCCIONES EXISTENTES GLB 1.00 810.00
02.06.00 TRAZO DE NIVELES Y REPLANTEO
02.06.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 100.80 5.59
02.06.02 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 604.80 3.20
03.00.00 MOVIMIENTO DE TIERRAS
03.02.00 EXCAVACIONES
03.02.02 EXCAVACION DE ZANJAS m3 78.19 21.75
03.04.00 RELLENOS
03.04.01 RELLENO CON MATERIAL PROPIO m3 43.57 8.16
03.05.00 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 45.00 16.32
03.06.00 NIVELACION INTERIOR APISONADO m2 70.14 2.48
04.00.00 OBRAS DE CONCRETO SIMPLE
04.01.00 CIMIENTOS CORRIDOS m3 7.64 163.04
04.03.00 SOLADO PARA ZAPATA m2 46.79 16.48
04.07.00 SOBRECIMIENTOS
04.07.01 CONCRETO 1:8 + 25% P.M. PARA SOBRECIMIENTO m3 11.84 222.27
04.07.02 ENCOFRADO Y DESENCOFRADO (SOBRECIM) m2 93.30 20.63
05.00.00 OBRAS DE CONCRETO ARMADO
05.02.00 ZAPATAS
05.02.01 CONCRETO FC=210KG/CM2 m3 18.72 316.81
05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 37.12 28.34
05.02.03 ACERO FY= 4200KG/CM2 GRADO 60 kg 820.73 5.87
05.03.00 VIGAS DE CIMENTACION
05.03.01 CONCRETO FC=210KG/CM2 m3 12.16 316.81
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 64.74 28.34
05.03.03 ACERO FY= 4200KG/CM2 GRADO 60 kg 1,916.99 5.87
05.06.00 MUROS REFORZADOS
05.06.02 MUROS, TABIQUES Y PLACAS
05.06.02.01 CONCRETO F'C=210 KG/CM2 m3 31.89 350.94
05.06.02.02 ENCOFRADO Y DESENCOFRADO m2 339.81 26.37
05.06.02.03 ACERO FY= 4200KG/CM2 GRADO 60 (P) kg 1,898.95 5.67
05.07.00 COLUMNAS
05.07.01 CONCRETO F'C=210 KG/CM2 m3 19.24 350.94
05.07.02 ENCOFRADO Y DESENCOFRADO m2 254.14 26.37
05.07.03 ACERO FY= 4200KG/CM2 GRADO 60 (P) kg 3,492.91 5.67
05.08.00 VIGAS
05.08.01 CONCRETO F'C=210 KG/CM2 (V) m3 37.28 342.82
05.08.02 ENCOFRADO Y DESENCOFRADO (V) m2 415.22 27.87
05.08.03 ACERO FY= 4200KG/CM2 GRADO 60 (V) kg 7,417.39 5.56
05.09.00 LOSAS
05.09.02 LOSAS ALIGERADAS
05.09.02.01 CONCRETO F'C=210 KG/CM2 (L) m3 31.01 351.53
05.09.02.02 ENCOFRADO Y DESENCOFRADO (L) m2 337.12 21.59
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
Presupuesto VIVIENDA FAMILIAR
Lugar CUSCO - CUSCO - SAN SEBASTIAN
Item Descripción Und. Metrado Precio S/.
