AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
1
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANLISIS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ACTIVIDADES PRELIMINARES
CAMPAMENTO 18 M2 unBASE GRANULA R m 2.34 51,480 51,480 51,480 51,031
BISAGRA COMN 3 un 6.00 4,200 4,200 5,400 4,200
GANCHO TEJA ETERNIT 55 MM un 28.00 7,280 7,280 7,252 7,280
MANO DE OBRA AA hc 22.60 245,820 245,820 245,820 245,820
PORTA CANDADO SIMPLE 3 un 2.00 2,000 2,000 1,802 2,000
PUNTILLA CON CABEZA 2 lb 4.00 11,128 11,400 9,424 10,976
RECEBO COMN m 2.34 74,283 74,283 74,283 74,283
TABLA CHAPA ORDINARIO 0.30 m 159.00 245,655 0 0 0
TABLA DE 2 CM X 10 m 159.00 0 0 0 588,300
TABLA OTOBO 0.30 m 159.00 0 250,266 0 0
TABLON CATIVO 0.30 m 159.00 0 0 397,500 0
TEJA ETERNIT NO.6 un 14.00 444,416 454,804 467,012 444,052
VARA DE CLAVO m 22.10 33,150 33,150 33,150 29,459
1,119,413 1,134,684 1,293,124 1,457,402
CAMPAMENTO 9 M2 unBASE GRAN ULA R m 1.17 25,740 25,740 25,740 25,515
BISA GRA COM N 3 un 3.00 2,100 2,100 2,700 2,100
GANCH O TEJA ETER NIT 55 MM un 16.00 4,160 4,160 4,144 4,160
MANO DE OBR A AA hc 15.18 165,113 165,113 165,113 165,113
PORTA CANDADO SIMPLE 3 un 2.00 2,000 2,000 1,802 2,000PUNTILLA CON CABEZA 2 lb 3.00 8,346 8,550 7,068 8,232
RECEB O COM N m 1.17 37,142 37,142 37,142 37,142
TABLA CHAPA ORDINARIO 0.30 m 90.00 139,050 0 0 0
TABLA DE 2 CM X 10 m 90.00 0 0 0 333,000
TABLA OTOBO 0.30 m 90.00 0 141,660 0 0
TABLON CATIVO 0.30 m 90.00 0 0 225,000 0
TEJA ETERNIT NO.6 un 8.00 253,952 259,888 266,864 253,744
VARA DE CLAVO m 12.40 18,600 18,600 18,600 16,529
656,203 664,953 754,173 847,535
CAMPAMENTO CONTENEDOR M2 ALQUILER msCONTENEDOR BODEGA 20 ms 3.00 1,080,000 1,080,000 1,080,000 1,080,000
MONTACARGAS 3.5 TN h 2.00 94,000 94,000 94,000 94,000
TRANSPORTE CONTENEDOR 20 un 2.00 520,000 520,000 520,000 520,000
1,694,000 1,694,000 1,694,000 1,694,000
CAMPAMENTO SHELTER M2 ALQUILER msMONTACARGAS 5.0 TN h 2.00 128,000 128,000 128,000 128,000
SHELTER OFICINA 40 ms 3.00 4,740,000 4,740,000 4,740,000 4,740,000
TRANSPORTE CONTENEDOR 40 un 2.00 650,000 650,000 650,000 650,000
5,518,000 5,518,000 5,518,000 5,518,000
CERCA EN ALAMBRE DE PUA mALAMBRE DE PUAS NO 12 kg 4.00 6,480 6,400 6,400 6,900MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
PUNTILLA CON CABEZA 2 lb 0.03 83 86 71 82
VARA DE CLAVO m 0.80 1,200 1,200 1,200 1,066
12,114 12,036 12,021 12,400
CERCA EN TABLA mMANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
PUNTILLA CON CABEZA 2 lb 0.07 195 200 165 192
TABLA CHAPA 3 M m 3.33 4,802 0 0 4,662
TABLA OTOBO 1X10 2.9 m 3.33 0 18,981 0 0
TABLON CATIVO 3 M m 3.33 0 0 4,995 0
VARA DE CLAVO m 1.30 1,950 1,950 1,950 1,733
VARA DE CORR EDOR L = 6.00 m 1.30 1,243 1,243 1,243 1,243
12,540 26,724 12,704 12,181
CERCA LAMINA BASE H/2.25 mAGUA lt 3.07 37 37 37 37
ARENA DE PEGA m 0.01 0 0 0 125
ARENA DE PEA m 0.01 310 0 0 0ARENA DE REVOQUE m 0.01 0 0 100 0
ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMEN TO GRIS kg 5.16 929 1,032 1,156 1,063
CUBI ERTA TRA PEZO IDAL ACESC O 3.05 un 0.54 14,138 14,138 14,138 14,138
LADRILLO BOCADILLO RECOCIDO un 12.88 0 0 0 2,628
LADRILLO LIMPIO 10-29 un 12.88 0 5,796 0 0
LADRILLO TOLETE RECOCIDO un 12.88 4,122 0 3,297 0
MANO DE OBR A AA hc 1.85 20,122 20,122 20,122 20,122
PERFIL ABIERTO GALVANIZADO 120 X 60 CAL.16 un 2.45 176,437 176,437 176,437 176,437
TORNI LLO PARA MADE RA 1 NO.6 un 6.55 118 118 118 105
216,212 217,935 215,405 214,654
DEMOL.PLACAS MACIZAS 0.30 mCOMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800
MANO DE OBR A AA hc 1.50 16,316 16,316 16,316 16,316
VOLQU ETA M3 vj 0.40 15,200 14,208 15,020 17,183
66,316 65,324 66,136 68,299
DEMOLICIN MUROS 0.15 mMANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
VOLQUETA M3 vj 0.15 5,700 5,328 5,633 6,444
10,051 9,679 9,983 10,795DEMOLICIN MUROS 0.25 mMANO DE OBRA AA hc 0.46 5,003 5,003 5,003 5,003
VOLQUETA M3 vj 0.25 9,500 8,880 9,388 10,740
14,503 13,883 14,391 15,743
DEMOLICIN PLACAS ALIGER. 0.25 mMANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
VOLQU ETA M3 vj 0.32 12,160 11,366 12,016 13,747
23,037 22,243 22,893 24,624
DEMOLICIN PLACAS MACIZAS 0.15 mCOMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800
MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
VOLQU ETA M3 vj 0.20 7,600 7,104 7,510 8,592
53,277 52,781 53,187 54,269
DEMOLICIN PLACAS MACIZAS 0.30 mCOMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800
MANO DE OBR A AA hc 1.50 16,316 16,316 16,316 16,316
VOLQU ETA M3 vj 0.40 15,200 14,208 15,020 17,183
66,316 65,324 66,136 68,299
DEMOLICIN PLACAS PISO m
COMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
VOLQUETA M3 vj 0.10 3,800 3,552 3,755 4,296
49,477 49,229 49,432 49,973
DEMOLICIN VIGAS Y COLUMNAS mCOMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800
MANO DE OBR A AA hc 8.00 87,016 87,016 87,016 87,016
VOLQUETA M3 vj 1.00 38,000 35,520 37,550 42,958
159,816 157,336 159,366 164,774
DESCAPOTE A MAQUINA mCARGADOR FRONTAL d 0.01 2,200 1,740 2,200 2,164
VOLQU ETA M3 vj 0.37 14,060 13,142 13,894 15,894
16,260 14,882 16,094 18,059
DESMONTE APARATOS SANITARIOS unMANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052
VOLQUETA M3 vj 0.10 3,800 3,552 3,755 4,296
16,852 16,604 16,807 17,348
8/13/2019 ANALISIS DETALLADOS GENERALES
2/28
CONSTRUDATA2
DESMONTE CUBIERTAS ASBESTO CEMENTO mMANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263
VOLQU ETA M3 vj 0.05 1,900 1,776 1,878 2,148
5,163 5,039 5,141 5,411
DESMONTE MARCOS Y PUERTAS unMANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263
VOLQUETA M3 vj 0.10 3,800 3,552 3,755 4,296
7,063 6,815 7,018 7,559EXCAVACION MECANICA mCARGADOR FRONTAL d 0.02 4,400 3,480 4,400 4,328
VOLQU ETA M3 vj 0.37 14,060 13,142 13,894 15,894
18,460 16,622 18,294 20,223
EXPLANACION Y EXTENDIDA mBULLDOZER D-6 h 0.02 900 900 900 900
900 900 900 900
EXPLANACION Y RETIRO mBULLDOZER D-6 h 0.03 1,350 1,350 1,350 1,350
CARGADOR FRONTAL d 0.02 4,400 3,480 4,400 4,328
VOLQU ETA M3 vj 0.37 14,060 13,142 13,894 15,894
19,810 17,972 19,644 21,573
LETRINA 2.00X1.00 unBASE GRANULA R m 0.10 2,200 2,200 2,200 2,181
BISA GRA COM N 3 un 3.00 2,100 2,100 2,700 2,100
CONCRETO CORRIENTE 2000 PSI m 0.10 28,385 27,910 23,942 28,420
GANCHO TEJA ETERNIT 55 MM un 8.00 2,080 2,080 2,072 2,080
MANO DE OBRA AA hc 6.00 65,262 65,262 65,262 65,262
PORTA CANDADO SIMPLE 3 un 1.00 1,000 1,000 901 1,000
PUNTILLA CON CABEZA 2 lb 1.20 3,338 3,420 2,827 3,293
RECEB O COM N m 0.10 3,175 3,175 3,175 3,175TABLA CHAPA 3 M m 42.00 60,564 0 0 58,800
TABLA OTOBO 1X10 2.9 m 42.00 0 239,400 0 0
TABLON CATIVO 3 M m 42.00 0 0 63,000 0
TAZA CAMPESINA MANCESA un 1.00 41,890 41,890 48,000 41,890
TEJA TEJALIT DOBLEANCHO NO.4 un 4.00 52,764 55,176 51,796 52,720
TUBO DE GRES 4 un 10.00 81,200 61,250 81,500 82,500
VARA DE CLAVO m 14.00 21,000 21,000 21,000 18,662
364,958 525,862 368,375 362,082
RED ELECTRICA PROVISIONAL L/50 M unBASTIDOR AMARILLO 2X2 3 M m 5.00 0 17,500 0 0
CABLE ALUMINIO AISLADO PVC 1/0 AWG m 65.00 738,595 738,595 738,595 738,595
CABL E ALUM INIO AISL ADO PVC 2/0 AWG m 130.00 1,801,150 1,801,150 1,801,150 1,801,150
CAJA CON ESPACI O PARA 4 CIRCU ITOS un 1.00 12,180 12,180 12,180 12,180
CORREA DE 2X2 DURMIENTE m 5.00 0 0 17,500 0
DURMIENTE ORDINARIO 4 M m 5.00 17,500 0 0 0
LARGUERO ORDINARIO 3 M m 5.00 0 0 0 4,025
MANO DE OBRA BB hc 20.00 239,300 239,300 239,300 239,300
TACO TERMOMAGNTICO UNIPOLAR HQP 30A un 4.00 19,088 19,088 19,088 19,200
TOMA TRIFSICA un 5.00 12,400 15,000 16,355 12,400
VARA DE CLAVO m 35.00 52,500 52,500 52,500 46,655SUB-CONTRATO ELECTRICO % 38.00 1,099,231 1,100,219 1,100,734 1,091,932
3,991,944 3,995,532 3,997,402 3,965,437
RED PROVISIONAL TELEFONOS unCABLE TELFONOS 2 PARES m 65.00 105,430 105,430 105,430 105,430
CAJA GALVANIZADA 5800 un 6.00 1,866 1,770 1,866 1,866
MANO DE OBRA BB hc 20.00 239,300 239,300 239,300 239,300
TOMA TELEFNICA un 5.00 12,020 14,600 14,090 12,610
VARA DE CLAVO m 30.00 45,000 45,000 45,000 39,990
SUB-CONTRATO ELECTRICO % 38.00 153,374 154,318 154,161 151,694
556,990 560,418 559,847 550,890
RELLENO MATERIAL EN SITIO mBULLDOZER D-6 h 0.02 900 900 900 900
VIBROCOMPACTADOR ELCTRICO d 0.03 870 870 848 825
VOLQU ETA M3 vj 0.45 17,100 15,984 16,898 19,331
18,870 17,754 18,646 21,056
REPLANTEO mBASTIDOR OTOBO 2X2 2.9 m 1.00 0 2,500 0 0
DURMIENTE ABARCO 4 M m 1.00 4,785 0 0 7,500
LARGUERO ABARCO 4 M m 1.00 0 0 2,700 0
MANO DE OBRA AA hc 0.28 3,046 3,046 3,046 3,046PUNTILLA CON CABEZA 1 lb 0.02 51 36 51 40
PUNTILLA CON CABEZA 2 lb 0.02 56 57 47 55
7,937 5,639 5,843 10,641
REPLANTEO CANCHAS mBASTIDOR OTOBO 2X2 2.9 m 0.10 0 250 0 0
DURMIENTE ABARCO 4 M m 0.10 479 0 0 750
LARGUERO ABARCO 4 M m 0.10 0 0 270 0
MANO DE OBRA AA hc 0.02 218 218 218 218
PUNTILLA CON CABEZA 2 lb 0.10 278 285 236 274
974 753 723 1,242
ANLISIS COMPUESTOS
BAO NO. 1 / 4 AP. ACUACER unCERRADURA SCHLAGE BAO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388
CERMICA CORONA CORSICO 20.5X30.5 m 1.00 22,000 22,000 22,000 22,000
DUCHA PISCIS SIN SB SU 8 CR un 1.00 37,800 26,999 26,999 26,999
ESPEJO CRISTAL BELGA 5MM m 0.80 34,400 34,400 34,400 22,643
ESTUCO VENECIANO m 1.00 29,000 30,000 28,500 29,200
JUEGO INCRUSTACIONES ACUACER un 1.00 26,500 26,500 26,500 26,500
ACCESORIOS DE GRES 4 un 1.00 21,346 21,310 21,177 21,260
ESMALTE SOBRE MADERA LLENA m 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m 3.60 32,728 32,870 34,397 34,298
INSTAL ACIN Y DOTACIO N BAO NO.1 un 1.00 2,683,189 2,705,149 2,666,513 2,351,028
JUEGOS INCRUSTAR un 1.00 77,936 63,233 63,433 63,195
OLIMPIA BRILL.BASE 20X20 m 25.47 936,236 934,398 940,287 931,101
PIRLAN DUCHA PORC. 20X20 m 0.90 23,342 23,285 23,38 3 23,274
PUERTAS DUCHAS POLIESTIR. m 1.70 161,500 190,400 161,500 170,000
PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317
4,404,525 4,346,998 4,283,321 3,983,162
BAO NO. 2 / 4 AP. STILO unCERRADURA SCHLAGE BAO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388
ESPEJO CRISTAL BELGA 5MM m 0.80 34,400 34,400 34,400 22,643
