TRAMO DIST. ASNM
1 10 3.432 12 4.43 958.433 18 4.434 8 -3 22,43 A 30,43
5 4 -1 22,43 A 30,43
C 0.40A 1.20
TRAMO ND DIAS C A
1 7,843.00 365 0.40 1.202 7,843.00 365 0.40 1.203 2,046.06 365 0.40 1.204 2,046.06 365 0.40 1.205 2,046.06 365 0.40 1.20
TRAMO Rg N´t Tramo
1 3.43 1.03 4.09E+07 4.09E+072 4.43 1.10 4.09E+07 4.09E+073 4.43 1.10 9.63E+06 5.06E+074 3 1.00 9.63E+06 5.06E+075 1 1.00 9.63E+06 5.06E+07
R=(P/3)EXP0.25
TRAMO CBR 1 CBR 2 CBR 3 CBR 41 3 5 4.3 62 3 5 4.3 63 3 5.8 5.8 5.7
PENDIENTE LONGITUDINA
L
TEMPERATURA ºC
PENDIENTE LONGITUDINA
L
N´t Tramo Acumulado
4 3 5.8 5.8 5.75 3 5.8 5.8 5.7
ENSAYO CBR Nº IGUALES RELACION %6 16 2 2/9 22.225 3 1/3 33.33
4.8 4 4/9 44.444.3 54.3 6 2/3 66.673.8 7 7/9 77.783.3 8 8/9 88.893 9 1 100.00
ENSAYO CBR Nº IGUALES RELACION %6.3 1 1/8 12.505.8 25.8 3 3/8 37.505.7 4 4/8 50.005.3 5 5/8 62.504.3 6 6/8 75.003.4 7 7/8 87.503 8 1 100.00
CLIMA
CLIMA
TRAMO CBR Sr TEMP. ºc
1 3.27 1150 22.43 --30.432 3.27 1043 22.43 --30.443 3.5 845 22.43 --30.454 3.5 550 22.43 --30.465 3.5 550 22.43 --30.47
PROGRESIVALONGITUD (Km)
DESDE HASTA1 0+000 10+000 102 10+000 22+000 123 22+000 40+000 184 40+000 57+000 17
TERRENO DE FUNDACION
PRECIPITACIONES (MM/AÑO)
UNIDAD DE DISEÑO
HASTA 10+000 22+000 40+000 57+000DESDE 0+000 10+000 22+000 40+000
1 2 3 4
02468
101214161820
LONGITUD (Km)
LONGITUD (Km)
ND PDT VTP %VP
1150 7,843.001043 7,843.00843 2,046.06 6843 889.59 13550 2,046.06 6843 889.59 13
550 2,046.06 6843 889.59 13
ND=FC*VTP
VTP=PDT*(%VP/100)
PDT VTP %VP FC TC %
44
6843 889.59 13 2.336843 889.59 13 2.3
6843 889.59 13 2.3
CBR 5 CBR 6 CBR 7 CBR 8 CBR 93.8 6 7.3 3.3 4.33.8 6 7.3 3.3 4.35.3 6.3 4.3 4
PRECIPITACION (MM/AÑO)
VTP=PDT*(%VP/100)
5.3 6.3 4.3 45.3 6.3 4.3 4
CLIMA
TRAMO CBR Sr N´t TEMP. ºc
1 3.27 4.21E+07 12 3.27 4.50E+07 23 3.5 5.56E+07 22.43 --30.43 34 3.5 5.06E+07 22.43 --30.43 45 3.5 5.06E+07 22.43 --30.43 4
N´t = Rg*N´t
TERRENO DE FUNDACION
PENDIENTE LONGITUDINAL
UNIDAD DE DISEÑO
HASTA 10+000 22+000 40+000 57+000DESDE 0+000 10+000 22+000 40+000
1 2 3 4
02468
101214161820
LONGITUD (Km)
LONGITUD (Km)
FC TC % ENSAYOS
2.3
32.3
2.3
N´t=Nd*365*C*A*FF N´t Tramo N´t Acumulado
20
29.78 4.09E+0729.78 4.09E+0726.87 9.63E+0626.87 9.63E+0626.87 9.63E+06
CBR: 3; 5; 4,3; 6; 3,8; 6; 4,3; 3,3; 4,8CBR: 3; 5,8; 5,8; 5,7; 5,3; 6,3; 3,4; 4,3
PERIODO DE DISEÑO
INFORMACION BASICA DE DISEÑO SIN MATERIAL SELECCIONADO- ALTERNATIVA 1OBRA FECHA
UBICACIÓN UNIDAD DE DISEÑO Nº
CARACTERISTICAS CLIMATICASTEMPERATURA
TMAA ºc CEMENTO ASFALTICO Rta
PRECIPITACION mm/año TIPO DE CBR
TRANSITO PERIODO DE DISEÑON´t Nt=N´t*Rg
DESCRIPCIÓN ESPECIF. COVENIN TIPO CBR ai TABLA O GRAFICO
FUNDACIÓN Y SUBRASANTEFUNDACION SUB-RASANTE
GRAN
ULA
RES
MATERIALES SELECCIONADOS
SUB-BASE
BASE
CEM
ENTA
DOS
BASE ESTABILIZADADESCRIPCIÓN ESPECIF. COVENIN TIPO CBR ai TABLA O GRAFICO
MEZCLAS ASFALTICASDESCRIPCIÓN ESPECIF. COVENIN TIPO ESTABILIDAD ai TABLA O GRAFICOBASE INTERMEDIARODAMIENTO