05.09.02.03 ACERO FY= 4200KG/CM2 GRADO 60 (L) kg 2,248.71 5.51
05.09.02.04 BLOQUE HUECO DE CONCRETO 30X30X15 CM UND 2,696.96 1.71
05.10.00 ESCALERAS
05.10.01 CONCRETO F'C=210 KG/CM2 (E) m3 7.88 346.29
05.10.02 ENCOFRADO Y DESENCOFRADO (E) m2 64.17 32.74
05.10.03 ACERO FY= 4200KG/CM2 GRADO 60 (E) kg 935.16 5.59
08.00.00 ESTRUCTURAS DE MADERA Y COBERTURAS
08.04.00 CORREAS pza 45.00 21.21
08.05.00 COBERTURAS
08.05.05 CON TEJAS m2 67.43 39.21
09.00.00 MUROS Y TABIQUES DE ALBAÑILERIA
09.01.00 MUROS DE LADRILLO KING KONG DE ARCILLA
09.01.02 MUROS DE SOGA m2 593.19 47.90
10.00.00 REVOQUES ENLUCIDOS Y MOLDURAS
10.01.00 TARRAJEO PRIMARIO O RAYADO m2 212.47 13.03
10.02.00 TARRAJEO EN INTERIORES m2 717.07 14.84
10.03.00 TARRAJEO EN EXTERIORES m2 164.38 18.95
10.05.00 TARRAJEO EN COLUMNAS
10.05.01 TARRAJEO DE SUPERFICIE (C) m2 135.92 21.82
10.05.02 VESTIDURA DE ARISTAS ml 341.92 9.40
10.06.00 TARRAJEO EN VIGAS
10.06.01 TARRAJEO EN SUPERFICIE (V) m2 147.87 33.05
10.06.02 VESTIDURA DE ARISTAS ml 409.12 9.40
10.07.00 TARRAJEO DE MUROS DE CONCRETO m2 77.31 19.83
10.11.00 VESTIDURA DE DERRAMES ml 482.27 14.86
11.00.00 CIELORASOS
11.03.00 CIELORASO CON MEZCLA m2 337.12 18.84
12.00.00 PISOS Y PAVIMENTOS
12.01.00 CONTRAPISOS
12.01.01 DE E=40 mm. m2 313.97 16.19
12.02.00 LOSETA
12.02.02 DE LOSETA VENECIANA
12.02.02.03 DE COLOR CLARO 30 x 30 CM. m2 58.30 53.40
12.05.00 MAYOLICA
12.05.01 DE 15 x 15 cm BLANCA 1ERA m2 23.58 52.87
12.10.00 CONCRETO
12.10.02 COLOREADO
12.10.02.03 ACABADO BRUÑADO m2 58.98 71.83
12.12.00 PISO DE PARKET
12.12.02 HUAYACAN m2 232.09 45.15
13.00.00 CONTRAZOCALOS
13.07.00 DE MADERA
13.07.01 DE CEDRO 3/4" RODON 3/4" ml 270.97 10.43
14.00.00 ZOCALOS
14.01.00 DE MAYOLICA
14.01.01 DE 15 x 15 cm BLANCA 1ERA m2 212.47 52.87
18.00.00 CARPINTERIA DE MADERA
18.01.00 PUERTAS
18.01.04 TABLERO REBAJADO m2 81.43 167.56
18.12.00 VESTIDURA INTERIOR DE CLOSETS pza 9.00 533.00
19.00.00 CARPINTERIA METALICA
19.04.00 VENTANAS DE ALUMINIO
19.04.01 PERSIANAS TIPO VITROVENT m2 109.65 82.13
19.14.00 BARANDAS METALICAS
19.14.02 DE TUBO GALVANIZADO ml 24.50 514.95
20.00.00 CERRAJERIA
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
Presupuesto VIVIENDA FAMILIAR
Lugar CUSCO - CUSCO - SAN SEBASTIAN
Item Descripción Und. Metrado Precio S/.