REJILLA SOSCO 3X2 un 1.00 3,586 3,500 3,100 3,320
ESMALTE SOBRE MADERA LLENA m 2.88 37,796 34,734 36,478 37,960
ESTUCO Y VINILO 3 MANOS m 3.60 32,728 32,870 34,397 34,298
INSTALACIN Y DOTACION BAO NO.2 un 1.00 2,684,075 2,637,629 2,619,489 2,617,384
JUEGOS INCRUSTAR STILO un 1.00 278,431 278,277 278,477 278,238
OLIMPIA BRILL.BASE 20X20 m 25.47 936,236 934,398 940,287 931,101
PIRLAN DUCHA PORC. 20X20 m 0.90 23,342 23,285 23,38 3 23,274
PUERTAS DUCHAS POLIESTIR. m 1.70 161,500 190,400 161,500 170,000
PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317
4,472,845 4,371,212 4,329,264 4,341,922
BAO NO. 3 / 3 AP. ACUACER unCERRADURA SCHLAGE BAO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388
ESPEJO CRISTAL BELGA 5MM m 0.80 34,400 34,400 34,400 22,643
REJILLA SOSCO 3X2 un 1.00 3,586 3,500 3,100 3,320
ESMALTE SOBRE MADERA LLENA m 2.88 37,796 34,734 36,478 37,960
ESTUCO Y VINILO 3 MANOS m 2.40 21,819 21,914 22,931 22,865
INSTALACIN Y DOTACION BAO NO.3 un 1.00 2,021,559 1,878,532 1,840,346 1,806,276
JUEGOS INCRUSTAR un 1.00 77,936 63,233 63,433 63,195
OLIMPIA BRILL.BASE 20X20 m 21.15 777,440 775,913 780,804 773,175
PIRLAN DUCHA PORC. 20X20 m 1.50 38,903 38,809 38,972 3 8,790
PUERTAS DUCHAS POLIESTIR. m 2.70 256,500 302,400 256,500 270,000
PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317
3,550,6 90 3,355,155 3,274,718 3,261,93 0
BAO NO. 4 / 3 AP. STILO unCERRADURA SCHLAGE BAO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388
ESPEJO CRISTAL BELGA 5MM m 0.80 34,400 34,400 34,400 22,643
REJILLA SOSCO 3X2 un 1.00 3,586 3,500 3,100 3,320
ESMALTE SOBRE MADERA LLENA m 2.88 37,796 34,734 36,478 37,960
ESTUCO Y VINILO 3 MANOS m 2.40 21,819 21,914 22,931 22,865
INSTALACIN Y DOTACION BAO NO.4 un 1.00 1,882,818 1,917,499 1,900,348 1,905,915JUEGOS INCRUSTAR STILO un 1.00 278,431 278,277 278,477 278,238
OLIMPIA BRILL.BASE 20X20 m 21.15 777,440 775,913 780,804 773,175
PIRLAN DUCHA PORC. 20X20 m 1.50 38,903 38,809 38,972 3 8,790
PUERTAS DUCHAS POLIESTIR. m 2.70 256,500 302,400 256,500 270,000
PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317
3,612,444 3,609,165 3,549,764 3,576,611
BAO NO. 5 / 2 AP. ACUACER unCERRADURA SCHLAGE BAO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388
ESPEJO CRISTAL BELGA 5MM m 0.80 34,400 34,400 34,400 22,643
REJILLA SOSCO 3X2 un 1.00 3,586 3,500 3,100 3,320
ESMALTE SOBRE MADERA LLENA m 2.88 37,796 34,734 36,478 37,960
ESTUCO Y VINILO 3 MANOS m 2.25 20,455 20,544 21,498 21,436
INSTAL ACIN Y DOTACIO N BAO NO.5 un 1.00 1,646,92 9 1,504,116 1,466,38 0 1,437,725
JUEGOS INCRUSTAR un 1.00 77,936 63,233 63,433 63,195
OLIMPIA BRILL.BASE 20X20 m 14.40 529,321 528,281 531,611 526,417
PUERTAS DUCHAS POLIESTIR. m 2.70 256,500 302,400 256,500 270,000
PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317
2,887,675 2,692,9 29 2,611,154 2,606,4 01
BAO NO. 6 / 2 AP. STILO un
CERRADURA SCHLAGE BAO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388ESPEJO CRISTAL BELGA 5MM m 0.80 34,400 34,400 34,400 22,643
REJILLA SOSCO 3X2 un 1.00 3,586 3,500 3,100 3,320
ESMALTE SOBRE MADERA LLENA m 2.88 37,796 34,734 36,478 37,960
ESTUCO Y VINILO 3 MANOS m 2.25 20,455 20,544 21,498 21,436
INSTALACIN Y DOTACION BAO NO.6 un 1.00 1,604,515 1,639,796 1,622,556 1,631,281
JUEGOS INCRUSTAR STILO un 1.00 278,431 278,277 278,477 278,238
OLIMPIA BRILL.BASE 20X20 m 14.40 529,321 528,281 531,611 526,417
PUERTAS DUCHAS POLIESTIR. m 2.70 256,500 302,400 256,500 270,000
PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317
3,045,756 3,043,652 2,982,374 3,015,000
INSTALACIN Y DOTACION BAO NO.1 unBID CORONA PRESTIGIO un 1.00 572,000 503,000 503,000 503,000
LAVAMANOS ATHENAS CONJ. CL-O un 1.00 361,900 314,000 277,724 277,724
MEZCLADOR ATHENAS CRO SIN SAL un 1.00 104,000 380,000 380,000 104,000
SANITARIO 30948/100 un 1.00 321,000 185,100 184,000 163,500
INSTALACIN APARATO SANITARIO un 4.00 108,297 108,021 108,380 107,952
PUNTO AGUA CALIENTE CPVC un 3.00 233,707 233,707 233,707 232,452
ANLISIS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
8/13/2019 ANALISIS DETALLADOS GENERALES
3/28
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
3
ANLISIS COMPUESTOS / CARPINTERA MADERA
PUNTO AGUA FRIA PVC un 4.00 314,569 312,446 312,446 310,284
PUNTO DESAGUE PVC 3;4 un 4.00 378,734 378,734 378,734 370,362
SALIDA LAMPARA TOMA PVC un 3.00 288,982 290,141 288,522 281,753
2,683,189 2,705,149 2,666,513 2,351,028
INSTALACIN Y DOTACION BAO NO.2 unBID CORONA STILO un 1.00 330,300 249,000 249,000 249,000
LAVAMANOS STILO 71580/115 un 1.00 227,586 221,880 205,000 221,880
MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800SANITARIO STILO 80538/118 un 1.00 412,900 412,900 412,900 412,900
INSTALACIN APARATO SANITARIO un 4.00 108,297 108,021 108,380 107,952
PUNTO AGUA CALIENTE CPVC un 3.00 233,707 233,707 233,707 232,452
PUNTO AGUA FRIA PVC un 4.00 314,569 312,446 312,446 310,284
PUNTO DESAGUE PVC 3;4 un 4.00 378,734 378,734 378,734 370,362
SALIDA LAMPARA TOMA PVC un 3.00 288,982 290,141 288,522 281,753
2,684,0 75 2,637,629 2,619,489 2,617,384
INSTALACIN Y DOTACION BAO NO.3 unLAVAMANOS ATHENAS CONJ. CL-O un 1.00 361,900 314,000 277,724 277,724
MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800
SANITARIO 30948/100 un 1.00 321,000 185,100 184,000 163,500
INSTALACIN APARATO SANITARIO un 3.00 81,223 81,016 81,285 80,964
PUNTO AGUA CALIENTE CPVC un 2.00 155,805 155,805 155,805 154,968
PUNTO AGUA FRIA PVC un 3.00 235,927 234,334 234,334 232,713
PUNTO DESAGUE PVC 3;4 un 3.00 284,050 284,050 284,050 277,772
SALIDA LAMPARA TOMA PVC un 2.00 192,654 193,427 192,348 187,835
2,021,559 1,878,532 1,840,346 1,806,276
INSTALACIN Y DOTACION BAO NO.4 unLAVAMANOS STILO 71580/115 un 1.00 227,586 221,880 205,000 221,880
MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800
SANITARIO STILO 80538/118 un 1.00 412,900 412,900 412,900 412,900INSTALACIN APARATO SANITARIO un 3.00 81,223 81,016 81,285 80,964
PUNTO AGUA CALIENTE CPVC un 2.00 155,805 155,805 155,805 154,968
PUNTO AGUA FRIA PVC un 3.00 235,927 234,334 234,334 232,713
PUNTO DESAGUE PVC 3;4 un 3.00 284,050 284,050 284,050 277,772
SALIDA LAMPARA TOMA PVC un 1.00 96,327 96,714 96,174 93,918
1,882,818 1,917,499 1,900,34 8 1,905,915
INSTALACIN Y DOTACION BAO NO.5 unLAVAMANOS ATHENAS CONJ. CL-O un 1.00 361,900 314,000 277,724 277,724
MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800
SANITARIO 30948/100 un 1.00 321,000 185,100 184,000 163,500
INSTALACIN APARATO SANITARIO un 2.00 54,148 54,010 54,190 53,976
PUNTO AGUA CALIENTE CPVC un 1.00 77,902 77,902 77,902 77,484
PUNTO AGUA FRIA PVC un 2.00 157,285 156,223 156,223 155,142
PUNTO DESAGUE PVC 3;4 un 2.00 189,367 189,367 189,367 185,181
SALIDA LAMPARA TOMA PVC un 1.00 96,327 96,714 96,174 93,918
1,646,92 9 1,504,116 1,466,38 0 1,437,725
INSTALACIN Y DOTACION BAO NO.6 unLAVAMANOS STILO 71580/115 un 1.00 227,586 221,880 205,000 221,880
MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800
SANITARIO STILO 80538/118 un 1.00 412,900 412,900 412,900 412,900INSTALACIN APARATO SANITARIO un 2.00 54,148 54,010 54,190 53,976
PUNTO AGUA CALIENTE CPVC un 1.00 77,902 77,902 77,902 77,484
PUNTO AGUA FRIA PVC un 2.00 157,285 156,223 156,223 155,142
PUNTO DESAGUE PVC 3;4 un 2.00 189,367 189,367 189,367 185,181
SALIDA LAMPARA TOMA PVC un 1.00 96,327 96,714 96,174 93,918
1,604,515 1,639,796 1,622,55 6 1,631,281
CARPINTERIA MADERA
BARANDA EN MADERA mCEDRO MACHO PIEZA 3.0 un 0.70 35,000 35,000 35,000 35,000
MANO DE OBRA DD hc 1.00 13,052 13,052 13,052 13,052
PUNTILLA SIN CABEZA 1 lb 0.25 673 675 673 548
TORNILLO PARA MADERA 2 NO.9 un 2.00 64 52 64 52
SUB-CONTRATO CARPINTERIA % 45.00 21,955 21,951 21,955 21,893
70,744 70,730 70,744 70,54 5
CLOSET FLORMORADO m
BISAGRA COMN 3 un 1.00 700 700 900 700MADERA FLORMORADO PIEZA un 0.52 19,302 19,760 19,302 19,302
MANO DE OBRA DD hc 6.31 82,358 82,358 82,358 82,358
PEGAN TE COLB N kl 0.25 2,113 1,813 2,113 2,108
PUNTILLA SIN CABEZA 1 lb 0.15 404 405 404 329
TORNILLO PARA MADERA 2 NO.9 un 4.68 150 122 150 122
SUB-CONTRATO CARPINTERIA % 45.00 47,262 47,321 47,352 47,213
152,288 152,478 152,578 152,132
CLOSET FOLDING DOOR AMERICA mCLOSET AMERICANO METAL m 1.00 125,860 125,860 141,000 125,860
125,860 125,860 141,000 125,860
CLOSET FOLDING DOOR INGLES mCLOSET INGLES METAL m 1.00 134,560 134,560 135,800 134,560
134,560 134,560 135,800 134,560
CLOSET FOLDING DOOR SEVILLA mCLOSET SEVILL A METAL/RE J. m 1.00 148,016 148,016 152,000 148,016
148,016 148,016 152,000 148,016
CLOSET FOLDING DOOR VENECIA mCLOSET VENECIA METAL m 1.00 154,744 154,744 172,000 154,744
154,744 154,744 172,000 154,744
CLOSET FORRADO FLORMORADO mBISAGRA COMN 3 un 1.39 973 973 1,251 973
MADERA FLORMORADO PIEZA un 0.60 22,272 22,800 22,272 22,272
MANO DE OBRA DD hc 9.21 120,209 120,209 120,209 120,209
PEGAN TE COLB N kl 0.25 2,113 1,813 2,113 2,108PUNTILLA SIN CABEZA 1 lb 0.50 1,346 1,350 1,346 1,096
TORNILLO PARA MADERA 2 NO.9 un 3.85 123 100 123 100
SUB-CONTRATO CARPINTERIA % 45.00 66,166 66,260 66,291 66,041
213,201 213,505 213,604 212,799
CLOSET TIPO A FORRADO mBISAGRA COMN 3 un 1.39 973 973 1,251 973
CAOBA PIEZA un 1.04 0 14,040 0 0
CEDRO CAQUETA PIEZA un 1.04 0 0 0 35,859
CEDRO MACHO PIEZA 3.0 un 1.04 84,448 0 0 0
MANO DE OBRA DD hc 9.21 120,209 120,209 120,209 120,209
PEGAN TE COLB N kl 0.25 2,113 1,813 2,113 2,108
PUNTILLA SIN CABEZA 1 lb 0.50 1,346 1,350 1,346 1,096
TABLON ABARCO 1`X8 un 1.04 0 0 11,440 0
TORNILLO PARA MADERA 2 NO.9 un 3.85 123 100 123 100
TRIP LEX PIZ ANO 4 MM 1.22 X 2.44 un 2.18 73,115 73,115 73,115 73,115
SUB-CONTRATO CARPINTERIA % 45.00 127,047 95,220 94,318 105,057
409,373 306,819 303,914 338,517
CLOSET TIPO B mBISAGRA COMN 3 un 0.76 532 532 684 532
CAOBA PIEZ A un 0.87 0 11,745 0 0
CEDRO CAQUETA PIEZA un 0.87 0 0 0 29,998CEDRO MACHO PIEZA 3.0 un 0.87 70,644 0 0 0
MANO DE OBRA DD hc 6.31 82,358 82,358 82,358 82,358
PEGAN TE COLB N kl 0.25 2,113 1,813 2,113 2,108
PUNTILLA SIN CABEZA 1 lb 0.15 404 405 404 329
TABLON ABARCO 1`X8 un 0.87 0 0 9,570 0
TORNILLO PARA MADERA 2 NO.9 un 4.68 150 122 150 122