20.01.00 BISAGRAS
20.01.02 DE BRONCE pza 138.00 8.56
20.02.00 CERRADURAS
20.02.01 PARA PUERTA PRINCIPAL DE SOBREPONER 2 GOLPES LLAVE EXTERIOR pza 4.00 57.61
20.02.03 pza 31.00 21.55
20.02.04 PARA BAÑO C/SEGURO INTERIOR DE PERILLA O MANIJA pza 10.00 22.76
20.02.05 PARA CLOSETS, PICO DE LORO pza 9.00 16.25
21.00.00 VIDRIOS, CRISTALES Y SIMILARES
21.01.00 VIDRIOS Y CRISTALES
21.01.03 DOBLES p2 1,180.24 4.95
22.00.00 PINTURA
22.01.00 PINTURA DE CIELORASOS Y MUROS
22.01.01 CIELOSRASOS AL TEMPLE m2 337.12 10.67
22.01.05 MUROS INTERIORES AL TEMPLE m2 794.38 9.86
22.01.09 MUROS EXTERIORES AL TEMPLE m2 164.38 11.08
22.01.13 CONTRAZOCALO CON BARNIZ ml 294.30 2.54
22.01.20 PUERTAS, MAMPARAS, VENTANAS Y OTROS DE MADERA AL BARNIZ m2 81.43 8.82
22.02.00 DE REJAS, BARANDAS Y CERCOS
22.02.03 AL ESMALTE ml 24.50 6.01
23.00.00 VARIOS, LIMPIEZA Y JARDINERIA
23.01.00 LIMPIEZA PERMANENTE EN OBRA GLB 1.00 138.36
23.02.00 LIMPIEZA FINAL DE OBRA GLB 1.00 660.45
23.03.00 LIMPIEZA DE VIDRIOS m2 109.65 4.52
23.05.00 ENCERADO DE PISOS m2 232.09 3.54
24.00.00 APARATOS Y ACCESORIOS SANITARIOS
24.01.00 INODOROS
24.01.01 TANQUE BAJO pza 10.00 150.53
24.02.00 LAVATORIOS
24.02.01 DE PARED pza 10.00 65.11
24.06.00 LAVADEROS DE COCINA
24.06.01 DE ACERO INOXIDABLE pza 5.00 97.20
24.07.00 LAVADEROS DE ROPA
24.07.01 DE GRANITO pza 5.00 64.80
24.09.00 DUCHAS pza 5.00 48.60
24.11.00 JABONERAS pza 10.00 12.15
24.12.00 TOALLERAS pza 5.00 5.67
24.13.00 PAPELERAS pza 10.00 16.20
24.14.00 GANCHOS pza 10.00 5.67
24.17.00 ESPEJOS pza 10.00 20.25
24.20.00 COLOCACION DE APARATOS SANITARIOS pza 30.00 38.20
24.21.00 COLOCACION DE ACCESORIOS pza 50.00 29.98
25.00.00 INSTALACIONES SANITARIAS
25.01.00 DESAGUE Y VENTILACION
25.01.01 SALIDAS DE DESAGUE pto 30.00 15.29
25.01.02 SALIDA DE VENTILACION pto 2.00 17.69
25.03.00 REDES DE DISTRIBUCION
25.03.02 TUBERIA PVC (D) ml 41.00 6.76
25.04.00 REDES COLECTORAS
25.04.01 EXCAVACION DE ZANJAS m3 3.36 21.75
25.04.02 RELLENO DE ZANJAS m3 3.36 8.16
25.04.08 TUBERIA DE PVC (RC) ml 14.00 11.43
25.05.00 ACCESORIOS DE REDES
25.05.01 UNIONES (D) pza 4.00 27.64
25.05.02 CODO (D) pza 32.00 8.20
25.05.03 TEES (D) pza 5.00 13.95
25.05.04 YEES (D) pza 28.00 16.50
PARA PUERTAS INTERIORES DE PESTILLO, MANIJA, LLAVE EXTERIOR, SEGURO INTERIOR
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
Presupuesto VIVIENDA FAMILIAR
Lugar CUSCO - CUSCO - SAN SEBASTIAN
Item Descripción Und. Metrado Precio S/.
25.06.00 ADITAMENTOS VARIOS
25.06.01 SUMIDERO und 24.00 23.75
25.06.02 REGISTRO pza 2.00 24.80
25.06.03 SOMBRERO DE VENTILACION pza 2.00 10.39
25.07.00 CAMARAS DE INSPECCION
25.07.01 CAJA DE REGISTRO pza 2.00 73.92
26.00.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
26.01.00 SALIDA DE AGUA FRIA pto 35.00 40.15
26.02.00 REDES DE DISTRIBUCION
26.02.02 TUBERIA DE PVC (AF) ml 35.50 12.77
26.03.00 REDES DE ALIMENTACION
26.03.01 EXCAVACION DE ZANJAS m3 4.69 21.75
26.03.02 RELLENO DE ZANJAS m3 4.69 8.16
26.03.03 TUBERIA DE PVC ml 65.00 11.49
26.04.00 ACCESORIOS DE REDES
26.04.01 UNIONES (AF) pza 4.00 27.64
26.04.02 CODO (AF) pza 90.00 4.73
26.04.03 TEES (AF) pza 27.00 7.81
26.05.00 LLAVES Y VALVULAS
26.05.02 VALVULA DE CHECK pza 12.00 66.65
28.00.00 SISTEMA DE AGUA DE LLUVIA
28.01.00 CANALETAS
28.01.01 METALICAS ml 11.50 9.58
28.02.00 TUBERIA DE BAJADA Y DISTRIBUCION
28.02.02 DE PVC (D) ml 37.00 9.95
28.03.00 ACCESORIOS DE TUBERIAS
28.03.01 UNIONES pza 12.00 18.73
28.03.02 CODOS pza 7.00 13.28
28.04.00 ADITAMENTOS VARIOS
28.04.01 SOPORTE DE CANALETAS pza 10.00 13.01
28.04.02 SOPORTE DE TUBERIAS pza 10.00 11.70
28.04.03 CAJA DE INSPECCION pza 1.00 73.92
28.04.04 SUMIDEROS und 2.00 12.88
29.00.00 INSTALACIONES ELECTRICAS
29.01.00 SALIDA PARA ELECTRICIDAD Y FUERZA
29.01.01 SALIDA PARA TECHOS (CENTROS) pto 62.00 21.22
29.01.02 SALIDAS DE PARED (BRAQUETES) pto 1.00 34.19
29.01.06 SALIDA PARA TOMACORRIENTES
29.01.06.01 BIPOLAR SIMPLE pto 5.00 23.37
29.01.06.02 BIPOLAR DOBLE pto 78.00 31.27
29.01.09 SALIDA DE FUERZA
29.01.09.01 PARA COCINA pto 5.00 94.88
30.00.00 SALIDA PARA COMUNICACION Y SEÑALES
30.01.00 SALIDA PARA TELEFONOS
30.01.01 DIRECTOR (DE SERVICIO PUBLICO) pto 15.00 32.15
30.03.00 SALIDA PARA TIMBRES
30.03.02 MUSICAL pto 5.00 80.55
31.00.00 CANALIZACIONES Y/O TUBERIAS
TUBERIA EMPOTRADA ml 585.20 4.68
32.00.00 CONDUCTORES Y/O CABLES
32.01.00 CONDUCTORES EN TUBERIAS ml 585.20 2.78
33.00.00 TABLEROS Y CUCHILLAS
33.01.00 TABLERO PRINCIPAL pza 1.00 763.44
33.02.00 TABLERO DE DISTRIBUCION pza 5.00 175.78
33.03.00 LLAVES DE INTERRUPCION
33.03.02 TRIFASICAS pza 1.00 79.49
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
Presupuesto VIVIENDA FAMILIAR
Lugar CUSCO - CUSCO - SAN SEBASTIAN
Item Descripción Und. Metrado Precio S/.