TRIP LEX PIZ ANO 4 MM 1.22 X 2.44 un 2.18 73,115 73,115 73,115 73,115
SUB-CONTRATO CARPINTERIA % 45.00 103,192 76,540 75,777 84,852
332,5 07 246,630 244,170 273,413
CLOSET VARTEL MADERA mCLOSET MADERA TRIPLEX m 1.00 180,000 180,000 157,000 187,200
180,000 180,000 157,000 187,200
DIFUSOR - FLORMORADO mMADERA FLORMORADO PIEZA un 0.80 29,696 3 0,400 29,696 29,696
MANO DE OBR A DD hc 2.69 35,110 35,110 35,110 35,110
PEGANTE COLBN kl 0.10 845 725 845 843
PUNTILLA SIN CABEZA 1 lb 0.10 269 270 269 219
SUB-CONTRATO CARPINTERIA % 45.00 29,664 29,927 29,664 29,641
95,584 96,432 95,584 95,509
DIFUSORES- MARCO PARA VIDRIO mCAOBA PIEZA un 0.80 0 10,800 0 0
CEDRO CAQUETA PIEZA un 0.80 0 0 0 27,584
CEDRO MACHO PIEZA 3.0 un 0.80 64,960 0 0 0
MANO DE OBRA DD hc 2.89 37,720 37,720 37,720 37,720
PEGANTE COLBN kl 0.10 845 725 845 843
PUNTILLA SIN CABEZA 1 lb 0.10 269 270 269 219
TABLON ABARCO 1`X8 un 0.80 0 0 8,800 0
SUB-CONTRATO CARPINTERIA % 45.00 46,707 22,282 21,435 29,865
150,502 71,797 69,070 96,232
ENCHAPES MUROS EN TRIPLEX mLISTON MONTERREY 1X2X3 m 2.00 0 0 844 0
LISTON OTOBO m 2.00 0 2,100 0 0
LISTN DE ORDINARIO m 2.00 0 0 0 1,462
LIST N M.H. PINO CIPR ES m 2.00 17,160 0 0 0
MANO DE OBRA DD hc 0.50 6,526 6,526 6,526 6,526
PEGANTE BOXER un 0.10 2,545 2,768 2,600 2,723
TRIPLEX OKUME PIZANO 4 MM 1.22 X 2.44 un 0.36 14,967 14,967 14,967 14,967
SUB-CONTRATO CARPINTERIA % 45.00 18,539 11,862 11,221 11,555
59,736 38,223 36,158 37,232
ENCHAPES MUROS FLORMORADO mCHAZO MADERA .04X.04 un 2.00 500 500 500 500MANO DE OBRA DD hc 0.50 6,526 6,526 6,526 6,526
PEGANTE BOXER un 0.10 2,545 2,768 2,600 2,723
TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 0.35 44,820 44,820 44,820 44,820
SUB-CONTRATO CARPINTERIA % 45.00 24,476 24,576 24,501 24,556
78,866 79,190 78,947 79,125
HOJA PUERTA FLORMORADO.60 unCAOBA PIEZA un 0.32 0 4,320 0 0
CEDRO CAQUETA PIEZA un 0.32 0 0 0 11,034
CEDRO MACHO PIEZA 3.0 un 0.32 25,984 0 0 0
MANO DE OBRA DD hc 1.72 22,449 22,449 22,449 22,449
PEGANTE COLBN kl 0.15 1,268 1,088 1,268 1,265
PUNTILLA SIN CABEZA 1 lb 0.10 269 270 269 219
TABLON ABARCO 1`X8 un 0.32 0 0 3,520 0
TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.50 192,086 192,086 192,086 192,086
SUB-CONTRATO CARPINTERIA % 45.00 108,925 99,096 98,816 102,174
350,981 319,308 318,408 329,226
8/13/2019 ANALISIS DETALLADOS GENERALES
4/28
CONSTRUDATA4
HOJA PUERTA FLORMORADO.80 unCAOBA PIEZA un 0.34 0 4,590 0 0
CEDRO CAQUETA PIEZA un 0.34 0 0 0 11,723
CEDRO MACHO PIEZA 3.0 un 0.34 27,608 0 0 0
MANO DE OBRA DD hc 1.72 22,449 22,449 22,449 22,449
PEGANTE COLBN kl 0.15 1,268 1,088 1,268 1,265
PUNTILLA SIN CABEZA 1 lb 0.10 269 270 269 219
TABLON ABARCO 1`X8 un 0.34 0 0 3,740 0TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.00 128,057 128,057 128,057 128,057
SUB-CONTRATO CARPINTERIA % 45.00 80,843 70,404 70,102 73,671
260,494 226,858 225,885 237,385
HOJA PUERTA FLORMORADO.90 unCAOBA PIEZA un 0.36 0 4,860 0 0
CEDRO CAQUETA PIEZA un 0.36 0 0 0 12,413
CEDRO MACHO PIEZA 3.0 un 0.36 29,232 0 0 0
MANO DE OBRA DD hc 1.72 22,449 22,449 22,449 22,449
PEGANTE COLBN kl 0.15 1,268 1,088 1,268 1,265
PUNTILLA SIN CABEZA 1 lb 0.10 269 270 269 219
TABLON ABARCO 1`X8 un 0.36 0 0 3,960 0
TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.50 192,086 192,086 192,086 192,086
SUB-CONTRATO CARPINTERIA % 45.00 110,387 99,339 99,014 102,794
355,690 320,091 319,046 331,226
HOJA PUERTA FORTEC 0.70 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUERTA FORTEC RESIDENCIAL 0.71 un 1.00 38,541 39,000 39,900 37,840
47,677 48,136 49,036 46,976
HOJA PUERTA FORTEC 0.71 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUERTA FORTEC RESIDENCIAL 0.71 un 1.00 38,541 39,000 39,900 37,840 47,677 48,136 49,036 46,976
HOJA PUERTA FORTEC 0.91 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUERTA FORTEC RESIDENCIAL 0.91 un 1.00 79,500 69,540 79,500 67,200
88,636 78,676 88,636 76,336
HOJA PUERTA FORTEC 1.00 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUERTA FORTEC RESIDENCIAL 0.91 un 1.10 87,450 76,494 87,450 73,920
96,586 85,630 96,586 83,056
HOJA PUERTA FORTEC 1.50 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUERTA FORTEC RESIDENCIAL 0.51 un 3.00 98,520 119,670 102,000 96,780
107,656 128,806 111,136 105,916
HOJA PUERTA TRIPLEX 0.81 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUER TA PIZ ANO 0.30- 0.50 un 1.00 67,941 67,941 67,941 67,941
77,077 77,077 77,077 77,077
HOJA PUERTA TRIPLEX 1.01 unMANO DE OBR A DD hc 0.70 9,136 9,136 9,136 9,136
PUERTA PIZANO INTERES SOCIAL 0.51 - 0.75 un 1.00 44,409 44,409 44,409 44,409 53,545 53,545 53,545 53,545
MUEBLE BAJO .80 mBISAGRA COMN 3 un 4.66 3,262 3,262 4,194 3,262
CAOBA PIEZA un 0.90 0 12,150 0 0
CEDRO CAQUETA PIEZA un 0.90 0 0 0 31,032
CEDRO MACHO PIEZA 3.0 un 0.90 73,080 0 0 0
MANO DE OBR A DD hc 8.45 110,289 110,289 110,289 110,289
PEGANTE COLBN kl 0.20 1,690 1,450 1,690 1,686
PUNTILLA SIN CABEZA 1 lb 0.40 1,076 1,080 1,076 877
TABLON CEIBA un 0.90 0 0 56,700 0
TORNILLO PARA MADERA 2 NO.9 un 6.98 223 181 223 181
TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 1.74 58,358 58,358 58,358 58,358
SUB-CONTRATO CARPINTERIA % 45.00 111,591 84,047 104,639 92,559
359,570 270,818 337,170 298,24 4
MUEBLE H/.80 FLORMORADO mBISAGRA COMN 3 un 4.66 3,262 3,262 4,194 3,262
MADERA FLORMORADO PIEZA un 0.52 19,302 19,760 19,302 19,302
MANO DE OBR A DD hc 8.45 110,289 110,289 110,289 110,289
PEGANTE COLBN kl 0.20 1,690 1,450 1,690 1,686
PUNTILLA SIN CABEZA 1 lb 0.45 1,211 1,215 1,211 986TORNILLO PARA MADERA 2 NO.9 un 6.98 223 181 223 181
TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 0.70 89,640 89,640 89,640 89,640
SUB-CONTRATO CARPINTERIA % 45.00 101,528 101,609 101,948 101,407
327,146 327,407 328,498 326,754
MUEBLE LINOS FLORMORADO mMADERA FLORMORADO PIEZA un 0.52 19,302 19,760 19,302 19,302
MANO DE OBRA DD hc 6.00 78,312 78,312 78,312 78,312
PEGANTE COLBN kl 0.20 1,690 1,450 1,690 1,686
PUNTILLA SIN CABEZA 1 lb 0.15 404 405 404 329
TORNILLO PARA MADERA 2 NO.9 un 4.56 146 119 146 119
TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 0.35 44,820 44,820 44,820 44,820
SUB-CONTRATO CARPINTERIA % 45.00 65,103 65,189 65,103 65,056
209,777 210,055 209,777 209,623
MUEBLE TIPO LINOS mCAOBA PIEZ A un 0.87 0 11,745 0 0
CEDRO CAQUETA PIEZA un 0.87 0 0 0 29,998
CEDRO MACHO PIEZA 3.0 un 0.87 70,644 0 0 0
MANO DE OBRA DD hc 6.00 78,312 78,312 78,312 78,312
PEGANTE COLBN kl 0.20 1,690 1,450 1,690 1,686
PUNTILLA SIN CABEZA 1 lb 0.15 404 405 404 329
TABLON ABARCO 1`X8 un 0.87 0 0 9,570 0
TORNILLO PARA MADERA 2 NO.9 un 4.56 146 119 146 119
TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 0.80 26,831 26,831 26,831 26,831
SUB-CONTRATO CARPINTERIA % 45.00 80,112 53,488 52,629 61,773
258,139 172,350 169,582 199,048PASAMANOS ESCAL. .15X.02 mCEDRO MACHO PIEZA 3.0 un 0.10 5,000 5,000 5,000 5,000
MANO DE OBRA DD hc 1.00 13,052 13,052 13,052 13,052
PUNTILLA SIN CABEZA 1 lb 0.10 269 270 269 219
TORNILLO PARA MADERA 2 NO.9 un 2.00 64 52 64 52
SUB-CONTRATO CARPINTERIA % 45.00 8,273 8,268 8,273 8,245
26,658 26,642 26,658 26,569
PASAMANOS FLORM. 15X.02 mMADERA FLORMORADO PIEZA un 0.17 6,310 6,460 6,310 6,310
MANO DE OBRA DD hc 1.00 13,052 13,052 13,052 13,052
PUNTILLA SIN CABEZA 1 lb 0.25 673 675 673 548
TORNILLO PARA MADERA 2 NO.9 un 2.00 64 52 64 52
SUB-CONTRATO CARPINTERIA % 45.00 9,045 9,108 9,045 8,983
29,144 29,347 29,144 28,94 5
PIRLAN .10 FLORMORADO mMADERA FLORMORADO PIEZA un 0.09 3,341 3,420 3,341 3,341
MANO DE OBRA DD hc 0.92 12,008 12,008 12,008 12,008
PUNTILLA SIN CABEZA 1 lb 0.14 377 378 377 307
TORNILLO PARA MADERA 2 NO.9 un 2.00 64 52 64 52
SUB- CONTR ATO CARP INTE RIA % 45.00 7,105 7,136 7,105 7,068
22,895 22,994 22,895 22,776
PIRLANES DE MADERA .10 mCAOBA PIEZA un 0.09 0 1,215 0 0
CEDRO CAQUETA PIEZA un 0.09 0 0 0 3,103
CEDRO MACHO PIEZA 3.0 un 0.09 7,308 0 0 0
MANO DE OBRA DD hc 0.92 12,008 12,008 12,008 12,008
PUNTILLA SIN CABEZA 1 lb 0.14 377 378 377 307
TABLON ABARCO 1`X8 un 0.09 0 0 990 0
TORNILLO PARA MADERA 2 NO.9 un 2.00 64 52 64 52
SUB-CONTRATO CARPINTERIA % 45.00 8,890 6,144 6,047 6,961
28,647 19,797 19,486 22,431
PUERTA FLORMORADO MARCO Y HOJA unBISA GRA COM N 3 un 3.00 2,100 2,100 2,700 2,100
MADERA FLORMORADO PIEZA un 0.44 16,333 16,720 16,333 16,333
MANO DE OBRA DD hc 3.00 39,156 39,156 39,156 39,156
PEGANTE COLBN kl 0.20 1,690 1,450 1,690 1,686
PUNTILLA SIN CABEZA 1 lb 0.35 942 945 942 767
TORNILLO PARA MADERA 2 NO.9 un 18.00 576 468 576 468
TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.50 192,086 192,086 192,086 192,086
SUB-CONTRATO CARPINTERIA % 45.00 113,797 113,816 114,067 113,668
366,679 366,741 367,549 366,264PUERTAS MARCO Y HOJA unBISA GRA COM N 3 un 3.00 2,100 2,100 2,700 2,100
CAOBA PIEZA un 0.80 0 10,800 0 0
CEDRO CAQUETA PIEZA un 0.80 0 0 0 27,584
CEDRO MACHO PIEZA 3.0 un 0.80 64,960 0 0 0
MANO DE OBRA DD hc 3.00 39,156 39,156 39,156 39,156
PEGANTE COLBN kl 0.20 1,690 1,450 1,690 1,686
PUNTILLA SIN CABEZA 1 lb 0.35 942 945 942 767
TABLON ABARCO 1`X8 un 0.80 0 0 8,800 0
TORNILLO PARA MADERA 2 NO.9 un 18.00 576 468 576 468
TRIP LEX PIZ ANO 4 MM 1.22 X 2.44 un 2.00 67,078 67,078 67,078 67,078
SUB-CONTRATO CARPINTERIA % 45.00 79,426 54,899 54,424 62,478
255,928 176,896 175,366 201,317
VENTANERIA EN MADERA mBISAGRA COMN 3 un 1.00 700 700 900 700
CAOBA PIEZA un 0.46 0 6,210 0 0
CEDRO CAQUETA PIEZA un 0.46 0 0 0 15,861
CEDRO MACHO PIEZA 3.0 un 0.46 37,352 0 0 0
MANO DE OBRA DD hc 2.50 32,630 32,630 32,630 32,630
PEGANTE COLBN kl 0.13 1,099 943 1,099 1,096PUNTILLA SIN CABEZA 1 lb 0.13 350 351 350 285
TABLON ABARCO 1`X8 un 0.46 0 0 5,060 0
TORNILLO PARA MADERA 2 NO.9 un 6.00 192 156 192 156
SUB-CONTRATO CARPINTERIA % 45.00 32,545 18,445 18,104 22,828
104,867 59,435 58,334 73,555
CARPINTERIA METALICA
CAJAS CONTADORES AGUA unANTICORROSIV O ROJO CLARO gl 0.02 640 620 616 616
BISAGRA ALUMINIO EXT 2 un 0.51 434 434 459 434
LMINA COLD ROLLED CAL.16 un 0.37 21,659 21,659 21,659 19,609
SOLDADURA ELCTRICA 004-3/23 kg 0.68 2,788 2,788 2,788 2,788