34.00.00 CONEXION A LA RED EXTERNA Y MEDIDORES GLB 1.00 1,620.00
Costo Directo
Gastos Generales 11.02%
Utilidad 8.00%
SUB TOTAL
IGV (19%)
TOTAL PRESUPUESTO
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
RENDIMIENTOPERSONAL
DIAS REQUERIDOS DIAS PROGRAMADOSParcial S/. OPERARIO OFICIAL PEON
1,270.80 20.00 2.00 0.00 1.00 1.80 1.00
401.44 6.00 0.00 1.00 1.00 0.67 1.00
132.93 200.00 0.00 0.00 3.00 0.05 1.00
0.00
263.72 1.00 1.00 0.00 1.00 1.00 1.00
842.39 1.00 0.00 1.00 3.00 1.00 1.00
258.10 1.00 1.00 1.00 0.00 1.00 1.00
0.00
0.00
329.01 4.00 0.00 0.00 1.00 5.04 3.00
1,451.92 10.00 0.00 0.50 2.00 8.74 5.00
810.00
0.00
563.47 100.00 1.00 1.00 2.00 1.01 1.00
1,935.36 100.00 1.00 1.00 2.00 6.05 4.00
0.00
0.00
1,700.63 3.00 0.00 0.00 1.00 26.06 20.00
0.00
355.53 8.00 0.00 0.00 1.00 5.45 4.00
734.40 4.00 0.00 0.00 1.00 11.25 10.00
173.95 120.00 1.00 1.00 2.00 0.58 1.00
0.00
1,245.63 30.00 1.00 1.00 8.00 0.25 1.00
771.10 200.00 3.00 1.00 6.00 0.23 1.00
0.00
2,631.68 12.00 2.00 2.00 8.00 0.99 1.00
1,924.78 16.00 1.00 1.00 0.00 5.83 3.00
0.00
0.00
5,930.68 15.00 3.00 2.00 8.00 1.25 1.00
1,051.98 8.00 1.00 1.00 0.00 4.64 2.00
4,817.69 200.00 1.00 1.00 0.00 4.10 2.00
0.00
3,852.41 15.00 3.00 2.00 8.00 0.81 1.00
1,834.73 8.00 1.00 1.00 0.00 8.09 6.00
11,252.73 200.00 1.00 1.00 0.00 9.58 7.00
0.00
0.00
11,191.48 12.00 3.00 2.00 8.00 2.66 2.00
8,960.79 12.00 1.00 1.00 0.00 28.32 25.00
10,767.05 270.00 1.00 1.00 0.00 7.03 5.00
0.00
6,752.09 12.00 3.00 2.00 8.00 1.60 1.00
6,701.67 12.00 1.00 1.00 0.00 21.18 18.00
19,804.80 270.00 1.00 1.00 0.00 12.94 10.00
0.00
12,780.33 15.00 3.00 2.00 10.00 2.49 2.00
11,572.18 16.00 1.00 1.00 0.00 25.95 20.00
41,240.69 320.00 1.00 1.00 0.00 23.18 20.00
0.00
0.00
10,900.95
7,278.42 16.00 1.00 1.00 0.00 21.07 18.00
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
RENDIMIENTOPERSONAL
DIAS REQUERIDOS DIAS PROGRAMADOSParcial S/. OPERARIO OFICIAL PEON
12,390.39 350.00 1.00 1.00 0.00 6.42 4.00
4,611.80 1200.00 0.00 0.00 8.00 2.25 1.00
0.00
2,728.77 15.00 2.00 2.00 12.00 0.53 1.00
2,100.93 8.00 1.00 1.00 0.00 8.02 6.00
5,227.54 300.00 1.00 1.00 0.00 3.12 2.00
0.00
954.45 60.00 2.00 1.00 1.00 0.75 1.00
0.00
2,643.93 12.00 1.00 1.00 2.00 5.62 4.00
0.00
0.00
28,413.80 6.00 1.00 0.00 0.50 98.87 80.00
0.00
2,768.48 12.00 1.00 0.00 0.50 17.71 14.00
10,641.32 14.00 1.00 0.00 1.00 51.22 48.00