SUB-CONTRATO ORNAMENTACION % 50.00 12,760 12,750 12,761 11,724
38,281 38,251 38,284 35,171
ANLISIS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
8/13/2019 ANALISIS DETALLADOS GENERALES
5/28
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
5
CELOSIA ALUMINIO mCELOSA EN ALUMINIO m 1.00 80,000 79,900 80,000 85,000
80,000 79,900 80,000 85,000
CERRAMIENTO CANCHA TENIS mMALLA PLASTIFIC ADA CAL. 10 H= 2.0 m 1.00 10,904 8,695 10,904 14,904
PLATINA HIERRO 1/2 X 1/8 m 1.36 811 811 811 910
SOLDADURA SP-13 1/8 kl 0.04 240 232 300 255
TUBO ESTR UCT. GALVAN IZA DO 1 m 0.11 1,136 1,136 1,136 1,137TUBO ESTRUCT. GALVANIZADO 2 m 0.42 8,715 8,601 8,715 8,715
NGULO HIERRO 2 1/2 X 3/16 m 0.92 7,994 7,576 7,576 8,694
SUB-CONTRATO DE ORNAMENTACION % 50.00 14,900 13,526 14,721 17,307
44,699 40,577 44,162 51,921
ESCALERA DE GATO mANTICORROSIV O ROJO CLARO gl 0.01 320 310 308 308
SOLDADURA ELCTRICA 004-3/23 kg 0.01 41 41 41 41
TUBO GALVANIZADO 1 m 5.00 51,560 25,135 62,850 51,560
SUB-CONTRATO DE ORNAMENTACION % 50.00 25,961 12,743 31,600 25,955
77,882 38,229 94,799 77,864
MARCOS PUERTAS LAMINA-.80 unANTICORROSIV O ROJO CLARO gl 0.02 640 620 616 616
BISAGRA ALUMINIO EXT 3 un 3.00 5,400 5,100 5,700 5,100
LMINA COLD ROLLED CAL.18 un 0.67 31,422 31,422 31,422 28,407
SOLDADURA ELCTRICA 004-3/23 kg 0.08 328 328 328 328
SUB-CONTRATO DE ORNAMENTACION % 50.00 18,895 18,735 19,033 17,226
56,685 56,205 57,099 51,678
MARCOS TAPAS CAJA INSPECCION unACERO FIGURADO 37000 PSI 1/4 kg 8.40 15,103 18,077 15,103 23,890
PLATINA 1 1/4 X 1/4 kg 3.36 64,441 64,441 64,441 40,448
SOLDADURA ELCTRICA 004-3/23 kg 0.20 820 820 820 820NGULO HIERRO 2 X 1/4 un 3.36 140,959 140,959 141,557 169,210
SUB- CONTR ATO DE ORNA MENTAC ION % 50.00 110,662 112,148 110,961 117,183
331,985 336,445 332,882 351,550
MARQUESINAS LAMINA mANTICORROSIV O ROJO CLARO gl 0.02 640 620 616 616
LM INA COLD ROLL ED CAL.16 un 0.43 25,172 25,172 25,172 2 2,789
SOLDADURA ELCTRICA 004-3/23 kg 0.22 902 902 902 902
TUBO ESTRUCT. GALVANIZADO 1 m 1.05 10,847 10,847 10,847 10,850
SUB-CONTRATO DE ORNAMENTACION % 50.00 18,780 18,770 18,768 17,579
56,340 56,310 56,304 52,736
PUERTA CANCHA TENIS 1X1 unMALLA PLASTIFIC ADA CAL. 10 H= 2.0 m 1.00 10,904 8,695 10,904 14,904
PLATI NA HIER RO 1/2 X 1/8 m 2.00 1,192 1,192 1,192 1,338
SOLDADURA 60.13 DE 1/8 kg 0.05 207 190 207 160
TUBO ESTRUCT. GALVANIZADO 1 m 2.00 20,660 20,660 20,660 20,666
NGULO HIERRO 2 X 3/16 m 2.00 10,382 9,600 10,382 12,590
SUB-CONTRATO DE ORNAMENTACION % 50.00 21,673 20,169 21,673 24,829
65,018 60,50 6 65,018 74,487
PUERTA ELECTRICA CORREDIZA un
MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508PUERTA ELCTRICA CORREDIZA un 1.00 5,220,000 5,220,000 5,220,000 5,637,600
SUB-CONTRATO DE ORNAMENTACION % 15.00 789,526 789,526 789,526 852,166
6,053,034 6,053,034 6,053,034 6,533,274
PUERTAS LAMINA mANTICORROSIV O ROJO CLARO gl 0.05 1,600 1,550 1,540 1,541
BISAGRA ALUMINIO EXT 3 un 0.75 1,350 1,275 1,425 1,275
LMINA COLD ROLLED CAL.16 un 1.50 87,809 87,809 87,809 79,497
SOLDADURA ELCTRICA 004-3/23 kg 0.97 3,977 3,977 3,977 3,977
SUB-CONTRATO DE ORNAMENTACION % 50.00 47,368 47,305 47,375 43,145
142,103 141,916 142,126 129,435
PUERTAS VENTANAS LAMINA mANTICORROSIV O ROJO CLARO gl 0.23 7,360 7,130 7,084 7,089
BISAGRA ALUMINIO EXT 3 un 1.75 3,150 2,975 3,325 2,975
LMINA COLD ROLLED CAL.18 un 0.55 25,794 25,794 25,794 23,319
SOLDADURA ELCTRICA 004-3/23 kg 0.16 656 656 656 656
NGULO HIERRO 3/4 X 1/8 m 1.05 1,299 1,208 1,299 1,167
SUB-CONTRATO DE ORNAMENTACION % 50.00 19,130 18,881 19,079 17,603
57,389 56,644 57,237 52,809
REJA BANCARIA m
ANTICORROSIV O ROJO CLARO gl 0.20 6,400 6,200 6,160 6,164HIERRO CUADRADO 9 MM un 1.74 12,984 12,984 12,984 12,636
SOLDADURA ELCTRICA 004-3/23 kg 0.60 2,460 2,460 2,460 2,460
SUB-CONTRATO DE ORNAMENTACION % 50.00 10,922 10,822 10,802 10,630
32,766 32,466 32,406 31,890
REJAS LAMINA mANTICORROSIV O ROJO CLARO gl 0.02 640 620 616 616
LMINA COLD ROLLED CAL.18 un 0.21 9,849 9,849 9,849 8,904
SOLDADURA ELCTRICA 004-3/23 kg 0.46 1,886 1,886 1,886 1,886
TUBO MUEBLE CAL.18 1 m 7.35 23,072 2 3,072 23,072 23,072
SUB- CONTR ATO DE ORNA MENTACI ON % 50.00 17,723 17,713 17,711 17,239
53,170 53,140 53,134 51,717
REJILLAS PISO .30 mACERO FIGURADO 60000 PSI 1 kg 10.44 18,771 22,467 18,771 19,251
ANTICORROSIV O ROJO CLARO gl 0.01 320 310 308 308
SOLDADURA ELCTRICA 004-3/23 kg 1.00 4,100 4,100 4,100 4,100
NGULO HIERRO 3/4 X 1/8 m 4.10 5,072 4,715 5,072 4,555
SUB- CONTR ATO DE ORNA MENTAC ION % 50.00 14,131 15,796 14,125 14,107
42,394 47,388 42,376 42,322
SOMBRERETE PARA CHIMENEA T-C unLM INA GALVAN IZA DA .20 un 0.35 14,125 14,125 14,125 14,962
SOLDADURA 60.13 DE 1/8 kg 0.20 828 760 828 641
TORNILLO ACERO 1/2X1/4 un 8.00 520 496 520 520
SUB-CONTRATO DE ORNAMENTACION % 80.00 12,379 12,305 12,379 12,899
27,852 27,686 27,852 29,022
TAPAS SHUT LAMINA unANTICORROSIV O ROJO CLARO gl 0.02 640 620 616 616LMINA COLD ROLLED CAL.16 un 0.50 29,270 29,270 29,270 26,499
SOLDADURA ELCTRICA 004-3/23 kg 0.46 1,886 1,886 1,886 1,886
SUB-CONTRATO DE ORNAMENTACION % 50.00 15,898 15,888 15,886 14,501
47,693 47,663 47,657 43,50 2
VENTANA ALUMINIO CORREDIZA mVENTANA CORREDIZA 1.2X1.2 m 1.00 90,000 75,000 90,000 67,000
90,000 75,000 90,000 67,000
VENTANA ALUMINIO ECONOMICA mVENTANA CORREDIZA 1.2X1.2 m 1.00 90,000 75,000 90,000 67,000
90,000 75,000 90,000 67,000
VENTANA ALUMINIO FIJA mVENTANA ALUMINIO FIJA m 1.00 69,000 78,500 69,000 82,564
69,000 78,500 69,000 82,564
VENTANA ALUMINIO GUILLOTINA mVENTANA PROYECTANTE 1.5X2.0 m 1.00 90,000 76,000 90,000 79,885
90,000 76,000 90,000 79,885
VENTANAS LAMINA mANTICORROSIV O ROJO CLARO gl 0.23 7,360 7,130 7,084 7,089
BISAGRA ALUMINIO EXT 2 un 1.05 893 893 945 893
LMINA COLD ROLLED CAL.18 un 0.44 20,636 20,636 20,636 18,656MANIJA PARA VENTANA un 1.00 2,000 2,000 2,500 2,000
SOLDADURA ELCTRICA 004-3/23 kg 0.16 656 656 656 656
NGULO HIERRO 3/4 X 1/8 m 1.94 2,400 2,231 2,400 2,155
SUB-CONTRATO DE ORNAMENTACION % 50.00 16,972 16,773 17,110 15,724
50,916 50,318 51,331 47,172
CIELOS RASOS
APLIQUE YESO mAPLIQUE DE LUZ un 1.00 38,280 38,280 27,232 33,000
38,280 38,280 27,232 33,000
ARMADURA MADERA Y MALLA mCUARTON OTOBO 2X4 2.9 m 2.16 0 9,720 0 0
LISTON ABARCO 3 M m 2.16 0 0 10,800 0
MALLA CON VENA 0.60X2.00 un 0.73 3,201 3,285 3,075 2,409
MANO DE OBR A AA hc 1.10 11,965 11,965 11,965 11,965
PUNTILLA CON CABEZA 2 lb 0.04 111 114 94 110
REPI SA ORDI NARI O 3 M m 2.16 2,179 0 0 2,117 17,456 25,084 25,934 16,600
CIELO RASO BOVEDAS DRYWALL mCIELO RASO DRY-WALL BVEDA m 1.00 25,000 27,217 25,000 25,000
MANO DE OBR A DD hc 1.38 18,012 18,012 18,012 18,012
VINILTEX gl 0.04 1,596 1,596 1,869 1,800
SUB-CONTRATO INSTALACION % 20.00 8,922 9,365 8,976 8,962
53,529 56,190 53,856 53,774
CIELO RASO DURACUSTIC mFIBERGLASS DURACUSTIC 5/8 lm 1.00 11,240 12,589 11,240 11,240
MANO DE OBR A BB hc 1.00 11,965 11,965 11,965 11,965
SUB-CONTRATO INSTALACION % 43.00 9,978 10,558 9,978 9,978
33,183 35,112 33,183 33,183
CIELO RASO PLANO DRYWALL mCIELO RASO DRY-WALL PLANO m 1.00 35,620 34,705 33,250 33,950
MANO DE OBR A DD hc 1.13 14,749 14,749 14,749 14,749
VINILTEX gl 0.04 1,596 1,596 1,869 1,800
SUB-CONTRATO INSTALACION % 20.00 10,393 10,210 9,973 10,100
62,358 61,260 59,841 60,599
CIELO RASO TABLEX 19MM m
CUARTON OTOBO 2X4 2.9 m 2.54 0 11,430 0 0LISTON ABARCO 3 M m 2.54 0 0 12,700 0
MANO DE OBR A AA hc 1.30 14,140 14,140 14,140 14,140
MERULEX I.F.A.TRANSPARENTE (20 KG) kg 0.20 1,810 1,810 1,810 1,810
PUER TA PIZ ANOTR IPLE X TABLE X DE 0.51 - 0.75 un 0.27 17,480 17,480 17,480 17,480
PUNTILLA CON CABEZA 2 lb 2.06 5,731 5,871 4,853 5,653
REPISA ORDINARIO 3 M m 2.54 2,563 0 0 2,489
41,724 50,731 50,98 3 41,572
CIELO RASO TRIPLEX mCUARTON OTOBO 2X4 2.9 m 2.54 0 11,430 0 0
MANO DE OBR A AA hc 1.10 11,965 11,965 11,965 11,965
MERULEX I.F.A.TRANSPARENTE (20 KG) kg 0.20 1,810 1,810 1,810 1,810
PUNTILLA CON CABEZA 2 lb 2.06 5,731 5,871 4,853 5,653
REPISA ORDINARIO 3 M m 2.54 7,620 0 0 0
TABLA BURRA CEDRO MACHO 0.10 m 2.54 0 0 8,890 8,890
TRIPLEX PIZANO 14 MM 1.22 X 2.44 un 0.27 29,447 29,447 29,447 29,447
56,573 60,523 56,965 57,764
8/13/2019 ANALISIS DETALLADOS GENERALES
6/28
CONSTRUDATA6
CIELOS RASOS / CIMIENTOS
CIELO RASO YESO OCULTO mCIELO RASO CARRIL OCULTO m 1.00 33,176 33,176 36,400 29,000
33,176 33,176 36,40 0 29,00 0
CIELO RASO YESO SEMI OCULTO mCIELO RASO CARRIL SEMI OCULTO m 1.00 38,860 33,176 36,400 39,000
38,860 33,176 36,400 39,000
CORNISAS YESO m
CORNISA 16 (CORTINERO ) m 1.00 21,692 21,692 20,509 19,000 21,692 21,692 20,509 19,000
LAMINA PLANA ETERNIT mLISTON MONTERREY 1X2X3 m 4.32 0 0 1,823 0
LISTON OTOBO m 4.32 0 4,536 0 0
LISTN DE ORDINARIO m 4.32 0 0 0 3,158
LISTN M.H. PINO CIPRES m 4.32 37,066 0 0 0
MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702
MEDIA CAA CHINGALE LISA m 0.54 814 0 0 814
MERULEX I.F.A.TRANSPARENTE (20 KG) kg 0.01 90 90 90 90
MOLDURAS VIROLA m 0.54 0 378 0 0
PLACA ETERNIT MEDIA X 4MM un 1.37 10,707 10,856 10,993 10,707
PUNTILLA CON CABEZA 2 lb 0.27 751 770 636 741
REGLILLAS TIRAS 3M m 0.54 0 0 184 0
58,130 25,331 22,428 24,212
LISTON M.H. OTOBO mLISTON MONTERREY 1X2X3 m 4.32 0 0 1,823 0
LISTON OTOBO m 4.32 0 4,536 0 0
LISTN DE ORDINARIO m 4.32 0 0 0 3,158
LISTN M.H. PINO CIPRES m 4.32 37,066 0 0 0
LIST N M.H. VIR OLA m 1.08 11,275 11,275 11,275 11,275
MANO DE OBR A AA hc 1.10 11,965 11,965 11,965 11,965MEDIA CAA CHINGALE LISA m 0.54 814 0 0 814
MOLDURAS VIROLA m 0.54 0 378 0 0
PUNTILLA CON CABEZA 2 lb 0.27 751 770 636 741
REGLILLAS TIRAS 3M m 0.54 0 0 184 0
TOC MADERA TRANSPARENTE kg 0.05 733 580 1,126 733
62,604 29,503 27,009 28,686
LISTON M.H. PINO ROMERON mLISTON MONTERREY 1X2X3 m 4.32 0 0 1,823 0
LISTON OTOBO m 4.32 0 4,536 0 0
LISTN DE ORDINARIO m 4.32 0 0 0 3,158
LISTN M.H. PINO CIPRES m 4.32 37,066 0 0 0
LISTN M.H. PINO ROMERN m 1.08 43,848 43,848 43,848 28,512
MANO DE OBR A AA hc 1.10 11,965 11,965 11,965 11,965
MEDIA CAA CHINGALE LISA m 0.54 814 0 0 814
MOLDURAS VIROLA m 0.54 0 378 0 0
PUNTILLA CON CABEZA 2 lb 0.27 751 770 636 741
REGLILLAS TIRAS 3M m 0.54 0 0 184 0
TOC MADERA TRANSPARENTE kg 0.05 733 580 1,126 733
95,177 62,076 59,582 45,923
LUXACELL ACERO mCIELO RAS O ALUZ INC CELL 5X5 m 1.03 249,193 249,193 249,193 249,193
249,193 249,193 249,193 249,193
LUXALON ALUMINIO P 80 mCIELO RASO ALUMINIO ACSTICO 84R V5 m 1.03 119,398 119,398 119,398 119,398
119,398 119,398 119,398 119,398
LUXALON GALV.ACUST. P 130 mCIELO RASO ALUZINC ACUSTICO 130B m 1.03 81,768 81,768 81,768 81,768
81,768 81,768 81,768 81,768
MALLA CON VENA mMALLA CON VENA 0.60X2.00 un 0.73 3,201 3,285 3,075 2,409
MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
PUNTILLA CON CABEZA 2 lb 0.02 56 57 47 55
7,607 7,693 7,473 6,815
CIMIENTOS
BASE AGREGADO PETREO m
BASE GRANULA R m 1.30 0 0 0 33,550MANO DE OBR A AA hc 0.70 7,614 7,614 7,614 7,614
RECEBO COMN m 1.30 41,269 0 0 0
ROCA MUERTA 5 M3 m 1.30 0 41,263 0 0
VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714
ZAHORRA B-200 m 1.30 0 0 20,280 0
50,396 50,337 29,425 42,878
BASE ARENA CEMENTO 1:20 mAGUA lt 234.00 2,808 2,808 2,808 2,808
ARENA DE PEA m 1.61 49,865 0 0 0
ARENA DE REVOQUE m 1.61 0 0 16,100 32,200
ARENA FINA 5 M3 m 1.61 0 41,087 0 0
CEMENTO GRIS kg 113.10 20,358 22,620 25,334 23,299
MANO DE OBR A AA hc 0.70 7,614 7,614 7,614 7,614
VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714
82,159 75,589 53,388 67,635
CICLOPEOS mAGUA lt 158.00 1,896 1,896 1,896 1,896
ARENA AMARILL A PUERTO COLOMBIA m 0.30 0 0 4,500 0
ARENA GRUESA 5 M3 m 0.30 0 7,656 0 0
ARENA LAVADA DE PEA m 0.30 7,500 0 0 0
ARENA LAVADA PARA CONCRETO m 0.30 0 0 0 5,788
CEMENTO GRIS kg 180.00 32,400 36,000 40,320 37,080
GRAVA CANTO RODADO 1/2 m 0.57 0 0 24,795 0GRAVILLA DE RIO m 0.57 31,692 0 0 31,692
GRAVILLA FINA 1/2 Y 3/4 m 0.57 0 22,800 0 0
MANO DE OBR A AA hc 4.70 51,122 51,122 51,122 51,122
PIEDRA CICLPEA m 0.42 0 0 9,030 0
PIEDRA ENTRESUELO m 0.42 0 0 0 5,788
PIEDRA MEDIA ZONGA m 0.42 11,340 0 0 0
RAJON DE PIEDRA m 0.42 0 8,820 0 0
135,950 128,294 131,663 133,366
DEMOLICIN CABEZAS PILOTES mCOMPRESOR DE 2 MARTILLOS h 6.95 241,860 241,860 241,860 241,860
MANO DE OBRA AA hc 8.91 96,914 96,914 96,914 96,914
RETROEXCAVADORA 5-10 d 0.04 14,080 12,528 14,080 14,432
VOLQU ETA M3 vj 0.45 17,100 15,984 16,898 19,331
369,954 367,286 369,752 372,537
DEMOLICIN CIMIENTO ENTERRADOS mCOMPRESOR DE 2 MARTILLOS h 3.50 121,800 121,800 121,800 121,800
MANO DE OBRA AA hc 4.02 43,726 43,726 43,726 43,726
VOLQU ETA M3 vj 0.50 19,000 17,760 18,775 21,479
184,526 183,286 184,301 187,005
EXCAVACION MANUAL CIMIENTOS mMANO DE OBR A AA hc 0.93 10,116 10,116 10,116 10,116VOLQU ETA M3 vj 0.37 14,060 13,142 13,894 15,894
24,176 23,258 24,009 26,010
IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX mAGUA lt 0.32 4 4 4 4
MANO DE OBR A CC hc 0.18 2,251 2,251 2,251 2,2 51
XYPEX CONCENTRADO- GRIS kg 0.80 9,240 9,240 9,240 9,240
11,495 11,495 11,495 11,495
PILOTES HINCADOS 25X25 mPILOTES HINCADOS 25X25 m 1.03 81,246 81,246 81,246 81,246
81,246 81,246 81,246 81,246
PLACA FLOTANTE 0.90 CIMIENTOS mCONCRETO CORRIENTE 3000 PSI m 0.46 144,125 143,912 126,303 144,072
COSTO ADICIONAL BOMBEO m 0.46 10,939 12,646 11,201 10,672
CUARTON OTOBO 2X4 2.9 m 0.11 0 495 0 0
ICOPOR 1 CM/DENS.20 /1X1 m 0.80 2,320 2,000 2,000 0
MANO DE OBRA AA hc 1.83 19,905 19,905 19,905 19,905
PUNTILLA CON CABEZA 2 lb 0.03 83 86 71 82
TABLA 2X10 MADERA COMUN m 0.11 0 0 0 308
TABLA CHAPA ORDINARIO 0.30 m 0.11 170 0 0 0
TABLON CATIVO 0.30 m 0.11 0 0 275 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244
178,746 180,464 161,069 176,283
RELLENOS DE EXCAVACION mMANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
6,526 6,526 6,526 6,526
RETIRO SOBRANTES TIERRA mMANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
VOLQU ETA M3 vj 0.37 14,060 13,142 13,894 15,894
18,411 17,493 18,244 20,245
SOBRECIMIENTO CONCRETO 25X25 mCONCRETO CORRIENTE 3000 PSI m 1.03 322,715 322,238 282,809 32 2,596
DURMIENTE 3 M m 10.10 8,787 0 8,585 0
LARGUERO COMUN 3.5X7.5X3 M m 9.35 0 0 0 23,843
LARGUERO ORDINARIO 3 M m 10.10 0 0 0 8,131
LISTN 2X2X3 M m 10.10 0 41,309 0 0
MANO DE OBRA AA hc 6.89 74,943 74,943 74,943 74,943
PUNTILLA CON CABEZA 2 lb 2.67 7,428 7,610 6,291 7,326
TABLA CHAPA ORDINARIO 0.30 m 9.35 14,446 0 0 0
TABLA OTOBO 0.30 m 9.35 0 14,717 0 0
TABLON CATIVO 0.30 m 9.35 0 0 23,375 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244
429,523 462,236 397,316 438,082
VIGA AMARRE EN CONCRETO mCONCR ETO CORRI ENTE 2500 PSI m 1.10 330,612 317,341 28 1,741 331,122
CUAR TON OTOBO 2X4 2.9 m 3.11 0 13,995 0 0
LARGUERO COMUN 3.5X7.5X3 M m 3.52 0 0 0 8,976
LISTON ABARCO 3 M m 3.11 0 0 15,550 0
MANO DE OBRA AA hc 6.89 74,943 74,943 74,943 74,943
PUNTILLA CON CABEZA 2 lb 1.47 4,090 4,190 3,463 4,034
REPISA ORDINARIO 3 M m 3.11 9,330 0 0 0
TABLA BURRA ORDINARIO 0.30 m 3.52 32,666 0 0 0
TABLA OTOBO 0.30 m 3.52 0 5,540 0 0
TABLON CATIVO 0.30 m 3.52 0 0 8,800 0
TABLON ORDIN ARIO 3 M m 3.11 0 0 0 8,011
VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244
452,843 417,430 385,811 428,330
ANLISIS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
8/13/2019 ANALISIS DETALLADOS GENERALES
7/28
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
7
CIMIENTOS / CUBIERTAS
VIGA TEE 25X25X20X40 mCONCRETO CORRIENTE 3000 PSI m 1.10 344,648 344,137 302,029 344,520
CUARTON OTOBO 2X4 2.9 m 2.35 0 10,575 0 0
DURMIENTE 3 M m 2.35 2,045 0 1,998 0
LARGUERO COMUN 3.5X7.5X3 M m 2.35 0 0 0 5,993
LARGUERO ORDINARIO 3 M m 2.35 0 0 0 1,892
MANO DE OBRA AA hc 8.97 97,567 97,567 97,567 97,567
PUNTILLA CON CABEZA 2 lb 0.60 1,669 1,710 1,414 1,646TABLA CHAPA ORDINARIO 0.30 m 2.35 3,631 0 0 0
TABLA OTOBO 0.30 m 2.35 0 3,699 0 0
TABLON CATIVO 0.30 m 2.35 0 0 5,875 0
VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244
450,763 459,109 410,196 452,86 1
VIGA TEE 25X25X20X50 mCONCRETO CORRIENTE 3000 PSI m 1.10 344,648 344,137 302,029 344,520
CUARTON OTOBO 2X4 2.9 m 2.63 0 11,835 0 0
DURMIENTE 3 M m 2.63 2,288 0 2,236 0
LARGUERO COMUN 3.5X7.5X3 M m 2.45 0 0 0 6,248
LARGUERO ORDINARIO 3 M m 2.63 0 0 0 2,117
MANO DE OBRA AA hc 8.97 97,567 97,567 97,567 97,567
PUNTILLA CON CABEZA 2 lb 0.70 1,947 1,995 1,649 1,921
TABLA CHAPA ORDINARIO 0.30 m 2.45 3,785 0 0 0
TABLA OTOBO 0.30 m 2.45 0 3,856 0 0
TABLON CATIV O 0.30 m 2.45 0 0 6,125 0
VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244
451,439 460,811 410,920 453,616
ZAPATAS mCONCRETO CORRIENTE 3000 PSI m 1.03 322,715 3 22,238 282,809 322,59 6
LARGUERO COMUN 3.5X7.5X3 M m 3.00 0 0 0 7,650LISTON MONTERREY 1X2X3 m 3.00 0 0 1,266 0
LISTON OTOBO m 3.00 0 3,150 0 0
MANO DE OBRA AA hc 8.27 89,953 89,953 89,953 89,953
PLANCHN ORDINARIO 3 M m 0.29 797 0 0 0
PUNTILLA CON CABEZA 2 lb 0.10 278 285 236 274
TABLA CHAPA ORDINARIO 0.30 m 3.00 4,635 0 0 0
TABLON ABARCO 3 M m 3.00 0 0 6,000 0
TABLON ORDINARIO 3 M m 3.00 0 0 0 7,728
TABLON OTOBO 3 M m 3.00 0 24,000 0 0
VARA DE CLAVO m 0.50 750 750 750 667
VIBRADOR A GASOLINA d 0.10 3,010 3,552 3,285 3,110
422,138 443,927 384,299 431,978
CUBIERTAS
AFINADO CUBIERTAS PLANAS mAGUA lt 13.93 167 167 167 167
ARENA FINA m 0.06 0 1,140 0 0ARENA LAVADA DE PEA m 0.06 1,500 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.06 0 0 1,470 0
ARENA LAVADA PARA CONCRETO m 0.06 0 0 0 1,158
CEMENTO GRIS kg 23.38 4,208 4,676 5,237 4,816
MANO DE OBR A AA hc 0.70 7,614 7,614 7,614 7,614
13,489 13,597 14,488 13,755
ALISTADO IMPERMEABILIZADO TEJA BARRO mALAMBRE DE PUAS NO 12 kg 6.30 10,206 10,080 10,080 10,868
ALAMBRE NEGRO NO.18 kg 0.02 34 32 34 36
ASFALTO TIPO 190/220 200 KG kg 1.02 1,639 1,639 1,639 1,639
CONCRETO CORRIENTE 2500 PSI m 0.05 15,028 14,425 12,806 15,051
ESTERILLA DE GADUA m 0.85 2,150 2,635 2,150 2,296
MANO DE OBRA AA hc 1.80 19,579 19,579 19,579 19,579
PERMA GLASS 6 FIBERGLASS m 1.56 3,493 3,912 3,493 3,493
PUNTILLA CON CABEZA 2 lb 0.05 139 143 118 137
52,267 52,444 49,899 53,098
BAJANTE LATON 12 X 6 mLMINA GALVANIZADA .22 un 0.20 6,687 6,687 6,687 7,030
SOLDADURA ESTAO PARA COBRE un 0.30 9,326 9,326 9,326 9,326
SUB-CONTRATO DE ORNAMENTACION % 80.00 12,811 12,811 12,811 13,085 28,824 28,824 28,824 29,442
BAJANTE PVC 3 mBAJA NTE REF.035103 BLA NCO un 1.05 18,732 18,732 17,843 17,843
CODO BAJANTE 45 BLANCO un 0.06 256 256 211 244
MANO DE OBR A BB hc 0.51 6,102 6,102 6,102 6,102
SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,492 4,492 4,492 3,279
SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 11,241 11,241 10,886 10,438
SUB-CONTRATO ORNAMENTACION % 38.00 11,241 11,241 10,886 10,438
52,066 52,066 50,420 48,344
BAJANTE PVC 4 mBAJANTE RECTANGULAR TRG-A 2.5 M un 1.10 38,434 41,806 38,434 39,496
CODO BAJANTE 90 BLANCO un 0.12 513 513 490 569
MANO DE OBR A BB hc 0.62 7,418 7,418 7,418 7,418
SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,492 4,492 4,492 3,279
SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 19,326 20,607 19,317 19,289
70,183 74,836 70,152 70,051
CABALLETE TEJA ETERNIT mCABALLETE ETERNIT PF/7 FIJO un 1.15 24,616 24,512 24,769 24,616
GANCH O TEJA ETER NIT 55 MM un 4.60 1,196 1,196 1,191 1,196
MANO DE OBR A AA hc 0.54 5,874 5,874 5,874 5,8 74
31,685 31,582 31,834 31,685
CABALLETE TEJA MOORE mARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 1.48 266 296 332 305
MANO DE OBR A AA hc 0.25 2,719 2,719 2,719 2,719
TEJA MOORE CABALLETE m 1.03 4,827 4,061 4,061 4,061
8,122 7,332 7,212 7,285
CANAL LATON D/0.50 mLMINA GALVANIZADA .22 un 0.25 8,359 8,359 8,359 8,788
SOLDADURA ESTAO PARA COBRE un 0.40 12,435 12,435 12,435 12,435
SUB-CONTRATO HIDRAULICO Y SANITARIO % 80.00 16,635 16,635 16,635 16,978
37,430 37,430 37,430 38,201
CANAL LATON D/0.75 mLMINA GALVANIZADA .22 un 0.38 12,706 12,706 12,706 13,357
SOLDADURA ESTAO PARA COBRE un 0.60 18,653 18,653 18,653 18,653
SUB-CONTRATO HIDRAULICO Y SANITARIO % 80.00 25,087 25,087 25,087 25,608
SUB-CONTRATO INSTALACION % 80.00 25,087 25,087 25,087 25,608
81,532 81,532 81,532 83,225
CANAL LATON D/1.00 mLM INA GALVAN IZA DA .22 un 0.50 16,718 16,718 16,718 17,575
SOLDADURA ESTAO PARA COBRE un 0.80 24,870 24,870 24,870 24,870