3,115.00 10.00 1.00 0.00 1.00 16.44 13.00
0.00
2,965.77 7.00 1.00 0.00 0.50 19.42 16.00
3,214.05 16.00 1.00 0.00 0.50 21.37 18.00
0.00
4,887.10 6.50 1.00 0.00 1.00 22.75 18.00
3,845.73 16.00 1.00 0.00 0.50 25.57 20.00
1,533.06 8.00 1.00 0.00 0.50 9.66 4.00
7,166.53 12.00 1.00 0.00 1.00 40.19 45.00
0.00
6,351.34 10.00 1.00 0.00 0.50 33.71 28.00
0.00
0.00
5,083.17 100.00 3.00 0.00 6.00 3.14 2.00
0.00
0.00
3,113.22 15.00 1.00 0.00 1.00 3.89 2.00
0.00
1,246.67 15.00 1.00 0.00 1.00 1.57 1.00
0.00
0.00
4,236.53 15.00 2.00 1.00 4.00 3.93 2.00
0.00
10,478.86 8.00 1.00 0.00 0.50 29.01 25.00
0.00
0.00
2,826.22 30.00 1.00 0.00 0.50 9.03 6.00
0.00
0.00
11,233.29 15.00 1.00 0.00 1.00 14.16 10.00
0.00
0.00
13,644.41 3.50 2.00 1.00 0.00 23.27 19.00
4,797.00 2.00 1.00 2.00 0.00 4.50 3.00
0.00
0.00
9,005.55 6.00 1.00 1.00 0.00 18.28 15.00
0.00
12,616.28 3.50 1.00 1.00 0.00 7.00 5.00
0.00
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
RENDIMIENTOPERSONAL
DIAS REQUERIDOS DIAS PROGRAMADOSParcial S/. OPERARIO OFICIAL PEON
0.00
1,181.28 12.00 1.00 0.00 0.00 11.50 9.00
0.00
230.44 6.00 1.00 0.00 0.00 0.67 1.00
668.05 8.00 1.00 0.00 0.00 3.88 2.00
227.60 8.00 1.00 0.00 0.00 1.25 1.00
146.25 12.00 1.00 0.00 0.00 0.75 1.00
0.00
0.00
5,842.19 80.00 1.00 1.00 0.00 14.75 12.00
0.00
0.00
3,597.07 25.00 1.00 0.00 0.00 13.48 11.00
7,832.59 25.00 1.00 0.00 0.00 31.78 27.00
1,821.33 25.00 1.00 0.00 0.00 6.58 4.00
747.52 60.00 1.00 0.00 1.00 4.91 3.00
718.21 20.00 1.00 0.00 1.00 4.07 3.00
0.00
147.25 20.00 1.00 0.00 0.50 1.23 1.00
0.00
138.36 1.00 0.10 0.00 2.00 1.00 1.00
660.45 1.00 0.10 0.00 10.00 1.00 1.00
495.62 45.00 0.10 0.00 3.00 2.44 2.00
821.60 60.00 0.10 0.00 3.00 3.87 2.00
0.00
0.00
1,505.30
0.00
651.10
0.00
486.00
0.00
324.00
243.00
121.50
28.35
162.00
56.70
202.50
1,146.00 4.00 1.00 1.00 0.00 7.50 6.00
1,499.00 5.00 1.00 1.00 0.00 10.00 7.00
0.00
0.00
458.70 12.00 1.00 0.00 1.00 2.50 2.00
35.38 10.00 1.00 0.00 1.00 0.20 1.00
0.00
277.16 50.00 1.00 0.00 2.00 0.82 1.00
0.00
73.08 3.00 0.00 0.00 1.00 1.12 1.00
27.42 8.00 0.00 0.00 1.00 0.42 1.00
160.02 45.00 1.00 0.00 2.00 0.31 1.00
0.00
110.56 6.00 1.00 0.00 0.00 0.67 1.00
262.40 12.00 1.00 0.00 0.00 2.67 2.00
69.75 8.00 1.00 0.00 0.00 0.63 1.00
462.00 8.00 1.00 0.00 0.00 3.50 3.00
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
RENDIMIENTOPERSONAL