SUB-CONTRATO INSTALACION % 80.00 33,271 33,271 33,271 33,956
74,859 74,859 74,859 76,402
CANAL PVC 3 mCANA L REF.035010 02 BLA NCO m 1.03 11,711 11,711 9,617 9,617
MANO DE OBRA BB hc 0.74 8,854 8,854 8,854 8,854
SOPORTE DE CANAL BLANCO un 2.74 4,146 4,146 4,809 4,809
TAPA EXTERNA BLANCO un 0.68 2,987 2,987 2,788 2,846
TORNILLO PARA MADERA 1 NO.6 un 4.00 72 72 72 64
UNIN CANAL BLANCO un 0.34 1,776 1,776 1,458 1,692
SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 11,227 11,227 10,487 10,595
40,772 40,772 38,085 38,476
CANALETA 43 DE 4.00 mCANALETA 43 ETERNIT X 400 un 0.60 48,231 48,231 49,325 49,499
IGAS GRIS (30 KG) kg 0.12 1,079 1,079 1,079 1,079
MANO DE OBRA AA hc 0.83 9,028 9,028 9,028 9,028
TORNILLO PARA CANALETA 43 METAL un 0.60 544 670 668 544
58,882 59,008 60,100 60,150
CANALETA 43 DE 5.00 mCANALETA 43 ETERNIT X 500 un 0.48 43,769 43,769 44,691 44,868
IGAS GRIS (30 KG) kg 0.12 1,079 1,079 1,079 1,079
MANO DE OBRA AA hc 0.90 9,789 9,789 9,789 9,789
TORNILLO PARA CANALETA 43 METAL un 0.48 435 536 534 435 55,072 55,173 56,09 4 56,171
CANALETA 43 DE 6.00 mCANALETA 43 ETERNIT X 600 un 0.39 41,937 41,937 42,878 43,051
IGAS GRIS (30 KG) kg 0.12 1,079 1,079 1,079 1,079
MANO DE OBRA AA hc 0.90 9,789 9,789 9,789 9,789
TORNILLO PARA CANALETA 43 METAL un 0.78 707 871 868 707
53,513 53,676 54,614 54,625
CANALETA 90 DE 4.50 mCANALETA 90 ETERNIT X 450 un 0.26 29,220 29,220 25,509 25,149
MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
MASIL GRIS FRIO kg 0.17 2,092 2,079 2,092 2,092
TORNILLO PARA CANALETA 90 un 0.26 771 771 771 771
38,609 38,596 34,899 34,538
CANALETA 90 DE 6.00 mCANALETA 90 ETERNIT X 600 un 0.20 30,038 30,038 26,019 25,854
MANO DE OBRA AA hc 0.83 9,028 9,028 9,028 9,028
MASIL GRIS FRIO kg 0.17 2,092 2,079 2,092 2,092
TORNI LLO PARA CANA LETA 90 un 0.40 1,186 1,186 1,186 1,186
42,344 42,331 38,326 38,160
CANALETA 90 DE 9.00 mCANALETA 90 ETERNIT X 900 un 0.13 29,285 29,285 29,285 29,285MANO DE OBRA AA hc 0.83 9,028 9,028 9,028 9,028
MASIL GRIS FRIO kg 0.17 2,092 2,079 2,092 2,092
TORNI LLO PARA CANA LETA 90 un 0.39 1,156 1,156 1,157 1,156
41,561 41,548 41,562 41,561
CANALETA ACESCO DE 4.50 mCANALETA 90 X 4.50 ACESCO un 0.25 35,387 35,387 35,387 35,387
MANO DE OBR A AA hc 0.75 8,158 8,158 8,158 8,158
TORNI LLO PARA CANA LETA 90 un 0.59 1,749 1,749 1,750 1,749
45,294 45,293 45,294 45,294
ENTRAMADO TEJA DE BARRO mCUARTON OTOBO 2X4 2.9 m 1.03 0 4,635 0 0
LISTON ABARCO 3 M m 1.03 0 0 5,150 0
MANO DE OBRA AA hc 1.80 19,579 19,579 19,579 19,579
PLANCHN ORDINARIO 3 M m 2.62 7,200 0 0 0
PUNTILLA CON CABEZA 2 lb 0.30 835 855 707 823
REPISA ORDINARIO 3 M m 1.03 1,039 0 0 1,009
8/13/2019 ANALISIS DETALLADOS GENERALES
8/28
CONSTRUDATA8
CUBIERTAS
TABLON ABARCO 3 M m 2.62 0 0 5,240 0
TABLON ORDINARIO 3 M m 2.62 0 0 0 6,749
TABLON OTOBO 3 M m 2.62 0 20,960 0 0
28,652 46,029 30,675 28,160
ENTRAMADO TEJA MOORE mCORREA DE 2X2 DURMIENTE m 8.20 0 0 28,700 0
CUADROS ABARCO 4X4X320 m 8.20 0 0 0 28,700
DURMIENTE ORDINARIO 4 M m 8.20 28,700 0 0 0LISTN 2X2X3 M m 8.20 0 33,538 0 0
MANO DE OBRA AA hc 1.80 19,579 19,579 19,579 19,579
PUNTILLA CON CABEZA 2 lb 0.20 556 570 471 549
48,835 53,687 48,750 48,827
ENTRAMADO TEJA ONDULADA mCUARTON OTOBO 2X4 2.9 m 0.51 0 2,295 0 0
LARGUERO DE 2 X 4 m 0.51 0 0 0 4,845
LISTON ABARCO 3 M m 0.51 0 0 2,550 0
MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
PLANCHN ORDINARIO 3 M m 2.62 7,200 0 0 0
PUNTILLA CON CABEZA 2 lb 0.20 556 570 471 549
REPISA ORDINARIO 3 M m 0.51 1,530 0 0 0
TABLA BURRA 3 M m 2.62 6,550 0 0 0
TABLON ABARCO 3 M m 2.62 0 0 5,240 0
TABLON ORDINARIO 3 M m 2.62 0 0 0 6,749
TABLON OTOBO 3 M m 2.62 0 20,960 0 0
26,713 34,702 19,138 23,020
FLANCHE LATON 0.08 mLMINA GALVANIZADA .22 un 0.20 6,687 6,687 6,687 7,030
SOLDADURA ESTAO PARA COBRE un 0.20 6,218 6,218 6,218 6,218
SUB-CONTRATO DE ORNAMENTACION % 80.00 10,324 10,324 10,324 10,598 23,229 23,229 23,229 23,846
INMUNIZANTE PARA CUBIERTA mA.C.P.M. gl 0.21 823 823 823 823
BROCHA DE CERDA 4 un 0.02 184 184 184 188
MANO DE OBR A AA hc 0.20 2,175 2,175 2,175 2,175
3,182 3,182 3,182 3,186
MANTO FIBERGLASS 2M mMANTO FIBERGLASS 400X m 1.00 6,546 6,982 6,546 6,546
SUB-CONTRATO INSTALACION % 45.00 2,946 3,142 2,946 2,946
9,492 10,124 9,492 9,492
MANTO FIBERGLASS 3M mMANTO FIBERGLASS 600XT rl 1.00 96,709 108,539 96,709 96,709
SUB-CONTRATO INSTALACION % 45.00 43,519 48,843 43,519 43,519
140,228 157,382 140,228 140,228
PERMA PLY 3 CAPAS mALUMOL (3 KG) kg 0.24 4,065 4,065 4,065 4,065
ASFALTO TIPO 190/220 200 KG kg 2.08 3,343 3,343 3,343 3,343
MANO DE OBRA AA hc 0.76 8,267 8,267 8,267 8,267
PERMA GLASS 6 FIBERGLASS m 3.55 7,948 8,903 7,948 7,948
23,622 24,577 23,622 23,622SHINGLE CON IMPERMEABILIZANTE mBASE FELT PLUS FIBERGLASS m 3.00 2,709 3,090 2,709 2,709
EMULSIN ASFLTICA ED/9 CUETE 5 GL gl 0.50 3,642 3,642 3,642 3,642
MANO DE OBRA AA hc 0.82 8,919 8,919 8,919 8,919
PUNTILLA CON CABEZA 1 lb 0.30 760 540 760 607
TEJA SHINGLE RECT ONIX BLACK m 2.20 75,836 69,729 75,836 75,836
91,866 85,920 91,866 91,712
TEJA DE BARRO mARENA DE PEA m 0.05 1,549 0 0 0
ARENA DE REVOQUE m 0.05 0 0 500 1,000
ARENA FINA 5 M3 m 0.05 0 1,276 0 0
CEMEN TO GRIS kg 9.67 1,741 1,934 2,166 1,992
MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052
TEJA BAVARA m 1.03 21,865 21,865 21,865 21,865
38,20 6 38,127 37,583 37,909
TEJA DE BARRO SOBRE ETERNIT mARENA DE PEA m 0.04 1,239 0 0 0
ARENA DE REVOQUE m 0.04 0 0 400 800
ARENA FINA 5 M3 m 0.04 0 1,021 0 0
CEMENTO GRIS kg 7.50 1,350 1,500 1,680 1,545MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702
TEJA BAVARA ALFA 30X15 m 0.50 4,500 4,500 4,500 4,500
15,790 15,722 15,282 15,547
TEJA ESPAOLA ETERNIT mGANCH O TEJA ETER NIT 55 MM un 1.59 413 413 412 413
MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895
TEJA ETERNIT ESPAOLA 0.74 un 0.26 5,381 5,626 5,361 5,377
TEJA ETERNIT ESPAOLA 1.64 un 0.53 23,766 29,848 29,034 23,766
34,456 40,782 39,702 34,451
TEJA ETERNIT NO.4 mGANCHO TEJA ETERNIT 55 MM un 2.02 525 525 523 525
MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
TEJA ETERNIT NO.4 un 1.01 20,818 21,769 20,435 20,800
27,870 28,820 27,485 27,851
TEJA ETERNIT NO.6 mGANCHO TEJA ETERNIT 55 MM un 1.30 338 338 337 338
MANO DE OBR A AA hc 0.54 5,874 5,874 5,874 5,874
TEJA ETER NIT NO.6 un 0.65 20,634 21,116 21,683 20,617
26,845 27,327 27,893 26,828
TEJA ETERNIT NO.8 mGANCHO TEJA ETERNIT 55 MM un 1.10 286 286 285 286
MANO DE OBR A AA hc 0.54 5,874 5,874 5,874 5,8 74
TEJA ETERNIT NO.8 un 0.50 20,598 20,580 21,463 20,580
26,757 26,740 27,621 26,740
TEJA TRANSPARENTE NO.4 m
GANCHO TEJA ETERNIT 55 MM un 2.02 525 525 523 525MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895
TEJA MAX ILI T ONDUL ADA PF/7 NO. 4 un 1.01 17,278 17,278 14,446 17,170
22,698 22,698 19,864 22,590
TEJA TRANSPARENTE NO.6 mGANCHO TEJA ETERNIT 55 MM un 1.30 338 338 337 338
MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895
TEJA MAXIL IT ONDULADA PF/7 NO. 6 un 1.01 26,600 26,600 22,245 25,755
31,833 31,833 27,477 30,988
TRAGANTES 4 unARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200
ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 1.00 180 200 224 206
CPULA TRAGANTE C 4X2 un 1.00 5,670 5,500 5,500 6,325
MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
10,511 10,306 10,175 11,082
TRAGANTES 6 unARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200
ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 1.00 180 200 224 206CPULA TRAGANTE C 6X4 un 1.00 12,600 13,000 12,500 11,098
MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
17,441 17,806 17,175 15,855
DESAGES E INST. SUBTERRNEAS
ACCESORIOS DE GRES 4 unAGUA lt 0.76 9 9 9 9
ARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200
ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 0.91 164 182 204 187
MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
SIFN DE GRES 4 un 1.03 14,338 14,338 14,338 14,338
21,346 21,310 21,177 21,260
ACCESORIOS DE GRES 6 unAGUA lt 1.59 19 19 19 19
ARENA DE PEA m 0.01 310 0 0 0ARENA DE REVOQUE m 0.01 0 0 100 200
ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 1.87 337 374 419 385
MANO DE OBR A AA hc 0.70 7,614 7,614 7,614 7,614
SIF N DE GRES 6 un 1.03 17,922 17,922 17,963 13,184
26,201 26,184 26,115 21,402
CAJA CONTADOR AGUA FIBRIT unBASE GRANULA R m 0.02 0 0 0 516
CAJA CONTADOR ACUEDUCTO CIMA 530 un 1.00 53,133 40,357 53,133 53,133
MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052
RECEBO COMN m 0.02 635 0 0 0
ROCA MUERTA 5 M3 m 0.02 0 635 0 0
ZAHORRA B-200 m 0.02 0 0 312 0
66,820 54,044 66,497 66,702
CAJA INSPECCION FIBRIT TRAFICO LIVIANO unBASE GRANULA R m 0.02 0 0 0 516
CAJA INSPECCIN FIBRIT PANDA 70X70X65 CAI-65F un 1.00 58,282 58,282 58,282
58,282
MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052
RECEBO COMN m 0.02 635 0 0 0ROCA MUERTA 5 M3 m 0.02 0 635 0 0
TAPA CAJA TRFICO LIVIANO 72X72X13 CAI-TL un 1.00 67,868 67,868 54,972 67,868
ZAHORRA B-200 m 0.02 0 0 312 0
139,837 139,837 126,618 139,719
CAJA INSPECCION FIBRIT TRAFICO PESADO unBASE GRANULA R m 0.02 0 0 0 516
CAJA INSPECCIN FIBRIT PROFUNDA 70X70X97 CAI-95F un 1.00 67,029 67,029 67,029
67,029
MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754
RECEBO COMN m 0.02 635 0 0 0
ROCA MUERTA 5 M3 m 0.02 0 635 0 0
TAPA CAJA TRFICO PESADO 72X72X13 un 1.00 110,288 110,288 110,288 110,288
ZAHORRA B-200 m 0.02 0 0 312 0
199,706 199,706 199,383 199,587
CAJAS INSPECCION 100 X 100 unACERO FIGURADO 60000 PSI 1 kg 0.11 198 237 198 203
ACERO FIGU RADO 6000 0 PSI 1/2 kg 4.00 7,192 8,608 7,192 7,472
ARENA AMARILL A PUERTO COLOMBIA m 0.07 0 0 1,050 0
ANLISIS BOGOT CAL I B/QUILLA MEDELLN
INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
8/13/2019 ANALISIS DETALLADOS GENERALES
9/28
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
9
CUBIERTAS / DESAGES E INST. SUBTERRNEAS
ARENA FINA m 0.22 0 4,180 0 0
ARENA GRUESA 5 M3 m 0.07 0 1,786 0 0
ARENA LAVADA DE PEA m 0.22 5,500 0 0 0
ARENA LAVADA DE RIO m 0.07 5,040 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.22 0 0 5,390 0
ARENA LAVADA MEISSEN m 0.22 0 0 0 4,699
ARENA LAVADA PARA CONCRETO m 0.07 0 0 0 1,351
BASE GRANULA R m 0.83 0 0 0 21,421CEMENTO GRIS kg 118.00 21,240 23,600 26,432 24,308
GRAVA CANTO RODADO 1/2 m 0.11 0 0 4,785 0
GRAVI LLA DE RIO m 0.11 6,116 0 0 6,116
GRAVILLA FINA 1/2 Y 3/4 m 0.11 0 4,400 0 0
LADRILLO BOCADILLO RECOCIDO un 235.80 0 0 0 48,103
LADRILLO LIMPIO 10-29 un 235.80 0 106,110 0 0
LADRILLO RECOCIDO OSCURO un 235.80 51,876 0 0 0
LADRILLO TOLETE RECOCIDO un 235.80 0 0 76,871 0
MANO DE OBRA AA hc 5.80 63,087 63,087 63,087 63,087
RECEBO COMN m 0.83 26,348 0 0 0
ROCA MUERTA 5 M3 m 0.83 0 26,345 0 0
ZAHORRA B-200 m 0.83 0 0 12,948 0
186,597 238,3 53 197,952 176,759
CAJAS INSPECCION 40 X 40 unACERO FIGURADO 60000 PSI 1/2 kg 0.60 1,079 1,291 1,079 1,121
ALA MBRE NEGRO NO.18 kg 0.01 17 16 17 18
ARENA AMARILL A PUERTO COLOMBIA m 0.02 0 0 300 0
ARENA FINA m 0.05 0 950 0 0
ARENA GRUESA 5 M3 m 0.02 0 510 0 0
ARENA LAVADA DE PEA m 0.05 1,250 0 0 0
ARENA LAVADA DE RIO m 0.02 1,440 0 0 0ARENA LAVADA JUAN DE ACOSTA m 0.05 0 0 1,225 0
ARENA LAVADA MEISSEN m 0.05 0 0 0 1,068
ARENA LAVADA PARA CONCRETO m 0.02 0 0 0 386
BASE GRANULA R m 0.07 0 0 0 1,807
CEMENTO GRIS kg 30.74 5,533 6,148 6,886 6,332
GRAVA CANTO RODADO 1/2 m 0.04 0 0 1,740 0
GRAVILLA DE RIO m 0.04 2,224 0 0 2,224
GRAVILLA FINA 1/2 Y 3/4 m 0.04 0 1,600 0 0
LADRILLO BOCADILLO RECOCIDO un 36.82 0 0 0 7,511
LADRILLO LIMPIO 10-29 un 36.82 0 16,569 0 0
LADRILLO RECOCIDO OSCURO un 36.82 8,100 0 0 0
LADRILLO TOLETE RECOCIDO un 36.82 0 0 12,003 0
MANO DE OBRA AA hc 4.85 52,753 52,753 52,753 52,753
RECEBO COMN m 0.07 2,222 0 0 0
ROCA MUERTA 5 M3 m 0.07 0 2,222 0 0
ZAHORRA B-200 m 0.07 0 0 1,092 0
74,619 82,060 77,095 73,220
CAJAS INSPECCION 60 X 60 unACERO FIGURADO 60000 PSI 1/2 kg 0.90 1,618 1,937 1,618 1,681
ALAMBRE NEGRO NO.18 kg 0.03 51 48 51 54ARENA AMARILL A PUERTO COLOMBIA m 0.03 0 0 450 0
ARENA FINA m 0.11 0 2,090 0 0
ARENA GRUESA 5 M3 m 0.03 0 766 0 0
ARENA LAVADA DE PEA m 0.11 2,750 0 0 0
ARENA LAVADA DE RIO m 0.03 2,160 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.11 0 0 2,695 0
ARENA LAVADA MEISSEN m 0.11 0 0 0 2,350
ARENA LAVADA PARA CONCRETO m 0.03 0 0 0 579
BASE GRANULA R m 0.11 0 0 0 2,839
CEMEN TO GRIS kg 57.19 10,294 11,438 12,811 11,781
GRAVA CANTO RODADO 1/2 m 0.06 0 0 2,610 0
GRAVILLA DE RIO m 0.06 3,336 0 0 3,336
GRAVILLA FINA 1/2 Y 3/4 m 0.06 0 2,400 0 0
LADRILLO BOCADILLO RECOCIDO un 92.80 0 0 0 18,931
LADRILLO LIMPIO 10-29 un 92.80 0 41,760 0 0
LADRILLO RECOCIDO OSCURO un 92.80 20,416 0 0 0
LADRILLO TOLETE RECOCIDO un 92.80 0 0 30,253 0
MANO DE OBRA AA hc 5.13 55,799 55,799 55,799 55,799
RECEBO COMN m 0.11 3,492 0 0 0
ROCA MUER TA 5 M3 m 0.11 0 3,492 0 0ZAH ORRA B-200 m 0.11 0 0 1,716 0
99,917 119,729 108,003 97,350
CAJAS INSPECCION 80 X 80 unACERO FIGURADO 60000 PSI 1/2 kg 3.20 5,754 6,886 5,754 5,978
ALAMBRE NEGRO NO.18 kg 0.09 153 144 153 162
ARENA AMARILL A PUERTO COLOMBIA m 0.05 0 0 750 0
ARENA FINA m 0.19 0 3,610 0 0
ARENA GRUESA 5 M3 m 0.05 0 1,276 0 0
ARENA LAVADA DE PEA m 0.19 4,750 0 0 0
ARENA LAVADA DE RIO m 0.05 3,600 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.19 0 0 4,655 0
ARENA LAVADA MEISSEN m 0.19 0 0 0 4,058
ARENA LAVADA PARA CONCRETO m 0.05 0 0 0 965
BASE GRANULA R m 0.16 0 0 0 4,129
CEMEN TO GRIS kg 94.38 16,988 18,876 21,141 19,442
GRAVA CANTO RODADO 1/2 m 0.09 0 0 3,915 0
GRAVILLA DE RIO m 0.09 5,004 0 0 5,004
GRAVILLA FINA 1/2 Y 3/4 m 0.09 0 3,600 0 0
LADRILLO BOCADILLO RECOCIDO un 188.64 0 0 0 38,483
LADRILLO LIMPIO 10-29 un 188.64 0 84,888 0 0
LADRILLO RECOCIDO OSCURO un 188.64 41,501 0 0 0
LADRILLO TOLETE RECOCIDO un 188.64 0 0 61,497 0
MANO DE OBRA AA hc 5.40 58,736 58,736 58,736 58,736
RECEBO COMN m 0.16 5,079 0 0 0
ROCA MUER TA 5 M3 m 0.16 0 5,079 0 0ZAHORRA B-200 m 0.16 0 0 2,496 0
141,565 183,095 159,097 136,957
CAMARAS ELECTRICAS DOBLES unACERO FIGURADO 60000 PSI 1/2 kg 20.63 37,093 44,396 37,093 38,537
ALA MBRE NEGRO NO.18 kg 0.62 1,057 991 1,057 1,116
ARENA AMARILL A PUERTO COLOMBIA m 0.16 0 0 2,400 0
ARENA FINA m 0.46 0 8,740 0 0
ARENA GRUESA 5 M3 m 0.16 0 4,083 0 0
ARENA LAVADA DE PEA m 0.46 11,500 0 0 0
AREN A LAVAD A DE RIO m 0.16 11,520 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.46 0 0 11,270 0
ARENA LAVADA MEISSEN m 0.46 0 0 0 9,826
ARENA LAVADA PARA CONCRETO m 0.16 0 0 0 3,087
BASE GRANULA R m 0.36 0 0 0 9,291
CEMENTO GRIS kg 255.58 46,004 51,116 57,250 52,649
GRAVA CANTO RODADO 1/2 m 0.34 0 0 14,790 0
GRAVILLA DE RIO m 0.34 18,904 0 0 18,904
GRAVILLA FINA 1/2 Y 3/4 m 0.34 0 13,600 0 0
LADRILLO BOCADILLO RECOCIDO un 527.41 0 0 0 107,592
LADRILLO LIMPIO 10-29 un 527.41 0 237,335 0 0
LADRILLO RECOCIDO OSCURO un 527.41 116,030 0 0 0LADRILLO TOLETE RECOCIDO un 527.41 0 0 171,936 0
MANO DE OBRA AA hc 10.00 108,770 108,770 108,770 108,770
RECEBO COMN m 0.36 11,428 0 0 0
ROCA MUER TA 5 M3 m 0.36 0 11,427 0 0
ZAHORRA B-200 m 0.36 0 0 5,616 0
362,307 480,458 410,181 349,771
DUCTO ELECTRICO PVC 3 mBASE GRANULA R m 0.01 0 0 0 258
DUCTO ELCTRICO LIVIANO 3 m 1.03 6,496 6,496 6,496 7,526
MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508
RECEBO COMN m 0.01 317 0 0 0
ROCA MUERTA 5 M3 m 0.01 0 317 0 0
UNIN CONDUIT PVC 3 un 0.21 963 963 963 963
ZAHORRA B-200 m 0.01 0 0 156 0
51,285 51,285 51,124 52,256
DUCTOS ELECTRICOS ASBETO CEMENTO 4 mBASE GRANULA R m 0.01 0 0 0 258
DUCTO ETER NIT 4 m 1.03 11,730 11,730 12,316 12,316
MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508
RECEBO COMN m 0.01 317 0 0 0ROCA MUERTA 5 M3 m 0.01 0 317 0 0
UNIN A.C CNICA 4 un 0.21 304 304 319 319
ZAHORRA B-200 m 0.10 0 0 1,560 0
55,859 55,859 57,703 56,401
DUCTOS ELECTRICOS PVC 4 mBASE GRANULA R m 0.01 0 0 0 258
DUCTO ELCTRICO LIVIANO 4 m 1.03 11,298 11,298 11,298 11,298
MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508
RECEBO COMN m 0.01 317 0 0 0
ROCA MUERTA 5 M3 m 0.01 0 317 0 0
UNIN CONDUIT PVC 4 un 0.21 1,043 1,043 1,043 1,043
ZAHORRA B-200 m 0.01 0 0 156 0
56,166 56,166 56,00 5 56,107
EXCAVACION MANUAL mMANO DE OBRA AA hc 1.25 13,596 13,596 13,596 13,596
VOLQU ETA M3 vj 0.37 14,060 13,142 13,894 15,894
27,656 26,739 27,490 29,491
POZO SEPTICO ETERNIT unBASE GRANULA R m 0.10 0 0 0 2,581
MANO DE OBRA AA hc 3.00 32,631 32,631 32,631 32,631RECEB O COM N m 0.10 3,175 0 0 0
ROCA MUER TA 5 M3 m 0.10 0 3,174 0 0
TANQUE SPTICO ETERNIT un 1.00 512,800 512,800 455,403 614,754
ZAHORRA B-200 m 0.10 0 0 1,560 0
548,606 548,605 489,594 649,966
RELLENO GRAVILLA DE RIO mGRAVA CANTO RODADO 1/2 m 1.00 0 0 43,500 0
GRAVILLA DE RIO m 1.00 55,600 0 0 55,600
GRAVILLA FINA 1/2 Y 3/4 m 1.00 0 40,000 0 0
MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714
63,640 47,986 51,557 63,840
RELLENOS GRAVILLA FINA mGRAVILLA FINA 1/2 m 1.30 70,876 49,399 70,200 70,200
MANO DE OBR A AA hc 0.70 7,614 7,614 7,614 7,614
VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714
80,004 58,473 79,345 79,528
8/13/2019 ANALISIS DETALLADOS GENERALES
10/28
CONSTRUDATA10
DESAGES E INST. SUBTERRNEAS
TAPA POZO EN VIA unMANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
MARCO TAPA POZO MTPA-60 un 1.00 79,042 79,042 79,042 79,042
TAPA POZO EN VIAS D/0.60 TPA-60P un 1.00 134,963 134,963 134,963 134,963
224,882 224,882 224,882 224,882
TAPA SUMIDERO 68X33 unMANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702
MARCO SUMIDERO 73X38X14 MR-70 un 1.00 26,644 26,644 26,644 26,644SUMIDERO VIAL 68X33X10 R-70P un 1.00 69,816 69,816 69,816 69,816
105,162 105,162 105,162 105,162
TAPA SUMIDERO 95X45 unMANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
MARCO SUMIDERO 100X50X14 un 1.00 65,389 65,389 65,389 65,389
SUMIDERO VIAL 95X45X10 un 1.00 220,400 220,400 220,400 220,400
296,666 296,666 296,666 296,666
TUBERIA CONCRETO 12 mAGUA lt 5.27 63 63 63 63
ARENA DE PEA m 0.03 929 0 0 0
ARENA DE REVOQUE m 0.03 0 0 300 600
ARENA FINA 5 M3 m 0.03 0 766 0 0
CEMEN TO GRIS kg 6.20 1,116 1,240 1,389 1,277
MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754
TUBO CLASE I CONCRETO SIN REF 12 m 1.03 25,616 25,616 25,616 25,616
BASE ARENA CEMENTO 1:20 m 0.05 4,108 3,779 2,669 3,382
53,586 53,218 51,792 52,692
TUBERIA CONCRETO 8 mAGUA lt 2.11 25 25 25 25
ARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 2.48 446 496 556 511
MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702
TUBO CALS E II CONCR ETO SIN REF 8 m 1.03 18,161 18,161 18,161 18,161
BASE ARENA CEMENTO 1:20 m 0.03 2,465 2,268 1,602 2,029
30,109 29,907 29,145 29,628
TUBERIA DE GRES 10 mAGUA lt 3.33 40 40 40 40
ARENA DE PEA m 0.02 619 0 0 0
ARENA DE REVOQUE m 0.02 0 0 200 400
ARENA FINA 5 M3 m 0.02 0 510 0 0
CEMENTO GRIS kg 3.96 713 792 887 816
MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052
TUBO DE GRES 10 un 1.03 30,659 30,900 30,900 30,900
BASE ARENA CEMENTO 1:20 m 0.04 3,286 3,024 2,136 2,705
48,370 48,318 47,215 47,914
TUBERIA DE GRES 4 mAGUA lt 0.76 9 9 9 9
ARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 0.91 164 182 204 187
MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
TUBO DE GRES 4 un 1.03 8,364 6,309 8,395 8,498
BASE ARENA CEMENTO 1:20 m 0.02 1,643 1,512 1,068 1,353
17,016 14,793 16,301 16,773
TUBERIA DE GRES 6 mAGUA lt 1.59 19 19 19 19
ARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200
ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 1.87 337 374 419 385
MANO DE OBR A AA hc 0.70 7,614 7,614 7,614 7,614
TUBO DE GRES 6 un 1.03 13,936 12,360 10,753 12,875
BASE ARENA CEMENTO 1:20 m 0.02 1,643 1,512 1,068 1,353
23,858 22,134 19,973 22,446
TUBERIA DRENAJE GRES 4 mAGUA lt 1.60 19 19 19 19
ARENA DE PEA m 0.01 310 0 0 0
ARENA DE REVOQUE m 0.01 0 0 100 200ARENA FINA 5 M3 m 0.01 0 255 0 0
CEMENTO GRIS kg 1.50 270 300 336 309
MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526
TUBO DRENAJE DE GRES 4 m 1.03 10,452 10,452 11,281 10,439
BASE AGREGADO PETREO m 0.03 1,512 1,510 883 1,286
BASE ARENA CEMENTO 1:20 m 0.03 2,465 2,268 1,602 2,029
21,554 21,331 20,746 20,809
TUBERIA DRENAJE PVC 100MM mMANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351
TRITURADO DE MAQUINA m 0.03 0 0 780 1,800
TRITURADO DE RO m 0.03 720 0 0 0