DIAS REQUERIDOS DIAS PROGRAMADOSParcial S/. OPERARIO OFICIAL PEON
0.00
570.00 6.00 1.00 0.00 0.00 4.00 3.00
49.60 6.00 1.00 0.00 0.50 0.33 1.00
20.78 25.00 1.00 1.00 0.00 0.08 1.00
0.00
147.84 4.00 1.00 1.00 0.00 0.50 1.00
0.00
1,405.25 3.00 1.00 0.00 0.00 11.67 9.00
0.00
453.34 20.00 1.00 0.00 1.00 1.78 1.00
0.00
102.01 3.00 0.00 0.00 1.00 1.56 1.00
38.27 8.00 0.00 0.00 1.00 0.59 1.00
746.85 20.00 1.00 0.00 1.00 3.25 2.00
0.00
110.56 6.00 1.00 0.00 0.00 0.67 1.00
425.70 20.00 1.00 0.00 0.00 4.50 3.00
210.87 12.00 1.00 0.00 0.00 2.25 2.00
0.00
799.80 6.00 1.00 0.00 0.00 2.00 1.00
0.00
0.00
110.17 20.00 1.00 1.00 0.00 0.58 1.00
0.00
368.15 25.00 1.00 0.00 1.00 1.48 1.00
0.00
224.76 6.00 1.00 0.00 0.00 2.00 1.00
92.96 8.00 1.00 0.00 0.00 0.88 1.00
0.00
130.10 12.00 1.00 0.00 0.00 0.83 1.00
117.00 15.00 1.00 0.00 0.00 0.67 1.00
73.92 4.00 1.00 1.00 0.00 0.25 1.00
25.76 12.00 1.00 0.00 0.00 0.17 1.00
0.00
0.00
1,315.64 8.00 1.00 0.00 0.00 7.75 6.00
34.19 6.00 1.00 0.00 0.00 0.17 1.00
0.00
116.85 10.00 1.00 0.00 0.00 0.50 1.00
2,439.06 5.00 1.00 0.00 0.00 15.60 13.00
0.00
474.40 6.00 1.00 0.00 0.00 0.83 1.00
0.00
0.00
482.25 6.00 1.00 1.00 0.00 2.50 2.00
0.00
402.75 4.00 1.00 1.00 0.00 1.25 1.00
0.00
2,738.74 50.00 1.00 1.00 11.70 9.00
0.00
1,626.86 80.00 1.00 1.00 0.00 7.32 6.00
0.00
763.44 2.00 1.00 1.00 0.00 0.50 1.00
878.90 5.00 1.00 1.00 0.00 1.00 1.00
0.00
79.49 8.00 1.00 1.00 0.00 0.13 1.00
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
PRESUPUESTO DE OBRA
RENDIMIENTOPERSONAL
DIAS REQUERIDOS DIAS PROGRAMADOSParcial S/. OPERARIO OFICIAL PEON
1,620.00
431,162.69
47,528.81
34,493.02
513,184.53
97,505.06
610,689.58
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
NUEVO PERSONAL
OPERARIO OFICIAL PEON
1.80 3.60 0.00 1.80
0.67 0.00 0.67 0.67
0.05 0.00 0.00 0.14
1.00 1.00 0.00 1.00
1.00 0.00 1.00 3.00
1.00 1.00 1.00 0.00
1.68 0.00 0.00 1.68
1.75 0.00 0.87 3.49
1.01 1.01 1.01 2.02
1.51 1.51 1.51 3.02
1.30 0.00 0.00 1.30
1.36 0.00 0.00 1.36
1.13 0.00 0.00 1.13
0.58 0.58 0.58 1.17
0.25 0.25 0.25 2.04
0.23 0.70 0.23 1.40
0.99 1.97 1.97 7.89
1.94 1.94 1.94 0.00
1.25 3.74 2.50 9.98
2.32 2.32 2.32 0.00
2.05 2.05 2.05 0.00
0.81 2.43 1.62 6.49
1.35 1.35 1.35 0.00
1.37 1.37 1.37 0.00
1.33 3.99 2.66 10.63
1.13 1.13 1.13 0.00
1.41 1.41 1.41 0.00
1.60 4.81 3.21 12.83
1.18 1.18 1.18 0.00