TRITURADO PARA BASE m 0.03 0 855 0 0
TUBO DRENAJE 100MM m 1.00 15,458 15,458 15,458 12,691
20,529 20,664 20,589 18,842
DOTACIONES DEPORTIVAS
MALLA GRUESA (VOLEIBOL) unMALLA NYLON CABLE TENNIS un 1.00 333,248 333,248 333,248 333,248
333,248 333,248 333,248 333,248
MALLA NYLON ( VOLEIBOL) unMALLA NYLON (VOLEIBOL) un 1.00 38,628 38,628 38,628 36,628 38,628 38,628 38,628 36,628
MALLA NYLON (PETROLIZADA) unMALLA NYLON PETROLIZA DA VOLEIBOL un 1.00 80,900 80,900 80,900 73,200
80,900 80,900 80,900 73,200
PORTERIA (CANCHA FUTBOL) unMALLA PORTERA FTBOL un 1.00 171,900 171,900 171,900 184,000
PORTERA FTBOL un 1.00 1,682,000 1,682,000 1,682,000 1,682,000
EXCAVACION MANUAL m 1.72 47,569 45,990 47,282 50,724
1,901,469 1,899,89 0 1,901,182 1,916,724
PORTICO MULTIFUNCIONAL(F) unMAL LA BASK ET un 1.00 8,100 8,100 10,000 8,874
MALLA MICROFTBOL un 1.00 103,900 103,900 103,900 127,280
PORTERA MULTIFUNCIONAL un 1.00 2,146,000 2,146,000 2,146,000 2,146,000
EXCAVACION MANUAL m 1.72 47,569 45,990 47,282 50,724
2,305,569 2,303,990 2,307,182 2,332,878
SOPORTE MALLA TUBO 4 unCONCRETO CORRIENTE 5000 PSI m 0.01 3,822 4,145 3,784 3,828
MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263
TUBO ESTRUCT. GALVANIZADO 2 m 2.07 42,950 42,392 42,950 42,950
50,036 49,799 49,997 50,042
TUBO SOPORTE MALLA unCONCRETO CORRIENTE 2000 PSI m 0.01 2,839 2,791 2,394 2,842
MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877
TUBO ESTRUCT. GALVANIZADO 2 m 3.00 62,247 61,437 62,247 62,247
75,963 75,105 75,518 75,966
ENCHAPES Y ACCESORIOS
BRINDISI 20X25 mAGUA lt 3.00 36 36 36 36
CEMENTO BLANCO kg 0.70 665 595 686 578
CERMICA CORONA MORAZU L m 1.03 20,497 20,497 20,497 20,497
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687
33,130 33,048 33,299 33,043
CERAMICA ALFA LISA 20X20 mAGUA lt 3.00 36 36 36 36
CEMENTO BLANCO kg 1.03 979 876 1,009 850CERMICA ALFA LISA 20X20 m 1.03 12,315 12,315 12,315 12,315
FIJAMIX ALFA kg 0.30 2,458 2,458 2,458 2,458
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
25,033 24,930 25,064 24,904
CERAMICA PARED ITALIA 20X20 mAGUA lt 3.00 36 36 36 36
CEMENTO BLANCO kg 0.70 665 595 686 578
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687
PISO PLANO PIECENZA m 1.05 18,659 18,659 18,659 18,659
31,292 31,209 31,461 31,204
DUCHAS CRISTANAC 1.2X.90 unAGUA lt 2.97 36 36 36 36
ARENA FINA m 0.01 0 190 0 0
ARENA LAVADA DE PEA m 0.01 250 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.01 0 0 245 0
ARENA LAVADA PARA CONCRETO m 0.01 0 0 0 193
CEMENTO BLANCO kg 40.77 38,732 34,655 39,955 33,635
CEMEN TO GRIS kg 6.12 1,102 1,224 1,371 1,261
COLOR MINERAL kg 0.10 626 580 580 520MANO DE OBRA AA hc 15.50 168,594 168,594 168,594 168,594
MOSAICO VITREO m 10.74 499,410 499,410 499,410 499,410
708,749 704,68 8 710,190 703,64 8
ENCHAPES FACHADA TABLETA mARENA DE PEA m 0.03 929 0 0 0
ARENA DE REVOQUE m 0.03 0 0 300 600
ARENA FINA 5 M3 m 0.03 0 766 0 0
CEMENTO GRIS kg 6.71 1,208 1,342 1,503 1,382
LADRILLO 10X10 un 60.00 10,320 10,320 10,320 8,160
MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702
SIKA-2 (5.5 KG) kg 0.19 1,344 1,344 1,344 1,344
22,503 22,474 22,169 20,188
GABINETES BAO PRINCIPAL unCEMENTO BLANCO kg 2.00 1,900 1,700 1,960 1,650
GABINETE BAO PPAL un 1.00 230,000 246,100 230,000 230,000
MANO DE OBRA AA hc 1.29 14,031 14,031 14,031 14,031
245,931 261,831 245,991 245,681
ANLISIS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
8/13/2019 ANALISIS DETALLADOS GENERALES
11/28
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
AN LIS IS BOGOT CAL I B/QUILLA MEDELLN INSUMO UM CANT. VALOR VALOR VALOR VALOR
11
DOTACIONES DEPORTIVAS / ENCHAPES Y ACCESORIOS
GABINETES BAO SERVICIO unCEMENTO BLANCO kg 1.00 950 850 980 825
GABINETE BAO SERVICIO un 1.00 187,500 200,625 187,500 187,500
MANO DE OBRA AA hc 0.94 10,224 10,224 10,224 10,224
198,674 211,699 198,704 198,549
JABONERAS PORCELANA ACUARIO unCEMENTO BLANCO kg 0.50 475 425 490 413
JABONERA GRANDE ALLEGRO un 1.03 11,330 10,300 10,300 10,300MANO DE OBRA AA hc 0.48 5,221 5,221 5,221 5,221
17,026 15,946 16,011 15,933
JUEGOS INCRUSTAR unCEMENTO BLANCO kg 1.54 1,463 1,309 1,509 1,271
JUEGO INCRUSTACIONES COMPLETO un 1.03 54,719 40,170 40,170 40,170
MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754
77,936 63,233 63,433 63,195
JUEGOS INCRUSTAR ACUARIO unCEMENTO BLANCO kg 1.54 1,463 1,309 1,509 1,271
JUEGO INCRUSTACIONES ACUACER un 1.03 27,295 27,295 27,295 27,295
MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754
50,512 50,358 50,558 50,320
JUEGOS INCRUSTAR STILO unCEMENTO BLANCO kg 1.54 1,463 1,309 1,509 1,271
JUEGO INCRUSTACIONES COMPLETO STILO un 1.03 249,775 249,775 249,775 249,775
MANO DE OBRA AA hc 2.50 27,193 27,193 27,193 27,193
278,431 278,277 278,477 278,238
LAVADEROS PORCELANA 20X20 unACERO FIGURADO 37000 PSI 1/4 kg 1.18 2,122 2,539 2,122 3,356
ARENA AMARILL A PUERTO COLOMBIA m 0.02 0 0 300 0
ARENA DE PEA m 0.04 1,239 0 0 0ARENA DE REVOQUE m 0.04 0 0 400 0
ARENA FINA 5 M3 m 0.04 0 1,021 0 0
ARENA GRUESA 5 M3 m 0.02 0 510 0 0
ARENA LAVADA DE RIO m 0.02 1,440 0 0 0
ARENA LAVADA MEISSEN m 0.04 0 0 0 854
ARENA LAVADA PARA CONCRETO m 0.02 0 0 0 386
BLOQU E NO. 4 SANTAF un 12.36 9,789 10,444 11,334 11,334
CEMENTO BLANCO kg 2.66 2,527 2,261 2,607 2,195
CEMENTO GRIS kg 22.30 4,014 4,460 4,995 4,594
CERMICA CORONA EGEO m 2.66 39,634 39,634 39,634 39,634
GRAVA CANTO RODADO 1/2 m 0.04 0 0 1,740 0
GRAVILLA DE RIO m 0.04 2,224 0 0 2,224
GRAVILLA FINA 1/2 Y 3/4 m 0.04 0 1,600 0 0
LARGUERO COMUN 3.5X7.5X3 M m 0.61 0 0 0 1,556
MANO DE OBRA AA hc 17.95 195,242 195,242 195,242 195,242
PERFIL ALUMINIO 1/2 X 1/2 m 7.36 13,763 13,763 13,763 13,763
TABLA CHAPA ORDINARIO 0.30 m 0.61 942 0 0 0
TABLA OTOBO 0.30 m 0.61 0 960 0 0
TABLON CATIVO 0.30 m 0.61 0 0 1,525 0
272,936 272,435 273,662 275,137MARMOL GRIS 30X15 mAGUA lt 6.48 78 78 78 78
ARENA FINA m 0.04 0 760 0 0
ARENA LAVADA DE PEA m 0.04 1,000 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.04 0 0 980 0
ARENA LAVADA PARA CONCRETO m 0.04 0 0 0 772
CEMENTO BLANCO kg 0.51 485 434 500 421
CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938
MANO DE OBR A AA hc 1.30 14,140 14,140 14,140 14,140
MRMOL GRIS PAYANDE m 1.03 203,355 212,555 243,978 212,316
220,751 229,848 261,784 229,665
MARMOL TRAVERTINO ROMANO mAGUA lt 6.48 78 78 78 78
ARENA FINA m 0.04 0 760 0 0
ARENA LAVADA DE PEA m 0.04 1,000 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.04 0 0 980 0
ARENA LAVADA PARA CONCRETO m 0.04 0 0 0 772
CEMENTO BLANCO kg 0.51 485 434 500 421
CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938
MANO DE OBR A AA hc 1.30 14,140 14,140 14,140 14,140MRMOL TRAVESAO ROMANO CLASIC m 1.03 263,268 263,268 327,159 210,893
280,664 280,561 344,964 228,241
OLIMPIA BRILL.BASE 20X20 mAGUA lt 3.00 36 36 36 36
ARENA FINA 5 M3 m 0.02 0 510 0 0
ARENA LAVADA DE PEA m 0.02 500 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.02 0 0 490 0
ARENA LAVADA PARA CONCRETO m 0.02 0 0 0 386
CEMENTO BLANCO kg 0.70 665 595 686 578
CERMICA CORONA MACEDONIA m 1.05 23,625 23,625 23,625 23,625
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687
36,758 36,686 36,917 36,557
PAPEL COLGADURA GISELLE mPAPEL WOODCR EST rl 0.21 11,760 12,911 11,865 11,693
11,760 12,911 11,865 11,693
PAPEL COLGADURA TIPO 1 mVINILO MURAL T/COL gl 0.21 8,925 8,421 8,925 8,247
8,925 8,421 8,925 8,247
PAPEL COLGADURA WOODCREST mPAPEL WOODCR EST rl 0.21 11,760 12,911 11,865 11,693
11,760 12,911 11,865 11,693
PIEDRA CREMA m
AGUA lt 6.48 78 78 78 78ARENA FINA m 0.04 0 760 0 0
ARENA LAVADA DE PEA m 0.04 1,000 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.04 0 0 980 0
ARENA LAVADA PARA CONCRETO m 0.04 0 0 0 772
CEMENTO BLANCO kg 0.51 485 434 500 421
CEMEN TO GRIS kg 9.41 1,694 1,882 2,108 1,938
MANO DE OBR A AA hc 1.30 14,140 14,140 14,140 14,140
PIEDR A CREM A E= 20 MM m 1.03 47,972 47,972 47,972 37,312
65,368 65,266 65,778 54,661
PIEDRA MUECA mAGUA lt 6.48 78 78 78 78
ARENA FINA m 0.04 0 760 0 0
ARENA LAVADA DE PEA m 0.04 1,000 0 0 0
ARENA LAVADA JUAN DE ACOSTA m 0.04 0 0 980 0
ARENA LAVADA PARA CONCRETO m 0.04 0 0 0 772
CEMENTO BLANCO kg 0.51 485 434 500 421
CEMEN TO GRIS kg 9.41 1,694 1,882 2,108 1,938
MANO DE OBR A AA hc 1.30 14,140 14,140 14,140 14,140
PIEDRA MUECA E= 20MM m 1.03 88,415 94,270 108,368 9 4,270
105,811 111,563 126,174 111,619
PIRLAN DUCHA PORC. 20X20 mCEMENTO BLANCO kg 0.60 570 510 588 495
CERMICA CORONA EGEO m 0.50 7,450 7,450 7,450 7,450
MANO DE OBR A AA hc 1.60 17,403 17,403 17,403 17,403
PEGACOR BLANCO kg 0.60 512 509 540 512
25,935 25,873 25,981 25,860
PORC.ESFUMADO BASE 20X20 mAGUA lt 3.00 36 36 36 36
CEMENTO BLANCO kg 0.90 855 765 882 743
CERMICA ESFUMADO 20X25 m 1.05 19,425 20,895 20,895 22,575
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687
32,248 33,616 33,893 35,286
PORC.PLANO ESTANCIA 11X22 mAGUA lt 3.00 36 36 36 36
CEMENTO BLANCO kg 0.90 855 765 882 743
CERMICA PORCELANA ARCADIA BL m 1.05 15,712 15,712 17,325 15,712
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687
28,536 28,433 30,323 28,423
PORC.ROSSO ITALIA 20X20 mAGUA lt 3.00 36 36 36 36
CEMENTO BLANCO kg 0.90 855 765 882 743
CERMICA PARED PARIS m 1.05 24,801 24,801 28,875 22,890
MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245
PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687
37,624 37,522 41,873 35,601
REJILLAS PLASTICAS SOSCO 3X2 unMANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263
PEGACOR BLANCO kg 0.20 171 170 180 171
REJILLA PLAST. 3X2 SOSCO un 1.00 1,901 1,800 1,500 1,568
5,335 5,233 4,943 5,002
REJILLAS SIFON unCEMENTO GRIS kg 0.60 108 120 134 124
MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263
REJILLA SIFN S 4.5X3.5 un 1.00 4,580 4,580 3,379 4,580
7,951 7,963 6,777 7,967
REJILLAS SIFON 20X20 unCEMENTO GRIS kg 1.00 180 200 224 206
MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263
REJI LLA SIF N PC 20X2 0 un 1.00 17,464 17,464 17,464 17,464 20,907 20,927 20,951 20,933
REJILLAS SOSCO 3X 2 unCEMENTO GRIS kg 0.20 36 40 45 41
MANO DE OBRA AA hc 0.30 3,263 3