1.29 1.29 1.29 0.00
1.24 3.73 2.49 12.43
1.30 1.30 1.30 0.00
1.16 1.16 1.16 0.00
1.17 1.17 1.17 0.00
FACTOR DE REDUCCION
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
NUEVO PERSONAL
OPERARIO OFICIAL PEON
FACTOR DE REDUCCION
1.61 1.61 1.61 0.00
2.25 0.00 0.00 17.98
0.53 1.05 1.05 6.30
1.34 1.34 1.34 0.00
1.56 1.56 1.56 0.00
0.75 1.50 0.75 0.75
1.40 1.40 1.40 2.81
1.24 1.24 0.00 0.62
1.26 1.26 0.00 0.63
1.07 1.07 0.00 1.07
1.26 1.26 0.00 1.26
1.21 1.21 0.00 0.61
1.19 1.19 0.00 0.59
1.26 1.26 0.00 1.26
1.28 1.28 0.00 0.64
2.42 2.42 0.00 1.21
0.89 0.89 0.00 0.89
1.20 1.20 0.00 0.60
1.57 4.71 0.00 9.42
1.94 1.94 0.00 1.94
1.57 1.57 0.00 1.57
1.97 3.93 1.97 7.86
1.16 1.16 0.00 0.58
1.51 1.51 0.00 0.75
1.42 1.42 0.00 1.42
1.22 2.45 1.22 0.00
1.50 1.50 3.00 0.00
1.22 1.22 1.22 0.00
1.40 1.40 1.40 0.00
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
NUEVO PERSONAL
OPERARIO OFICIAL PEON
FACTOR DE REDUCCION
1.28 1.28 0.00 0.00
0.67 0.67 0.00 0.00
1.94 1.94 0.00 0.00
1.25 1.25 0.00 0.00
0.75 0.75 0.00 0.00
1.23 1.23 1.23 0.00
1.23 1.23 0.00 0.00
1.18 1.18 0.00 0.00
1.64 1.64 0.00 0.00
1.64 1.64 0.00 1.64
1.36 1.36 0.00 1.36
1.23 1.23 0.00 0.61
1.00 0.10 0.00 2.00
1.00 0.10 0.00 10.00
1.22 0.12 0.00 3.66
1.93 0.19 0.00 5.80
1.25 1.25 1.25 0.00
1.43 1.43 1.43 0.00
1.25 1.25 0.00 1.25
0.20 0.20 0.00 0.20
0.82 0.82 0.00 1.64
1.12 0.00 0.00 1.12
0.42 0.00 0.00 0.42
0.31 0.31 0.00 0.62
0.67 0.67 0.00 0.00
1.33 1.33 0.00 0.00
0.63 0.63 0.00 0.00
1.17 1.17 0.00 0.00
____________________________________________________________________________________PROYECTO: DISEÑO ESTRUCTURAL DE UN EDIFICIO PARA VIVIENDAS
NUEVO PERSONAL
OPERARIO OFICIAL PEON
FACTOR DE REDUCCION
1.33 1.33 0.00 0.00
0.33 0.33 0.00 0.17
0.08 0.08 0.08 0.00
0.50 0.50 0.50 0.00
1.30 1.30 0.00 0.00
1.78 1.78 0.00 1.78
1.56 0.00 0.00 1.56
0.59 0.00 0.00 0.59
1.63 1.63 0.00 1.63
0.67 0.67 0.00 0.00
1.50 1.50 0.00 0.00
1.13 1.13 0.00 0.00
2.00 2.00 0.00 0.00
0.58 0.58 0.58 0.00
1.48 1.48 0.00 1.48
2.00 2.00 0.00 0.00
0.88 0.88 0.00 0.00
0.83 0.83 0.00 0.00
0.67 0.67 0.00 0.00
0.25 0.25 0.25 0.00
0.17 0.17 0.00 0.00
1.29 1.29 0.00 0.00
0.17 0.17 0.00 0.00
0.50 0.50 0.00 0.00
1.20 1.20 0.00 0.00
0.83 0.83 0.00 0.00
1.25 1.25 1.25 0.00
1.25 1.25 1.25 0.00
1.30 1.30 1.30 0.00
1.22 1.22 1.22 0.00
0.50 0.50 0.50 0.00
1.00 1.00 1.00 0.00
0.13 0.13 0.13 0.00